The Canberra light rail network, also known as Canberra Metro, is a light rail system serving the city of Canberra, Australia. The initial 12-kilometre (7.5 mi) line links the northern town centre of Gungahlin to the city centre (Civic) and has 14 stops. Services commenced on 20 April 2019. The 14th stop at Sandford Street in Mitchell commenced operation in September 2021.[2]

Light rail in Canberra
An Urbos 3 departing Alinga Street
Overview
LocaleCanberra, Australian Capital Territory
Transit typeLight rail
Number of lines1
Number of stations14 (3 under construction)
Annual ridership3,165,958 (2022)[1]
Chief executiveGlenn Stockton
HeadquartersMitchell
Websitecanberra-metro.com.au
Operation
Began operation20 April 2019
Operator(s)Canberra Metro Operations (CMET)
Number of vehicles14 CAF Urbos 3 trams
Train length32.96 m (108.1 ft)
Headway6-15 minutes
Technical
System length12 km (7.5 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC overhead catenary
Top speed70 km/h (43 mph)

An extension of the line south to the Woden Town Centre is currently being planned. Early works on the extension (Stage 2A to Commonwealth Park) are set to commence after works to raise London Circuit are complete.[3] Planning of the remainder of the extension (Stage 2B to Woden) will continue while construction of Stage 2A is underway.[4]

History edit

Background edit

 
Aerial view of Northbourne Avenue, 2009, before construction of the light rail. Seen looking north from Civic, with City Hill in the foreground.

Walter Burley Griffin's master plan for Canberra proposed the construction of a tram network.[5] The proposal did not eventuate and the city was exclusively served by buses from 1926, when the Canberra City Omnibus Service was introduced, until 2019.

While railways across Canberra, including one to Belconnen, were seriously considered until the mid-1960s, little discussion of a metropolitan tramway occurred until the 1990s. Before 1989, the ACT had been directly administered by the Federal Government thus any large public infrastructure expenditure in Canberra was subject to national scrutiny.

In the early 1990s, Canberra Land proposed an 8.5-kilometre (5.3 mi) line from Canberra Racecourse via Northbourne Avenue to Civic with Melbourne tram B2089 displayed in February 1992.[6]

A light rail connection for Gungahlin was proposed as far back as 1992. An eight-year-old Canberran proposed the idea of a tram line to the newly announced, but undeveloped town centre of Gungahlin in April 1992.[7] In October 1992 a syndicate of private land developers MBA Land and Consolidated Builders (together known as Canberra Land) incorporated rail into an urban village plan.[8] The Gungahlin proposal followed a 1991 Murdoch University report, Towards a More Sustainable Canberra, which suggested the city was too car-oriented and should implement a light rail system along the Y-Plan.[9] In 1993 a report by Maunsell-Denis Johnston and Associates found that a dedicated inter-town busway was a more viable transport option for Canberra than light rail.[10]

In 1994, the ACT Government commissioned a study into light rail, based on the findings of an independent report that light rail would be viable in Canberra by 1998.[11] In its detailed report consultants Booz Allen Hamilton recommended a route from Belconnen to Barton via the City and Kings Avenue Bridge be operating by 1998; Woden to Barton by 2000; Tuggeranong to Woden by 2002 and Gungahlin to City by 2004. Routes to Canberra Airport and Queanbeyan received a lower priority. By January 1995 the then ACT Liberal Opposition Leader, Kate Carnell, announced her party's opposition to the light rail proposal citing "suspect" patronage figures and questioned the report's projected population for Canberra-Queanbeyan of 474,000 by 2016.[12] Projections in 2017 for the Canberra-Queanbeyan population, forecast the metropolitan area reaching 474,000 between 2020 and 2023, four to seven years later than the 1995 projections.[13][14] In 1995, the ACT Liberal Party came to power and plans for a light rail system in Canberra were dropped.

In February 1998, the ACT Government announced its support for the Federation Line, a proposed 7-kilometre (4.3 mi) line from the National Museum of Australia via Civic to the Australian War Memorial. The line was proposed to use heritage trams.[15]

In September 2001, to try to garner support for the project, Melbourne tram W249 and Sydney tram R2001 were placed on display outside the Australian War Memorial, the latter operating on a 50-metre (164 ft) section of track and powered by a diesel generator.[16][17] In a further display in September 2003, W249 operated on an 80-metre (262 ft) section of track on Parkes Way.[18][19]

In August 2012, an ACT Government submission to Infrastructure Australia estimated that bus rapid transit (BRT) had roughly twice the benefit-cost ratio of light rail transit (LRT) under a wide range of assumptions.[20] However, the Government decided on light rail, relying partly on a triple-bottom-line evaluation by URS which found that light rail had higher social benefits and a better overall outcome.[21][22] Capital Metro Minister Simon Corbell responded to criticism by stating "City building is about more than simply economic logarithms."[23]

Development edit

The construction of the light rail line was part of a deal struck between the Labor Party and The Greens following the 2012 Australian Capital Territory Election, at which Labor required the Greens' support to form the government.[24][25] In the 2013/14 ACT budget, $5 million was allocated for early design work.[26] In September 2014, the business case was approved by the government. The project, known as Capital Metro during planning, was developed by the government agency Capital Metro Agency (CMA).

 
Light rail works in Franklin in July 2017

The line was to be delivered under a public-private partnership.[27][28] Expressions of interest were received from the following consortia:[29][30]

 
The centre of Flemington Road in Gungahlin after being cleared for light rail works in July 2017

In March 2015, the government announced that ACTivate and Canberra Metro had been selected to move on to the Request for Proposal stage of the procurement process.[33][34] The bidders submitted their final proposals for the Gungahlin to the city route on 4 September and had an additional four weeks to submit their proposals for a potential expansion of the project, from the city to Russell.[35] The Canberra Metro consortium was announced as the preferred tenderer in February 2016 and the contract was finalised in May.[36][37][38] Under the contract, Canberra Metro will operate and maintain the line for 20 years, after which ownership will pass to the ACT Government.[36][39]

 
Stacked rails in Gungahlin in August 2017

Design and construction costs were budgeted at $707 million.[36] The Federal Government contributed $67 million to the project.[39] Commencement of construction was marked by a sod-turning in the northern suburb of Mitchell at the site of the depot on 12 July 2016.[40] Major construction of the route itself began towards the end of the year.[41][42][43]

The opposition Liberal Party opposed the project, and so did the Like Canberra and Sustainable Australia parties. In April 2015, the party announced it would cancel any contracts for the light rail if it won the 2016 ACT election.[44] A year out from the poll, the light rail project was already predicted to be the election's major issue.[45] As predicted, the light rail project was the major issue of the campaign.[46][47] The election saw the Labor government returned, with the party claiming the result as an endorsement of the project.

The CMA was amalgamated into a new government directorate, the Transport Canberra & City Services (TCCS), on 1 July 2016, resulting in the responsibility for the project being transferred to the TCCS.[48]

Testing of the line began in June 2018. A section in Gungahlin was electrified and one of the trams made trial runs.[49] All 14 trams have arrived in Canberra and it was hoped to have the project completed by the end of 2018.[50] The light rail eventually opened on 20 April 2019, with the final construction cost for Stage 1 being $675 million, some $32 million under the original budget.[51][52][53]

Route edit

 
The Phillip Avenue light rail stop
 
Each station has a ticket machine

The 12-kilometre (7.5 mi) line has its northern terminus at Hibberson Street in Gungahlin and follows Flemington Road, the Federal Highway and Northbourne Avenue to the southern terminus between Alinga and Rudd Streets in the City Centre. It is double track for its full length.[36] Emergency crossovers are located to the south of the Dickson Interchange stop, as well as the north of the Nullarbor Avenue stop.[54] There are 14 stops.[55] The main bus interchanges are located at Gungahlin Place, Dickson Interchange and Alinga Street.[36][56]

 


