fbpx
Wikipedia

Bharuch high-speed railway station

Bharuch high-speed railway station is an under construction high-speed railway station on the Mumbai–Ahmedabad high-speed rail corridor. This station is located near Kunkarwada, Bharuch, Gujarat, India. It is the eighth station of the Mumbai–Ahmedabad high-speed rail corridor, after Surat station and before Vadodara station.[3][1]

Bharuch high-speed railway station
Mumbai-Ahmedabad High-Speed Railway station
General information
LocationKunkarwada, Bharuch, Gujarat, India
Coordinates21°41′50″N 72°57′06″E / 21.6973°N 72.9517°E / 21.6973; 72.9517
Elevation35 metres (115 ft)
Owned byNational High Speed Rail Corporation Limited
Operated byNational High Speed Rail Corporation Limited
Line(s)Mumbai–Ahmedabad high-speed rail corridor
Platforms2
Tracks2
Construction
Structure typeElevated
ParkingYes
Other information
StatusUnder construction[1]
History
OpenedAugust 2026; 2 years' time (2026-08)[2]
ElectrifiedYes
Route map
Sabarmati Depot and Workshop
Sabarmati
 Red Line 
Ahmedabad
(Golden Quadrilateral)
Anand/Nadiad
Maintenance Depot
Indian Railways
Delhi–Mumbai Expressway
NH 48 (Golden Quadrilateral)
Vadodara
Western
DFC
Bharuch
Western DFC
Indian Railways
Surat
Surat Depot
Indian Railways
(Golden Quadrilateral)
Bilimora
Kharera River [gu]
NH 48 (Golden Quadrilateral)
Maintenance Depot
Vapi
Dadra and Nagar Haveli
Gujarat
border
border
NH 48 (Golden Quadrilateral)
Boisar
Maintenance Depot
Indian Railways and Western DFC
Virar
NH 48 (Golden Quadrilateral)
Indian Railways and Western DFC
Ulhas River
Indian Railways
Thane Depot and Workshop
Mumbai Suburban Railway
Thane
Mumbai Suburban Railway
7 km (4.3 mi) tunnel under Thane Creek
Mumbai BKC
Key
Indian Railways (including Western DFC on the same line)
Western DFC
Western DFC (under construction)
Ahmedabad Metro
Location
Bharuch high-speed railway station
Location within Gujarat
Bharuch high-speed railway station
Bharuch high-speed railway station (India)
Interactive map

Construction edit

The National High-Speed Rail Corporation Limited (NHSRCL) had invited tenders for Package "C4" of the Mumbai-Ahmedabad high-speed rail corridor (MAHSR) in September 2020, with a deadline of around 4 years.[4] In October 2020, Larsen and Toubro won the tender.[5] The NSHRCL signed an agreement with Larsen and Toubro for the design and construction of Vapi station and its depot, Bilimora station, Surat station and its depot, Bharuch and Vadodara stations in November 2020.[6] In August 2021, Larsen and Toubro began construction on the station, after acquiring 12.9 hectares of land near Kunkarwada. The station is slated to be completed by August 2026, the time also slated for opening of the Gujarat section of the high-speed rail corridor.[2][1]

Lines edit

The station will be served by the Mumbai–Ahmedabad high-speed rail corridor, and will be the eighth station of the Mumbai–Ahmedabad high-speed rail corridor in Bharuch.[7][1]

Structure edit

The station will have two platforms and two tracks for regular services. It will have three levels–the platform, concourse and service floor as the entrance level. The design of the station will be inspired by Bharuch's famous cotton weaving industry and the Bandhani technique, honouring 150 years of the industry and its artists. The station area will have 2 platforms of 425 m (1,394 ft) length for 16-coach E5 Series Shinkansen trains.[8]

Features edit

The station will have all modern and advanced facilities and amenities for customers and passengers, distinct from Indian Railway stations and similar to airports. Its design has been made to accommodate sufficient space for passenger movement and amenities at the concourse and platform areas. There will be ticketing and waiting areas, a business-class lounge, a nursery, restrooms, smoking rooms, information booths, retail centres and a public information and announcement system. Moreover, skylight provisions will be present on the roof and exterior sides for natural lighting and reduced energy usage. The station will be developed as a transport hub through integration with all basic modes of transportation for better, faster and hassle-free connectivity to and from the station, such as autos, buses and taxis. Such features will be available in all 12 stations of the Mumbai-Ahmedabad high-speed rail corridor.[9][8]

