fbpx
Wikipedia

Expo Line (SkyTrain)

The Expo Line is the oldest line of the SkyTrain rapid transit system in the Metro Vancouver region of British Columbia, Canada. The line is owned and operated by BC Rapid Transit Company, a subsidiary of TransLink, and links the cities of Vancouver, Burnaby, New Westminster and Surrey.

Expo Line
An Expo Line train in New Westminster
Overview
OwnerTransLink (South Coast British Columbia Transportation Authority)
LocaleMetro Vancouver, British Columbia
Termini
Stations24
Service
TypeRapid transit
SystemSkyTrain
Operator(s)British Columbia Rapid Transit Company
Rolling stock
Daily ridership288,000 (2022)[a][1]
History
OpenedDecember 11, 1985; 38 years ago (1985-12-11)
Technical
Line length36.4 km (22.6 mi)
Number of tracks2
Track gauge4 ft 8+12 in (1,435 mm)
ElectrificationThird rail (Linear motor)
Operating speed80 km/h (50 mph)

The line was originally known only as "the SkyTrain" from its inception in 1985 until 2002, as it was the system's only line during this time. In 2002, after the opening of the system's second line, the Millennium Line, the original line was given the name "Expo Line". The new name was in recognition of Expo 86 (the World's Fair that Vancouver hosted in 1986) as the transit system had been built in large part as a showcase and an attraction for that fair.

Route edit

Expo Line
 
 
 
 
 
 
 
 
 
 
 
 
Waterfront
 
 
Burrard
 
 
 
and YVR–Airport
 
Granville
 
Stadium–Chinatown
 
 
Main Street–Science World
 
 
 
 
 
 
 
 
Commercial–Broadway
Nanaimo
 
 
 
 
29th Avenue
 
Joyce–Collingwood
 
Vancouver Zone 1
Burnaby Zone 2
 
 
 
Patterson
 
 
Production Way–University  
Metrotown
 
 
Lougheed Town Centre
Royal Oak
 
 
 
Edmonds
 
 
Edmonds Yard
 
 
 
 
Burnaby
Coquitlam
Burnaby
New Westminster
 
 
 
 
Future storage facility
22nd Street
 
 
Coquitlam
New Westminster
New Westminster
 
 
Braid
Columbia
 
 
Sapperton
 
 
 
 
 
New Westminster Zone 2
Surrey Zone 3
 
 
 
Scott Road
 
Gateway
 
Surrey Central
 
King George
 
   
 
Future Surrey–Langley
extension
   
 
Future Surrey–Langley
extension
 
 
 
 
 
Surrey
Langley Township
 
 
Langley Township
Langley City
 
 

The line is elevated from Stadium–Chinatown to New Westminster stations, except for short at-grade sections between Nanaimo and Joyce–Collingwood stations in East Vancouver, and around the SkyTrain yards at Edmonds station in Burnaby.

The line travels underground for a short stretch between New Westminster and Columbia stations. Just east of Columbia is a junction where the line splits. One branch crosses the Fraser River, via the SkyBridge, and is elevated for the rest of its run through Surrey, with King George as its terminus station. The other branch continues through New Westminster, first through a tunnel and then elevated until it terminates at Production Way–University in Burnaby.

From just west of Nanaimo station all the way to New Westminster station, the Expo Line follows BC Electric's former Central Park Line, which carried interurbans between Vancouver and New Westminster from 1890 to the early 1950s.

History edit

ICTS demonstration project (1983) edit

What is now known as SkyTrain began as a demonstration project to showcase the newly developed linear induction propulsion technology to Vancouver and other prospective cities throughout the world. Although Toronto's Scarborough RT was completed before the Expo Line in 1985, the ICTS demonstration was the first system to use SkyTrain technology. The Intermediate Capacity Transit System (ICTS) demonstration was built using the Advanced Rapid Transit (ART) technology developed by the Urban Transportation Development Corporation (now part of Bombardier). Construction began on March 1, 1982, and was completed in early 1983. The demonstration project consisted of just one station and about one kilometre of guideway with no switches. This original station was not "named" during this time as it was the only station, but then in 1985 opened as Main Street station.

As it was a showcase station, Main Street had a different initial design from other stations on the Expo Line that came after it. For example, glass was featured in the station's design, but was missing from other original Expo Line stations, except Stadium station (now Stadium–Chinatown) since it was tied to the Expo grounds. Having preceded other stations on the line by three years, Main Street–Science World was visibly older, and signs of rust and wear were showing before extensive renovations to the station were completed in 2014.[2]

The guideway for the showcase line was a straight section east of the station running over Terminal Avenue. It ended across from where the former Brussels Chocolate factory once was, located on Terminal. There was no guideway west of the station as the track ended immediately at the west end of the platform where the Vancity head office now stands.

The ICTS guideway was built differently from the rest of the Expo Line. The columns were different especially with how they are joined with the guideway. The walkway between the two tracks is of a different but also inferior design from the Expo Line, and it is showing signs of rust that come with the older age of the guideway.

There was only a single two-car train running on the north westbound track. After passengers boarded, it ran east toward the end of the test guideway. At the eastern end, the train would stop and after a pause, reverse directions and return to the station. Since there were no switches, only the northern track was used and the train would run back and forth on the same track. There was also a single car mock up parked on the south platform, what is now the eastbound platform. This car was not operational. The two-car train and single car mock up were of a different and unique design to all the production Mark I trains. The red tail lights were located on the bottom beside the headlights, instead of at the top. The end door and window were of a different design. As well, there were black panels on either side of the door, that are not found in the production trains. The whereabouts of these trains is unknown.

The ICTS guideway was retrofitted during the construction of the Millennium Line to accommodate the heavier weight Mark II cars. This was done by adding additional steel-reinforced concrete beams to the columns where they support the guideway. These are clearly visible when driving or walking on Terminal Avenue under the guideway. With the exception of the original ICTS guideway, no other part of the Expo Line required retrofitting for strength in order to accommodate the Mark II cars.

