fbpx
Wikipedia

Oxford, Worcester and Wolverhampton Railway

The Oxford, Worcester and Wolverhampton Railway (OW&WR) was a railway company in England. It built a line from Wolvercot Junction[note 1] near Oxford to Worcester, Stourbridge, Dudley and Wolverhampton, as well as some branches.

Oxford, Worcester and Wolverhampton Railway
Overview
Main region(s)Gloucestershire
HeadquartersWorcester
Reporting markOWW
Locale
Dates of operation1837 (1837)–1863 (1863)
SuccessorWest Midland Railway

Its main line was opened in stages between 1852 and 1853. When the West Midland Railway (WMR) was formed by amalgamation in 1860, the OW&WR was the dominant partner, but the West Midland company amalgamated with the Great Western Railway (GWR) in 1863. Several branches and extensions were built in the West Midlands, and the main line was developed as an important trunk route. Much of the original main line is in use at present.

Before the OW&WR edit

 
The Oxford, Worcester and Wolverhampton Railway in 1860

In 1841 the GWR opened its first main line between London and Bristol. It was engineered by Isambard Kingdom Brunel and the track was on the broad gauge, in contrast to most of the railways already in existence in Great Britain. The broad gauge would, Brunel argued, give greater stability to trains running at speed. In 1844 a branch line from Didcot to Oxford was opened, preparatory to extending the GWR system into the West Midlands. It too was designed by Brunel, and used the broad gauge.

Birmingham and the industrial area of the Black Country were already served, by the London and Birmingham Railway of 1838, and the Grand Junction Railway (GJR). The GJR had opened in 1837, and ran north from Birmingham, skirting Wolverhampton to reach the Liverpool and Manchester Railway.

Approaching Birmingham from the south was the Birmingham and Gloucester Railway, opened in 1840; it bypassed Worcester at some distance. In 1845 it became part of the Midland Railway, and linked with the Bristol and Gloucester Railway, forming a through route to Bristol, although with a break of gauge at Gloucester initially.[1][2]

The opening of these lines gave an enormous impetus to the heavy industry of the areas they served, representing a considerable move forward from the canal-based transport that had formerly been a near-monopoly. At the same time, the limited network generated a demand for further lines serving areas remote from the existing lines, and if possible competition.[3]

OW&WR proposed edit

Against this background, there was considerable interest in a railway crossing the Black Country to Wolverhampton, its largest town. A line from Oxford could be made, running through Worcester, Kidderminster and Stourbridge to Wolverhampton, and this would connect into a great many locations of industry. The proposed line fell naturally into the Great Western Railway's area of dominance, and Brunel was commissioned to undertake a survey for a broad gauge line.

A prospectus was issued on 22 May 1844; the capital of the company was to be £1,500,000, and negotiations were in hand to lease the line on completion to the Great Western Railway. In fact this was provisionally agreed in September; the lease term was to be 999 years; the GWR would pay a rent of 3.5% on the capital plus 50% of the profits.[note 2]

The necessary bill incorporating the company went to the 1845 session of Parliament, and received royal assent as the Oxford, Worcester and Wolverhampton Railway Act 1845 on 4 August 1845.[3][4][5]

Gauge edit

 
Wolverhampton Low Level Station

The OW&WR Act required the track gauge to be the same as on the GWR: the broad gauge, but with qualifications.

The line was to start from a junction off the mixed gauge Oxford and Rugby Railway immediately north of Oxford, at Wolvercot Junction.[note 3][3]

However, at the northern end it was to terminate by a junction on to the Grand Junction Railway at Bushbury Junction.[note 4] The Grand Junction was a solidly narrow (standard) gauge railway, and any "junction" must have been a transhipment point. The waters were muddied by a possible change of heart by the GJR. They had relied on the London and Birmingham Railway (L&BR) for access to London, but relationships had soured when the L&BR planned amalgamation with the Manchester and Birmingham Railway. Fearing that this would bypass their own line, the GJR flirted with the idea of converting to the broad gauge, or at least mixed gauge. This would give it access to London over the OW&WR, by-passing the L&BR.

Webster says that this alarmed the L&BR, but "whether the Grand Junction Board ever seriously contemplated relaying their tracks with the broad gauge is extremely doubtful."[note 5][6][3]

The next issue was that the Birmingham and Gloucester Railway had been built passing at some distance from Worcester, a fact that had caused resentment in the city. A spur at Abbots Wood[note 6] between the two lines would enable B&GR trains to reach Worcester, and it was contemplated that a connecting line from Droitwich to the B&GR line at Stoke Works would form a loop line for the B&GR. The B&GR was a narrow (standard) gauge line, and the loop line would need to be mixed gauge.[3][4]

Construction cost escalation edit

In 1846, Francis Rufford, the Chairman of the OW&WR saw that the inflation of construction costs brought about by the railway mania, now at its height, meant that the £1.5 million estimate they had used would be inadequate, and he asked the GWR to increase its rent in proportion to the anticipated cost, thought to be £2.5 million at least. The GWR was not immediately opposed to this, and the OW&WR may have understood that the GWR had formally agreed. The OW&WR Board improperly represented to prospective shareholders that the GWR guaranteed 4% interest on the whole construction cost whatever that might prove to be, and this led to soured relations between the two companies for a long period later on. (In August 1847 when the OW&WR found itself once again embarrassed financially, it asked the GWR to raise the interest rate to 5%, increasing the bad feeling.)[7]

In 1847, a review of the northern termination of the line was made; rather than simply join the Grand Junction at Bushbury, a spur would be added to reach a proposed joint station at Wolverhampton, shared with the Birmingham, Wolverhampton and Dudley Railway and the Shrewsbury and Birmingham Railway.

This was authorised by Act of 14 August 1848; the Act also authorised a further million pounds of capital, to be raised by preference shares.[3] As the economy was recovering from the post-mania depression, the French Revolution of 1848 plunged public confidence into turmoil, and for the time being construction ceased due to lack of money. A shareholders' committee was appointed, alarmed at the repeated deferral of construction, and opening of the line. They thought that a further £1.5 million would be needed to complete the line, and they recommended a drastic curtailment of the extent of the construction for the time being. The Board of Trade heard of this and sent Captain Simmons to investigate. His report of 27 November 1849 resulted in the Board of Trade instructing the Great Western Railway to complete the line itself. The 1845 Act had authorised the GWR to do so, but the Board of Trade had no power to compel them. Matters stalled for the time being.[3][7]

Midland Railway and a branch to Worcester edit

When the Birmingham and Gloucester Railway was built, its route avoided Worcester by some distance, and this remained a sore point with the city. The Midland Railway had taken over the B&GR in 1846.[1] The OW&WR proposed route crossed the B&GR line at Abbot's Wood, and by agreement the Midland Railway built a short spur between the two lines[note 7] and laid narrow (standard) gauge track on the OW&WR alignment as far as a temporary station at Tallow Hill, near Shrub Hill in Worcester. It was in effect a single line branch; it opened to Midland Railway trains on 5 October 1850. There were five trains to Bristol daily and six to Birmingham (Curzon Street); the latter journey took over two hours.[3][7][5]

On 18 February 1852,[note 8] the section from Droitwich to Stoke Works Junction, on the Birmingham and Gloucester line (now owned by the Midland Railway) was opened, completing the Worcester loop for the Midland. Now all their Gloucester to Birmingham passenger trains ran via Worcester and Droitwich, leaving their own main line to goods traffic and a very light local connecting service. This too was reduced and was discontinued from the end of September 1855, with all the Midland intermediate stations on their old main line between Abbotswood and Stoke Works Junctions closing permanently.[3][7][8][9]

Trying to regain momentum edit

In January 1851, a further special shareholders' meeting was held. Lord Ward, newly elected as Chairman, told the meeting that it was time for the OW&WR to take control of its own destiny, forsaking reliance on others (meaning the GWR); and raising a further £850,000 of capital in 6% preference shares. He began negotiations with George Carr Glyn and Samuel Carter of the London and North Western Railway but with mixed success.[10]

The contractors Peto and Betts were contractors for the construction as well as Treadwells. Samuel Morton Peto was associated with a solicitor named John Parson, and he and Peto were elected to the Board. Parson arranged an agreement (on 21 February 1851) that the London and North Western Railway and the Midland Railway would work the OW&WR as a 4 ft 8+12 in (1,435 mm) standard gauge line[7] - Carter was solicitor to both of these major companies.

This was in conflict with the Company's authorising act, and in May 1851 a group of shareholders secured a restraining order preventing this "illegal act". Parson soon agreed a working arrangement with the Great Western Railway. When the shareholders were asked to ratify this, at Parson's urging they insisted on a clause requiring the GWR to purchase the line after four years. Although this would be at a heavy discount of £30 for every £50 face value OW&WR share, the GWR noted that the market price of the OW&WR shares was £15 and falling, and declined the proposal.[7]

At this time a Stourbridge bank failed, and the £24,000 deposited there by the OW&WR was lost.[3][7]

Campden Tunnel skirmishes edit

A contractor called Marchant was constructing the Campden Tunnel, but in 1851, believing that he was owed money by the OW&WR, ceased work. Parson and Peto decided to occupy the tunnel works and seize Marchant's plant by force, and went there with a gang of workmen. Brunel became involved and he too tried to seize Marchant's equipment, but a magistrate had been called and the Riot Act was read. In the small hours of 23 July 1851 a large force was mustered by Brunel in the absence of the magistrates and a violent skirmish took place, during which Marchant and his men were routed.[3][7]

Timber viaducts edit

There were six timber viaducts, and 57 timber bridges in all, designed by Brunel, on the OW&WR main line. Structures with at least one span over 60 feet (18.3 m) or more than five spans, were, from south to north, at Aldington, Evesham, Fernhill, Fladbury, Hoo Brook (Kidderminster), Blakedown, Stambermill, Parkhead, Tipton (over Birmingham Canal), Dasiey Bank, Bilston (occupation road), Bilston Viaduct, Bilston Quarry, Gibbets Lane, George Street, Tramway Overbridge, and Holyhead turnpike. All except a footbridge were reconstructed by 1893.[3][11]

Resignation of Brunel edit

The methods of Parson and Peto clashed with Brunel's principles as an engineer, and he resigned as engineer of the OW&WR on 17 March 1852.[3][7]

Opening of part of the line edit

 
Evesham GWR station

The Evesham to Stourbridge section of line was practically ready in March 1852 and a date of 1 May 1852 had been fixed for the opening of that part of the line. The financial resources of the Company had long been exhausted and the acquisition of the necessary rolling stock was beyond it. A contractor, C C Williams, was engaged to work the line and he appointed a young locomotive engineer, David Joy to be his superintendent. Joy took the post on 19 April and now scrambled to get hold of locomotives. He found four, one six-coupled long-boiler engine in good condition, and three small contractors' engines. A special service duly opened on 1 May and a full public service on 3 May 1852. There were four services between Stourbridge and Evesham, taking a little over two hours; in addition there were two short workings between Stourbridge and Kidderminster, and two Sunday services. All this was done with six second hand locomotives.[3][7][9]

