Interstate 215 (I-215), also known locally as the Belt Route,[2] is an auxiliary Interstate in the U.S. state of Utah that forms a three-quarters loop around Salt Lake City and many of its suburbs. The route begins at the mouth of Parley's Canyon at a junction with I-80 east of the city center, and heads south through the edge of the Salt Lake City metropolitan area's eastern suburbs of Millcreek, Holladay, and Cottonwood Heights. It continues west through Murray before turning north again, passing through the city's first-ring western suburbs of Taylorsville and West Valley City. It then enters North Salt Lake and Davis County for a short distance before reaching I-15 northwest of the city center.

Interstate 215

Belt Route
I-215 highlighted in red
Route information
Auxiliary route of I-15
Maintained by UDOT
Length28.946 mi[1] (46.584 km)
Existed1963–present
NHSEntire route
Major junctions
Counterclockwise end I-80 / SR-186 in Millcreek
Major intersections SR-152 in Cottonwood Heights
I-15 in Murray
SR-201 in West Valley City
I-80 in Salt Lake City
SR-67 in North Salt Lake
Clockwise end I-15 in North Salt Lake
Location
CountryUnited States
StateUtah
CountiesSalt Lake, Davis
Highway system
  • Utah State Highway System
SR-212 SR-218

The Interstate was proposed in the mid-1950s, along with I-15 and I-80 through Salt Lake City. At the time, only the western portion of the belt route was assigned as I-215. The eastern portion of the belt route was designated Interstate 415. However, the I-415 designation was scrapped to provide a single route number for the entire route in 1969, with the I-215 designation covering the complete belt route. The freeway was constructed in segments, the first of which opened in 1963 between Redwood Road in North Salt Lake and 2100 North near the airport. I-215 was originally planned to be complete in the mid-1970s, but the last section, between 6200 South and 4500 South in Holladay, was not completed until 1989 because of challenges from citizens' groups over environmental impact statements.[citation needed]

Route description edit

 
The terminus of I-215 at I-80, to the east of Salt Lake City

I-215 begins at an interchange at the mouth of Parley's Canyon in Millcreek near the southeast corner of Salt Lake City that connects I-80, Foothill Drive (State Route 186, or SR-186) and Parleys Way. At this point, I-215 splits into three legs, connecting I-80 toward Salt Lake City, Foothill Drive, and Parleys Way, and I-80 through Parley's Canyon. From here, the freeway travels southeast along the Salt Lake Valley's east bench with three lanes in each direction. The route enters a residential area of East Millcreek and turns south. Then, the first exit appears, an incomplete diamond interchange with 3300 South (SR-171) that lacks an offramp from northbound I-215. Past this interchange, an onramp connects 3800 South to northbound I-215. A block further south is a partial interchange lacking an offramp from northbound I-215 onto 3900 South. Entering Holladay, I-215 is heading south but soon turns southwest. An offramp here allows northbound motorists to connect to Wasatch Boulevard. However, this exit is signed as 3900 South and 3300 South because of the incomplete interchanges on both roads. Past an interchange at 4500 South (SR-266) that serves southbound I-215, the road turns south again and begins descending toward Knudsen's Corner and Cottonwood Heights. At this point, the southbound lanes are lower than the parallel northbound lanes. The belt route flattens out upon reaching an interchange at 6200 South at Knudsen's Corner.[3][4]

 
I-215 northbound approaching Legacy Parkway, to the northwest of Salt Lake City

As the freeway enters Cottonwood Heights, it turns west and becomes a sunken freeway. Then it reaches an interchange at Highland Drive, signed as 2000 East (SR-152). This interchange features a grade-separated ramp from northbound 2000 East to eastbound I-215. Past this junction, another interchange at Union Park Avenue appears. Another grade-separated ramp from Union Park Avenue is present. The freeway enters Murray as an interchange serving westbound motorists connects to 280 East and State Street (U.S. Route 89, or US-89). Eastbound travelers connect to State Street further west at a separate exit. The road turns northwest for a short time to approach a junction at I-15 (often called the South Interchange). Approaching the interchange, the route gains two lanes and reverts to a ground-level freeway. The freeway crosses I-15 and loses one lane as it enters Taylorsville and curves to the northwest, crossing the Jordan River in the process. Right before a partial cloverleaf interchange at Redwood Road (SR-68) the route turns west one final time before turning north after the interchange. The freeway continues north and has another partial cloverleaf interchange at 4700 South (SR-266). The route enters West Valley City and encounters 3500 South (SR-171), where its eastbound lanes have a grade-separated ramp to northbound I-215. The road turns northeast and enters an industrial area of western Salt Lake City. After reaching a cloverleaf interchange at SR-201, the route turns north again. Beyond a single-point urban interchange at California Avenue, the freeway continues north.[3][4]

