fbpx
Wikipedia

Ranaghat–Krishnanagar City–Lalgola line

The Ranaghat–Krishnanagar City–Lalgola line is a 155 km (96 mi) long broad gauge railway line which connects Ranaghat Junction in the Nadia district with Lalgola in the Murshidabad district of the Indian state of West Bengal. The line runs up to the Bangladesh border near the Ganga river and is a part of the Sealdah railway division of the Eastern Railway zone.[1]

Ranaghat–Krishnanagar City–Lalgola line
(including Shantipur loop line)
Krishnanagar City Junction railway station
Overview
StatusOperational
OwnerIndian Railway
LocaleWest Bengal
Termini
Stations35
Service
SystemElectrified
Operator(s)Eastern Railway
Depot(s)Ranaghat EMU Carshed
History
Opened1899; 124 years ago (1899) (Aistala Ghat–Shantipur–Krishnanagar City NG line)
1905; 118 years ago (1905) (Ranaghat–Krishnanagar City–Krishnapur BG line)
Technical
Line length155 km (96 mi) - Ranaghat–Krishnanagar City–Lalgola
36 km (22 mi) - Ranaghat–Shantipur–Krishnanagar City
Number of tracks2
Track gauge5 ft 6 in (1,676 mm) broad gauge
Old gauge2 ft 6 in (762 mm) - Aistala Ghat–Nabadwip Ghat section
ElectrificationYes
Operating speedup to 100 km per hour
Route map

km
km
Godagari Ghat–Amnura line
(abandoned)
178
Godagari Ghat
old ferry connection
to Godagari Ghat
160
Lalgola Ghat
line dismantled
155
Lalgola
line dismantled
153
Krishnapur
147
Pirtala
144
Bhagwangola
137
Subarnamrigi
Azimganj Junction
108
132
Jiaganj
destroyed bridge
over Bhagirathi River
129
Nashipur Road
124
Murshidabad
116
Cossimbazar
113
Berhampore Court
New Balarampur Halt
108
Sargachhi
104
planned line
Bhabta
101
Beldanga
95
Domkal
Rejinagar
86
Karimpur
Sirajnagar
82
Betai
Plassey
77
Tehatta
Paglachandi
71
Charatala
Paglachandi River
Chapra
66
Debagram
Nabadwip Dham
49
58
Sonadanga
54
Bethuadahari
planned bridge
over Bhagirathi River
44
Muragchha
Nabadwip Ghat
49
39
Dhubulia
Maheshganj
47
33
Bahadurpur
Amghata
44
Krishnanagar Road
39
planned line
under gauge conversion
26
36
Krishnanagar City Junction
Bhatjangla
33
Dignagar
27
Bagdi
23
Shantipur Junction
21
21
Jalal Khali Halt
Bathna Krittibas
16
16
Badkulla
Phulia
12
11
Taherpur
Habibpur
08
8
Birnagar
old NG line dismantled
4
Kalinarayanpur Junction
Baicha
13
Raghabpur
08
Aistala Ghat
05
3
Churni Ghat
old ferry connection
to Aistala Ghat
0
Ranaghat Junction
km
km
Key
Indian Railways broad gauge (1676 mm)
narrow gauge (762 mm)
metre gauge (1000 mm)
in use
out of use, planned, or
under construction (u/c)
tunnel

Services edit

There are three express services, which connect Lalgola with Kolkata (Hazarduari Express and Dhano Dhanye Express) and Sealdah (Bhagirathi Express), that traverse the entire length of the line connecting major towns like Krishnanagar and Berhampore in between.[2] These services are further augmented by locomotive hauled passenger trains that stop at every station on the line.[3] In 2012, daily MEMU services were started between Sealdah and Lalgola.[4]

The Ranaghat–Krishnanagar City section along with the Kalinarayanpur–Shantipur–Krishnanagar City loop line is a part of the suburban section of the Kolkata Suburban Railway linking with the system at Ranaghat Junction.[1][5] The Sealdah–Ranaghat–Krishnanagar City section is served with total pairs of 231 Daily and 187 Sunday EMU services.[5] There are also 3 pairs of EMU services between Ranaghat and Krishnanagar via the Shantipur Loop line. Shantipur is further connected to Bangaon via the Ranaghat–Bangaon branch line with 2 pairs of daily EMU services.[5]

A majority of the Sealdah–Ranaghat–Krishnanagar City section is served by 9-car EMU rakes from the Narkeldanga EMU Carshed.[4] The Ranaghat EMU Carshed, commissioned in 2007, mainly serves the Bangaon–Ranaghat–Shantipur–Krishnanagar City section and the Ranaghat–Lalgola section, where EMU services were introduced from 2017, with 12-car EMU and MEMU rakes.[4][5]

History edit

Pre–Partition edit

Ranaghat–Krishnanagar Light Railway edit

While the main line of the eastern section of the Eastern Bengal Railway (reporting mark :EBR) was opened from Calcutta to Kushtia via Ranaghat in 1862, it bypassed Krishnanagar and Shantipur, two very prominent heritage centers of art, culture and learning of the 18th and 19th century Bengal.[6][7] To resolve this issue, Martin's Light Railways (reporting mark :MLR) constructed a 20.25 mi (32.59 km) long, 2 ft 6 in narrow gauge line from Aistala Ghat, on the west bank of the Churni river, near Ranaghat to Krishnanagar via Shantipur in 1899 which was known as the Ranaghat–Krishnanagar Light Railway.[8] EBR further constructed a 1.6 mi (2.6 km) long broad gauge line from Ranaghat station to Churni Ghat, known as the Churni Extension railway, from where a direct ferry connection to Aistala Ghat was established.[9] The administration of the Ranaghat–Krishnanagar Light Railway passed onto EBR in 1904.[8][10]

