The Red Line of the Ahmedabad Metro is a metro route of the mass rapid transit system in Ahmedabad, India.

Red Line
Overview
StatusUnder Construction
LocaleAhmedabad
Gandhinagar
Termini
Stations38
Service
TypeRapid Transit
SystemAhmedabad Metro
Operator(s)Gujarat Metro Rail Corporation Limited
Rolling stockHyundai Rotem
History
Opened6 October 2022
Technical
Line length41.36 km (25.70 mi)
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) (Standard gauge)
Electrification750V DC Third Rail
Route map

History edit

Phase-1 edit

 
North-South Corridor under construction near Sabarmati Powerhouse and Sabarmati Railway Station 9 July 2017

The Phase-1 of the North-South Corridor consists of 15 metro stations from APMC to Motera Stadium with a total distance of 18.87 km (11.73 mi). The line is completely elevated. It will connect Motera Stadium to APMC, Vasna and will be passing through Sabarmati, AEC, Sabarmati Railway station, Ranip, Vadaj, Vijaynagar, Usmanpura, Old High court, Gandhigram, Paldi, Shreyas, Rajivnagar and Jivraj stations.[1] The Phase-1 of the North-South Corridor was inaugurated on 30 September 2022 by Indian Prime Minister Narendra Modi.[2] It was opened to public on 6 October 2022 except Sabarmati Railway Station metro station which is under construction.[3][4]

Phase-2 edit

The Government of Gujarat approved the Phase-2 in October 2017 and revised it in October 2018. In February 2019, the Union cabinet approved the Phase-2 worth cost of 5,384.17 crore (US$670 million). It will extend the North-South corridor from Motera in Ahmedabad to Mahatma Mandir in Gandhinagar (23.838 km (14.812 mi)) with a branch line from Gujarat National Law University (GNLU) linking Pandit Deendayal Energy University (PDEU) and GIFT City (5.416 km). The Phase-2 will have total 28.26 km (17.56 mi)-long elevated corridor with 22 stations.[5][6][7]

The tendering for the Phase 2 began in January 2020.[8][9] On 18 January 2021, the foundation stone of the Phase-2 was laid by Prime Minister Modi.[10] The branch line connecting to GIFT City is expected to open in early 2024.[11]

List of stations edit

Main Line edit

Following is a list of stations on this route:[12]

Red Line (Main Line)
# Station Name Opening Connections Layout
English Gujarati
1 Mahatma Mandir મહાત્મા મંદિર Under Construction None Elevated
2 Sector-24 સેક્ટર-24 Under Construction None Elevated
3 Sector-16 સેક્ટર-16 Under Construction None Elevated
4 Juna Sachivalaya જૂના સચિવાલય Under Construction None Elevated
5 Akshardham અક્ષરધામ Under Construction None Elevated
6 Sachivalaya સચિવાલય Under Construction None Elevated
7 Sector-10A સેક્ટર-10એ Under Construction None Elevated
8 Sector-1 સેક્ટર-1 Under Construction None Elevated
9 Infocity ઇન્ફોસિટી Under Construction None Elevated
10 Dholakuva Circle ધોળાકુવા સર્કલ Under Construction None Elevated
11 Randesan રાંદેસણ Under Construction None Elevated
12 Raysan રાયસન Under Construction None Elevated
13 GNLU જી એન એલ યુ Under Construction  Red Line (Branch Line)  Elevated
14 Koba Gam કોબા ગામ Under Construction None Elevated
15 Juna Koba જૂના કોબા Under Construction None Elevated
16 Koba Circle કોબા સર્કલ Under Construction None Elevated
17 Narmada Canal નર્મદા કેનાલ Under Construction None Elevated
18 Tapovan Circle તપોવન સર્કલ Under Construction None Elevated
19 Vishwakarma College વિશ્વકર્મા કોલેજ Under Construction None Elevated
20 Koteshwar Road કોટેશ્વર રોડ Under Construction None Elevated
21 Motera Stadium મોટેરા સ્ટેડિયમ 30 September 2022 None Elevated
22 Sabarmati સાબરમતી 30 September 2022 None Elevated
23 AEC એ ઇ સી 30 September 2022 None Elevated
24 Sabarmati Railway Station સાબરમતી રેલવે સ્ટેશન 30 September 2022 Ahmedabad BRTS, Sabarmati Junction railway station and Mumbai–Ahmedabad high-speed rail corridor[12] Elevated
25 Ranip રાણીપ 30 September 2022 Ahmedabad BRTS and GSRTC Bus Station at Ranip[12] Elevated
26 Vadaj વાડજ 30 September 2022 None Elevated
27 Vijay Nagar વિજય નગર 30 September 2022 None Elevated
28 Usmanpura ઉસ્માનપુરા 30 September 2022 None Elevated
29 Old High Court જૂની હાઇ કોર્ટ 30 September 2022  Blue Line [12] Elevated
30 Gandhigram ગાંધીગ્રામ 30 September 2022 Gandhigram railway station[12] Elevated
31 Paldi પાલડી 30 September 2022 None Elevated
32 Shreyas શ્રેયસ 30 September 2022 None Elevated
33 Rajiv Nagar રાજીવ નગર 30 September 2022 None Elevated
34 Jivraj Park જીવરાજ પાર્ક 30 September 2022 None Elevated
35 APMC એ પી એમ સી 30 September 2022 None Elevated