 
View east along the southern portion of I-215

A partial stack interchange involving I-80, Redwood Road, and the access road to Salt Lake City International Airport is next. The freeway loses one lane in each direction as the Interstate passes the airport to the east. Two diamond interchanges at 700 North and 2100 North occur as the freeway approaches Davis County. Past 2100 North, the freeway enters rural Davis County, and the road curves to the northwest. An interchange at Legacy Parkway gives northbound I-215 motorists and southbound Legacy Parkway motorists their respective connections. The road turns east and loses one lane in each direction. There is a diamond interchange at SR-68 before the highway merges into northbound I-15 in North Salt Lake.[3][4]

History edit

 
Looking southward at the southern terminus of SR-186 toward the counter-clockwise end of I-215 at the mouth of Parley's Canyon
 
A diagram showing the year each section of I-215 opened

A belt route around Salt Lake City was first proposed in 1955, with the Utah Highway Department (the predecessor to the present-day Utah Department of Transportation) holding hearings concerning construction beginning in early 1958.[5] The southeast quadrant of the route was originally placed from a junction at proposed I-15 in Murray northeasterly through Murray and Holladay, eventually reaching the east bench at 3900 South. From there, it would have run north toward the mouth of Parley's Canyon at proposed I-80 (at the time US-40).[6] Almost immediately, this plan was met with opposition among local residents in the area. The proposed route would have bisected the primarily residential Holladay suburb, as well as the southern portion of Murray. After more than two years of hearings and widespread opposition from residents, the Highway Department released their proposed routing in June 1960, which placed the southeast quadrant where it runs today. While quelling criticism from some,[6] others remained in opposition, saying the route was still too intrusive along residential areas.[7] The western quadrant was also admonished for being placed to close to other major arterials.[8] In November 1963, a small, two-lane portion of the northwest quadrant of the belt route opened from Redwood Road (SR-68) in Davis County west and south to 2100 North, north of the Salt Lake City International Airport.[9][10] This portion of road was extended east to I-15 in North Salt Lake and upgraded to freeway standards by 1969.[11]

Construction of the southeast quadrant from I-80 (at the time replacing US-40) at Parley's Canyon to 4600 South in Holladay began in mid-1965. This involved realigning Wasatch Boulevard to parallel the route and truncating that road at 3300 South. Prior to this, Wasatch Boulevard connected to US-40. The section from I-80 to 3300 South opened by January 1967,[12] with the portion of roadway from 3300 South to 4500 South opening in November 1969.[5]

By 1973, construction was progressing on the western quadrant between I-15 in Murray and SR-201 (at the time U.S. Route 40 Alternate (US-40A)/US-50A). Land acquisition was also taking place for the rest of the southeastern quadrant between 300 East in Murray and 4600 South in Holladay. However, a citizens' group named Cottonwood Inc. halted right-of-way acquirements due to the lack of an environmental impact statement (EIS). Also controversial was a proposed cloverleaf interchange at 2000 East.[13] By mid-1975, an EIS was released with four main alternatives: a no-build alternative which would leave a gap in the southeast quadrant, building the road along the modern-day path (at about 6400 South), moving the southern portion southwest through Fort Union and Midvale to 7200 South, or extending the eastern portion further south to Sandy and then west along 9000 South.[14] Cottonwood Inc. filed a lawsuit challenging the EIS. Meanwhile, I-215 from SR-201 in the western quadrant to 280 East in Murray opened in November 1976.[5]

