fbpx
Wikipedia

Circular line (New Taipei)

The Circular or Yellow line (code Y) (Chinese: 環狀線) is a metro line in New Taipei City. The first phase of the project consists of the section from Dapinglin to New Taipei Industrial Park and is approximately 15.4 km (9.6 mi) long with 14 stations.[5] This initial section was opened on 31 January 2020.[3] Hitachi Rail Italy supplied 17 sets of 4-car driverless medium-capacity trains for the line.[6][1]

Circular line
A Circular line train (Driverless Metro) at Dapinglin
Overview
LocaleTaipei and New Taipei, Taiwan
Termini
Stations14 (Western Section)
Service
TypeRapid transit
Operator(s)New Taipei Rapid Transit Corporation
Depot(s)
  • North
  • South
Rolling stock
History
Opened31 January 2020 (2020-01-31)[3]
Technical
Line length15.4 km (9.6 mi)[4]
Number of tracks2
CharacterElevated and underground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Operating speed80 km/h (50 mph)
Route map

Y01
Taipei Zoo
( )
Y02
National Chengchi University
Y03
Wenshan District Office
Y04
Mamingtan
Y05
Gouzikou
Y06
Baodoucuo
(  )
Y07
Dapinglin
Y08
Shisizhang
Y09
Xiulang Bridge
Y10
Jingping
Y11
Jingan
(  )
Y12
Zhonghe
( future  )
Y13
Qiaohe
Y14
Zhongyuan
Y15
Banxin
Y16
Banqiao
(  )
(  )
Y17
Xinpu Minsheng
Y18
Touqianzhuang
(  )
Y19
Xingfu
Y20
New Taipei Industrial Park
(   )
Y21
New Taipei City Exhibition Hall
Y22
Gengliao
Y23
Zhonglu
Y24
St Ignatius High School
(  )
Y25
Fenziwei
Y26
Chongyang Bridge
Y27
Shezi
Keelung River
Y28
Fudeyang
Y29
Shilin
(  )
Y30
Linzikou
Y31
National Palace Museum
Y32
Jiannan Road
(  )
Y33
Xiatayou
Y34
Zhouzi
Y35
Neihu Technology Park
Y36
Ruiguang Park
Y37
Fenliao
Y38
Jiulizu
Y39
Songshan
( )
(  )
(  )
Y40
Yongchun
(  )
Y41
Xiangshan
Y42
Sanzhangli
Note: Names in italics are only possible names and may change.
Circular line
Traditional Chinese環狀線
Simplified Chinese环状线
Transcriptions
Standard Mandarin
Hanyu PinyinHuánzhuàng Xiàn
Wade–GilesHuan2-chuang4 Hsien4
Tongyong PinyinHuánjhuàng-Siàn
Southern Min
Hokkien POJKhoân-chōng Sòaⁿ
Yellow line
Traditional Chinese黃線
Simplified Chinese黄线
Transcriptions
Standard Mandarin
Hanyu PinyinHuáng Xiàn
Wade–GilesHuang Hsien4
Tongyong PinyinHuáng-Siàn
Southern Min
Hokkien POJN̂g Sòaⁿ

Construction edit

Hitachi Rail STS supplied electromechanical equipment for the line, including driverless technology and CBTC signaling.[6][1] Dapinglin, currently the only underground station on the line, was constructed by RSEA Engineering Corporation and employed the cut-and-cover method.[7]

Construction for the first phase officially broke ground on 11 July 2011 on a 6.3 km (3.9 mi) elevated section between Zhonghe and Banqiao.[8] The section is estimated to cost NT$13.7 billion, with the entire first-stage 15.4 km (9.6 mi) route estimated to cost NT$54.7 billion to construct.

The line includes the first elevated split platforms in the system at Zhonghe, Qiaohe, and Zhongyuan due to the narrowness of the available station area.[9][10]

Stations in operation edit

The western section of the line officially opened on 31 January 2020.[3][11]

Code Station Name Transfer District City
English Chinese
Y07 Dapinglin 大坪林   Xindian New Taipei
Y08 Shisizhang 十四張  
Y09 Xiulang Bridge 秀朗橋 Zhonghe
Y10 Jingping 景平
Y11 Jingan 景安  
Y12 Zhonghe 中和   (constructing)
Y13 Qiaohe 橋和
Y14 Zhongyuan 中原
Y15 Banxin 板新 Banqiao
Y16 Banqiao 板橋   (out of station)    
Y17 Xinpu Minsheng 新埔民生   (Xinpu)
Y18 Touqianzhuang 頭前庄   Xinzhuang
Y19 Xingfu 幸福
Y20 New Taipei Industrial Park 新北產業園區  

Stations under construction edit

The north and south sections are approved for construction. [a] Currently under construction, with estimated completion in 2029.

