fbpx
Wikipedia

Basel–Biel/Bienne railway line

The Basel–Biel/Bienne railway line (also known in German as the Jurabahn—Jura Railway) is a standard gauge railway line of the Swiss Federal Railways (SBB) and the BLS AG. It runs from Basel SBB along the Birs in the French-speaking Jura to Delémont and Biel/Bienne. The traffic on the line is shown in table 230 of the official timetable.[2]

Basel–Biel/Bienne
Basel–Biel/Bienne railway
Overview
Native nameJurabahn
Owner
Line number230
Termini
Technical
Line length71 km (44 mi)
Number of tracks1 or 2
Track gauge1,435 mm (4 ft 8+12 in)
Electrification15 kV  16.7 Hz AC overhead catenary
Route map

km
123.0
Basel SBB
SBB line to Olten and Zürich
Wolf tunnel
212 m
121.0
Basel Dreispitz
connecting curve from Muttenz
Birs bridge
right: 44 m
left: 46 m
118.3
Münchenstein
Basel–Dornach railway
115.5
Dornach-Arlesheim
113.0
Aesch
Angenstein tunnel
64 m
111.0
Duggingen
108.8
Grellingen
lower Kessiloch bridge
100 m
upper Kessiloch bridge
91 m
103.5
Zwingen
100.6
Laufen
97.5
Bärschwil
(closed halt)
Bärschwil tunnel
116 m
Liesberg tunnel
184 m
94.2
Liesberg
(closed halt)
Birs bridge, Soyhières
44 m
88.5
Soyhières
(closed halt)
84.6
Delémont
reversal
SBB line to Porrentruy–Delle
81.1
Courrendlin
(closed halt)
Choindez
tunnels:
II 165 m
III 255 m
Choindez I tunnel
30 m
79.2
Choindez
(closed halt)
Verrerie-de-Roches tunnel
112 m
Verrerie-de-Moutier tunnel
32 m
75.8
Roches
(closed halt)
Moutier I tunnel
31 m
Moutier II tunnel
11 m
Moutier III tunnel
7 m
Moutier IV tunnel
8 m
Moutier V tunnel
60 m
Moutier VI tunnel
23 m
Moutier VII tunnel
54 m
Moutier VIII tunnel
18 m
Moutier IX tunnel
13 m
73.4
0.0
Moutier
Grenchenberg tunnel
8578 m
Oberdorf bridge
272 m
10.7
Grenchen Nord
Mösli viaduct
285 m
13.0
13.0
88.0
Lengnau
(stop only for trains
to/from Solothurn)
90.2
Pieterlen
(stop only for trains
to/from Solothurn)
94.0
Biel/Bienne Bözingenfeld/​Champ
(stop only for trains
to/from Solothurn)
95.8
Biel Mett
(stop only for trains
to/from Solothurn)
98.0
SBB line to/from Bern
99.4
33.8
Biel/Bienne
SBB line to Neuchâtel
Source: Swiss railway atlas[1]

History edit

 
South portal of the Grenchenberg Tunnel in Grenchen
 
The passage through the rocks between Roches and Moutier before the electrification of the line
 
Historical photograph of the Mösli viaduct of the Moutier–Lengnau section

The line was built in several sections by the Chemins de fer du Jura bernois (French for "Bernese Jura Railway", JB) and formed the main line of the company, which operated in the Bernese Jura. The Biel–SoncebozTavannes line (which has since been bypassed; part of it now forms part of the Sonceboz-Sombeval–Moutier railway) and the Sonceboz–Convers branch line (which forms part of the line to La Chaux-de-Fonds) opened on 30 April 1874. The opening of the Basel–Delémont line followed on 23 September 1875. The gap between Tavannes and Delémont was further reduced on 16 December 1876 with the opening of the Tavannes–Court and Moutier–Delémont sections. A continuous connection from Biel to Basel was finally opened on 24 May 1877, with the commissioning of the Court–Moutier section.

The route as described above was the shortest railway connection from Basel to Biel until the opening of the Grenchenberg tunnel in 1915. During the run up to the First World War, the northernmost rail link between Switzerland and France ran via Delle, using the Basel–Delémont section of the Jura Railway, the Delémont–Delle railway, the Belfort–Delle railway and the remaining part of Compagnie de l'Est's Paris–Mulhouse railway that had not have been ceded to the German Empire with Alsace in 1871.

