fbpx
Wikipedia

U.S. Route 12 in South Dakota

U.S. Highway 12 (US 12) is a part of the United States Numbered Highway System that travels from Aberdeen, Washington, to Detroit, Michigan. In the state of South Dakota, US 12 extends from the North Dakota border east to the Minnesota border.

U.S. Highway 12

US 12 highlighted in red
Route information
Maintained by SDDOT
Length319.24 mi[1] (513.77 km)
Existed1926–present
Major junctions
West end US 12 at the North Dakota state line
Major intersections
East end US 12 at the Minnesota state line
Location
CountryUnited States
StateSouth Dakota
CountiesPerkins, Corson, Walworth, Edmunds, Brown, Day, Roberts, Grant
Highway system
  • South Dakota State Trunk Highway System
SD 11 SD 12

Route description edit

US 12 enters South Dakota from North Dakota as a rural two-lane highway about 10 miles (16 km) west-northwest of Lemmon before entering the Standing Rock Indian Reservation. For approximately the next 70 miles (110 km), US 12 runs parallel to the border of North Dakota, sometimes within less than a mile (1.6 km). At Walker, US 12 heads southeast for 37 miles (60 km), where it crosses the Missouri River at Mobridge, exiting the reservation. From there, it continues east for 18 miles (29 km), until it meets with US 83 near Selby. It overlaps US 83 for seven miles (11 km). After leaving US 83, it turns due east and spends about 80 miles (130 km) as a rural two-lane highway again. A few miles before reaching Aberdeen, it becomes an at-grade expressway. After the junction with US 281, it goes back to being two lanes for a few miles through Aberdeen and past Aberdeen Regional Airport, before once again becoming a four-lane expressway, until two miles (3.2 km) before Waubay. East of Waubay it becomes again an at-grade expressway until it meets with I-29 near Summit. The speed limit from Aberdeen to I-29 is 70 mph (110 km/h) except through the communities of Groton, Webster, and Waubay. From there, it heads southeast 22 miles (35 km) until Milbank. At Milbank, it continues east for 12 miles (19 km), until it crosses into Minnesota at Big Stone City, just south of Big Stone Lake.[2]

The South Dakota section of US 12 is legally defined at South Dakota Codified Laws § 31-4-132.[3]

History edit

Major intersections edit

CountyLocationmi[1]kmDestinationsNotes
PerkinsWhite Butte Township80.50129.55 
 
US 12 west – Hettinger
Continuation into North Dakota
Lincoln Township91.08146.58 
 
SD 73 south – Faith
Western end of SD 73 concurrency
CorsonLemmon No. 2101.68163.64 
 
 
 
 
SD 73 north to ND 49 north – New Leipzig
Eastern end of SD 73 concurrency
Lake Township132.11212.61 
 
 
 
 
SD 65 north to ND 31 north – Raleigh
Western end of SD 65 concurrency
132.64213.46 
 
SD 65 south – Isabel
Eastern end of SD 65 concurrency
Module:Jctint/USA warning: Unused argument(s): ctdab
McLaughlin159.32256.40  SD 63 – Fort Yates, Little Eagle
Mission Township181.52292.13 
 
  SD 20 west / Lewis and Clark Trail / Native American Scenic Byway south – Timber Lake
Western end of SD 20 concurrency
184.58297.05 
 
SD 1806 south – Sitting Bull Monument
Western end of SD 1806 concurrency
Module:Jctint/USA warning: Unused argument(s): ctdab
185.69298.84 
 
  SD 1806 north / Lewis and Clark Trail / Native American Scenic Byway north – Wakpala, Indian Memorial Recreation Area
Eastern end of SD 1806 concurrency
Module:Jctint/USA warning: Unused argument(s): ctdab
Missouri River (Lake Oahe)186.18299.63US 12 Missouri River Bridge
WalworthMobridge Township189.92305.65 
 
  SD 1804 north (4th Avenue East) / Lewis and Clark Trail – Pollock
Western end of SD 1804 concurrency
West Walworth193.79311.87 
 
SD 1804 south – Akaska
Eastern end of SD 1804 concurrency
West Walworth–East Walworth line207.38333.75 
 
US 83 north – Mound City
Western end of US 83 concurrency
Selby209.96337.90 
 
SD 130 east (Scranton Street) – Java, Lake Hiddenwood Recreation Area
Western terminus of SD 130
West Walworth–East Walworth line214.08344.53 
 
 
 
  
 
US 83 south / SD 20 east / Lewis and Clark Trail to US 212
Eastern end of US 83/SD 20 concurrency
East Walworth220.94355.57 
 
SD 271 north – Java, Lake Hiddenwood Recreation Area
226.06363.81 
 
SD 47 south – Hoven
Western end of SD 47 concurrency
Module:Jctint/USA warning: Unused argument(s): ctdab
EdmundsBowdle233.07375.09 
 
SD 47 north – Eureka
Eastern end of SD 47 concurrency
Cottonwood Lake–Glen
township line
242.07389.57 
 
