fbpx
Wikipedia

Wuppertal Schwebebahn

The Wuppertaler Schwebebahn ("Wuppertal Suspension Railway") is a suspension railway in Wuppertal, Germany.

Wuppertaler Schwebebahn
Schwebebahn between Adlerbrücke and Alter Markt
Overview
LocaleWuppertal, Germany
Transit typeSuspension railway
Number of lines1
Number of stations20
Daily ridership82,000[1]
Operation
Began operation1 March 1901; 121 years ago (1901-03-01)
Operator(s)Wuppertaler Stadtwerke (WSW)
Technical
System length13.3 km (8.3 mi)
System map

Depot and turning loop
0.0
Oberbarmen
0.7
Wupperfeld
L419 Brändströmstraße
1.3
Werther Brücke
2.0
Alter Markt
B 7 Friedrich-Engels-Allee
2.8
Adlerbrücke
3.3
Loher Brücke
L433 Loher Straße
4.1
Völklinger Straße
5.1
Landgericht
B 7 Bundesallee
5.8
Kluse/Schauspielhaus
B 7 Bundesallee
L70 Morianstraße
Alte Freiheit
6.3
Hauptbahnhof
6.8
Ohligsmühle
B 7 Bundesallee
L427 Tannenbergstraße
7.4
Robert-Daum-Platz
8.2
Pestalozzistraße
8.8
Westende
9.7
Varresbecker Straße
10.3
Düsseldorf–Elberfeld railway
10.4
Zoo/Stadion
10.5
Former turning loop
10.6
Start of the Overland section.
B 228 Sonnborner Straße
11.0
Sonnborner Straße
11.3
A 46 Sonnborner Kreuz
11.7
Hammerstein
12.5
Bruch
B 224 Gräfrather Straße
13.3
Vohwinkel Schwebebahn
Main workshops, depot and turning loop

Its original name was Einschienige Hängebahn System Eugen Langen ("Eugen Langen Monorail Overhead Conveyor System"). It is the oldest electric elevated railway with hanging cars in the world and is a unique system in Germany.

Designed by Eugen Langen and offered first to the cities of Berlin, Munich, and Breslau who all turned it down,[2] the installation with elevated stations was built in Barmen, Elberfeld, and Vohwinkel between 1897 and 1903; the first track opened in 1901. The railway line is credited with growth of the original cities and their eventual merger into Wuppertal.[2] The Schwebebahn is still in use as a normal means of local public transport, moving 25 million passengers annually, per the 2008 annual report.[3] New rail cars were ordered in 2015, called Generation 15, and the first new car went into service in December 2016.

The Schwebebahn runs along a route of 13.3 kilometres (8.3 mi), at a height of about 12 metres (39 ft) above the River Wupper between Oberbarmen and Sonnborner Straße (10 kilometres or 6.2 miles) and about 8 metres (26 ft) above the valley road between Sonnborner Straße and Vohwinkel (3.3 kilometres or 2.1 miles).[4][5] At one point the railway crosses the A46 motorway. The entire trip takes about 30 minutes.[5] The Schwebebahn operates within the Verkehrsverbund Rhein-Ruhr (VRR) and accepts tickets issued by the VRR companies.

History

The Wuppertaler Schwebebahn had a forerunner: in 1824, Henry Robinson Palmer of Britain presented a railway system which differed from all previous constructions. It was a low single-rail suspension railway on which the carriages were drawn by horses. Friedrich Harkort, a Prussian industrial entrepreneur and politician, loved the idea. He saw big advantages for the transportation of coal to the early industrialised region in and around the Wupper valley. Harkort had his own steel mill in Elberfeld; he built a demonstration segment of the Palmer system and set it up in 1826 on the grounds of what is today the Wuppertal tax office. He tried to attract public attention to his railway plans.

On 9 September 1826, the town councillors of Elberfeld met to discuss the use of a "Palmer's Railway" from the Ruhr region, Hinsbeck, or Langenberg, to the Wupper valley, Elberfeld, connecting Harkort's factories. Friedrich Harkort inspected the projected route with a surveyor and a member of the town council. The plans never went ahead because of protests from the transport branch[clarification needed] and owners of mills that were not on the routes.

In 1887 the cities of Elberfeld and Barmen formed a commission for the construction of an elevated railway or Hochbahn. In 1894 they chose the system of the engineer Eugen Langen of Cologne, and in 1896 the order was licensed by the City of Düsseldorf.[5][6] In 2003, the Rhine Heritage Office (Rheinisches Amt für Denkmalpflege des Landschaftsverbandes Rheinland or LVR) announced the discovery of an original section of the test route of the Schwebebahn.