After the 1983 preview closed, the single pair of demonstration cars were sent back to Ontario, which have since served as test trains for the UTDC. The subsequent trains ordered for Expo were designed slightly differently from the demo train set because of issues such as a lack of standardized parts, and the wish to introduce automated computer technology to drive the trains.

Phase I: Waterfront to New Westminster (1985) edit

 
Operations and Maintenance Centre 1, located east of Edmonds station in Burnaby

Following the demonstration project, construction of the first phase of the Expo Line between Vancouver and New Westminster got under way in mid-1983, with guideway construction nearing completion by late 1984, and station construction beginning in early 1985.[citation needed] On December 11, 1985, SkyTrain began providing free weekend service, with full revenue service opening on January 3, 1986.[3][4] Phase I was 21.4 kilometres (13.3 mi) in length, starting at Waterfront station and terminating at New Westminster station.[5] The newly built system had limited Sunday service until 1990, and shorter revenue hours during weekdays than SkyTrain's current revenue schedule as of 2010.

During Expo 86, special shuttle trains ran from a third track at Stadium station, where there was a connection to the monorail serving the main site of the world's fair, to the Canadian pavilion at Waterfront station. Waterfront station was divided in two, with a fence going down the centre of the platform. One side of the platform was used exclusively for the shuttles, and was accessible only from the Canada Place entrance, while the other side was only for revenue service and was only accessible from the main entrance to the east.[citation needed]

For the first few years of revenue service until the early 1990s, all trains were lined with carpeting, and train doors did not open automatically but rather at the push of buttons on the interior and exterior of the trains when docked in stations. This on-demand system reflected the small-scale ridership SkyTrain had before Vancouver experienced a major population boost. Due to an inability to steadily maintain the carpeting, wax floors of the same colour were installed between 1992 and 1993.[citation needed]

In the planning of the original line, a proposed future station at Boundary Road and Kingsway, or "Boundary station" was to be included to serve employees of BCTel. However, the proposal was scrapped largely due to a fear of the station attracting crime to the neighbourhood and noise-level concerns.[citation needed]

Phase II: Columbia and Scott Road stations (1989–1990) edit

The first extension, or Phase II, was split into two parts. Construction began in 1987, with Columbia station opening on February 14, 1989, adding 600 metres (2,000 ft) of guideway in the City of New Westminster.[citation needed] The second segment opened on March 16, 1990, and included Scott Road station in Surrey, crossing the Fraser River via the purpose-built, cable-stayed "SkyBridge", adding 2.5 kilometres (1.6 mi) to the line.[6]

Phase III: Surrey City Centre extension (1994) edit

 
Crossover west of King George station

Construction of a 4-kilometre (2.5 mi) second extension, or Phase III, began in late 1991 and opened on March 28, 1994, adding three stations in Surrey's City Centre district in Whalley.[7] Private partnerships with surrounding businesses in the community led to the then-new stations having a different appearance from the rest of the Expo Line. This extension set one of the Expo Line's current eastern terminus at King George station. It also added Gateway and Surrey Central stations.

Branch to Production Way–University (2016) edit

In 2002, the Millennium Line opened and shared the same track alignment with the Expo Line from Waterfront station in Downtown Vancouver to Columbia station in New Westminster. At Columbia, the two lines diverged, with the Expo Line crossing the Fraser River towards Surrey City Centre and the Millennium Line entering a short tunnel towards northeastern New Westminster and North Burnaby.

In late 2016, the SkyTrain system underwent a service change in preparation for the opening of the Evergreen Extension, resulting in a new branch of the Expo Line serving four stations that were originally built for the Millennium Line. On October 22, 2016, this branch began service from Columbia to Sapperton, Braid, Lougheed Town Centre, and Production Way–University stations, while the Millennium Line began running between VCC–Clark and Lougheed Town Centre (and later, Lafarge Lake–Douglas) stations, effectively ending nearly 15 years of Millennium Line service between Waterfront and Braid. The main Expo Line service between Waterfront and King George stations remained in place, operating at the same frequency levels.[8][9]

Technology edit

The Expo Line uses a fleet of Innovia ART and Innovia Metro trains built by Bombardier Transportation (now Alstom). Like the Millennium Line, the trains are powered by linear induction motors rather than the conventional electric (rotary) motors used on the Canada Line. Expo Line trains are operated by the same SelTrac automated train control system used in the rest of the SkyTrain network.

The 2023 fleet consists of six-car Mark I trains using the Innovia ART 100, two- and four-car Mark II trains (operating in married pairs of two cars) using the Innovia ART 200, and four-car Mark III trains using the Innovia Metro 300.

Expansions edit

Capacity upgrades edit

Before the purchase of some Mark II vehicles in 2009, the Expo line was operating at capacity while carrying 12,000 passengers per hour per direction (pphpd). Its ultimate design capacity was 19,400 pphpd using six-car Mark I trains operating at 93-second headways. However, exclusively operating a fleet of five-car trains would increase the capacity to 25,700 pphpd if Mark II trains were used.[10]: 1, 16 

Several options have been considered over the system's history to increase capacity on the Expo Line, including:

  • Purchasing middle "C" cars to use with some of the Mark II trainsets to maximize available platform space. Current platforms can fit six-car Mark I trains and five-car Mark II/III trains. With its current fleet, TransLink can only create two-car and four-car Mark II trains (2 or 2+2). By adding a middle "C" car to some Mark II couplets to create three-car trainsets, longer five-car Mark II trains could have been used (2+3).
  • Reducing SkyTrain operating headways to 75 seconds per train, down from the 108 seconds used in the early 2010s, which would have allowed for more trains to operate at peak times.[11]
  • After using longer trains and running trains at 75-second headways, the next option would be to lengthen the station platforms beyond 80 metres (260 ft) to accommodate even longer trains. This expansion option would be the most expensive as it would require heavy construction at all Expo Line stations.[citation needed]

In late 2020, TransLink ordered 41 Alstom Mark V trainsets in five-car configurations.[12] These trains are based on the previous Mark III trains; however, each train will have an additional carriage and will have more internal space.[13] Each five-car Mark V train will be able to hold 672 passengers regularly, both seated and standing, with a potential crush capacity of up to 1,207 passengers.[14] The order will provide for both an increase in the number of trainsets and ultimately a total replacement of the mid-1980s to early 1990s Mark I rolling stock.[15] Construction will be required at some stations to accommodate the 80-metre (260 ft) length of the Mark V trainsets, but no service interruptions will be necessary.[16]