SD 253 north – Hosmer
Southern terminus of SD 253
Roscoe248.04399.18 
 
SD 247 north (Mitchell Street)
Southern terminus of SD 247
Ipswich263.10423.42 
 
SD 45 south (4th Street)
Western end of SD 45 concurrency
Fountain Township268.13431.51 
 
SD 45 north – Leola
Eastern end of SD 45 concurrency
BrownAberdeen288.94465.00  
 
US 281 (19th Street) to SD 10 – Redfield
Groton309.02497.32  
 
SD 37 (Broadway Street) to SD 10 – Doland
DayBristol Township326.37525.24  SD 27 – BrittonSouthern terminus of SD 27
Webster343.04552.07  
 
 
 
SD 25 (Main Street) to US 212 / SD 10 – Fort Sisseton State ParkModule:Jct error: Invalid "to" argument
RobertsSummit Township366.36589.60   I-29 / US 81 – Watertown, Sisseton
GrantOsceola–Kilborn
township line
376.68606.21  SD 123 – WilmotSouthern terminus of SD 123
GrantMilbank389.06626.13  
 
SD 15 (Dakota Street) to US 212 – Hartford Beach State Park
Southern terminus of SD 123
Big Stone City399.02642.16  SD 109 – Hartford Beach State ParkSouthern terminus of SD 109
399.74643.32 
 
US 12 east – Ortonville
Continuation into Minnesota
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also edit

References edit

  1. ^ a b "State Highway Data Viewer". experience.arcgis.com. South Dakota Department of Transportation. from the original on November 4, 2023. Retrieved January 18, 2024.
  2. ^ South Dakota Department of Transportation (2023). South Dakota State Map (PDF) (Map). c. 1:977,644. Pierre: South Dakota Department of Transportation. §§ B8–B18. (PDF) from the original on November 1, 2023. Retrieved November 1, 2023.
  3. ^ "31-4-132. U.S. Highway 12 from North Dakota to Minnesota". South Dakota Statutes. from the original on October 31, 2023. Retrieved October 31, 2023.

External links edit

  • Aberdeen Region Highway Log
  • Mitchell Region Highway Log
  • Pierre Region Highway Log
  • Rapid City Region Highway Log