The so-called Münster-Lengnau-Bahn (Moutier–Lengnau railway, MLB) was built to shorten the Delémont–Biel line and thus also the travel time from Biel to both Basel and Belfort. The approximately 13-kilometre (8.1 mi)-long line consists essentially of the almost 8.6-kilometre (5.3 mi)-long, single-track Grenchenberg Tunnel. The Berner Alpenbahn-Gesellschaft Bern–Lötschberg–Simplon (Bernese Alpine Railway Company Bern-Lötschberg-Simplon) built the MLB to improve access to its Lötschberg line. While the track is owned by the BLS, the SBB has operated trains on it since its opening in 1915.

After the Second World War, the SNCF upgraded the Belfort–Mulhouse–Basel line, so that the line via Delle was reduced to a regional branch line. The Belfort–Delle line was closed to passenger traffic in 1992 and the Boncourt–Delle cross-border section followed in 1996. As part of the construction of the LGV Rhin-Rhône, the French section was reactivated as a feeder line in December 2018; the Boncourt–Delle section was reopened in December 2006 for symbolic reasons.

Accidents edit

 
Bridge collapse in Münchenstein, 1891

Switzerland's worst railway disaster to date occurred on 14 June 1891: the railway bridge over the Birs, which was built by Gustave Eiffel, collapsed below the village of Münchenstein under a train from Basel. Three carriages and the two locomotives crashed into the flooded Birs. 78 people were killed and 131 were injured. The cause of the disaster was poor maintenance of the bridge and the buckling of a strut that was inadequate for increasingly heavy trains.

On 26 March 1974, the CerbèreGenevaBaselHamburg express train in Choindez passed over a set of points, where the first bogie of the dining car was steered to the left and the second to the right track of the double tracks. The dining car rolled on for a kilometer on both tracks and passed the short double-track Choindez I tunnel. In the parallel single-track Choindez II and III tunnels, the dining car crashed against the rock between the tunnels, resulting in the death of two German nationals and a Swiss and injuries to 27 people.[3]

Route edit

 
Delémont roundhouse with C 5/6 steam locomotive 2978
 
ICN on the Moslivi Viaduct near Grenchen

From Basel, the line runs past the Wolf freight yard and in the Birseck area through the suburbs of Münchenstein, Arlesheim, Dornach and Aesch. Here, the railway passes under Angenstein Castle through a short tunnel. The railway meanders along the Birs southwest to Grellingen. During the First and Second World War, the two railway bridges over the Birs in the Chessiloch area were guarded by Swiss Army troops. The crests of the regiments and inscriptions that were carved into the rock walls by the soldiers still exist. Running through the widening Laufen valley, the line passes through Laufen and Liesberg to reach Delémont, the capital of the French-speaking Canton of Jura.

The historic Delémont roundhouse is located in Delémont. This former locomotive depot/roundhouse with a turntable is now the home of the Historische Eisenbahn Gesellschaft (Historical Railway Company, HEG), which focuses on the rescue, restoration and operation of historic Swiss rolling stock. The Delémont–Delle railway branches off at the station, passing through Porrentruy and Boncourt. It has been served hourly by the S3 service of the Regio S-Bahn Basel since December 2004.

Trains must reverse in the station to continue towards Biel. After leaving the plain of Delémont, the line reaches Courrendlin and from there passes through the cliffs at Choindez and Roches. The line passes through a canyon that is typical for the Jura, having numerous short rock outcroppings. There are nine of them on the two-kilometre section between Roches and Moutier. The longest tunnel is 60 metres long, while the shortest is only seven metres long. The station of Moutier is also reached from the same side by the Solothurn–Moutier railway of the Solothurn-Münster-Bahn (SMB), now part of the BLS.

Moutier station connects in the same direction with both the original Jura Railway, which runs to Biel via Tavannes and Sonceboz, and the newer Moutier–Lengnau railway (MLB), which runs to Biel via Grenchen. South of Moutier the trains on the MLB route run through the 8,578 metre-long Grenchenberg Tunnel, after which Grenchen Nord station is reached. The MLB line joins the Olten–Solothurn–Biel line in Lengnau—part of the so-called Jura Foot Railway of the SBB—and uses it to Biel.

