fbpx
Wikipedia

Vapi high-speed railway station

Vapi high-speed railway station is an under construction high-speed railway station on the Mumbai–Ahmedabad high-speed rail corridor. This station is located near Chanod Colony, Dungra, Vapi, Gujarat, India. It is the fifth station of the Mumbai–Ahmedabad high-speed rail corridor, after Boisar station and before Bilimora station. The station will have the second depot of the high-speed rail corridor, just north of it near Karvad.[3][1]

Vapi high-speed railway station
Mumbai-Ahmedabad High-Speed Railway station
General information
LocationChanod Colony, Dungra, Vapi, Gujarat, India
Coordinates20°19′38″N 72°56′57″E / 20.3272°N 72.9491°E / 20.3272; 72.9491
Elevation53 metres (174 ft)
Owned byNational High Speed Rail Corporation Limited
Operated byNational High Speed Rail Corporation Limited
Line(s)Mumbai–Ahmedabad high-speed rail corridor
Platforms2
Tracks2
Construction
Structure typeElevated
ParkingYes
Other information
StatusUnder construction[1]
History
OpenedAugust 2026; 2 years' time (2026-08)[2]
ElectrifiedYes
Route map
Sabarmati Depot and Workshop
Sabarmati
 Red Line 
Ahmedabad
(Golden Quadrilateral)
Anand/Nadiad
Maintenance Depot
Indian Railways
Delhi–Mumbai Expressway
NH 48 (Golden Quadrilateral)
Vadodara
Western
DFC
Bharuch
Western DFC
Indian Railways
Surat
Surat Depot
Indian Railways
(Golden Quadrilateral)
Bilimora
Kharera River [gu]
NH 48 (Golden Quadrilateral)
Maintenance Depot
Vapi
Dadra and Nagar Haveli
Gujarat
border
border
NH 48 (Golden Quadrilateral)
Boisar
Maintenance Depot
Indian Railways and Western DFC
Virar
NH 48 (Golden Quadrilateral)
Indian Railways and Western DFC
Ulhas River
Indian Railways
Thane Depot and Workshop
Mumbai Suburban Railway
Thane
Mumbai Suburban Railway
7 km (4.3 mi) tunnel under Thane Creek
Mumbai BKC
Key
Indian Railways (including Western DFC on the same line)
Western DFC
Western DFC (under construction)
Ahmedabad Metro
Location
Vapi high-speed railway station
Location within Gujarat
Vapi high-speed railway station
Vapi high-speed railway station (India)
Interactive map

Construction edit

The National High-Speed Rail Corporation Limited (NHSRCL) had invited tenders for Package "C4" of the Mumbai-Ahmedabad high-speed rail corridor (MAHSR) in September 2020, with a deadline of around 4 years.[4] In October 2020, Larsen and Toubro won the tender.[5] The NSHRCL signed an agreement with Larsen and Toubro for the design and construction of Vapi station and its depot, Bilimora station, Surat and its depot, Bharuch and Vadodara stations in November 2020.[6] In August 2021, Larsen and Toubro began construction on both the station and its depot, after acquiring 11.7 hectares of land near Chanod Colony in Dungra, with a completion deadline of 48 months. This also marked the beginning of the large-scale construction of the high-speed rail corridor project. The station is slated to be completed by August 2026, the time also slated for opening of the Gujarat section of the high-speed rail corridor.[1][2]

Lines edit

The station will be served by the Mumbai–Ahmedabad high-speed rail corridor, and will be the fifth station of the Mumbai–Ahmedabad high-speed rail corridor in Vapi.[7][1]

Structure edit

The station will have two platforms and two tracks for regular services. It will have three levels–the platform, concourse and service floor as the entrance level. The exterior design of the station building will be inspired by the importance and significance of speed. The station area will have 2 platforms of 425 m (1,394 ft) length for 16-coach E5 Series Shinkansen trains.[8][9]

Features edit

The station will have all modern and advanced facilities and amenities for customers and passengers, distinct from Indian Railway stations and similar to airports. Its design has been made to accommodate sufficient space for passenger movement and amenities at the concourse and platform areas. There will be ticketing and waiting areas, a business-class lounge, a nursery, restrooms, smoking rooms, information booths, retail centres and a public information and announcement system. Moreover, skylight provisions will be present on the roof and exterior sides for natural lighting and reduced energy usage. The station will be developed as a transport hub through integration with all basic modes of transportation for better, faster and hassle-free connectivity to and from the station, such as autos, buses and taxis. Such features will be available in all 12 stations of the Mumbai-Ahmedabad high-speed rail corridor.[8]

Vapi depot edit

 
The depot is being constructed on the lines of Shinkansen train depots of Japan, such as the Niigata depot shown here.