Construction on the actual Schwebebahn began in 1898, overseen by the government's master builder, Wilhelm Feldmann. On 24 October 1900, Emperor Wilhelm II participated in a monorail trial run.[5]

In 1901 the railway came into operation. It opened in sections: the line from Kluse to Zoo/Stadion opened on 1 March, the line to the western terminus at Vohwinkel opened on 24 May, while the line to the eastern terminus at Oberbarmen did not open until 27 June 1903.[4] Around 19,200 tonnes (18,900 long tons; 21,200 short tons) of steel were used to produce the supporting frame and the stations.[5] The construction cost 16 million gold marks. The railway was closed owing to severe damage during World War II, but reopened as early as 1946.[4]

Modernization

The Schwebebahn now carries approximately 80,000[1] passengers through the city per weekday. Since 1997, the supporting frame has been largely modernized, and many stations have been reconstructed and brought up to date technically. Kluse station, at the theatre in Elberfeld, was destroyed during the Second World War and was reconstructed during the modernization phase. Work was planned to be completed in 2001, but a serious accident took place in 1999 which left five people dead and 47 injured. That, along with delivery problems, delayed completion. By 2004, the cost of the reconstruction work had increased from €380 million to €480 million.[7]

On 15 December 2009, the Schwebebahn suspended its operations due to safety concerns. Several of the older support structures needed to be renewed, a process that was completed on 19 April 2010.[8]

In 2012, the Schwebebahn was closed for significant periods to allow upgrades to the system: from 7 to 21 July and 6 August to 22 October, and on weekends in September (15/16) and November (10/11).[9] The modernization was completed and the line fully reopened on 19 August 2013.

Post-2015 train replacement

On 10 November 2011, Wuppertaler Stadtwerke signed a contract with Vossloh Kiepe to supply a new fleet of Generation 15 or GTW 15 trains to gradually replace the ageing GTW 72 fleet. The 31 new articulated cars were assembled by Vossloh España in Valencia, Spain,[10] featuring a light blue livery and having cushioned seating, air conditioning, information displays, LED lights, improved disabled access, and induction motors with energy recovery during braking.[11] The first new train was commissioned by WSW in 2015[12][13] and entered regular passenger service on 18 December 2016,[14] at which point the line's power supply voltage was raised from 600 to 750 V.

The GTW 72 stock was gradually withdrawn from service as the new trains were introduced, the last of which operated immediately prior to the line's shutdown in November 2018. WSW announced it would not scrap any of the GTW 72 stock, but instead offer 21 of the vehicles for sale and three for free, as long as they remained in the city of Wuppertal.[15][16]

In November 2018 a bus bar detached and fell to the ground but nobody was injured. Following this accident, the Schwebebahn was closed down for nearly nine months.[17] It re-opened on 1 August 2019.[18]

Stations

Technology

 
Detail of suspender, wheel, and motor of a GTW 72 train

The cars are suspended from a single rail built underneath a supporting steel frame. The cars hang on wheels which are driven by multiple electric motors operating at 750 volts DC, fed from a live rail below the running rail.[19]

A vehicle leaving the Wagenhalle Oberbarmen depot

Until August 2019, the Schwebebahn used block signalling like other light- and heavy-rail systems. Signals with red, green, and yellow lights, present at every station, signalled the driver if the next block, usually continuing until the next station, was free or not. The yellow aspect was mostly used to warn about construction work ahead, while a blinking red light warned about more severe problems.

Today, the Schwebebahn uses the European Train Control System, allowing for shorter distances between trains.

The supporting frame and tracks are made out of 486 pillars and bridgework sections. When the line was originally built, Anton Rieppel, head of MAN-Werk Gustavsburg, designed the structural system, which he patented.[20] At each end of the line is a servicing depot, including a loop of track to allow the trains to be turned around.[5]

The current fleet consists of 31 articulated cars.[5] The cars are 24 metres long and have 4 doors. One carriage can seat 48 with approximately 130 standing passengers.[4] The top speed is 60 kilometres per hour (37 mph) and the average speed is 27 km/h (17 mph).[5]

The Kaiserwagen (Emperor's car), the original train used by Emperor Wilhelm II during a test ride on 24 October 1900, is still operated on scheduled excursion services, special occasions and for charter events.[5]

Incidents

15 January 1917
A train rear-ended another train that had stopped unexpectedly in front of it between Oberbarmen and Wupperfeld, causing the trailing car of the stopped train to fall off the track. There were two minor injuries.[21] Subsequently, a safety device was developed to make derailments nearly impossible.[5]
21 July 1950
The Althoff Circus organised a publicity stunt by putting a baby elephant on a train at Alter Markt station. As the elephant started to bump around during the ride, she fell out of the car and into the river Wupper.[22] The elephant, two journalists, and one passenger sustained minor injuries. After that jump, the elephant got the name Tuffi, meaning 'waterdive' in Italian. The official of the railway and the circus director were fined after the incident.
11 September 1968
A truck crashed into a pillar and caused a section of track to fall. There were no trains in the area at the time. This incident led to the use of concrete barriers around the pillar anchors.
25 March 1997
A technical malfunction caused a rear-end collision in Oberbarmen station between a structure train and the Kaiserwagen. There were 14 injuries, but no derailment.
 
