fbpx
Wikipedia

ICE 3

ICE 3, or Intercity-Express 3, is a family of high-speed electric multiple unit trains operated by Deutsche Bahn. It includes classes 403, 406, 407 and 408, which are known as ICE 3, ICE 3M, New ICE 3 and ICE 3neo respectively. Three multisystem trains, known as ICE International, are owned by Nederlandse Spoorwegen (NS, Dutch Railways).[1] Based on the ICE 3M/F, Siemens developed its Siemens Velaro train family with versions used in Germany, Belgium, France, the United Kingdom, the Netherlands, Spain, China, Russia and Turkey.

DB/NS Class 403/406/407/408
In service1999–present
ManufacturerSiemens
DesignerN+P Industrial Design, Siemens
Family nameVelaro
Number builtClass 403: 50 (49 in service)
Class 406: 17 (16 in service)
Class 407: 17
Class 408: 90 on order
Formation8 passenger cars per halftrain, optional double traction giving 16 passenger cars
Capacity441 (Class 403)
430 (Class 406)
460 (Class 407)
455 (Class 408)
Operator(s)DB Fernverkehr
Nederlandse Spoorwegen
Specifications
Car body constructionAluminum
Train lengthtrainset(8 cars) 200.84 m (658 ft 11+18 in)(403/406)
trainset(8 cars) 200.72 m (658 ft 6+38 in)(407/408)
Car length25.835 m (84 ft 9+18 in) (Cab car)
24.775 m (81 ft 3+38 in) (Intermediate car)
Width2.950 m (9 ft 8+18 in) (ICE 3/ICE 3M/Velaro D, Euro Spec)
3.265 m (10 ft 8+12 in) (CRH3, International option)
Height3.89 m (12 ft 9+18 in)
Maximum speed(Class 403/406) 330 km/h (210 mph) (design)
(Class 407/408) 320 km/h (200 mph) (design)
(Class 403) 300 km/h (190 mph) (service)
(Class 406-408) 320 km/h (200 mph) (service)
Weight409 t (403 long tons; 451 short tons) (ICE 3)
435 t (428 long tons; 480 short tons) (ICE 3M)
Traction systemClass 403/406 GTO-VVVF
Class 407/408 IGBT-VVVF
Power output8,000 kW (10,728 hp)
Tractive effort300 kN (67,443 lbf) Starting
270 kN (60,698 lbf) Cont. at 106 km/h (66 mph)
Electric system(s)15 kV  16.7 Hz AC
1,500 V DC (406-408)
3 kV DC (406-408)
25 kV 50 Hz AC (406-408)
Overhead line
Current collector(s)Pantograph
UIC classificationBo'Bo' + 2'2' + Bo'Bo' + 2'2' + 2'2' + Bo'Bo' + 2'2' + Bo'Bo' (8 car set)
Safety system(s)Sifa, PZB90, LZB (ICE 3)
Sifa, PZB90, LZB80, Crocodile, TVM430, KVB, ATB, Eurobalise (ICE 3M)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

Class 403

 
Interior view showing smart glass separating driver's cab

The design goal of the ICE 3 (Class 403) was to create a higher-powered, lighter train than its predecessors. This was achieved by distributing its 16 traction motors underneath the whole train. The train is certified for 330 km/h (210 mph) and has reached 368 km/h (229 mph) on trial runs. On regular Intercity-Express services they run at up to 300 km/h (190 mph), the maximum design speed of German high-speed lines.

Because the train does not have power cars, the whole length of the train is available for passenger seats, including the first car. The lounge-seats are located directly behind the driver, separated only by a glass wall.

