Line 3 of the Hangzhou Metro (simplified Chinese: 杭州地铁三号线; traditional Chinese: 杭州地鐵三號線; pinyin: Hángzhōu Dìtiě Sānhào Xiàn) is a metro line in Hangzhou.[3][4] The line is 57.5 km long.[2] It will run in a southwest-northeast direction between Wushanqiancun station in Yuhang District and Xingqiao station[1] in Linping District in the east, passing through downtown Hangzhou and providing transfers with multiple other lines in the system. The line uses 6-car Type AH rolling stock, which is designed for exclusive use in Hangzhou.[5]

Line 3
 3 
Overview
StatusIn operation
OwnerCity of Hangzhou
LocaleHangzhou, Zhejiang, China
Termini
Stations39[2]
Service
TypeRapid transit
SystemHangzhou Metro
Services1
Operator(s)Hangzhou Metro Corporation
Depot(s)Xingqiao Depot
Xiaoheshan Stabling Yard
Cangqian Depot
Rolling stock6 cars, type AH
History
OpenedFebruary 21, 2022; 22 months ago (2022-02-21)
Technical
Line length57.5 km (35.73 mi)[2]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead, 1500 V DC
Operating speed80 km/h (50 mph)
Route map

Cangqian Stabling Yard
1
Wushanqiancun
2
Tangjiacun
Tiaoxi
3
West Railway Station
 19 
4
North Longzhou Road
5
West Wenyi Road
East Nanhu
6
Lvting Road
 5   16 
7
Chuangming Road
8
Quanfeng
9
Gaojiao Road
10
Liansheng Road
11
Hongyuan
district
b1
Shima
b2
Xiaoheshan
Xiaoheshan Stabling Yard
b3
Pingfeng
b4
Liuxia
12
South Xixi Wetland
13
Huawu
14
Dongyue
15
Gudun Road
16
Gudang Xincun
17
Gudang
 Zhejiang University – Yisheng Road 
18
Huanglong Sports Center
 10 
19
Huanglong Cave
20
Wulinmen
 2 
 Chaoyang – Liangzhu 
district
21
Wulin Square
 1 
Line 1 interconnection
22
West Lake Cultural Square
 1   19 
 Yongsheng Road – Tiaoxi 
23
Chaowang Road
24
Xiangji Temple
25
Daguan
26
Shanxian
 5 
 Guniangqiao – East Nanhu 
Line 5 interconnection
27
Xintiandi Street
 4 
28
Qilun Square
29
Huafeng Road
district
30
Tongxie Road
31
Taohuahu Park
32
Dingqiao
Xingqiao Depot
33
Huahe Street
district
34
Huangheshan
35
Xingqiao

Opening timeline edit

The initial section of the line, from Xingqiao to Chaowang Road was opened to public on 21 February 2022,[6][7] and the remaining section from Chaowang Road to West Wenyi Road and the branch from South Xixi Wetland to Shima was opened on 10 June 2022.[8] The Northern extension from West Wenyi Road to Wushanqiancun was opened on 22 September 2022.[9]

Segment Commencement Length Station(s) Name
Chaowang RoadXingqiao 21 February 2022 21 km (13.05 mi) 13 Phase 1 initial section[6]
West Wenyi Road — Chaowang Road 10 June 2022 22.41 km (13.92 mi) 16 Phase 1 remaining section[8]
Shima — South Xixi Wetland 7.8 km (4.85 mi) 4
Wulinmen 20 July 2022 infill station 1 Phase 1 remaining section[8]
Wushanqiancun — West Wenyi Road 22 September 2022 4.7 km (2.92 mi)[10] 3 Phase 1 adjustment section[11]