At first only a single line was available, but by July a double line was opened between Norton Junction and Evesham. Joy had no proper workshop facilities and had to use a local blacksmith for repairs to the engines at first; in fact he did some of the specialist metalwork jobs himself. A proper workshop was finally available to him by March 1855. The Stourbridge to Dudley section was opened to goods traffic on 16 November 1852, and passenger traffic followed on 20 December 1852; at first this was single line north of Brettell Lane.[3][7]

By now the Company was able to order locomotives to its own specification, and by the end of 1852 eleven out of an order of twenty engines had arrived from R and W Hawthorn. The passenger engines were of the 2-4-0 type and the goods engines were 0-6-0. All the OW&WR rolling stock was narrow (standard) gauge. The part of the line between Wolvercot Junction and Evesham was nearing completion and was planned to open on 21 April 1853, as a mixed gauge single line. When there was an earth slip near Campden tunnel this was postponed to 7 May, but Captain Galton of the Board of Trade refused to sanction passenger opening as the broad gauge track was incomplete, as was the junction at Wolvercot. A special excursion for the Directors was run anyway on 7 May. On the return journey to Oxford the excursion was running late and the Cheltenham Chronicle reported that a signalman Charles Marles had entered the Campden tunnel and received fatal injuries from the overdue train. Three more inspections took place before opening was sanctioned and passenger operation started on 4 June 1853.[3][4][7]

The line between Evesham and Wolvercot Junction was soon doubled, but the second track was narrow (standard) gauge, contrary to the authorising Act. Parson took a combative line when this was queried by the Board of Trade, and this resulted in their obtaining an injunction against use of the unapproved track. On 18 March 1854 the line reverted to mixed gauge single line, and Parson refused for some time to comply with the BoT requirement. At length the second line was reopened on 20 March 1855 when a broad gauge rail had been installed, and the line was doubled as far as Campden.[3][7][5]

On 1 December 1853, the line opened between Dudley and Tipton, which included a curve to join the Stour Valley Line of the London and North Western Railway. This was encouraged by Parson who still wished to ally the line with the LNWR, and trains could now run to Wolverhampton over that company's line from Tipton. There was a delay in getting running powers into Oxford station over the GWR, as successors to the Oxford and Rugby Railway. These were eventually agreed on 4 August 1853; at the same time the GWR was allowed running powers between Priestfield and Cannock Road Junction at Wolverhampton. (Its line connecting at Priestfield was not yet ready.) The OW&WR had contemplated not proceeding with the construction between Tipton and Wolverhampton, but the GWR relied on part of it to reach the Shrewsbury line, and in this case Parson relented and arranged for the line to be built.[3]

Yarnton Loop edit

Parson and Peto had long been manipulating to find a route to London independent of the Great Western Railway, a fact which naturally annoyed the GWR. After some failed Parliamentary bills for a new line from north of Oxford to London, they managed to get approval for the Buckinghamshire Junction Railway, more usually known as the Yarnton Loop, a short link between Yarnton and a junction with the London and North Western Railway's line from Oxford to Bletchley.

This opened on 1 April 1854, from which time OW&WR trains ran to London Euston via Bletchley. This was something of a Pyrrhic victory as the route was very lengthy. The service was discontinued in September 1861.[note 9][3][7]

More openings and enhancements edit

On 13 April 1854, a broad gauge train travelled the entire length of the main line between Oxford and Wolverhampton, and on 1 July that same year the last section of the OW&WR was opened to passengers, between Tipton and Cannock Road Junction; this followed the opening to goods which had taken place in April 1854. The Low Level station at Wolverhampton was unfinished, and for a time some OW&WR passenger trains continued to use the LNWR Stour Valley line.[3]

On 14 November 1854, the Great Western Railway opened its line between Birmingham Snow Hill and Wolverhampton Low Level. It joined the OW&WR at Priestfield. A mixed gauge link was opened from Cannock Road Junction to Stafford Road Junction.[4][7]

From this time, GWR passenger trains ran from Paddington and Birmingham to Wolverhampton, using the running powers over the OW&WR from Priestfield; these were the only regular broad gauge trains to run on the OW&WR, ceasing in October 1868.[3] (In 1864 to 1867 there was a passenger service between Wolverhampton GWR and Manchester via Bushbury Junction; this was the only regular passenger service to use the section of line.)[7]

Termination of the working contract edit

Early in 1855, the company terminated the working arrangement with C C Williams.[3][7]

Chipping Norton branch edit

When the OW&WR was opened, Chipping Norton was a flourishing wool town, five miles from the line, but there was no station on the line to serve it. William Bliss, owner of the biggest mill in the town repeatedly requested the OW&WR to provide a station near the town, but without success. Bliss met with Sir Morton Peto, a director of the OW&WR and the two men agreed to finance a branch line themselves, with some contribution by other local businesspeople. The line from Chipping Norton Junction, later named Kingham, opened on 10 August 1855.[3][7]

Amalgamation edit

In 1854, the Great Western Railway took over narrow (standard) gauge railways around Shrewsbury, and its attitude to narrow gauge traffic began to soften. This gradual process resulted, in February 1858, in the GWR relaxing its hostility to the use of the narrow gauge on the OW&WR and the abandonment of the broad gauge rails. This needed legislative approval, and this was gained in February 1859.[4]

On 14 June 1860, the OW&WR joined with the Worcester and Hereford Railway and the Newport, Abergavenny and Hereford Railway, together forming the West Midland Railway. The effective date was 1 July 1860. The OW&WR was the major partner in the new company. The enthusiasm for amalgamation went further, and in 1861 the OW&WR and the GWR agreed that amalgamation was desirable. The arrangement was authorised in Parliament on 13 July 1863 and the effective date was 1 August 1863.[3][7]

Kingswinford branch edit

On 14 November 1858 the OW&WR opened a line from a junction at Kingswinford to a canal basin at Bromley. The branch was about a mile long. It was later extended to the Earl of Dudley's Railway at Pensnett.[3]

Stratford branch edit

The OW&WR Act of 1846 authorised a branch line to Stratford from Honeybourne. The Company experienced considerable difficulty over land acquisition, and two extensions of time had to be sought; the line did not open until 11 July 1859. The branch started northwards from Honeybourne, and there were intermediate stations at Long Marston and Milcote, and the Stratford terminus was in Sanctuary Lane. The line was single-track, with sharp curves because of its intended minor branch status.

In the following year, 1860, the Stratford on Avon Railway line from Hatton to Stratford opened to its own independent station in Stratford. Both stations were inconveniently sited for the town, and despite tensions between the GWR and the OW&WR, agreement was reached to connect the two routes and provide a central station. This was completed on 24 July 1863. The line was doubled in 1907 - 1908.[3][12]

GWR trains to Paddington edit

On 1 October 1861, through passenger trains from Wolverhampton to Paddington over the OW&WR started running. Hitherto there had been a through service to Euston over the Yarnton Loop, but that ceased on the same day.[3][7]

Bourton-on-the-Water branch edit

The OW&WR obtained an Act in 1859 to build a branch line from Chipping Campden Junction to Bourton-on-the-Water. Morton Peto was the contractor, and the line opened on 1 March 1862. It was 8 miles (13 km) in length and had one intermediate station serving Stow-on-the-Wold, although that station was inconveniently sited for its community.[3]

Severn Valley Railway edit

In 1853, a nominally independent company, sponsored by the OW&WR, obtained its authorising Act to construct the Severn Valley Railway, from Hartlebury on the OW&WR through Bewdley, Bridgnorth and Ironbridge to Shrewsbury. Further Acts were secured in 1855 and 1856 amending the route, and construction did not begin until 1858. At 40 miles in extent, it was the longest OW&WR branch, and it finally opened to traffic on 1 February 1862, by which time the OW&WR had amalgamated into the West Midland Railway. There was considerable, and diverse, industry on the route which was much stimulated by the railway from the outset. Later, weekend leisure and tourism also featured heavily, especially from 1900 to 1950.

The south-facing connection at Hartlebury proved to be a significant limitation, and the Great Western Railway constructed a route leading north-east from Bewdley to Kidderminster, which opened on 1 June 1878.[3]

Stourbridge Extension Railway edit

In 1860, the Stourbridge Railway was authorised to build a railway line between Stourbridge and Cradley Heath. The following year the Stourbridge Extension Railway Act authorised an extension of that to join the LNWR main line at Galton Junction, and in 1862 a further extension was approved to reach the Great Western Railway line at Handsworth Junction. The line was opened to Cradley Heath with an intermediate station at Lye, on 1 April 1863. That portion was worked by the West Midland Railway, and when that company was absorbed into the Great Western Railway the GWR took over the working. On 1 January 1866 the line was opened to Old Hill and throughout on 1 April 1867. The line had formidable gradients and banking of heavy goods trains was commonplace.[3][7] The Stourbridge Railway was absorbed by the GWR on 1 February 1870.[13][9]

WMR amalgamated with the GWR edit

Effective from 1 August 1863, the West Midland Railway was amalgamated with the Great Western Railway. The accounts of the WMR were kept separately for some years; the former Worcester and Hereford Railway shareholders received a guaranteed 5% (because of earlier agreements) and the OW&WR shareholders got 72% of the residue. This arrangement continued until 1870. The whole of the OW&WR (except the Chipping Norton and Stratford branches) was laid with longitudinal timber track. There were 76 timber viaducts and timber underbridges in aggregate on the main line and branches. The former OW&WR contributed 59 locomotives.[7]

Netherton to Old Hill line edit

The West Midland Railway obtained an authorising Act in July 1862 for a line connecting the Stourbridge Extension line at Old Hill to the OW&WR main line near Netherton. Completion was much delayed: it opened on 1 March 1878. There was one intermediate station at Windmill End, and Netherton station was transferred on to the line from the OW&WR main line.[13] In September 1905, the GWR introduced steam railmotors on the line, and opened three new halts; the area was heavily industrialised and passenger usage was heavy. After World War II passenger usage declined steeply, and the passenger service was confined to the peak hours in 1958. this was followed by closure to passengers on 13 June 1964, and goods operation finished at the end of 1967.[3]

Stourbridge Town branch edit

 
An auto train for Dudley at Stourbridge Junction station

The Stourbridge station of the OW&WR was over a mile from the town: goods were brought up to the railway from the town on a rope-worked inclined plane at a gradient of 1 in 14.