Land acquisition issues edit

When the National High Speed Rail Corporation Limited (NHSRCL) began land acquisition for the station and the high-speed railway viaduct, they were met with protests from farmers in the region because of not only losing their land but also the fear of not getting sufficient compensation from NHSRCL, thus fearing them of losing their livelihoods as a whole. They demanded various topics to be discussed so that they could sustain their lives while carrying out their occupations under the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 and to the Annual Statement of Rate (ASR) for compensation. The NHSRCL officials advised the land acquisition officer of Bharuch district to prepare a report on these topics and send it to the district revenue department for review to issue a final notice for the land acquisition to be undertaken. The main reasons for which the farmers objected were the implementation of all acquisition procedures based on the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013, and to carry out social and environmental impact assessments under the Land Acquisition Act, 2013. Any debate regarding how the project would affect the farmers, their farmlands and how it would benefit the farmers during and after the project's execution was undone. The farmers concluded that their opposition would continue until their requests were resolved. Finally, NHSRCL, Indian Railways, the central and state governments reached a consensus on paying all farmers in the entire Gujarat section of the Mumbai-Ahmedabad high-speed rail corridor not only a fair but a double compensation for their livelihoods to be sustained, and hence, the problem got resolved on time and did not lead to delay in land acquisition and execution of the project.[10][11]

Connectivity edit

Road edit

The station is being built just next to the Bharuch-Dahej Road, or Gujarat SH-6, towards north. Because of this location, it will be accessible easily from Bharuch and Ankleshwar, as well as from the under-construction Delhi–Mumbai Expressway. Most of the stations being built in the Gujarat section of the Mumbai-Ahmedabad high-speed rail corridor are located near or next to state or national highways, in order to provide better and direct connectivity to the stations.[12]

Rail edit

The nearest railway station after the station's completion will be Bharuch Junction railway station, located around 8 km (5.0 mi) east from the station.

See also edit

Notes edit

  1. ^ under construction; operational till Bharuch, as of May 2024.

References edit

  1. ^ a b c d "Bullet train project: Updates from Bharuch district". DeshGujarat. 30 December 2018. Retrieved 12 October 2023.
  2. ^ a b "Bullet train by August 2026, hyperloop 7-8 years away: Railways Minister Ashiwini Vaishnaw". The Economic Times. 14 March 2023. Retrieved 12 October 2023.
  3. ^ "Mumbai – Ahmedabad High Speed Rail – Information, Route Map, Fares, Tenders & Updates". The Metro Rail Guy. Retrieved 12 October 2023.
  4. ^ "3 Bidders for Mumbai – Ahmedabad HSR's Package C4". The Metro Rail Guy. 23 September 2020. Retrieved 12 October 2023.
  5. ^ "Bullet train: L&T wins Rs 25,000-crore order for Gujarat stretch". Moneycontrol. 28 October 2020. Retrieved 8 October 2023.
  6. ^ "Bullet Train Project: Agreement Signed With L&T For India's Biggest Infrastructure Contract". NDTV Profit. 28 November 2020. Retrieved 8 October 2023.
  7. ^ "Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor Final Report Volume 6" (PDF). Japan International Cooperation Agency (JICA). Retrieved 12 October 2023.
  8. ^ a b Mishra, Kamal (18 July 2022). "Mumbai-Ahmedabad bullet train station facades to be built representing city's character; details inside". Free Press Journal. Retrieved 12 October 2023.
  9. ^ Aklekar B., Rajendra (10 February 2023). "Maharashtra: Designs of four bullet train stations unveiled". Mid-Day. Mumbai. Retrieved 12 October 2023.
  10. ^ "Bullet train project: In Bharuch, land officer lists 12-point farmers' objections". The Indian Express. 21 June 2018. Retrieved 12 October 2023.
  11. ^ "How Ahmedabad-Mumbai bullet train project has turned many into crorepatis". The Economic Times. 27 April 2023. Retrieved 12 October 2023.
  12. ^ Rupera, Prashant (16 May 2018). "Bullet train terminals planned close to highways". The Times of India. Retrieved 12 October 2023.