References edit

  1. ^ Eisenbahnatlas Schweiz [Swiss railway atlas]. Schweers + Wall. 2012. pp. 8, 18–19, 62. ISBN 978-3-89494-130-7.
  2. ^ "230: Biel/Bienne–Moutier–Delémont–Laufen–Basel" (PDF) (in German). Official Swiss Railway Timetable. (PDF) from the original on 17 December 2018. Retrieved 18 December 2018.
  3. ^ . Journal de Genève (in French). 27 March 1974. p. 9. Archived from the original on 2 December 2013. Retrieved 17 December 2018.

basel, biel, bienne, railway, line, also, known, german, jurabahn, jura, railway, standard, gauge, railway, line, swiss, federal, railways, runs, from, basel, along, birs, french, speaking, jura, delémont, biel, bienne, traffic, line, shown, table, official, t. The Basel Biel Bienne railway line also known in German as the Jurabahn Jura Railway is a standard gauge railway line of the Swiss Federal Railways SBB and the BLS AG It runs from Basel SBB along the Birs in the French speaking Jura to Delemont and Biel Bienne The traffic on the line is shown in table 230 of the official timetable 2 Basel Biel BienneBasel Biel Bienne railwayOverviewNative nameJurabahnOwnerSwiss Federal Railways BLSLine number230TerminiBasel SBBBiel BienneTechnicalLine length71 km 44 mi Number of tracks1 or 2Track gauge1 435 mm 4 ft 8 1 2 in Electrification15 kV 16 7 Hz AC overhead catenaryRoute mapLegendkm elevfrom MulhouseBasel Bad Bf 123 0 Basel SBBSBB line to Olten and ZurichBasel tramsWolf tunnel 212 m121 0 Basel Dreispitzconnecting curve from MuttenzBirs bridge right 44 mleft 46 mBasel Dornach railway118 3 MunchensteinBasel Dornach railway115 5 Dornach Arlesheim113 0 AeschAngenstein tunnel 64 m111 0 Duggingen108 8 Grellingenlower Kessiloch bridge 100 mupper Kessiloch bridge 91 m103 5 Zwingen100 6 Laufen97 5 Barschwil closed halt Barschwil tunnel 116 mLiesberg tunnel 184 m94 2 Liesberg closed halt Birs bridge Soyhieres 44 m88 5 Soyhieres closed halt 84 6 Delemont reversalSBB line to Porrentruy Delle81 1 Courrendlin closed halt Choindeztunnels II 165 mIII 255 mChoindez I tunnel 30 m79 2 Choindez closed halt Verrerie de Roches tunnel 112 mVerrerie de Moutier tunnel 32 m75 8 Roches closed halt Moutier I tunnel 31 mMoutier II tunnel 11 mMoutier III tunnel 7 mMoutier IV tunnel 8 mMoutier V tunnel 60 mMoutier VI tunnel 23 mMoutier VII tunnel 54 mMoutier VIII tunnel 18 mMoutier IX tunnel 13 mBLS line from Solothurn73 40 0 MoutierSBB line to Tavannes SoncebozGrenchenberg tunnel 8578 mOberdorf bridge 272 m10 7 Grenchen NordMosli viaduct 285 m13 0 SBB line from Solothurn and Olten13 088 0 Lengnau stop only for trainsto from Solothurn 90 2 Pieterlen stop only for trainsto from Solothurn 94 0 Biel Bienne Bozingenfeld Champ stop only for trainsto from Solothurn 95 8 Biel Mett stop only for trainsto from Solothurn 98 0 SBB line to from BernASm line from Ins99 433 8 Biel BienneSBB line to La Chaux de FondsSBB line to NeuchatelSource Swiss railway atlas 1 This diagram viewtalkedit Contents 1 History 2 Accidents 3 Route 4 ReferencesHistory edit nbsp South portal of the Grenchenberg Tunnel in Grenchen nbsp The passage through the rocks between Roches and Moutier before the electrification of the line nbsp Historical photograph of the Mosli viaduct of the Moutier Lengnau sectionThe line was built in several sections by the Chemins de fer du Jura bernois French for Bernese Jura Railway JB and formed the main line of the company which operated in the Bernese Jura The Biel Sonceboz Tavannes line which has since been bypassed part of it now forms part of the Sonceboz Sombeval Moutier railway and the Sonceboz Convers branch line which forms part of the line to La Chaux de Fonds opened on 30 April 1874 The opening of the Basel Delemont line followed on 23 September 1875 The gap between Tavannes and Delemont was further reduced on 16 December 1876 with the opening of the Tavannes Court and Moutier Delemont sections A continuous connection from Biel to Basel was finally opened on 24 May 1877 with the commissioning of the Court Moutier section The route as described above was the shortest railway connection from Basel to Biel until the opening of the Grenchenberg tunnel in 1915 During the run up to the First World War the northernmost rail link between Switzerland and France ran via Delle using the Basel Delemont section of the Jura Railway the Delemont Delle railway the Belfort Delle railway and the remaining part of Compagnie de l Est s Paris Mulhouse railway that had not have been ceded to the German Empire with Alsace in 1871 The so called Munster Lengnau Bahn Moutier Lengnau railway MLB was built to shorten the Delemont Biel line and thus also the travel time from Biel to both Basel and Belfort The approximately 13 kilometre 8 1 mi long line consists essentially of the almost 8 6 kilometre 5 3 mi