The Binondo–Intramuros Bridge is a tied-arch bridge in Manila, Philippines that spans the Pasig River. It connects Muelle de Binondo in Binondo and in San Nicolas to Solana Street and Riverside Drive in Intramuros.[4] The bridge has four lanes and exhibits a steel bowstring arch design with inclined arches.[5] It has a length of 680 meters (2,230 ft).[6]

Binondo–Intramuros Bridge
The bridge in August 2023
Coordinates14°35′42.97″N 120°58′29.32″E / 14.5952694°N 120.9748111°E / 14.5952694; 120.9748111
CarriesVehicular traffic and pedestrians
CrossesPasig River
LocaleManila, Philippines
Maintained byDepartment of Public Works and Highways
Preceded byRoxas Bridge
Followed byJones Bridge
Characteristics
DesignTied-arch bridge
MaterialSteel
Pier constructionConcrete
Total length680 m (2,230 ft)
Width21.65 m (71.0 ft)
Longest span70 m (230 ft)
No. of lanes4
History
Constructed byChina Road and Bridge Corporation
Construction startJuly 17, 2018
Construction cost₱3.39 billion
OpenedApril 5, 2022; 2 years ago (2022-04-05)
Statistics
Daily traffic30,000 vehicles
Location
References
[1][2][3]

The bridge is controversial due to its location at the historic center of Manila, near the San Agustin Church heritage site.

History edit

Planning and funding edit

 
December 2020
 
February 2021
The bridge under construction

The bridge is a part of the CN¥500 million (3.6 billion) infrastructure grant by China under the Agreement on Economic and Technical Cooperation, which was agreed upon by China and the Philippines following a state visit of Philippine President Rodrigo Duterte to China in May 2017.[7] On June 22, 2017, the Department of Public Works and Highways and the Chinese embassy signed a Minutes of Discussion regarding the full grant and financing the construction of the bridge.[8]

By July 2017, the feasibility study for the bridge was completed.[9]

Construction and opening edit

Construction was expected to begin within 2017.[10] The DPWH Unified Project Management Office-Roads Management Cluster I will implement the construction of the bridge,[8] while China Road and Bridge Corporation is the contractor of the project.[3] The groundbreaking ceremony for the bridge led by President Rodrigo Duterte took place on July 17, 2018.[11] The bridge was expected to be completed in September 2021,[12] but was delayed to December 2021 due to the COVID-19 pandemic.[13]

On April 5, 2022, President Rodrigo Duterte and other government officials inaugurated the bridge. It was opened on the same day.[2]

Pedestrian stairways are currently being completed, with the actual stairways now being welded into place. These were not present during the bridge's inauguration due to logistic issues.

Design edit

 
Exit ramp at Binondo side
 
Exit ramp at Intramuros side

Designed according to new seismic specifications and taking into consideration the impact of climate change,[2] the bridge is a basket-handle tied-arch bridge.[1] Its main span is 70 meters (230 ft) long and 21.65 meters (71.0 ft) wide.[1]

The ramps on both sides branch out to different streets. The entrance ramp on the Binondo side is located along Muelle de la Industria in San Nicolas, while its exit ramp in the same side runs above Estero de Binondo and ends at Muelle de Binondo, intersecting Santo Cristo Street (near South San Nicolas Volunteer Fire Brigade) in San Nicolas on the west bank and Rentas Street in Binondo on the east bank. On the other hand, the entrance ramp on the Intramuros side is located along Riverside Drive while its exit ramp ends at the intersection of Andres Soriano Avenue, Muralla Street, and Solana Street, just beside Aduana Building.[1]

Reception edit

Heritage conservationists groups has expressed concerns regarding the proposed bridge. International Council on Monuments and Sites (ICOMOS) Philippines advises against the construction of a vehicular bridge connecting Binondo and Intramuros suggesting a pedestrian bridge instead. A study conducted by the organization found the construction of the proposed Binondo–Intramuros Bridge will likely affect the Aduana Building in Intramuros due to its soft foundation as well as the Chamber of Commerce Building and Plaza Mexico. It also notes that the bridge will cover the Estero de Binondo and the Puente de San Fernando will be demolished to give way for the bridge's construction. ICOMOS Philippines has also said that the bridge will worsen traffic conditions in the area and will cause visual and air pollution. The organization also notes that ramps of the proposed bridge will affect the buffer zone of the San Agustin Church and Monastery, a World Heritage Site. The case of the desisting of the City of Dresden as a World Heritage Site due to the construction of the Waldschlösschen Bridge has been cited by ICOMOS Philippines with regards to the proposed Binondo–Intramuros Bridge and has raised concerns that the bridge project could threaten the bid of the whole Intramuros area to become a UNESCO World Heritage Site.[14]