Stops edit

Stop Suburb Platform layout Coordinates Refs.
Gungahlin Place Gungahlin Dual (Island & Side) 35°11′8.3″S 149°8′7.73″E / 35.185639°S 149.1354806°E / -35.185639; 149.1354806 (Gungahlin Place) [57]
Manning Clark North Gungahlin Island 35°11′13.15″S 149°8′36.14″E / 35.1869861°S 149.1433722°E / -35.1869861; 149.1433722 (Manning Clark North) [58]
Mapleton Avenue Franklin / Harrison Island 35°11′36.17″S 149°9′3.5″E / 35.1933806°S 149.150972°E / -35.1933806; 149.150972 (Mapleton Avenue) [59]
Nullarbor Avenue Franklin / Harrison Island 35°12′1.98″S 149°8′57.46″E / 35.2005500°S 149.1492944°E / -35.2005500; 149.1492944 (Nullarbor Avenue) [60]
Well Station Drive Mitchell Island 35°12′29.29″S 149°8′50.96″E / 35.2081361°S 149.1474889°E / -35.2081361; 149.1474889 (Well Station Drive) [61]
Sandford Street Mitchell Island 35°13′17.8″S 149°8′40.8″E / 35.221611°S 149.144667°E / -35.221611; 149.144667 (Sandford Street)
EPIC and Racecourse Lyneham Side 35°13′42.37″S 149°8′39.85″E / 35.2284361°S 149.1444028°E / -35.2284361; 149.1444028 (EPIC and Racecourse) [62]
Phillip Avenue Lyneham / Watson Island 35°14′8.86″S 149°8′38.14″E / 35.2357944°S 149.1439278°E / -35.2357944; 149.1439278 (Phillip Avenue) [63]
Swinden Street Lyneham / Downer Island 35°14′38.89″S 149°8′4.69″E / 35.2441361°S 149.1346361°E / -35.2441361; 149.1346361 (Swinden Street) [64]
Dickson Interchange Lyneham / Dickson Side 35°15′2.01″S 149°8′1.46″E / 35.2505583°S 149.1337389°E / -35.2505583; 149.1337389 (Dickson Interchange) [54]
Macarthur Avenue Lyneham / Dickson Side 35°15′36.57″S 149°7′56.02″E / 35.2601583°S 149.1322278°E / -35.2601583; 149.1322278 (Macarthur Avenue) [65]
Ipima Street Turner / Braddon Side 35°15′57.23″S 149°7′52.62″E / 35.2658972°S 149.1312833°E / -35.2658972; 149.1312833 (Ipima Street) [66]
Elouera Street Turner / Braddon Side 35°16′21.42″S 149°7′48.62″E / 35.2726167°S 149.1301722°E / -35.2726167; 149.1301722 (Elouera Street) [67]
Alinga Street Civic Side 35°16′40.56″S 149°7′45.59″E / 35.2779333°S 149.1293306°E / -35.2779333; 149.1293306 (Alinga Street) [68]

The Sandford Street light rail stop commenced construction in 2020 and opened on 16 September 2021.[69][70][2]

Operation edit

 
Canberra Metro Operations logo

The service is operated by Canberra Metro Operations (CMET), in association with Deutsche Bahn Engineering and Consulting, under a 20-year contract.[36][71] CMET is a joint venture between John Holland and Pacific Partnerships, both of whom are part of the Canberra Metro consortium.

CMET holds the contract to operate the light rail until at least 2036.[72]: p. 1 [73] Formed in 2016,[74] it is a partnership between John Holland and Pacific Partnerships in association with Deutsche Bahn Engineering and Consulting.[72]: p. 12  CMET commenced operations on 20 April 2019 with the completion of the first stage of the project.[75]

 
The structure of the Canberra Metro Consortium[72]: p. 13 

CMET is part of the Canberra Metro Consortium, acting as the operations component of the group, with both its owners also being equity providers.[72]: p. 12  CMET does not contract with the ACT Government, rather it contracts with Canberra Metro PC Pty Limited (Canberra Metro) to provide service on its lines, which then contracts with the Canberra Metro Agency to manage the project and provide services to the city.[72]: p. 3 

The contract specifies the following minimum service levels for hours of operation and service frequency:[36]

Day First service Last service
Monday to Thursday 06:00 23:30
Friday and Saturday 06:00 01:00 the following day
Sunday 08:00 23:30
The last services from Gungahlin depart half an hour earlier.
The first service from the city on Sunday departs half an hour later.
Day Departure time Frequency
To the city To Gungahlin
Monday to Friday 06:00-07:00 15 minutes 15 minutes
Monday to Friday 07:00-07:30 6 minutes 10 minutes
Monday to Friday 07:30-09:00 6 minutes 6 minutes
Monday to Friday 09:00-16:00 10 minutes 10 minutes
Monday to Friday 16:00-17:30 6 minutes 6 minutes
Monday to Friday 17:30-18:00 10 minutes 6 minutes
Monday to Friday After 18:00 15 minutes 15 minutes
Saturday 06:00-01:00 15 minutes 15 minutes
Sunday 08:00-23:00 15 minutes 15 minutes

Rolling stock edit

 
An Urbos 3 on Northbourne Avenue
 
Interior

14 CAF-built Urbos 3 trams operate on the system. CAF will also provide twenty years of maintenance for the fleet.[76][77] The trams are 32.96 m (108 ft 1.64 in) long and consist of five modules. There are four doors on each side of the vehicle, two single-leaf and two double-leaf doors.[78] The first tram was delivered in December 2017.[79][80][81] The vehicles feature a red and grey livery, with a white reflective stripe in the middle.[82] The depot is located in Mitchell.[83]

Control system edit

Tehnika's t-visor RAIL platform, also used on the Gold Coast Light Rail,[84] provides the operators with a single, centralised control system. This encompasses the automatic vehicle location, traffic signalling priority, traction power & infrastructure SCADA, CCTV and passenger information systems, amongst others.[85]

Potential extensions edit

 
View of Commonwealth Avenue looking south from City Hill towards Parliament House. The hump in the middle distance is the bridge over Lake Burley Griffin, over which trams are expected to travel if Stage 2 goes ahead.

The consortia participating in the procurement process for the initial line were asked to develop plans for an expanded route from the City Centre to the Defence headquarters in Russell via London Circuit and Constitution Avenue. This additional 3.2-kilometre (2.0 mi) section was estimated to boost the patronage of the line as a whole by more than 30%. The proposal highlighted the desire of the Federal Government's National Capital Authority to use wire-free technology to power the trams in areas of the city under the authority's management.[86][87] The ACT Government decided not to proceed with the expanded route but committed to releasing a plan for a second stage of the light rail network before the October 2016 territory election. It was considering extending the line not only to Russell but to the broader parliamentary triangle, possibly including Canberra Airport and the Australian National University.[88]

Stage 2: Civic to Woden edit

In July 2016, the government released a shortlist of four potential routes that could form the second stage of the light rail network. The routes were:[89]

In September 2016, the government selected a truncated version of the Mawson route that ends at Woden as its preferred second-stage project. The route is around 11 kilometres (6.8 mi) long.[90][91] Tenders to design various aspects of the project were called in November. At that stage, the only firm decisions the government had made about the route were that it would run from Alinga Street to the Woden Town Centre and use Commonwealth Avenue Bridge to cross Lake Burley Griffin.[92] More concrete plans were released in May 2017. South of Lake Burley Griffin, the route will predominantly travel via Adelaide Avenue and Yarra Glen. Design options for several sections of the route that had yet to be locked in were presented to the public for comment.[93][94] An option that would have extended the route to the Canberra Hospital was dropped in December 2017.

Routes for Stage 2 presented in May 2017
 
Routes for the Woden extension presented in May 2017:
  Option 1
  Option 2
  Alternative route through the city
  Alternative terminus at Canberra Hospital

There were two options for the section between Lake Burley Griffin and Adelaide Avenue: a deviation to Barton with proposed stops at Old Parliament House, Brisbane Avenue and Sydney Avenue; or a more direct route via the Capital Circle.[95] The longer route via Barton was selected by the ACT Government as the preferred route in April 2018.[96] In March 2019, the Commonwealth Government offered its support for the extension to Woden, however, it favoured a different path around Capital Hill, arguing for a route along the State Circle.[97] A delay in the federal government response meant planning work for the line was postponed, though choosing to not pursue the Barton route could mean a simpler regulatory process.[97] The ACT Government is now investigating the State Circle route, which involves some technical challenges due to steep gradients for light rail.[98]

When construction of Stage 1 began, construction of Stage 2 was planned to begin shortly after the completion of the first stage.[92] The Federal Government will be invited to contribute to the project as part of the government's City Deals program.[99]

In July 2019, the new ACT Transport minister Chris Steel announced that stage 2 would be divided into 2 parts, 2A to stop before Lake Burley Griffin at Commonwealth Park and 2B to continue across the lake to Woden.[100]

Stage 2A edit

 
Parts of stage 2A will contain green track, this is the prototype being tested at the National Arboretum

In mid-July 2019, the ACT Government submitted a referral to the Australian Department of Environment and Energy for stage 2A, covering the extension from Civic to Commonwealth Park as well as an expansion of the depot in Mitchell.[101]

In September 2019, the ACT Government approved the business case for stage 2A, confirming the three new stops on the route which will also require London Circuit to be raised at Commonwealth Avenue where the light rail will travel.[102] According to the stage 2A business case, from the Alinga Street Stop to the Commonwealth Park Stop will be about 6 minutes.[103]