Service routes edit

  • Wushanqiancun — Xingqiao
  • Shima — Xingqiao

Stations edit

 
Line 3 drawn to scale.
Legend

  - Operational
  - Under construction

Service
routes
Station name Connections Distance
km
Location Opening Date
English[12] Chinese[1]
Shima 石马 10.71 Xihu 10 June 2022
Xiaoheshan 小和山 1.25 11.96
Pingfeng 屏峰 2.00 13.96
Liuxia 留下 2.75 16.71
Wushanqiancun 吴山前村 0.00 0.00 Yuhang 22 September 2022
Tangjiacun 汤家村 Unopened
West Railway Station 火车西站  19  22 September 2022
North Longzhou Road[13] 龙舟北路
West Wenyi Road 文一西路 7.20 10 June 2022
Lvting Road 绿汀路  5   16  2.24 9.44
Chuangming Road 创明路 1.27 10.71 Unopened
Quanfeng 全丰 2.04 12.75 10 June 2022
Gaojiao Road 高教路 1.41 14.16
Liansheng Road 联胜路 1.50 15.66
Hongyuan 洪园 1.62 17.28
South Xixi Wetland 西溪湿地南 1.23 18.51 Xihu
Huawu 花坞 1.66 20.17
Dongyue 东岳 1.68 21.85
Gudun Road 古墩路 0.83 22.68
Gudang Xincun 古荡新村 1.20 23.88
Gudang 古荡 0.94 24.82
Huanglong Sports Center 黄龙体育中心  10  0.93 25.75
Huanglong Cave 黄龙洞 1.23 26.98
Wulinmen 武林门  2  1.42 28.40 20 July 2022
Wulin Square 武林广场  1  1.14 29.54 Gongshu 10 June 2022
West Lake Cultural Square 西湖文化广场  1   19  0.84 30.38
Chaowang Road 潮王路 1.26 31.64 Gongshu 21 February 2022
Xiangji Temple 香积寺 1.61 33.25
Daguan 大关 1.04 34.29
Shanxian 善贤  5  1.50 35.79
Xintiandi Street 新天地街  4  2.02 37.81
Qilun Square 汽轮广场 2.04 39.85
Huafeng Road 华丰路 1.70 41.55
Tongxie Road 同协路 1.22 42.77 Shangcheng
Taohuahu Park 桃花湖公园 1.37 44.14
Dingqiao 丁桥 1.28 45.42
Huahe Street 华鹤街 2.11 47.53
Huangheshan 黄鹤山 1.32 48.85 Linping
Xingqiao 星桥 1.84 50.69

See also edit

References edit

  1. ^ a b c d "杭州市人民政府关于杭州地铁3号线一期工程车站站名及地铁5号线"香积寺路站"更名的批复".
  2. ^ a b c "杭州地铁3号线最新进展:一期工程香积寺路站主体结构封顶 全线预计2021年年底建成". 2019-10-30.
  3. ^ "杭州地铁3号线一期年底开工". ZJNews. 14 July 2017.
  4. ^ "工可报告通过评审 地铁3号线一期"上马在即" 预计今年开工,力争亚运会前建成". Hangzhou Daily. 2 March 2017.
  5. ^ . www.zjdpc.gov.cn. Archived from the original on 2018-02-10. Retrieved 2019-02-08.
  6. ^ a b "开通400+ 今天上午11点,杭州地铁3、4、10号线,三线齐开". Archived from the original on 2022-06-08.
  7. ^ "杭州亚运会倒计时200天:杭州地铁"三线齐开"-中新网". www.chinanews.com.cn. Retrieved 2022-09-21.
  8. ^ a b c "6月10日上午10点,3号线后通段上线!". Archived from the original on 2022-06-08.
  9. ^ "明日14时,杭州地铁19号线开通运营!3号线北延段、10号线黄龙体育中心站同步开通-杭州新闻中心-杭州网". hznews.hangzhou.com.cn. Retrieved 2022-09-21.
  10. ^ "多条轨道交通快速推进!杭州地铁10号线计划年底通车!". 3号线北延段长约4.7公里,设站4座
  11. ^ . 杭州地铁. Archived from the original on 2020-01-19. Retrieved 2019-11-01.
  12. ^ "Photo of official map".
  13. ^ . 2022-06-16. Archived from the original on 2022-06-16.