Surrey–Langley extension edit

The Surrey Langley SkyTrain Project is a 16-kilometre (9.9 mi) elevated extension of the Expo Line from King George SkyTrain Station in Surrey to 203 Street in Langley City, routed mostly along Fraser Highway.[17] Anticipated to open in late 2028, it will be built in one phase (a change from earlier plans) and include the following eight stations:[18]

Station City Location Transit exchange
Green Timbers Surrey Fraser Highway at 140 Street No
152 Street Surrey Fraser Highway at 152 Street No
Fleetwood Surrey Fraser Highway at 160 Street No
Bakerview–166 Street Surrey Fraser Highway at 166 Street Yes
Hillcrest–184 Street Surrey Fraser Highway at 184 Street No
Clayton Surrey Fraser Highway at 190 Street No
Willowbrook Langley Township Fraser Highway at 196 Street Yes
Langley City Centre Langley City Industrial Avenue at 203 Street[19] Yes

The 2008 Provincial Transit Plan included a 6-kilometre (3.7 mi) extension from King George station in Surrey east to Guildford, then along 152 Street to Fraser Highway and southeast to 168 Street; a further extension to Willowbrook Shopping Centre in Langley Township was also included in the plan.[20] In 2011, as part of phase 2 of the Surrey Rapid Transit Study, different possibilities were examined for expanding rapid transit along multiple corridors in the South of Fraser region.[21] In addition to SkyTrain, light rail and bus rapid transit were also in consideration. In 2016, TransLink was building dual business cases for LRT and SkyTrain technologies.[22]

In November 2018, following a change of government in Surrey, the Metro Vancouver Mayors' Council voted to indefinitely suspend the at-grade Surrey light rail project in favour of extending the Expo Line from King George station to Langley City. This extension would be 16 kilometres (9.9 mi) long and add eight stations to the Expo Line.[23][24] The $1.65 billion in funding that was earmarked for the light rail project was intended to be used to construct part of this extension to Langley but was insufficient to fund the entire extension, with $1.9 billion more needed to complete the project.[25] The existing funding would extend the line 7 kilometres (4.3 mi) to Fleetwood in Surrey and add 4 new stations, terminating at 166th Street.

On July 25, 2019, the Mayors' Council voted to extend the Expo Line to Fleetwood using the existing funds.[26] The council also voted to proceed with preparing a detailed business case for the full Surrey–Langley SkyTrain extension, which was expected to be completed by early 2020. If approved by the end of the third quarter of 2020, construction would have started in early 2022, with revenue service to Fleetwood projected to have started in late 2025.[25]

On October 8, 2020, during the 2020 provincial election campaign, the BC NDP pledged to work with senior levels of government to obtain the $1.5 billion needed to complete the full extension to Langley.[27]

On July 9, 2021, Prime Minister Justin Trudeau announced that the federal government would provide up to $1.3 billion to build the SkyTrain extension to Langley in a single phase.[28] At that time, the cost of the project was estimated between $3.8 and $3.95 billion in total, more than $650 million in excess of the earlier $3.13 billion estimate from TransLink, with the rest of the funding being split between TransLink and the provincial government.[28][29] The full extension to Langley was planned to be constructed as a single project rather than in two phases and is scheduled to open in 2028.[30] In July 2022, the provincial government officially approved this one-phase plan. Procurement for contractors was slated to start later in 2022, with major construction expected to begin in 2024.[31]

Stations edit

Station Opened City Connections Location
Waterfront 1985 Vancouver         Cordova between Granville and Seymour
Burrard 1985 Vancouver   Burrard between Melville and Dunsmuir
Granville 1985 Vancouver Granville between Georgia and Dunsmuir; adjacent to Pacific Centre
Stadium–Chinatown 1985 Vancouver Beatty at Dunsmuir; adjacent to Rogers Arena; near BC Place and Chinatown
Main Street–Science World 1985 Vancouver     Pacific Central Main at Terminal; near Science World
Commercial–Broadway 1985/2002[b] Vancouver     Commercial at Broadway
Nanaimo 1985 Vancouver East 24th Avenue at Nanaimo
29th Avenue 1985 Vancouver East 29th Avenue at Atlin
Joyce–Collingwood 1985 Vancouver   Joyce at Vanness
Patterson 1985 Burnaby Patterson between Beresford and Central
Metrotown 1985 Burnaby Beresford and Central between Silver and Telford; adjacent to Metropolis at Metrotown
Royal Oak 1985 Burnaby Beresford at Royal Oak
Edmonds 1985 Burnaby 18th Street near Griffiths
22nd Street station 1985 New Westminster 22nd Street at 7th Avenue
New Westminster 1985 New Westminster 8th Street between Columbia and Carnarvon; integrated with Shops at New West
Columbia 1989 New Westminster 4th Street between Columbia and Carnarvon; branches split
King George branch
Scott Road 1990 Surrey   Scott Road near King George Boulevard
Gateway 1994 Surrey 108 Avenue at University Drive
Surrey Central 1994 Surrey   Central Avenue at City Parkway; adjacent to Central City
King George 1994 Surrey   King George Boulevard between 100 Avenue and George Junction; adjacent to King George Hub
Production Way–University branch
Sapperton 2002 New Westminster Brunette at Spruce; adjacent to Royal Columbian Hospital
Braid 2002 Brunette at Braid; near Highway 1
Lougheed Town Centre 2002 Burnaby   Lougheed Highway at Austin; adjacent to the City of Lougheed shopping centre
Production Way–University 2002     SFU Lougheed Highway at Production Way

See also edit

Notes edit

  1. ^ Combined with Millennium Line
  2. ^ Commercial–Broadway station was originally two separate stations—Broadway station and Commercial Drive station. Broadway station was completed in 1985, while Commercial Drive station was completed in 2002; the stations were merged in 2009.[32]

