fbpx
Wikipedia

Shapingba railway station

The Shapingba railway station (Chinese: 沙坪坝站; pinyin: Shāpíngbà zhàn) is a railway station of Chengyu Passenger Railway that is located in Shapingba District of Chongqing, People's Republic of China. It was originally opened in 1979 serving ground-level tracks and has been operated as part of China Railway's Chengdu Bureau. In 1988, it was renamed as Chongqing North Railway Station, but reverted to the Shapingba name when another new station in Yubei District was opened as Chongqing North railway station.[1] Serving only conventional services, the station was closed in 2011[2][3] for a major renovation and as part of an expansion of the Three Gorges Plaza commercial development. It was redeveloped as a fully Integrated Transport Hub, serving high-speed and conventional rail, metro rail services, local city buses, taxi services and personal cars, all within a major commercial and retail complex. The railway station section of this project was reopened on 25 January 2018[4] and the final retail and commercial development was completed on 30 December 2020.[5] It should not be confused with the larger Chongqing West railway station, which is also located in Shapingba District, and opened on the same day.

Shapingba

沙坪坝
Shapingba railway station
General information
LocationShapingba Station West Lu, Shapingba District, Chongqing
China
Coordinates29°33′23″N 106°27′12″E / 29.55639°N 106.45333°E / 29.55639; 106.45333
Operated byChengdu Railway Bureau
China Railway Corporation
Line(s)Chuanqian Railway
Chengyu Railway
Xiangyu Railway
Platforms4
Connections
Other information
Station code47066 (TMIS)
CYW (telegram)
SPB (pinyin)
History
Opened1979; 44 years ago (1979)
25 January 2018; 5 years ago (2018-01-25) (renovation)

History edit

 
The old Shapingba Station before renovation (2008)
  • 1979: Shapingba station opened.
  • 1988: Shapingba station renamed "Chongqing North Station".
  • 20 October 2006: The station was renamed again as "Shapingba station" with the opening of the Chongqing North Station in Yubei District
  • 8 May 2011: The final service of the 5608 train from Chongqing bound for Nanchong before demolition of the station, platform and tracks.[6]
  • 28 December 2012: Construction of a new Shapingba Station, as an Integrated Transport hub project, officially started.
  • May 2017: New station building begins track laying.[7]
  • October 2017: New main underground station building completed, track laying completed. Station interiors begin to be decorated.[8]
  • 25 January 2018: New station put into operation with high speed rail services to Chengdu East Railway Station.

Station Structure edit

Originally built as an above-ground station, serving at-grade railway tracks. After major renovations and construction work, the current station building is mostly an underground complex serving a rebuilt sunken railway, with a retail and commercial development being built above the station complex. The redevelopment was budgeted to cost 10 Billion RMB.[9] The renovations for the station building was opened to the public on 25 January 2018.[10]

Station Building edit

 
A CRH380D EMU at the station.

The main railway station consists of eight levels, one at ground level and seven underground levels. There are also 34 self-service gates in the waiting room. In the waiting area and at platform level, it is equipped with 8 barrier-free elevators and 13 escalators to facilitate passenger movements. Public toilets (including barrier-free toilets) been built at the Front Entrance, the Waiting Hall, Transfer Hall, Taxi Station and on the Bus Station levels. Parenting rooms are present in the Waiting Room and Transfer Hall. A temporary shopping area is present in the Waiting Room too. Parking for 800 vehicles is provided over four levels.

The bus station serves only local city bus services on 27 routes and an Airport Express bus to Chongqing Jiangbei Airport's Terminal 3. There are another two additional city bus stations externally to the station along the West and South Roads serving the station. Long distance buses are found at Chongqing West, Chongqing North and Chongqing railway stations.

Commercial and Retail Development edit

Above the station, two office towers and a retail development is under construction. Called the Shapingba Twin Towers, it is a first in China for such a mixed commercial development, as part of a railway station. The northern side of the station will also feature an open public space as part of an expansion to the existing Three Gorges Plaza. Construction of this development is expected to be complete by 2020.

Metro Station edit

Connection and interchange is possible with the Chongqing Rail Transit metro system. It connects with the Shapingba station on Line 1, Line 9 and the Loop Line via dedicated underground passageways.