long single track Grenchenberg Tunnel The Berner Alpenbahn Gesellschaft Bern Lotschberg Simplon Bernese Alpine Railway Company Bern Lotschberg Simplon built the MLB to improve access to its Lotschberg line While the track is owned by the BLS the SBB has operated trains on it since its opening in 1915 After the Second World War the SNCF upgraded the Belfort Mulhouse Basel line so that the line via Delle was reduced to a regional branch line The Belfort Delle line was closed to passenger traffic in 1992 and the Boncourt Delle cross border section followed in 1996 As part of the construction of the LGV Rhin Rhone the French section was reactivated as a feeder line in December 2018 the Boncourt Delle section was reopened in December 2006 for symbolic reasons Accidents edit nbsp Bridge collapse in Munchenstein 1891See also Munchenstein rail disaster Switzerland s worst railway disaster to date occurred on 14 June 1891 the railway bridge over the Birs which was built by Gustave Eiffel collapsed below the village of Munchenstein under a train from Basel Three carriages and the two locomotives crashed into the flooded Birs 78 people were killed and 131 were injured The cause of the disaster was poor maintenance of the bridge and the buckling of a strut that was inadequate for increasingly heavy trains On 26 March 1974 the Cerbere Geneva Basel Hamburg express train in Choindez passed over a set of points where the first bogie of the dining car was steered to the left and the second to the right track of the double tracks The dining car rolled on for a kilometer on both tracks and passed the short double track Choindez I tunnel In the parallel single track Choindez II and III tunnels the dining car crashed against the rock between the tunnels resulting in the death of two German nationals and a Swiss and injuries to 27 people 3 Route edit nbsp Delemont roundhouse with C 5 6 steam locomotive 2978 nbsp ICN on the Moslivi Viaduct near GrenchenFrom Basel the line runs past the Wolf freight yard and in the Birseck area through the suburbs of Munchenstein Arlesheim Dornach and Aesch Here the railway passes under Angenstein Castle through a short tunnel The railway meanders along the Birs southwest to Grellingen During the First and Second World War the two railway bridges over the Birs in the Chessiloch area were guarded by Swiss Army troops The crests of the regiments and inscriptions that were carved into the rock walls by the soldiers still exist Running through the widening Laufen valley the line passes through Laufen and Liesberg to reach Delemont the capital of the French speaking Canton of Jura The historic Delemont roundhouse is located in Delemont This former locomotive depot roundhouse with a turntable is now the home of the Historische Eisenbahn Gesellschaft Historical Railway Company HEG which focuses on the rescue restoration and operation of historic Swiss rolling stock The Delemont Delle railway branches off at the station passing through Porrentruy and Boncourt It has been served hourly by the S3 service of the Regio S Bahn Basel since December 2004 Trains must reverse in the station to continue towards Biel After leaving the plain of Delemont the line reaches Courrendlin and from there passes through the cliffs at Choindez and Roches The line passes through a canyon that is typical for the Jura having numerous short rock outcroppings There are nine of them on the two kilometre section between Roches and Moutier The longest tunnel is 60 metres long while the shortest is only seven metres long The station of Moutier is also reached from the same side by the Solothurn Moutier railway of the Solothurn Munster Bahn SMB now part of the BLS Moutier station connects in the same direction with both the original Jura Railway which runs to Biel via Tavannes and Sonceboz and the newer Moutier Lengnau railway MLB which runs to Biel via Grenchen South of Moutier the trains on the MLB route run through the 8 578 metre long Grenchenberg Tunnel after which Grenchen Nord station is reached The MLB line joins the Olten Solothurn Biel line in Lengnau part of the so called Jura Foot Railway of the SBB and uses it to Biel References edit Eisenbahnatlas Schweiz Swiss railway atlas Schweers Wall 2012 pp 8 18 19 62 ISBN 978 3 89494 130 7 230 Biel Bienne Moutier Delemont Laufen Basel PDF in German Official Swiss Railway Timetable Archived PDF from the original on 17 December 2018 Retrieved 18 December 2018 Trois morts vingt sept blesses a Choindez Journal de Geneve in French 27 March 1974 p 9 Archived from the original on 2 December 2013 Retrieved 17 December 2018 Retrieved from https en wikipedia org w index php title Basel Biel Bienne railway line amp oldid 1177562762, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.