References edit

  1. ^ "TransLink 2022 Transit Performance Review" (PDF). TransLink. Retrieved June 23, 2023.
  2. ^ (PDF). TransLink. October 30, 2012. Archived from the original (PDF) on November 14, 2017. Retrieved November 14, 2017.
  3. ^ Farrow, Moira; Cox, Sarah (December 11, 1985). "Glitter, bands and balloons". The Vancouver Sun. p. A1. Retrieved December 8, 2022 – via Newspapers.com.
  4. ^ "In business, on time: System's first riders all had their reasons". The Vancouver Sun. January 3, 1986. p. A1. Retrieved December 8, 2022 – via Newspapers.com.
  5. ^ Hall, Neal (December 27, 1986). "Happy birthday, SkyTrain". The Vancouver Sun. p. B12. Retrieved December 8, 2022 – via Newspapers.com.
  6. ^ Schaefer, Glen (March 16, 1990). "Ride across river offers new views". The Province. p. 14. Retrieved December 8, 2022 – via Newspapers.com.
  7. ^ "SkyTrain Your City to City Connection" (PDF). The Buzzer. BC Transit. March 11, 1994. (PDF) from the original on December 17, 2021. Retrieved October 7, 2022.
  8. ^ . TransLink. September 19, 2016. Archived from the original on September 24, 2016. Retrieved September 19, 2016.
  9. ^ Johnston, Jesse (October 22, 2016). "SkyTrain network changes start today". CBC News. from the original on January 20, 2022. Retrieved October 27, 2016.
  10. ^ Expo Line Upgrade Strategy - Project Summary (PDF) (Report). May 7, 2012. Retrieved January 4, 2024.
  11. ^ . Thales Group. Archived from the original on April 5, 2012. Retrieved November 17, 2011.
  12. ^ "TransLink to buy 205 new SkyTrain cars from Bombardier for $723 million | Urbanized". dailyhive.com. Retrieved August 17, 2023.
  13. ^ "New rendering of the future SkyTrain cars, arriving starting later this year | Urbanized". dailyhive.com. Retrieved August 17, 2023.
  14. ^ Chan, Kenneth (December 22, 2023). "First new generation SkyTrain cars arrive in Metro Vancouver | Urbanized". dailyhive.com. Retrieved January 4, 2024.
  15. ^ "End of the line in sight for two generations of old SkyTrain cars | Urbanized". dailyhive.com. Retrieved August 17, 2023.
  16. ^ Chan, Kenneth (February 16, 2023). "TransLink begins upgrade of SkyTrain stations to handle longer trains | Urbanized". DailyHive. Retrieved December 8, 2023.
  17. ^ "Surrey Langley SkyTrain". www.surrey.ca. City of Surrey. December 11, 2019. Retrieved December 1, 2023.
  18. ^ "Surrey Langley SkyTrain Project - Project Overview". Ministry of Transportation and Infrastructure, Province of British Columbia. Retrieved December 1, 2023.
  19. ^ Chan, Kenneth (May 12, 2022). "BC government seeking public input on Surrey-Langley SkyTrain design | Urbanized". dailyhive.com. Retrieved December 7, 2023.
  20. ^ Nagel, Jeff (January 16, 2008). . Surrey Leader. Archived from the original on January 20, 2008. Retrieved February 21, 2008.
  21. ^ . TransLink. Archived from the original on January 13, 2012. Retrieved November 17, 2011.
  22. ^ Nagel, Jeff (June 7, 2016). "Line to Langley may still be SkyTrain: TransLink CEO". Abbotsford News. from the original on November 30, 2018. Retrieved February 13, 2018.
  23. ^ McElroy, Justin (November 15, 2018). "Metro Vancouver mayors agree to suspend Surrey LRT, start process for SkyTrain to Langley". CBC News. from the original on December 4, 2021. Retrieved November 30, 2018.
  24. ^ Chan, Kenneth (July 20, 2018). "SkyTrain along Fraser Highway to Langley will cost $2.9 billion, says TransLink". Daily Hive. from the original on March 6, 2021. Retrieved November 30, 2018.
  25. ^ a b Saltman, Jennifer (July 26, 2019). "Mayors' Council votes to proceed with plan for Surrey-Langley SkyTrain". Vancouver Sun. from the original on August 27, 2019. Retrieved August 27, 2019.
  26. ^ Pablo, Carlito (July 25, 2019). "Divided Metro Vancouver mayors approve new SkyTrain from King George Station to Fleetwood". The Georgia Straight. from the original on August 27, 2019. Retrieved August 27, 2019.
  27. ^ Claxton, Matthew (October 8, 2020). "Horgan pledges NDP will complete $1.5 billion SkyTrain extension to Langley". Surrey Now-Leader. from the original on November 24, 2021. Retrieved October 25, 2020.
  28. ^ a b Chan, Kenneth (July 9, 2021). "Trudeau announces $1.3 billion for Surrey-Langley SkyTrain, confirms UBC support | Urbanized". DailyHive. from the original on October 26, 2021. Retrieved July 11, 2021.
  29. ^ Weichel, Andrew (July 9, 2021). "Federal government providing up to $1.3 billion for Surrey-Langley SkyTrain extension". CTV News Vancouver. from the original on December 8, 2021. Retrieved July 9, 2021.
  30. ^ Chan, Kenneth (July 14, 2022). "16-km-long Surrey-Langley SkyTrain extension receives full government approval | Urbanized". dailyhive.com. Retrieved July 24, 2022.
  31. ^ Chan, Kenneth (July 14, 2022). "16-km-long Surrey-Langley SkyTrain extension receives full provincial and federal approval". Daily Hive. Retrieved July 20, 2022.
  32. ^ . TransLink. August 28, 2009. Archived from the original on March 25, 2018. Retrieved June 26, 2021.