The 50 sets were ordered in 1997 and specifically designed for the new high-speed line between Frankfurt and Cologne. They were built by a consortium led by Siemens and Adtranz (now Bombardier Transportation).[2]

On 11 April 2017, Deutsche Bahn announced the modernisation programme called ICE 3 Redesign for its 66-unit ICE 3 fleet to be completed by the end of 2020.[3] The renovation involves replacing the seats, tables, and floor coverings. The six-seat compartment rooms are eliminated from the second class section to increase the number of seats and add more luggage compartments. In addition, the number of disability seating has been increased to two; however, no integrated wheelchair lift has been installed, and no disability seating is offered in the first-class section. The seats in some Bordrestaurant have been converted to the red bench seating while Bordbistro receives the new stand tables. The cabin illumination is provided by LED lamps, providing more illumination, while the reading lamps are eliminated. The seat reservation panels are moved from the walls above the windows to the seat headrests per EU directive on accessibilities: the new panel has bigger and more visible white lettering and Braille. The yellow LCD information monitors in the antechambers are replaced with larger full-colour LED displays, showing the map, train number, speed, and other pertinent information. The new smaller displays are attached to the ceiling above the aisle throughout the cabins.

Class 406

 
NS logoed ICE 3 (Class 406) on the Cologne–Frankfurt high-speed rail line

The ICE 3M (Class 406; M for multisystem) was developed to operate international services under the four different railway electrification systems in use on Europe's main lines and with support for various train protection systems. The Deutsche Bahn (DB) ordered 13 of these units in 1994, the NS (Nederlandse Spoorwegen) four, making sure that the demands of the Dutch rail network are taken care of. Though these trains carry NS logos, the DB and NS trains together form a pool and therefore, the NS trains may operate DB services as well. In 2007 the train was licensed for operation in the Netherlands, Belgium, and France. Currently, those trains are used for cross-border runs between Netherlands, Germany, Belgium, and France. On the French LGV Est, some trains reach a regular top speed of 320 km/h (199 mph).

The 17 class 406 sets were built by the same consortium as the class 403. They were first introduced in November 2000 on services between Cologne and Amsterdam. Since December 2002, they have also been operating three journeys daily each way between Frankfurt and Brussels (increased to four per day since December 2010).[2]

 
A picture of a DB ICE 3 class 406 cab
 
DB logoed ICE 3 (Class 406) approaching Frankfurt (Main) Hauptbahnhof

In Belgium, the train was licensed in 2002 to run on the classic 3 kV DC lines with speeds up to 160 km/h (99 mph) and, from December 2004, also on the new 25 kV AC high-speed lines, but initially limited to 250 km/h (160 mph) instead of 300 km/h (190 mph).[4] Problems with flying gravel and its frictionless linear eddy current brake came up during testing. In order to limit the creation of tornado-like vortices that pick up gravel and to limit damage from flying gravel to the train, spoilers have been added under the car joints, under the carbody next to the bogies and under the powered axles on the bogies.

 
Additional spoiler (marked red) to limit the creation of vortices that pick up gravel and to protect the bogie and the underframe

The linear eddy current brake, which is required for higher speeds, cannot yet be used, because the magnetic field would rip off the magnetic covers of some trackside equipment; those covers will have to be replaced by non-magnetic ones according to the EU Technical Specifications for Interoperability for international rail traffic in Europe.

As in Belgium, licensing procedures for France took five years to be completed. Trial runs were completed in late 2005 and the same two problems were encountered as in Belgium: loose gravel damage and possible side-effects of the brakes. ICE 3Ms were allowed on the LGV Est and started service there on 20 June 2007, mixed with TGVs. Since December 2007, DB operates ICE 3M trains from Frankfurt central station to Paris Est, initially with five daily runs between both cities. The six trains for running into France (designated ICE-3 MF, indicating multisystem France) were modified at Bombardier's Hennigsdorf plant and were extensively tested on Siemens' test site in Wegberg-Wildenrath before the modified trains re-entered commercial service.

Despite this, the "French" subset of six class 406 trains have suffered from reliability problems, so that some Paris–Frankfurt services are operated instead by French TGVs (currently TGV 2N2 'Euroduplex' as of 2015) under the "Alleo" joint venture between DB and SNCF.[2]

In Switzerland, licensing took only six months.[4]

Class 407

 
A Siemens Velaro D, on display at InnoTrans 2010. These trains were delivered in 2011 and 2012.

