fbpx
Wikipedia

Rapid Metro Gurgaon

Rapid Metro Gurgaon is a light metro[5][6][7] system serving the city of Gurgaon, Haryana, India.[8] Rapid Metro connects the commercial areas of Gurgaon, and acts as a feeder link to the Delhi Metro with an interchange with its Yellow Line at Sikanderpur metro station.

Rapid Metro Gurgaon
Metro in Gurgaon
Overview
OwnerHaryana Mass Rapid Transport Corporation Limited[1]
LocaleGurgaon, Haryana, India
Transit typeLight rapid transit
Number of lines1
Number of stations11
Daily ridership50,000–55,000 (2018)[2]
HeadquartersAmbience Corporate Towers, Ambience Island, NH 48, Gurgaon
Operation
Began operation14 November 2013; 9 years ago (2013-11-14)
Operator(s)DMRC
CharacterFully elevated and grade-separated
Number of vehicles12
Train length3 coaches
Headway4 minutes
Technical
System length12.85 km (7.98 mi)
No. of tracks2 (7.8 km [4.8 mi])
1 (3.7 km [2.3 mi])[3]
Track gauge1,435 mm (4 ft 8+12 in) (standard gauge)[3]
Electrification750 V, DC via third rail[4]
Average speed35 km/h (22 mph)
Top speed80 km/h (50 mph)

Built by Rapid Metro Gurgaon Limited (RMGL), the system was the world's first fully privately financed modern light metro system. The venture did not have any investment from the Union Government, Government of Haryana or any public sector undertaking. However, it was not the first fully privately financed rapid transit system, as the Metropolitan Railway was privately financed.[9] Originally planned to open in 2012, the first phase of the system opened on 14 November 2013. The second phase of the project began commercial operation on 31 March 2017.[10] In September 2019, IL&FS announced that it does not have the resources to continue running the Rapid Metro due to financial issues with the company and is looking for another entity to fund and takeover operations.[11] After a short dispute with the Haryana government and a court ruling from the Punjab and Haryana High Court, the Delhi Metro Rail Corporation took over the operation of the line from IL&FS.[12]

Rapid Metro has a total length of 12.85 kilometres (7.98 mi) serving 11 stations.[13] The system is fully elevated using standard-gauge tracks. The trains are composed of three cars. The power is supplied by 750 volt direct current through third rail. Services operate daily between 06:05 and 22:00 running with a headway of four minutes. The metro system was the first in India to auction naming rights for its stations.[14]

Platform No 1, towards Sector 55-56, Phase 2 Metro Station

History Edit

A 3.2 km (2.0 mi) metro line between Sikanderpur and National Highway 8 was originally proposed in September 2007. The Haryana Urban Development Authority (HUDA) invited expressions of interest to construct the metro line on built-operate-transfer basis with a 99-year lease in 2008.[15] However, real estate developer DLF wanted to provide metro connectivity to its Cyber City.[16][17] A new tender was issued in July 2008,[18] with the DLF-IL&FS consortium emerging as the only bidder.[19] The project was initially conceived as a collaborative venture between Enso Group, DLF and Infrastructure Leasing & Financial Services (IL&FS).[20] Rapid Metro is the first fully privately financed modern metro system in the world.[21] Rapid Metro did not even get the 20 acres of land, which it required to construct the first phase of the project, at any concessional rate from the state.[21]

The Rapid Metro project was implemented as a public-private partnership.[22] The entire cost of the project was borne by the private party.[23] The private party was also tasked with maintenance and operation of the metro at its own cost.[24] While HUDA initially objected to a private company making profit from public transport, an agreement was eventually reached for the consortium to pay HUDA 7.65 billion (US$95.8 million) over 35 years in "connectivity charges" as well as 5–10% of advertising and property development revenue.[3]

The contract for the 9 billion (US$112.7 million) project was awarded in July 2009, with completion scheduled in 30 months' time.[3] The foundation stone was laid on 11 August 2009.[25] The line was built and is operated by Rapid Metro Gurgaon Limited (RMGL). The project was estimated to cost 10.88 billion (US$136.3 million) as of October 2012.[26]

Originally planned to open in 2012, the first phase of the system opened on 14 November 2013.[27]

Phase II Edit

On 11 June 2013, IL&FS Engineering and Construction Company Limited informed the Bombay Stock Exchange that it had been awarded a contract worth 266.5 crores to construct the elevated viaducts for Phase 2 of the project. The company also stated that the project would be completed within 24 months.[28] The company was later awarded a contract worth 84.3 crore to construct all 5 elevated stations in Phase II. The project completion period was specified as 24 months.[29][30] The southward extension is 6.6 km (4.1 mi) long double track and will extend from Sikanderpur to Sector 55 and 56 in Gurgaon.[31] It is estimated to cost 2,423 crore (US$300 million).[32] There are six stations on the extension and it will take around 20 minutes to travel the entire route. Land for the project and right of way will be provided by HUDA.[33] Trial runs were held on the first phase of the metro, between Phase 2 and Phase 3 stations, in October 2012. On the same day, Chief Minister Bhupinder Singh laid the foundation stone for Phase 2 of the project.[citation needed]

Construction work on Phase 2 began in April 2013, and was given an initial deadline of July 2015. However, the deadline was later revised to mid-2016, September 2016 and then the last quarter of 2016.[34] By June 2016, 75% of work on the Phase 2 was complete.[35] Trial runs were conducted along the 6.3-km Phase-2 route between in December 2016.[34] Rapid Metro authorities applied for inspection of phase II by the Commissioner of Metro Rail Safety in March 2017.[36] The second phase of the system was opened to the public on 31 March 2017.[37]