External links edit

KML is from Wikidata
  • TransLink – The organization that owns SkyTrain
  • – The subsidiary of TransLink that operates and maintains SkyTrain

expo, line, skytrain, expo, line, oldest, line, skytrain, rapid, transit, system, metro, vancouver, region, british, columbia, canada, line, owned, operated, rapid, transit, company, subsidiary, translink, links, cities, vancouver, burnaby, westminster, surrey. The Expo Line is the oldest line of the SkyTrain rapid transit system in the Metro Vancouver region of British Columbia Canada The line is owned and operated by BC Rapid Transit Company a subsidiary of TransLink and links the cities of Vancouver Burnaby New Westminster and Surrey Expo LineAn Expo Line train in New WestminsterOverviewOwnerTransLink South Coast British Columbia Transportation Authority LocaleMetro Vancouver British ColumbiaTerminiWaterfrontKing George and Production Way UniversityStations24ServiceTypeRapid transitSystemSkyTrainOperator s British Columbia Rapid Transit CompanyRolling stockICTS Mark I 6 cars per trainset ART Mark II III 4 cars per trainsetDaily ridership288 000 2022 a 1 HistoryOpenedDecember 11 1985 38 years ago 1985 12 11 TechnicalLine length36 4 km 22 6 mi Number of tracks2Track gauge4 ft 8 1 2 in 1 435 mm ElectrificationThird rail Linear motor Operating speed80 km h 50 mph The line was originally known only as the SkyTrain from its inception in 1985 until 2002 as it was the system s only line during this time In 2002 after the opening of the system s second line the Millennium Line the original line was given the name Expo Line The new name was in recognition of Expo 86 the World s Fair that Vancouver hosted in 1986 as the transit system had been built in large part as a showcase and an attraction for that fair Contents 1 Route 2 History 2 1 ICTS demonstration project 1983 2 2 Phase I Waterfront to New Westminster 1985 2 3 Phase II Columbia and Scott Road stations 1989 1990 2 4 Phase III Surrey City Centre extension 1994 2 5 Branch to Production Way University 2016 3 Technology 4 Expansions 4 1 Capacity upgrades 4 2 Surrey Langley extension 5 Stations 6 See also 7 Notes 8 References 9 External linksRoute editvteExpo LineLegendSeaBusto Lonsdale Quay nbsp nbsp nbsp nbsp nbsp West Coast Expressto Mission nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp Waterfront nbsp nbsp nbsp nbsp Burrard nbsp Canada Lineto Richmond Brighouse nbsp nbsp nbsp and YVR Airport nbsp Granville nbsp Stadium ChinatownMillennium Lineto VCC Clark nbsp nbsp Main Street Science World nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp Commercial Broadway nbsp nbsp Nanaimo nbsp nbsp nbsp nbsp 29th Avenue nbsp nbsp Joyce Collingwood nbsp Vancouver Zone 1Burnaby Zone 2 nbsp nbsp nbsp Patterson nbsp nbsp Production Way University nbsp Metrotown nbsp nbsp Lougheed Town Centre nbsp Royal Oak nbsp nbsp nbsp Millennium Lineto Lafarge Lake DouglasEdmonds nbsp nbsp nbsp Hwy 1 Trans CanadaHighway Edmonds Yard nbsp nbsp nbsp nbsp BurnabyCoquitlamBurnabyNew Westminster nbsp nbsp nbsp nbsp Future storage facility22nd Street nbsp nbsp CoquitlamNew WestminsterNew Westminster nbsp nbsp Braid nbsp Columbia nbsp nbsp Sapperton nbsp nbsp nbsp nbsp nbsp New Westminster Zone 2Surrey Zone 3 nbsp nbsp nbsp Skybridgeover Fraser River nbsp Scott Road nbsp Gateway nbsp nbsp Surrey Central nbsp nbsp King George nbsp nbsp Future Surrey LangleyextensionGreen Timbers nbsp Future Surrey Langleyextension152 Street nbsp Fleetwood nbsp Bakerview 166 Street nbsp Hillcrest 184 Street nbsp Clayton nbsp SurreyLangley Township nbsp Willowbrook nbsp Langley TownshipLangley City nbsp Langley City Centre nbsp The line is elevated from Stadium Chinatown to New Westminster stations except for short at grade sections between Nanaimo and Joyce Collingwood stations in East Vancouver and around the SkyTrain yards at Edmonds station in Burnaby The line travels underground for a short stretch between New Westminster and Columbia stations Just east of Columbia is a junction where the line splits One branch crosses the Fraser River via the SkyBridge and is elevated for the rest of its run through Surrey with King George as its terminus station The other branch continues through New Westminster first through a tunnel and then elevated until it terminates at Production Way University in Burnaby From just west of Nanaimo station all the way to New Westminster station the Expo Line follows BC Electric s former Central Park Line which carried interurbans between Vancouver and New Westminster from 1890 to the early 1950s History editThis section needs additional citations for verification Please help improve this article by adding citations to reliable sources in this section Unsourced material may be challenged and removed Find sources Expo Line SkyTrain news newspapers books scholar JSTOR June 2021 Learn how and when to remove this template message ICTS demonstration project 1983 edit What is now known as SkyTrain began as a demonstration project to showcase the newly developed linear induction propulsion technology to Vancouver and other prospective cities throughout the world Although Toronto s Scarborough RT was completed before the Expo Line in 1985 the ICTS demonstration was the first system to use SkyTrain technology The Intermediate Capacity Transit System ICTS demonstration was built using the Advanced Rapid Transit ART technology developed by the Urban Transportation Development Corporation now part of Bombardier Construction began on March 1 1982 and was completed in early 1983 The demonstration project consisted of just one station and about one kilometre of guideway with no switches This original station was not named during this time as it was the only station but then in 1985 opened as Main Street station As it was a showcase station Main Street had a different initial design from other stations on the Expo Line that came after it For example glass was featured in the station s design but was missing from other original Expo Line stations except Stadium station now Stadium Chinatown since it was tied to the Expo grounds Having preceded other stations on the line by three years Main Street Science World was visibly older and signs of rust and wear were showing before extensive renovations to the station were completed in 2014 2 The guideway for the showcase line was a straight section east of the station running over Terminal Avenue It ended across from where the former Brussels Chocolate factory once was located on Terminal There was no guideway west of the station as the track ended immediately at the west end of the platform where the Vancity head office now stands The ICTS guideway was built differently from the rest of the Expo Line The columns were different especially with