In November 2022, works to raise London Circuit commenced.[104][105]

In December 2023, the ACT Government signed a contact for the construction of the stage 2A service. This construction is expected to commence in late 2024 or early 2025, after the raising of London Circuit is complete.[106]

Stage 2B edit

In mid-July 2019, the ACT Government submitted a referral to the Australian Department of Environment and Energy for stage 2B, covering the extension from Commonwealth Park to Woden.[107]

Stage 3: Belconnen to Canberra Airport edit

In October 2019, the ACT Government released its infrastructure plan which included stage 3 of light rail going from Belconnen to Canberra Airport via Civic, with the Civic–Belconnen section built first.[108][109]

Stage 4: Woden to Tuggeranong edit

In October 2019, the ACT Government released its infrastructure plan which included stage 4 extending from Woden to Tuggeranong via Mawson.[109]

Twenty-five-year vision edit

In October 2015, the ACT Government released a plan for a citywide light rail network that would be built over twenty-five years.[110] The plan includes the following elements:[111]

Corridor Notes
Gungahlin to City Stage One; complete.
Parliamentary Triangle Connecting City to Russell, City to the Parliamentary Zone and Russell to the Parliamentary Zone. High priority corridor.
Woden to City Running via Adelaide Avenue. High priority corridor.
Tuggeranong to Woden (Athllon Corridor) Running either via the Athllon Drive Corridor or the existing rapid bus alignment along Erindale Drive
Eastern connections (Fyshwick and Canberra Airport) Additions to the Parliamentary Triangle routes, from Russell to Canberra Airport and the Parliamentary Zone to Fyshwick. High priority corridor.
Belconnen to City Running via Southern Cross Drive and Barry Drive
Molonglo to City Woden to City via Hindmarsh Drive, John Gorton Drive and Parkes Way

