105 km/h (65 mph) (Current) 160 km/h (99 mph) (Proposed Upgrade)[1]
History
The Shorkot–Sheikhupura Branch Line was originally named as the Shorekot Road-Chichoki Railway as part of the North Western State Railway. Surveying for the railway line began in 1906 while construction began in 1907 and ended in 1911.[3][4]
^(PDF). Islamabad: PILDAT. December 2015. p. 21. ISBN978-969-558-589-4. Archived from the original (PDF) on 24 January 2016. Retrieved 18 August 2016.
^(PDF) (in English and Urdu) (October 2015 ed.). Pakistan: National Book Foundation. pp. 66–67 (10–11). Archived from the original (PDF) on 18 August 2016. Retrieved 18 August 2016.
^Archive.org "History of Railway Projects, including Tramways – corrected up to 30th June 1906" page 40; Retrieved 13 Dec 2015
^No. 75. - "Expenditure on State Railways and Irrigation Works in India chargeable against Capital 1907-11" Spreadsheet available at dsal.uchicago.edu/statistics/1903_excel/1903.075.XLS
^. Archived from the original on 13 December 2017. Retrieved 13 December 2017.
^"Kot Daya Kishan Railway Station". geoview.info. Retrieved 13 August 2019.
January 06, 2023
shorkot, sheikhupura, branch, line, urdu, شورکوٹ, يخ, وپ, ور, فرعی, ریلوے, خط, several, branch, lines, pakistan, operated, maintained, pakistan, railways, line, begins, from, shorkot, cantonment, junction, station, ends, qila, sheikhupura, junction, total, len. Shorkot Sheikhupura Branch Line Urdu شورکوٹ ش يخ وپ ور فرعی ریلوے خط is one of several branch lines in Pakistan operated and maintained by Pakistan Railways The line begins from Shorkot Cantonment Junction station and ends at Qila Sheikhupura Junction The total length of this railway line is 314 kilometers 195 mi There are 13 railway stations from Shorkot Junction to Qila Sheikhupura Junction 2 Shorkot Sheikhupura Branch Lineشورکوٹ ش يخ وپ ور فرعی ریلوے خطOverviewStatusOperationalOwnerPakistan RailwaysTerminiShorkot Cantonment JunctionQila Sheikhupura JunctionStations18ServiceOperator s Pakistan RailwaysHistoryOpened1 March 1911 1911 03 01 TechnicalLine length314 km 195 mi Track gauge1 676 mm 5 ft 6 in Operating speed105 km h 65 mph Current 160 km h 99 mph Proposed Upgrade 1 History EditThe Shorkot Sheikhupura Branch Line was originally named as the Shorekot Road Chichoki Railway as part of the North Western State Railway Surveying for the railway line began in 1906 while construction began in 1907 and ended in 1911 3 4 Stations EditShorkot Cantonment Junction Naim Ishfaq Shahid Halt Pir Mahal Kamalia Mamu Kanjan Kanjwani Rahme Shah Chak Ibrahim Bhatti Tandliawala Chak Turan Jhok Ditta Rurala Road Jaranwala Junction Kot Daya Kishen railway station 5 6 Buchiana Nankana Sahib Warburton Bahuman Qila Sheikhupura JunctionReferences Edit Pakistan Railways A Performance Analysis Citizens Periodic Reports on the Performance of State Institutions PDF Islamabad PILDAT December 2015 p 21 ISBN 978 969 558 589 4 Archived from the original PDF on 24 January 2016 Retrieved 18 August 2016 Pakistan Railways Time amp Fare Table 2015 PDF in English and Urdu October 2015 ed Pakistan National Book Foundation pp 66 67 10 11 Archived from the original PDF on 18 August 2016 Retrieved 18 August 2016 Archive org History of Railway Projects including Tramways corrected up to 30th June 1906 page 40 Retrieved 13 Dec 2015 No 75 Expenditure on State Railways and Irrigation Works in India chargeable against Capital 1907 11 Spreadsheet available at dsal uchicago edu statistics 1903 excel 1903 075 XLS Blogger Archived from the original on 13 December 2017 Retrieved 13 December 2017 Kot Daya Kishan Railway Station geoview info Retrieved 13 August 2019 Retrieved from https en wikipedia org w index php title Shorkot Sheikhupura Branch Line amp oldid 1098725602, wikipedia, wiki, book, books, library,