Deutsche Bahn placed an order for fifteen trains valued €500 million in November 2008.[5] On 18 April 2010, Deutsche Bahn presented the first Velaro D at Siemens' Krefeld plant.[6] It is designed for operation at up to 320 km/h (200 mph), is wider, quieter and more energy-saving, should be less susceptible to malfunctions than its predecessor, and incorporates additional crashworthiness and fire safety measures.[6] The new train was supposed to be used mainly for international services from Germany to France, Belgium and the Netherlands.[7] The new type's safety measures are in line with the new specifications for operating passenger trains inside the Channel Tunnel, allowing the Class 407 to be used on the services that DB planned to operate from London to Amsterdam and Frankfurt in 2015.[8] The planned service to London was never introduced.[9]

The new train was designated Class 407 and was originally scheduled to enter service at the end of 2011. This date has since been postponed several times.[10] In December 2013 the first four trains delivered to DB were licensed for domestic operation as multiple units and started with passenger traffic. Four more trains were expected for delivery in spring 2014, whereas the remainder of eight trains shall be used by Siemens for test runs in France and Belgium to gain type approval there.[11]

In June 2011, Deutsche Bahn ordered one additional Velaro D set in order to replace an ICE3MF set damaged in an accident in August 2010.[12]

Class 408

In 2019 Deutsche Bahn needed more trains to run on national and international high-speed tracks. Siemens offered them an evolution of the Velaro D equipped with multi-system capability and hence labelled Velaro MS. In 2020 Deutsche Bahn ordered 30 trainsets for delivery starting in 2022. The trains are designed for operation at 320 km/h and will be deployed from the end of 2022 on routes that use the Cologne – Frankfurt high speed line which is designed for operation at 300 km/h.[13] The first of the trains, called ICE 3neo by Deutsche Bahn and classed as 408, was completed in late 2021 with test runs started immediately. In February of 2022, the order volume increased to 73 trains and the first train was shown to journalists. All 73 trains are supposed to be in service by early 2029.[14] In May 2023 DB announced to order the remaining 17 Options of Class 408-trains, so the total order rose to 90.

Special services

For the EXPO 2000 in Hanover, Deutsche Bahn provided 120 additional train services. Some of these special services were operated by ICE trains and labelled "ExpoExpress" (EXE). These services also constituted the first widespread use of the then-new ICE 3 train sets, presenting them to the domestic and international general public.[15]

See also

References

  1. ^ "ICE - NS" (PDF).
  2. ^ a b c "The German ICE family". Modern Railways. London. December 2010. pp. 70–71.
  3. ^ "ICE 3 Redesign: Die Anpassungen im Überblick". 11 April 2017.
  4. ^ a b Harmonisierungsdefizite am Beispiel von Auslandszulassungen des Triebzuges ICE 3, in "Elektrische Bahnen", Vo. 103 (2005), pages 147-149
  5. ^ (Press release). Siemens. 17 December 2008. Archived from the original on 10 June 2022. Retrieved 27 December 2008. Reference Number: I MO 200812.006-04.
  6. ^ a b . Railway Gazette International. London. 28 April 2010. Archived from the original on 9 August 2011. Retrieved 4 May 2010.
  7. ^ "Neuer ICE: Hightech gegen die Achsenkrise". Spiegel Online (in German). 28 April 2010. Retrieved 28 April 2010.
  8. ^ Fender, Keith (December 2010). "DB unveils plans for London services". Modern Railways. London. pp. 68–69.
  9. ^ "Germany's Frankfurt-London high-speed rail link put on ice". February 2014. Retrieved 21 February 2014.
  10. ^ Keith Barrow (14 June 2013). "DB secures Channel Tunnel access". International Railway Journal.
  11. ^ "EBA approves Velaro D high speed trains for domestic operation". Railway Gazette International. London. 23 December 2013.
  12. ^ Smith, Kevin (June 2011). "DB and Siemens finally sign ICx contract". International Railway Journal. Falmouth. p. 4.
  13. ^ "Deutsche Bahn orders 320 km/h Velaro derivatives". Railway Gazette. 15 July 2020. Retrieved 1 February 2022..
  14. ^ "DB orders more ICE3neo sets as first unit is unveiled". Railway Gazette. 1 February 2022. Retrieved 1 February 2022.
  15. ^ "Dritte Generation ICE-Triebzüge für DB Reise&Touristik". Elektrische Bahnen, Elektrotechnik im Verkehrswesen (in German) (11). 2000. ISSN 0013-5437.