On 30th July 1859, a branch was completed from the OWWR main line to the north of the viaduct, probably very close to where the junction to the engine shed was to be located, to the ironworks that had been built on the western side of Lower High Street… There was a hope that the branch would be available for passenger traffic. However, due to the steepness of the incline (1 in 14), which necessitated traffic having to be winched up and down using a cable attached to a stationary engine, it was doubtful that such traffic could be handled safely.[9]

In time, this was considered to be unsatisfactory and an Act for construction of a short branch to a Town station was secured by the GWR on 30 June 1874. The little branch was also on a gradient of 1 in 67 with double track, and beyond the new "Town" station there was a 1 in 27 gradient leading down to sidings on the River Stour. The passenger part of the line opened on 1 May 1879 and the goods extension on 1 January 1880. The new station was called Stourbridge, and the existing Stourbridge station was renamed Stourbridge Junction. The branch curved round to the north to reach the junction station on joining the main line, but in 1901 Stourbridge Junction station was relocated further south, and the branch was altered to run to it and to face the south.

The branch was closed to passengers from 29 March 1915 to 1 May 1919.[3][9]

Banbury and Cheltenham Direct Railway edit

From the opening of the Chipping Norton branch and the Bourton-on-the-Water branch, their alignment on the map encouraged ideas of forming a trunk railway. Iron ore from the East Midlands was in demand in South Wales, as ores of differing qualities were required for mixing there. These facts led to the Great Western Railway promoting its Banbury and Cheltenham Direct Railway. The part of this line from Bourton-on-the-Water to Cheltenham opened on 1 June 1881. This was followed by the extension of the Chipping Norton branch to King's Sutton, near Banbury, opening on 6 April 1887. Additionally there were ironstone workings on the course of the new line.

Through mineral trains required to reverse in Chipping Norton Junction station, until in 1906 a spur line connecting the two arms of the branch and crossing the main line, was opened, to goods on 8 January 1906 and to passenger trains on 1 May 1906. There was a single regular passenger train that used the new spur, a Swansea to Newcastle upon Tyne through train, operated jointly with the Great Central Railway.[3][14]

The Banbury and Cheltenham Direct Railway was purchased by the GWR in 1897 for £138,000 cash.[13] Chipping Norton Junction station was renamed Kingham in 1909.[3]

Shipston-on-Stour line edit

 
Moreton-in-Marsh station

The Stratford and Moreton Tramway had been built, opening between Stratford[-upon-Avon] and Moreton, opening in 1826. It was a horse-operated toll tramway, although there had been grand ideas of continuing to London. An extension to Shipston-on-Stour was opened in 1836, this time with the intention of extending to Coventry. The OW&WR Act of 1845 authorised the new railway to take over the tramway on a perpetual lease; it had debts then of over £48,000.

The Stratford section fell into disuse about 1880, but local people agitated for the Shipston part to be modernised, and it was converted by the GWR into a conventional railway, opening on 1 July 1889, with locomotive operation. It was therefore the Shipston-on-Stour branch of the Great Western Railway.[13] The sharp curves of the tramway alignment made it a slow journey, but passenger operation continued until 8 July 1929. Goods operation continued until closure on 3 May 1960.[3][7]

Cheltenham to Stratford main line edit

The Great Western Railway had long regretted the loss to the Midland Railway of the Birmingham to Bristol line in 1845. As the GWR network in the West Midlands grew, the difficulty increased. It had running powers over the Midland line, but with intensive traffic this became more unsatisfactory. At the end of the nineteenth century the GWR contemplated building an independent route from Cheltenham to Stratford, using the existing Honeybourne to Stratford line of 1859.[13]

The old branch needed considerable upgrading work, including doubling the line and easing many of the curves. The section between Honeybourne and Cheltenham was completely new, and the route opened throughout on 1 July 1908. Honeybourne station was considerably extended, with four platforms, and with loop connections to enable direct running to and from the OW&WR main line, though not directly to or from the direction of Oxford, only directly to or from the direction of Worcester. Trains travelling directly between Cheltenham and Stratford did not go through Honeybourne station but went on a railway line through fields some distance to the east of Honeybourne station. Many express passenger trains as well as through freight were diverted to the new route, and traffic was especially heavy after World War I on summer Saturdays when holiday trains from the West Midlands and places further north to the West of England were dominant.[13]

A significant weakness of the route was that it passed through relatively undeveloped countryside, with comparatively few major settlements intermediately.[3]

Grouping edit

In 1923, the railways of Great Britain were "grouped" in to one or other of four new large companies, following the Railways Act 1921. The Great Western Railway and certain other railways were constituents of the new Great Western Railway.

Kingswinford to Oxley edit

The Great Western Railway saw that it had the Kingswinford Railway, to a canal and colliery at Pensnett; it thought that it could usefully be extended to Oxley, on the line from Wolverhampton to Shrewsbury. It prepared several Bills over time to get authorisation, finally succeeding on 1905. Construction was slow, further delayed by World War I, and the line opened on 11 May 1925. The passenger service was discontinued from 31 October 1932.[3]

Diesel railcars edit

From July 1935, a GWR diesel railcar was put in service at Worcester, followed by several more. The vehicles were a more economical means of providing a passenger service on less-busy routes, and they were widely employed on the former OW&WR network. These vehicles and a later variant continued in use until 1962.[3][12]

Nationalisation edit

On nationalisation in 1948, the line became part of the Western Region of British Railways.

After 1960 edit

Near Stratford a new south to east curve was installed on 12 June 1960, which allowed the line northwards to be closed; mineral trains conveying iron ore from Northamptonshire to South Wales used the curve, and the line northwards was closed to that traffic. The flow ceased on to 1 March 1965 and the curve was removed.[12] The line between Stourbridge Junction and Priestfield Junction was closed to passenger trains after 29 July 1962. It remained open to goods trains until December 1967.

The Severn Valley line closed on 8 September 1963, although the Kidderminster to Bewdley loop and the Hartlebury to Bewdley sections operated a thin passenger service until closure on 3 January 1970.

However a group of railway enthusiasts formed the Severn Valley Railway as a heritage railway in 1967 and in 1970 steam operated trains resumed running. At the present day the line operates between Kidderminster and Bridgnorth.

The Kingswinford to Oxley line was closed north of Pensnett on 27 February 1965, and throughout in 1990.

The Old Hill to Dudley line closed to passenger services after 13 June 1964.[3]

The section of the railway between Stourbridge and Dudley was later absorbed into the South Staffordshire Line, which continued to Walsall after forking off eastwards from Dudley. Passenger services had all been withdrawn by 1965, but goods trains continued to serve the route until 1993, when the line north of Round Oak was mothballed. The line is still open for freight to this point to serve Round Oak Steel Terminal.

The Cheltenham – Honeybourne – Stratford route was less significant in British Railways days, and when the traffic declined in the 1960s the route was not any longer important. From September 1966 long distance trains were diverted to other routes, chiefly the Midland route via the Lickey Incline, and in May 1969 the local passenger service between Stratford and Worcester was closed down, together with Honeybourne station itself. Goods traffic between Honeybourne and Cheltenham ceased in August 1976. The section from Honeybourne to Long Marston was retained because of the Royal Engineers depot there.[3]

 
Parry People Mover at Stourbridge Town station

The Stourbridge Town branch was closed to goods operation in July 1965; the passenger part of the line was successively cut back but is still in operation. In 2006 trial operation of the branch started using a lightweight vehicle from Parry People Movers Ltd. The vehicle uses a flywheel for energy storage to supplement the engine power.

The main line between Moreton and Norton Junction was singled in the Autumn of 1971; there was only one passing loop, at Evesham, in this long single line route.

Honeybourne station was reopened on 22 May 1981.

On 19 March 1993 the final operation of through freight on the Dudley to Stourbridge route took place.[3]

The main line of the former OW&WR had been singled in the 1960s, and there were moves to reinstate double track at the beginning of the twenty-first century. The new double track section between Charlbury and Ascott was commissioned on 6 June 2011, and the section between Moreton and Evesham on 22 August 2011.

The former OW&WR network is (2017) still in use from Oxford to Round Oak, as well as the Norton Junction spur and the Stoke Works connection. A short length near Bushbury Junction has been reused as part of a loop from Stafford Road Junction.

Round Oak accident edit

On 23 August 1858 an excursion train was run from Wolverhampton to Worcester. 1,506 adults and children were on board. On the return journey the excursion was run in two portions. Ascending the steep gradient between Brettell Road and Round Oak, the first portion came to a stand, and part of the train ran back down the gradient and struck the second portion which was following. The time interval system of operation was in use.

There had been a number of failures of the couplings on the journey, and numerous badly made welds were later found. It appears that the head guard alighted from his van to deal with a broken coupling, and was unable to regain his post to apply the brakes. 14 passengers died and about 50 were badly injured.[15][7][3]

Topography edit

Oxford, Worcester and
Wolverhampton Railway
 
 
Wolverhampton Low Level
 
 
 
 
 
 
Priestfield
main line
Midland Metro
 
 
 
Bilston West
 
Daisy Bank
 
Princes End and Coseley
 
 
 
 
 
 
Tipton Five Ways
 
 
 
Dudley
 
 
Blowers Green
 
 
 
 
 
Harts Hill
 
 
Round Oak
 
Brierley Hill
 
 
freight only branch
 
 
Brettell Lane
 
 
Great Western Railway
to Handsworth Junction
 
 
Stourbridge Town
 
Stourbridge Junction
 
Hagley
 
Blakedown
 
Kidderminster
 
 
 
 
 
 
Hartlebury
 
Cutnall Green Halt
 
 
 
 
Droitwich Spa
 
Fernhill Heath
 
Blackpole Halt
 
Astwood Halt
 
 
 
 
 
 
 
 
Tunnel Junction
 
 
Worcester Shrub Hill
 
Norton Halt
 
 
 
 
 
Abbotswood Junction (MR)
Gloucester - Birmingham New Street line
 
Stoulton
 
Pershore
 
Wyre Halt
 
Fladbury
 
 
 
 
 
 
 
 
 
 
 
 
Evesham
 
 
 
 
 
 
 
 
Littleton and Badsey
 
Honeybourne
 
 
 
 
 
 
 
Mickleton Halt
 
Campden Tunnel
 
Chipping Campden
 
Blockley
 
 
 
Moreton-in-Marsh
 
summit
 
Adlestrop
 
 
 
 
 
 
 
Kingham
 
Shipton
 
Ascott-under-Wychwood
 
 
 
Charlbury
 
Finstock
 
Combe
 
Hanborough
 
 
 
 
 
Yarnton
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Wolvercote Junction
 
 
 
 
Duke's Cut │ Wolvercote Tunnel
 
 
 
Wolvercot Platform
 
 
 
Wolvercote Halt
 
 
 
 
 
 
 
 
Oxford North Junction
 
 
Port Meadow Halt
 
 
 
 
 