how they are joined with the guideway The walkway between the two tracks is of a different but also inferior design from the Expo Line and it is showing signs of rust that come with the older age of the guideway There was only a single two car train running on the north westbound track After passengers boarded it ran east toward the end of the test guideway At the eastern end the train would stop and after a pause reverse directions and return to the station Since there were no switches only the northern track was used and the train would run back and forth on the same track There was also a single car mock up parked on the south platform what is now the eastbound platform This car was not operational The two car train and single car mock up were of a different and unique design to all the production Mark I trains The red tail lights were located on the bottom beside the headlights instead of at the top The end door and window were of a different design As well there were black panels on either side of the door that are not found in the production trains The whereabouts of these trains is unknown The ICTS guideway was retrofitted during the construction of the Millennium Line to accommodate the heavier weight Mark II cars This was done by adding additional steel reinforced concrete beams to the columns where they support the guideway These are clearly visible when driving or walking on Terminal Avenue under the guideway With the exception of the original ICTS guideway no other part of the Expo Line required retrofitting for strength in order to accommodate the Mark II cars After the 1983 preview closed the single pair of demonstration cars were sent back to Ontario which have since served as test trains for the UTDC The subsequent trains ordered for Expo were designed slightly differently from the demo train set because of issues such as a lack of standardized parts and the wish to introduce automated computer technology to drive the trains Phase I Waterfront to New Westminster 1985 edit nbsp Operations and Maintenance Centre 1 located east of Edmonds station in BurnabyFollowing the demonstration project construction of the first phase of the Expo Line between Vancouver and New Westminster got under way in mid 1983 with guideway construction nearing completion by late 1984 and station construction beginning in early 1985 citation needed On December 11 1985 SkyTrain began providing free weekend service with full revenue service opening on January 3 1986 3 4 Phase I was 21 4 kilometres 13 3 mi in length starting at Waterfront station and terminating at New Westminster station 5 The newly built system had limited Sunday service until 1990 and shorter revenue hours during weekdays than SkyTrain s current revenue schedule as of 2010 During Expo 86 special shuttle trains ran from a third track at Stadium station where there was a connection to the monorail serving the main site of the world s fair to the Canadian pavilion at Waterfront station Waterfront station was divided in two with a fence going down the centre of the platform One side of the platform was used exclusively for the shuttles and was accessible only from the Canada Place entrance while the other side was only for revenue service and was only accessible from the main entrance to the east citation needed For the first few years of revenue service until the early 1990s all trains were lined with carpeting and train doors did not open automatically but rather at the push of buttons on the interior and exterior of the trains when docked in stations This on demand system reflected the small scale ridership SkyTrain had before Vancouver experienced a major population boost Due to an inability to steadily maintain the carpeting wax floors of the same colour were installed between 1992 and 1993 citation needed In the planning of the original line a proposed future station at Boundary Road and Kingsway or Boundary station was to be included to serve employees of BCTel However the proposal was scrapped largely due to a fear of the station attracting crime to the neighbourhood and noise level concerns citation needed Phase II Columbia and Scott Road stations 1989 1990 edit The first extension or Phase II was split into two parts Construction began in 1987 with Columbia station opening on February 14 1989 adding 600 metres 2 000 ft of guideway in the City of New Westminster citation needed The second segment opened on March 16 1990 and included Scott Road station in Surrey crossing the Fraser River via the purpose built cable stayed SkyBridge adding 2 5 kilometres 1 6 mi to the line 6 Phase III Surrey City Centre extension 1994 edit nbsp Crossover west of King George stationConstruction of a 4 kilometre 2 5 mi second extension or Phase III began in late 1991 and opened on March 28 1994 adding three stations in Surrey s City Centre district in Whalley 7 Private partnerships with surrounding businesses in the community led to the then new stations having a different appearance from the rest of the Expo Line This extension set one of the Expo Line s current eastern terminus at King George station It also added Gateway and Surrey Central stations Branch to Production Way University 2016 edit In 2002 the Millennium Line opened and shared the same track alignment with the Expo Line from Waterfront station in Downtown Vancouver to Columbia station in New Westminster At Columbia the two lines diverged with the Expo Line crossing the Fraser River towards Surrey City Centre and the Millennium Line entering a short tunnel towards northeastern New Westminster and North Burnaby In late 2016 the SkyTrain system underwent a service change in preparation for the opening of the Evergreen Extension resulting in a new branch of the Expo Line serving four stations that were originally built for the Millennium Line On October 22 2016 this branch began service from Columbia to Sapperton Braid Lougheed Town Centre and Production Way University stations while the Millennium Line began running between VCC Clark and Lougheed Town Centre and later Lafarge Lake Douglas stations effectively ending nearly 15 years of Millennium Line service between Waterfront and Braid The main Expo Line service between Waterfront and King George stations remained in place operating at the same frequency levels 8 9 Technology editMain article SkyTrain Vancouver rolling stock Expo Line and Millennium Line fleets The Expo Line uses a fleet of Innovia ART and Innovia Metro trains built by Bombardier Transportation now Alstom Like the Millennium Line the trains are powered by linear induction motors rather than the conventional electric rotary motors used on the Canada Line Expo Line trains are operated by the same SelTrac automated train control system used in the rest