Accident on 12 April 1999, near Robert-Daum-Platz station
12 April 1999
The line's first and only fatal accident occurred close to Robert-Daum-Platz station during maintenance work in the early morning hours of 12 April 1999. Workers had forgotten to remove a metal claw from the track on completion of scheduled night work. The first eastbound train of the day hit the claw at a speed of around 50 km/h (31 mph), derailed, and fell about 10 metres (33 ft) into the river Wupper, killing five passengers and injuring 47, some seriously. The salvage operation took three days and nights to complete. Eight weeks after the incident, the Schwebebahn returned to operation. The cost of the damage was approximately 8 million marks.
The judicial inquiry into the incident highlighted that the disaster was not caused by technical defects or mechanical system failure, but by the negligence of workers who had fallen behind in their schedule during the preceding night, and abandoned the work site hastily ten minutes before the train departed from the depot. Contributing to the accident was a lack of control of their activities by site supervisors.
The works manager in charge of safety, and the workers dealing with the steel claw, were acquitted of all charges by the District Court of Wuppertal. The site supervision personnel, having neglected their duties of control, were sentenced for involuntary manslaughter in five cases and bodily injury caused by negligence in 47 cases, but given probation under verdict 4 StR 289/01, dated 31 January 2002.[23]
Since then, it has become a custom to follow every repair work to the line by a test run at slow speed, even though this is not prescribed by law.
 
Aftermath of the collision with a crane, near Hammerstein station, 5 August 2008
5 August 2008
A train collided with a crane truck making deliveries under the track, causing a 10-metre-long (33 ft) tear in the floor of one of the cars. The truck driver was seriously injured, and the train driver and some passengers were treated for shock.[24]
17 October 2013
A section of power rail 260 metres (850 ft) long fell from the track onto Federal Route 7, damaging several cars parked underneath and forcing closure of the road. The city's fire service had to rescue 76 passengers from a stranded train. No one was injured.[25]
November 2018
A 350 metres (1,150 ft) long section of the power rail fell to the ground, extensively damaging a parked car. After the replacement of 18,000 support clamps, the line reopened in August 2019.

In popular culture

Literature

The Schwebebahn is alluded to in Theodor Herzl's 1902 utopian novel Altneuland (The Old New Land). For Herzl, the Schwebebahn was the ideal form of urban transport, and he imagined a large monorail built in its style in Haifa.[26]

Film

A sequence in Lyrical Nitrate, using film from between 1905 and 1915, features the Schwebebahn. Rüdiger Vogler and Yella Rottländer's characters ride the Schwebebahn in Wim Wenders's 1974 movie Alice in the Cities (Alice in den Städten). It also appears in the 1992 Dutch movie The Sunday Child (De Zondagsjongen) by Pieter Verhoeff, in Tom Tykwer's 2000 film The Princess and the Warrior (Der Krieger und die Kaiserin), and as a background to a number of outdoor dance choreographies in another Wim Wenders film – 2011's Pina, where some dances are also set inside the cars.

The Schwebebahn is both subject and title of video work by the Turner Prize-nominated artist Darren Almond. Produced in 1995, Schwebebahn is the first of three videos that constitute his Train Trilogy.

The Museum of Modern Art has a two-minute film from 1902 featuring the Schwebebahn.[27] A colourized and upscaled version of the 1902 film is now available [28] and has been matched with a recent video.[29]

Television

Gerry Anderson's Thunderbirds featured a hanging monorail in at least one episode.[30]

Other fiction

Some of the events in Le Feu de Wotan, a Belgian bande dessinée in the Yoko Tsuno series, take place in the Schwebebahn.

The denouement of the episode of the 1972 ITC TV series The Adventurer called "I'll Get There Sometime" takes place on the railway.

Video games

In 2013 the Schwebebahn Simulator 2013[31] was launched for Windows, Mac OS X and Wii U. In this simulator, the player controls the GTW 72.

In the "Add-on Wuppertal" DLC[32] of the OMSI 2 bus simulator, there is the option for the player to control the Schwebebahn of the newest model (GTW 15), with all stations faithfully recreated.