 
Oxford Rewley Road
 
Oxford General
 

Main line edit

  • Oxford;
  • Wolvercot Junction; divergence from Oxford and Rugby Railway;
  • Yarnton; opened 14 November 1861; closed 18 June 1962; divergence of Witney Railway 1861 – 1970;
  • Han[d]borough; opened 4 June 1853; still open;
  • Combe; opened 8 July 1935; still open;
  • Finstock Halt; opened 9 April 1934; still open;
  • Charlbury; opened 4 June 1853; still open;
  • Ascott; opened 4 June 1853; renamed Ascott-under-Wychwood 1880; renamed Ascott-under-Wychwood Halt 1965; renamed Ascott-under-Wychwood 1969; still open;
  • Shipton; opened 4 June 1853; still open;
  • Chipping Norton Junction; opened 10 August 1855; renamed Kingham 1909; still open; divergence of line to Bourton-on-the-Water 1862 – 1964; divergence of line to Chipping Norton 1855 – 1964;
  • Addlestrop and Stow Road; opened 4 June 1853; renamed Addlestrop 1862; renamed Adlestrop 1883; closed 3 January 1966;
  • Moreton-in-Marsh; opened 4 June 1853; still open; early tramway connection, and divergence of line to Shipston on Stour 1869 – 1960;
  • Blockley; opened 4 June 1853; closed 3 January 1966;
  • Campden; opened 4 June 1853; renamed Chipping Campden 1952; closed 3 January 1966;
  • Campden Tunnel or Mickleton Tunnel;
  • Mickleton Halt; opened 8 November 1937; closed 6 October 1941;
  • Honeybourne South Loop Junction; divergence of loop to Stratford branch;
  • Honeybourne North Loop Junction; convergence of Stratford branch;
  • Honeybourne; opened 4 June 1853; closed 5 May 1969; reopened 25 May 1981; still open;
  • Littleton and Badsey; opened 21 April 1884; closed 3 January 1966;
  • Evesham; opened 3 May 1852; still open;
  • Fladbury; opened 3 May 1852; closed 3 January 1966;
  • Wyre Halt; opened 11 June 1934; closed 3 January 1966;
  • Pershore; opened 3 May 1852; still open;
  • Stoulton; opened 20 February 1899; closed 3 January 1966;
  • Norton Junction; opened from October 1879; renamed Norton Halt 1959; closed 3 January 1966; convergence of spur from Abbotswoood Junction;
  • Worcester Shrub Hill; opened 5 October 1850 for Midland Railway; still open; divergence of line to Hereford 1860 -;
  • Tunnel Junction; convergence of line from Hereford, 1860 -;
  • Astwood Halt; opened 18 May 1936; closed 25 September 1939;
  • Blackpole Halt; private station for Ordnance Factory; used 1917 to 1920 and 1940 to 1946;
  • Fearnall Heath; opened 15 February 1852; renamed Fernhill Heath 1883; closed 5 April 1965;
  • Droitwich; opened 18 February 1852; renamed Droitwich Spa 1923; divergence of line to Stoke Works Junction; still open;
  • Cutnall Green; opened from 9 July 1928; closed 5 April 1965;
  • Hartlebury; opened 3 May 1852; still open;
  • Hartlebury Junction; divergence of Severn Valley Railway 1862 – 1980;
  • Kidderminster Junction; convergence of line from Bewdley 1878 – 1984;
  • Kidderminster; opened 3 May 1852; still open;
  • Churchill and Blakedown; opened from April 1853; renamed Blakedown 1968; still open;
  • Hagley; opened by June 1857; still open;
  • Stourbridge; opened 3 May 1852; renamed Stourbridge Junction 1879; relocated southwards 1 October 1901; divergence of Stourbridge Town branch; still open;
  • Stourbridge North Junction; divergence of Stourbridge Extension line;
  • Brettell Lane; opened 20 December 1852; closed 30 July 1962;
  • Kingswinford Junction; divergence of Kingswinford branch;
  • Moor Lane; workmen's halt not publicly advertised; probably used during WWI;
  • Brierley Hill; opened 1 December 1858; closed 30 July 1962;
  • Round Oak; opened 20 December 1852; relocated about 1894; closed 30 July 1962;
  • Harts Hill and Woodside; opened 1 April 1895; closed 1 January 1917;
  • Netherton; opened 20 December 1852; closed 1 March 1878;
  • Netherton Junction; convergence of Windmill End branch;
  • Dudley South Side and Netherton; opened 1 March 1878; renamed Blowers Green 1921; closed 30 July 1962; convergence of GWR line from Old Hill 1878 - 1968
  • Dudley; opened 20 December 1852; closed 6 July 1964; divergence of South Staffordshire line (later LMS) to Dudley Port, 1850 – 1993;
  • Tipton; opened 1 December 1853; renamed Tipton Five Ways 1950; closed 30 July 1962; divergence of spur to Stour Valley line 1853 to 1983;
  • Princes End; opened by December 1856; renamed Princes End and Coseley 1936; closed 30 July 1962;
  • Daisey Bank; opened 1 July 1854; closed 1 January 1917; reopened as Daisy Bank and Bradley 3 February 1919; closed 30 July 1962;
  • Bilston; opened 1 July 1854; renamed Bilston West 1950; closed 30 July 1962;
  • Priestfield; opened 5 July 1854; closed 6 March 1972; convergence of GWR line from Birmingham;
  • Wolverhampton Low Level; opened 1 July 1854; closed 6 March 1972;
  • Cannock Road Junction; divergence of Shrewsbury and Birmingham Railway, 1854 – 1968;
  • Bushbury Junction; convergence with former Grand Junction Railway line.[16][17]

[18]

Shipston-on-Stour branch edit

(Formerly tramway)

  • Moreton-in-Marsh; above;
  • Stretton-on-Fosse; opened 1 July 1889; closed 1 January 1917; reopened 1 January 1919; closed 8 July 1929;
  • Longdon Road; opened 1 July 1889; closed 8 July 1929;
  • Shipston-on-Stour; opened 1 July 1889; closed 8 July 1929.[17][16][18]

Stratford branch edit

  • Honeybourne;
  • Honeybourne North Loop Junction;
  • Honeybourne East Loop Junction;
  • Pebworth Halt; opened 6 September 1937; closed 3 January 1966;
  • Broad Marston Halt; opened 17 October 1904; closed 14 July 1916;
  • Long Marston; opened 11 July 1859; closed 3 January 1966;
  • Milcote [and Weston]; opened 11 July 1859; relocated about 9 May 1908; closed 3 January 1966;
  • Chambers Crossing Halt; opened 17 October 1904; closed 14 July 1916;
  • Race Course Junction; divergence of 1960 line to East and West Junction line;
  • Stratford Racecourse; opened 6 May 1933; closed by 1968; special traffic only;
  • East and West Junction; convergence of line from East and West Junction line;
  • Stratford [OW&WR station]; opened 11 July 1859; closed 1 January 1863 when new station opened.[17][16][18]

Abbotswood Junction spur edit

  • Abbotswood Junction; divergence from Birmingham and Gloucester Railway;
  • Norton Junction; above.[17][16][18]

Stoke Works Spur edit

  • Droitwich Spa; above;
  • Stoke Works; opened 18 February 1852; closed 18 April 1966;
  • Stoke Works Junction; convergence with Birmingham and Gloucester Railway.[17][16][18]

Stourbridge Town branch edit

  • Stourbridge Junction; above;
  • Stourbridge Town; opened 1 October 1879; closed 20 March 1915; reopened 3 March 1919; relocated 1979; still open.[17][16][18]

Bromley Basin branch edit

  • Kingswinford Junction; above;
  • Brockmoor Halt; opened 11 May 1925; closed 31 October 1932;
  • Bromley Halt; opened 11 May 1925; closed 31 October 1932;
  • Bromley Basin.[17][16][18]

See also edit

Notes edit

  1. ^ The nearby settlement is spelt Wolvercote and a later station on the LNWR Bicester line follows that spelling. The OW&WR and GWR consistently used the spelling Wolvercot.
  2. ^ The arrangement appears to have been provisional only, and was not formalised, but the GWR subscribed £375,000 to the subscription list.
  3. ^ The Oxford and Rugby Railway was authorised on the same day as the Oxford, Worcester and Wolverhampton Railway.
  4. ^ Bushbury, from Boynton, page 10. The junction would leave OW&WR trains directed away from Wolverhampton, even though it was the most important town in the area. On page 12 Boynton refers to the junction as being proposed "on the edge of the town, at Wednesfield Heath."
  5. ^ Mark Huish of the GJR told shareholders: "The question at issue has been represented as one entirely of Broad and Narrow Gauge; upon this point the Directors may observe that they do not anticipate any inconvenience whatever to arise from the introduction of the Broad Gauge among the Narrow Gauge lines, or a mixture of gauges on the same line. On the contrary, looking at express trains running at high speed, which are now being introduced on the leading roads, they deem it probable that many Companies possessing trunk lines on the Narrow Gauge principle may find it their interest to adopt both; and the Directors have ascertained the perfect practicability of adding the Broad Gauge on the Grand Junction at a very reasonable cost."
  6. ^ Later spelt Abbotswood.
  7. ^ Abbot's Wood Junction to Norton Junction.
  8. ^ Rake says 10 February 1852.
  9. ^ Boynton refers (on page 30) to these trains making good connections with the GWR trains at Oxford. If this is intended literally, it seems to mean that for some of the time the Euston trains ran to Oxford station and reversed there instead of using the Yarnton Loop. However MacDermot says (page 508, volume I part 2) that "the southern curve towards Oxford appears to have been used for goods traffic only, there being no evidence that Oxford, Worcester & Wolverhampton passenger trains ever entered the North Western Station at Oxford."