  U.S. Route 12
Previous state:
North Dakota
South Dakota Next state:
Minnesota

route, south, dakota, this, article, about, section, entire, route, route, highway, part, united, states, numbered, highway, system, that, travels, from, aberdeen, washington, detroit, michigan, state, south, dakota, extends, from, north, dakota, border, east,. This article is about the section of U S Route 12 in South Dakota For the entire route see U S Route 12 U S Highway 12 US 12 is a part of the United States Numbered Highway System that travels from Aberdeen Washington to Detroit Michigan In the state of South Dakota US 12 extends from the North Dakota border east to the Minnesota border U S Highway 12US 12 highlighted in redRoute informationMaintained by SDDOTLength319 24 mi 1 513 77 km Existed1926 presentMajor junctionsWest endUS 12 at the North Dakota state lineMajor intersectionsUS 83 in Selby US 281 in Aberdeen I 29 US 81 near SummitEast endUS 12 at the Minnesota state lineLocationCountryUnited StatesStateSouth DakotaCountiesPerkins Corson Walworth Edmunds Brown Day Roberts GrantHighway systemUnited States Numbered Highway System List Special Divided South Dakota State Trunk Highway System Interstate US State SD 11 SD 12 Contents 1 Route description 2 History 3 Major intersections 4 See also 5 References 6 External linksRoute description editThis section needs expansion You can help by adding to it October 2023 US 12 enters South Dakota from North Dakota as a rural two lane highway about 10 miles 16 km west northwest of Lemmon before entering the Standing Rock Indian Reservation For approximately the next 70 miles 110 km US 12 runs parallel to the border of North Dakota sometimes within less than a mile 1 6 km At Walker US 12 heads southeast for 37 miles 60 km where it crosses the Missouri River at Mobridge exiting the reservation From there it continues east for 18 miles 29 km until it meets with US 83 near Selby It overlaps US 83 for seven miles 11 km After leaving US 83 it turns due east and spends about 80 miles 130 km as a rural two lane highway again A few miles before reaching Aberdeen it becomes an at grade expressway After the junction with US 281 it goes back to being two lanes for a few miles through Aberdeen and past Aberdeen Regional Airport before once again becoming a four lane expressway until two miles 3 2 km before Waubay East of Waubay it becomes again an at grade expressway until it meets with I 29 near Summit The speed limit from Aberdeen to I 29 is 70 mph 110 km h except through the communities of Groton Webster and Waubay From there it heads southeast 22 miles 35 km until Milbank At Milbank it continues east for 12 miles 19 km until it crosses into Minnesota at Big Stone City just south of Big Stone Lake 2 The South Dakota section of US 12 is legally defined at South Dakota Codified Laws 31 4 132 3 History editThis section is empty You can help by adding to it October 2023 Major intersections editThis section needs expansion You can help by adding to it October 2023 CountyLocationmi 1 kmDestinationsNotes PerkinsWhite Butte Township80 50129 55 nbsp nbsp US 12 west HettingerContinuation into North Dakota Lincoln Township91 08146 58 nbsp nbsp SD 73 south FaithWestern end of SD 73 concurrency CorsonLemmon No 2101 68163 64 nbsp nbsp nbsp nbsp nbsp SD 73 north to ND 49 north New LeipzigEastern end of SD 73 concurrency Lake Township132 11212 61 nbsp nbsp nbsp nbsp nbsp SD 65 north to ND 31 north RaleighWestern end of SD 65 concurrency 132 64213 46 nbsp nbsp SD 65 south IsabelEastern end of SD 65 concurrencyModule Jctint USA warning Unused argument s ctdab McLaughlin159 32256 40 nbsp SD 63 Fort Yates Little Eagle Mission Township181 52292 13 nbsp nbsp nbsp SD 20 west Lewis and Clark Trail Native American Scenic Byway south Timber LakeWestern end of SD 20 concurrency 184 58297 05 nbsp nbsp SD 1806 south Sitting Bull MonumentWestern end of SD 1806 concurrencyModule Jctint USA warning Unused argument s ctdab 185 69298 84 nbsp nbsp nbsp SD 1806 north Lewis and Clark Trail Native American Scenic Byway north Wakpala Indian Memorial Recreation AreaEastern end of SD 1806 concurrencyModule Jctint USA warning Unused argument s ctdab Missouri River Lake Oahe 186 18299 63US 12 Missouri River Bridge WalworthMobridge Township189 92305 65 nbsp nbsp nbsp SD 1804 north 4th Avenue East Lewis and Clark Trail PollockWestern end of SD 1804 concurrency West Walworth193 79311 87 nbsp nbsp SD 1804 south AkaskaEastern end of SD 1804 concurrency West Walworth East Walworth line207 38333 75 nbsp nbsp US 83 north Mound CityWestern end of US 83 concurrency Selby209 96337 90 nbsp nbsp SD 130 east Scranton Street Java Lake Hiddenwood Recreation AreaWestern terminus of SD 130 West Walworth East Walworth line214 08344 53 nbsp nbsp nbsp nbsp nbsp nbsp nbsp US 83 south SD 20 east Lewis and Clark Trail to US 212Eastern end of US 83 SD 20 concurrency East Walworth220 94355 57 nbsp nbsp SD 271 north Java Lake Hiddenwood Recreation Area 226 06363 81 nbsp nbsp SD 47 south HovenWestern end of SD 47 concurrencyModule Jctint USA warning Unused argument s ctdab EdmundsBowdle233 07375 09 nbsp nbsp SD 47 north EurekaEastern end of SD 47 concurrency Cottonwood Lake Glentownship line242 07389 57 nbsp nbsp SD 253 north HosmerSouthern terminus of SD 253 Roscoe248 04399 18 nbsp nbsp SD 247 north Mitchell Street Southern terminus of SD 247 Ipswich263 10423 42 nbsp nbsp SD 45 south 4th Street Western end of SD 45 concurrency Fountain Township268 13431 51 nbsp nbsp SD 45 north LeolaEastern end of SD 45 concurrency BrownAberdeen288 94465 00 nbsp nbsp nbsp US 281 19th Street to SD 10 Redfield Groton309 02497 32 nbsp nbsp nbsp SD 37 Broadway Street to SD 10 Doland DayBristol Township326 37525 24 nbsp SD 27 BrittonSouthern terminus of SD 27 Webster343 04552 07 nbsp nbsp nbsp nbsp nbsp SD 25 Main Street to US 212 SD 10 Fort Sisseton State ParkModule Jct error Invalid to argument RobertsSummit Township366 36589 60 nbsp nbsp I 29 US 81 Watertown Sisseton GrantOsceola Kilborntownship line376 68606 21 nbsp SD 123 WilmotSouthern terminus of SD 123 GrantMilbank389 06626 13 nbsp nbsp nbsp SD 15 Dakota Street to US 212 Hartford Beach State ParkSouthern terminus of SD 123 Big Stone City399 02642 16 nbsp SD 109 Hartford Beach State ParkSouthern terminus of SD 109 399 74643 32 nbsp nbsp US 12 east OrtonvilleContinuation into Minnesota 1 000 mi 1 609 km 1 000 km 0 621 mi Concurrency terminusSee also edit nbsp U S roads portalReferences edit a b State Highway Data Viewer experience arcgis com South Dakota Department of Transportation Archived from the original on November 4 2023 Retrieved January 18 2024 South Dakota Department of Transportation 2023 South Dakota State Map PDF Map c 1 977 644 Pierre South Dakota Department of Transportation B8 B18 Archived PDF from the original on November 1 2023 Retrieved November 1 2023 31 4 132 U S Highway 12 from North Dakota to Minnesota South Dakota Statutes Archived from the original on October 31 2023 Retrieved October 31 2023 External links edit nbsp Wikimedia Commons has media related to U S Route 12 in South Dakota Aberdeen Region Highway Log Mitchell Region Highway Log Pierre Region Highway Log Rapid City Region Highway Log nbsp U S Route 12 Previous state North Dakota South Dakota Next state Minnesota Retrieved from https en wikipedia org w index php title U S Route 12 in South Dakota amp oldid 1214018595, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.