Murshidabad Branch Railway edit

EBR opened the Ranaghat–Murshidabad–Bhagwangola–Krishnapur branch line in 1905. This was known as the Murshidabad Branch Railway.[8] This was further extended to Lalgola Ghat on the south bank of the Ganges in 1907 and the line came to be known as the Lalgola Ghat Branch Railway.[8][11] In 1909, a metre gauge line from Katihar to Godagari Ghat (on the north bank of the Ganges), known as the Godagari Ghat Branch Railway was built, from where a ferry connection was established to Lalgola Ghat, thus providing a direct link from Katihar to Calcutta.[12][13]

Further extensions edit

in 1925. a broad gauge extension was built from Churni Bridge (present day Kalinarayanpur Junction railway station) to Shantipur thus establishing direct connectivity from Sealdah to Shantipur.[14] This made the Aistala Ghat–Shantipur section and the Churni Extension Railway redundant following which they were dismantled and the line was known as Shantipur–Krishnanagar Light Railway.[7][14]

The Shantipur–Krishnanagar Light Railway was extended up to Nabadwip Ghat on the east bank of the Bhagirathi river, in 1926 and a direct ferry connection was established to Nabadwip Dham, an important pilgrimage centre of Bengal.[15]

In 1928, a 2.01 mi (3.23 km) long branch line was constructed from Azimganj on the B.B. loop line to the Nashipur Road station on the Ranaghat–Lalgola line via a bridge across the Bhagirathi river for carrying stone freight traffic.[16] This bridge was destroyed in the Second World War, leading to connectivity problems between the twin cities of Azimganj and Jiaganj located on the opposite sides of the Bhagirathi river.[17]

Post-partition edit

Following the partition of India in 1947, the link between Sealdah and Katihar via this line was snapped[13] affecting the connection of South Bengal with North Bengal, North Bihar and Assam due to which the ferry connection was moved to between Sakrigali Ghat railway station in the Sahibganj Loop to Manihari Ghat railway station in the Katihar–Teznarayanpur branch line.[18] The Katihar–Singhabad section was converted to broad gauge in 1962 with the construction of the new Howrah–New Jalpaiguri line.[19][20]

The line along with other EBR lines came under the jurisdiction of the Sealdah railway division of the Eastern Railway post zonal re-organisation in 1952.[1][21]

Gauge conversion & Nabadwip Dham Connection edit

The Shantipur–Krishnanagar City narrow gauge line was sanctioned for gauge conversion to broad gauge in 2001.[22] The line closed for gauge conversion in 2010 which was completed and the new line was commissioned on 7 February 2012.[23][24][25]

The Krishnanagar–Nabadwip Ghat section was sanctioned for gauge conversion in 2007 along with a planned extension of the line to Nabadwip Dham on the B.B. loop line with a bridge over the Bhagirathi.[22] While the gauge conversion of the section has been completed from Krishnanagar City to Amghata railway station it has not been commissioned because of unauthorized crossings and the stretch between Amghata and Nabadwip Ghat has been blocked due to a temple and a mosque being on the alignment.[24] Similarly while the massive 992.25 metres (3,255.4 ft) long bridge between Nabadwip Ghat and Nabadwip Dham over the Bhagirathi is ready, tracks leading to the bridge haven't been able to be built because of land hurdle, political warfare & political violence.[26][27]

Nashipur Rail bridge Restoration edit

Before Second World War, there existed a rail bridge connecting Azimganj with Murshidabad. The bridge was destroyed by Japanese bombing in the war. Restoration of the 900 metres (3,000 ft) long new railway bridge to reconnect Azimganj and Murshidabad, across the Bhagirathi river was sanctioned in 2001 owing to a long time demand of the people of the area.[28] While superstructure of the bridge has been completed, the approach roads couldn't be built due to land hurdle and political warfare & political violence. The tracks leading to the bridge couldn't be constructed because of which the connection to Murshidabad still lies incomplete, as of February 2021.[28][29][17] Once completed Indian Railways plans to use it for the North bound trains from Sealdah like Darjeeling Mail as it provides a shorter route between Sealdah and New Jalpaiguri leading to significant savings in cost and time.[30]

Track edit

The Ranaghat–Krishnanagar City–Lalgola section along with the Ranaghat–Shantipur section is a double line section while the Shantipur–Krishnanagar City section is a single line section.[1]

Electrification edit

The Ranaghat–Krishnanagar City and the Ranaghat–Shantipur section was electrified in 1963–64.[31] The 128 km (80 mi) long Krishnanagar City–Lalgola stretch was electrified in 2007.[32] The single electrified line of the Shantipur–Krishnanagar City section was commissioned after gauge conversion in 2012.[23][24][25]

EMU Carsheds edit

The Ranaghat–Krishnanagar City section of the line is primarily served by 9-car EMU rakes from the Narkeldanga EMU Carshed with a few 12-car EMU rakes from Ranaghat EMU Carshed as well. Further to this most 12-car EMU rakes from Ranaghat EMU Carshed serve in the Ranaghat–Lalgola section and the Krishnanagar City–Shantipur–Ranaghat–Bangaon section.[4] The Ranaghat EMU Carshed also maintains 12-car MEMU rakes which started serving from Sealdah to Lalgola in 2012.[4]