Gallery

See also

References

  1. ^ a b "Facts & Figures". Schwebebahn. Retrieved 21 November 2015.
  2. ^ a b Küffner, Georg (25 August 1998). [The Great Renewal is already badly behind schedule]. Frankfurter Allgemeine Zeitung (Frankfurt General Newspaper) (in German). Archived from the original on 5 November 2014. Retrieved 26 August 2020.
  3. ^ (PDF). WSW Group of companies (in German). p. 44. Archived from the original (PDF) on 15 February 2010.
  4. ^ a b c d Robert Schwandl. "Wuppertal". UrbanRail.net. Retrieved 21 November 2015.
  5. ^ a b c d e f g h i j . Archived from the original on 8 October 2006. Retrieved 20 February 2007.
  6. ^ "Die Geschichte der Schwebebahn" (in German). Schwebebahn. Retrieved 21 November 2015.
  7. ^ Von Andreas Spiegelhauer (18 March 2009). "Schwebebahn-Ausbau: Betrug bei Millionen-Hilfe?". Westdeutsche Zeitung (in German).
  8. ^ WSW-Online: Altgerüst muss verstärkt werden -Schwebebahn außer Betrieb 2 January 2010 at the Wayback Machine (in German).
  9. ^ "WSW mobil GMBH - Ausbau 2013". Archived from the original on 12 February 2013. Retrieved 10 August 2012.
  10. ^ "Generation 15 trainsets enter service in Wuppertal". Metro Report. Retrieved 16 July 2019.
  11. ^ "Vehicles – From the prototype to the modern suspension railway". Schwebebahn.de/en. Retrieved 23 March 2018.
  12. ^ Wuppertal begrüßt die neue Schwebebahn. Website der Westdeutschen Zeitung, 14 November 2015, retrieved 15 November 2015.
  13. ^ Erster Wagen in Vohwinkel – Die neue Schwebebahn ist da. Website der Rheinischen Post, 14 November 2015, retrieved 15 November 2015.
  14. ^ "Suspension Railway in Wuppertal: Story of a Landmark". YouTube. Retrieved 23 March 2018.
  15. ^ Wuppertal verschenkt und verkauft Schwebebahn-Wagen. Website der Rheinischen Post, 13 August 2015, retrieved 5 September 2015.
  16. ^ Wuppertal verschenkt drei Schwebebahnen: Rest ist zu kaufen auf t-online.de, 13 August 2015, retrieved 5 September 2015.
  17. ^ Connolly, Kate (1 August 2019). "World's oldest electric suspension train reopens in Germany". The Guardian. Retrieved 1 August 2019.
  18. ^ "Da schwebt sie wieder!". Spiegel. 1 August 2019. Retrieved 1 August 2019. (in German)
  19. ^ . Archived from the original on 9 October 2006. Retrieved 20 February 2007.
  20. ^ "Unbenanntes Dokument". rheinische-industriekultur.de (in German).
  21. ^ "Schwebebahn in Wuppertal und mehr". Retrieved 21 November 2015.
  22. ^ Article in Westdeutsche Zeitung, March 2009[full citation needed]
  23. ^ "BGH 4 StR 289/01 - 31 January 2002 (LG Wuppertal)". hrr-strafrecht.de (in German).
  24. ^ "Rettung aus der Luft: Wuppertaler Schwebebahn kollidiert mit Kran". Spiegel Online (in German). Hamburg, Germany. 5 August 2008.
  25. ^ "Löste Materialfehler das Schwebebahnunglück aus?". DerWesten.de (in German). WAZ Mediengruppe. 6 November 2013. Retrieved 23 September 2020.
  26. ^ "Monorails were a great idea in 1902, and they're a great idea now". Yesterday's Salad. 3 January 2007.
  27. ^ "The Flying Train (1902) MoMA FILM VAULT SUMMER CAMP". YouTube.
  28. ^ "[60 fps] The Flying Train, Germany, 1902". YouTube. Archived from the original on 12 December 2021.
  29. ^ pwduze (2020). "Wuppertal Schwebebahn 1902 & 2015 side by side video". youtube.com. Archived from the original on 12 December 2021. Retrieved 19 January 2021.
  30. ^ "S1. Ep.3". IMDB. Retrieved 29 July 2022.
  31. ^ . 9 March 2016. Archived from the original on 9 March 2016. Retrieved 11 May 2021.
  32. ^ "OMSI 2 Add-on Wuppertal". Aerosoft US Shop. Retrieved 11 May 2021.

External links

  • Official website  
  • WSW Mobility
  • Wuppertal at UrbanRail.net
  • The Monorail Society
  • 1903 Film of "The Flying Train"
  • Tim Travel about the Schwebebahn
  • gallery of the Schwebebahn