References edit

  1. ^ "Operational Performance".
  2. ^ a b "Sandford Street light rail stop now operational". ACT Government. 16 September 2021.
  3. ^ "Raising London Circuit". The Canberra Times. 27 July 2023. Retrieved 22 November 2023.
  4. ^ "On track: Government updates delivery plans for stage 2A". Canberra Weekly. 28 April 2021. Retrieved 11 May 2021.
  5. ^ "The Canberra Legacy: Griffin, Government and the Future of Strategic Planning in the National Capital" (PDF). Be.unsw.edu.au. p. 26. Retrieved 8 March 2015.
  6. ^ "Canberra" Trolley Wire issue 249 May 1992 page 21
  7. ^ "Trams are a good idea". Canberra Times. 27 April 1992. Retrieved 2 August 2022.
  8. ^ Sibley, David (13 October 1992). "Our city's future, and $337m windfall". The Canberra Times. Retrieved 12 June 2017.
  9. ^ Hobbs, Philip (18 May 1991). "Light rail needed to reduce ACT traffic". The Canberra Times. Retrieved 12 June 2017.
  10. ^ Clack, Peter (3 September 1993). "Buses beat light rail, says report". The Canberra Times. Retrieved 12 June 2017.
  11. ^ Downie, Graham (21 December 1994). "Govt pays fare for next light rail trip". The Canberra Times. Retrieved 12 June 2017.
  12. ^ Hull, Crispin (4 January 1995). "Light-rail to costly for ACT, say Libs". The Canberra Times. Retrieved 13 June 2017.
  13. ^ Burgess, Kate (14 March 2017). "ACT's population projected to hit 421,000 by 2020". The Canberra Times. Retrieved 13 June 2017.
  14. ^ "Queanbeyan (C) (LGA)". Australian Bureau of Statistics. Retrieved 13 June 2017.
  15. ^ "Heritage Tramway proposed for Canberra" Trolley Wire issue 272 February 1998 page 16
  16. ^ Canberra trams Railway Gazette International 1 October 2001
  17. ^ "First Tram Runs in Canberra" Trolley Wire issue 287 November 2001 page 3
  18. ^ "A W2 runs in Canberra" Trolley Wire issue 295 November 2003 pages 8-11
  19. ^ The Federation Line
  20. ^ (PDF). p. 85. Archived from the original (PDF) on 29 February 2016. Retrieved 2 March 2022.
  21. ^ My Gungahlin (30 July 2013). "Light rail best choice for Canberra's future". Retrieved 2 March 2022.
  22. ^ (PDF). Archived from the original (PDF) on 7 May 2015. Retrieved 2 March 2022.
  23. ^ "Canberra light rail business case criticised in Grattan Institute report". ABC News. 5 April 2016. Retrieved 2 March 2022.
  24. ^ "Parliamentary Agreement for the 8th Legislative Assembly for the Australian Capital Territory" ACT Greens 2 November 2012
  25. ^ Canberrans not completely on board light rail project: poll Canberra Times 3 August 2014
  26. ^ "Canberra light rail funding included in budget". Railway Gazette International. 10 June 2013. Retrieved 11 June 2013.
  27. ^ A Public Private Partnership for Canberra Metro 2014-11-29 at the Wayback Machine Capital Metro
  28. ^ Canberra light rail project moves ahead after business case approved ABC News 16 September 2014
  29. ^ Carter, Mark (24 December 2014). "Bidders line up for Canberra LRT tender". International Railway Journal.
  30. ^ ABC News 22 December 2014
  31. ^ ACTivate Canberra
  32. ^ John Holland 17 May 2016
  33. ^ Barrow, Keith (19 March 2015). "Two bidders shortlisted for Canberra LRT". International Railway Journal.
  34. ^ . ACT Government. Archived from the original on 1 April 2015. Retrieved 20 March 2015.
  35. ^ Belot, Henry (4 September 2015). "Canberra light rail hopefuls submit final bid papers for $783 million contract". The Canberra Times.
  36. ^ a b c d e f g "Capital Metro Contract Summary" (PDF). Transport Canberra and City Services. (PDF) from the original on 21 March 2019. Retrieved 20 April 2019.
  37. ^ Canberra Metro selected to build stage one of light rail from Gungahlin to the city ABC News 1 February 2016
  38. ^ Capita Metro named as successful light rail consortium 2016-02-29 at the Wayback Machine Canberra Metro 1 February 2016
  39. ^ a b "Contracts signed for Canberra's first light rail project". Capital Metro. 17 May 2016.[permanent dead link]
  40. ^ Sibthorpe, Clare (12 July 2016). "Construction begins on ACT light rail depot at Mitchell". The Canberra Times.
  41. ^ Canberra light rail contract signed Railway Gazette International 18 May 2016
  42. ^ Budget 2017: Extra safety inspectors announced for Canberra light rail Canberra Times 3 June 2017
  43. ^ Burgess, Katie (26 October 2018). "Canberra's light rail won't take passengers until 2019". The Canberra Times. Retrieved 7 November 2018.
  44. ^ "Light rail contract 'will be torn up' if the Canberra Liberals win 2016 ACT election". ABC News. 15 April 2015. Retrieved 15 April 2015.
  45. ^ "Light rail will dominate next year's ACT election. Both main parties have more explaining to do". The Canberra Times. 11 October 2015.
  46. ^ Knaus, Christopher (15 October 2016). "Election win shows comprehensive support for light rail". The Canberra Times.
  47. ^ "ACT election: Labor Chief Minister Andrew Barr claims victory, says Canberra has voted for light rail". ABC News. 15 October 2016. Retrieved 15 October 2016.
  48. ^ "Transport Canberra and City Services: Annual Report 2016-17 Volume 1" (PDF). Transport Canberra and City Services Directorate. (PDF) from the original on 21 March 2019. Retrieved 21 April 2019.
  49. ^ Burgess, Katie (12 June 2018). "In dead of night, Canberra's light rail vehicle emerges for testing". The Canberra Times. Retrieved 15 July 2018.
  50. ^ Canberra's last light rail vehicle arrives Canberra Times 27 September 2018
  51. ^ Burgess, Kate (19 March 2019). "Start date revealed for Canberra's light rail system". The Canberra Times. Retrieved 19 March 2019.
  52. ^ Canberra light rail delivered in time for Easter launch UGL 23 April 2019
  53. ^ Jervis-Bardy, Dan (13 May 2019). "Canberra's light rail bill arrives at $675 million". The Canberra Times. Retrieved 2 June 2021.
  54. ^ a b "Capital Metro - Canberra's light rail: design drawings" (PDF). Arup/Hassell/Parsons Brinckerhoff/Capital Metro Agency. pp. 32, 33. Retrieved 17 October 2016.
  55. ^ "Find your stop". CMET. Retrieved 27 September 2021.
  56. ^ . Transport Canberra. Archived from the original on 14 April 2018. Retrieved 5 May 2017.
  57. ^ "Capital Metro - Canberra's light rail: design drawings" (PDF). Arup/Hassell/Parsons Brinckerhoff/Capital Metro Agency. p. 8. Retrieved 17 October 2016.
  58. ^ "Capital Metro - Canberra's light rail: design drawings" (PDF). Arup/Hassell/Parsons Brinckerhoff/Capital Metro Agency. p. 10. Retrieved 17 October 2016.
  59. ^ "Capital Metro - Canberra's light rail: design drawings" (PDF). Arup/Hassell/Parsons Brinckerhoff/Capital Metro Agency. p. 13. Retrieved 17 October 2016.
  60. ^ "Capital Metro - Canberra's light rail: design drawings" (PDF). Arup/Hassell/Parsons Brinckerhoff/Capital Metro Agency. pp. 15, 16. Retrieved 17 October 2016.
  61. ^ "Capital Metro - Canberra's light rail: design drawings" (PDF). Arup/Hassell/Parsons Brinckerhoff/Capital Metro Agency. p. 43. Retrieved 17 October 2016.
  62. ^ "Capital Metro - Canberra's light rail: design drawings" (PDF). Arup/Hassell/Parsons Brinckerhoff/Capital Metro Agency. p. 25. Retrieved 17 October 2016.
  63. ^ "Capital Metro - Canberra's light rail: design drawings" (PDF). Arup/Hassell/Parsons Brinckerhoff/Capital Metro Agency. p. 27. Retrieved 17 October 2016.
  64. ^ "Capital Metro - Canberra's light rail: design drawings" (PDF). Arup/Hassell/Parsons Brinckerhoff/Capital Metro Agency. p. 44. Retrieved 17 October 2016.
  65. ^ "Capital Metro - Canberra's light rail: design drawings" (PDF). Arup/Hassell/Parsons Brinckerhoff/Capital Metro Agency. p. 36. Retrieved 17 October 2016.
  66. ^ "Capital Metro - Canberra's light rail: design drawings" (PDF). Arup/Hassell/Parsons Brinckerhoff/Capital Metro Agency. p. 37. Retrieved 17 October 2016.
  67. ^ "Capital Metro - Canberra's light rail: design drawings" (PDF). Arup/Hassell/Parsons Brinckerhoff/Capital Metro Agency. p. 40. Retrieved 17 October 2016.
  68. ^ "Capital Metro - Canberra's light rail: design drawings" (PDF). Arup/Hassell/Parsons Brinckerhoff/Capital Metro Agency. p. 41. Retrieved 17 October 2016.
  69. ^ Brewer, Peter (4 June 2019). "More buses arriving and Mitchell lands a second light rail stop". The Canberra Times. Australian Community Media. Retrieved 8 November 2019.
  70. ^ Transport Canberra
  71. ^ "Corrs Advises Pacific Partnerships And John Holland On Canberra's Light Rail Project". Corrs Chambers Westgarth Laweyers. 24 February 2016. from the original on 20 March 2019. Retrieved 20 April 2019.
  72. ^ a b c d e Capital Metro Agency (1 June 2016). (PDF). Transport Canberra City Services. Archived from the original (PDF) on 21 March 2019. Retrieved 21 December 2019.
  73. ^ "Canberra Light Rail". www.pacificpartnerships.com.au. Retrieved 20 December 2019.
  74. ^ ASIC Company Registry; ACN 612 397 485
  75. ^ Hitch, Georgia (20 April 2019). "Canberra's light rail welcomes its first official passengers". ABC News. Retrieved 20 December 2019.
  76. ^ . ACT Government. Archived from the original on 1 April 2016. Retrieved 26 March 2016.
  77. ^ "CAF to deliver Capital Metro Trams" Railway Digest September 2016 page 4
  78. ^ "CAF awarded the supply of Canberra trams, in Australia". Construcciones y Auxiliar de Ferrocarriles. 1 February 2016.
  79. ^ First tram gets police escort into Canberra under the cover of darkness Canberra Times 14 December 2017
  80. ^ First tram arrives in Canberra Metro Report International 15 December 2017
  81. ^ A century late, Canberra gets its first tram Rail Express 15 December 2017
  82. ^ New ACTION buses to be blue, light rail trams to be red 2016-12-20 at the Wayback Machine Canberra Times 14 December 2016
  83. ^ . ACT Government. Archived from the original on 22 March 2016. Retrieved 26 March 2016.
  84. ^ "Light Rail Innovation | News & Insights". Informa Australia. 10 February 2017. Retrieved 28 May 2020.
  85. ^ Staff Writer (24 February 2020). "One-stop-shop for LRV operations". Rail Express. Retrieved 28 May 2020.
  86. ^ Carter, Mark (9 February 2015). "Canberra expands light rail project". International Railway Journal.
  87. ^ McIlroy, Tom (10 September 2015). "Underground power plan for Russell light rail extension". The Canberra Times.
  88. ^ Knaus, Christopher (7 June 2016). "ACT Budget 2016: Budget shows 'rubbish' claims on tram cost, chief minister says". The Canberra Times.
  89. ^ Lawson, Kirsten (21 July 2016). "Labor announces possible Canberra light rail extensions to build in next term of government". The Canberra Times.
  90. ^ Knaus, Christopher (2 September 2016). "Labor announces light rail to go to Woden". The Canberra Times.
  91. ^ "Canberra light rail's second stage to link Woden and Civic, ACT Government says". ABC News. Australian Broadcasting Corporation. 2 September 2016.
  92. ^ a b Lawson, Kirsten (25 November 2016). "Serious work to begin on Woden light rail line as ACT government calls tenders on design and cost". The Canberra Times.
  93. ^ Scott, Elise (1 May 2017). "Could Canberra's light rail head to Barton instead of Parliament House?". ABC News. Australian Broadcasting Corporation.
  94. ^ Kirsten, Lawson (2 May 2017). "Canberra light rail: Options for stage two route to Woden revealed". The Canberra Times. Retrieved 10 April 2018.
  95. ^ Burgess, Katie (19 December 2017). "Canberra Hospital extension officially dropped for stage two of light rail". The Canberra Times. Retrieved 10 April 2018.
  96. ^ Trask, Steven (19 April 2018). "ACT government announces preferred stage two light rail route". The Canberra Times. Retrieved 19 April 2018.
  97. ^ a b Burgess, Katie (7 March 2019). "Commonwealth backs State Circle route for light rail stage two". The Canberra Times. Retrieved 27 April 2019.
  98. ^ Burgess, Katie (17 December 2018). "Steep gradient poses technical challenge to State Circle alignment". The Canberra Times. Retrieved 27 April 2019.
  99. ^ "ACT light rail funding to be discussed at 'City Deals' meeting with Prime Minister". ABC News. Australian Broadcasting Corporation. 9 November 2016.
  100. ^ Ian Bushnell (5 July 2019). "Light rail Stage 2 split in two in bid for faster approval". RiotACT. Region Group Pty Ltd. Retrieved 17 September 2019.
  101. ^ "CMTEDD ACT PROCUREMENT/Transport - Land/Northbourne Ave, Mitchell Depot, London Cct, Commonwealth Ave/Australian Capital Territory/City to Commonwealth Park Light Rail Project, ACT". Department of the Environment and Energy. Retrieved 17 September 2019.
  102. ^ Hayne, Jordan (10 September 2019). "Canberra light rail's business plan for Stage 2A approved by ACT Government, London Circuit to be raised". ABC.net.au. Australian Broadcasting Corporation. Retrieved 17 September 2019.
  103. ^ Major Projects Canberra (August 2019). "City to Woden Light Rail: Stage 2A City to Commonwealth Park Business Case" (PDF). Transport Canberra. ACT Government. Retrieved 17 September 2019.
  104. ^ "Rethink your routine: London Circuit to close from 2 December". ACT Government. 22 November 2022. Retrieved 22 November 2023.
  105. ^ Twyford, Lottie. "UPDATED: 'Ludicrous' to suggest buses won't be changed after light rail gets to Woden: Steel". Riotact. Retrieved 22 November 2023.
  106. ^ Bushnell, Ian. "Light rail Stage 2A contract signed but it'll be 2028 before first passengers". Riotact. Retrieved 3 January 2024.
  107. ^ "CMTEDD ACT PROCUREMENT/Transport - Land/Road reserves of Commonwealth Ave, State Circle, Adelaide Ave, Yarra Glen and Callam St/Australian Capital Territory/Commonwealth Park to Woden Light Rail Project, ACT". Department of the Environment and Energy. Retrieved 17 September 2019.
  108. ^ Bushnell, Ian (17 October 2019). "Belco, Airport and Tuggeranong next stops for Canberra's light rail journey". RiotACT. Region Group Pty Ltd. Retrieved 8 November 2019.
  109. ^ a b "Infrastructure Plan" (PDF). ACT Treasury. ACT Government. Retrieved 8 November 2019.
  110. ^ McIlroy, Tom (26 October 2015). "Woden and Parliament next for light rail lines in Canberra tram master plan". The Canberra Times.
  111. ^ "Light Rail Network - Delivering a modern transport system for a growing city". ACT Government/Trove. 2015. Retrieved 18 June 2019.