line, hangzhou, metro, line, hangzhou, metro, simplified, chinese, 杭州地铁三号线, traditional, chinese, 杭州地鐵三號線, pinyin, hángzhōu, dìtiě, sānhào, xiàn, metro, line, hangzhou, line, long, will, southwest, northeast, direction, between, wushanqiancun, station, yuhang,. Line 3 of the Hangzhou Metro simplified Chinese 杭州地铁三号线 traditional Chinese 杭州地鐵三號線 pinyin Hangzhōu Ditie Sanhao Xian is a metro line in Hangzhou 3 4 The line is 57 5 km long 2 It will run in a southwest northeast direction between Wushanqiancun station in Yuhang District and Xingqiao station 1 in Linping District in the east passing through downtown Hangzhou and providing transfers with multiple other lines in the system The line uses 6 car Type AH rolling stock which is designed for exclusive use in Hangzhou 5 Line 3 3 OverviewStatusIn operationOwnerCity of HangzhouLocaleHangzhou Zhejiang ChinaTerminiXingqiao 1 Wushanqiancun Shima 1 Stations39 2 ServiceTypeRapid transitSystemHangzhou MetroServices1Operator s Hangzhou Metro CorporationDepot s Xingqiao DepotXiaoheshan Stabling YardCangqian DepotRolling stock6 cars type AHHistoryOpenedFebruary 21 2022 22 months ago 2022 02 21 TechnicalLine length57 5 km 35 73 mi 2 Number of tracks2CharacterUndergroundTrack gauge1 435 mm 4 ft 8 1 2 in ElectrificationOverhead 1500 V DCOperating speed80 km h 50 mph Route mapLegendCangqian Stabling Yard1 Wushanqiancun2 TangjiacunTiaoxiHangzhou Wenzhou HSRHuzhou Hangzhou HSR3 West Railway Station 19 Yongsheng Road4 North Longzhou Road5 West Wenyi RoadEast NanhuLine 16 Jiuzhou Street6 Lvting Road 5 16 Guniangqiao7 Chuangming Road8 Quanfeng9 Gaojiao Road10 Liansheng Road11 Hongyuandistrict YuhangXihub1 Shimab2 XiaoheshanXiaoheshan Stabling Yardb3 Pingfengb4 Liuxia12 South Xixi Wetland13 Huawu14 Dongyue15 Gudun Road16 Gudang Xincun17 Gudang Zhejiang University Yisheng Road 18 Huanglong Sports Center 10 19 Huanglong Cave20 Wulinmen 2 Chaoyang Liangzhu district XihuGongshu Xianghu21 Wulin Square 1 Beijing Hangzhou Grand CanalLine 1 interconnection22 West Lake Cultural Square 1 19 Yongsheng Road Tiaoxi Xiaoshan International Airport23 Chaowang Road24 Xiangji Temple25 Daguan26 Shanxian 5 Guniangqiao East Nanhu Line 5 interconnectionChihua Street27 Xintiandi Street 4 Xuancheng Hangzhou railway crossingNanjing Hangzhou HSR crossingPuyan28 Qilun Square29 Huafeng Roaddistrict GongshuShangcheng30 Tongxie Road31 Taohuahu Park32 DingqiaoXingqiao Depot33 Huahe Streetdistrict ShangchengLinping34 Huangheshan35 XingqiaoThis diagram viewtalkedit Contents 1 Opening timeline 2 Service routes 3 Stations 4 See also 5 ReferencesOpening timeline editThe initial section of the line from Xingqiao to Chaowang Road was opened to public on 21 February 2022 6 7 and the remaining section from Chaowang Road to West Wenyi Road and the branch from South Xixi Wetland to Shima was opened on 10 June 2022 8 The Northern extension from West Wenyi Road to Wushanqiancun was opened on 22 September 2022 9 Segment Commencement Length Station s NameChaowang Road Xingqiao 21 February 2022 21 km 13 05 mi 13 