South section edit

Stations Y01–06 are approved for construction. (Unopened stations' names are to be confirmed)

Code Station Name Transfer District City
English Chinese
Y01 Taipei Zoo 臺北動物園     Wenshan Taipei
Y02 National Chengchi University 政大
Y03 Wenshan District Office 文山區公所
Y04 Mamingtan 馬明潭
Y05 Gouzikou 溝子口
Y06 Baodoucuo 寶斗厝 To be connected to Dapinglin Xindian New Taipei

North section edit

Stations Y21–32 are approved for construction. (Unopened stations' names are to be confirmed)

Code Station Name Transfer District City
English Chinese
Y21 New Taipei City Exhibition Hall 工商展覽中心 To be connected to New Taipei Industrial Park Wugu New Taipei
Y22 Gengliao 更寮
Y23 Zhonglu 中路 Luzhou
Y24 St Ignatius High School 徐匯中學  
Y25 Fenziwei 分子尾
Y26 Chongyang Bridge 重陽橋 Sanchong
Y27 Shezi 社子 Shilin Taipei
Y28 Fudeyang 福德洋
Y29 Shilin 士林  
Y30 Linzikou 林子口
Y31 National Palace Museum 故宮
Y32 Jiannan Road 劍南路   Zhongshan

Planned stations edit

The east section is still under planning and subject to change.[a] After this section is complete, the Circular line will go in a circle.

East section edit

(Unopened stations' names are to be confirmed)

Code Station Name Transfer Districts City
English Chinese
Y33 Xiatayou 下塔悠 To be connected to Jiannan Road Zhongshan Taipei
Y34 Zhouzi 洲子 Neihu
Y35 Neihu Technology Park 內湖科技園區
Y36 Ruiguang Park 瑞光公園
Y37 Fenliao 粉寮
Y38 Jiulizhu 舊里族   (planned)
Y39 Songshan 松山   (out-of-station)   Songshan
Y40 Yongchun 永春   (out-of-station) Xinyi
Y41 Xiangshan 象山   (out-of-station)
Y42 Sanzhangli 三張犁 To be connected to Taipei Zoo

Network map edit

 

See also edit

Notes edit

  1. ^ a b The listed station codes are those used for the construction project and may differ from those used by the operator.

References edit

  1. ^ a b c (Press release). Tokyo and Rome: Hitachi Rail. 2 November 2015. Archived from the original on 1 December 2020. Retrieved 26 January 2020.
  2. ^ Collet, Coralie; Chan, Jane (30 September 2021). "Alstom-led consortium to deliver innovative integrated system for Taipei's fully automated metro line" (Press release). Alstom. Retrieved 15 January 2022.
  3. ^ a b c 陳怡璇 (21 January 2020). "Jié yùn huán zhuàng xiàn 1 yuè 31 rì tōngchē" 捷運環狀線 1月31日通車 [MRT Circular Line Opens to Traffic on January 31]. CNA.
  4. ^ "Xīnběi huán zhuàng xiàn qiāodìng 1/31 tōngchē!3 Yuè kāishǐ zhèngshì shōufèi" 新北環狀線敲定1/31通車!3月開始正式收費 [New Taipei Circular Line Is Finalized 1/31 to Open to Traffic! Official Fees Will Start in March]. newtalk.tw (in Chinese). 21 January 2020.
  5. ^ . Comprehensive Planning Division. 4 July 2009. Archived from the original on 7 February 2010. Retrieved 14 August 2009.
  6. ^ a b Pearce, Jane (17 March 2009). "Taipei Circular Line Kicks off". Railway Gazette. Retrieved 16 March 2021.
  7. ^ . Department of Rapid Transit Systems. 23 December 2009. Archived from the original on 15 August 2011. Retrieved 22 February 2010.
  8. ^ Liu, Philip (12 July 2011). "Construction on 1st-Stage Ring Section of Taipei MRT Breaks Ground". China Economic News Service. Retrieved 14 July 2011.
  9. ^ . Department of Rapid Transit Systems. 1 June 2011. Archived from the original on 14 July 2011. Retrieved 22 July 2011.
  10. ^ [Construction of the Cf650 Elevated Section of the Circular Line Started] (PDF) (in Chinese). Department of Rapid Transit Systems. 1 May 2011. Archived from the original (PDF) on 8 October 2011. Retrieved 25 July 2011.
  11. ^ . Global News for New Immigrants. Ministry of Interior, National Immigration Agency. 28 December 2019. Archived from the original on 11 January 2020. Retrieved 11 January 2020.