 
Westbound on I-215 toward the Union Park Avenue interchange

After 1976, gaps in the belt route were present from 2100 North near the airport to SR-201 and from State Street in Murray to 4600 South in Holladay. The first step in completing the gap was taken in June 1979, when construction of the Interstate from State Street to 700 East began.[15] This was followed by the Cottonwood Inc. lawsuit being awarded in favor of UDOT in November 1979. In July 1985, the route from 280 East to Union Park Avenue was completed. At the time, this portion of road was the most expensive in the state in terms of cost per mile, due to the road being depressed below surrounding neighborhoods.[16] The next section to open was from 2100 North south to I-80 in 1987.[17] This was followed by a section between Union Park Avenue and 2000 East, opened in November 1987, which was also built as a sunken freeway.[18] The western quadrant of the freeway was completed in October 1988, closing the gap between SR-201 and I-80 (however, the California Avenue interchange wasn't opened until mid-1989).[19] In August 1989, the road from 2000 East to 6200 South was finished, and the belt route was completed with the opening of freeway between 4500 South and 6200 South in October 1989.[20]

Since 1989, major modifications have occurred on the belt route, consisting of the rebuilding of the southern I-15 interchange in 2001, widening the freeway from six to eight lanes from 4700 South in Taylorsville to I-15 in Murray in 2004, and the addition of an interchange at Legacy Parkway in 2008.[21][22] The 3300 South and 4500 South overpasses were rebuilt as well, in 2008 and 2007, respectively.[23][24] In November 2017, a complete rebuild of the southwest quadrant from SR-201 to 4700 South in Taylorsville was completed. The $105 million project replaced the concrete road surface, added auxiliary lanes between exits, resurfaced and widened several bridge decks, and replaced two major bridges over SR-201.[25]

As part of the original proposal of a belt route through Salt Lake City, the southeastern quadrant received the designation of I-415. To maintain continuity in the belt route, the 415 number was replaced in favor of the I-215 designation covering the entire route in 1969.[26]

Exit list edit

CountyLocationmi[1]kmExitDestinationsNotes
Salt LakeSalt Lake City0.0000.000 
 
I-80 west – Reno
I-80 exit 128
Millcreek1.0611.7081 
 
SR-186 west (Foothill Drive) / Parleys Way west
No southbound exit
1.4662.3592 
 
I-80 east – Park City, Cheyenne
No southbound exit; I-80 exit 130
1.7012.7373  SR-171 (3300 South) / Wasatch BoulevardNo northbound exit
2.6154.20843900 South, 3300 South (Wasatch Boulevard)
Holladay3.4915.6185  SR-266 (4500 South)Southbound exit and entrance
HolladayCottonwood Heights line6.0809.7856  SR-190 (6200 South) / 3000 East – Ski areas
Cardinal direction change: southbound becomes westbound; eastbound becomes northbound
7.48112.0408  SR-152 (2000 East)
Cottonwood Heights9.07614.6069Union Park Avenue
Murray10.20516.42310280 EastWestbound exit and entrance
10.64617.13311  US 89 (State Street)Eastbound exit and entrance
11.25618.11512  I-15 – Las Vegas, Salt Lake CityI-15 exit 298
Taylorsville13.28821.38513  SR-68 (Redwood Road)
14.00022.531Cardinal direction change: westbound becomes northbound; southbound becomes eastbound
15.25824.55515  SR-266 (4700 South) – Taylorsville
West Valley City17.351–
17.571
27.924–
28.278
18  SR-171 (3500 South) – Maverik Center, West Valley CitySigned as exits 18A (east) and 18B (west) northbound
Salt Lake City19.232–
19.625
30.951–
31.583
20  
 
SR-201 to I-80 – Magna, Reno, Cheyenne
Cloverleaf interchange, signed as exits 20A (east) and 20B (west); SR 201 exits 15A-B; northbound entrance includes direct entrance ramp from SR-68 (Redwood Road)
20.39632.82421California Avenue
21.76435.02622   I-80 / Redwood Road (SR-68) – Cheyenne, Salt Lake City International Airport, RenoSigned as exits 22A (west) and 22B (east) southbound; I-80 exit 117
23.36537.60223700 North
25.34140.782252100 North
26.70142.97126 
 