Phase 1 initial section 6 West Wenyi Road Chaowang Road 10 June 2022 22 41 km 13 92 mi 16 Phase 1 remaining section 8 Shima South Xixi Wetland 7 8 km 4 85 mi 4Wulinmen 20 July 2022 infill station 1 Phase 1 remaining section 8 Wushanqiancun West Wenyi Road 22 September 2022 4 7 km 2 92 mi 10 3 Phase 1 adjustment section 11 Service routes editWushanqiancun Xingqiao Shima XingqiaoStations edit nbsp Line 3 drawn to scale Legend Operational Under construction Serviceroutes Station name Connections Distancekm Location Opening DateEnglish 12 Chinese 1 Shima 石马 10 71 Xihu 10 June 2022 Xiaoheshan 小和山 1 25 11 96 Pingfeng 屏峰 2 00 13 96 Liuxia 留下 2 75 16 71 Wushanqiancun 吴山前村 0 00 0 00 Yuhang 22 September 2022 Tangjiacun 汤家村 Unopened West Railway Station 火车西站 19 22 September 2022 North Longzhou Road 13 龙舟北路 West Wenyi Road 文一西路 7 20 10 June 2022 Lvting Road 绿汀路 5 16 2 24 9 44 Chuangming Road 创明路 1 27 10 71 Unopened Quanfeng 全丰 2 04 12 75 10 June 2022 Gaojiao Road 高教路 1 41 14 16 Liansheng Road 联胜路 1 50 15 66 Hongyuan 洪园 1 62 17 28 South Xixi Wetland 西溪湿地南 1 23 18 51 Xihu Huawu 花坞 1 66 20 17 Dongyue 东岳 1 68 21 85 Gudun Road 古墩路 0 83 22 68 Gudang Xincun 古荡新村 1 20 23 88 Gudang 古荡 0 94 24 82 Huanglong Sports Center 黄龙体育中心 10 0 93 25 75 Huanglong Cave 黄龙洞 1 23 26 98 Wulinmen 武林门 2 1 42 28 40 20 July 2022 Wulin Square 武林广场 1 1 14 29 54 Gongshu 10 June 2022 West Lake Cultural Square 西湖文化广场 1 19 0 84 30 38 Chaowang Road 潮王路 1 26 31 64 Gongshu 21 February 2022 Xiangji Temple 香积寺 1 61 33 25 Daguan 大关 1 04 34 29 Shanxian 善贤 5 1 50 35 79 Xintiandi Street 新天地街 4 2 02 37 81 Qilun Square 汽轮广场 2 04 39 85 Huafeng Road 华丰路 1 70 41 55 Tongxie Road 同协路 1 22 42 77 Shangcheng Taohuahu Park 桃花湖公园 1 37 44 14 Dingqiao 丁桥 1 28 45 42 Huahe Street 华鹤街 2 11 47 53 Huangheshan 黄鹤山 1 32 48 85 Linping Xingqiao 星桥 1 84 50 69See also edit nbsp Hangzhou MetroReferences edit a b c d 杭州市人民政府关于杭州地铁3号线一期工程车站站名及地铁5号线 香积寺路站 更名的批复 a b c 杭州地铁3号线最新进展 一期工程香积寺路站主体结构封顶 全线预计2021年年底建成 2019 10 30 杭州地铁3号线一期年底开工 ZJNews 14 July 2017 工可报告通过评审 地铁3号线一期 上马在即 预计今年开工 力争亚运会前建成 Hangzhou Daily 2 March 2017 省发展改革委关于杭州地铁3号线一期工程初步设计的批复 www zjdpc gov cn Archived from the original on 2018 02 10 Retrieved 2019 02 08 a b 开通400 今天上午11点 杭州地铁3 4 10号线 三线齐开 Archived from the original on 2022 06 08 杭州亚运会倒计时200天 杭州地铁 三线齐开 中新网 www chinanews com cn Retrieved 2022 09 21 a b c 6月10日上午10点 3号线后通段上线 Archived from the original on 2022 06 08 明日14时 杭州地铁19号线开通运营 3号线北延段 10号线黄龙体育中心站同步开通 杭州新闻中心 杭州网 hznews hangzhou com cn Retrieved 2022 09 21 多条轨道交通快速推进 杭州地铁10号线计划年底通车 3号线北延段长约4 7公里 设站4座 杭州地铁3号线一期工程调整环境影响评价信息公示 杭州地铁 Archived from the original on 2020 01 19 Retrieved 2019 11 01 Photo of official map 杭州市人民政府关于杭州机场轨道快线工程 地铁3号线一期工程及5号线二期工程车站站名的批复 2022 06 16 Archived from the original on 2022 06 16 nbsp Wikimedia Commons has media related to Line 3 Hangzhou Metro nbsp This China related article is a stub You can help Wikipedia by expanding it vte Retrieved from https en wikipedia org w index php title Line 3 Hangzhou Metro amp oldid 1174529112 Stations, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.