fbpx
Wikipedia

Pune–Nashik rail line

The Pune–Nasik railway line is a proposed higher speed railway between the cities of Pune and Nashik.[1] The project will allow trains to cover the 235.5 km route in around two hours at speeds of up to 200 km/h, including future-proofing for 250 km/h.[2]

Pune–Nasik railway line
Overview
Status
  • Survey – done
  • Feasibility Report – Done
  • Submission to Planning Commission for appraisal – Done
  • Approval by Planning Commission – Yes
  • Land Acquisition – Started
  • Construction – No
LocaleMaharashtra, India
Termini
Stations20 (proposed)
Websitehttps://www.maharail.com/project-pune_nashik.php
History
Planned opening2027
Technical
Line length231 km (144 mi)
Track length231 km (144 mi)
Track gauge1,676 mm (5 ft 6 in)

Once completed this will link two of the most important industrial cities of India and thus will complete Maharashtra's industrial triangle (Mumbai, Pune and Nashik) link by rail. This will also benefit growth of trade and commerce in both cities and also will help growth of rural industries on the route. This link will also benefit some spiritual destinations like Bhimashankar Jyotirlinga, Ashatavinayak at Ojhar and Lenyadri and Pabal Jain temple. The new industrial zone at Chakan, Rajgurunagar and Sinnar area will get a rail connectivity by this project.[3] for this railway line recently notice for land acquisition in khed tahsil has been published by khed subdivision officer namely vikrant chavan and fixed limitations of 15 days to raise objection regarding rate and other issues

It will be funded from a mixture of stat government and private investor money.[4]

Route edit

Old Plan

The total length of this route initially was 265 km out of which 34 km between Pune Junction and Talegaon is already existing and 32 km between Nasik Road and Sinnar (Gulwanch) was under land acquiring process. The Nasik road to Sinnar/Gulwanch section requires land from ten villages Eklahare, Hinganwedhe and Jakori in Nashik, Jogaltembi, Nayangaon, Dashwandi, Patpimri, Baragaon Pimpri and Gulwanch in Sinnar Taluka and Pimpalgaon-Nipani in Niphad Taluka.[5] Due to the length of route this plan was scrapped. (265 km by rail compared to 202 km by road between Pune and Nashik road)

New plan

However this route was revised and now will be 231 km instead of old 265 km. The new route will divert from Manjari (11 km from Pune Junction) instead of old diversion from Talegaon. There will be total of 24 stations out of which 8 are major and 16 minor. The route will also include 18 tunnels. As of 2023, the project is on hold due to several issues, including shortage of funds. There will be major stations at Chakan, Rajgurunagar, Manchar, Narayangaon, Ale Phata, Sangamner, Sinnar and Satpur. This will be a double track project supporting speed of 200 - 250 kmhr. Operation speed will be restricted to 140 kmhr and is expected to reduce journey time to 2 hours.

Third Plan

According new plan by Maharashtra Deputy CM Devendra Fadnavis new alignment will go via Shirdi. This will benefit pilgrims from Pune and Nashik going to Shirdi. This plan will increase distance of 235 km by 30 km to 265 km. [6]

Rolling stock edit

The depot for the rolling stock of the new line will be at Nasik Road, and will be operated by 6 electric multiple unit trainsets. These multiple units will each be 6 coaches long, and will have the capacity for 450 passengers, and will be fully electric, running on 25kV AC supplied by overhead cable. Eight runs daily between Pune and Nashik will be scheduled for each consist. The line's signalling will be ETCS Level 2 cab signalling, likely with a lineside backup. Cab signalling will allow for trains to operate at higher speeds than conventional signalling permits, due to info about the line being transmitted directly into the train cab, rather than relying on lineside signals to determine whether the line is clear or not, which train drivers can struggle to interpret at speed.

References edit

  1. ^ Sengupta, Joy (2 March 2017). "Pune-Nashik rail line survey to end soon - Times of India". The Times of India.
  2. ^ "MAHARAIL - Maharashtra Rail Infrastructure Development Corporation Limited". www.maharail.com. Retrieved 23 June 2020.
  3. ^ Railways gives go-ahead to Pune-Nashik route
  4. ^ "Pune - Nashik Semi High Speed Rail – Information, Route Map, Fares, Tenders & Updates". The Metro Rail Guy. Retrieved 23 June 2020.
  5. ^ MIDC plans to acquire land for Sinnar-Eklahare railway line project by Jan
  6. ^ Nashik-Pune rail route now via Shirdi: Dy CM