While the section was initially served by the Narkeldanga EMU carshed which opened on 1963, due to the increasing traffic requirements in the Ranaghat–Gede, Ranaghat–Bangaon, Ranaghat–Shantipur–Krishnanagar City and Ranaghat–Lalgola sections owing to the electrification and gauge conversions of various lines, the Ranaghat EMU carshed was commissioned in 2007.[4] EMU services were introduced between Ranaghat and Lalgola in 2017.[4]

As of January 2023, the Narkeldanga carshed had 28 9-car EMU rakes, a few of which served the Sealdah South section mostly via the Circular line, while rest served the Sealdah North section lines. The Ranaghat EMU carshed contains 13 12-car EMU rakes and 8 12-car MEMU rakes. 4 of the 12-car MEMU rakes are three phase MEMU.[4]

Routes and stations edit

Stations edit

Names in bold indicate that the station is a major stop or an important interchange/terminal station.
Names in italics indicate that the station is now defunct

Ranaghat–Krishnanagar City–Lalgola main line edit

Ranaghat–Krishnanagar City–Lalgola main line
# Distance from Ranaghat Junction (km) Station Name Station Code Connections Station Category[33]
1 0 (74 ex Sealdah) Ranaghat Junction RHA Ranaghat–Bangaon line / Sealdah–Ranaghat–Gede line NSG-5
2 4 Kalinarayanpur Junction KLNP Shantipur loop line SG-3
3 8 Birnagar BIJ SG-3
4 11 Taherpur THP SG-3
5 16 Badkulla BDZ SG-3
6 21 Jalal Khali Halt JKL HG-3
7 26 Krishnanagar City Junction KNJ Shantipur loop line, Nabadwip Ghat line (future connection to Nabadwip Dham) NSG-4
8 33 Bahadurpur BPD NSG-6
9 39 Dhubulia DHU NSG-6
10 44 Muragachha MGM NSG-6
11 54 Bethuadahari BTY NSG-5
12 58 Sonadanga SVH NSG-6
13 66 Debagram DEB NSG-5
14 71 Paglachandi PCX NSG-6
15 77 Plassey PLY NSG-5
16 82 Sirajnagar SRJN HG-3
17 86 Rejinagar REJ NSG-6
18 95 Beldanga BEB NSG-5
19 101 Bhabta BFT NSG-6
20 104 Sargachhi SGV NSG-6
21 108 New Balarampur Halt NBPH HG-3
22 113 Berhampore Court BPC New Line proposed to Karimpur NSG-4
23 116 Cossimbazar CSZ NSG-5
24 124 Murshidabad MBB NSG-5
25 129 Nashipur Road NSO New Line to Azimganj Junction on BAK Loop,Nashipur Road will be rebuilt again.
26 132 Jiaganj JJG NSG-5
27 137 Subarnamrigi SBNM HG-3
28 144 Bhagwangola BQG NSG-5
29 147 Pirtala PRTL HG-3
30 153 Krishnapur KRP NSG-5
31 155 Lalgola LGL New Line proposed to Jalangi NSG-5
32 160 Lalgola Ghat LGG Lalgola Ghat will be rebuilt again.
† End of suburban section of Kolkata Suburban Railway

Shantipur loop line edit

Shantipur loop line
# Distance from Ranaghat Junction (km) Station Name Station Code Connections Station Category[33]
1 0 Ranaghat Junction RHA Ranaghat–Bangaon line / Sealdah–Ranaghat–Gede line NSG-4
2 4 Kalinarayanpur Junction KLNP Ranaghat–Lalgola line SG-3
3 8 Habibpur HBE SG-3
4 12 Phulia FLU SG-3
5 16 Bathna Krittibas BTKB HG-3
6 21 Shantipur Junction STB SG-3
8 27 Dignagar DTG HG-3
7 33 Krishnanagar City Junction KNJ Ranaghat–Lalgola line NSG-4
† End of suburban section of Kolkata Suburban Railway

Planned extensions edit

There have been multiple demands for a new railway line from Krishnanagar to Berhampore via Karimpur and Domkal, two major towns in the Nadia and Murshidabad districts.[34][35][36] While multiple surveys have been conducted for the proposed railway line since 1905, it was not sanctioned for construction.[37] Two new railway line projects, Dhubulia–Charatala and Krishnanagar City–Chapra have been sanctioned in the railway budget in 2001 and 2002 respectively.[22] While the final line survey of both the newly planned line has been completed there has been no further progress made in the project.[36][37] Eastern Railway has done surveying 3 new railway lines to be built to connect the Indo-Bangla border region. These lines will open another Indo-Bangla Rail corridor as planned. The new lines to be built are as follows: -

  1. Krishnanagar to Jalangi via Tehatta, Betai, Karimpur, which will be 111 kilometres (69 mi) long.
  2. Baharampur to Karimpur via Domkal, which will be 57 kilometres (35 mi) long.
  3. Lalgola or Bhagwangola to Jalangi, which will be 65 kilometres (40 mi)(if Lalgola-Jalangi is made) or 56 kilometres (35 mi)(if Bhagwangola-Jalangi is made).