The depot is one of the four planned depots of the Mumbai-Ahmedabad high-speed rail corridor, after Thane, Surat and Sabarmati depots, out of which the depot at Vapi being built near Karvad is the second. It will have all modern and advanced technologies like Shinkansen train depots in Japan, such as maintenance and cleaning of train sets, with inspection bays, washing plants, stabling lines, etc. Unlike Thane and Sabarmati depots, this depot is being constructed relatively smaller in size, because initially, after the opening of the Gujarat section of the Mumbai-Ahmedabad high-speed rail corridor, it will handle trainsets on a large scale for a short period of time, until when the Maharashtra section will be opened. After its opening, the entire high-speed rail corridor will be completed, thus this depot will be converted into a maintenance depot, like the depots at Virar and Bilimora. After conversion, it will have facilities for the stabling of the inspection and maintenance vehicles and material for the maintenance of the track, bridges and overhead equipments. Construction began on the depot in February 2022, after acquiring around 6 hectares of land near Karvad, being constructed by Ircon International. It is part of the high-speed rail corridor project's Package "T-2", which was awarded to Ircon International by the National High-Speed Rail Corporation Limited (NHSRCL) in the same month. The depot is also slated to be completed by the time of the station's completion.[3][10]

Connectivity edit

Road edit

The station is being built just next to the Vapi-Silvassa Road, or Gujarat SH-185, towards south. Because of this location, it will be accessible easily from Vapi, Dadra and Silvassa, as well as from the under-construction Delhi–Mumbai Expressway. Most of the stations being built in the Gujarat section of the Mumbai-Ahmedabad high-speed rail corridor are located near or next to state or national highways, in order to provide better and direct connectivity to the stations.[11]

Rail edit

The nearest railway station after the station's completion will be Vapi railway station, located 7 km (4.3 mi) north-west from the station.

See also edit

Notes edit

  1. ^ under construction; operational till Bharuch, as of May 2024.

References edit

  1. ^ a b c d "Big update on Mumbai-Ahmedabad Bullet Train Project: NHSRCL casts first full-height pier near Vapi – details here". The Financial Express. 2 August 2021. Retrieved 8 October 2023.
  2. ^ a b "Bullet train by August 2026, hyperloop 7-8 years away: Railways Minister Ashiwini Vaishnaw". The Economic Times. 14 March 2023. Retrieved 8 October 2023.
  3. ^ a b "Mumbai – Ahmedabad High Speed Rail – Information, Route Map, Fares, Tenders & Updates". The Metro Rail Guy. Retrieved 8 October 2023.
  4. ^ "3 Bidders for Mumbai – Ahmedabad HSR's Package C4". The Metro Rail Guy. 23 September 2020. Retrieved 8 October 2023.
  5. ^ "Bullet train: L&T wins Rs 25,000-crore order for Gujarat stretch". Moneycontrol. 28 October 2020. Retrieved 8 October 2023.
  6. ^ "Bullet Train Project: Agreement Signed With L&T For India's Biggest Infrastructure Contract". NDTV Profit. 28 November 2020. Retrieved 8 October 2023.
  7. ^ "Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor Final Report Volume 6" (PDF). Japan International Cooperation Agency (JICA). Retrieved 6 October 2023.
  8. ^ a b Aklekar B., Rajendra (10 February 2023). "Maharashtra: Designs of four bullet train stations unveiled". Mid-Day. Mumbai. Retrieved 8 October 2023.
  9. ^ Mishra, Kamal (18 July 2022). "Mumbai-Ahmedabad bullet train station facades to be built representing city's character; details inside". Free Press Journal. Retrieved 12 October 2023.
  10. ^ "NHSRCL, IRCON Int inks track package contract for MAHSR project". Construction World. 14 February 2022. Retrieved 8 October 2023.
  11. ^ Rupera, Prashant (16 May 2018). "Bullet train terminals planned close to highways". The Times of India. Retrieved 8 October 2023.