References edit

  1. ^ a b P J Long and W V Awdry, The Birmingham and Gloucester Railway, Alan Sutton Publishing, Gloucester, 1987, ISBN 0 86299 329 6
  2. ^ C G Maggs, The Bristol and Gloucester Railway and the Avon and Gloucestershire Railway, The Oakwood Press, Witney, second edition 1992, ISBN 0-85361-435-0
  3. ^ a b c d e f g h i j k l m n o p q r s t u v w x y z aa ab ac ad ae af ag ah ai aj ak al am an ao ap John Boynton, The Oxford, Worcester and Wolverhampton Railway, Mid England Books, Kidderminster, 2002, ISBN 0 954 0839 0 3
  4. ^ a b c d e E T MacDermot, History of the Great Western Railway: volume I: 1833 - 1863, part 1, published by the Great Western Railway, London, 1927
  5. ^ a b c Herbert Rake, The Oxford, Worcester and Wolverhampton Railway, in the Railway Magazine, January and February 1913
  6. ^ Norman W Webster, Britain's First Trunk Line': the Grand Junction Railway, Adams and Dart, Bath, 1972, ISBN 0239 00105 2, pages 134 and 135
  7. ^ a b c d e f g h i j k l m n o p q r s t u v w x E T MacDermot, History of the Great Western Railway: volume I: 1833 - 1863, part 2, published by the Great Western Railway, London, 1927
  8. ^ William J Skillern, Stoke Works: An Unusual Station, in the Railway Magazine, July 1953
  9. ^ a b c d e Clive Butcher, The Railways of Stourbridge, Oakwood Press, Usk, 1998, ISBN 0 85361 533 0
  10. ^ "Lord Ward and Mr Glyn". Railway Record. 8: 192. 1851.
  11. ^ Brian Lewis, Brunel's Timber Bridges and Viaducts, Ian Allan Publishing, Hersham, 2007, ISBN 978 0 7110 3218 7
  12. ^ a b c Vic Mitchell and Keith Smith, Stratford upon Avon to Cheltenham, Middleton Press, Midhurst, 1988, ISBN 1 901706 25 7
  13. ^ a b c d e f E T MacDermot, History of the Great Western Railway: volume II: 1863 - 1921, published by the Great Western Railway, London, 1931
  14. ^ William Hemmings. The Banbury and Cheltenham Direct Railway, volume one, Wild Swan Publications, Didcot, 2004, ISBN 1 874 103 88 7
  15. ^ Captain H W Tyler, Report to Railway Department, Board of Trade, 16 October 1858
  16. ^ a b c d e f g M E Quick, Railway Passenger Stations in England Scotland and Wales—A Chronology, The Railway and Canal Historical Society, 2002
  17. ^ a b c d e f g R A Cooke, Atlas of the Great Western Railway, 1947, Wild Swan Publications Limited, Didcot, 1997 ISBN 1-874103-38-0
  18. ^ a b c d e f g Col M H Cobb, The Railways of Great Britain -- A Historical Atlas, Ian Allan Publishing Limited, Shepperton, 2003, ISBN 07110 3003 0
  • Report of the Railway Department of the Board of Trade on the London, Worcester and Wolverhampton, and on the Birmingham and Shrewsbury Districts, by Samuel Laing, et al. at Project Gutenberg