Currently only Krishnanagar - Jalangi via Tehatta, Betai & Karimpur new line project is sanctioned by Indian Railway as of June 2023. On the other hand Bangladesh Railway will construct the pre-partition era Bheramara - Damukdia Ghat railway line to connect Poradaho Junction & Iswardi Junction & extend it to Jalangi on the Indo-Bangla border, creating a new 56 kilometres (35 mi) long rail corridor as planned for future. The pre-partition era line used to connect Damukdia with Sara Ghat using ferry service. Before the 1.85 kilometres (6,100 ft) long Hardinge Bridge was made in 1912, Damukdia Ghat to Sara Ghat Railway ferry service was there for Kolkata Siliguri train journey by the then Darjeeling Mail main line via current Bangladesh.

Gallery edit

References edit

  1. ^ a b c d "Sealdah Division System Map" (PDF). Retrieved 11 November 2021.
  2. ^ "Arrivals at LGL/Lalgola - Express trains". India Railinfo. Retrieved 1 February 2022.
  3. ^ "Arrivals at LGL/Lalgola - Passenger Trains". India RailInfo. Retrieved 1 February 2022.
  4. ^ a b c d e f g h "Highlights of TRS Organisation, Sealdah division, Eastern Railway". Retrieved 30 November 2021.
  5. ^ a b c d "Details of Operating Department: Sealdah Division, Eastern Railway". Retrieved 30 November 2021.
  6. ^ "Administration Report on Railways 1918". Retrieved 28 November 2021.
  7. ^ a b "The Santipur Local – Part 2". GetBengal. 5 December 2020. Retrieved 1 February 2022.
  8. ^ a b c d “Administration Report on Railways 1918” page48-49, pdf page 56; Retrieved 22 Nov 2016
  9. ^ “Administration Report on Railways 1918” page 42 (pdf51) ; Retrieved 31 Dec 2017
  10. ^ J. H. E. Garrett. "Nadia, Bengal District Gazetteers (1910)". IRFCA. from the original on 28 October 2012. Retrieved 10 February 2012.
  11. ^ "Bengal District Gazetteer" / Mukshidabad by L S S O’Malley, Indian Civil Service, Calcutta; Pages 150-151"; Retrieved 1 Jan 2016
  12. ^ “Administration Report on Railways 1918” page 47 (pdf56); Retrieved 1 Feb 2022
  13. ^ a b Assam Information. Directorate of Information & Public Relations. 1971.
  14. ^ a b “Administration Report on Railways 1937” page 71 (pdf98) ;Retrieved 1 Feb 2022
  15. ^ “Administration Report on Railways 1937” page 78 (pdf105) Retrieved 1 Feb 2022
  16. ^ “Administration Report on Railways 1937” page 70 (pdf95) Retrieved 1 Feb 2022
  17. ^ a b "Passengers association call for hunger strike for railway bridge". The Times of India. Retrieved 11 October 2021.
  18. ^ "Katihar Division – North East Frontier Railway". North East Frontier Railway. Retrieved 2 February 2022.
  19. ^ "Speech of Shri Jagjivan Ram introducing the Railway Budget for 1961-62 on, 15th February, 1961" (PDF). Indian Railways. Retrieved 4 February 2022.
  20. ^ "Speech of Sardar Swaran Singh: Introducing the Railway Budget for 1963-64, on 19t h February, 1963" (PDF). Indian Railways. Retrieved 4 February 2022.
  21. ^ Brief Detail of Sealdah Division 2018-06-25 at the Wayback Machine, Eastern Railway
  22. ^ a b c "Ongoing projects Eastern Railway" (PDF). Eastern Railway. Retrieved 2 February 2022.
  23. ^ a b "List of sanctioned projects commissioned – Eastern Railway" (PDF). Eastern Railway. Retrieved 2 February 2022.
  24. ^ a b c "Brief status of sanctioned projects – Eastern Railway" (PDF). Eastern Railway. Retrieved 2 February 2022.
  25. ^ a b "Mamata rolls out rly sops for Nadia". The Times of India. Archived from the original on 10 July 2012. Retrieved 10 February 2012.
  26. ^ "Nabadwip Dham-Sealdah Rail Link Work Suspended Over Land Dispute". News from Nadia. 18 January 2019. Retrieved 2 February 2022.
  27. ^ "Trinamul accused of double standards as party leaders press Nadia villagers to give up land". The Telegraph. Retrieved 2 February 2022.
  28. ^ a b "The Nashipur syndrome". The Week. Retrieved 2 February 2022.
  29. ^ . The Statesman, 19 February 2010. Archived from the original on 14 June 2012. Retrieved 10 February 2012.
  30. ^ "Darjeeling Mail gears up for short route, cheaper fare". Retrieved 11 October 2021.
  31. ^ . IRFCA. Archived from the original on 25 December 2007. Retrieved 10 February 2012.
  32. ^ "Important Landmarks of Indian Railways Electrification". Central Organization for Railway Electrification (CORE). Retrieved 3 February 2022.
  33. ^ a b "Category of stations - Eastern Railway" (PDF). Retrieved 24 December 2021.
  34. ^ "Regarding demand for Behrampore-Karimpur via Domkal Islampur new railway line in Murshidabad district in West Bengal". India Kanoon. 9 February 2017. Retrieved 7 February 2022.
  35. ^ "Regarding demand for Behrampore-Karimpur via Domkal Islampur new railway line in Murshidabad district in West Bengal" (PDF). Parliament of India, Lok Sabha, Digital Library. Retrieved 7 February 2022.
  36. ^ a b "Demand For Rail Link Revived In Karimpur". News from Nadia. 22 March 2018. Retrieved 7 February 2022.
  37. ^ a b "Bengal Polls 2021: Rail link remains elusive to Karimpur". The Telegraph Online. Retrieved 7 February 2022.