External links

  • Siemens Page
  • Spec Sheet; French

this, article, about, high, speed, train, design, bridgman, form, water, intercity, express, family, high, speed, electric, multiple, unit, trains, operated, deutsche, bahn, includes, classes, which, known, respectively, three, multisystem, trains, known, inte. This article is about a high speed train design For the Bridgman form of water ice see Ice III ICE 3 or Intercity Express 3 is a family of high speed electric multiple unit trains operated by Deutsche Bahn It includes classes 403 406 407 and 408 which are known as ICE 3 ICE 3M New ICE 3 and ICE 3neo respectively Three multisystem trains known as ICE International are owned by Nederlandse Spoorwegen NS Dutch Railways 1 Based on the ICE 3M F Siemens developed its Siemens Velaro train family with versions used in Germany Belgium France the United Kingdom the Netherlands Spain China Russia and Turkey DB NS Class 403 406 407 408ICE 3 on the Cologne Frankfurt high speed rail lineIn service1999 presentManufacturerSiemensDesignerN P Industrial Design SiemensFamily nameVelaroNumber builtClass 403 50 49 in service Class 406 17 16 in service Class 407 17Class 408 90 on orderFormation8 passenger cars per halftrain optional double traction giving 16 passenger carsCapacity441 Class 403 430 Class 406 460 Class 407 455 Class 408 Operator s DB FernverkehrNederlandse SpoorwegenSpecificationsCar body constructionAluminumTrain lengthtrainset 8 cars 200 84 m 658 ft 11 1 8 in 403 406 trainset 8 cars 200 72 m 658 ft 6 3 8 in 407 408 Car length25 835 m 84 ft 9 1 8 in Cab car 24 775 m 81 ft 3 3 8 in Intermediate car Width2 950 m 9 ft 8 1 8 in ICE 3 ICE 3M Velaro D Euro Spec 3 265 m 10 ft 8 1 2 in CRH3 International option Height3 89 m 12 ft 9 1 8 in Maximum speed Class 403 406 330 km h 210 mph design Class 407 408 320 km h 200 mph design Class 403 300 km h 190 mph service Class 406 408 320 km h 200 mph service Weight409 t 403 long tons 451 short tons ICE 3 435 t 428 long tons 480 short tons ICE 3M Traction systemClass 403 406 GTO VVVFClass 407 408 IGBT VVVFPower output8 000 kW 10 728 hp Tractive effort300 kN 67 443 lbf Starting270 kN 60 698 lbf Cont at 106 km h 66 mph Electric system s 15 kV 16 7 Hz AC1 500 V DC 406 408 3 kV DC 406 408 25 kV 50 Hz AC 406 408 Overhead lineCurrent collector s PantographUIC classificationBo Bo 2 2 Bo Bo 2 2 2 2 Bo Bo 2 2 Bo Bo 8 car set Safety system s Sifa PZB90 LZB ICE 3 Sifa PZB90 LZB80 Crocodile TVM430 KVB ATB Eurobalise ICE 3M Track gauge1 435 mm 4 ft 8 1 2 in standard gauge Contents 1 Class 403 2 Class 406 3 Class 407 4 Class 408 5 Special services 6 See also 7 References 8 External linksClass 403 Edit Interior view showing smart glass separating driver s cabThe design goal of the ICE 3 Class 403 was to create a higher powered lighter train than its predecessors This was achieved by distributing its 16 traction motors underneath the whole train The train is certified for 330 km h 210 mph and has reached 368 km h 229 mph on trial runs On regular Intercity Express services they run at up to 300 km h 190 mph the maximum design speed of German high speed lines Because the train does not have power cars the whole length of the train is available for passenger seats including the first car The lounge seats are located directly behind the driver separated only by a glass wall The 50 sets were ordered in 1997 and specifically designed for the new high speed line between Frankfurt and Cologne They were built by a consortium led by Siemens and Adtranz now Bombardier Transportation 2 On 11 April 2017 Deutsche Bahn announced the modernisation programme called ICE 3 Redesign for its 66 unit ICE 3 fleet to be completed by the end of 2020 3 The renovation involves replacing the seats tables and floor coverings The six seat compartment rooms are eliminated from the second class section to increase the number of seats and add more luggage compartments In addition the number of disability seating has been increased to two however no integrated wheelchair lift has been installed and no disability seating is offered in the first class section The seats in some Bordrestaurant have been converted to the red bench seating while Bordbistro receives the new stand tables The cabin illumination is provided by LED lamps providing more illumination while the reading lamps are