oxford, worcester, wolverhampton, railway, railway, company, england, built, line, from, wolvercot, junction, note, near, oxford, worcester, stourbridge, dudley, wolverhampton, well, some, branches, overviewmain, region, gloucestershireheadquartersworcesterrep. The Oxford Worcester and Wolverhampton Railway OW amp WR was a railway company in England It built a line from Wolvercot Junction note 1 near Oxford to Worcester Stourbridge Dudley and Wolverhampton as well as some branches Oxford Worcester and Wolverhampton RailwayOverviewMain region s GloucestershireHeadquartersWorcesterReporting markOWWLocaleOxfordshireGloucestershireWorcestershireStaffordshireDates of operation1837 1837 1863 1863 SuccessorWest Midland Railway Its main line was opened in stages between 1852 and 1853 When the West Midland Railway WMR was formed by amalgamation in 1860 the OW amp WR was the dominant partner but the West Midland company amalgamated with the Great Western Railway GWR in 1863 Several branches and extensions were built in the West Midlands and the main line was developed as an important trunk route Much of the original main line is in use at present Contents 1 Before the OW amp WR 2 OW amp WR proposed 3 Gauge 4 Construction cost escalation 5 Midland Railway and a branch to Worcester 6 Trying to regain momentum 7 Campden Tunnel skirmishes 8 Timber viaducts 9 Resignation of Brunel 10 Opening of part of the line 11 Yarnton Loop 12 More openings and enhancements 13 Termination of the working contract 14 Chipping Norton branch 15 Amalgamation 16 Kingswinford branch 17 Stratford branch 18 GWR trains to Paddington 19 Bourton on the Water branch 20 Severn Valley Railway 21 Stourbridge Extension Railway 22 WMR amalgamated with the GWR 23 Netherton to Old Hill line 24 Stourbridge Town branch 25 Banbury and Cheltenham Direct Railway 26 Shipston on Stour line 27 Cheltenham to Stratford main line 28 Grouping 29 Kingswinford to Oxley 30 Diesel railcars 31 Nationalisation 32 After 1960 33 Round Oak accident 34 Topography 34 1 Main line 34 2 Shipston on Stour branch 34 3 Stratford branch 34 4 Abbotswood Junction spur 34 5 Stoke Works Spur 34 6 Stourbridge Town branch 34 7 Bromley Basin branch 35 See also 36 Notes 37 ReferencesBefore the OW amp WR edit nbsp The Oxford Worcester and Wolverhampton Railway in 1860 In 1841 the GWR opened its first main line between London and Bristol It was engineered by Isambard Kingdom Brunel and the track was on the broad gauge in contrast to most of the railways already in existence in Great Britain The broad gauge would Brunel argued give greater stability to trains running at speed In 1844 a branch line from Didcot to Oxford was opened preparatory to extending the GWR system into the West Midlands It too was designed by Brunel and used the broad gauge Birmingham and the industrial area of the Black Country were already served by the London and Birmingham Railway of 1838 and the Grand Junction Railway GJR The GJR had opened in 1837 and ran north from Birmingham skirting Wolverhampton to reach the Liverpool and Manchester Railway Approaching Birmingham from the south was the Birmingham and Gloucester Railway opened in 1840 it bypassed Worcester at some distance In 1845 it became part of the Midland Railway and linked with the Bristol and Gloucester Railway forming a through route to Bristol although with a break of gauge at Gloucester initially 1 2 The opening of these lines gave an enormous impetus to the heavy industry of the areas they served representing a considerable move forward from the canal based transport that had formerly been a near monopoly At the same time the limited network generated a demand for further lines serving areas remote from the existing lines and if possible competition 3 OW amp WR proposed editAgainst this background there was considerable interest in a railway crossing the Black Country to Wolverhampton its largest town A line from Oxford could be made running through Worcester Kidderminster and Stourbridge to Wolverhampton and this would connect into a great many locations of industry The proposed line fell naturally into the Great Western Railway s area of dominance and Brunel was commissioned to undertake a survey for a broad gauge line A prospectus was issued on 22 May 1844 the capital of the company was to be 1 500 000 and negotiations were in hand to lease the line on completion to the Great Western Railway In fact this was provisionally agreed in September the lease term was to be 999 years the GWR would pay a rent of 3 5 on the capital plus 50 of the profits note 2 The necessary bill incorporating the company went to the 1845 session of Parliament and received royal assent as the Oxford Worcester and Wolverhampton Railway Act 1845 on 4 August 1845 3 4 5 Gauge edit nbsp Wolverhampton Low Level Station The OW amp WR Act required the track gauge to be the same as on the GWR the broad gauge but with qualifications The line was to start from a junction off the mixed gauge Oxford and Rugby Railway immediately north of Oxford at Wolvercot Junction note 3 3 However at the northern end it was to terminate by a junction on to the Grand Junction Railway at Bushbury Junction note 4 The Grand Junction was a solidly narrow standard gauge railway and any junction must have been a transhipment point The waters were muddied by a possible change of heart by the GJR They had relied on the London and Birmingham Railway L amp BR for access to London but relationships had soured when the L amp BR planned amalgamation with the Manchester and Birmingham Railway Fearing that this would bypass their own line the GJR flirted with the idea of converting to the broad gauge or at least mixed gauge This would give it access to London over the OW amp WR by passing the L amp BR Webster says that this alarmed the L amp BR but whether the Grand Junction Board ever seriously contemplated relaying their tracks with the broad gauge is extremely doubtful note 5 6 3 The next issue was that the Birmingham and Gloucester Railway had been built passing at some distance from Worcester a fact that had caused resentment in the city A spur at Abbots Wood note 6 between the two lines would enable B amp GR trains to reach Worcester and it was contemplated that a connecting line from Droitwich to the B amp GR line at Stoke Works would form a loop line for the B amp GR The B amp GR was a narrow standard gauge line and the loop line would need to be mixed gauge 3 4 Construction cost escalation editIn 1846 Francis Rufford the Chairman of the OW amp WR saw that the inflation of construction costs brought about by the railway mania now at its height meant that the 1 5 million estimate they had used would be inadequate and he asked the GWR to increase its rent in proportion to the anticipated cost thought to be 2 5 million at least The GWR was not immediately opposed to this and the OW amp WR may have understood that the GWR had formally agreed The OW amp WR Board improperly represented to prospective shareholders that the GWR guaranteed 4 interest on the whole construction cost whatever that might prove to be and this led to soured relations between the two companies for a long period later on In August 1847 when the OW amp WR found itself once again embarrassed financially it asked the GWR to raise the interest rate to 5 increasing the bad feeling 7 In 1847 a review of the northern termination of the line was made rather than simply join the Grand Junction at Bushbury a spur would be added to reach a proposed joint station at Wolverhampton shared with the Birmingham Wolverhampton and Dudley Railway and the Shrewsbury and Birmingham Railway This was authorised by Act of 14 August 1848 the Act also authorised a further million pounds of capital to be raised by preference shares 3 As the economy was recovering from the post mania depression the French Revolution of 1848 plunged public confidence into turmoil and for the time being construction ceased due to lack of money A shareholders committee was appointed alarmed at the repeated deferral of construction and opening of the line They thought that a further 1 5 million would be needed to complete the line and they recommended a drastic curtailment of the extent of the construction for the time being The Board of Trade heard of this and sent Captain Simmons to investigate His report of 27 November 1849 resulted in the Board of Trade instructing the Great Western Railway to complete the line itself The 1845 Act had authorised the GWR to do so but the Board of Trade had no power to compel them Matters stalled for the time being 3 7 Midland Railway and a branch to Worcester editWhen the Birmingham and Gloucester Railway was built its route avoided Worcester by some distance and this remained a sore point with the city The Midland Railway had taken over the B amp GR in 1846 1 The OW amp WR proposed route crossed the B amp GR line at Abbot s Wood and by agreement the Midland Railway built a short spur between the two lines note 7 and laid narrow standard gauge track on the OW amp WR alignment as far as a temporary station at Tallow Hill near Shrub Hill in Worcester It was in effect a single line branch it opened to Midland Railway trains on 5 October 1850 There were five trains to Bristol daily and six to Birmingham Curzon Street the latter journey took over two hours 3 7 5 On 18 February 1852 note 8 the section from Droitwich to Stoke Works Junction on the Birmingham and Gloucester line now owned by the Midland Railway was opened completing the Worcester loop for the Midland Now all their Gloucester to Birmingham passenger trains ran via Worcester and Droitwich leaving their own main line to goods traffic and a very light local connecting service This too was reduced and was discontinued from the end of September 1855 with all the Midland intermediate stations on their old main line between Abbotswood and Stoke Works Junctions closing permanently 3 7 8 9 Trying to regain momentum editIn January 1851 a further special shareholders meeting was held Lord Ward newly elected as Chairman told the meeting that it was time for the OW amp WR to take control of its own destiny forsaking reliance on others meaning the GWR and raising a further 850 000 of capital in 6 preference shares He began negotiations with George Carr Glyn and Samuel Carter of the London and North Western Railway but with mixed success 10 The contractors Peto and Betts were contractors for the construction as well as Treadwells Samuel Morton Peto was associated with a solicitor named John Parson and he and Peto were elected to the Board Parson arranged an agreement on 21 February 1851 that the London and North Western Railway and the Midland Railway would work the OW amp WR as a 4 ft 8 1 2 in 1 435 mm standard gauge line 7 Carter was solicitor to both of these major companies This was in conflict with the Company s authorising act and in May 1851 a group of shareholders secured a restraining order preventing this illegal act Parson soon agreed a working arrangement with the Great Western Railway When the shareholders were asked to ratify this at Parson s urging they insisted on a clause requiring the GWR to purchase the line after four years Although this would be at a heavy discount of 30 for every 50 face value OW amp WR share the GWR noted that the market price of the OW amp WR shares was 15 and falling and declined the proposal 7 At this time a Stourbridge bank failed and the 24 000 deposited there by the OW amp WR was lost 3 7 Campden Tunnel skirmishes editA contractor called Marchant was constructing the Campden Tunnel but in 1851 believing that he was owed money by the OW amp WR ceased work Parson and Peto decided to occupy the tunnel works and seize Marchant s plant by force and went there with a gang of workmen Brunel became involved and he too tried to seize Marchant s equipment but a magistrate had been called and the Riot Act was read In the small hours of 23 July 1851 a large force was mustered by Brunel in the absence of the magistrates and a violent skirmish took place during which Marchant and his men were routed 3 7 Timber viaducts editThere were six timber viaducts and 57 timber bridges in all designed by Brunel on the OW amp WR main line Structures with at least one span over 60 feet 18 3 m or more than five spans were from south to north at Aldington Evesham Fernhill Fladbury Hoo Brook Kidderminster Blakedown Stambermill Parkhead Tipton over Birmingham Canal Dasiey Bank Bilston occupation road Bilston Viaduct Bilston Quarry Gibbets Lane George Street Tramway Overbridge and Holyhead turnpike All except a footbridge were reconstructed by 1893 3 11 Resignation of Brunel editThe methods of Parson and Peto clashed with Brunel s principles as an engineer and he resigned as engineer of the OW amp WR on 17 March 1852 3 7 Opening of part of the line edit nbsp Evesham GWR stationThe Evesham to Stourbridge section of line was practically ready in March 1852 and a date of 1 May 1852 had been fixed for the opening of that part of the line The financial resources of the Company had long been exhausted and the acquisition of the necessary rolling stock was beyond it A contractor C C Williams was engaged to work the line and he appointed a young locomotive engineer David Joy to be his superintendent Joy took the post on 19 April and now scrambled to get hold of locomotives He found four one six coupled long boiler engine in good condition and three small contractors engines A special service duly opened on 1 May and a full public service on 3 May 1852 There were four services between Stourbridge and Evesham taking a little over two hours in addition there were two short workings between Stourbridge and Kidderminster and two Sunday services All this was done with six second hand locomotives 3 7 9 At first only a single line was available but by July a double line was opened between Norton Junction and Evesham Joy had no proper workshop facilities and had to use a local blacksmith for repairs to the engines at first in fact he did some of the specialist metalwork jobs himself A proper workshop was finally available to him by March 1855 The Stourbridge to Dudley section was opened to goods traffic on 16 November 1852 and passenger traffic followed on 20 December 1852 at first this was single line north of Brettell Lane 3 7 By now the Company was able to order locomotives to its own specification and by the end of 1852 eleven out of an order of twenty engines had arrived from R and W Hawthorn The passenger engines were of the 2 4 0 type and the goods engines were 0 6 0 All the OW amp WR rolling stock was narrow standard gauge The part of the line between Wolvercot Junction and Evesham was nearing completion and was planned to open on 21 April 1853 as a mixed gauge single line When there was an earth slip near Campden tunnel this was postponed to 7 May but Captain Galton of the Board of Trade refused to sanction passenger opening as the broad gauge track was incomplete as was the junction at Wolvercot A special excursion for the Directors was run anyway on 7 May On the return journey to Oxford the excursion was running late and the Cheltenham Chronicle reported that a signalman Charles Marles had entered the Campden tunnel and received fatal injuries from the overdue train Three more inspections took place before opening was sanctioned and passenger operation started on 4 June 