Route Edit

 
Rapid Metro Gurgaon transit diagram

Line 1 Edit

Line 1 was built in two phases.[38] The first phase of the project covers a distance of 5.1 km (3.2 mi) north of Sikanderpur. The section between Sikanderpur and Phase 2 station is double-tracked, while the remaining stations are served by a single-track loop. The second phase is a 6.6 km (4.1 mi) long southward extension from Sikanderpur to Sector 55 and 56 of Gurgaon and mostly runs through the affluent Golf Course Road.[10] This section of a line opened on 31 March 2017 partially till Sector 53–54. The two remaining stations till Sector 55-56 opened on 25 April 2017.[3] Platforms are 75m in length.[39][10]

Sikanderpur station offers an interchange with Delhi Metro via a 90m x 9m walkway.[40]

Line 1
# Station Name Phase Opening Interchange Connenction Station Layout Depot Connection Depot Layout
English Hindi
1 Sector 55–56 सैक्टर ५५-५६ 2 31 March 2017 None Elevated Rapid Metro Rail Depot Elevated
2 Sector 54 Chowk सैक्टर ५४ चौक 2 31 March 2017 None Elevated None None
3 Sector 53-54 सैक्टर ५३-५४ 2 25 April 2017 None Elevated None None
4 Sector 42-43 सैक्टर ४२-४३ 2 25 April 2017 None Elevated None None
5 Phase 1 फ़ेस १ 2 31 March 2017 None Elevated None None
6 Sikanderpur सिकंदरपुर 1 14 November 2013 Yellow Line Elevated None None
7 Phase 2 फ़ेस २ 1 14 November 2013 None Elevated None None
8 Belvedere Towers बेल्वेडियर टावर्स 1 14 November 2013 None Elevated None None
9 Cyber City साइबर सिटि 1 7 May 2014 None Elevated None None
10 Moulsari Avenue मौलसरी एवेन्यू 1 14 November 2013 None Elevated None None
11 Phase 3 फ़ेस ३ 1 14 November 2013 None Elevated Rapid Metro Rail Depot Elevated

Infrastructure Edit

The system is fully elevated and operated automatically.[41] Because of the features, several articles in railway magazines define the system as Light Metro.[7][6][5]

 
Gurgaon Metro track

Rolling stock Edit

On 21 April 2010, Siemens announced that it had been awarded a turnkey contract to build the metro line, including five three-car metro trains.[42] Siemens sub-contracted CRRC Zhuzhou Locomotive to build the 5 aluminium-bodied air-conditioned trains.[4] The first three-coach train set built in China, arrived in Gurgaon on 11 September 2012.[43] RMGL ordered an additional seven three-car metro train sets for the second phase expansion of the metro. The final 4 of these 7 rakes arrived in Gurgaon on 5 February 2016.[44]

Each train with three coaches costs 300 million (US$3.8 million) and is silver and blue in colour.[45] The total length of a 3 coach train is 59.94 metres (196 ft 8 in). The coaches are 2.8 metres (9 ft 2 in) wide, have roof-mounted air conditioning and have 4 doors on each side of each coach. Each train has a capacity of approximately 800 passengers.[46] The metro is designed to carry 30,000 passengers per hour.[47]

Operations Edit

Operator Edit

The line was built and is operated by Rapid Metro Gurgaon Limited (RMGL), founded as a joint venture between Enso group, real estate developer DLF and IL&FS. DLF owns many properties near the stations, while IL&FS was the majority stake holder in the JV.[16] DLF later sold its stake to IL&FS, and exited the joint venture. Following the transaction, IL&FS Transportation Networks Ltd (ITNL) held 82.8% stake in RMGL, and ITNL's subsidiary IL&FS Rail Ltd (IRL) held 17.2%. On 11 February 2016, ITNL announced that it had sold a 49% stake in RMGL for 509.9 crore (US$64 million) to its parent company, Infrastructure Leasing & Financial Services Ltd (IL&FS), in an effort to reduce debt.[48][49][50]

The Rapid Metro charges are flat rate 20 (25¢ US) only in travelling at any stations of Phase-1 line & Phase-2 line stations separately, but travelling form Phase-1 line to Phase-2 line or vice versa the charges are 35 (44¢ US).[51] Delhi Metro tokens and smart cards are accepted on Rapid Metro.[52] The automatic fare collection system is supplied by Thales Group.[53]

Ridership Edit

Ridership of the Rapid Metro has been below expectations.[54] Phase 1 was expected to bring 100,000 riders per day, but only achieved 30,000, and even after the addition of Phase 2, daily ridership in 2018 hovered around the 50,000 mark.[54] Urban Transport News has described the Rapid Metro as a "failure" due to its high cost, low ridership and poor location.[55]

Frequency Edit

Trains run from 06:05 to 22:00[56] Three-coach trains operate at four-minute intervals.[16] Trains have a maximum speed of 80 km/h (50 mph), and operate at an average speed of 40 km/h (25 mph).[16]

Safety Edit

For the passengers' safety, there are Emergency Stop Plungers at every platform, while the Blue Light Station feature enables passengers to contact the Control Room. A Press to Talk Button inside the coaches enables commuters to talk directly to the driver, in the event of any problem.[57]

Security Edit

Security in the Rapid Metro is being handled by a private security agency. The system has a dedicated Metro Police Station at Sikanderpur station, while a Toll Free Helpline for all passengers is operational for 24 hours. CCTV cameras are used to monitor trains and stations.[58]