of the SkyTrain network The 2023 fleet consists of six car Mark I trains using the Innovia ART 100 two and four car Mark II trains operating in married pairs of two cars using the Innovia ART 200 and four car Mark III trains using the Innovia Metro 300 Expansions editCapacity upgrades edit Before the purchase of some Mark II vehicles in 2009 the Expo line was operating at capacity while carrying 12 000 passengers per hour per direction pphpd Its ultimate design capacity was 19 400 pphpd using six car Mark I trains operating at 93 second headways However exclusively operating a fleet of five car trains would increase the capacity to 25 700 pphpd if Mark II trains were used 10 1 16 Several options have been considered over the system s history to increase capacity on the Expo Line including Purchasing middle C cars to use with some of the Mark II trainsets to maximize available platform space Current platforms can fit six car Mark I trains and five car Mark II III trains With its current fleet TransLink can only create two car and four car Mark II trains 2 or 2 2 By adding a middle C car to some Mark II couplets to create three car trainsets longer five car Mark II trains could have been used 2 3 Reducing SkyTrain operating headways to 75 seconds per train down from the 108 seconds used in the early 2010s which would have allowed for more trains to operate at peak times 11 After using longer trains and running trains at 75 second headways the next option would be to lengthen the station platforms beyond 80 metres 260 ft to accommodate even longer trains This expansion option would be the most expensive as it would require heavy construction at all Expo Line stations citation needed In late 2020 TransLink ordered 41 Alstom Mark V trainsets in five car configurations 12 These trains are based on the previous Mark III trains however each train will have an additional carriage and will have more internal space 13 Each five car Mark V train will be able to hold 672 passengers regularly both seated and standing with a potential crush capacity of up to 1 207 passengers 14 The order will provide for both an increase in the number of trainsets and ultimately a total replacement of the mid 1980s to early 1990s Mark I rolling stock 15 Construction will be required at some stations to accommodate the 80 metre 260 ft length of the Mark V trainsets but no service interruptions will be necessary 16 Surrey Langley extension edit The Surrey Langley SkyTrain Project is a 16 kilometre 9 9 mi elevated extension of the Expo Line from King George SkyTrain Station in Surrey to 203 Street in Langley City routed mostly along Fraser Highway 17 Anticipated to open in late 2028 it will be built in one phase a change from earlier plans and include the following eight stations 18 Station City Location Transit exchangeGreen Timbers Surrey Fraser Highway at 140 Street No152 Street Surrey Fraser Highway at 152 Street NoFleetwood Surrey Fraser Highway at 160 Street NoBakerview 166 Street Surrey Fraser Highway at 166 Street YesHillcrest 184 Street Surrey Fraser Highway at 184 Street NoClayton Surrey Fraser Highway at 190 Street NoWillowbrook Langley Township Fraser Highway at 196 Street YesLangley City Centre Langley City Industrial Avenue at 203 Street 19 YesThe 2008 Provincial Transit Plan included a 6 kilometre 3 7 mi extension from King George station in Surrey east to Guildford then along 152 Street to Fraser Highway and southeast to 168 Street a further extension to Willowbrook Shopping Centre in Langley Township was also included in the plan 20 In 2011 as part of phase 2 of the Surrey Rapid Transit Study different possibilities were examined for expanding rapid transit along multiple corridors in the South of Fraser region 21 In addition to SkyTrain light rail and bus rapid transit were also in consideration In 2016 TransLink was building dual business cases for LRT and SkyTrain technologies 22 In November 2018 following a change of government in Surrey the Metro Vancouver Mayors Council voted to indefinitely suspend the at grade Surrey light rail project in favour of extending the Expo Line from King George station to Langley City This extension would be 16 kilometres 9 9 mi long and add eight stations to the Expo Line 23 24 The 1 65 billion in funding that was earmarked for the light rail project was intended to be used to construct part of this extension to Langley but was insufficient to fund the entire extension with 1 9 billion more needed to complete the project 25 The existing funding would extend the line 7 kilometres 4 3 mi to Fleetwood in Surrey and add 4 new stations terminating at 166th Street On July 25 2019 the Mayors Council voted to extend the Expo Line to Fleetwood using the existing funds 26 The council also voted to proceed with preparing a detailed business case for the full Surrey Langley SkyTrain extension which was expected to be completed by early 2020 If approved by the end of the third quarter of 2020 construction would have started in early 2022 with revenue service to Fleetwood projected to have started in late 2025 25 On October 8 2020 during the 2020 provincial election campaign the BC NDP pledged to work with senior levels of government to obtain the 1 5 billion needed to complete the full extension to Langley 27 On July 9 2021 Prime Minister Justin Trudeau announced that the federal government would provide up to 1 3 billion to build the SkyTrain extension to Langley in a single phase 28 At that time the cost of the project was estimated between 3 8 and 3 95 billion in total more than 650 million in excess of the earlier 3 13 billion estimate from TransLink with the rest of the funding being split between TransLink and the provincial government 28 29 The full extension to Langley was planned to be constructed as a single project rather than in two phases and is scheduled to open in 2028 30 In July 2022 the provincial government officially approved this one phase plan Procurement for contractors was slated to start later in 2022 with major construction expected to begin in 2024 31 Stations editStation Opened City Connections LocationWaterfront 1985 Vancouver nbsp nbsp nbsp nbsp Cordova between Granville and SeymourBurrard 1985 Vancouver nbsp Burrard between Melville and DunsmuirGranville 1985 Vancouver Granville between Georgia and Dunsmuir adjacent to Pacific CentreStadium Chinatown 1985 Vancouver Beatty at Dunsmuir adjacent to Rogers Arena near BC Place and ChinatownMain Street Science World 1985 Vancouver nbsp nbsp Pacific Central Main at Terminal near Science WorldCommercial Broadway 1985 2002 b Vancouver nbsp nbsp Commercial at BroadwayNanaimo 1985 Vancouver East 24th Avenue at Nanaimo29th Avenue 1985 Vancouver East 29th Avenue at AtlinJoyce Collingwood 1985 