Heritage Conservation Society also has opposed the project while the Advocates for Heritage Preservation has urged the bridge to be designed to complement the area's Spanish colonial architecture.[14] The Chamber of Commerce of the Philippine Islands has also opposed the planned bridge due to heritage and pollution concerns. It proposed instead to expand the Del Pan and Jones Bridges.[15]

Despite its controversial nature, the bridge became a new hangout for sightseers due to its unique design since its opening, where a daily gathering of people taking pictures and posing beside the structure has been noted, especially in good weather.[16] A police outpost has been set up at the bridge to dissuade excessive crowd gathering and to usher traffic.

See also edit

External links edit

  •   Media related to Binondo–Intramuros Bridge at Wikimedia Commons

References edit

  1. ^ a b c d "Iconic steel arch bridge Project in Manila now has concrete slab". Philippine Information Agency. September 2, 2021. Retrieved April 5, 2022.
  2. ^ a b c Flores, Helen (April 6, 2022). "Duterte leads inauguration of Binondo-Intramuros bridge". The Philippine Star. Retrieved April 6, 2022.
  3. ^ a b "Binondo-Intramuros Bridge On Track for 2021 Opening". Department of Public Works and Highways. April 15, 2021. Retrieved April 4, 2022.
  4. ^ OpenStreetMap contributors (April 9, 2022). "Way: Binondo-Intramuros Bridge (991039651)" (Map). OpenStreetMap. OpenStreetMap. Retrieved April 9, 2022.[self-published source]
  5. ^ Placido, Dharel (June 29, 2017). "Construction of two China-sponsored bridges to begin this year". ABS-CBN News. Retrieved June 29, 2017.
  6. ^ "DPWH to start construction of Estrella-Pantaleon, Binondo-Intramuros bridges by next week–Villar". BusinessMirror. July 11, 2018. Retrieved July 12, 2018.
  7. ^ Kabiling, Genalyn (June 25, 2017). . Manila Bulletin. Archived from the original on June 25, 2017. Retrieved July 13, 2017.{{cite news}}: CS1 maint: unfit URL (link)
  8. ^ a b Depasupil, William (June 22, 2017). . The Manila Times. Archived from the original on March 28, 2019. Retrieved July 13, 2017.{{cite news}}: CS1 maint: unfit URL (link)
  9. ^ Tubayan, Elijah Joseph (July 12, 2017). . BusinessWorld. BusinessWorld Publishing Corporation. Archived from the original on July 11, 2017. Retrieved July 13, 2017.
  10. ^ Alvarez, Kathrina Charmaine (June 29, 2017). "Villar boasts of 2 China-funded bridges, Ilocos-Bicol road network". GMA News. Retrieved July 13, 2017.
  11. ^ "President Duterte breaks ground for two China Grant-Aid bridges". PTV News. July 17, 2018. Retrieved July 17, 2018.
  12. ^ De Guzman, Marcus (February 8, 2021). "Binondo-Intramuros Bridge to be completed Sept 2021". AutoIndustriya.com. Retrieved July 1, 2021.
  13. ^ De Guzman, Marcus (June 30, 2021). "Binondo-Intramuros Bridge opening moved to Dec 2021". AutoIndustriya.com. Retrieved July 1, 2021.
  14. ^ a b Sembrano, Edgar (July 30, 2018). "Unesco advisory group warns vs planned Binondo-Intramuros bridge". Philippine Daily Inquirer. Retrieved November 11, 2018.
  15. ^ Cahiles-Magkilat, Bernie (September 5, 2018). "Chamber opposes China-funded Binondo-Intramuros bridge". Manila Bulletin. Retrieved November 11, 2018.
  16. ^ "Binondo-Intramuros Bridge the new photo op spot - Motorcycle News". April 11, 2022.