SR-67 north (Legacy Parkway)
Northbound left exit and southbound left entrance
DavisNorth Salt Lake27.11543.63727  SR-68 (Redwood Road)Diverging diamond interchange
28.94646.584 
 
I-15 north – Ogden
Northbound exit and southbound entrance; I-15 exit 313
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References edit

  1. ^ a b "Interstate 215 Reference" (PDF). Utah Department of Transportation. 2008. Retrieved December 30, 2008.
  2. ^ Boal, Jed; Giauque, Marc (July 9, 2008). "Morning accident has some questioning if semi truck ban is needed". KSL.com. Retrieved August 10, 2008.
  3. ^ a b c DeLorme (2022). Utah Atlas & Gazetteer (Map) (2022 ed.). 1 in:2.5 mi. Yarmouth, Maine: DeLorme. ISBN 978-1946494450.
  4. ^ a b c Google (August 10, 2008). "Interstate 215 Overview" (Map). Google Maps. Google. Retrieved August 10, 2008.
  5. ^ a b c Peterson, Corey (July 23, 1980), "I-215 Belt Route – 30 years from conception to completion?", Deseret News, pp. 2H, retrieved November 6, 2010
  6. ^ a b "Compromise Plan On Belt Route Gets Area Support At Surprise Unveiling", Deseret News, pp. 1B, June 9, 1960, retrieved November 6, 2010
  7. ^ Ellis, Dexter (June 28, 1960), "Hot Protests Greet 'Belt' Plan At Olympus High School Meet", Deseret News, pp. 1B, retrieved November 6, 2010
  8. ^ "Proposed Belt Route Draws Farm Queries", Deseret News, pp. A5, January 20, 1959, retrieved November 6, 2010
  9. ^ "Ribbon Cutting Opens Section of Belt Route", Deseret News, pp. 1B, November 20, 1963, retrieved November 6, 2010
  10. ^ (Map) (1965 ed.). United States Department of Agriculture. Archived from the original on July 11, 2011. Retrieved January 24, 2011.
  11. ^ "National Bridge Inventory". Nationalbridges.com. 2009. Retrieved January 24, 2011.[dead link]
  12. ^ Salt Lake Area Interstate System (Map) (1967 ed.). Utah Department of Transportation.
  13. ^ Wirsing, Whit (June 1, 1973), "Residents oppose belt route plan", Deseret News, pp. B1, retrieved November 6, 2010
  14. ^ Dean, Suzanne (July 18, 1975), "Here's summary on belt route impact issues", Deseret News, pp. B1, retrieved November 6, 2010 [dead link]
  15. ^ "Work begins on segment of belt route", Deseret News, pp. 12A, June 4, 1979, retrieved November 6, 2010 [dead link]
  16. ^ "Behind schedule but finished by July", Deseret News, pp. B1, April 29, 1985, retrieved November 6, 2010[permanent dead link]
  17. ^ "I-80 on-ramp near airport open to traffic", Deseret News, pp. G25, July 30, 1987, retrieved November 6, 2010
  18. ^ Spangler, Jerry (November 6, 1987), "I-215 now stretches a little further", Deseret News, pp. B1, retrieved November 6, 2010
  19. ^ Riley Roche, Lisa (September 30, 1988), "Delay in opening I-215 interchange questioned", Deseret News, pp. B2, retrieved November 6, 2010
  20. ^ Thompson, Jan (October 18, 1989), "I-215 belt route's finished – finally", Deseret News, pp. B1, retrieved November 6, 2010
  21. ^ (PDF), archived from the original (PDF) on February 13, 2016, retrieved November 6, 2010
  22. ^ Dougherty, Joseph (September 14, 2008), "'The Legacy Parkway is done' — and it's open to commuters", Deseret News, retrieved November 6, 2010
  23. ^ Raymond, Arthur (August 18, 2008), , Deseret News, archived from the original on October 21, 2012, retrieved November 6, 2010
  24. ^ Warburton, Nicole (September 28, 2007), "'The Legacy Parkway is done' — and it's open to commuters", Deseret News, retrieved November 6, 2010
  25. ^ Thompson, Ben (November 16, 2017), "west-side-commuters-about-to-get-some-relief-after-months-of-construction-lane-restrictions", Salt Lake Tribune, retrieved December 30, 2017
  26. ^ "SR-215 History" (PDF). State Road Commission of Utah. October 14, 1968. Retrieved July 29, 2008.
KML is from Wikidata