vapi, high, speed, railway, station, under, construction, high, speed, railway, station, mumbai, ahmedabad, high, speed, rail, corridor, this, station, located, near, chanod, colony, dungra, vapi, gujarat, india, fifth, station, mumbai, ahmedabad, high, speed,. Vapi high speed railway station is an under construction high speed railway station on the Mumbai Ahmedabad high speed rail corridor This station is located near Chanod Colony Dungra Vapi Gujarat India It is the fifth station of the Mumbai Ahmedabad high speed rail corridor after Boisar station and before Bilimora station The station will have the second depot of the high speed rail corridor just north of it near Karvad 3 1 Vapi high speed railway stationMumbai Ahmedabad High Speed Railway stationGeneral informationLocationChanod Colony Dungra Vapi Gujarat IndiaCoordinates20 19 38 N 72 56 57 E 20 3272 N 72 9491 E 20 3272 72 9491Elevation53 metres 174 ft Owned byNational High Speed Rail Corporation LimitedOperated byNational High Speed Rail Corporation LimitedLine s Mumbai Ahmedabad high speed rail corridorPlatforms2Tracks2ConstructionStructure typeElevatedParkingYesOther informationStatusUnder construction 1 HistoryOpenedAugust 2026 2 years time 2026 08 2 ElectrifiedYesRoute mapLegend Delhi Ahmedabad high speed rail corridorto New Delhi planned Sabarmati Depot and Workshop Sabarmati Red Line Sabarmati River Ahmedabad NH 47 Sardar Patel Ring Road Meshwo River Vatrak River NH 48 Golden Quadrilateral Anand Nadiad Maintenance Depot Indian Railways Mahi River Delhi Mumbai Expressway NH 48 Golden Quadrilateral Vadodara Western DFC Bharuch Narmada River Western DFC Delhi Mumbai Expressway a Indian Railways Tapti River Surat Surat Depot Indian Railways NH 53 NH 48 Golden Quadrilateral NH 60 Bilimora Kharera River gu NH 48 Golden Quadrilateral Auranga River Par River NH 848 NH 56 Maintenance Depot Vapi Daman Ganga River GujaratDadra and Nagar Haveli border Dadra and Nagar HaveliGujarat border GujaratMaharashtra border NH 48 Golden Quadrilateral Boisar NH 160A Maintenance Depot Indian Railways and Western DFC Vaitarna River Virar Western DFC NH 48 Golden Quadrilateral Tungareshwar Wildlife Sanctuary Indian Railways and Western DFC Ulhas River NH 848 Indian Railways NH 160 Mumbai Agra Highway Mumbai Nagpur high speed rail corridorto Nagpur planned Thane Depot and Workshop Ulhas River Mumbai Suburban Railway Thane Mumbai Suburban Railway NH 48 Golden Quadrilateral Parsik Hills 7 km 4 3 mi tunnel under Thane Creek Eastern Express Highway Mumbai Suburban Railway Mithi River Mumbai BKC Line 2 Key Indian Railways including Western DFC on the same line Western DFC Western DFC under construction Ahmedabad Metro This diagram viewtalkeditLocationVapi high speed railway stationLocation within GujaratShow map of GujaratVapi high speed railway stationVapi high speed railway station India Show map of IndiaInteractive map Contents 1 Construction 2 Lines 3 Structure 4 Features 5 Vapi depot 6 Connectivity 6 1 Road 6 2 Rail 7 See also 8 Notes 9 ReferencesConstruction editThe National High Speed Rail Corporation Limited NHSRCL had invited tenders for Package C4 of the Mumbai Ahmedabad high speed rail corridor MAHSR in September 2020 with a deadline of around 4 years 4 In October 2020 Larsen and Toubro won the tender 5 The NSHRCL signed an agreement with Larsen and Toubro for the design and construction of Vapi station and its depot Bilimora station Surat and its depot Bharuch and Vadodara stations in November 2020 6 In August 2021 Larsen and Toubro began construction on both the station and its depot after acquiring 11 7 hectares of land near Chanod Colony in Dungra with a completion deadline of 48 months This also marked the beginning of the large scale construction of the high speed rail corridor project The station is slated to be completed by August 2026 the time also slated for opening of the Gujarat section of the high speed rail corridor 1 2 Lines editThe station will be served by the Mumbai Ahmedabad high speed rail corridor and will be the fifth station of the Mumbai Ahmedabad high speed rail corridor in Vapi 7 1 Structure editThe station will have two platforms and two tracks for regular services It will have three levels the platform concourse and service floor as the entrance level The exterior design of the station building will be inspired by the importance and significance of speed The station area will have 2 platforms of 425 m 1 394 ft length for 16 coach E5 Series Shinkansen trains 8 9 Features editThe station will have all modern and advanced facilities and amenities for customers and passengers distinct from Indian Railway stations and similar to airports Its design has been made to accommodate sufficient space for passenger movement and amenities at the concourse and platform