External links edit

External videos
  Shantipur-Krishnanagar-Nabadwip Ghat Toy Train – Now closed

ranaghat, krishnanagar, city, lalgola, line, long, broad, gauge, railway, line, which, connects, ranaghat, junction, nadia, district, with, lalgola, murshidabad, district, indian, state, west, bengal, line, runs, bangladesh, border, near, ganga, river, part, s. The Ranaghat Krishnanagar City Lalgola line is a 155 km 96 mi long broad gauge railway line which connects Ranaghat Junction in the Nadia district with Lalgola in the Murshidabad district of the Indian state of West Bengal The line runs up to the Bangladesh border near the Ganga river and is a part of the Sealdah railway division of the Eastern Railway zone 1 Ranaghat Krishnanagar City Lalgola line including Shantipur loop line Krishnanagar City Junction railway stationOverviewStatusOperationalOwnerIndian RailwayLocaleWest BengalTerminiRanaghatLalgolaStations35ServiceSystemElectrifiedOperator s Eastern RailwayDepot s Ranaghat EMU CarshedHistoryOpened1899 124 years ago 1899 Aistala Ghat Shantipur Krishnanagar City NG line 1905 118 years ago 1905 Ranaghat Krishnanagar City Krishnapur BG line TechnicalLine length155 km 96 mi Ranaghat Krishnanagar City Lalgola 36 km 22 mi Ranaghat Shantipur Krishnanagar CityNumber of tracks2Track gauge5 ft 6 in 1 676 mm broad gaugeOld gauge2 ft 6 in 762 mm Aistala Ghat Nabadwip Ghat sectionElectrificationYesOperating speedup to 100 km per hourRoute mapLegendkm kmGodagari Ghat Amnura line abandoned 178 Godagari GhatGanges River BangladeshIndiaold ferry connectionto Godagari Ghat160 Lalgola Ghatline dismantled155 Lalgolaline dismantled153 Krishnapur147 Pirtala144 BhagwangolaB B loop line 137 SubarnamrigiAzimganj Junction 108 132 Jiaganjdestroyed bridgeover Bhagirathi River129 Nashipur RoadBhagirathi River Nashipur Rail Bridge u c B B loop line 124 Murshidabad116 Cossimbazar113 Berhampore CourtNew Balarampur Halt 108Sargachhi 104 planned lineBhabta 101Beldanga 95 DomkalRejinagar 86 KarimpurSirajnagar 82 BetaiPlassey 77 TehattaPaglachandi 71 CharatalaPaglachandi River ChapraB B loop line 66 DebagramNabadwip Dham 49 58 SonadangaB B loop line 54 Bethuadahariplanned bridgeover Bhagirathi River 44 MuragchhaNabadwip Ghat 49 39 DhubuliaMaheshganj 47 33 BahadurpurAmghata 44 Jalangi RiverKrishnanagar Road 39 planned lineunder gauge conversionKolkata Suburban Railwayends here 2636 Krishnanagar City JunctionBhatjangla 33Dignagar 27Bagdi 23Shantipur Junction 21 21 Jalal Khali HaltBathna Krittibas 16 16 BadkullaPhulia 12 11 TaherpurHabibpur 0 8 8 Birnagarold NG line dismantled4 Kalinarayanpur JunctionBaicha 13 Churni RiverRaghabpur 0 8 Ranaghat Gede lineAistala Ghat 0 5 3 Churni Ghat old ferry connectionto Aistala Ghat0 Ranaghat JunctionRanaghat Bangaon lineSealdah Ranaghat linekm kmKeyIndian Railways broad gauge 1676 mm narrow gauge 762 mm metre gauge 1000 mm in use out of use planned orunder construction u c tunnel Contents 1 Services 2 History 2 1 Pre Partition 2 1 1 Ranaghat Krishnanagar Light Railway 2 1 2 Murshidabad Branch Railway 2 1 3 Further extensions 2 2 Post partition 2 2 1 Gauge conversion amp Nabadwip Dham Connection 2 2 2 Nashipur Rail bridge Restoration 3 Track 4 Electrification 5 EMU Carsheds 6 Routes and stations 6 1 Stations 6 1 1 Ranaghat Krishnanagar City Lalgola main line 6 1 2 Shantipur loop line 7 Planned extensions 8 Gallery 9 References 10 External linksServices editThere are three express services which connect Lalgola with Kolkata Hazarduari Express and Dhano Dhanye Express and Sealdah Bhagirathi Express that traverse the entire length of the line connecting major towns like Krishnanagar and Berhampore in between 2 These services are further augmented by locomotive hauled passenger trains that stop at every station on the line 3 In 2012 daily MEMU services were started between Sealdah and Lalgola 4 The Ranaghat Krishnanagar City section along with the Kalinarayanpur Shantipur Krishnanagar City loop line is a part of the suburban section of the Kolkata Suburban Railway linking with the system at Ranaghat Junction 1 5 The Sealdah Ranaghat Krishnanagar City section is served with total pairs of 231 Daily and 187 Sunday EMU services 5 There are also 3 pairs of EMU services between Ranaghat and Krishnanagar via the Shantipur Loop line Shantipur is further connected to Bangaon via the Ranaghat Bangaon branch line with 2 pairs of daily EMU services 5 A majority of the Sealdah Ranaghat Krishnanagar City section is served by 9 car EMU rakes from the Narkeldanga EMU Carshed 4 The Ranaghat EMU Carshed commissioned in 2007 mainly serves the Bangaon Ranaghat Shantipur Krishnanagar City section and the Ranaghat Lalgola section where EMU services were introduced from 2017 with 12 car EMU and MEMU rakes 4 5 History editPre Partition edit Ranaghat Krishnanagar Light Railway edit While the main line of the eastern section of the Eastern Bengal Railway reporting mark EBR was opened from Calcutta to Kushtia via Ranaghat in 1862 it bypassed Krishnanagar