interstate, utah, interstate, also, known, locally, belt, route, auxiliary, interstate, state, utah, that, forms, three, quarters, loop, around, salt, lake, city, many, suburbs, route, begins, mouth, parley, canyon, junction, with, east, city, center, heads, s. Interstate 215 I 215 also known locally as the Belt Route 2 is an auxiliary Interstate in the U S state of Utah that forms a three quarters loop around Salt Lake City and many of its suburbs The route begins at the mouth of Parley s Canyon at a junction with I 80 east of the city center and heads south through the edge of the Salt Lake City metropolitan area s eastern suburbs of Millcreek Holladay and Cottonwood Heights It continues west through Murray before turning north again passing through the city s first ring western suburbs of Taylorsville and West Valley City It then enters North Salt Lake and Davis County for a short distance before reaching I 15 northwest of the city center Interstate 215Belt RouteI 215 highlighted in redRoute informationAuxiliary route of I 15Maintained by UDOTLength28 946 mi 1 46 584 km Existed1963 presentNHSEntire routeMajor junctionsCounterclockwise endI 80 SR 186 in MillcreekMajor intersectionsSR 152 in Cottonwood Heights I 15 in Murray SR 201 in West Valley City I 80 in Salt Lake City SR 67 in North Salt LakeClockwise endI 15 in North Salt LakeLocationCountryUnited StatesStateUtahCountiesSalt Lake DavisHighway systemInterstate Highway System Main Auxiliary Suffixed Business Future Utah State Highway System Interstate US State Minor Scenic SR 212 SR 218 The Interstate was proposed in the mid 1950s along with I 15 and I 80 through Salt Lake City At the time only the western portion of the belt route was assigned as I 215 The eastern portion of the belt route was designated Interstate 415 However the I 415 designation was scrapped to provide a single route number for the entire route in 1969 with the I 215 designation covering the complete belt route The freeway was constructed in segments the first of which opened in 1963 between Redwood Road in North Salt Lake and 2100 North near the airport I 215 was originally planned to be complete in the mid 1970s but the last section between 6200 South and 4500 South in Holladay was not completed until 1989 because of challenges from citizens groups over environmental impact statements citation needed Contents 1 Route description 2 History 3 Exit list 4 ReferencesRoute description edit nbsp The terminus of I 215 at I 80 to the east of Salt Lake City I 215 begins at an interchange at the mouth of Parley s Canyon in Millcreek near the southeast corner of Salt Lake City that connects I 80 Foothill Drive State Route 186 or SR 186 and Parleys Way At this point I 215 splits into three legs connecting I 80 toward Salt Lake City Foothill Drive and Parleys Way and I 80 through Parley s Canyon From here the freeway travels southeast along the Salt Lake Valley s east bench with three lanes in each direction The route enters a residential area of East Millcreek and turns south Then the first exit appears an incomplete diamond interchange with 3300 South SR 171 that lacks an offramp from northbound I 215 Past this interchange an onramp connects 3800 South to northbound I 215 A block further south is a partial interchange lacking an offramp from northbound I 215 onto 3900 South Entering Holladay I 215 is heading south but soon turns southwest An offramp here allows northbound motorists to connect to Wasatch Boulevard However this exit is signed as 3900 South and 3300 South because of the incomplete interchanges on both roads Past an interchange at 4500 South SR 266 that serves southbound I 215 the road turns south again and begins descending toward Knudsen s Corner and Cottonwood Heights At this point the southbound lanes are lower than the parallel northbound lanes The belt route flattens out upon reaching an interchange at 6200 South at Knudsen s Corner 3 4 nbsp I 215 northbound approaching Legacy Parkway to the northwest of Salt Lake City As the freeway enters Cottonwood Heights it turns west and becomes a sunken freeway Then it reaches an interchange at Highland Drive signed as 2000 East SR 152 This interchange features a grade separated ramp from northbound 2000 East to eastbound I 215 Past this junction