eliminated The seat reservation panels are moved from the walls above the windows to the seat headrests per EU directive on accessibilities the new panel has bigger and more visible white lettering and Braille The yellow LCD information monitors in the antechambers are replaced with larger full colour LED displays showing the map train number speed and other pertinent information The new smaller displays are attached to the ceiling above the aisle throughout the cabins Class 406 Edit NS logoed ICE 3 Class 406 on the Cologne Frankfurt high speed rail lineThe ICE 3M Class 406 M for multisystem was developed to operate international services under the four different railway electrification systems in use on Europe s main lines and with support for various train protection systems The Deutsche Bahn DB ordered 13 of these units in 1994 the NS Nederlandse Spoorwegen four making sure that the demands of the Dutch rail network are taken care of Though these trains carry NS logos the DB and NS trains together form a pool and therefore the NS trains may operate DB services as well In 2007 the train was licensed for operation in the Netherlands Belgium and France Currently those trains are used for cross border runs between Netherlands Germany Belgium and France On the French LGV Est some trains reach a regular top speed of 320 km h 199 mph The 17 class 406 sets were built by the same consortium as the class 403 They were first introduced in November 2000 on services between Cologne and Amsterdam Since December 2002 they have also been operating three journeys daily each way between Frankfurt and Brussels increased to four per day since December 2010 2 A picture of a DB ICE 3 class 406 cab DB logoed ICE 3 Class 406 approaching Frankfurt Main HauptbahnhofIn Belgium the train was licensed in 2002 to run on the classic 3 kV DC lines with speeds up to 160 km h 99 mph and from December 2004 also on the new 25 kV AC high speed lines but initially limited to 250 km h 160 mph instead of 300 km h 190 mph 4 Problems with flying gravel and its frictionless linear eddy current brake came up during testing In order to limit the creation of tornado like vortices that pick up gravel and to limit damage from flying gravel to the train spoilers have been added under the car joints under the carbody next to the bogies and under the powered axles on the bogies Additional spoiler marked red to limit the creation of vortices that pick up gravel and to protect the bogie and the underframeThe linear eddy current brake which is required for higher speeds cannot yet be used because the magnetic field would rip off the magnetic covers of some trackside equipment those covers will have to be replaced by non magnetic ones according to the EU Technical Specifications for Interoperability for international rail traffic in Europe As in Belgium licensing procedures for France took five years to be completed Trial runs were completed in late 2005 and the same two problems were encountered as in Belgium loose gravel damage and possible side effects of the brakes ICE 3Ms were allowed on the LGV Est and started service there on 20 June 2007 mixed with TGVs Since December 2007 DB operates ICE 3M trains from Frankfurt central station to Paris Est initially with five daily runs between both cities The six trains for running into France designated ICE 3 MF indicating multisystem France were modified at Bombardier s Hennigsdorf plant and were extensively tested on Siemens test site in Wegberg Wildenrath before the modified trains re entered commercial service Despite this the French subset of six class 406 trains have suffered from reliability problems so that some Paris Frankfurt services are operated instead by French TGVs currently TGV 2N2 Euroduplex as of 2015 under the Alleo joint venture between DB and SNCF 2 In Switzerland licensing took only six months 4 Class 407 Edit A Siemens Velaro D on display at InnoTrans 2010 These trains were delivered in 2011 and 2012 Main article DB Class 407 Deutsche Bahn placed an order for fifteen trains valued 500 million in November 2008 5 On 18 April 2010 Deutsche Bahn presented the first Velaro D at Siemens Krefeld plant 6 It is designed for operation at up to 320 km h 200 mph is wider quieter and more energy saving should be less susceptible to malfunctions than its predecessor