Train Services edit

The station opened on January 25, 2018 with 10 pairs of trains daily between Chengdu East Railway Station and Shapingba.[11]

References edit

  1. ^ 蒋艳 (15 October 2009). . Chongqing Morning Post. Archived from the original on 22 February 2011. Retrieved 6 May 2016.
  2. ^ Dai, Liu (31 December 2012). "Chongqing to be railway hub in W China in 2017". CQ News. Retrieved 14 January 2013.
  3. ^ 黄宇. . Chongqing Morning Post. 7 May 2011. Archived from the original on 24 January 2018.
  4. ^ 李琅; 郑友; 冉文; 李化 (23 January 2018). "沙坪坝火车站后天迎客". Chongqing Evening Post. Retrieved 24 January 2018.{{cite news}}: CS1 maint: multiple names: authors list (link)
  5. ^ . 24 December 2020. Archived from the original on 2 February 2021.
  6. ^ "六年前的今晨 沙坪坝火车站送走最后一班绿皮车". 新浪网. 8 May 2017.
  7. ^ "沙坪坝火车站下月铺轨". 新华网. 22 April 2017.
  8. ^ "沙坪坝火车站主体完工". Chongqing Evening Post. 2 October 2017. Retrieved 18 October 2017.
  9. ^ . Chongqing Times. 19 January 2017. Archived from the original on 12 April 2017.
  10. ^ "渝贵铁路、重庆西站、沙坪坝站25日开通,乘车出行的你千万别走错地方!". Chongqing Morning Post. 19 January 2018. Retrieved 19 January 2018.
  11. ^ 李智 (23 January 2018). "沙坪坝、重庆北、重庆西……成都赶高铁去重庆该在哪站下?". Huaxi City Daily. Retrieved 24 January 2018.