another interchange at Union Park Avenue appears Another grade separated ramp from Union Park Avenue is present The freeway enters Murray as an interchange serving westbound motorists connects to 280 East and State Street U S Route 89 or US 89 Eastbound travelers connect to State Street further west at a separate exit The road turns northwest for a short time to approach a junction at I 15 often called the South Interchange Approaching the interchange the route gains two lanes and reverts to a ground level freeway The freeway crosses I 15 and loses one lane as it enters Taylorsville and curves to the northwest crossing the Jordan River in the process Right before a partial cloverleaf interchange at Redwood Road SR 68 the route turns west one final time before turning north after the interchange The freeway continues north and has another partial cloverleaf interchange at 4700 South SR 266 The route enters West Valley City and encounters 3500 South SR 171 where its eastbound lanes have a grade separated ramp to northbound I 215 The road turns northeast and enters an industrial area of western Salt Lake City After reaching a cloverleaf interchange at SR 201 the route turns north again Beyond a single point urban interchange at California Avenue the freeway continues north 3 4 nbsp View east along the southern portion of I 215 A partial stack interchange involving I 80 Redwood Road and the access road to Salt Lake City International Airport is next The freeway loses one lane in each direction as the Interstate passes the airport to the east Two diamond interchanges at 700 North and 2100 North occur as the freeway approaches Davis County Past 2100 North the freeway enters rural Davis County and the road curves to the northwest An interchange at Legacy Parkway gives northbound I 215 motorists and southbound Legacy Parkway motorists their respective connections The road turns east and loses one lane in each direction There is a diamond interchange at SR 68 before the highway merges into northbound I 15 in North Salt Lake 3 4 History edit nbsp Looking southward at the southern terminus of SR 186 toward the counter clockwise end of I 215 at the mouth of Parley s Canyon nbsp A diagram showing the year each section of I 215 opened A belt route around Salt Lake City was first proposed in 1955 with the Utah Highway Department the predecessor to the present day Utah Department of Transportation holding hearings concerning construction beginning in early 1958 5 The southeast quadrant of the route was originally placed from a junction at proposed I 15 in Murray northeasterly through Murray and Holladay eventually reaching the east bench at 3900 South From there it would have run north toward the mouth of Parley s Canyon at proposed I 80 at the time US 40 6 Almost immediately this plan was met with opposition among local residents in the area The proposed route would have bisected the primarily residential Holladay suburb as well as the southern portion of Murray After more than two years of hearings and widespread opposition from residents the Highway Department released their proposed routing in June 1960 which placed the southeast quadrant where it runs today While quelling criticism from some 6 others remained in opposition saying the route was still too intrusive along residential areas 7 The western quadrant was also admonished for being placed to close to other major arterials 8 In November 1963 a small two lane portion of the northwest quadrant of the belt route opened from Redwood Road SR 68 in Davis County west and south to 2100 North north of the Salt Lake City International Airport 9 10 This portion of road was extended east to I 15 in North Salt Lake and upgraded to freeway standards by 1969 11 Construction of the southeast quadrant from I 80 at the time replacing US 40 at Parley s Canyon to 4600 South in Holladay began in mid 1965 This involved realigning Wasatch Boulevard to parallel the route and truncating that road at 3300 South Prior to this Wasatch Boulevard connected to US 40 The section from I 80 to 3300 South opened by January 1967 12 with the portion of roadway from 3300 South to 4500 South opening in November 1969 5 By 1973 construction was progressing on the western quadrant between I 15 in Murray and SR 201 at