and Shantipur two very prominent heritage centers of art culture and learning of the 18th and 19th century Bengal 6 7 To resolve this issue Martin s Light Railways reporting mark MLR constructed a 20 25 mi 32 59 km long 2 ft 6 in narrow gauge line from Aistala Ghat on the west bank of the Churni river near Ranaghat to Krishnanagar via Shantipur in 1899 which was known as the Ranaghat Krishnanagar Light Railway 8 EBR further constructed a 1 6 mi 2 6 km long broad gauge line from Ranaghat station to Churni Ghat known as the Churni Extension railway from where a direct ferry connection to Aistala Ghat was established 9 The administration of the Ranaghat Krishnanagar Light Railway passed onto EBR in 1904 8 10 Murshidabad Branch Railway edit EBR opened the Ranaghat Murshidabad Bhagwangola Krishnapur branch line in 1905 This was known as the Murshidabad Branch Railway 8 This was further extended to Lalgola Ghat on the south bank of the Ganges in 1907 and the line came to be known as the Lalgola Ghat Branch Railway 8 11 In 1909 a metre gauge line from Katihar to Godagari Ghat on the north bank of the Ganges known as the Godagari Ghat Branch Railway was built from where a ferry connection was established to Lalgola Ghat thus providing a direct link from Katihar to Calcutta 12 13 Further extensions edit in 1925 a broad gauge extension was built from Churni Bridge present day Kalinarayanpur Junction railway station to Shantipur thus establishing direct connectivity from Sealdah to Shantipur 14 This made the Aistala Ghat Shantipur section and the Churni Extension Railway redundant following which they were dismantled and the line was known as Shantipur Krishnanagar Light Railway 7 14 The Shantipur Krishnanagar Light Railway was extended up to Nabadwip Ghat on the east bank of the Bhagirathi river in 1926 and a direct ferry connection was established to Nabadwip Dham an important pilgrimage centre of Bengal 15 In 1928 a 2 01 mi 3 23 km long branch line was constructed from Azimganj on the B B loop line to the Nashipur Road station on the Ranaghat Lalgola line via a bridge across the Bhagirathi river for carrying stone freight traffic 16 This bridge was destroyed in the Second World War leading to connectivity problems between the twin cities of Azimganj and Jiaganj located on the opposite sides of the Bhagirathi river 17 Post partition edit Following the partition of India in 1947 the link between Sealdah and Katihar via this line was snapped 13 affecting the connection of South Bengal with North Bengal North Bihar and Assam due to which the ferry connection was moved to between Sakrigali Ghat railway station in the Sahibganj Loop to Manihari Ghat railway station in the Katihar Teznarayanpur branch line 18 The Katihar Singhabad section was converted to broad gauge in 1962 with the construction of the new Howrah New Jalpaiguri line 19 20 The line along with other EBR lines came under the jurisdiction of the Sealdah railway division of the Eastern Railway post zonal re organisation in 1952 1 21 Gauge conversion amp Nabadwip Dham Connection edit The Shantipur Krishnanagar City narrow gauge line was sanctioned for gauge conversion to broad gauge in 2001 22 The line closed for gauge conversion in 2010 which was completed and the new line was commissioned on 7 February 2012 23 24 25 The Krishnanagar Nabadwip Ghat section was sanctioned for gauge conversion in 2007 along with a planned extension of the line to Nabadwip Dham on the B B loop line with a bridge over the Bhagirathi 22 While the gauge conversion of the section has been completed from Krishnanagar City to Amghata railway station it has not been commissioned because of unauthorized crossings and the stretch between Amghata and Nabadwip Ghat has been blocked due to a temple and a mosque being on the alignment 24 Similarly while the massive 992 25 metres 3 255 4 ft long bridge between Nabadwip Ghat and Nabadwip Dham over the Bhagirathi is ready tracks leading to the bridge haven t been able to be built because of land hurdle political warfare amp political violence 26 27 Nashipur Rail bridge Restoration edit Before Second World War there existed a rail bridge connecting Azimganj with Murshidabad The bridge was destroyed by Japanese bombing in the war Restoration of the 900 metres 3 000 ft long new railway bridge to reconnect Azimganj and Murshidabad across the Bhagirathi river was sanctioned in 2001 owing to a long time demand of the people of the area 28 While superstructure of the bridge has been completed the approach roads couldn t be built due to land hurdle and political warfare amp political violence The tracks leading to the bridge couldn t be constructed because of which the connection to Murshidabad still lies incomplete as of February 2021 28 29 17 Once completed Indian Railways plans to use it for the North bound trains from Sealdah like Darjeeling Mail as it provides a shorter route between Sealdah and New Jalpaiguri leading to significant savings in cost and time 30 Track editThe