Branch Line edit

Following is a list of stations on this route:

Red Line (Branch Line)
# Station Name Opening Connections Layout
English Gujarati
1 GNLU જી એન એલ યુ Under Construction  Red Line (Main Line)  Elevated
2 PDPU પી ડી પી યુ Under Construction None Elevated
3 GIFT City ગિફ્ટ સિટી Under Construction None Elevated

Map edit

 
Click on icons for more details


References edit

  1. ^ "Project Profile". GMRC. Retrieved 8 March 2019.
  2. ^ "PM Modi to launch Ahmedabad Metro Phase 1, flag off Vande Bharat Express during two-day Gujarat visit". 28 September 2022.
  3. ^ "મેટ્રો ટ્રેનની સવારી: અમદાવાદમાં થલતેજ-વસ્ત્રાલ મેટ્રો ગાંધી જયંતીથી, એપીએમસી-મોટેરા 6 ઓક્ટોબરથી શરૂ થશે". Divya Bhaskar (in Gujarati). 30 September 2022. Retrieved 30 September 2022.
  4. ^ "Ahmedabad: Metro service on North-South corridor to begin on October 6". The Indian Express. 3 October 2022. Retrieved 4 October 2022.
  5. ^ "Gujarat nod for Rs 6,758crore Metro Phase II". The Times of India. Retrieved 18 January 2018.
  6. ^ Nair, Avinash (20 October 2018). "Ahmedabad Metro Rail: After Centre objects, Metro rail link to GIFT City shortened by 6 km". The Indian Express. Retrieved 21 October 2018.
  7. ^ "Ahmedabad Metro Phase 2 gets Modi Cabinet clearance ahead of Phase 1 inauguration on 4 March". The Financial Express. 21 February 2019. Retrieved 4 March 2019.
  8. ^ "GMRC Invites Bids for Ahmedabad Metro's Phase 2 Construction". The Metro Rail Guy. 20 January 2020. Retrieved 20 April 2020.
  9. ^ "Ahmedabad Metro Phase 2 – Information, Route Maps, Tenders & Updates". The Metro Rail Guy. Retrieved 20 April 2020.
  10. ^ "'Very important gifts for Ahmedabad, Surat': PM Modi launches metro rail projects in Gujarat". www.timesnownews.com. Retrieved 18 January 2021.
  11. ^ "Ahmedabad Metro connectivity to GIFT City by early 2024, says GMRC". 19 September 2021.
  12. ^ a b c d e "Chugging in, clearing hurdles: Prime Minister to inaugurate Phase I of Ahmedabad Metro in August this year". The Indian Express. 11 July 2022. Retrieved 13 July 2022.

