fbpx
Wikipedia

Soekarno–Hatta Airport Skytrain

The Soekarno–Hatta Airport Skytrain (Indonesian: Kalayang Bandara Soekarno–Hatta) is a driverless 3.05 kilometre Automated People Mover System (APMS) which connects Soekarno-Hatta Airport Terminals 1, 2, 3 and SHIA railway station, free of charge.[1] Trains are spaced 5 minutes apart, with 7 minutes needed to get from Terminal 1 to Terminal 3.[2][3]

Soekarno–Hatta Airport Skytrain
Soekarno-Hatta Airport Skytrain used for airport terminals shuttle service
Overview
Native nameKA layang Bandara Internasional Soekarno-Hatta
StatusOperational
OwnerAngkasa Pura II
LocaleSoekarno–Hatta International Airport serving Jakarta
Stations4
Service
TypeAutomated people mover (APM)
Operator(s)Angkasa Pura II
Rolling stockWoojin Automated People Mover System
History
Opened17 September 2017[1]
Technical
Line length3.05 km (1.90 mi)
ElectrificationThird rail
Route map

Rolling stock

 
Automated People Mover System at Terminal 1 Station

The system uses Airport Automated People Mover System rubber-tyred metro manufactured by state-owned enterprise PT LEN Industri in cooperation with South Korean Woojin Industries.[4] Three train units operate with each train unit consisting of two cars. They are capable to transport 176 passengers in one trip. The train travels at a speed of 60 kilometers per hour. Each trainset is equipped with automated guide-way transit (AGT) technology. The system is capable for automated operations, but its implementation have been delayed pending trials conducted by LEN Industri.

Stations

 
Skytrain Terminal 3 Station

There are 4 stations served by Airport Skytrain; Terminal 1, 2 and 3 each has one station. The airport shuttle Skytrain is integrated to SHIA railway station, from where passengers can conveniently travel to–and from–Jakarta city center by Soekarno–Hatta Airport Rail Link.

Skytrain operating schedule is accessible online and through the Indonesia Airport website and smartphone application. All Skytrain stations are equipped with platform screen doors and have information screens displaying real-time arrival time of the next train. Skytrain has been operational since 17 September 2017.[5]

  Station Transfer/Notes
Terminal 3 Terminal station

  Soekarno-Hatta Terminal 3

  Terminal 3 Airport Bus Terminal

Terminal 2   Soekarno-Hatta Terminal 2

  Terminal 2 Airport Bus Terminal

Integrated Building   SHIA

  Soekarno–Hatta Airport Rail Link

Terminal 1 Terminal Station

  Soekarno-Hatta Terminal 1

Future expansion

 
Skytrain passengers

The Skytrain will be extended to planned new Terminal 4 and Sky Hub (commercial area) in Phase 2. Then it will be connected to Integrated Building Terminal, Terminal 1, 2 and 3.[6]

References

  1. ^ a b "Soekarno–Hatta International Airport Skytrain is officially launched". The Jakarta Post. Retrieved 2018-05-04.
  2. ^ "Skytrain Trials at Soekarno Hatta Airport to Begin in Mid August". Tempo. Retrieved 30 August 2017.
  3. ^ "Skytrain to connect terminals at Soekarno–Hatta Airport". The Jakarta Post. Retrieved 30 August 2017.
  4. ^ "Airport skytrain to be operated by crew for first six months". The Jakarta Post. Retrieved 2018-05-04.
  5. ^ "Skytrain to link with Dukuh Atas in December". The Jakarta Post. Retrieved 18 September 2017.
  6. ^ "Soekarno-Hatta Airport Airport Train officially operated for public". angkasapura2.co.id. Retrieved 29 December 2017.