and incorporates additional crashworthiness and fire safety measures 6 The new train was supposed to be used mainly for international services from Germany to France Belgium and the Netherlands 7 The new type s safety measures are in line with the new specifications for operating passenger trains inside the Channel Tunnel allowing the Class 407 to be used on the services that DB planned to operate from London to Amsterdam and Frankfurt in 2015 8 The planned service to London was never introduced 9 The new train was designated Class 407 and was originally scheduled to enter service at the end of 2011 This date has since been postponed several times 10 In December 2013 the first four trains delivered to DB were licensed for domestic operation as multiple units and started with passenger traffic Four more trains were expected for delivery in spring 2014 whereas the remainder of eight trains shall be used by Siemens for test runs in France and Belgium to gain type approval there 11 In June 2011 Deutsche Bahn ordered one additional Velaro D set in order to replace an ICE3MF set damaged in an accident in August 2010 12 Class 408 EditMain article DB Class 408 In 2019 Deutsche Bahn needed more trains to run on national and international high speed tracks Siemens offered them an evolution of the Velaro D equipped with multi system capability and hence labelled Velaro MS In 2020 Deutsche Bahn ordered 30 trainsets for delivery starting in 2022 The trains are designed for operation at 320 km h and will be deployed from the end of 2022 on routes that use the Cologne Frankfurt high speed line which is designed for operation at 300 km h 13 The first of the trains called ICE 3neo by Deutsche Bahn and classed as 408 was completed in late 2021 with test runs started immediately In February of 2022 the order volume increased to 73 trains and the first train was shown to journalists All 73 trains are supposed to be in service by early 2029 14 In May 2023 DB announced to order the remaining 17 Options of Class 408 trains so the total order rose to 90 Special services EditFor the EXPO 2000 in Hanover Deutsche Bahn provided 120 additional train services Some of these special services were operated by ICE trains and labelled ExpoExpress EXE These services also constituted the first widespread use of the then new ICE 3 train sets presenting them to the domestic and international general public 15 See also EditList of high speed trainsReferences Edit ICE NS PDF a b c The German ICE family Modern Railways London December 2010 pp 70 71 ICE 3 Redesign Die Anpassungen im Uberblick 11 April 2017 a b Harmonisierungsdefizite am Beispiel von Auslandszulassungen des Triebzuges ICE 3 in Elektrische Bahnen Vo 103 2005 pages 147 149 Siemens receives order over 15 high speed trains from Deutsche Bahn Press release Siemens 17 December 2008 Archived from the original on 10 June 2022 Retrieved 27 December 2008 Reference Number I MO 200812 006 04 a b DB unveils next generation ICE Railway Gazette International London 28 April 2010 Archived from the original on 9 August 2011 Retrieved 4 May 2010 Neuer ICE Hightech gegen die Achsenkrise Spiegel Online in German 28 April 2010 Retrieved 28 April 2010 Fender Keith December 2010 DB unveils plans for London services Modern Railways London pp 68 69 Germany s Frankfurt London high speed rail link put on ice February 2014 Retrieved 21 February 2014 Keith Barrow 14 June 2013 DB secures Channel Tunnel access International Railway Journal EBA approves Velaro D high speed trains for domestic operation Railway Gazette International London 23 December 2013 Smith Kevin June 2011 DB and Siemens finally sign ICx contract International Railway Journal Falmouth p 4 Deutsche Bahn orders 320 km h Velaro derivatives Railway Gazette 15 July 2020 Retrieved 1 February 2022 DB orders more ICE3neo sets as first unit is unveiled Railway Gazette 1 February 2022 Retrieved 1 February 2022 Dritte Generation ICE Triebzuge fur DB Reise amp Touristik Elektrische Bahnen Elektrotechnik im Verkehrswesen in German 11 2000 ISSN 0013 5437 External links Edit Wikimedia Commons has media related to ICE 3 ICE 3 for Germany and the Netherlands Siemens Page Spec Sheet French Retrieved from https en wikipedia org w index php title ICE 3 amp oldid 1170994026, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.