line, ahmedabad, metro, line, ahmedabad, metro, metro, route, mass, rapid, transit, system, ahmedabad, india, lineoverviewstatusunder, constructionlocaleahmedabadgandhinagarterminimahatma, mandirapmcstations38servicetyperapid, transitsystemahmedabad, metrooper. The Red Line of the Ahmedabad Metro is a metro route of the mass rapid transit system in Ahmedabad India Red LineOverviewStatusUnder ConstructionLocaleAhmedabadGandhinagarTerminiMahatma MandirAPMCStations38ServiceTypeRapid TransitSystemAhmedabad MetroOperator s Gujarat Metro Rail Corporation LimitedRolling stockHyundai RotemHistoryOpened6 October 2022TechnicalLine length41 36 km 25 70 mi CharacterElevatedTrack gauge1 435 mm 4 ft 8 1 2 in Standard gauge Electrification750V DC Third RailRoute mapLegendRed LineMain LineMahatma MandirSector 24Sector 16Juna SachivalayaAkshardhamSachivalayaSector 10ASector 1InfocityDholakuva Circle Red LineBranch LineRandesan GIFT CityRaysan PDPUGNLUKoba GamJuna KobaKoba CircleNarmada CanalTapovan CircleVishwakarma CollegeKoteshwar RoadMotera StadiumSabarmatiAECSabarmati Railway StationRanipVadajVijay NagarUsmanpuraBlue Line Old High CourtGandhigramPaldiShreyasRajiv NagarJivraj ParkAPMCGyaspur Depot Contents 1 History 1 1 Phase 1 1 2 Phase 2 2 List of stations 2 1 Main Line 2 2 Branch Line 3 Map 4 ReferencesHistory editPhase 1 edit nbsp North South Corridor under construction near Sabarmati Powerhouse and Sabarmati Railway Station 9 July 2017The Phase 1 of the North South Corridor consists of 15 metro stations from APMC to Motera Stadium with a total distance of 18 87 km 11 73 mi The line is completely elevated It will connect Motera Stadium to APMC Vasna and will be passing through Sabarmati AEC Sabarmati Railway station Ranip Vadaj Vijaynagar Usmanpura Old High court Gandhigram Paldi Shreyas Rajivnagar and Jivraj stations 1 The Phase 1 of the North South Corridor was inaugurated on 30 September 2022 by Indian Prime Minister Narendra Modi 2 It was opened to public on 6 October 2022 except Sabarmati Railway Station metro station which is under construction 3 4 Phase 2 edit The Government of Gujarat approved the Phase 2 in October 2017 and revised it in October 2018 In February 2019 the Union cabinet approved the Phase 2 worth cost of 5 384 17 crore US 670 million It will extend the North South corridor from Motera in Ahmedabad to Mahatma Mandir in Gandhinagar 23 838 km 14 812 mi with a branch line from Gujarat National Law University GNLU linking Pandit Deendayal Energy University PDEU and GIFT City 5 416 km The Phase 2 will have total 28 26 km 17 56 mi long elevated corridor with 22 stations 5 6 7 The tendering for the Phase 2 began in January 2020 8 9 On 18 January 2021 the foundation stone of the Phase 2 was laid by Prime Minister Modi 10 The branch line connecting to GIFT City is expected to open in early 2024 11 List of stations editMain Line edit Following is a list of stations on this route 12 Red Line Main Line Station Name Opening Connections LayoutEnglish Gujarati1 Mahatma Mandir મહ ત મ મ દ ર Under Construction None Elevated2 Sector 24 સ ક ટર 24 Under Construction None Elevated3 Sector 16 સ ક ટર 16 Under Construction None Elevated4 Juna Sachivalaya જ ન સચ વ લય Under Construction None Elevated5 Akshardham અક ષરધ મ Under Construction None Elevated6 Sachivalaya સચ વ લય Under Construction None Elevated7 Sector 10A સ ક ટર 10એ Under Construction None Elevated8 Sector 1 સ ક ટર 1 Under Construction None Elevated9 Infocity ઇન ફ સ ટ Under Construction None Elevated10 Dholakuva Circle ધ ળ ક વ સર કલ Under Construction