Future plans Edit

Phase III: construction June 2023-April 2027 Edit

Cyber City to HUDA City Centre metro or Gurgaon loop metro or Gurgram loop metro: In June 2023, Gurugram had 17 km metro network, 11.7km rapid metro and 5.3 km yellow line metro. On 7th June 2023, Union govt's cabinet approved additional ₹5452 crore 28.5 km long metro network with 27 new stations connecting the existing metro network at Cyber City metro station in the north and Huda City Centre in the south. It includes 2 spurs, 2.2 km spur from Basai to Dwarka Expressway (Sector-102) and second spur from Sector-5 to Gurgaon railway station, third spur (phase-iv) has been approved as a separate project which will connect Rezang La Chowk in Palam Vihar to IGI Airport through Delhi Airport Metro Express (Orange Line) at existing IICC - Dwarka Sector 25 metro station (India International Convention and Expo Centre). The new corridor will begin from the existing Cyber City metro station in the northeast, run northwest to Palam Vihar (spur to IICC Dwarka & IGI Airport), then southwest to Sector-5 (spur to Gurugram railway station) & Sector-9 (with a spur to Dwarka Expressway Sector-101) & Basai village, then run southeast via Udhyog Vihar-6 to Sector-48 & Subhash Chowk, then run north to the existing Cyber City metro station, thus completing the loop. Delhi–Alwar RRTS will pass between the Sector-22 & Udhyog Vihar-4 metro stations in the North and Udhyog Vihar-6 & Hero Honda Chowk in the south. Completion deadline is fy2026-27.[59]

The expected ridership of the expanded network is 530,000 by 2026, 730,000 by 2031, 880,000 by 2041 and 1,070,000 by 2051. New expansion will connect the old and new areas of the city. Cost will be split equally between the state and the Indian government.[59]

Phase IV Edit

Rezang La Chowk-Dwarka metro or Palam Vihar-Dwarka metro or Gurugram-IGI Airport metro extension of Delhi Airport Metro Express (Orange Line): ₹1678 crore 8.4 km (4.4 km in Haryana & 4 km in Delhi) route will have 7 stations, Palam Vihar, Choma, Sector 110A, Sector 111 (in Gurgaon), Dwarka Sector 28, IICC - Dwarka Sector 25 metro station (India International Convention and Expo Centre) IICC metro station and existing which also connects to Blue Line at Dwarka Sector 21 metro station). In october 2022, the DPR (detailed project report) was approved by the Haryana government and construction will commence in 2023, construction of IICC - Dwarka Sector 25 metro station to Dwarka Sector 21 metro station is already underway.[60][59]