Ranaghat Krishnanagar City Lalgola section along with the Ranaghat Shantipur section is a double line section while the Shantipur Krishnanagar City section is a single line section 1 Electrification editThe Ranaghat Krishnanagar City and the Ranaghat Shantipur section was electrified in 1963 64 31 The 128 km 80 mi long Krishnanagar City Lalgola stretch was electrified in 2007 32 The single electrified line of the Shantipur Krishnanagar City section was commissioned after gauge conversion in 2012 23 24 25 EMU Carsheds editThe Ranaghat Krishnanagar City section of the line is primarily served by 9 car EMU rakes from the Narkeldanga EMU Carshed with a few 12 car EMU rakes from Ranaghat EMU Carshed as well Further to this most 12 car EMU rakes from Ranaghat EMU Carshed serve in the Ranaghat Lalgola section and the Krishnanagar City Shantipur Ranaghat Bangaon section 4 The Ranaghat EMU Carshed also maintains 12 car MEMU rakes which started serving from Sealdah to Lalgola in 2012 4 While the section was initially served by the Narkeldanga EMU carshed which opened on 1963 due to the increasing traffic requirements in the Ranaghat Gede Ranaghat Bangaon Ranaghat Shantipur Krishnanagar City and Ranaghat Lalgola sections owing to the electrification and gauge conversions of various lines the Ranaghat EMU carshed was commissioned in 2007 4 EMU services were introduced between Ranaghat and Lalgola in 2017 4 As of January 2023 the Narkeldanga carshed had 28 9 car EMU rakes a few of which served the Sealdah South section mostly via the Circular line while rest served the Sealdah North section lines The Ranaghat EMU carshed contains 13 12 car EMU rakes and 8 12 car MEMU rakes 4 of the 12 car MEMU rakes are three phase MEMU 4 Routes and stations editStations edit Names in bold indicate that the station is a major stop or an important interchange terminal station Names in italics indicate that the station is now defunctRanaghat Krishnanagar City Lalgola main line edit Ranaghat Krishnanagar City Lalgola main line Distance from Ranaghat Junction km Station Name Station Code Connections Station Category 33 1 0 74 ex Sealdah Ranaghat Junction RHA Ranaghat Bangaon line Sealdah Ranaghat Gede line NSG 52 4 Kalinarayanpur Junction KLNP Shantipur loop line SG 33 8 Birnagar BIJ SG 34 11 Taherpur THP SG 35 16 Badkulla BDZ SG 36 21 Jalal Khali Halt JKL HG 37 26 Krishnanagar City Junction KNJ Shantipur loop line Nabadwip Ghat line future connection to Nabadwip Dham NSG 48 33 Bahadurpur BPD NSG 69 39 Dhubulia DHU NSG 610 44 Muragachha MGM NSG 611 54 Bethuadahari BTY NSG 512 58 Sonadanga SVH NSG 613 66 Debagram DEB NSG 514 71 Paglachandi PCX NSG 615 77 Plassey PLY NSG 516 82 Sirajnagar SRJN HG 317 86 Rejinagar REJ NSG 618 95 Beldanga BEB NSG 519 101 Bhabta BFT NSG 620 104 Sargachhi SGV NSG 621 108 New Balarampur Halt NBPH HG 322 113 Berhampore Court BPC New Line proposed to Karimpur NSG 423 116 Cossimbazar CSZ NSG 524 124 Murshidabad MBB NSG 525 129 Nashipur Road NSO New Line to Azimganj Junction on BAK Loop Nashipur Road will be rebuilt again 26 132 Jiaganj JJG NSG 527 137 Subarnamrigi SBNM HG 328 144 Bhagwangola BQG NSG 529 147 Pirtala PRTL HG 330 153 Krishnapur KRP NSG 531 155 Lalgola LGL New Line proposed to Jalangi NSG 532 160 Lalgola Ghat LGG Lalgola Ghat will be rebuilt again End of suburban section of Kolkata Suburban RailwayShantipur loop line edit Shantipur loop line Distance from Ranaghat Junction km Station Name Station Code Connections Station Category 33 1 0 Ranaghat Junction RHA Ranaghat Bangaon line Sealdah Ranaghat Gede line NSG 42 4 Kalinarayanpur Junction KLNP Ranaghat Lalgola line SG 33 8 Habibpur HBE SG 34 12 Phulia FLU SG 35 16 Bathna Krittibas BTKB HG 36 21 Shantipur Junction STB SG 38 27 Dignagar DTG HG 37 33 Krishnanagar City Junction KNJ Ranaghat Lalgola line NSG 4 End of suburban section of Kolkata Suburban RailwayPlanned extensions editMain article Krishnanagar City Karimpur line There have been multiple demands for a new railway line from Krishnanagar to Berhampore via Karimpur and Domkal two major towns in the Nadia and Murshidabad districts 34 35 36 While multiple surveys have been conducted for the proposed railway line since 1905 it was not sanctioned for construction 37 Two new railway line projects Dhubulia Charatala and Krishnanagar City Chapra have been sanctioned in the railway budget in 2001 and 2002 respectively 22 While the final line survey of both the newly planned line has been completed there has been no further progress made in the project 36 37 Eastern Railway has done surveying 3 new railway lines to be built to connect the Indo Bangla border region These lines will open another Indo Bangla Rail corridor as planned The new lines to be built are as follows Krishnanagar to Jalangi via Tehatta Betai Karimpur which will be 111 kilometres 69 mi long Baharampur to Karimpur via Domkal which will be 57 kilometres 35 mi long Lalgola or Bhagwangola to Jalangi which will be 65 kilometres 40 mi if Lalgola Jalangi is made or 56 