Vancouver nbsp Joyce at VannessPatterson 1985 Burnaby Patterson between Beresford and CentralMetrotown 1985 Burnaby Beresford and Central between Silver and Telford adjacent to Metropolis at MetrotownRoyal Oak 1985 Burnaby Beresford at Royal OakEdmonds 1985 Burnaby 18th Street near Griffiths22nd Street station 1985 New Westminster 22nd Street at 7th AvenueNew Westminster 1985 New Westminster 8th Street between Columbia and Carnarvon integrated with Shops at New WestColumbia 1989 New Westminster 4th Street between Columbia and Carnarvon branches splitKing George branchScott Road 1990 Surrey nbsp Scott Road near King George BoulevardGateway 1994 Surrey 108 Avenue at University DriveSurrey Central 1994 Surrey nbsp Central Avenue at City Parkway adjacent to Central CityKing George 1994 Surrey nbsp King George Boulevard between 100 Avenue and George Junction adjacent to King George HubProduction Way University branchSapperton 2002 New Westminster Brunette at Spruce adjacent to Royal Columbian HospitalBraid 2002 Brunette at Braid near Highway 1Lougheed Town Centre 2002 Burnaby nbsp Lougheed Highway at Austin adjacent to the City of Lougheed shopping centreProduction Way University 2002 nbsp nbsp SFU Lougheed Highway at Production WaySee also editSkyTrain Vancouver rolling stockNotes edit Combined with Millennium Line Commercial Broadway station was originally two separate stations Broadway station and Commercial Drive station Broadway station was completed in 1985 while Commercial Drive station was completed in 2002 the stations were merged in 2009 32 References edit TransLink 2022 Transit Performance Review PDF TransLink Retrieved June 23 2023 Transportation and Financial Base Plan for 2013 to 2015 and Outlook for 2016 to 2022 PDF TransLink October 30 2012 Archived from the original PDF on November 14 2017 Retrieved November 14 2017 Farrow Moira Cox Sarah December 11 1985 Glitter bands and balloons The Vancouver Sun p A1 Retrieved December 8 2022 via Newspapers com In business on time System s first riders all had their reasons The Vancouver Sun January 3 1986 p A1 Retrieved December 8 2022 via Newspapers com Hall Neal December 27 1986 Happy birthday SkyTrain The Vancouver Sun p B12 Retrieved December 8 2022 via Newspapers com Schaefer Glen March 16 1990 Ride across river offers new views The Province p 14 Retrieved December 8 2022 via Newspapers com SkyTrain Your City to City Connection PDF The Buzzer BC Transit March 11 1994 Archived PDF from the original on December 17 2021 Retrieved October 7 2022 Changes Coming to SkyTrain October 22 TransLink September 19 2016 Archived from the original on September 24 2016 Retrieved September 19 2016 Johnston Jesse October 22 2016 SkyTrain network changes start today CBC News Archived from the original on January 20 2022 Retrieved October 27 2016 Expo Line Upgrade Strategy Project Summary PDF Report May 7 2012 Retrieved January 4 2024 Skytrain Vancouver s advanced rapid transit system Thales Group Archived from the original on April 5 2012 Retrieved November 17 2011 TransLink to buy 205 new SkyTrain cars from Bombardier for 723 million Urbanized dailyhive com Retrieved August 17 2023 New rendering of the future SkyTrain cars arriving starting later this year Urbanized dailyhive com Retrieved August 17 2023 Chan Kenneth December 22 2023 First new generation SkyTrain cars arrive in Metro Vancouver Urbanized dailyhive com Retrieved January 4 2024 End of the line in sight for two generations of old SkyTrain cars Urbanized dailyhive com Retrieved August 17 2023 Chan Kenneth February 16 2023 TransLink begins upgrade of SkyTrain stations to handle longer trains Urbanized DailyHive Retrieved December 8 2023 Surrey Langley SkyTrain www surrey ca City of Surrey December 11 2019 Retrieved December 1 2023 Surrey Langley SkyTrain Project Project Overview Ministry of Transportation and Infrastructure Province of British Columbia Retrieved December 1 2023 Chan Kenneth May 12 2022 BC government seeking public input on Surrey Langley SkyTrain design Urbanized dailyhive com Retrieved December 7 2023 Nagel Jeff January 16 2008 More SkyTrains for Surrey Surrey Leader Archived from the original on January 20 2008 Retrieved February 21 2008 Rapid Transit Principles for the Broadway Corridor and the UBC Line Rapid Transit Study TransLink Archived from the original on January 13 2012 Retrieved November 17 2011 Nagel Jeff June 7 2016 Line to Langley may still be SkyTrain TransLink CEO Abbotsford News Archived from the original on November 30 2018 Retrieved February 13 2018 McElroy Justin November 15 2018 Metro Vancouver mayors agree to suspend Surrey LRT start process for SkyTrain to Langley CBC News Archived from the original on December 4 2021 Retrieved November 30 2018 Chan Kenneth July 20 2018 SkyTrain along Fraser Highway to Langley will cost 2 9 billion says TransLink Daily Hive Archived from the original on March 6 2021 Retrieved November 30 2018 a b Saltman Jennifer July 26 2019 Mayors Council votes to proceed with plan for Surrey Langley SkyTrain Vancouver Sun Archived from the original on August 27 2019 Retrieved August 27 2019 Pablo Carlito July 25 2019 Divided Metro Vancouver mayors approve new SkyTrain from King George Station to Fleetwood The Georgia Straight Archived from the original on August 27 2019 Retrieved August 27 2019 Claxton Matthew October 8 2020 Horgan pledges NDP will complete 1 5 billion SkyTrain extension to Langley Surrey Now Leader Archived from the original on November 24 2021 Retrieved October 25 2020 a b Chan Kenneth July 9 2021 Trudeau announces 1 3 billion for Surrey Langley SkyTrain confirms UBC support Urbanized DailyHive Archived from the original on October 26 2021 Retrieved July 11 2021 Weichel Andrew July 9 2021 Federal government providing up to 1 3 billion for Surrey Langley SkyTrain extension CTV News Vancouver Archived from the original on December 8 2021 Retrieved July 9 2021 Chan Kenneth July 14 2022 16 km long Surrey Langley SkyTrain extension receives full government approval Urbanized dailyhive com Retrieved July 24 2022 Chan Kenneth July 14 2022 16 km long Surrey Langley SkyTrain extension receives full provincial and federal approval Daily Hive Retrieved July 20 2022 What s That Name Again Canada Line Start Brings Station Name Changes TransLink August 28 2009 Archived from the original on March 25 2018 Retrieved June 26 2021 External links editKML file edit help Template Attached KML Expo Line TransLink KML is from Wikidata TransLink The organization that owns SkyTrain B C Rapid Transit Company Ltd The subsidiary of TransLink that operates and maintains SkyTrain Retrieved from https en wikipedia org w index php title Expo Line SkyTrain amp oldid 1195794537, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.