the time U S Route 40 Alternate US 40A US 50A Land acquisition was also taking place for the rest of the southeastern quadrant between 300 East in Murray and 4600 South in Holladay However a citizens group named Cottonwood Inc halted right of way acquirements due to the lack of an environmental impact statement EIS Also controversial was a proposed cloverleaf interchange at 2000 East 13 By mid 1975 an EIS was released with four main alternatives a no build alternative which would leave a gap in the southeast quadrant building the road along the modern day path at about 6400 South moving the southern portion southwest through Fort Union and Midvale to 7200 South or extending the eastern portion further south to Sandy and then west along 9000 South 14 Cottonwood Inc filed a lawsuit challenging the EIS Meanwhile I 215 from SR 201 in the western quadrant to 280 East in Murray opened in November 1976 5 nbsp Westbound on I 215 toward the Union Park Avenue interchange After 1976 gaps in the belt route were present from 2100 North near the airport to SR 201 and from State Street in Murray to 4600 South in Holladay The first step in completing the gap was taken in June 1979 when construction of the Interstate from State Street to 700 East began 15 This was followed by the Cottonwood Inc lawsuit being awarded in favor of UDOT in November 1979 In July 1985 the route from 280 East to Union Park Avenue was completed At the time this portion of road was the most expensive in the state in terms of cost per mile due to the road being depressed below surrounding neighborhoods 16 The next section to open was from 2100 North south to I 80 in 1987 17 This was followed by a section between Union Park Avenue and 2000 East opened in November 1987 which was also built as a sunken freeway 18 The western quadrant of the freeway was completed in October 1988 closing the gap between SR 201 and I 80 however the California Avenue interchange wasn t opened until mid 1989 19 In August 1989 the road from 2000 East to 6200 South was finished and the belt route was completed with the opening of freeway between 4500 South and 6200 South in October 1989 20 Since 1989 major modifications have occurred on the belt route consisting of the rebuilding of the southern I 15 interchange in 2001 widening the freeway from six to eight lanes from 4700 South in Taylorsville to I 15 in Murray in 2004 and the addition of an interchange at Legacy Parkway in 2008 21 22 The 3300 South and 4500 South overpasses were rebuilt as well in 2008 and 2007 respectively 23 24 In November 2017 a complete rebuild of the southwest quadrant from SR 201 to 4700 South in Taylorsville was completed The 105 million project replaced the concrete road surface added auxiliary lanes between exits resurfaced and widened several bridge decks and replaced two major bridges over SR 201 25 As part of the original proposal of a belt route through Salt Lake City the southeastern quadrant received the designation of I 415 To maintain continuity in the belt route the 415 number was replaced in favor of the I 215 designation covering the entire route in 1969 26 Exit list editCountyLocationmi 1 kmExitDestinationsNotes Salt LakeSalt Lake City0 0000 000 nbsp nbsp I 80 west RenoI 80 exit 128 Millcreek1 0611 7081 nbsp nbsp SR 186 west Foothill Drive Parleys Way westNo southbound exit 1 4662 3592 nbsp nbsp I 80 east Park City CheyenneNo southbound exit I 80 exit 130 1 7012 7373 nbsp SR 171 3300 South Wasatch BoulevardNo northbound exit 2 6154 20843900 South 3300 South Wasatch Boulevard Holladay3 4915 6185 nbsp SR 266 4500 South Southbound exit and entrance Holladay Cottonwood Heights line6 0809 7856 nbsp SR 190 6200 South 3000 East Ski areas Cardinal direction change southbound becomes westbound eastbound becomes northbound 7 48112 0408 nbsp SR 152 2000 East Cottonwood Heights9 07614 6069Union Park Avenue Murray10 20516 42310280 EastWestbound exit and entrance 10 64617 13311 nbsp US 89 State Street Eastbound exit and entrance 11 25618 11512 nbsp I 15 Las Vegas Salt Lake CityI 15 exit 298 Taylorsville13 28821 38513 nbsp SR 68 Redwood Road 14 00022 531Cardinal direction change westbound becomes northbound southbound becomes eastbound 15 25824 55515 nbsp SR 266 4700 South Taylorsville West Valley City17 351 17 57127 