51°16′1.52″N 7°10′53.13″E / 51.2670889°N 7.1814250°E / 51.2670889; 7.1814250Coordinates: 51°16′1.52″N 7°10′53.13″E / 51.2670889°N 7.1814250°E / 51.2670889; 7.1814250

wuppertal, schwebebahn, wuppertaler, schwebebahn, wuppertal, suspension, railway, suspension, railway, wuppertal, germany, wuppertaler, schwebebahnschwebebahn, between, adlerbrücke, alter, marktoverviewlocalewuppertal, germanytransit, typesuspension, railwaynu. The Wuppertaler Schwebebahn Wuppertal Suspension Railway is a suspension railway in Wuppertal Germany Wuppertaler SchwebebahnSchwebebahn between Adlerbrucke and Alter MarktOverviewLocaleWuppertal GermanyTransit typeSuspension railwayNumber of lines1Number of stations20Daily ridership82 000 1 OperationBegan operation1 March 1901 121 years ago 1901 03 01 Operator s Wuppertaler Stadtwerke WSW TechnicalSystem length13 3 km 8 3 mi System mapLegendDepot and turning loop0 0 Oberbarmen0 7 WupperfeldL419 Brandstromstrasse1 3 Werther Brucke2 0 Alter MarktB 7 Friedrich Engels Allee2 8 Adlerbrucke3 3 Loher BruckeL433 Loher Strasse4 1 Volklinger Strasse5 1 LandgerichtB 7 Bundesallee5 8 Kluse SchauspielhausB 7 BundesalleeL70 MorianstrasseAlte Freiheit6 3 Hauptbahnhof6 8 OhligsmuhleB 7 BundesalleeL427 Tannenbergstrasse7 4 Robert Daum Platz8 2 Pestalozzistrasse8 8 Westende9 7 Varresbecker Strasse10 3 Dusseldorf Elberfeld railway10 4 Zoo Stadion10 5 Former turning loop10 6 Start of the Overland section B 228 Sonnborner Strasse11 0 Sonnborner Strasse11 3 A 46 Sonnborner Kreuz11 7 Hammerstein12 5 BruchB 224 Grafrather Strasse13 3 Vohwinkel SchwebebahnMain workshops depot and turning loopThis diagram viewtalkeditIts original name was Einschienige Hangebahn System Eugen Langen Eugen Langen Monorail Overhead Conveyor System It is the oldest electric elevated railway with hanging cars in the world and is a unique system in Germany Designed by Eugen Langen and offered first to the cities of Berlin Munich and Breslau who all turned it down 2 the installation with elevated stations was built in Barmen Elberfeld and Vohwinkel between 1897 and 1903 the first track opened in 1901 The railway line is credited with growth of the original cities and their eventual merger into Wuppertal 2 The Schwebebahn is still in use as a normal means of local public transport moving 25 million passengers annually per the 2008 annual report 3 New rail cars were ordered in 2015 called Generation 15 and the first new car went into service in December 2016 The Schwebebahn runs along a route of 13 3 kilometres 8 3 mi at a height of about 12 metres 39 ft above the River Wupper between Oberbarmen and Sonnborner Strasse 10 kilometres or 6 2 miles and about 8 metres 26 ft above the valley road between Sonnborner Strasse and Vohwinkel 3 3 kilometres or 2 1 miles 4 5 At one point the railway crosses the A46 motorway The entire trip takes about 30 minutes 5 The Schwebebahn operates within the Verkehrsverbund Rhein Ruhr VRR and accepts tickets issued by the VRR companies Contents 1 History 1 1 Modernization 1 2 Post 2015 train replacement 2 Stations 3 Technology 4 Incidents 5 In popular culture 5 1 Literature 5 2 Film 5 3 Television 5 4 Other fiction 5 5 Video games 6 Gallery 7 See also 8 References 9 External linksHistory EditThe Wuppertaler Schwebebahn had a forerunner in 1824 Henry Robinson Palmer of Britain presented a railway system which differed from all previous constructions It was a low single rail suspension railway on which the carriages were drawn by horses Friedrich Harkort a Prussian industrial entrepreneur and politician loved the idea He saw big advantages for the transportation of coal to the early industrialised region in and around the Wupper valley Harkort had his own steel mill in Elberfeld he built a demonstration segment of the Palmer system and set it up in 1826 on the grounds of what is today the Wuppertal tax office He tried to attract public attention to his railway plans On 9 September 1826 the town councillors of Elberfeld met to discuss the use of a Palmer s Railway from the Ruhr region Hinsbeck or Langenberg to the Wupper valley Elberfeld connecting Harkort s factories Friedrich Harkort inspected the projected route with a surveyor and a member of the town council The plans never went ahead because of protests from the transport branch clarification needed and owners of mills that were not on the routes In 1887 the cities of Elberfeld and Barmen formed a commission for the construction of an elevated railway or Hochbahn In 1894 they chose the system of the engineer Eugen Langen of Cologne and in 1896 the order was licensed by the City of Dusseldorf 5 6 In 2003 the Rhine Heritage Office Rheinisches Amt fur Denkmalpflege des Landschaftsverbandes Rheinland or LVR announced the discovery of an original section of the test route of the Schwebebahn Construction on the actual Schwebebahn began in 1898 overseen by the government s master builder Wilhelm Feldmann On 24 October 1900 Emperor Wilhelm II participated in a monorail trial run 5 In 1901 the railway