External links edit

  Media related to Canberra Metro at Wikimedia Commons

  • Transport Canberra - Light Rail

light, rail, canberra, canberra, light, rail, network, also, known, canberra, metro, light, rail, system, serving, city, canberra, australia, initial, kilometre, line, links, northern, town, centre, gungahlin, city, centre, civic, stops, services, commenced, a. The Canberra light rail network also known as Canberra Metro is a light rail system serving the city of Canberra Australia The initial 12 kilometre 7 5 mi line links the northern town centre of Gungahlin to the city centre Civic and has 14 stops Services commenced on 20 April 2019 The 14th stop at Sandford Street in Mitchell commenced operation in September 2021 2 Light rail in CanberraAn Urbos 3 departing Alinga StreetOverviewLocaleCanberra Australian Capital TerritoryTransit typeLight railNumber of lines1Number of stations14 3 under construction Annual ridership3 165 958 2022 1 Chief executiveGlenn StocktonHeadquartersMitchellWebsitecanberra metro wbr com wbr auOperationBegan operation20 April 2019Operator s Canberra Metro Operations CMET Number of vehicles14 CAF Urbos 3 tramsTrain length32 96 m 108 1 ft Headway6 15 minutesTechnicalSystem length12 km 7 5 mi Track gauge1 435 mm 4 ft 8 1 2 in standard gaugeElectrification750 V DC overhead catenaryTop speed70 km h 43 mph System mapGungahlin Place Manning Clark North Mapleton Avenue Nullarbor Avenue Well Station Drive Sandford Street Mitchell Depot Sullivans Creek EPIC and Racecourse Phillip Avenue Swinden Street Dickson Interchange Macarthur Avenue Ipima Street Elouera Street Alinga Street This diagram viewtalkedit An extension of the line south to the Woden Town Centre is currently being planned Early works on the extension Stage 2A to Commonwealth Park are set to commence after works to raise London Circuit are complete 3 Planning of the remainder of the extension Stage 2B to Woden will continue while construction of Stage 2A is underway 4 Contents 1 History 1 1 Background 1 2 Development 2 Route 2 1 Stops 3 Operation 3 1 Rolling stock 3 2 Control system 4 Potential extensions 4 1 Stage 2 Civic to Woden 4 1 1 Stage 2A 4 1 2 Stage 2B 4 2 Stage 3 Belconnen to Canberra Airport 4 3 Stage 4 Woden to Tuggeranong 4 4 Twenty five year vision 5 References 6 External linksHistory editBackground edit nbsp Aerial view of Northbourne Avenue 2009 before construction of the light rail Seen looking north from Civic with City Hill in the foreground Walter Burley Griffin s master plan for Canberra proposed the construction of a tram network 5 The proposal did not eventuate and the city was exclusively served by buses from 1926 when the Canberra City Omnibus Service was introduced until 2019 While railways across Canberra including one to Belconnen were seriously considered until the mid 1960s little discussion of a metropolitan tramway occurred until the 1990s Before 1989 the ACT had been directly administered by the Federal Government thus any large public infrastructure expenditure in Canberra was subject to national scrutiny In the early 1990s Canberra Land proposed an 8 5 kilometre 5 3 mi line from Canberra Racecourse via Northbourne Avenue to Civic with Melbourne tram B2089 displayed in February 1992 6 A light rail connection for Gungahlin was proposed as far back as 1992 An eight year old Canberran proposed the idea of a tram line to the newly announced but undeveloped town centre of Gungahlin in April 1992 7 In October 1992 a syndicate of private land developers MBA Land and Consolidated Builders together known as Canberra Land incorporated rail into an urban village plan 8 The Gungahlin proposal followed a 1991 Murdoch University report Towards a More Sustainable Canberra which suggested the city was too car oriented and should implement a light rail system along the Y Plan 9 In 1993 a report by Maunsell Denis Johnston and Associates found that a dedicated inter town busway was a more viable transport option for Canberra than light rail 10 In 1994 the ACT Government commissioned a study into light rail based on the findings of an independent report that light rail would be viable in Canberra by 1998 11 In its detailed report consultants Booz Allen Hamilton recommended a route from Belconnen to Barton via the City and Kings Avenue Bridge be operating by 1998 Woden to Barton by 2000 Tuggeranong to Woden by 2002 and Gungahlin to City by 2004 Routes to Canberra Airport and Queanbeyan received a lower priority By January 1995 the then ACT Liberal Opposition Leader Kate Carnell announced her party s opposition to the light rail proposal citing suspect patronage figures and questioned the report s projected population for Canberra Queanbeyan of 474 000 by 2016 12 Projections in 2017 for the Canberra Queanbeyan population forecast the metropolitan area reaching 474 000 between 2020 and 2023 four to seven years later than the 1995 projections 13 14 In 1995 the ACT Liberal Party came to power and plans for a light rail system in Canberra were dropped In February 1998 the ACT Government announced its support for the Federation Line a proposed 7 kilometre 4 3 mi line from the National Museum of Australia via Civic to the Australian War Memorial The line was proposed to use heritage trams 15 In September 2001 to try to garner support for the project Melbourne tram W249 and Sydney tram R2001 were placed on display outside the Australian War Memorial the latter operating on a 50 metre 164 ft section of track and powered by a diesel generator 16 17 In a further display in September 2003 W249 operated on an 80 metre 262 ft section of track on Parkes Way 18 19 In August 2012 an ACT Government submission to Infrastructure Australia estimated that bus rapid transit BRT had roughly twice the benefit cost ratio of light rail transit LRT under a wide range of assumptions 20 However the Government decided on light rail relying partly on a triple bottom line evaluation by URS which found that light rail had higher social benefits and a better overall outcome 21 22 Capital Metro Minister Simon Corbell responded to criticism by stating City building is about more than simply economic logarithms 23 Development edit The construction of the light rail line was part of a deal struck between the Labor Party and The Greens following the 2012 Australian Capital Territory Election at which Labor required the Greens support to form the government 24 25 In the 2013 14 ACT budget 5 million was allocated for early design work 26 In September 2014 the business case was approved by the government The project known as Capital Metro during planning was developed by the government agency Capital Metro Agency CMA nbsp Light rail works in Franklin in July 2017 The line was to be delivered under a public private partnership 27 28 Expressions of interest were received from the following consortia 29 30 ACTivate Downer Group Plenary Group Bombardier and Keolis Downer 31 Canberra Metro Pacific Partnerships Mitsubishi Corporation John Holland CAF Deutsche Bahn Aberdeen Asset Management Leighton Contractors and Bank of Tokyo Mitsubishi 32 CANGO Macquarie Capital Group Obrascon Huarte Lain SMRT International UGL Rail and Siemens Connecting Canberra Capella Capital Transdev Alstom and Acciona Infrastructure nbsp The centre of Flemington Road in Gungahlin after being cleared for light rail works in July 2017 In March 2015 the government announced that ACTivate and Canberra Metro had been selected to move on to the Request for Proposal stage of the procurement process 33 34 The bidders submitted their final proposals for the Gungahlin to the city route on 4 September and had an additional four weeks to submit their proposals for a potential expansion of the project from the city to Russell 35 The Canberra Metro consortium was announced as the preferred tenderer in February 2016 and the contract was finalised in May 36 37 38 Under the contract Canberra Metro will operate and maintain the line for 20 years after which ownership will pass to the ACT Government 36 39 nbsp Stacked rails in Gungahlin in August 2017 Design and construction costs were budgeted at 707 million 36 The Federal Government contributed 67 million to the project 39 Commencement of construction was marked by a sod turning in the northern suburb of Mitchell at the site of the depot on 12 July 2016 40 Major construction of the route itself began towards the end of the year 41 42 43 The opposition Liberal Party opposed the project and so did the Like Canberra and Sustainable Australia parties In April 2015 the party announced it would cancel any contracts for the light rail if it won the 2016 ACT election 44 A year out from the poll the light rail project was already predicted to be the