circular, line, taipei, circular, yellow, line, code, chinese, 環狀線, metro, line, taipei, city, first, phase, project, consists, section, from, dapinglin, taipei, industrial, park, approximately, long, with, stations, this, initial, section, opened, january, 20. The Circular or Yellow line code Y Chinese 環狀線 is a metro line in New Taipei City The first phase of the project consists of the section from Dapinglin to New Taipei Industrial Park and is approximately 15 4 km 9 6 mi long with 14 stations 5 This initial section was opened on 31 January 2020 3 Hitachi Rail Italy supplied 17 sets of 4 car driverless medium capacity trains for the line 6 1 Circular lineA Circular line train Driverless Metro at DapinglinOverviewLocaleTaipei and New Taipei TaiwanTerminiDapinglinNew Taipei Industrial ParkStations14 Western Section ServiceTypeRapid transitOperator s New Taipei Rapid Transit CorporationDepot s North SouthRolling stockPhase 1 Hitachi Rail Italy Driverless Metro 1 Phase 2 Alstom Metropolis type TBA built in Taubate 2 HistoryOpened31 January 2020 2020 01 31 3 TechnicalLine length15 4 km 9 6 mi 4 Number of tracks2CharacterElevated and undergroundTrack gauge1 435 mm 4 ft 8 1 2 in standard gaugeElectrification750 V DC third railOperating speed80 km h 50 mph Route mapY01 Taipei Zoo Y02 National Chengchi UniversityY03 Wenshan District OfficeY04 MamingtanY05 GouzikouY06 Baodoucuo Y07 DapinglinY08 Shisizhang Ankeng LRT Y09 Xiulang BridgeY10 JingpingY11 Jingan Y12 Zhonghe future Y13 QiaoheY14 ZhongyuanY15 BanxinY16 Banqiao West Coast line Y17 Xinpu MinshengTamsui RiverY18 Touqianzhuang Y19 XingfuY20 New Taipei Industrial Park Y21 New Taipei City Exhibition HallY22 GengliaoY23 ZhongluY24 St Ignatius High School Y25 FenziweiY26 Chongyang BridgeTamsui RiverY27 SheziKeelung RiverY28 FudeyangY29 Shilin Y30 LinzikouY31 National Palace MuseumY32 Jiannan Road Y33 XiatayouY34 ZhouziY35 Neihu Technology ParkY36 Ruiguang ParkY37 FenliaoY38 JiulizuY39 Songshan West Coast line Y40 Yongchun Y41 XiangshanY42 SanzhangliThis diagram viewtalkedit Note Names in italics are only possible names and may change Circular lineTraditional Chinese環狀線Simplified Chinese环状线TranscriptionsStandard MandarinHanyu PinyinHuanzhuang XianWade GilesHuan2 chuang4 Hsien4Tongyong PinyinHuanjhuang SianSouthern MinHokkien POJKhoan chōng SoaⁿYellow lineTraditional Chinese黃線Simplified Chinese黄线TranscriptionsStandard MandarinHanyu PinyinHuang XianWade GilesHuang Hsien4Tongyong PinyinHuang SianSouthern MinHokkien POJN g Soaⁿ Contents 1 Construction 2 Stations in operation 3 Stations under construction 3 1 South section 3 2 North section 4 Planned stations 4 1 East section 5 Network map 6 See also 7 Notes 8 ReferencesConstruction editHitachi Rail STS supplied electromechanical equipment for the line including driverless technology and CBTC signaling 6 1 Dapinglin currently the only underground station on the line was constructed by RSEA Engineering Corporation and employed the cut and cover method 7 Construction for the first phase officially broke ground on 11 July 2011 on a 6 3 km 3 9 mi elevated section between Zhonghe and Banqiao 8 The section is estimated to cost NT 13 7 billion with the entire first stage 15 4 km 9 6 mi route estimated to cost NT 54 7 billion to construct The line includes the first elevated split platforms in the system at Zhonghe Qiaohe and Zhongyuan due to the narrowness of the available station area 9 10 Stations in operation editThe western section of the line officially opened on 31 January 2020 3 11 Code Station Name Transfer District CityEnglish ChineseY07 Dapinglin 大坪林 nbsp Xindian New TaipeiY08 Shisizhang 十四張 nbsp Y09 Xiulang Bridge 秀朗橋 ZhongheY10 Jingping 景平Y11 Jingan 景安 nbsp Y12 Zhonghe 中和 nbsp constructing Y13 Qiaohe 橋和Y14 Zhongyuan 中原Y15 Banxin 板新 BanqiaoY16 Banqiao 板橋 nbsp out of station nbsp nbsp Y17 Xinpu Minsheng 新埔民生 nbsp Xinpu Y18 Touqianzhuang 頭前庄 nbsp XinzhuangY19 Xingfu 幸福Y20 New Taipei Industrial Park 新北產業園區 nbsp Stations under construction editThe north and south sections are