2025 in rail transport
This article lists events related to rail transport that are currently scheduled to occur in 2025. Please be aware that the actual dates on which these events occur may differ substantially from what is shown here.
Events Edit
January Edit
- January 6 – The 99-year lease on Moffat Tunnel in Colorado is set to expire.[1]
- – Tampere light rail extension to Lentävänniemi.[2]
- – Planned completion of Los Angeles Metro Rail Foothill Extension to Pomona, California.[3][4][5]
February Edit
- – Estimated start of South Shore Line service along the West Lake Corridor in Northwest Indiana.[6]
April Edit
- – Delhi–Alwar Regional Rapid Transit System to be completed, allowing speeds up to 160 kilometres per hour (99 mph).[7]
Unknown date Edit
- – Transperth's Armadale and Thornlie lines reopen after an 18-month closure for the Victoria Park-Canning Level Crossing Removal Project.[8] At the same time, the Thornlie–Cockburn Link and the extension of the Armadale line to Byford will open.
- – Metro Tunnel is planned to open, connecting north and south railway lines in Melbourne.[9]
- – Vienna U-Bahn line U5 opening.[citation needed]
- – Possible completion of Hasselt – Maastricht tramway.[citation needed]
- – O-Train Confederation Line (Ottawa) Stage 2 West extension earliest completion date.[citation needed]
- – Valley Line (Edmonton) extension earliest completion date.[citation needed]
- – Shenzhen Metro is claimed to exceed 1000 km length.[citation needed]
- – Shanghai Metro is claimed to exceed 1000 km length.[citation needed]
- – Greater Copenhagen Light Rail opening.[citation needed]
- – Opening of the southern section of Paris Métro Line 15, between Pont de Sèvres and Noisy–Champs.[10]
- – Opening of Câble 1 in the Paris/Île-de-France region.[11]
- – Paris Métro Line 13 automation start (end in 2027).[citation needed]
- – Expected completion of Stuttgart 21 railway.[12]
- – Delhi Metro network to exceed 450 km.[citation needed]
- – Tehran Metro network to exceed 430 km.[citation needed]
- – claimed Milan–Verona high-speed railway completion.[citation needed]
- – claimed opening of high-speed Drammen–Tønsberg line and Dovre Line sections.[citation needed]
- – Makati Intra-city Subway opening.[13]
- – The first phase of the North–South Commuter Railway is scheduled to partially open.[14]
- – Circle MRT line final extension to make closed full loop.[citation needed]
- – Several short high-speed lines[which?] upgrading to 250 km/h.[citation needed]
- – Wanda–Zhonghe–Shulin line opening.[citation needed]
- – Northern HSR Phase 1 opening.[citation needed]
- – Northeastern HSR Phase 2 opening.[citation needed]
- – West Midlands Metro Eastside extension is planned to be put into operation, providing connections to Birmingham Airport and High Speed 2.[15]
- – Latest expected date of the Oxford–Bedford railway reopening.[16]
- – Los Angeles D Line Extension Phase 2 expected to be complete.[17]
- – Earliest expected date that Monterey County Rail Extension service in California will link Salinas to San Francisco.[18][19]
- – Planned extension of Honolulu's Skyline to Middle Street.[20]
- – Altamont Corridor Express services are expected to be extended to Merced.[21][22]
- – Earliest expected opening of the Norristown High Speed Line King of Prussia Spur.[23]
- – The final section of the 2 Line of the Link light rail system in Seattle is expected to begin service, connecting the city to the suburbs of Bellevue and Redmond. It will be the first rail system to use a fixed floating bridge.[24]
- – Dallas Silver Line commuter rail expected to open.[25]
- – Tentative scheduling for the start of Amtrak service from New Orleans to Baton Rouge, Louisiana.[26]
References Edit
- ^ Williams, David O. (July 28, 2023). "Oil-train opponents look to railroad's expiring Moffat Tunnel lease for bargaining power". Colorado Newsline. Retrieved 26 September 2023.