came into operation It opened in sections the line from Kluse to Zoo Stadion opened on 1 March the line to the western terminus at Vohwinkel opened on 24 May while the line to the eastern terminus at Oberbarmen did not open until 27 June 1903 4 Around 19 200 tonnes 18 900 long tons 21 200 short tons of steel were used to produce the supporting frame and the stations 5 The construction cost 16 million gold marks The railway was closed owing to severe damage during World War II but reopened as early as 1946 4 Construction of the Schwebebahn 1900 Werther Brucke station in 1913 A GTW 72 train crossing an intersection A train in Wuppertal in 2010 The Kaiserwagen Generation 15 train at Vohwinkel depot Modernization Edit The Schwebebahn now carries approximately 80 000 1 passengers through the city per weekday Since 1997 the supporting frame has been largely modernized and many stations have been reconstructed and brought up to date technically Kluse station at the theatre in Elberfeld was destroyed during the Second World War and was reconstructed during the modernization phase Work was planned to be completed in 2001 but a serious accident took place in 1999 which left five people dead and 47 injured That along with delivery problems delayed completion By 2004 the cost of the reconstruction work had increased from 380 million to 480 million 7 On 15 December 2009 the Schwebebahn suspended its operations due to safety concerns Several of the older support structures needed to be renewed a process that was completed on 19 April 2010 8 In 2012 the Schwebebahn was closed for significant periods to allow upgrades to the system from 7 to 21 July and 6 August to 22 October and on weekends in September 15 16 and November 10 11 9 The modernization was completed and the line fully reopened on 19 August 2013 Post 2015 train replacement Edit On 10 November 2011 Wuppertaler Stadtwerke signed a contract with Vossloh Kiepe to supply a new fleet of Generation 15 or GTW 15 trains to gradually replace the ageing GTW 72 fleet The 31 new articulated cars were assembled by Vossloh Espana in Valencia Spain 10 featuring a light blue livery and having cushioned seating air conditioning information displays LED lights improved disabled access and induction motors with energy recovery during braking 11 The first new train was commissioned by WSW in 2015 12 13 and entered regular passenger service on 18 December 2016 14 at which point the line s power supply voltage was raised from 600 to 750 V The GTW 72 stock was gradually withdrawn from service as the new trains were introduced the last of which operated immediately prior to the line s shutdown in November 2018 WSW announced it would not scrap any of the GTW 72 stock but instead offer 21 of the vehicles for sale and three for free as long as they remained in the city of Wuppertal 15 16 In November 2018 a bus bar detached and fell to the ground but nobody was injured Following this accident the Schwebebahn was closed down for nearly nine months 17 It re opened on 1 August 2019 18 Stations EditOberbarmen eastern terminus Wupperfeld Werther Brucke Alter Markt Adlerbrucke Opernhaus Loher Brucke Junior Uni Volklinger Strasse Landgericht Kluse Hauptbahnhof Doppersberg Ohligsmuhle Robert Daum Platz Pestalozzistrasse Westende Varresbecker Strasse Zoo Stadion Sonnborner Strasse Hammerstein Bruch Vohwinkel western terminus Werther Brucke station Zoo Stadion station Sonnborner Strasse stationTechnology Edit Detail of suspender wheel and motor of a GTW 72 train The cars are suspended from a single rail built underneath a supporting steel frame The cars hang on wheels which are driven by multiple electric motors operating at 750 volts DC fed from a live rail below the running rail 19 source source source source source source source source source source source source A vehicle leaving the Wagenhalle Oberbarmen depot Until August 2019 the Schwebebahn used block signalling like other light and heavy rail systems Signals with red green and yellow lights present at every station signalled the driver if the next block usually continuing until the next station was free or not The yellow aspect was mostly used to warn about construction work ahead while a blinking red light warned about more severe problems Today the Schwebebahn uses the European Train Control System allowing for shorter distances between trains The supporting frame and tracks are made out of 486 pillars and bridgework sections When the line was originally built Anton Rieppel head of MAN Werk Gustavsburg designed the structural system which he patented 20 At each end of the line is a servicing depot including a loop of track to allow the trains to be turned around 5 The current fleet consists of 31 articulated cars 5 The cars are 24 metres long and have 4 doors One carriage can seat 48 with approximately 130 standing passengers 4 The top speed is 60 kilometres per hour 37 mph and the average speed is 27 km h 17 mph 5 The Kaiserwagen Emperor s car the original train used by Emperor