See also Edit

References Edit

  1. ^ "Rapid Metro Gurgaon". www.delhimetrorail.com. from the original on 30 May 2022. Retrieved 28 October 2021.
  2. ^ Joel Joseph (4 May 2018). "Phase 2 adds only 15,000 daily riders to Rapid Metro". The Times of India. Gurugram. TNN. from the original on 18 September 2020. Retrieved 17 June 2018.
  3. ^ a b c d e "Gurgaon's own Metro". Hindustan Times. 15 July 2009. from the original on 18 March 2018. Retrieved 11 December 2016.
  4. ^ a b . Railway Gazette International. 30 June 2010. Archived from the original on 9 August 2011. Retrieved 22 July 2010.
  5. ^ a b . Archived from the original on 28 December 2014. Retrieved 28 December 2014.
  6. ^ a b Simon Crompton-Reid (18 November 2013). . Total Rail. Archived from the original on 28 December 2014. Retrieved 28 December 2014.
  7. ^ a b . Railway Gazette. 15 November 2013. Archived from the original on 28 December 2014. Retrieved 28 December 2014.
  8. ^ "Metro lines cover only 3% of Gurugram". The Times of India. from the original on 31 August 2019. Retrieved 3 September 2019.
  9. ^ "A very short history of the Underground". from the original on 27 March 2019. Retrieved 27 March 2019.
  10. ^ a b c Kumar, Kartik (31 March 2017). "After delays, affluent south Gurgaon hops on to Rapid Metro". Hindustan Times. from the original on 1 April 2017. Retrieved 31 July 2017.
  11. ^ Khare, Anushka (26 August 2019). "Gurgaon Rapid Metro is in trouble, may stop operations from September". Urban Transport News. from the original on 17 February 2023. Retrieved 27 September 2019.
  12. ^ Khare, Anushka (24 September 2019). . Urban Transport News. Archived from the original on 27 February 2020. Retrieved 27 September 2019.
  13. ^ "Second phase of Gurgaon's Rapid Metro thrown open". The Indian Express. 31 March 2017. from the original on 19 January 2019. Retrieved 19 January 2019.
  14. ^ Soni, Anusha (19 April 2014). "Mumbai Metro joins station branding ride". Business Standard India. from the original on 4 March 2020. Retrieved 3 January 2019 – via Business Standard.
  15. ^ "CAG raps HUDA over Gurgaon Rapid Metro contract - Times of India". The Times of India. from the original on 7 March 2017. Retrieved 3 March 2017.
  16. ^ a b c d . The Times of India. 16 July 2009. Archived from the original on 24 October 2012.
  17. ^ "From tomorrow, Gurgaon will finally have its Rapid Metro". Times of India. from the original on 12 November 2013. Retrieved 14 November 2013.
  18. ^ (PDF). Haryan Urban Development Authority, (HUDA). July 2008. Archived from the original (PDF) on 10 April 2009. Retrieved 17 July 2009.
  19. ^ DLF-led consortium sole bidder for Gurgaon metro project 31 March 2012 at the Wayback Machine Business Standard, 11 December 2008.
  20. ^ "First set of Rapid Metro Rail coaches arrive in Gurgaon from China". from the original on 8 June 2020. Retrieved 8 June 2020.
  21. ^ a b Soni, Surajeet Das Gupta & Anusha (25 November 2013). "Gurgaon Rapid Metro blazes a new trail". Business Standard India. from the original on 27 April 2016. Retrieved 11 December 2016.
  22. ^ . The Times of India. 1 October 2012. Archived from the original on 5 October 2012. Retrieved 28 September 2013.
  23. ^ Sharma, Ravi Teja. "IL&FS Transportation Networks sells 49% stake in Rapid MetroRail Gurgaon Ltd for Rs 509.9 crore". The Economic Times. from the original on 11 February 2017. Retrieved 10 February 2017.
  24. ^ TNN (1 October 2012). . The Times of India. Archived from the original on 5 October 2012. Retrieved 28 September 2013.
  25. ^ "Gurgaon Metro: Foundation laid, project to be completed by mid-2012". Indian Express. 12 August 2009. from the original on 18 September 2009. Retrieved 14 August 2009.
  26. ^ "Gurgaon Rapid Metro begins trial runs". Indian Express. 3 October 2012. Retrieved 28 September 2013.
  27. ^ "India's first rapid metro begins operations in Gurgaon". www.businesstoday.in. from the original on 23 June 2018. Retrieved 3 January 2019.
  28. ^ "Letter to BSE" (PDF). IL&FS. (PDF) from the original on 28 April 2016. Retrieved 11 December 2016.
  29. ^ Kumar, V Rishi (6 January 2014). "IL&FS wins Gurgaon metro project deal". The Hindu Business Line. Retrieved 11 December 2016.
  30. ^ "IL&FS Eng gets Rs 84 crore contract for Rapid Metro in Gurgaon - The Economic Times". The Economic Times. Retrieved 11 December 2016.
  31. ^ Kumar, Ashok (30 March 2017). "Rapid Metro to throw open Phase-II today". The Hindu. from the original on 26 February 2020. Retrieved 1 April 2017.
  32. ^ "Second phase of Gurgaon's Rapid Metro launched". Press Trust of India. 31 March 2017. from the original on 11 November 2017. Retrieved 1 April 2017.
  33. ^ "Rapid Metro begins trial runs". Indian Express. 3 October 2012. Retrieved 28 September 2013.
  34. ^ a b "Rapid Metro gets closer to Phase 2 start". The Times of India. from the original on 9 December 2016. Retrieved 11 December 2016.
  35. ^ "Rapid Metro Phase 2 to be ready by year-end, will miss September deadline". Hindustan Times. 2 June 2016. from the original on 17 March 2018. Retrieved 11 December 2016.
  36. ^ "April launch possible for Rapid Metro Phase-2 - Times of India". The Times of India. from the original on 28 March 2017. Retrieved 28 March 2017.
  37. ^ "After delays, affluent south Gurgaon hops on to Rapid Metro". Hindustan Times. 31 March 2017. from the original on 1 April 2017. Retrieved 1 April 2017.
  38. ^ "Gurugram Metro". MetroMap. August 2020. from the original on 19 August 2020. Retrieved 11 August 2020.
  39. ^ "Gurgaon Rapid Metro Rail Project". Railway-Technology.com. 15 June 2011. from the original on 25 September 2013. Retrieved 28 September 2013.
  40. ^ . Archived from the original on 15 October 2011. Retrieved 1 December 2011.
  41. ^ "Rapid MetroRail Gurgaon Newsletter 1" (PDF). rapidmetrogurgaon.com. (PDF) from the original on 8 April 2016. Retrieved 28 December 2014.
  42. ^ "Siemens Mobility to equip additional metro line in Delhi" (Press release). Siemens. 12 August 2009.
  43. ^ "First set of Rapid Metro Rail coaches arrive in Gurgaon from China". India Today. from the original on 29 March 2016. Retrieved 10 February 2017.
  44. ^ "Rapid Metro gets all seven new rakes for Phase-2 run - Times of India". The Times of India. from the original on 12 February 2017. Retrieved 10 February 2017.
  45. ^ "It's official, Rapid Metro in 6 months". Hindustan Times. 14 September 2012. Archived from the original on 25 January 2013. Retrieved 28 September 2013.
  46. ^ DVV Media Group GmbH. . Railway Gazette. Archived from the original on 12 August 2011. Retrieved 28 September 2013.
  47. ^ . Railway Gazette International. 23 April 2010. Archived from the original on 26 April 2010. Retrieved 23 April 2010.
  48. ^ Sharma, Shailaja (11 February 2016). "IL&FS Transportation sells 49% stake in Gurgaon's Rapid Metro". Livemint. from the original on 11 February 2017. Retrieved 10 February 2017.
  49. ^ "DMRC set to run Rapid Metro from February, its second rescue act of a private line - Times of India". The Times of India. from the original on 2 February 2019. Retrieved 4 February 2019.
  50. ^ "HMRTC likely to operate Gurugram rapid metro". 28 June 2019. from the original on 30 June 2019. Retrieved 30 June 2019.
  51. ^ Banerjee, Rumu (6 August 2012). "Delhi Metro to link up with Rapid Rail - The Economic Times". Economictimes.indiatimes.com. from the original on 11 March 2014. Retrieved 28 September 2013.
  52. ^ TNN 14 Sep 2012, 01.51AM IST (14 September 2012). . The Times of India. Archived from the original on 31 December 2013. Retrieved 28 September 2013.
  53. ^ "Technology". Rapid Metro Gurgaon. from the original on 9 February 2014. Retrieved 6 February 2014.
  54. ^ a b "Phase 2 adds only 15,000 daily riders to Rapid Metro". The Times of India. 4 May 2018. ISSN 0971-8257. Retrieved 31 July 2023.
  55. ^ . www.urbantransportnews.com. Archived from the original on 17 June 2020.
  56. ^ "Quick facts". unknown. from the original on 3 April 2016. Retrieved 8 June 2016.
  57. ^ "FAQs". Rapid Metro Gurgaon. from the original on 9 February 2014. Retrieved 6 February 2014.
  58. ^ "Rapid Metro: Rapid Metro: Security measures firmly in place | Gurgaon News - Times of India". The Times of India. 13 November 2013. from the original on 14 September 2021. Retrieved 14 September 2021.
  59. ^ a b c Joy after long wait as Gurgaon Metro gets central green light, Times of India, 8 Jun 8 2023.
  60. ^ Nod for Palam Vihar-Dwarka Metro route, to be linked with Delhi Metro 8 June 2023 at the Wayback Machine, Times of India, 20 Oct 2022.