bharuch, high, speed, railway, station, under, construction, high, speed, railway, station, mumbai, ahmedabad, high, speed, rail, corridor, this, station, located, near, kunkarwada, bharuch, gujarat, india, eighth, station, mumbai, ahmedabad, high, speed, rail. Bharuch high speed railway station is an under construction high speed railway station on the Mumbai Ahmedabad high speed rail corridor This station is located near Kunkarwada Bharuch Gujarat India It is the eighth station of the Mumbai Ahmedabad high speed rail corridor after Surat station and before Vadodara station 3 1 Bharuch high speed railway stationMumbai Ahmedabad High Speed Railway stationGeneral informationLocationKunkarwada Bharuch Gujarat IndiaCoordinates21 41 50 N 72 57 06 E 21 6973 N 72 9517 E 21 6973 72 9517Elevation35 metres 115 ft Owned byNational High Speed Rail Corporation LimitedOperated byNational High Speed Rail Corporation LimitedLine s Mumbai Ahmedabad high speed rail corridorPlatforms2Tracks2ConstructionStructure typeElevatedParkingYesOther informationStatusUnder construction 1 HistoryOpenedAugust 2026 2 years time 2026 08 2 ElectrifiedYesRoute mapLegend Delhi Ahmedabad high speed rail corridorto New Delhi planned Sabarmati Depot and Workshop Sabarmati Red Line Sabarmati River Ahmedabad NH 47 Sardar Patel Ring Road Meshwo River Vatrak River NH 48 Golden Quadrilateral Anand Nadiad Maintenance Depot Indian Railways Mahi River Delhi Mumbai Expressway NH 48 Golden Quadrilateral Vadodara Western DFC Bharuch Narmada River Western DFC Delhi Mumbai Expressway a Indian Railways Tapti River Surat Surat Depot Indian Railways NH 53 NH 48 Golden Quadrilateral NH 60 Bilimora Kharera River gu NH 48 Golden Quadrilateral Auranga River Par River NH 848 NH 56 Maintenance Depot Vapi Daman Ganga River GujaratDadra and Nagar Haveli border Dadra and Nagar HaveliGujarat border GujaratMaharashtra border NH 48 Golden Quadrilateral Boisar NH 160A Maintenance Depot Indian Railways and Western DFC Vaitarna River Virar Western DFC NH 48 Golden Quadrilateral Tungareshwar Wildlife Sanctuary Indian Railways and Western DFC Ulhas River NH 848 Indian Railways NH 160 Mumbai Agra Highway Mumbai Nagpur high speed rail corridorto Nagpur planned Thane Depot and Workshop Ulhas River Mumbai Suburban Railway Thane Mumbai Suburban Railway NH 48 Golden Quadrilateral Parsik Hills 7 km 4 3 mi tunnel under Thane Creek Eastern Express Highway Mumbai Suburban Railway Mithi River Mumbai BKC Line 2 Key Indian Railways including Western DFC on the same line Western DFC Western DFC under construction Ahmedabad Metro This diagram viewtalkeditLocationBharuch high speed railway stationLocation within GujaratShow map of GujaratBharuch high speed railway stationBharuch high speed railway station India Show map of IndiaInteractive map Contents 1 Construction 2 Lines 3 Structure 4 Features 5 Land acquisition issues 6 Connectivity 6 1 Road 6 2 Rail 7 See also 8 Notes 9 ReferencesConstruction editThe National High Speed Rail Corporation Limited NHSRCL had invited tenders for Package C4 of the Mumbai Ahmedabad high speed rail corridor MAHSR in September 2020 with a deadline of around 4 years 4 In October 2020 Larsen and Toubro won the tender 5 The NSHRCL signed an agreement with Larsen and Toubro for the design and construction of Vapi station and its depot Bilimora station Surat station and its depot Bharuch and Vadodara stations in November 2020 6 In August 2021 Larsen and Toubro began construction on the station after acquiring 12 9 hectares of land near Kunkarwada The station is slated to be completed by August 2026 the time also slated for opening of the Gujarat section of the high speed rail corridor 2 1 Lines editThe station will be served by the Mumbai Ahmedabad high speed rail corridor and will be the eighth station of the Mumbai Ahmedabad high speed rail corridor in Bharuch 7 1 Structure editThe station will have two platforms and two tracks for regular services It will have three levels the platform concourse and service floor as the entrance level The design of the station will be inspired by Bharuch s famous cotton weaving industry and the Bandhani technique honouring 150 years of the industry and its artists The station area will have 2 platforms of 425 m 1 394 ft length for 16 coach E5 Series Shinkansen trains 8 Features editThe station will have all modern and advanced facilities and amenities for customers and passengers distinct from Indian Railway stations and similar to airports Its design has been made to accommodate sufficient space for passenger movement and amenities at the concourse and platform areas There will be ticketing and waiting areas a business class lounge a nursery restrooms smoking rooms information booths retail centres and a public information and announcement system Moreover skylight provisions will be present on the roof and exterior sides for natural lighting