External links edit

  • Finally, Central Railway to carry out survey for new Pune-Nashik line
  • Pune-Nashik road semi highspeed rail project (Maharail)
  • Pune - Nasik semi-high speed rail
  • Shirdi Included in New Route for Nashik-Pune Semi High-Speed Rail Project, Says Deputy Chief Minister

pune, nashik, rail, line, this, article, includes, list, general, references, lacks, sufficient, corresponding, inline, citations, please, help, improve, this, article, introducing, more, precise, citations, 2023, learn, when, remove, this, template, message, . This article includes a list of general references but it lacks sufficient corresponding inline citations Please help to improve this article by introducing more precise citations May 2023 Learn how and when to remove this template message The Pune Nasik railway line is a proposed higher speed railway between the cities of Pune and Nashik 1 The project will allow trains to cover the 235 5 km route in around two hours at speeds of up to 200 km h including future proofing for 250 km h 2 Pune Nasik railway lineOverviewStatusSurvey done Feasibility Report Done Submission to Planning Commission for appraisal Done Approval by Planning Commission Yes Land Acquisition Started Construction NoLocaleMaharashtra IndiaTerminiPuneNasik RoadStations20 proposed Websitehttps www maharail com project pune nashik phpHistoryPlanned opening2027TechnicalLine length231 km 144 mi Track length231 km 144 mi Track gauge1 676 mm 5 ft 6 in Once completed this will link two of the most important industrial cities of India and thus will complete Maharashtra s industrial triangle Mumbai Pune and Nashik link by rail This will also benefit growth of trade and commerce in both cities and also will help growth of rural industries on the route This link will also benefit some spiritual destinations like Bhimashankar Jyotirlinga Ashatavinayak at Ojhar and Lenyadri and Pabal Jain temple The new industrial zone at Chakan Rajgurunagar and Sinnar area will get a rail connectivity by this project 3 for this railway line recently notice for land acquisition in khed tahsil has been published by khed subdivision officer namely vikrant chavan and fixed limitations of 15 days to raise objection regarding rate and other issuesIt will be funded from a mixture of stat government and private investor money 4 Contents 1 Route 2 Rolling stock 3 References 4 External linksRoute editOld PlanThe total length of this route initially was 265 km out of which 34 km between Pune Junction and Talegaon is already existing and 32 km between Nasik Road and Sinnar Gulwanch was under land acquiring process The Nasik road to Sinnar Gulwanch section requires land from ten villages Eklahare Hinganwedhe and Jakori in Nashik Jogaltembi Nayangaon Dashwandi Patpimri Baragaon Pimpri and Gulwanch in Sinnar Taluka and Pimpalgaon Nipani in Niphad Taluka 5 Due to the length of route this plan was scrapped 265 km by rail compared to 202 km by road between Pune and Nashik road New planHowever this route was revised and now will be 231 km instead of old 265 km The new route will divert from Manjari 11 km from Pune Junction instead of old diversion from Talegaon There will be total of 24 stations out of which 8 are major and 16 minor The route will also include 18 tunnels As of 2023 the project is on hold due to several issues including shortage of funds There will be major stations at Chakan Rajgurunagar Manchar Narayangaon Ale Phata Sangamner Sinnar and Satpur This will be a double track project supporting speed of 200 250 kmhr Operation speed will be restricted to 140 kmhr and is expected to reduce journey time to 2 hours Third PlanAccording new plan by Maharashtra Deputy CM Devendra Fadnavis new alignment will go via Shirdi This will benefit pilgrims from Pune and Nashik going to Shirdi This plan will increase distance of 235 km by 30 km to 265 km 6 Rolling stock editThe depot for the rolling stock of the new line will be at Nasik Road and will be operated by 6 electric multiple unit trainsets These multiple units will each be 6 coaches long and will have the capacity for 450 passengers and will be fully electric running on 25kV AC supplied by overhead cable Eight runs daily between Pune and Nashik will be scheduled for each consist The line s signalling will be ETCS Level 2 cab signalling likely with a lineside backup Cab signalling will allow for trains to operate at higher speeds than conventional signalling permits due to info about the line being transmitted directly into the train cab rather than relying on lineside signals to determine whether the line is clear or not which train drivers can struggle to interpret at speed References edit Sengupta Joy 2 March 2017 Pune Nashik rail line survey to end soon Times of India The Times of India MAHARAIL Maharashtra Rail Infrastructure Development Corporation Limited www maharail com Retrieved 23 June 2020 Railways gives go ahead to Pune Nashik route Pune Nashik Semi High Speed Rail Information Route Map Fares Tenders amp Updates The Metro Rail Guy Retrieved 23 June 2020 MIDC plans to acquire land for Sinnar Eklahare railway line project by Jan Nashik Pune rail route now via Shirdi Dy CMExternal links editFinally Central Railway to carry out survey for new Pune Nashik line Pune Nashik road semi highspeed rail project Maharail Pune Nasik semi high speed rail Shirdi Included in New Route for Nashik Pune Semi High Speed Rail Project Says Deputy Chief Minister Retrieved from https en wikipedia org w index php title Pune Nashik rail line amp oldid 1210051515, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.