External links Edit

Metro map

  • Official website of Rapid Metro Gurgaon Limited (RMGL)
  • See Metro Map data of Indian Metro

rapid, metro, gurgaon, some, this, article, listed, sources, reliable, please, help, this, article, looking, better, more, reliable, sources, unreliable, citations, challenged, deleted, september, 2019, learn, when, remove, this, template, message, light, metr. Some of this article s listed sources may not be reliable Please help this article by looking for better more reliable sources Unreliable citations may be challenged or deleted September 2019 Learn how and when to remove this template message Rapid Metro Gurgaon is a light metro 5 6 7 system serving the city of Gurgaon Haryana India 8 Rapid Metro connects the commercial areas of Gurgaon and acts as a feeder link to the Delhi Metro with an interchange with its Yellow Line at Sikanderpur metro station Rapid Metro GurgaonMetro in GurgaonOverviewOwnerHaryana Mass Rapid Transport Corporation Limited 1 LocaleGurgaon Haryana IndiaTransit typeLight rapid transitNumber of lines1Number of stations11Daily ridership50 000 55 000 2018 2 HeadquartersAmbience Corporate Towers Ambience Island NH 48 GurgaonOperationBegan operation14 November 2013 9 years ago 2013 11 14 Operator s DMRCCharacterFully elevated and grade separatedNumber of vehicles12Train length3 coachesHeadway4 minutesTechnicalSystem length12 85 km 7 98 mi No of tracks2 7 8 km 4 8 mi 1 3 7 km 2 3 mi 3 Track gauge1 435 mm 4 ft 8 1 2 in standard gauge 3 Electrification750 V DC via third rail 4 Average speed35 km h 22 mph Top speed80 km h 50 mph Route mapLegendCyber CityMoulsari AvenueBelvedere TowersPhase 3Phase 2Yellow LineSikanderpurPhase 1Sector 42 43Sector 53 54Sector 54 ChowkSector 55 56Built by Rapid Metro Gurgaon Limited RMGL the system was the world s first fully privately financed modern light metro system The venture did not have any investment from the Union Government Government of Haryana or any public sector undertaking However it was not the first fully privately financed rapid transit system as the Metropolitan Railway was privately financed 9 Originally planned to open in 2012 the first phase of the system opened on 14 November 2013 The second phase of the project began commercial operation on 31 March 2017 10 In September 2019 IL amp FS announced that it does not have the resources to continue running the Rapid Metro due to financial issues with the company and is looking for another entity to fund and takeover operations 11 After a short dispute with the Haryana government and a court ruling from the Punjab and Haryana High Court the Delhi Metro Rail Corporation took over the operation of the line from IL amp FS 12 Rapid Metro has a total length of 12 85 kilometres 7 98 mi serving 11 stations 13 The system is fully elevated using standard gauge tracks The trains are composed of three cars The power is supplied by 750 volt direct current through third rail Services operate daily between 06 05 and 22 00 running with a headway of four minutes The metro system was the first in India to auction naming rights for its stations 14 Platform No 1 towards Sector 55 56 Phase 2 Metro StationContents 1 History 1 1 Phase II 2 Route 2 1 Line 1 3 Infrastructure 3 1 Rolling stock 4 Operations 4 1 Operator 4 2 Ridership 4 3 Frequency 4 4 Safety 4 5 Security 5 Future plans 5 1 Phase III construction June 2023 April 2027 5 2 Phase IV 6 See also 7 References 8 External linksHistory EditA 3 2 km 2 0 mi metro line between Sikanderpur and National Highway 8 was originally proposed in September 2007 The Haryana Urban Development Authority HUDA invited expressions of interest to construct the metro line on built operate transfer basis with a 99 year lease in 2008 15 However real estate developer DLF wanted to provide metro connectivity to its Cyber City 16 17 A new tender was issued in July 2008 18 with the DLF IL amp FS consortium emerging as the only bidder 19 The project was initially conceived as a collaborative venture between Enso Group DLF and Infrastructure Leasing amp Financial Services IL amp FS 20 Rapid Metro is the first fully privately financed modern metro system in the world 21 Rapid Metro did not even get the 20 acres of land which it required to construct the first phase of the project at any concessional rate from the state 21 The Rapid Metro project was implemented as a public private partnership 22 The entire cost of the project was borne by the private party 23 The private party was also tasked with maintenance and operation of the metro at its own cost 24 While HUDA initially objected to a private company making profit from public transport an agreement was eventually reached for the consortium to pay HUDA 7 65 billion US 95 8 million over 35 years in connectivity charges as well as 5 10 of advertising and property development revenue 3 The contract for the 9 billion US 112 7 million project was awarded in July 2009 with completion scheduled in 30 months time 3 The foundation stone was laid on 11 August 2009 25 The line was built and is operated by Rapid Metro Gurgaon Limited RMGL The project was estimated to cost 10 88 billion US 136 3 million as of October 2012 26 Originally planned to open in 2012 the first phase of the system opened on 14 November 2013 27 Phase II Edit On 11 June 2013 IL amp FS Engineering and Construction Company Limited informed the Bombay Stock Exchange that it had been awarded a contract worth 266 5 crores to construct the elevated viaducts for Phase 2 of the project The company also stated that the project would be completed within 24 months 28 The company was later awarded a contract worth 84 3 crore to construct all 5 elevated stations in Phase II The project completion period was specified as 24 months 29 30 The southward extension is 6 6 km 4 1 mi long double track