binondo, intramuros, bridge, tied, arch, bridge, manila, philippines, that, spans, pasig, river, connects, muelle, binondo, binondo, nicolas, solana, street, riverside, drive, intramuros, bridge, four, lanes, exhibits, steel, bowstring, arch, design, with, inc. The Binondo Intramuros Bridge is a tied arch bridge in Manila Philippines that spans the Pasig River It connects Muelle de Binondo in Binondo and in San Nicolas to Solana Street and Riverside Drive in Intramuros 4 The bridge has four lanes and exhibits a steel bowstring arch design with inclined arches 5 It has a length of 680 meters 2 230 ft 6 Binondo Intramuros BridgeThe bridge in August 2023Coordinates14 35 42 97 N 120 58 29 32 E 14 5952694 N 120 9748111 E 14 5952694 120 9748111CarriesVehicular traffic and pedestriansCrossesPasig RiverLocaleManila PhilippinesMaintained byDepartment of Public Works and HighwaysPreceded byRoxas BridgeFollowed byJones BridgeCharacteristicsDesignTied arch bridgeMaterialSteelPier constructionConcreteTotal length680 m 2 230 ft Width21 65 m 71 0 ft Longest span70 m 230 ft No of lanes4HistoryConstructed byChina Road and Bridge CorporationConstruction startJuly 17 2018Construction cost 3 39 billionOpenedApril 5 2022 2 years ago 2022 04 05 StatisticsDaily traffic30 000 vehiclesLocationReferences 1 2 3 The bridge is controversial due to its location at the historic center of Manila near the San Agustin Church heritage site Contents 1 History 1 1 Planning and funding 1 2 Construction and opening 2 Design 3 Reception 4 See also 5 External links 6 ReferencesHistory editPlanning and funding edit nbsp December 2020 nbsp February 2021The bridge under construction The bridge is a part of the CN 500 million 3 6 billion infrastructure grant by China under the Agreement on Economic and Technical Cooperation which was agreed upon by China and the Philippines following a state visit of Philippine President Rodrigo Duterte to China in May 2017 7 On June 22 2017 the Department of Public Works and Highways and the Chinese embassy signed a Minutes of Discussion regarding the full grant and financing the construction of the bridge 8 By July 2017 the feasibility study for the bridge was completed 9 Construction and opening edit Construction was expected to begin within 2017 10 The DPWH Unified Project Management Office Roads Management Cluster I will implement the construction of the bridge 8 while China Road and Bridge Corporation is the contractor of the project 3 The groundbreaking ceremony for the bridge led by President Rodrigo Duterte took place on July 17 2018 11 The bridge was expected to be completed in September 2021 12 but was delayed to December 2021 due to the COVID 19 pandemic 13 On April 5 2022 President Rodrigo Duterte and other government officials inaugurated the bridge It was opened on the same day 2 Pedestrian stairways are currently being completed with the actual stairways now being welded into place These were not present during the bridge s inauguration due to logistic issues Design edit nbsp Exit ramp at Binondo side nbsp Exit ramp at Intramuros side Designed according to new seismic specifications and taking into consideration the impact of climate change 2 the bridge is a basket handle tied arch bridge 1 Its main span is 70 meters 230 ft long and 21 65 meters 71 0 ft wide 1 The ramps on both sides branch out to different streets The entrance ramp on the Binondo side is located along Muelle de la Industria in San Nicolas while its exit ramp in the same side runs above Estero de Binondo and ends at Muelle de Binondo intersecting Santo Cristo Street near South San Nicolas Volunteer Fire Brigade in San Nicolas on the west bank and Rentas Street in Binondo on the east bank On the other hand the entrance ramp on the Intramuros side is located along Riverside Drive while its exit ramp ends at the intersection of Andres Soriano Avenue Muralla Street and Solana Street just beside Aduana Building 1 Reception editHeritage conservationists groups has expressed concerns regarding the proposed bridge International Council on Monuments and Sites ICOMOS Philippines advises against the construction of a vehicular bridge connecting Binondo and Intramuros suggesting a pedestrian bridge instead A study conducted by the organization found the construction of the proposed Binondo Intramuros Bridge will likely affect the Aduana Building in Intramuros due to its soft