kilometres 35 mi if Bhagwangola Jalangi is made Currently only Krishnanagar Jalangi via Tehatta Betai amp Karimpur new line project is sanctioned by Indian Railway as of June 2023 On the other hand Bangladesh Railway will construct the pre partition era Bheramara Damukdia Ghat railway line to connect Poradaho Junction amp Iswardi Junction amp extend it to Jalangi on the Indo Bangla border creating a new 56 kilometres 35 mi long rail corridor as planned for future The pre partition era line used to connect Damukdia with Sara Ghat using ferry service Before the 1 85 kilometres 6 100 ft long Hardinge Bridge was made in 1912 Damukdia Ghat to Sara Ghat Railway ferry service was there for Kolkata Siliguri train journey by the then Darjeeling Mail main line via current Bangladesh Gallery edit nbsp Plassey railway station nbsp Berhampore Court railway station nbsp Rail Bridge over Jalangi river at KrishnanagarReferences edit a b c d Sealdah Division System Map PDF Retrieved 11 November 2021 Arrivals at LGL Lalgola Express trains India Railinfo Retrieved 1 February 2022 Arrivals at LGL Lalgola Passenger Trains India RailInfo Retrieved 1 February 2022 a b c d e f g h Highlights of TRS Organisation Sealdah division Eastern Railway Retrieved 30 November 2021 a b c d Details of Operating Department Sealdah Division Eastern Railway Retrieved 30 November 2021 Administration Report on Railways 1918 Retrieved 28 November 2021 a b The Santipur Local Part 2 GetBengal 5 December 2020 Retrieved 1 February 2022 a b c d Administration Report on Railways 1918 page48 49 pdf page 56 Retrieved 22 Nov 2016 Administration Report on Railways 1918 page 42 pdf51 Retrieved 31 Dec 2017 J H E Garrett Nadia Bengal District Gazetteers 1910 IRFCA Archived from the original on 28 October 2012 Retrieved 10 February 2012 Bengal District Gazetteer Mukshidabad by L S S O Malley Indian Civil Service Calcutta Pages 150 151 Retrieved 1 Jan 2016 Administration Report on Railways 1918 page 47 pdf56 Retrieved 1 Feb 2022 a b Assam Information Directorate of Information amp Public Relations 1971 a b Administration Report on Railways 1937 page 71 pdf98 Retrieved 1 Feb 2022 Administration Report on Railways 1937 page 78 pdf105 Retrieved 1 Feb 2022 Administration Report on Railways 1937 page 70 pdf95 Retrieved 1 Feb 2022 a b Passengers association call for hunger strike for railway bridge The Times of India Retrieved 11 October 2021 Katihar Division North East Frontier Railway North East Frontier Railway Retrieved 2 February 2022 Speech of Shri Jagjivan Ram introducing the Railway Budget for 1961 62 on 15th February 1961 PDF Indian Railways Retrieved 4 February 2022 Speech of Sardar Swaran Singh Introducing the Railway Budget for 1963 64 on 19t h February 1963 PDF Indian Railways Retrieved 4 February 2022 Brief Detail of Sealdah Division Archived 2018 06 25 at the Wayback Machine Eastern Railway a b c Ongoing projects Eastern Railway PDF Eastern Railway Retrieved 2 February 2022 a b List of sanctioned projects commissioned Eastern Railway PDF Eastern Railway Retrieved 2 February 2022 a b c Brief status of sanctioned projects Eastern Railway PDF Eastern Railway Retrieved 2 February 2022 a b Mamata rolls out rly sops for Nadia The Times of India Archived from the original on 10 July 2012 Retrieved 10 February 2012 Nabadwip Dham Sealdah Rail Link Work Suspended Over Land Dispute News from Nadia 18 January 2019 Retrieved 2 February 2022 Trinamul accused of double standards as party leaders press Nadia villagers to give up land The Telegraph Retrieved 2 February 2022 a b The Nashipur syndrome The Week Retrieved 2 February 2022 Left landowners play spoilsport in railway project The Statesman 19 February 2010 Archived from the original on 14 June 2012 Retrieved 10 February 2012 Darjeeling Mail gears up for short route cheaper fare Retrieved 11 October 2021 History of Electrification IRFCA Archived from the original on 25 December 2007 Retrieved 10 February 2012 Important Landmarks of Indian Railways Electrification Central Organization for Railway Electrification CORE Retrieved 3 February 2022 a b Category of stations Eastern Railway PDF Retrieved 24 December 2021 Regarding demand for Behrampore Karimpur via Domkal Islampur new railway line in Murshidabad district in West Bengal India Kanoon 9 February 2017 Retrieved 7 February 2022 Regarding demand for Behrampore Karimpur via Domkal Islampur new railway line in Murshidabad district in West Bengal PDF Parliament of India Lok Sabha Digital Library Retrieved 7 February 2022 a b Demand For Rail Link Revived In Karimpur News from Nadia 22 March 2018 Retrieved 7 February 2022 a b Bengal Polls 2021 Rail link remains elusive to Karimpur The Telegraph Online Retrieved 7 February 2022 External links editExternal videos nbsp Shantipur Krishnanagar Nabadwip Ghat Toy Train Now closed Retrieved from https en wikipedia org w index php title Ranaghat Krishnanagar City Lalgola line amp oldid 1174783890, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.