External links

soekarno, hatta, airport, skytrain, other, rail, systems, named, skytrain, skytrain, indonesian, kalayang, bandara, soekarno, hatta, driverless, kilometre, automated, people, mover, system, apms, which, connects, soekarno, hatta, airport, terminals, shia, rail. For other rail systems named Skytrain see SkyTrain The Soekarno Hatta Airport Skytrain Indonesian Kalayang Bandara Soekarno Hatta is a driverless 3 05 kilometre Automated People Mover System APMS which connects Soekarno Hatta Airport Terminals 1 2 3 and SHIA railway station free of charge 1 Trains are spaced 5 minutes apart with 7 minutes needed to get from Terminal 1 to Terminal 3 2 3 Soekarno Hatta Airport SkytrainSoekarno Hatta Airport Skytrain used for airport terminals shuttle serviceOverviewNative nameKA layang Bandara Internasional Soekarno HattaStatusOperationalOwnerAngkasa Pura IILocaleSoekarno Hatta International Airport serving JakartaStations4ServiceTypeAutomated people mover APM Operator s Angkasa Pura IIRolling stockWoojin Automated People Mover SystemHistoryOpened17 September 2017 1 TechnicalLine length3 05 km 1 90 mi ElectrificationThird railRoute mapLegendSoekarno Hatta Terminal 3Soekarno Hatta Terminal 2Soekarno Hatta Terminal 1Integrated Terminal BuildingSHIASkytrain Depotto Batu CeperThis diagram viewtalkedit Contents 1 Rolling stock 2 Stations 3 Future expansion 4 References 5 External linksRolling stock Edit Automated People Mover System at Terminal 1 Station The system uses Airport Automated People Mover System rubber tyred metro manufactured by state owned enterprise PT LEN Industri in cooperation with South Korean Woojin Industries 4 Three train units operate with each train unit consisting of two cars They are capable to transport 176 passengers in one trip The train travels at a speed of 60 kilometers per hour Each trainset is equipped with automated guide way transit AGT technology The system is capable for automated operations but its implementation have been delayed pending trials conducted by LEN Industri Stations Edit Skytrain Terminal 3 Station There are 4 stations served by Airport Skytrain Terminal 1 2 and 3 each has one station The airport shuttle Skytrain is integrated to SHIA railway station from where passengers can conveniently travel to and from Jakarta city center by Soekarno Hatta Airport Rail Link Skytrain operating schedule is accessible online and through the Indonesia Airport website and smartphone application All Skytrain stations are equipped with platform screen doors and have information screens displaying real time arrival time of the next train Skytrain has been operational since 17 September 2017 5 Station Transfer NotesTerminal 3 Terminal station Soekarno Hatta Terminal 3 Terminal 3 Airport Bus TerminalTerminal 2 Soekarno Hatta Terminal 2 Terminal 2 Airport Bus TerminalIntegrated Building SHIA Soekarno Hatta Airport Rail LinkTerminal 1 Terminal Station Soekarno Hatta Terminal 1Future expansion Edit Skytrain passengers The Skytrain will be extended to planned new Terminal 4 and Sky Hub commercial area in Phase 2 Then it will be connected to Integrated Building Terminal Terminal 1 2 and 3 6 References Edit a b Soekarno Hatta International Airport Skytrain is officially launched The Jakarta Post Retrieved 2018 05 04 Skytrain Trials at Soekarno Hatta Airport to Begin in Mid August Tempo Retrieved 30 August 2017 Skytrain to connect terminals at Soekarno Hatta Airport The Jakarta Post Retrieved 30 August 2017 Airport skytrain to be operated by crew for first six months The Jakarta Post Retrieved 2018 05 04 Skytrain to link with Dukuh Atas in December The Jakarta Post Retrieved 18 September 2017 Soekarno Hatta Airport Airport Train officially operated for public angkasapura2 co id Retrieved 29 December 2017 External links Edit Wikimedia Commons has media related to Soekarno Hatta Airport Skytrain Retrieved from https en wikipedia org w index php title Soekarno Hatta Airport Skytrain amp oldid 1125556689, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.