approved for construction a Currently under construction with estimated completion in 2029 South section edit Stations Y01 06 are approved for construction Unopened stations names are to be confirmed Code Station Name Transfer District CityEnglish ChineseY01 Taipei Zoo 臺北動物園 nbsp nbsp Wenshan TaipeiY02 National Chengchi University 政大Y03 Wenshan District Office 文山區公所Y04 Mamingtan 馬明潭Y05 Gouzikou 溝子口Y06 Baodoucuo 寶斗厝 To be connected to Dapinglin Xindian New TaipeiNorth section edit Stations Y21 32 are approved for construction Unopened stations names are to be confirmed Code Station Name Transfer District CityEnglish ChineseY21 New Taipei City Exhibition Hall 工商展覽中心 To be connected to New Taipei Industrial Park Wugu New TaipeiY22 Gengliao 更寮Y23 Zhonglu 中路 LuzhouY24 St Ignatius High School 徐匯中學 nbsp Y25 Fenziwei 分子尾Y26 Chongyang Bridge 重陽橋 SanchongY27 Shezi 社子 Shilin TaipeiY28 Fudeyang 福德洋Y29 Shilin 士林 nbsp Y30 Linzikou 林子口Y31 National Palace Museum 故宮Y32 Jiannan Road 劍南路 nbsp ZhongshanPlanned stations editThe east section is still under planning and subject to change a After this section is complete the Circular line will go in a circle East section edit Unopened stations names are to be confirmed Code Station Name Transfer Districts CityEnglish ChineseY33 Xiatayou 下塔悠 To be connected to Jiannan Road Zhongshan TaipeiY34 Zhouzi 洲子 NeihuY35 Neihu Technology Park 內湖科技園區Y36 Ruiguang Park 瑞光公園Y37 Fenliao 粉寮Y38 Jiulizhu 舊里族 nbsp planned Y39 Songshan 松山 nbsp out of station nbsp SongshanY40 Yongchun 永春 nbsp out of station XinyiY41 Xiangshan 象山 nbsp out of station Y42 Sanzhangli 三張犁 To be connected to Taipei ZooNetwork map edit nbsp See also editRail transport in TaiwanNotes edit a b The listed station codes are those used for the construction project and may differ from those used by the operator References edit a b c Sale of AnsaldoBreda and Ansaldo STS from Finmeccanica to Hitachi Completed Press release Tokyo and Rome Hitachi Rail 2 November 2015 Archived from the original on 1 December 2020 Retrieved 26 January 2020 Collet Coralie Chan Jane 30 September 2021 Alstom led consortium to deliver innovative integrated system for Taipei s fully automated metro line Press release Alstom Retrieved 15 January 2022 a b c 陳怡璇 21 January 2020 Jie yun huan zhuang xian 1 yue 31 ri tōngche 捷運環狀線 1月31日通車 MRT Circular Line Opens to Traffic on January 31 CNA Xinbei huan zhuang xian qiaoding 1 31 tōngche 3 Yue kaishǐ zhengshi shōufei 新北環狀線敲定1 31通車 3月開始正式收費 New Taipei Circular Line Is Finalized 1 31 to Open to Traffic Official Fees Will Start in March newtalk tw in Chinese 21 January 2020 Second Stage of Taipei MRT Approved MRT line Comprehensive Planning Division 4 July 2009 Archived from the original on 7 February 2010 Retrieved 14 August 2009 a b Pearce Jane 17 March 2009 Taipei Circular Line Kicks off Railway Gazette Retrieved 16 March 2021 Part of Circular Line Phase One Construction Successfully Awarded and Main Construction to be Launched Department of Rapid Transit Systems 23 December 2009 Archived from the original on 15 August 2011 Retrieved 22 February 2010 Liu Philip 12 July 2011 Construction on 1st Stage Ring Section of Taipei MRT Breaks Ground China Economic News Service Retrieved 14 July 2011 Construction of the Circular Line Launched Department of Rapid Transit Systems 1 June 2011 Archived from the original on 14 July 2011 Retrieved 22 July 2011 Huan zhuang xian CF650 biaogao jia duan kaigōngle 環狀線CF650標高架段開工了 Construction of the Cf650 Elevated Section of the Circular Line Started PDF in Chinese Department of Rapid Transit Systems 1 May 2011 Archived from the original PDF on 8 October 2011 Retrieved 25 July 2011 Taipei MRT Circular Line to Face Inspection Jan 5 Global News for New Immigrants Ministry of Interior National Immigration Agency 28 December 2019 Archived from the original on 11 January 2020 Retrieved 11 January 2020 Retrieved from https en wikipedia org w index php title Circular line New Taipei amp oldid 1218242134, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.