924 28 27818 nbsp SR 171 3500 South Maverik Center West Valley CitySigned as exits 18A east and 18B west northbound Salt Lake City19 232 19 62530 951 31 58320 nbsp nbsp nbsp SR 201 to I 80 Magna Reno CheyenneCloverleaf interchange signed as exits 20A east and 20B west SR 201 exits 15A B northbound entrance includes direct entrance ramp from SR 68 Redwood Road 20 39632 82421California Avenue 21 76435 02622 nbsp nbsp I 80 Redwood Road SR 68 Cheyenne Salt Lake City International Airport RenoSigned as exits 22A west and 22B east southbound I 80 exit 117 23 36537 60223700 North 25 34140 782252100 North 26 70142 97126 nbsp nbsp SR 67 north Legacy Parkway Northbound left exit and southbound left entrance DavisNorth Salt Lake27 11543 63727 nbsp SR 68 Redwood Road Diverging diamond interchange 28 94646 584 nbsp nbsp I 15 north OgdenNorthbound exit and southbound entrance I 15 exit 313 1 000 mi 1 609 km 1 000 km 0 621 mi Incomplete accessReferences edit nbsp Wikimedia Commons has media related to Interstate 215 Utah a b Interstate 215 Reference PDF Utah Department of Transportation 2008 Retrieved December 30 2008 Boal Jed Giauque Marc July 9 2008 Morning accident has some questioning if semi truck ban is needed KSL com Retrieved August 10 2008 a b c DeLorme 2022 Utah Atlas amp Gazetteer Map 2022 ed 1 in 2 5 mi Yarmouth Maine DeLorme ISBN 978 1946494450 a b c Google August 10 2008 Interstate 215 Overview Map Google Maps Google Retrieved August 10 2008 a b c Peterson Corey July 23 1980 I 215 Belt Route 30 years from conception to completion Deseret News pp 2H retrieved November 6 2010 a b Compromise Plan On Belt Route Gets Area Support At Surprise Unveiling Deseret News pp 1B June 9 1960 retrieved November 6 2010 Ellis Dexter June 28 1960 Hot Protests Greet Belt Plan At Olympus High School Meet Deseret News pp 1B retrieved November 6 2010 Proposed Belt Route Draws Farm Queries Deseret News pp A5 January 20 1959 retrieved November 6 2010 Ribbon Cutting Opens Section of Belt Route Deseret News pp 1B November 20 1963 retrieved November 6 2010 Historic Aerials website Map 1965 ed United States Department of Agriculture Archived from the original on July 11 2011 Retrieved January 24 2011 National Bridge Inventory Nationalbridges com 2009 Retrieved January 24 2011 dead link Salt Lake Area Interstate System Map 1967 ed Utah Department of Transportation Wirsing Whit June 1 1973 Residents oppose belt route plan Deseret News pp B1 retrieved November 6 2010 Dean Suzanne July 18 1975 Here s summary on belt route impact issues Deseret News pp B1 retrieved November 6 2010 dead link Work begins on segment of belt route Deseret News pp 12A June 4 1979 retrieved November 6 2010 dead link Behind schedule but finished by July Deseret News pp B1 April 29 1985 retrieved November 6 2010 permanent dead link I 80 on ramp near airport open to traffic Deseret News pp G25 July 30 1987 retrieved November 6 2010 Spangler Jerry November 6 1987 I 215 now stretches a little further Deseret News pp B1 retrieved November 6 2010 Riley Roche Lisa September 30 1988 Delay in opening I 215 interchange questioned Deseret News pp B2 retrieved November 6 2010 Thompson Jan October 18 1989 I 215 belt route s finished finally Deseret News pp B1 retrieved November 6 2010 Wasatch Front Regional Council 2030 Transportation Plan PDF archived from the original PDF on February 13 2016 retrieved November 6 2010 Dougherty Joseph September 14 2008 The Legacy Parkway is done and it s open to commuters Deseret News retrieved November 6 2010 Raymond Arthur August 18 2008 I 80 reopens ahead of schedule Deseret News archived from the original on October 21 2012 retrieved November 6 2010 Warburton Nicole September 28 2007 The Legacy Parkway is done and it s open to commuters Deseret News retrieved November 6 2010 Thompson Ben November 16 2017 west side commuters about to get some relief after months of construction lane restrictions Salt Lake Tribune retrieved December 30 2017 SR 215 History PDF State Road Commission of Utah October 14 1968 Retrieved July 29 2008 KML file edit help Template Attached KML Interstate 215 Utah KML is from Wikidata Retrieved from https en wikipedia org w index php title Interstate 215 Utah amp oldid 1194668250, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.