and reduced energy usage The station will be developed as a transport hub through integration with all basic modes of transportation for better faster and hassle free connectivity to and from the station such as autos buses and taxis Such features will be available in all 12 stations of the Mumbai Ahmedabad high speed rail corridor 9 8 Land acquisition issues editWhen the National High Speed Rail Corporation Limited NHSRCL began land acquisition for the station and the high speed railway viaduct they were met with protests from farmers in the region because of not only losing their land but also the fear of not getting sufficient compensation from NHSRCL thus fearing them of losing their livelihoods as a whole They demanded various topics to be discussed so that they could sustain their lives while carrying out their occupations under the Right to Fair Compensation and Transparency in Land Acquisition Rehabilitation and Resettlement Act 2013 and to the Annual Statement of Rate ASR for compensation The NHSRCL officials advised the land acquisition officer of Bharuch district to prepare a report on these topics and send it to the district revenue department for review to issue a final notice for the land acquisition to be undertaken The main reasons for which the farmers objected were the implementation of all acquisition procedures based on the Right to Fair Compensation and Transparency in Land Acquisition Rehabilitation and Resettlement Act 2013 and to carry out social and environmental impact assessments under the Land Acquisition Act 2013 Any debate regarding how the project would affect the farmers their farmlands and how it would benefit the farmers during and after the project s execution was undone The farmers concluded that their opposition would continue until their requests were resolved Finally NHSRCL Indian Railways the central and state governments reached a consensus on paying all farmers in the entire Gujarat section of the Mumbai Ahmedabad high speed rail corridor not only a fair but a double compensation for their livelihoods to be sustained and hence the problem got resolved on time and did not lead to delay in land acquisition and execution of the project 10 11 Connectivity editRoad edit The station is being built just next to the Bharuch Dahej Road or Gujarat SH 6 towards north Because of this location it will be accessible easily from Bharuch and Ankleshwar as well as from the under construction Delhi Mumbai Expressway Most of the stations being built in the Gujarat section of the Mumbai Ahmedabad high speed rail corridor are located near or next to state or national highways in order to provide better and direct connectivity to the stations 12 Rail edit The nearest railway station after the station s completion will be Bharuch Junction railway station located around 8 km 5 0 mi east from the station See also editHigh speed rail in India Bandhani Mumbai Ahmedabad high speed rail corridor National High Speed Rail Corporation LimitedNotes edit under construction operational till Bharuch as of May 2024 References edit a b c d Bullet train project Updates from Bharuch district DeshGujarat 30 December 2018 Retrieved 12 October 2023 a b Bullet train by August 2026 hyperloop 7 8 years away Railways Minister Ashiwini Vaishnaw The Economic Times 14 March 2023 Retrieved 12 October 2023 Mumbai Ahmedabad High Speed Rail Information Route Map Fares Tenders amp Updates The Metro Rail Guy Retrieved 12 October 2023 3 Bidders for Mumbai Ahmedabad HSR s Package C4 The Metro Rail Guy 23 September 2020 Retrieved 12 October 2023 Bullet train L amp T wins Rs 25 000 crore order for Gujarat stretch Moneycontrol 28 October 2020 Retrieved 8 October 2023 Bullet Train Project Agreement Signed With L amp T For India s Biggest Infrastructure Contract NDTV Profit 28 November 2020 Retrieved 8 October 2023 Joint Feasibility Study for Mumbai Ahmedabad High Speed Railway Corridor Final Report Volume 6 PDF Japan International Cooperation Agency JICA Retrieved 12 October 2023 a b Mishra Kamal 18 July 2022 Mumbai Ahmedabad bullet train station facades to be built representing city s character details inside Free Press Journal Retrieved 12 October 2023 Aklekar B Rajendra 10 February 2023 Maharashtra Designs of four bullet train stations unveiled Mid Day Mumbai Retrieved 12 October 2023 Bullet train project In Bharuch land officer lists 12 point farmers objections The Indian Express 21 June 2018 Retrieved 12 October 2023 How Ahmedabad Mumbai bullet train project has turned many into crorepatis The Economic Times 27 April 2023 Retrieved 12 October 2023 Rupera Prashant 16 May 2018 Bullet train terminals planned close to highways The Times of India Retrieved 12 October 2023 Retrieved from https en wikipedia org w index php title Bharuch high speed railway station amp oldid 1220246491, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.