- ^ Kriikku, Kati (6 August 2023). "Tampereen Ratikan liikennöinti Santalahteen alkaa maanantaina 7. elokuuta – Ratikalla tehty kahdessa vuodessa yli 23 miljoonaa matkaa". Tampereen Ratikka (in Finnish).
- ^ "Major Construction Begins on Foothill Gold Line Extension Project". NBC Los Angeles. 10 July 2020. Retrieved 18 August 2020.
- ^ Felschundneff, Steven (2 February 2023). "State rejects funding light rail extension to Claremont". Claremont Courier. Retrieved 3 February 2023.
- ^ "Foothill Gold Line celebrates completion of major trackwork for Glendora to Pomona light-rail project". Mass Transit. June 26, 2023. Retrieved 29 June 2023.
- ^ Mills, Wes (27 October 2020). "Ceremony to Break Ground on West Lake Corridor Project". Grow INdiana Media Ventures. Inside Indiana Business. Retrieved 1 November 2020.
- ^ Stateholders' Workshop for Delhi-Gurgaon-Rewar-Alwar RRTS Corridor (PDF) (Report). Archived from the original (PDF) on 20 September 2017. Retrieved 2017-09-20.
- ^ Hastie, Hamish (22 May 2023). "Look at the cars: Coldplay concerts delay Armadale line shutdown". WAtoday. from the original on 22 May 2023. Retrieved 22 May 2023.
- ^ "Frequently asked questions". Metro Tunnel. Victorian Government. Retrieved 13 June 2020.
- ^ "Projet Métro ligne 15 Nouvelle ligne Pont de Sèvres > Noisy-Champs". Île-deFrance Mobilités. 2 August 2023. Retrieved 5 October 2023.
- ^ "Projet Câble Nouvelle ligne Créteil > Villeneuve-Saint-Georges". Île-deFrance Mobilités. 21 September 2023. Retrieved 5 October 2023.
- ^ "Projektstatus" (in German). Bahnprojekt Stuttgart-Ulm. October 28, 2019.
- ^ "Makati City, IRC consortium likely to break ground for subway project by year-end". GMA News Online. Retrieved September 19, 2018.
- ^ Gines Jr., Ben (2021-12-02). "PNR phase 1 on track for 2022 completion". The Manila Times. from the original on December 2, 2021. Retrieved 2022-01-05.
- ^ Jones, Tamlyn (25 May 2021). "Work to start on next phase of West Midlands Metro extension". Business Live. Retrieved 28 May 2021.
- ^ Cuzner, Mark, ed. (May 2022). "EWR2 Project Newsletter – Spring 2022". East West Rail Alliance. (Winslow Station progress update)
- ^ Los Angeles Metro. "Purple Line Extension". Retrieved 2018-05-02.
- ^ https://www.tamcmonterey.org/files/b19d25afa/TAMC-MCRE.pdf
- ^ Schmalz, David (12 October 2021). "A long-stalled commuter rail extension project from Gilroy to Salinas is making critical progress, and finally has an estimated arrival time". Monterey County Weekly. Retrieved 12 October 2021.
- ^ "'A 21st-century system': To fanfare, city announces official opening date of rail's first phase". Hawaii News Now. 9 May 2023. Retrieved 19 June 2023.
- ^ Holland, John (4 December 2021). "Board advances ACE service to Turlock and Merced County. When will first train run?". Modesto Bee. Retrieved 9 December 2021.
- ^ Luczak, Marybeth (6 December 2021). "ACE Ceres-Merced Extension Project Advances". Railway Age. Retrieved 9 December 2021.
- ^ Madej, Patricia (December 2, 2020). "SEPTA doubles down on commitment to $2B King of Prussia Rail project". The Philadelphia Inquirer. Retrieved December 2, 2020.
- ^ Lindblom, Mike (24 August 2023). "Eastside-only light rail should open in March, Sound Transit says". The Seattle Times. Retrieved 24 August 2023.
- ^ "Silver Line Project". dart.org. Retrieved 2023-06-22.
- ^ Hubbard, Cali (2023-09-06). "Passenger rail from BR to NOLA tentatively scheduled for mid-2025". www.fox8live.com. Retrieved 2023-09-06.