foundation as well as the Chamber of Commerce Building and Plaza Mexico It also notes that the bridge will cover the Estero de Binondo and the Puente de San Fernando will be demolished to give way for the bridge s construction ICOMOS Philippines has also said that the bridge will worsen traffic conditions in the area and will cause visual and air pollution The organization also notes that ramps of the proposed bridge will affect the buffer zone of the San Agustin Church and Monastery a World Heritage Site The case of the desisting of the City of Dresden as a World Heritage Site due to the construction of the Waldschlosschen Bridge has been cited by ICOMOS Philippines with regards to the proposed Binondo Intramuros Bridge and has raised concerns that the bridge project could threaten the bid of the whole Intramuros area to become a UNESCO World Heritage Site 14 Heritage Conservation Society also has opposed the project while the Advocates for Heritage Preservation has urged the bridge to be designed to complement the area s Spanish colonial architecture 14 The Chamber of Commerce of the Philippine Islands has also opposed the planned bridge due to heritage and pollution concerns It proposed instead to expand the Del Pan and Jones Bridges 15 Despite its controversial nature the bridge became a new hangout for sightseers due to its unique design since its opening where a daily gathering of people taking pictures and posing beside the structure has been noted especially in good weather 16 A police outpost has been set up at the bridge to dissuade excessive crowd gathering and to usher traffic See also editList of crossings of the Pasig River Estrella Pantaleon Bridge China Philippines relationsExternal links edit nbsp Media related to Binondo Intramuros Bridge at Wikimedia CommonsReferences edit a b c d Iconic steel arch bridge Project in Manila now has concrete slab Philippine Information Agency September 2 2021 Retrieved April 5 2022 a b c Flores Helen April 6 2022 Duterte leads inauguration of Binondo Intramuros bridge The Philippine Star Retrieved April 6 2022 a b Binondo Intramuros Bridge On Track for 2021 Opening Department of Public Works and Highways April 15 2021 Retrieved April 4 2022 OpenStreetMap contributors April 9 2022 Way Binondo Intramuros Bridge 991039651 Map OpenStreetMap OpenStreetMap Retrieved April 9 2022 self published source Placido Dharel June 29 2017 Construction of two China sponsored bridges to begin this year ABS CBN News Retrieved June 29 2017 DPWH to start construction of Estrella Pantaleon Binondo Intramuros bridges by next week Villar BusinessMirror July 11 2018 Retrieved July 12 2018 Kabiling Genalyn June 25 2017 Malacanang welcomes China s grant to finance two bridges Manila Bulletin Archived from the original on June 25 2017 Retrieved July 13 2017 a href Template Cite news html title Template Cite news cite news a CS1 maint unfit URL link a b Depasupil William June 22 2017 Philippines China ink first infra partnership under Duterte The Manila Times Archived from the original on March 28 2019 Retrieved July 13 2017 a href Template Cite news html title Template Cite news cite news a CS1 maint unfit URL link Tubayan Elijah Joseph July 12 2017 55 big ticket infra projects await ICC action 6 pass feasibility stage BusinessWorld BusinessWorld Publishing Corporation Archived from the original on July 11 2017 Retrieved July 13 2017 Alvarez Kathrina Charmaine June 29 2017 Villar boasts of 2 China funded bridges Ilocos Bicol road network GMA News Retrieved July 13 2017 President Duterte breaks ground for two China Grant Aid bridges PTV News July 17 2018 Retrieved July 17 2018 De Guzman Marcus February 8 2021 Binondo Intramuros Bridge to be completed Sept 2021 AutoIndustriya com Retrieved July 1 2021 De Guzman Marcus June 30 2021 Binondo Intramuros Bridge opening moved to Dec 2021 AutoIndustriya com Retrieved July 1 2021 a b Sembrano Edgar July 30 2018 Unesco advisory group warns vs planned Binondo Intramuros bridge Philippine Daily Inquirer Retrieved November 11 2018 Cahiles Magkilat Bernie September 5 2018 Chamber opposes China funded Binondo Intramuros bridge Manila Bulletin Retrieved November 11 2018 Binondo Intramuros Bridge the new photo op spot Motorcycle News April 11 2022 Retrieved from https en wikipedia org w index php title Binondo Intramuros Bridge amp oldid 1213544874, wikipedia, wiki, book, books, library,