areas There will be ticketing and waiting areas a business class lounge a nursery restrooms smoking rooms information booths retail centres and a public information and announcement system Moreover skylight provisions will be present on the roof and exterior sides for natural lighting and reduced energy usage The station will be developed as a transport hub through integration with all basic modes of transportation for better faster and hassle free connectivity to and from the station such as autos buses and taxis Such features will be available in all 12 stations of the Mumbai Ahmedabad high speed rail corridor 8 Vapi depot edit nbsp The depot is being constructed on the lines of Shinkansen train depots of Japan such as the Niigata depot shown here The depot is one of the four planned depots of the Mumbai Ahmedabad high speed rail corridor after Thane Surat and Sabarmati depots out of which the depot at Vapi being built near Karvad is the second It will have all modern and advanced technologies like Shinkansen train depots in Japan such as maintenance and cleaning of train sets with inspection bays washing plants stabling lines etc Unlike Thane and Sabarmati depots this depot is being constructed relatively smaller in size because initially after the opening of the Gujarat section of the Mumbai Ahmedabad high speed rail corridor it will handle trainsets on a large scale for a short period of time until when the Maharashtra section will be opened After its opening the entire high speed rail corridor will be completed thus this depot will be converted into a maintenance depot like the depots at Virar and Bilimora After conversion it will have facilities for the stabling of the inspection and maintenance vehicles and material for the maintenance of the track bridges and overhead equipments Construction began on the depot in February 2022 after acquiring around 6 hectares of land near Karvad being constructed by Ircon International It is part of the high speed rail corridor project s Package T 2 which was awarded to Ircon International by the National High Speed Rail Corporation Limited NHSRCL in the same month The depot is also slated to be completed by the time of the station s completion 3 10 Connectivity editRoad edit The station is being built just next to the Vapi Silvassa Road or Gujarat SH 185 towards south Because of this location it will be accessible easily from Vapi Dadra and Silvassa as well as from the under construction Delhi Mumbai Expressway Most of the stations being built in the Gujarat section of the Mumbai Ahmedabad high speed rail corridor are located near or next to state or national highways in order to provide better and direct connectivity to the stations 11 Rail edit The nearest railway station after the station s completion will be Vapi railway station located 7 km 4 3 mi north west from the station See also editHigh speed rail in India Mumbai Ahmedabad high speed rail corridor National High Speed Rail Corporation LimitedNotes edit under construction operational till Bharuch as of May 2024 References edit a b c d Big update on Mumbai Ahmedabad Bullet Train Project NHSRCL casts first full height pier near Vapi details here The Financial Express 2 August 2021 Retrieved 8 October 2023 a b Bullet train by August 2026 hyperloop 7 8 years away Railways Minister Ashiwini Vaishnaw The Economic Times 14 March 2023 Retrieved 8 October 2023 a b Mumbai Ahmedabad High Speed Rail Information Route Map Fares Tenders amp Updates The Metro Rail Guy Retrieved 8 October 2023 3 Bidders for Mumbai Ahmedabad HSR s Package C4 The Metro Rail Guy 23 September 2020 Retrieved 8 October 2023 Bullet train L amp T wins Rs 25 000 crore order for Gujarat stretch Moneycontrol 28 October 2020 Retrieved 8 October 2023 Bullet Train Project Agreement Signed With L amp T For India s Biggest Infrastructure Contract NDTV Profit 28 November 2020 Retrieved 8 October 2023 Joint Feasibility Study for Mumbai Ahmedabad High Speed Railway Corridor Final Report Volume 6 PDF Japan International Cooperation Agency JICA Retrieved 6 October 2023 a b Aklekar B Rajendra 10 February 2023 Maharashtra Designs of four bullet train stations unveiled Mid Day Mumbai Retrieved 8 October 2023 Mishra Kamal 18 July 2022 Mumbai Ahmedabad bullet train station facades to be built representing city s character details inside Free Press Journal Retrieved 12 October 2023 NHSRCL IRCON Int inks track package contract for MAHSR project Construction World 14 February 2022 Retrieved 8 October 2023 Rupera Prashant 16 May 2018 Bullet train terminals planned close to highways The Times of India Retrieved 8 October 2023 Retrieved from https en wikipedia org w index php title Vapi high speed railway station amp oldid 1220243113, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.