1853 3 4 7 The line between Evesham and Wolvercot Junction was soon doubled but the second track was narrow standard gauge contrary to the authorising Act Parson took a combative line when this was queried by the Board of Trade and this resulted in their obtaining an injunction against use of the unapproved track On 18 March 1854 the line reverted to mixed gauge single line and Parson refused for some time to comply with the BoT requirement At length the second line was reopened on 20 March 1855 when a broad gauge rail had been installed and the line was doubled as far as Campden 3 7 5 On 1 December 1853 the line opened between Dudley and Tipton which included a curve to join the Stour Valley Line of the London and North Western Railway This was encouraged by Parson who still wished to ally the line with the LNWR and trains could now run to Wolverhampton over that company s line from Tipton There was a delay in getting running powers into Oxford station over the GWR as successors to the Oxford and Rugby Railway These were eventually agreed on 4 August 1853 at the same time the GWR was allowed running powers between Priestfield and Cannock Road Junction at Wolverhampton Its line connecting at Priestfield was not yet ready The OW amp WR had contemplated not proceeding with the construction between Tipton and Wolverhampton but the GWR relied on part of it to reach the Shrewsbury line and in this case Parson relented and arranged for the line to be built 3 Yarnton Loop editParson and Peto had long been manipulating to find a route to London independent of the Great Western Railway a fact which naturally annoyed the GWR After some failed Parliamentary bills for a new line from north of Oxford to London they managed to get approval for the Buckinghamshire Junction Railway more usually known as the Yarnton Loop a short link between Yarnton and a junction with the London and North Western Railway s line from Oxford to Bletchley This opened on 1 April 1854 from which time OW amp WR trains ran to London Euston via Bletchley This was something of a Pyrrhic victory as the route was very lengthy The service was discontinued in September 1861 note 9 3 7 More openings and enhancements editOn 13 April 1854 a broad gauge train travelled the entire length of the main line between Oxford and Wolverhampton and on 1 July that same year the last section of the OW amp WR was opened to passengers between Tipton and Cannock Road Junction this followed the opening to goods which had taken place in April 1854 The Low Level station at Wolverhampton was unfinished and for a time some OW amp WR passenger trains continued to use the LNWR Stour Valley line 3 On 14 November 1854 the Great Western Railway opened its line between Birmingham Snow Hill and Wolverhampton Low Level It joined the OW amp WR at Priestfield A mixed gauge link was opened from Cannock Road Junction to Stafford Road Junction 4 7 From this time GWR passenger trains ran from Paddington and Birmingham to Wolverhampton using the running powers over the OW amp WR from Priestfield these were the only regular broad gauge trains to run on the OW amp WR ceasing in October 1868 3 In 1864 to 1867 there was a passenger service between Wolverhampton GWR and Manchester via Bushbury Junction this was the only regular passenger service to use the section of line 7 Termination of the working contract editEarly in 1855 the company terminated the working arrangement with C C Williams 3 7 Chipping Norton branch editWhen the OW amp WR was opened Chipping Norton was a flourishing wool town five miles from the line but there was no station on the line to serve it William Bliss owner of the biggest mill in the town repeatedly requested the OW amp WR to provide a station near the town but without success Bliss met with Sir Morton Peto a director of the OW amp WR and the two men agreed to finance a branch line themselves with some contribution by other local businesspeople The line from Chipping Norton Junction later named Kingham opened on 10 August 1855 3 7 Amalgamation editIn 1854 the Great Western Railway took over narrow standard gauge railways around Shrewsbury and its attitude to narrow gauge traffic began to soften This gradual process resulted in February 1858 in the GWR relaxing its hostility to the use of the narrow gauge on the OW amp WR and the abandonment of the broad gauge rails This needed legislative approval and this was gained in February 1859 4 On 14 June 1860 the OW amp WR joined with the Worcester and Hereford Railway and the Newport Abergavenny and Hereford Railway together forming the West Midland Railway The effective date was 1 July 1860 The OW amp WR was the major partner in the new company The enthusiasm for amalgamation went further and in 1861 the OW amp WR and the GWR agreed that amalgamation was desirable The arrangement was authorised in Parliament on 13 July 1863 and the effective date was 1 August 1863 3 7 Kingswinford branch editOn 14 November 1858 the OW amp WR opened a line from a junction at Kingswinford to a canal basin at Bromley The branch was about a mile long It was later extended to the Earl of Dudley s Railway at Pensnett 3 Stratford branch editThe OW amp WR Act of 1846 authorised a branch line to Stratford from Honeybourne The Company experienced considerable difficulty over land acquisition and two extensions of time had to be sought the line did not open until 11 July 1859 The branch started northwards from Honeybourne and there were intermediate stations at Long Marston and Milcote and the Stratford terminus was in Sanctuary Lane The line was single track with sharp curves because of its intended minor branch status In the following year 1860 the Stratford on Avon Railway line from Hatton to Stratford opened to its own independent station in Stratford Both stations were inconveniently sited for the town and despite tensions between the GWR and the OW amp WR agreement was reached to connect the two routes and provide a central station This was completed on 24 July 1863 The line was doubled in 1907 1908 3 12 GWR trains to Paddington editOn 1 October 1861 through passenger trains from Wolverhampton to Paddington over the OW amp WR started running Hitherto there had been a through service to Euston over the Yarnton Loop but that ceased on the same day 3 7 Bourton on the Water branch editThe OW amp WR obtained an Act in 1859 to build a branch line from Chipping Campden Junction to Bourton on the Water Morton Peto was the contractor and the line opened on 1 March 1862 It was 8 miles 13 km in length and had one intermediate station serving Stow on the Wold although that station was inconveniently sited for its community 3 Severn Valley Railway editMain article Severn Valley Railway In 1853 a nominally independent company sponsored by the OW amp WR obtained its authorising Act to construct the Severn Valley Railway from Hartlebury on the OW amp WR through Bewdley Bridgnorth and Ironbridge to Shrewsbury Further Acts were secured in 1855 and 1856 amending the route and construction did not begin until 1858 At 40 miles in extent it was the longest OW amp WR branch and it finally opened to traffic on 1 February 1862 by which time the OW amp WR had amalgamated into the West Midland Railway There was considerable and diverse industry on the route which was much stimulated by the railway from the outset Later weekend leisure and tourism also featured heavily especially from 1900 to 1950 The south facing connection at Hartlebury proved to be a significant limitation and the Great Western Railway constructed a route leading north east from Bewdley to Kidderminster which opened on 1 June 1878 3 Stourbridge Extension Railway editIn 1860 the Stourbridge Railway was authorised to build a railway line between Stourbridge and Cradley Heath The following year the Stourbridge Extension Railway Act authorised an extension of that to join the LNWR main line at Galton Junction and in 1862 a further extension was approved to reach the Great Western Railway line at Handsworth Junction The line was opened to Cradley Heath with an intermediate station at Lye on 1 April 1863 That portion was worked by the West Midland Railway and when that company was absorbed into the Great Western Railway the GWR took over the working On 1 January 1866 the line was opened to Old Hill and throughout on 1 April 1867 The line had formidable gradients and banking of heavy goods trains was commonplace 3 7 The Stourbridge Railway was absorbed by the GWR on 1 February 1870 13 9 WMR amalgamated with the GWR editEffective from 1 August 1863 the West Midland Railway was amalgamated with the Great Western Railway The accounts of the WMR were kept separately for some years the former Worcester and Hereford Railway shareholders received a guaranteed 5 because of earlier agreements and the OW amp WR shareholders got 72 of the residue This arrangement continued until 1870 The whole of the OW amp WR except the Chipping Norton and Stratford branches was laid with longitudinal timber track There were 76 timber viaducts and timber underbridges in aggregate on the main line and branches The former OW amp WR contributed 59 locomotives 7 Netherton to Old Hill line editThe West Midland Railway obtained an authorising Act in July 1862 for a line connecting the Stourbridge Extension line at Old Hill to the OW amp WR main line near Netherton Completion was much delayed it opened on 1 March 1878 There was one intermediate station at Windmill End and Netherton station was transferred on to the line from the OW amp WR main line 13 In September 1905 the GWR introduced steam railmotors on the line and opened three new halts the area was heavily industrialised and passenger usage was heavy After World War II passenger usage declined steeply and the passenger service was confined to the peak hours in 1958 this was followed by closure to passengers on 13 June 1964 and goods operation finished at the end of 1967 3 Stourbridge Town branch edit nbsp An auto train for Dudley at Stourbridge Junction stationThe Stourbridge station of the OW amp WR was over a mile from the town goods were brought up to the railway from the town on a rope worked inclined plane at a gradient of 1 in 14 On 30th July 1859 a branch was completed from the OWWR main line to the north of the viaduct probably very close to where the junction to the engine shed was to be located to the ironworks that had been built on the western side of Lower High Street There was a hope that the branch would be available for passenger traffic However due to the steepness of the incline 1 in 14 which necessitated traffic having to be winched up and down using a cable attached to a stationary engine it was doubtful that such traffic could be handled safely 9 In time this was considered to be unsatisfactory and an Act for construction of a short branch to a Town station was secured by the GWR on 30 June 1874 The little branch was also on a gradient of 1 in 67 with double track and beyond the new Town station there was a 1 in 27 gradient leading down to sidings on the River Stour The passenger part of the line opened on 1 May 1879 and the goods extension on 1 January 1880 The new station was called Stourbridge and the existing Stourbridge station was renamed Stourbridge Junction The branch curved round to the north to reach the junction station on joining the main line but in 1901 Stourbridge Junction station was relocated further south and the branch was altered to run to it and to face the south The branch was closed to passengers from 29 March 1915 to 1 May 1919 3 9 Banbury and Cheltenham Direct Railway editMain article Banbury and Cheltenham Direct Railway From the opening of the Chipping Norton branch and the Bourton on the Water branch their alignment on the map encouraged ideas of forming a trunk railway Iron ore from the East Midlands was in demand in South Wales as ores of differing qualities were required for mixing there These facts led to the Great Western Railway promoting its Banbury and Cheltenham Direct Railway The part of this line from Bourton on the Water to Cheltenham opened on 1 June 1881 This was followed by the extension of the Chipping Norton branch to King s Sutton near Banbury opening on 6 April 1887 Additionally there were ironstone workings on the course of the new line Through mineral trains required to reverse in Chipping Norton Junction station until in 1906 a spur line connecting the two arms of the branch and crossing the main line was opened to goods on 8 January 1906 and to passenger trains on 1 May 1906 There was a single regular passenger train that used the new spur a Swansea to Newcastle upon Tyne through train operated jointly with the Great Central Railway 3 14 The Banbury and Cheltenham Direct Railway was purchased by the GWR in 1897 for 138 000 cash 13 Chipping Norton Junction station was renamed Kingham in 1909 3 Shipston on Stour line edit nbsp Moreton in Marsh stationThe Stratford and Moreton Tramway had been built opening between Stratford upon Avon and Moreton opening in 1826 It was a horse operated toll tramway although there had been grand ideas of continuing to London An extension to Shipston on Stour was opened in 1836 this time with the intention of extending to Coventry The OW amp WR Act of 1845 authorised the new railway to take over the tramway on a perpetual lease it had debts then of over 48 000 The Stratford section fell into disuse about 1880 but local people agitated for the Shipston part to be modernised and it was converted by the GWR into a conventional railway opening on 1 July 1889 with locomotive operation It was therefore the Shipston on Stour branch of the Great Western Railway 13 The sharp curves of the tramway alignment made it a slow journey but passenger operation continued until 8 July 1929 Goods operation continued until closure on 3 May 1960 3 7 Cheltenham to Stratford main line editThe Great Western Railway had long regretted the loss to the Midland Railway of the Birmingham to Bristol line in 1845 As the GWR network in the West Midlands grew the difficulty increased It had running powers over the Midland line but with intensive traffic this became more unsatisfactory At the end of the nineteenth century the GWR contemplated building an independent route from Cheltenham to Stratford using the existing Honeybourne to Stratford line of 1859 13 The old branch needed considerable upgrading work including doubling the line and easing many of the curves The section between Honeybourne and Cheltenham was completely new and the route opened throughout on 1 July 1908 Honeybourne station was considerably extended with four platforms and with loop connections to enable direct running to and from the OW amp WR main line though not directly to or from the direction of Oxford only directly to or from the direction of Worcester Trains travelling directly between Cheltenham and Stratford did not go through Honeybourne station but went on a railway line through fields some distance to the east of Honeybourne station Many express passenger trains as well as through freight were diverted to the new route and traffic was especially heavy after World War I on summer Saturdays when holiday trains from the West Midlands and places further north to the West of England were dominant 13 A significant weakness of the route was that it passed through relatively undeveloped countryside with