election s major issue 45 As predicted the light rail project was the major issue of the campaign 46 47 The election saw the Labor government returned with the party claiming the result as an endorsement of the project The CMA was amalgamated into a new government directorate the Transport Canberra amp City Services TCCS on 1 July 2016 resulting in the responsibility for the project being transferred to the TCCS 48 Testing of the line began in June 2018 A section in Gungahlin was electrified and one of the trams made trial runs 49 All 14 trams have arrived in Canberra and it was hoped to have the project completed by the end of 2018 50 The light rail eventually opened on 20 April 2019 with the final construction cost for Stage 1 being 675 million some 32 million under the original budget 51 52 53 Route edit nbsp The Phillip Avenue light rail stop nbsp Each station has a ticket machine The 12 kilometre 7 5 mi line has its northern terminus at Hibberson Street in Gungahlin and follows Flemington Road the Federal Highway and Northbourne Avenue to the southern terminus between Alinga and Rudd Streets in the City Centre It is double track for its full length 36 Emergency crossovers are located to the south of the Dickson Interchange stop as well as the north of the Nullarbor Avenue stop 54 There are 14 stops 55 The main bus interchanges are located at Gungahlin Place Dickson Interchange and Alinga Street 36 56 nbsp Stops edit Stop Suburb Platform layout Coordinates Refs Gungahlin Place Gungahlin Dual Island amp Side 35 11 8 3 S 149 8 7 73 E 35 185639 S 149 1354806 E 35 185639 149 1354806 Gungahlin Place 57 Manning Clark North Gungahlin Island 35 11 13 15 S 149 8 36 14 E 35 1869861 S 149 1433722 E 35 1869861 149 1433722 Manning Clark North 58 Mapleton Avenue Franklin Harrison Island 35 11 36 17 S 149 9 3 5 E 35 1933806 S 149 150972 E 35 1933806 149 150972 Mapleton Avenue 59 Nullarbor Avenue Franklin Harrison Island 35 12 1 98 S 149 8 57 46 E 35 2005500 S 149 1492944 E 35 2005500 149 1492944 Nullarbor Avenue 60 Well Station Drive Mitchell Island 35 12 29 29 S 149 8 50 96 E 35 2081361 S 149 1474889 E 35 2081361 149 1474889 Well Station Drive 61 Sandford Street Mitchell Island 35 13 17 8 S 149 8 40 8 E 35 221611 S 149 144667 E 35 221611 149 144667 Sandford Street EPIC and Racecourse Lyneham Side 35 13 42 37 S 149 8 39 85 E 35 2284361 S 149 1444028 E 35 2284361 149 1444028 EPIC and Racecourse 62 Phillip Avenue Lyneham Watson Island 35 14 8 86 S 149 8 38 14 E 35 2357944 S 149 1439278 E 35 2357944 149 1439278 Phillip Avenue 63 Swinden Street Lyneham Downer Island 35 14 38 89 S 149 8 4 69 E 35 2441361 S 149 1346361 E 35 2441361 149 1346361 Swinden Street 64 Dickson Interchange Lyneham Dickson Side 35 15 2 01 S 149 8 1 46 E 35 2505583 S 149 1337389 E 35 2505583 149 1337389 Dickson Interchange 54 Macarthur Avenue Lyneham Dickson Side 35 15 36 57 S 149 7 56 02 E 35 2601583 S 149 1322278 E 35 2601583 149 1322278 Macarthur Avenue 65 Ipima Street Turner Braddon Side 35 15 57 23 S 149 7 52 62 E 35 2658972 S 149 1312833 E 35 2658972 149 1312833 Ipima Street 66 Elouera Street Turner Braddon Side 35 16 21 42 S 149 7 48 62 E 35 2726167 S 149 1301722 E 35 2726167 149 1301722 Elouera Street 67 Alinga Street Civic Side 35 16 40 56 S 149 7 45 59 E 35 2779333 S 149 1293306 E 35 2779333 149 1293306 Alinga Street 68 The Sandford Street light rail stop commenced construction in 2020 and opened on 16 September 2021 69 70 2 Operation edit nbsp Canberra Metro Operations logo The service is operated by Canberra Metro Operations CMET in association with Deutsche Bahn Engineering and Consulting under a 20 year contract 36 71 CMET is a joint venture between John Holland and Pacific Partnerships both of whom are part of the Canberra Metro consortium CMET holds the contract to operate the light rail until at least 2036 72 p 1 73 Formed in 2016 74 it is a partnership between John Holland and Pacific Partnerships in association with Deutsche Bahn Engineering and Consulting 72 p 12 CMET commenced operations on 20 April 2019 with the completion of the first stage of the project 75 nbsp The structure of the Canberra Metro Consortium 72 p 13 CMET is part of the Canberra Metro Consortium acting as the operations component of the group with both its owners also being equity providers 72 p 12 CMET does not contract with the ACT Government rather it contracts with Canberra Metro PC Pty Limited Canberra Metro to provide service on its lines which then contracts with the Canberra Metro Agency to manage the project and provide services to the city 72 p 3 The contract specifies the following minimum service levels for hours of operation and service frequency 36 Day First service Last service Monday to Thursday 06 00 23 30 Friday and Saturday 06 00 01 00 the following day Sunday 08 00 23 30 The last services from Gungahlin depart half an hour earlier The first service from the city on Sunday departs half an hour later Day Departure time Frequency To the city To Gungahlin Monday to Friday 06 00 07 00 15 minutes 15 minutes Monday to Friday 07 00 07 30 6 minutes 10 minutes Monday to Friday 07 30 09 00 6 minutes 6 minutes Monday to Friday 09 00 16 00 10 minutes 10 minutes Monday to Friday 16 00 17 30 6 minutes 6 minutes Monday to Friday 17 30 18 00 10 minutes 6 minutes Monday to Friday After 18 00 15 minutes 15 minutes Saturday 06 00 01 00 15 minutes 15 minutes Sunday 08 00 23 00 15 minutes 15 minutes Rolling stock edit nbsp An Urbos 3 on Northbourne Avenue nbsp Interior 14 CAF built Urbos 3 trams operate on the system CAF will also provide twenty years of maintenance for the fleet 76 77 The trams are 32 96 m 108 ft 1 64 in long and consist of five modules There are four doors on each side of the vehicle two single leaf and two double leaf doors 78 The first tram was delivered in December 2017 79 80 81 The vehicles feature a red and grey livery with a white reflective stripe in the middle 82 The depot is located in Mitchell 83 Control system edit Tehnika s t visor RAIL platform also used on the Gold Coast Light Rail 84 provides the operators with a single centralised control system This encompasses the automatic vehicle location traffic signalling priority traction power amp infrastructure SCADA CCTV and passenger information systems amongst others 85 Potential extensions edit nbsp View of Commonwealth Avenue looking south from City Hill towards Parliament House The hump in the middle distance is the bridge over Lake Burley Griffin over which trams are expected to travel if Stage 2 goes ahead The consortia participating in the procurement process for the initial line were asked to develop plans for an expanded route from the City Centre to the Defence headquarters in Russell via London Circuit and Constitution Avenue This additional 3 2 kilometre 2 0 mi section was estimated to boost the patronage of the line as a whole by more than 30 The proposal highlighted the desire of the Federal Government s National Capital Authority to use wire free technology to power the trams in areas of the city under the authority s management 86 87 The ACT Government decided not to proceed with the expanded route but committed to releasing a plan for a second stage of the light rail network before the October 2016 territory election It was considering extending the line not only to Russell but to the broader parliamentary triangle possibly including Canberra Airport and the Australian National University 88 Stage 2 Civic to Woden edit In July 2016 the government released a shortlist of four potential routes that could form the second stage of the light rail network The routes were 89 City to Canberra Airport via Constitution Avenue and Parkes Way City to Belconnen Town Centre via Barry Drive past Calvary Hospital and the University of Canberra City to the Parliamentary Triangle via either Commonwealth Avenue or Kings Avenue City to Mawson via Woden In September 2016 the government selected a truncated version of the Mawson route that ends at Woden as its preferred second stage project The route is around 11 kilometres 6 8 mi long 90 91 Tenders to design various aspects of the project were called in November At that stage the only firm decisions the government had made about the route were that it would run from Alinga Street to the Woden Town Centre and use Commonwealth Avenue Bridge to cross Lake Burley Griffin 92 More concrete plans were released in May 2017 South of Lake Burley Griffin the route will predominantly travel via Adelaide Avenue and Yarra Glen Design options for several sections of the route that had yet to be locked in were presented to the public for comment 93 94 An option that would have extended the route to the Canberra Hospital was dropped in December 2017 Routes