None Elevated11 Randesan ર દ સણ Under Construction None Elevated12 Raysan ર યસન Under Construction None Elevated13 GNLU જ એન એલ ય Under Construction Red Line Branch Line Elevated14 Koba Gam ક બ ગ મ Under Construction None Elevated15 Juna Koba જ ન ક બ Under Construction None Elevated16 Koba Circle ક બ સર કલ Under Construction None Elevated17 Narmada Canal નર મદ ક ન લ Under Construction None Elevated18 Tapovan Circle તપ વન સર કલ Under Construction None Elevated19 Vishwakarma College વ શ વકર મ ક લ જ Under Construction None Elevated20 Koteshwar Road ક ટ શ વર ર ડ Under Construction None Elevated21 Motera Stadium મ ટ ર સ ટ ડ યમ 30 September 2022 None Elevated22 Sabarmati સ બરમત 30 September 2022 None Elevated23 AEC એ ઇ સ 30 September 2022 None Elevated24 Sabarmati Railway Station સ બરમત ર લવ સ ટ શન 30 September 2022 Ahmedabad BRTS Sabarmati Junction railway station and Mumbai Ahmedabad high speed rail corridor 12 Elevated25 Ranip ર ણ પ 30 September 2022 Ahmedabad BRTS and GSRTC Bus Station at Ranip 12 Elevated26 Vadaj વ ડજ 30 September 2022 None Elevated27 Vijay Nagar વ જય નગર 30 September 2022 None Elevated28 Usmanpura ઉસ મ નપ ર 30 September 2022 None Elevated29 Old High Court જ ન હ ઇ ક ર ટ 30 September 2022 Blue Line 12 Elevated30 Gandhigram ગ ધ ગ ર મ 30 September 2022 Gandhigram railway station 12 Elevated31 Paldi પ લડ 30 September 2022 None Elevated32 Shreyas શ ર યસ 30 September 2022 None Elevated33 Rajiv Nagar ર જ વ નગર 30 September 2022 None Elevated34 Jivraj Park જ વર જ પ ર ક 30 September 2022 None Elevated35 APMC એ પ એમ સ 30 September 2022 None ElevatedBranch Line edit Following is a list of stations on this route Red Line Branch Line Station Name Opening Connections LayoutEnglish Gujarati1 GNLU જ એન એલ ય Under Construction Red Line Main Line Elevated2 PDPU પ ડ પ ય Under Construction None Elevated3 GIFT City ગ ફ ટ સ ટ Under Construction None ElevatedMap edit nbsp Click on icons for more detailsReferences edit Project Profile GMRC Retrieved 8 March 2019 PM Modi to launch Ahmedabad Metro Phase 1 flag off Vande Bharat Express during two day Gujarat visit 28 September 2022 મ ટ ર ટ ર નન સવ ર અમદ વ દમ થલત જ વસ ત ર લ મ ટ ર ગ ધ જય ત થ એપ એમસ મ ટ ર 6 ઓક ટ બરથ શર થશ Divya Bhaskar in Gujarati 30 September 2022 Retrieved 30 September 2022 Ahmedabad Metro service on North South corridor to begin on October 6 The Indian Express 3 October 2022 Retrieved 4 October 2022 Gujarat nod for Rs 6 758crore Metro Phase II The Times of India Retrieved 18 January 2018 Nair Avinash 20 October 2018 Ahmedabad Metro Rail After Centre objects Metro rail link to GIFT City shortened by 6 km The Indian Express Retrieved 21 October 2018 Ahmedabad Metro Phase 2 gets Modi Cabinet clearance ahead of Phase 1 inauguration on 4 March The Financial Express 21 February 2019 Retrieved 4 March 2019 GMRC Invites Bids for Ahmedabad Metro s Phase 2 Construction The Metro Rail Guy 20 January 2020 Retrieved 20 April 2020 Ahmedabad Metro Phase 2 Information Route Maps Tenders amp Updates The Metro Rail Guy Retrieved 20 April 2020 Very important gifts for Ahmedabad Surat PM Modi launches metro rail projects in Gujarat www timesnownews com Retrieved 18 January 2021 Ahmedabad Metro connectivity to GIFT City by early 2024 says GMRC 19 September 2021 a b c d e Chugging in clearing hurdles Prime Minister to inaugurate Phase I of Ahmedabad Metro in August this year The Indian Express 11 July 2022 Retrieved 13 July 2022 Retrieved from https en wikipedia org w index php title Red Line Ahmedabad Metro amp oldid 1187410538, wikipedia, wiki, book, books, library,