and will extend from Sikanderpur to Sector 55 and 56 in Gurgaon 31 It is estimated to cost 2 423 crore US 300 million 32 There are six stations on the extension and it will take around 20 minutes to travel the entire route Land for the project and right of way will be provided by HUDA 33 Trial runs were held on the first phase of the metro between Phase 2 and Phase 3 stations in October 2012 On the same day Chief Minister Bhupinder Singh laid the foundation stone for Phase 2 of the project citation needed Construction work on Phase 2 began in April 2013 and was given an initial deadline of July 2015 However the deadline was later revised to mid 2016 September 2016 and then the last quarter of 2016 34 By June 2016 75 of work on the Phase 2 was complete 35 Trial runs were conducted along the 6 3 km Phase 2 route between in December 2016 34 Rapid Metro authorities applied for inspection of phase II by the Commissioner of Metro Rail Safety in March 2017 36 The second phase of the system was opened to the public on 31 March 2017 37 Route Edit nbsp Rapid Metro Gurgaon transit diagramLine 1 Edit Line 1 was built in two phases 38 The first phase of the project covers a distance of 5 1 km 3 2 mi north of Sikanderpur The section between Sikanderpur and Phase 2 station is double tracked while the remaining stations are served by a single track loop The second phase is a 6 6 km 4 1 mi long southward extension from Sikanderpur to Sector 55 and 56 of Gurgaon and mostly runs through the affluent Golf Course Road 10 This section of a line opened on 31 March 2017 partially till Sector 53 54 The two remaining stations till Sector 55 56 opened on 25 April 2017 3 Platforms are 75m in length 39 10 Sikanderpur station offers an interchange with Delhi Metro via a 90m x 9m walkway 40 Line 1 Station Name Phase Opening Interchange Connenction Station Layout Depot Connection Depot LayoutEnglish Hindi1 Sector 55 56 स क टर ५५ ५६ 2 31 March 2017 None Elevated Rapid Metro Rail Depot Elevated2 Sector 54 Chowk स क टर ५४ च क 2 31 March 2017 None Elevated None None3 Sector 53 54 स क टर ५३ ५४ 2 25 April 2017 None Elevated None None4 Sector 42 43 स क टर ४२ ४३ 2 25 April 2017 None Elevated None None5 Phase 1 फ स १ 2 31 March 2017 None Elevated None None6 Sikanderpur स क दरप र 1 14 November 2013 Yellow Line Elevated None None7 Phase 2 फ स २ 1 14 November 2013 None Elevated None None8 Belvedere Towers ब ल व ड यर ट वर स 1 14 November 2013 None Elevated None None9 Cyber City स इबर स ट 1 7 May 2014 None Elevated None None10 Moulsari Avenue म लसर एव न य 1 14 November 2013 None Elevated None None11 Phase 3 फ स ३ 1 14 November 2013 None Elevated Rapid Metro Rail Depot ElevatedInfrastructure EditThe system is fully elevated and operated automatically 41 Because of the features several articles in railway magazines define the system as Light Metro 7 6 5 nbsp Gurgaon Metro trackRolling stock Edit On 21 April 2010 Siemens announced that it had been awarded a turnkey contract to build the metro line including five three car metro trains 42 Siemens sub contracted CRRC Zhuzhou Locomotive to build the 5 aluminium bodied air conditioned trains 4 The first three coach train set built in China arrived in Gurgaon on 11 September 2012 43 RMGL ordered an additional seven three car metro train sets for the second phase expansion of the metro The final 4 of these 7 rakes arrived in Gurgaon on 5 February 2016 44 Each train with three coaches costs 300 million US 3 8 million and is silver and blue in colour 45 The total length of a 3 coach train is 59 94 metres 196 ft 8 in The coaches are 2 8 metres 9 ft 2 in wide have roof mounted air conditioning and have 4 doors on each side of each coach Each train has a capacity of approximately 800 passengers 46 The metro is designed to carry 30 000 passengers per hour 47 Operations EditOperator Edit The line was built and is operated by Rapid Metro Gurgaon Limited RMGL founded as a joint venture between Enso group real estate developer DLF and IL amp FS DLF owns many properties near the stations while IL amp FS was the majority stake holder in the JV 16 DLF later sold its stake to IL amp FS and exited the joint venture Following the transaction IL amp FS Transportation Networks Ltd ITNL held 82 8 stake in RMGL and ITNL s subsidiary IL amp FS Rail Ltd IRL held 17 2 On 11 February 2016 ITNL announced that it had sold a 49 stake in RMGL for 509 9 crore US 64 million to its parent company Infrastructure Leasing amp Financial Services Ltd IL amp FS in an effort to reduce debt 48 49 50 The Rapid Metro charges are flat rate 20 25 US only in travelling at any stations of Phase 1 line amp Phase 2 line stations separately but travelling form Phase 1 line to Phase 2 line or vice versa the charges are 35 44 US 51 Delhi Metro tokens and smart cards are accepted on Rapid Metro 52 The automatic fare collection system is supplied by Thales Group 53 Ridership Edit Ridership of the Rapid Metro has been below expectations 54 Phase 1 was expected to bring 100 000 riders per day but only achieved 30 000 and even after the addition of Phase 2 daily ridership in 2018 hovered around the 50 000 mark 54 Urban Transport News has described the Rapid Metro as a failure due to its high cost low ridership and poor location 55 Frequency Edit Trains run from 06 05 to 22 00 56 Three coach trains operate at four minute intervals 16 Trains have a maximum speed of 80 km h 50 mph and operate at an average speed of 40 km h 25 mph 16 Safety Edit For the passengers safety there are Emergency Stop Plungers at every platform while the Blue Light Station feature enables passengers to contact the Control Room A Press to Talk Button inside the coaches enables commuters to talk directly to the driver in the event of any problem 57 Security Edit Security in the Rapid Metro is being handled by a private security