shapingba, railway, station, help, expand, this, article, with, text, translated, from, corresponding, article, chinese, march, 2011, click, show, important, translation, instructions, machine, translation, like, deepl, google, translate, useful, starting, poi. You can help expand this article with text translated from the corresponding article in Chinese March 2011 Click show for important translation instructions Machine translation like DeepL or Google Translate is a useful starting point for translations but translators must revise errors as necessary and confirm that the translation is accurate rather than simply copy pasting machine translated text into the English Wikipedia Do not translate text that appears unreliable or low quality If possible verify the text with references provided in the foreign language article You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation A model attribution edit summary is Content in this edit is translated from the existing Chinese Wikipedia article at zh 沙坪坝站 see its history for attribution You should also add the template Translated zh 沙坪坝站 to the talk page For more guidance see Wikipedia Translation For the metro station see Shapingba station The Shapingba railway station Chinese 沙坪坝站 pinyin Shapingba zhan is a railway station of Chengyu Passenger Railway that is located in Shapingba District of Chongqing People s Republic of China It was originally opened in 1979 serving ground level tracks and has been operated as part of China Railway s Chengdu Bureau In 1988 it was renamed as Chongqing North Railway Station but reverted to the Shapingba name when another new station in Yubei District was opened as Chongqing North railway station 1 Serving only conventional services the station was closed in 2011 2 3 for a major renovation and as part of an expansion of the Three Gorges Plaza commercial development It was redeveloped as a fully Integrated Transport Hub serving high speed and conventional rail metro rail services local city buses taxi services and personal cars all within a major commercial and retail complex The railway station section of this project was reopened on 25 January 2018 4 and the final retail and commercial development was completed on 30 December 2020 5 It should not be confused with the larger Chongqing West railway station which is also located in Shapingba District and opened on the same day Shapingba沙坪坝Shapingba railway stationGeneral informationLocationShapingba Station West Lu Shapingba District ChongqingChinaCoordinates29 33 23 N 106 27 12 E 29 55639 N 106 45333 E 29 55639 106 45333Operated byChengdu Railway Bureau China Railway CorporationLine s Chuanqian RailwayChengyu RailwayXiangyu RailwayPlatforms4ConnectionsShapingba Metro Station Bus terminalOther informationStation code47066 TMIS CYW telegram SPB pinyin HistoryOpened1979 44 years ago 1979 25 January 2018 5 years ago 2018 01 25 renovation Contents 1 History 2 Station Structure 2 1 Station Building 2 2 Commercial and Retail Development 3 Metro Station 4 Train Services 5 ReferencesHistory edit nbsp The old Shapingba Station before renovation 2008 1979 Shapingba station opened 1988 Shapingba station renamed Chongqing North Station 20 October 2006 The station was renamed again as Shapingba station with the opening of the Chongqing North Station in Yubei District 8 May 2011 The final service of the 5608 train from Chongqing bound for Nanchong before demolition of the station platform and tracks 6 28 December 2012 Construction of a new Shapingba Station as an Integrated Transport hub project officially started May 2017 New station building begins track laying 7 October 2017 New main underground station building completed track laying completed Station interiors begin to be decorated 8 25 January 2018 New station put into operation with high speed rail services to Chengdu East Railway Station Station Structure editOriginally built as an above ground station serving at grade railway tracks After major renovations and construction work the current station building is mostly an underground complex serving a rebuilt sunken railway with a retail and commercial development being built above the station complex The redevelopment was budgeted to cost 10 Billion RMB 9 The renovations for the station building was opened to the public on 25 January 2018 10 Station Building edit nbsp A CRH380D EMU at the station The main railway station consists of eight levels one at ground level and seven underground levels There are also 34 self service gates in the waiting room In the waiting area and at platform level it is equipped with 8 barrier free elevators and 13 escalators to facilitate passenger movements Public toilets including barrier free toilets been built at the Front Entrance the Waiting Hall Transfer Hall Taxi Station and on the Bus Station levels Parenting rooms are present in the Waiting Room and Transfer Hall A temporary shopping area is present in the Waiting Room too Parking for 800 vehicles is provided over four levels The bus station serves only local city bus services on 27 routes and an Airport Express bus to Chongqing Jiangbei Airport s Terminal 3 There are another two additional city bus stations externally to the station along the West and South Roads serving the station Long distance buses are found at Chongqing West Chongqing North and Chongqing railway stations Commercial and Retail Development edit Above the station two office towers and a retail development is under construction Called the Shapingba Twin Towers it is a first in China for such a mixed commercial development as part of a railway station The northern side of the station will also feature an open public space as part of an expansion to the existing Three Gorges Plaza Construction of this development is expected to be complete by 2020 Metro Station editMain article Shapingba station Connection and interchange is possible with the Chongqing Rail Transit metro system It connects with the Shapingba station on Line 1 Line 9 and the Loop Line via dedicated underground passageways Train Services editThe station opened on January 25 2018 with 10 pairs of trains daily between Chengdu East Railway Station and Shapingba 11 References edit 蒋艳 15 October 2009 重庆几个火车站取名混乱太误人 Chongqing Morning Post Archived from the original on 22 February 2011 Retrieved 6 May 2016 Dai Liu 31 December 2012 Chongqing to be railway hub in W China in 2017 CQ News Retrieved 14 January 2013 黄宇 最后的绿皮车 带我们回到从前 Chongqing Morning Post 7 May 2011 Archived from the original on 24 January 2018 李琅 郑友 冉文 李化 23 January 2018 沙坪坝火车站后天迎客 Chongqing Evening Post Retrieved 24 January 2018 a href Template Cite news html title Template Cite news cite news a CS1 maint multiple names authors list link 成渝双城实现62分钟互通 复兴号开进龙湖光年 24 December 2020 Archived from the original on 2 February 2021 六年前的今晨 沙坪坝火车站送走最后一班绿皮车 新浪网 8 May 2017 沙坪坝火车站下月铺轨 新华网 22 April 2017 沙坪坝火车站主体完工 Chongqing Evening Post 2 October 2017 Retrieved 18 October 2017 沙坪坝铁路枢纽 盖子 已完成85 今年底到成都只要58分钟 Chongqing Times 19 January 2017 Archived from the original on 12 April 2017 渝贵铁路 重庆西站 沙坪坝站25日开通 乘车出行的你千万别走错地方 Chongqing Morning Post 19 January 2018 Retrieved 19 January 2018 李智 23 January 2018 沙坪坝 重庆北 重庆西 成都赶高铁去重庆该在哪站下 Huaxi City Daily Retrieved 24 January 2018 Retrieved from https en wikipedia org w index php title Shapingba railway station amp oldid 1167138290, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.