Wilhelm II during a test ride on 24 October 1900 is still operated on scheduled excursion services special occasions and for charter events 5 Incidents Edit15 January 1917 A train rear ended another train that had stopped unexpectedly in front of it between Oberbarmen and Wupperfeld causing the trailing car of the stopped train to fall off the track There were two minor injuries 21 Subsequently a safety device was developed to make derailments nearly impossible 5 21 July 1950 The Althoff Circus organised a publicity stunt by putting a baby elephant on a train at Alter Markt station As the elephant started to bump around during the ride she fell out of the car and into the river Wupper 22 The elephant two journalists and one passenger sustained minor injuries After that jump the elephant got the name Tuffi meaning waterdive in Italian The official of the railway and the circus director were fined after the incident 11 September 1968 A truck crashed into a pillar and caused a section of track to fall There were no trains in the area at the time This incident led to the use of concrete barriers around the pillar anchors 25 March 1997 A technical malfunction caused a rear end collision in Oberbarmen station between a structure train and the Kaiserwagen There were 14 injuries but no derailment Accident on 12 April 1999 near Robert Daum Platz station 12 April 1999Main article 1999 Wuppertal Schwebebahn accident The line s first and only fatal accident occurred close to Robert Daum Platz station during maintenance work in the early morning hours of 12 April 1999 Workers had forgotten to remove a metal claw from the track on completion of scheduled night work The first eastbound train of the day hit the claw at a speed of around 50 km h 31 mph derailed and fell about 10 metres 33 ft into the river Wupper killing five passengers and injuring 47 some seriously The salvage operation took three days and nights to complete Eight weeks after the incident the Schwebebahn returned to operation The cost of the damage was approximately 8 million marks The judicial inquiry into the incident highlighted that the disaster was not caused by technical defects or mechanical system failure but by the negligence of workers who had fallen behind in their schedule during the preceding night and abandoned the work site hastily ten minutes before the train departed from the depot Contributing to the accident was a lack of control of their activities by site supervisors The works manager in charge of safety and the workers dealing with the steel claw were acquitted of all charges by the District Court of Wuppertal The site supervision personnel having neglected their duties of control were sentenced for involuntary manslaughter in five cases and bodily injury caused by negligence in 47 cases but given probation under verdict 4 StR 289 01 dated 31 January 2002 23 Since then it has become a custom to follow every repair work to the line by a test run at slow speed even though this is not prescribed by law Aftermath of the collision with a crane near Hammerstein station 5 August 2008 5 August 2008 A train collided with a crane truck making deliveries under the track causing a 10 metre long 33 ft tear in the floor of one of the cars The truck driver was seriously injured and the train driver and some passengers were treated for shock 24 17 October 2013 A section of power rail 260 metres 850 ft long fell from the track onto Federal Route 7 damaging several cars parked underneath and forcing closure of the road The city s fire service had to rescue 76 passengers from a stranded train No one was injured 25 November 2018 A 350 metres 1 150 ft long section of the power rail fell to the ground extensively damaging a parked car After the replacement of 18 000 support clamps the line reopened in August 2019 In popular culture EditLiterature Edit The Schwebebahn is alluded to in Theodor Herzl s 1902 utopian novel Altneuland The Old New Land For Herzl the Schwebebahn was the ideal form of urban transport and he imagined a large monorail built in its style in Haifa 26 Film Edit A sequence in Lyrical Nitrate using film from between 1905 and 1915 features the Schwebebahn Rudiger Vogler and Yella Rottlander s characters ride the Schwebebahn in Wim Wenders s 1974 movie Alice in the Cities Alice in den Stadten It also appears in the 1992 Dutch movie The Sunday Child De Zondagsjongen by Pieter Verhoeff in Tom Tykwer s 2000 film The Princess and the Warrior Der Krieger und die Kaiserin and as a background to a number of outdoor dance choreographies in another Wim Wenders film 2011 s Pina where some dances are also set inside the cars The Schwebebahn is both subject and title of video work by the Turner Prize nominated artist Darren Almond Produced in 1995 Schwebebahn is the first of three videos that constitute his Train Trilogy The Museum of Modern Art has a two minute film from 1902 featuring the Schwebebahn 27 A colourized and upscaled version of the 1902 film is now available 28 and has been