agency The system has a dedicated Metro Police Station at Sikanderpur station while a Toll Free Helpline for all passengers is operational for 24 hours CCTV cameras are used to monitor trains and stations 58 Future plans EditPhase III construction June 2023 April 2027 Edit Cyber City to HUDA City Centre metro or Gurgaon loop metro or Gurgram loop metro In June 2023 Gurugram had 17 km metro network 11 7km rapid metro and 5 3 km yellow line metro On 7th June 2023 Union govt s cabinet approved additional 5452 crore 28 5 km long metro network with 27 new stations connecting the existing metro network at Cyber City metro station in the north and Huda City Centre in the south It includes 2 spurs 2 2 km spur from Basai to Dwarka Expressway Sector 102 and second spur from Sector 5 to Gurgaon railway station third spur phase iv has been approved as a separate project which will connect Rezang La Chowk in Palam Vihar to IGI Airport through Delhi Airport Metro Express Orange Line at existing IICC Dwarka Sector 25 metro station India International Convention and Expo Centre The new corridor will begin from the existing Cyber City metro station in the northeast run northwest to Palam Vihar spur to IICC Dwarka amp IGI Airport then southwest to Sector 5 spur to Gurugram railway station amp Sector 9 with a spur to Dwarka Expressway Sector 101 amp Basai village then run southeast via Udhyog Vihar 6 to Sector 48 amp Subhash Chowk then run north to the existing Cyber City metro station thus completing the loop Delhi Alwar RRTS will pass between the Sector 22 amp Udhyog Vihar 4 metro stations in the North and Udhyog Vihar 6 amp Hero Honda Chowk in the south Completion deadline is fy2026 27 59 The expected ridership of the expanded network is 530 000 by 2026 730 000 by 2031 880 000 by 2041 and 1 070 000 by 2051 New expansion will connect the old and new areas of the city Cost will be split equally between the state and the Indian government 59 Phase IV Edit Rezang La Chowk Dwarka metro or Palam Vihar Dwarka metro or Gurugram IGI Airport metro extension of Delhi Airport Metro Express Orange Line 1678 crore 8 4 km 4 4 km in Haryana amp 4 km in Delhi route will have 7 stations Palam Vihar Choma Sector 110A Sector 111 in Gurgaon Dwarka Sector 28 IICC Dwarka Sector 25 metro station India International Convention and Expo Centre IICC metro station and existing which also connects to Blue Line at Dwarka Sector 21 metro station In october 2022 the DPR detailed project report was approved by the Haryana government and construction will commence in 2023 construction of IICC Dwarka Sector 25 metro station to Dwarka Sector 21 metro station is already underway 60 59 See also EditUrban rail transit in India Delhi Metro Noida MetroReferences Edit Rapid Metro Gurgaon www delhimetrorail com Archived from the original on 30 May 2022 Retrieved 28 October 2021 Joel Joseph 4 May 2018 Phase 2 adds only 15 000 daily riders to Rapid Metro The Times of India Gurugram TNN Archived from the original on 18 September 2020 Retrieved 17 June 2018 a b c d e Gurgaon s own Metro Hindustan Times 15 July 2009 Archived from the original on 18 March 2018 Retrieved 11 December 2016 a b CSR Zhuzhou to supply Gurgaon trains Railway Gazette International 30 June 2010 Archived from the original on 9 August 2011 Retrieved 22 July 2010 a b Gurgaon automated metro Archived from the original on 28 December 2014 Retrieved 28 December 2014 a b Simon Crompton Reid 18 November 2013 Rapid MetroRail Gurgaon launched Total Rail Archived from the original on 28 December 2014 Retrieved 28 December 2014 a b Rapid MetroRail Gurgaon opens Railway Gazette 15 November 2013 Archived from the original on 28 December 2014 Retrieved 28 December 2014 Metro lines cover only 3 of Gurugram The Times of India Archived from the original on 31 August 2019 Retrieved 3 September 2019 A very short history of the Underground Archived from the original on 27 March 2019 Retrieved 27 March 2019 a b c Kumar Kartik 31 March 2017 After delays affluent south Gurgaon hops on to Rapid Metro Hindustan Times Archived from the original on 1 April 2017 Retrieved 31 July 2017 Khare Anushka 26 August 2019 Gurgaon Rapid Metro is in trouble may stop operations from September Urban Transport News Archived from the original on 17 February 2023 Retrieved 27 September 2019 Khare Anushka 24 September 2019 Delhi Metro starts taking over process of Gurgaon Rapid Metro from IL amp FS Urban Transport News Archived from the original on 27 February 2020 Retrieved 27 September 2019 Second phase of Gurgaon s Rapid Metro thrown open The Indian Express 31 March 2017 Archived from the original on 19 January 2019 Retrieved 19 January 2019 Soni Anusha 19 April 2014 Mumbai Metro joins station branding ride Business Standard India Archived from the original on 4 March 2020 Retrieved 3 January 2019 via Business Standard CAG raps HUDA over Gurgaon Rapid Metro contract Times of India The Times of India Archived from the original on 7 March 2017 Retrieved 3 March 2017 a b c d Gurgaon metro link to be completed in 30 months The Times of India 16 July 2009 Archived from the original on 24 October 2012 From tomorrow Gurgaon will finally have its Rapid Metro Times of India Archived from the original on 12 November 2013 Retrieved 14 November 2013 Development of Metro Link PDF Haryan Urban Development Authority HUDA July 2008 Archived from the original PDF on 10 April 2009 Retrieved 17 July 2009 DLF led consortium sole bidder for Gurgaon metro project Archived 31 March 2012 at the Wayback Machine Business Standard 11 December 2008 First set of Rapid Metro Rail coaches arrive in Gurgaon from China Archived from the original on 8 June 2020 Retrieved 8 June 2020 a b Soni Surajeet Das Gupta amp Anusha 25 November 2013 Gurgaon Rapid Metro blazes a new trail Business Standard India