for Stage 2 presented in May 2017 nbsp Routes for the Woden extension presented in May 2017 Option 1 Option 2 Alternative route through the city Alternative terminus at Canberra Hospital There were two options for the section between Lake Burley Griffin and Adelaide Avenue a deviation to Barton with proposed stops at Old Parliament House Brisbane Avenue and Sydney Avenue or a more direct route via the Capital Circle 95 The longer route via Barton was selected by the ACT Government as the preferred route in April 2018 96 In March 2019 the Commonwealth Government offered its support for the extension to Woden however it favoured a different path around Capital Hill arguing for a route along the State Circle 97 A delay in the federal government response meant planning work for the line was postponed though choosing to not pursue the Barton route could mean a simpler regulatory process 97 The ACT Government is now investigating the State Circle route which involves some technical challenges due to steep gradients for light rail 98 When construction of Stage 1 began construction of Stage 2 was planned to begin shortly after the completion of the first stage 92 The Federal Government will be invited to contribute to the project as part of the government s City Deals program 99 In July 2019 the new ACT Transport minister Chris Steel announced that stage 2 would be divided into 2 parts 2A to stop before Lake Burley Griffin at Commonwealth Park and 2B to continue across the lake to Woden 100 Stage 2A edit nbsp Parts of stage 2A will contain green track this is the prototype being tested at the National Arboretum In mid July 2019 the ACT Government submitted a referral to the Australian Department of Environment and Energy for stage 2A covering the extension from Civic to Commonwealth Park as well as an expansion of the depot in Mitchell 101 In September 2019 the ACT Government approved the business case for stage 2A confirming the three new stops on the route which will also require London Circuit to be raised at Commonwealth Avenue where the light rail will travel 102 According to the stage 2A business case from the Alinga Street Stop to the Commonwealth Park Stop will be about 6 minutes 103 In November 2022 works to raise London Circuit commenced 104 105 In December 2023 the ACT Government signed a contact for the construction of the stage 2A service This construction is expected to commence in late 2024 or early 2025 after the raising of London Circuit is complete 106 Stage 2B edit In mid July 2019 the ACT Government submitted a referral to the Australian Department of Environment and Energy for stage 2B covering the extension from Commonwealth Park to Woden 107 Stage 3 Belconnen to Canberra Airport edit In October 2019 the ACT Government released its infrastructure plan which included stage 3 of light rail going from Belconnen to Canberra Airport via Civic with the Civic Belconnen section built first 108 109 Stage 4 Woden to Tuggeranong edit In October 2019 the ACT Government released its infrastructure plan which included stage 4 extending from Woden to Tuggeranong via Mawson 109 Twenty five year vision edit In October 2015 the ACT Government released a plan for a citywide light rail network that would be built over twenty five years 110 The plan includes the following elements 111 Corridor Notes Gungahlin to City Stage One complete Parliamentary Triangle Connecting City to Russell City to the Parliamentary Zone and Russell to the Parliamentary Zone High priority corridor Woden to City Running via Adelaide Avenue High priority corridor Tuggeranong to Woden Athllon Corridor Running either via the Athllon Drive Corridor or the existing rapid bus alignment along Erindale Drive Eastern connections Fyshwick and Canberra Airport Additions to the Parliamentary Triangle routes from Russell to Canberra Airport and the Parliamentary Zone to Fyshwick High priority corridor Belconnen to City Running via Southern Cross Drive and Barry Drive Molonglo to City Woden to City via Hindmarsh Drive John Gorton Drive and Parkes WayReferences edit Operational Performance a b Sandford Street light rail stop now operational ACT Government 16 September 2021 Raising London Circuit The Canberra Times 27 July 2023 Retrieved 22 November 2023 On track Government updates delivery plans for stage 2A Canberra Weekly 28 April 2021 Retrieved 11 May 2021 The Canberra Legacy Griffin Government and the Future of Strategic Planning in the National Capital PDF Be unsw edu au p 26 Retrieved 8 March 2015 Canberra Trolley Wire issue 249 May 1992 page 21 Trams are a good idea Canberra Times 27 April 1992 Retrieved 2 August 2022 Sibley David 13 October 1992 Our city s future and 337m windfall The Canberra Times Retrieved 12 June 2017 Hobbs Philip 18 May 1991 Light rail needed to reduce ACT traffic The Canberra Times Retrieved 12 June 2017 Clack Peter 3 September 1993 Buses beat light rail says report The Canberra Times Retrieved 12 June 2017 Downie Graham 21 December 1994 Govt pays fare for next light rail trip The Canberra Times Retrieved 12 June 2017 Hull Crispin 4 January 1995 Light rail to costly for ACT say Libs The Canberra Times Retrieved 13 June 2017 Burgess Kate 14 March 2017 ACT s population projected to hit 421 000 by 2020 The Canberra Times Retrieved 13 June 2017 Queanbeyan C LGA Australian Bureau of Statistics Retrieved 13 June 2017 Heritage Tramway proposed for Canberra Trolley Wire issue 272 February 1998 page 16 Canberra trams Railway Gazette International 1 October 2001 First Tram Runs in Canberra Trolley Wire issue 287 November 2001 page 3 A W2 runs in Canberra Trolley Wire issue 295 November 2003 pages 8 11 September 2001 Trams displayed at the Australian War Museum The Federation Line City to Gungahlin Transit Corridor Infrastructure Australia Project Submission PDF p 85 Archived from the original PDF on 29 February 2016 Retrieved 2 March 2022 My Gungahlin 30 July 2013 Light rail best choice for Canberra s future Retrieved 2 March 2022 City to Gungahlin Transit Corridor Concept Design Report April 2012 PDF Archived from the original PDF on 7 May 2015 Retrieved 2 March 2022 Canberra light rail business case criticised in Grattan Institute report ABC News 5 April 2016 Retrieved 2 March 2022 Parliamentary Agreement for the 8th Legislative Assembly for the Australian Capital Territory ACT Greens 2 November 2012 Canberrans not completely on board light rail project poll Canberra Times 3 August 2014 Canberra light rail funding included in budget Railway Gazette International 10 June 2013 Retrieved 11 June 2013 A Public Private Partnership for Canberra Metro Archived 2014 11 29 at the Wayback Machine Capital Metro Canberra light rail project moves ahead after business case approved ABC News 16 September 2014 Carter Mark 24 December 2014 Bidders line up for Canberra LRT tender International Railway Journal Major companies vying for chance to build ACT light rail network ABC News 22 December 2014 Consortium members ACTivate Canberra John Holland to deliver Canberra light rail project John Holland 17 May 2016 Barrow Keith 19 March 2015 Two bidders shortlisted for Canberra LRT International Railway Journal Preferred consortia announced for light rail project ACT Government Archived from the original on 1 April 2015 Retrieved 20 March 2015 Belot Henry 4 September 2015 Canberra light rail hopefuls submit final bid papers for 783 million contract The Canberra Times a b c d e f g Capital Metro Contract Summary PDF Transport Canberra and City Services Archived PDF from the original on 21 March 2019 Retrieved 20 April 2019 Canberra Metro selected to build stage one of light rail from Gungahlin to the city ABC News 1 February 2016 Capita Metro named as successful light rail consortium Archived 2016 02 29 at the Wayback Machine Canberra Metro 1 February 2016 a b Contracts signed for Canberra s first light rail project Capital Metro 17 May 2016 permanent dead link Sibthorpe Clare 12 July 2016 Construction begins on ACT light rail depot at Mitchell The Canberra Times Canberra light rail contract signed Railway Gazette International 18 May 2016 Budget 2017 Extra safety inspectors announced for Canberra light rail Canberra Times 3 June 2017 Burgess Katie 26 October 2018 Canberra s light rail won t take passengers until 2019 The Canberra Times Retrieved 7 November 2018 Light rail contract will be torn up if the Canberra Liberals win 2016 ACT election ABC News 15 April 2015 Retrieved 15 April 2015 Light rail will dominate next year s ACT election Both main parties have more explaining to do The Canberra Times 11 October 2015 Knaus Christopher 15 October 2016 Election win shows comprehensive support for light rail The Canberra Times ACT election Labor Chief