matched with a recent video 29 Television Edit Gerry Anderson s Thunderbirds featured a hanging monorail in at least one episode 30 Other fiction Edit Some of the events in Le Feu de Wotan a Belgian bande dessinee in the Yoko Tsuno series take place in the Schwebebahn The denouement of the episode of the 1972 ITC TV series The Adventurer called I ll Get There Sometime takes place on the railway Video games Edit In 2013 the Schwebebahn Simulator 2013 31 was launched for Windows Mac OS X and Wii U In this simulator the player controls the GTW 72 In the Add on Wuppertal DLC 32 of the OMSI 2 bus simulator there is the option for the player to control the Schwebebahn of the newest model GTW 15 with all stations faithfully recreated Gallery Edit 1913 depiction of the line Zoo station at night Wuppertaler Schwebebahn depot GTW 72 train interior GTW 72 train at a station Generation 15 train interiorSee also Edit Trains portalAerobus Bennie Railplane Dresden Suspension Railway Elevated railway H Bahn Dortmund and Dusseldorf Lists of rapid transit systems Memphis Suspension Railway Monorail Shonan Monorail Japan Chiba Urban Monorail Japan Skybus Metro India Suspension railwayReferences Edit a b Facts amp Figures Schwebebahn Retrieved 21 November 2015 a b Kuffner Georg 25 August 1998 Die Grosse Erneuerung ist schon arg in Verzug The Great Renewal is already badly behind schedule Frankfurter Allgemeine Zeitung Frankfurt General Newspaper in German Archived from the original on 5 November 2014 Retrieved 26 August 2020 2008 Annual report PDF WSW Group of companies in German p 44 Archived from the original PDF on 15 February 2010 a b c d Robert Schwandl Wuppertal UrbanRail net Retrieved 21 November 2015 a b c d e f g h i j Uni Wuppertal Wuppertal s Suspension Railway overview and history Archived from the original on 8 October 2006 Retrieved 20 February 2007 Die Geschichte der Schwebebahn in German Schwebebahn Retrieved 21 November 2015 Von Andreas Spiegelhauer 18 March 2009 Schwebebahn Ausbau Betrug bei Millionen Hilfe Westdeutsche Zeitung in German WSW Online Altgerust muss verstarkt werden Schwebebahn ausser Betrieb Archived 2 January 2010 at the Wayback Machine in German WSW mobil GMBH Ausbau 2013 Archived from the original on 12 February 2013 Retrieved 10 August 2012 Generation 15 trainsets enter service in Wuppertal Metro Report Retrieved 16 July 2019 Vehicles From the prototype to the modern suspension railway Schwebebahn de en Retrieved 23 March 2018 Wuppertal begrusst die neue Schwebebahn Website der Westdeutschen Zeitung 14 November 2015 retrieved 15 November 2015 Erster Wagen in Vohwinkel Die neue Schwebebahn ist da Website der Rheinischen Post 14 November 2015 retrieved 15 November 2015 Suspension Railway in Wuppertal Story of a Landmark YouTube Retrieved 23 March 2018 Wuppertal verschenkt und verkauft Schwebebahn Wagen Website der Rheinischen Post 13 August 2015 retrieved 5 September 2015 Wuppertal verschenkt drei Schwebebahnen Rest ist zu kaufen auf t online de 13 August 2015 retrieved 5 September 2015 Connolly Kate 1 August 2019 World s oldest electric suspension train reopens in Germany The Guardian Retrieved 1 August 2019 Da schwebt sie wieder Spiegel 1 August 2019 Retrieved 1 August 2019 in German Wuppertaler Stadtwerke AG English Archived from the original on 9 October 2006 Retrieved 20 February 2007 Unbenanntes Dokument rheinische industriekultur de in German Schwebebahn in Wuppertal und mehr Retrieved 21 November 2015 Article in Westdeutsche Zeitung March 2009 full citation needed BGH 4 StR 289 01 31 January 2002 LG Wuppertal hrr strafrecht de in German Rettung aus der Luft Wuppertaler Schwebebahn kollidiert mit Kran Spiegel Online in German Hamburg Germany 5 August 2008 Loste Materialfehler das Schwebebahnungluck aus DerWesten de in German WAZ Mediengruppe 6 November 2013 Retrieved 23 September 2020 Monorails were a great idea in 1902 and they re a great idea now Yesterday s Salad 3 January 2007 The Flying Train 1902 MoMA FILM VAULT SUMMER CAMP YouTube 60 fps The Flying Train Germany 1902 YouTube Archived from the original on 12 December 2021 pwduze 2020 Wuppertal Schwebebahn 1902 amp 2015 side by side video youtube com Archived from the original on 12 December 2021 Retrieved 19 January 2021 S1 Ep 3 IMDB Retrieved 29 July 2022 Schwebebahn Simulator 2013 9 March 2016 Archived from the original on 9 March 2016 Retrieved 11 May 2021 OMSI 2 Add on Wuppertal Aerosoft US Shop Retrieved 11 May 2021 External links Edit Wikimedia Commons has media related to Wuppertaler Schwebebahn Official website WSW Mobility Wuppertal at UrbanRail net The Monorail Society 1903 Film of The Flying Train Tim Travel about the Schwebebahn gallery of the Schwebebahn51 16 1 52 N 7 10 53 13 E 51 2670889 N 7 1814250 E 51 2670889 7 1814250 Coordinates 51 16 1 52 N 7 10 53 13 E 51 2670889 N 7 1814250 E 51 2670889 7 1814250 Retrieved from https en wikipedia org w index php title Wuppertal Schwebebahn amp oldid 1134743361, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.