Archived from the original on 27 April 2016 Retrieved 11 December 2016 CM nod to phase II of Rapid Metro Rail project The Times of India 1 October 2012 Archived from the original on 5 October 2012 Retrieved 28 September 2013 Sharma Ravi Teja IL amp FS Transportation Networks sells 49 stake in Rapid MetroRail Gurgaon Ltd for Rs 509 9 crore The Economic Times Archived from the original on 11 February 2017 Retrieved 10 February 2017 TNN 1 October 2012 CM nod to phase II of Rapid Metro Rail project The Times of India Archived from the original on 5 October 2012 Retrieved 28 September 2013 Gurgaon Metro Foundation laid project to be completed by mid 2012 Indian Express 12 August 2009 Archived from the original on 18 September 2009 Retrieved 14 August 2009 Gurgaon Rapid Metro begins trial runs Indian Express 3 October 2012 Retrieved 28 September 2013 India s first rapid metro begins operations in Gurgaon www businesstoday in Archived from the original on 23 June 2018 Retrieved 3 January 2019 Letter to BSE PDF IL amp FS Archived PDF from the original on 28 April 2016 Retrieved 11 December 2016 Kumar V Rishi 6 January 2014 IL amp FS wins Gurgaon metro project deal The Hindu Business Line Retrieved 11 December 2016 IL amp FS Eng gets Rs 84 crore contract for Rapid Metro in Gurgaon The Economic Times The Economic Times Retrieved 11 December 2016 Kumar Ashok 30 March 2017 Rapid Metro to throw open Phase II today The Hindu Archived from the original on 26 February 2020 Retrieved 1 April 2017 Second phase of Gurgaon s Rapid Metro launched Press Trust of India 31 March 2017 Archived from the original on 11 November 2017 Retrieved 1 April 2017 Rapid Metro begins trial runs Indian Express 3 October 2012 Retrieved 28 September 2013 a b Rapid Metro gets closer to Phase 2 start The Times of India Archived from the original on 9 December 2016 Retrieved 11 December 2016 Rapid Metro Phase 2 to be ready by year end will miss September deadline Hindustan Times 2 June 2016 Archived from the original on 17 March 2018 Retrieved 11 December 2016 April launch possible for Rapid Metro Phase 2 Times of India The Times of India Archived from the original on 28 March 2017 Retrieved 28 March 2017 After delays affluent south Gurgaon hops on to Rapid Metro Hindustan Times 31 March 2017 Archived from the original on 1 April 2017 Retrieved 1 April 2017 Gurugram Metro MetroMap August 2020 Archived from the original on 19 August 2020 Retrieved 11 August 2020 Gurgaon Rapid Metro Rail Project Railway Technology com 15 June 2011 Archived from the original on 25 September 2013 Retrieved 28 September 2013 About Us Archived from the original on 15 October 2011 Retrieved 1 December 2011 Rapid MetroRail Gurgaon Newsletter 1 PDF rapidmetrogurgaon com Archived PDF from the original on 8 April 2016 Retrieved 28 December 2014 Siemens Mobility to equip additional metro line in Delhi Press release Siemens 12 August 2009 First set of Rapid Metro Rail coaches arrive in Gurgaon from China India Today Archived from the original on 29 March 2016 Retrieved 10 February 2017 Rapid Metro gets all seven new rakes for Phase 2 run Times of India The Times of India Archived from the original on 12 February 2017 Retrieved 10 February 2017 It s official Rapid Metro in 6 months Hindustan Times 14 September 2012 Archived from the original on 25 January 2013 Retrieved 28 September 2013 DVV Media Group GmbH CSR Zhuzhou to supply Gurgaon trains Railway Gazette Archived from the original on 12 August 2011 Retrieved 28 September 2013 Gurgaon metro turnkey contract awarded Railway Gazette International 23 April 2010 Archived from the original on 26 April 2010 Retrieved 23 April 2010 Sharma Shailaja 11 February 2016 IL amp FS Transportation sells 49 stake in Gurgaon s Rapid Metro Livemint Archived from the original on 11 February 2017 Retrieved 10 February 2017 DMRC set to run Rapid Metro from February its second rescue act of a private line Times of India The Times of India Archived from the original on 2 February 2019 Retrieved 4 February 2019 HMRTC likely to operate Gurugram rapid metro 28 June 2019 Archived from the original on 30 June 2019 Retrieved 30 June 2019 Banerjee Rumu 6 August 2012 Delhi Metro to link up with Rapid Rail The Economic Times Economictimes indiatimes com Archived from the original on 11 March 2014 Retrieved 28 September 2013 TNN 14 Sep 2012 01 51AM IST 14 September 2012 Gurgaon rapid Metro ready for trials The Times of India Archived from the original on 31 December 2013 Retrieved 28 September 2013 Technology Rapid Metro Gurgaon Archived from the original on 9 February 2014 Retrieved 6 February 2014 a b Phase 2 adds only 15 000 daily riders to Rapid Metro The Times of India 4 May 2018 ISSN 0971 8257 Retrieved 31 July 2023 High cost low ridership location ensured failure of Gurgaon Rapid Metro www urbantransportnews com Archived from the original on 17 June 2020 Quick facts unknown Archived from the original on 3 April 2016 Retrieved 8 June 2016 FAQs Rapid Metro Gurgaon Archived from the original on 9 February 2014 Retrieved 6 February 2014 Rapid Metro Rapid Metro Security measures firmly in place Gurgaon News Times of India The Times of India 13 November 2013 Archived from the original on 14 September 2021 Retrieved 14 September 2021 a b c Joy after long wait as Gurgaon Metro gets central green light Times of India 8 Jun 8 2023 Nod for Palam Vihar Dwarka Metro route to be linked with Delhi Metro Archived 8 June 2023 at the Wayback Machine Times of India 20 Oct 2022 External links Edit nbsp Wikimedia Commons has media related to Rapid Metro Gurgaon Metro map Official website of Rapid Metro Gurgaon Limited RMGL See Metro Map data of Indian Metro Retrieved from https en wikipedia org w index php title Rapid Metro Gurgaon amp oldid 1172490840, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.