Minister Andrew Barr claims victory says Canberra has voted for light rail ABC News 15 October 2016 Retrieved 15 October 2016 Transport Canberra and City Services Annual Report 2016 17 Volume 1 PDF Transport Canberra and City Services Directorate Archived PDF from the original on 21 March 2019 Retrieved 21 April 2019 Burgess Katie 12 June 2018 In dead of night Canberra s light rail vehicle emerges for testing The Canberra Times Retrieved 15 July 2018 Canberra s last light rail vehicle arrives Canberra Times 27 September 2018 Burgess Kate 19 March 2019 Start date revealed for Canberra s light rail system The Canberra Times Retrieved 19 March 2019 Canberra light rail delivered in time for Easter launch UGL 23 April 2019 Jervis Bardy Dan 13 May 2019 Canberra s light rail bill arrives at 675 million The Canberra Times Retrieved 2 June 2021 a b Capital Metro Canberra s light rail design drawings PDF Arup Hassell Parsons Brinckerhoff Capital Metro Agency pp 32 33 Retrieved 17 October 2016 Find your stop CMET Retrieved 27 September 2021 Light Rail Stage 1 takes shape as stop names announced Transport Canberra Archived from the original on 14 April 2018 Retrieved 5 May 2017 Capital Metro Canberra s light rail design drawings PDF Arup Hassell Parsons Brinckerhoff Capital Metro Agency p 8 Retrieved 17 October 2016 Capital Metro Canberra s light rail design drawings PDF Arup Hassell Parsons Brinckerhoff Capital Metro Agency p 10 Retrieved 17 October 2016 Capital Metro Canberra s light rail design drawings PDF Arup Hassell Parsons Brinckerhoff Capital Metro Agency p 13 Retrieved 17 October 2016 Capital Metro Canberra s light rail design drawings PDF Arup Hassell Parsons Brinckerhoff Capital Metro Agency pp 15 16 Retrieved 17 October 2016 Capital Metro Canberra s light rail design drawings PDF Arup Hassell Parsons Brinckerhoff Capital Metro Agency p 43 Retrieved 17 October 2016 Capital Metro Canberra s light rail design drawings PDF Arup Hassell Parsons Brinckerhoff Capital Metro Agency p 25 Retrieved 17 October 2016 Capital Metro Canberra s light rail design drawings PDF Arup Hassell Parsons Brinckerhoff Capital Metro Agency p 27 Retrieved 17 October 2016 Capital Metro Canberra s light rail design drawings PDF Arup Hassell Parsons Brinckerhoff Capital Metro Agency p 44 Retrieved 17 October 2016 Capital Metro Canberra s light rail design drawings PDF Arup Hassell Parsons Brinckerhoff Capital Metro Agency p 36 Retrieved 17 October 2016 Capital Metro Canberra s light rail design drawings PDF Arup Hassell Parsons Brinckerhoff Capital Metro Agency p 37 Retrieved 17 October 2016 Capital Metro Canberra s light rail design drawings PDF Arup Hassell Parsons Brinckerhoff Capital Metro Agency p 40 Retrieved 17 October 2016 Capital Metro Canberra s light rail design drawings PDF Arup Hassell Parsons Brinckerhoff Capital Metro Agency p 41 Retrieved 17 October 2016 Brewer Peter 4 June 2019 More buses arriving and Mitchell lands a second light rail stop The Canberra Times Australian Community Media Retrieved 8 November 2019 New light rail stop in Mitchell Transport Canberra Corrs Advises Pacific Partnerships And John Holland On Canberra s Light Rail Project Corrs Chambers Westgarth Laweyers 24 February 2016 Archived from the original on 20 March 2019 Retrieved 20 April 2019 a b c d e Capital Metro Agency 1 June 2016 Capital Metro Contract Summary PDF Transport Canberra City Services Archived from the original PDF on 21 March 2019 Retrieved 21 December 2019 Canberra Light Rail www pacificpartnerships com au Retrieved 20 December 2019 ASIC Company Registry ACN 612 397 485 Hitch Georgia 20 April 2019 Canberra s light rail welcomes its first official passengers ABC News Retrieved 20 December 2019 Canberra Metro named as successful light rail consortium ACT Government Archived from the original on 1 April 2016 Retrieved 26 March 2016 CAF to deliver Capital Metro Trams Railway Digest September 2016 page 4 CAF awarded the supply of Canberra trams in Australia Construcciones y Auxiliar de Ferrocarriles 1 February 2016 First tram gets police escort into Canberra under the cover of darkness Canberra Times 14 December 2017 First tram arrives in Canberra Metro Report International 15 December 2017 A century late Canberra gets its first tram Rail Express 15 December 2017 New ACTION buses to be blue light rail trams to be red Archived 2016 12 20 at the Wayback Machine Canberra Times 14 December 2016 Nuts and bolts ACT Government Archived from the original on 22 March 2016 Retrieved 26 March 2016 Light Rail Innovation News amp Insights Informa Australia 10 February 2017 Retrieved 28 May 2020 Staff Writer 24 February 2020 One stop shop for LRV operations Rail Express Retrieved 28 May 2020 Carter Mark 9 February 2015 Canberra expands light rail project International Railway Journal McIlroy Tom 10 September 2015 Underground power plan for Russell light rail extension The Canberra Times Knaus Christopher 7 June 2016 ACT Budget 2016 Budget shows rubbish claims on tram cost chief minister says The Canberra Times Lawson Kirsten 21 July 2016 Labor announces possible Canberra light rail extensions to build in next term of government The Canberra Times Knaus Christopher 2 September 2016 Labor announces light rail to go to Woden The Canberra Times Canberra light rail s second stage to link Woden and Civic ACT Government says ABC News Australian Broadcasting Corporation 2 September 2016 a b Lawson Kirsten 25 November 2016 Serious work to begin on Woden light rail line as ACT government calls tenders on design and cost The Canberra Times Scott Elise 1 May 2017 Could Canberra s light rail head to Barton instead of Parliament House ABC News Australian Broadcasting Corporation Kirsten Lawson 2 May 2017 Canberra light rail Options for stage two route to Woden revealed The Canberra Times Retrieved 10 April 2018 Burgess Katie 19 December 2017 Canberra Hospital extension officially dropped for stage two of light rail The Canberra Times Retrieved 10 April 2018 Trask Steven 19 April 2018 ACT government announces preferred stage two light rail route The Canberra Times Retrieved 19 April 2018 a b Burgess Katie 7 March 2019 Commonwealth backs State Circle route for light rail stage two The Canberra Times Retrieved 27 April 2019 Burgess Katie 17 December 2018 Steep gradient poses technical challenge to State Circle alignment The Canberra Times Retrieved 27 April 2019 ACT light rail funding to be discussed at City Deals meeting with Prime Minister ABC News Australian Broadcasting Corporation 9 November 2016 Ian Bushnell 5 July 2019 Light rail Stage 2 split in two in bid for faster approval RiotACT Region Group Pty Ltd Retrieved 17 September 2019 CMTEDD ACT PROCUREMENT Transport Land Northbourne Ave Mitchell Depot London Cct Commonwealth Ave Australian Capital Territory City to Commonwealth Park Light Rail Project ACT Department of the Environment and Energy Retrieved 17 September 2019 Hayne Jordan 10 September 2019 Canberra light rail s business plan for Stage 2A approved by ACT Government London Circuit to be raised ABC net au Australian Broadcasting Corporation Retrieved 17 September 2019 Major Projects Canberra August 2019 City to Woden Light Rail Stage 2A City to Commonwealth Park Business Case PDF Transport Canberra ACT Government Retrieved 17 September 2019 Rethink your routine London Circuit to close from 2 December ACT Government 22 November 2022 Retrieved 22 November 2023 Twyford Lottie UPDATED Ludicrous to suggest buses won t be changed after light rail gets to Woden Steel Riotact Retrieved 22 November 2023 Bushnell Ian Light rail Stage 2A contract signed but it ll be 2028 before first passengers Riotact Retrieved 3 January 2024 CMTEDD ACT PROCUREMENT Transport Land Road reserves of Commonwealth Ave State Circle Adelaide Ave Yarra Glen and Callam St Australian Capital Territory Commonwealth Park to Woden Light Rail Project ACT Department of the Environment and Energy Retrieved 17 September 2019 Bushnell Ian 17 October 2019 Belco Airport and Tuggeranong next stops for Canberra s light rail journey RiotACT Region Group Pty Ltd Retrieved 8 November 2019 a b Infrastructure Plan PDF ACT Treasury ACT Government Retrieved 8 November 2019 McIlroy Tom 26 October 2015 Woden and Parliament next for light rail lines in Canberra tram master plan The Canberra Times Light Rail Network Delivering a modern transport system for a growing city ACT Government Trove 2015 Retrieved 18 June 2019 External links edit nbsp Media related to Canberra Metro at Wikimedia Commons Transport Canberra Light Rail Portals nbsp Transport nbsp Australia Retrieved from https en wikipedia org w index php title Light rail in Canberra amp oldid 1221302605, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.