comparatively few major settlements intermediately 3 Grouping editIn 1923 the railways of Great Britain were grouped in to one or other of four new large companies following the Railways Act 1921 The Great Western Railway and certain other railways were constituents of the new Great Western Railway Kingswinford to Oxley editThe Great Western Railway saw that it had the Kingswinford Railway to a canal and colliery at Pensnett it thought that it could usefully be extended to Oxley on the line from Wolverhampton to Shrewsbury It prepared several Bills over time to get authorisation finally succeeding on 1905 Construction was slow further delayed by World War I and the line opened on 11 May 1925 The passenger service was discontinued from 31 October 1932 3 Diesel railcars editFrom July 1935 a GWR diesel railcar was put in service at Worcester followed by several more The vehicles were a more economical means of providing a passenger service on less busy routes and they were widely employed on the former OW amp WR network These vehicles and a later variant continued in use until 1962 3 12 Nationalisation editOn nationalisation in 1948 the line became part of the Western Region of British Railways After 1960 editNear Stratford a new south to east curve was installed on 12 June 1960 which allowed the line northwards to be closed mineral trains conveying iron ore from Northamptonshire to South Wales used the curve and the line northwards was closed to that traffic The flow ceased on to 1 March 1965 and the curve was removed 12 The line between Stourbridge Junction and Priestfield Junction was closed to passenger trains after 29 July 1962 It remained open to goods trains until December 1967 The Severn Valley line closed on 8 September 1963 although the Kidderminster to Bewdley loop and the Hartlebury to Bewdley sections operated a thin passenger service until closure on 3 January 1970 However a group of railway enthusiasts formed the Severn Valley Railway as a heritage railway in 1967 and in 1970 steam operated trains resumed running At the present day the line operates between Kidderminster and Bridgnorth The Kingswinford to Oxley line was closed north of Pensnett on 27 February 1965 and throughout in 1990 The Old Hill to Dudley line closed to passenger services after 13 June 1964 3 The section of the railway between Stourbridge and Dudley was later absorbed into the South Staffordshire Line which continued to Walsall after forking off eastwards from Dudley Passenger services had all been withdrawn by 1965 but goods trains continued to serve the route until 1993 when the line north of Round Oak was mothballed The line is still open for freight to this point to serve Round Oak Steel Terminal The Cheltenham Honeybourne Stratford route was less significant in British Railways days and when the traffic declined in the 1960s the route was not any longer important From September 1966 long distance trains were diverted to other routes chiefly the Midland route via the Lickey Incline and in May 1969 the local passenger service between Stratford and Worcester was closed down together with Honeybourne station itself Goods traffic between Honeybourne and Cheltenham ceased in August 1976 The section from Honeybourne to Long Marston was retained because of the Royal Engineers depot there 3 nbsp Parry People Mover at Stourbridge Town stationThe Stourbridge Town branch was closed to goods operation in July 1965 the passenger part of the line was successively cut back but is still in operation In 2006 trial operation of the branch started using a lightweight vehicle from Parry People Movers Ltd The vehicle uses a flywheel for energy storage to supplement the engine power The main line between Moreton and Norton Junction was singled in the Autumn of 1971 there was only one passing loop at Evesham in this long single line route Honeybourne station was reopened on 22 May 1981 On 19 March 1993 the final operation of through freight on the Dudley to Stourbridge route took place 3 The main line of the former OW amp WR had been singled in the 1960s and there were moves to reinstate double track at the beginning of the twenty first century The new double track section between Charlbury and Ascott was commissioned on 6 June 2011 and the section between Moreton and Evesham on 22 August 2011 The former OW amp WR network is 2017 still in use from Oxford to Round Oak as well as the Norton Junction spur and the Stoke Works connection A short length near Bushbury Junction has been reused as part of a loop from Stafford Road Junction Round Oak accident editMain article Round Oak rail accident On 23 August 1858 an excursion train was run from Wolverhampton to Worcester 1 506 adults and children were on board On the return journey the excursion was run in two portions Ascending the steep gradient between Brettell Road and Round Oak the first portion came to a stand and part of the train ran back down the gradient and struck the second portion which was following The time interval system of operation was in use There had been a number of failures of the couplings on the journey and numerous badly made welds were later found It appears that the head guard alighted from his van to deal with a broken coupling and was unable to regain his post to apply the brakes 14 passengers died and about 50 were badly injured 15 7 3 Topography editvteOxford Worcester andWolverhampton Railway Legend nbsp Great Western Railwayto Wellington nbsp Wolverhampton Low Level nbsp Wyrley and Essington Canal nbsp nbsp Midland Metroto Wolverhampton St George s nbsp nbsp nbsp Priestfield main lineMidland Metro nbsp nbsp Midland Metro former GWR to Birmingham Snow Hill nbsp Bilston West nbsp Daisy Bank nbsp Princes End and Coseley nbsp nbsp nbsp LNWR main line nbsp Wolverhampton Birmingham New Street nbsp nbsp nbsp Birmingham Canal NavigationMain Line nbsp Tipton Five Ways nbsp nbsp London amp North Western Railwayto Bescot nbsp Dudley nbsp nbsp Blowers Green nbsp nbsp Great Western Railwayto Rowley Regis nbsp nbsp Parkhead Viaductover Dudley Canal nbsp Harts Hill nbsp Round Oak Steel Terminal nbsp Round Oak nbsp Brierley Hill nbsp nbsp freight only branch nbsp Dudley Canal nbsp Brettell Lane nbsp nbsp Great Western Railwayto Handsworth Junction nbsp nbsp Stourbridge Town nbsp Stourbridge Junction nbsp Hagley nbsp Blakedown nbsp Kidderminster nbsp nbsp to Bewdley andSevern Valley Railway nbsp nbsp nbsp Great Western Railway former SVR to Shrewsbury nbsp Hartlebury nbsp Cutnall Green Halt nbsp nbsp Great Western Railwayto Stoke Works nbsp Droitwich Canal nbsp Droitwich Spa nbsp Fernhill Heath nbsp Blackpole Halt nbsp Astwood Halt nbsp Worcester andBirmingham Canal nbsp nbsp nbsp nbsp nbsp nbsp nbsp Tunnel Junction nbsp to Worcester Foregate Streetand Great Malvern nbsp Worcester Shrub Hill nbsp Norton Halt nbsp nbsp nbsp nbsp nbsp Abbotswood Junction MR Gloucester Birmingham New Street line nbsp Stoulton nbsp Pershore nbsp Wyre Halt nbsp Fladbury nbsp River Avon Lower Avon Navigation nbsp nbsp Midland Railway to Tewkesbury nbsp nbsp nbsp nbsp River Avon Lower Avon Navigation nbsp nbsp nbsp nbsp nbsp Evesham nbsp nbsp nbsp nbsp nbsp nbsp Midland Railwayto Barnt Green nbsp River Avon Upper Avon Navigation nbsp Littleton and Badsey nbsp Honeybourne nbsp nbsp nbsp nbsp nbsp Great Western Railway nbsp Cheltenham Spa HoneybourneBirmingham Snow Hill line nbsp Mickleton Halt nbsp Campden Tunnel nbsp Chipping Campden nbsp Blockley nbsp nbsp Shipston on Stour branch nbsp Moreton in Marsh nbsp summit nbsp Adlestrop nbsp nbsp nbsp nbsp nbsp Banbury and CheltenhamDirect Railway nbsp nbsp Kingham nbsp Shipton nbsp Ascott under Wychwood nbsp nbsp water troughs nbsp Charlbury nbsp Finstock nbsp Combe nbsp Hanborough nbsp nbsp Witney Railway nbsp nbsp nbsp Yarnton nbsp nbsp nbsp nbsp Oxford and Rugby Railwayto Banbury nbsp nbsp nbsp nbsp nbsp Varsity Line to Bletchley nbsp nbsp nbsp nbsp nbsp nbsp Buckinghamshire Jn Rly nbsp nbsp nbsp nbsp Wolvercote Junction nbsp nbsp nbsp nbsp Duke s Cut Wolvercote Tunnel nbsp nbsp nbsp Wolvercot Platform nbsp nbsp nbsp Wolvercote Halt nbsp nbsp nbsp Oxford Canal nbsp nbsp nbsp nbsp nbsp Oxford North Junction nbsp nbsp Port Meadow Halt nbsp nbsp nbsp nbsp Sheepwash Channel Railway Bridgeand Rewley Road Swing Bridge nbsp nbsp Oxford Rewley Road nbsp Oxford General nbsp Great Western Railwayto Didcot Parkway Main line edit Oxford Wolvercot Junction divergence from Oxford and Rugby Railway Yarnton opened 14 November 1861 closed 18 June 1962 divergence of Witney Railway 1861 1970 Han d borough opened 4 June 1853 still open Combe opened 8 July 1935 still open Finstock Halt opened 9 April 1934 still open Charlbury opened 4 June 1853 still open Ascott opened 4 June 1853 renamed Ascott under Wychwood 1880 renamed Ascott under Wychwood Halt 1965 renamed Ascott under Wychwood 1969 still open Shipton opened 4 June 1853 still open Chipping Norton Junction opened 10 August 1855 renamed Kingham 1909 still open divergence of line to Bourton on the Water 1862 1964 divergence of line to Chipping Norton 1855 1964 Addlestrop and Stow Road opened 4 June 1853 renamed Addlestrop 1862 renamed Adlestrop 1883 closed 3 January 1966 Moreton in Marsh opened 4 June 1853 still open early tramway connection and divergence of line to Shipston on Stour 1869 1960 Blockley opened 4 June 1853 closed 3 January 1966 Campden opened 4 June 1853 renamed Chipping Campden 1952 closed 3 January 1966 Campden Tunnel or Mickleton Tunnel Mickleton Halt opened 8 November 1937 closed 6 October 1941 Honeybourne South Loop Junction divergence of loop to Stratford branch Honeybourne North Loop Junction convergence of Stratford branch Honeybourne opened 4 June 1853 closed 5 May 1969 reopened 25 May 1981 still open Littleton and Badsey opened 21 April 1884 closed 3 January 1966 Evesham opened 3 May 1852 still open Fladbury opened 3 May 1852 closed 3 January 1966 Wyre Halt opened 11 June 1934 closed 3 January 1966 Pershore opened 3 May 1852 still open Stoulton opened 20 February 1899 closed 3 January 1966 Norton Junction opened from October 1879 renamed Norton Halt 1959 closed 3 January 1966 convergence of spur from Abbotswoood Junction Worcester Shrub Hill opened 5 October 1850 for Midland Railway still open divergence of line to Hereford 1860 Tunnel Junction convergence of line from Hereford 1860 Astwood Halt opened 18 May 1936 closed 25 September 1939 Blackpole Halt private station for Ordnance Factory used 1917 to 1920 and 1940 to 1946 Fearnall Heath opened 15 February 1852 renamed Fernhill Heath 1883 closed 5 April 1965 Droitwich opened 18 February 1852 renamed Droitwich Spa 1923 divergence of line to Stoke Works Junction still open Cutnall Green opened from 9 July 1928 closed 5 April 1965 Hartlebury opened 3 May 1852 still open Hartlebury Junction divergence of Severn Valley Railway 1862 1980 Kidderminster Junction convergence of line from Bewdley 1878 1984 Kidderminster opened 3 May 1852 still open Churchill and Blakedown opened from April 1853 renamed Blakedown 1968 still open Hagley opened by June 1857 still open Stourbridge opened 3 May 1852 renamed Stourbridge Junction 1879 relocated southwards 1 October 1901 divergence of Stourbridge Town branch still open Stourbridge North Junction divergence of Stourbridge Extension line Brettell Lane opened 20 December 1852 closed 30 July 1962 Kingswinford Junction divergence of Kingswinford branch Moor Lane workmen s halt not publicly advertised probably used during WWI Brierley Hill opened 1 December 1858 closed 30 July 1962 Round Oak opened 20 December 1852 relocated about 1894 closed 30 July 1962 Harts Hill and Woodside opened 1 April 1895 closed 1 January 1917 Netherton opened 20 December 1852 closed 1 March 1878 Netherton Junction convergence of Windmill End branch Dudley South Side and Netherton opened 1 March 1878 renamed Blowers Green 1921 closed 30 July 1962 convergence of GWR line from Old Hill 1878 1968 Dudley opened 20 December 1852 closed 6 July 1964 divergence of South Staffordshire line later LMS to Dudley Port 1850 1993 Tipton opened 1 December 1853 renamed Tipton Five Ways 1950 closed 30 July 1962 divergence of spur to Stour Valley line 1853 to 1983 Princes End opened by December 1856 renamed Princes End and Coseley 1936 closed 30 July 1962 Daisey Bank opened 1 July 1854 closed 1 January 1917 reopened as Daisy Bank and Bradley 3 February 1919 closed 30 July 1962 Bilston opened 1 July 1854 renamed Bilston West 1950 closed 30 July 1962 Priestfield opened 5 July 1854 closed 6 March 1972 convergence of GWR line from Birmingham Wolverhampton Low Level opened 1 July 1854 closed 6 March 1972 Cannock Road Junction divergence of Shrewsbury and Birmingham Railway 1854 1968 Bushbury Junction convergence with former Grand Junction Railway line 16 17 18 Shipston on Stour branch edit Formerly tramway Moreton in Marsh above Stretton on Fosse opened 1 July 1889 closed 1 January 1917 reopened 1 January 1919 closed 8 July 1929 Longdon Road opened 1 July 1889 closed 8 July 1929 Shipston on Stour opened 1 July 1889 closed 8 July 1929 17 16 18 Stratford branch edit Honeybourne Honeybourne North Loop Junction Honeybourne East Loop Junction Pebworth Halt opened 6 September 1937 closed 3 January 1966 Broad Marston Halt opened 17 October 1904 closed 14 July 1916 Long Marston opened 11 July 1859 closed 3 January 1966 Milcote and Weston opened 11 July 1859 relocated about 9 May 1908 closed 3 January 1966 Chambers Crossing Halt opened 17 October 1904 closed 14 July 1916 Race Course Junction divergence of 1960 line to East and West Junction line Stratford Racecourse opened 6 May 1933 closed by 1968 special traffic only East and West Junction convergence of line from East and West Junction line Stratford OW amp WR station opened 11 July 1859 closed 1 January 1863 when new station opened 17 16 18 Abbotswood Junction spur edit Abbotswood Junction divergence from Birmingham and Gloucester Railway Norton Junction above 17 16 18 Stoke Works Spur edit Droitwich Spa above Stoke Works opened 18 February 1852 closed 18 April 1966 Stoke Works Junction convergence with Birmingham and Gloucester Railway 17 16 18 Stourbridge Town branch edit Stourbridge Junction above Stourbridge Town opened 1 October 1879 closed 20 March 1915 reopened 3 March 1919 relocated 1979 still open 17 16 18 Bromley Basin branch edit Kingswinford Junction above Brockmoor Halt opened 11 May 1925 closed 31 October 1932 Bromley Halt opened 11 May 1925 closed 31 October 1932 Bromley Basin 17 16 18 See also editWest Midland RailwayNotes edit The nearby settlement is spelt Wolvercote and a later station on the LNWR Bicester line follows that spelling The OW amp WR and GWR consistently used the spelling Wolvercot The arrangement appears to have been provisional only and was not formalised but the GWR subscribed 375 000 to the subscription list The Oxford and Rugby Railway was authorised on the same day as the Oxford Worcester and Wolverhampton Railway Bushbury from Boynton page 10 The junction would leave OW amp WR trains directed away from Wolverhampton even though it was the most important town in the area On page 12 Boynton refers to the junction as being proposed on the edge of the town at Wednesfield Heath Mark Huish of the GJR told shareholders The question at issue has been represented as one entirely of Broad and Narrow Gauge upon this point the Directors may observe that they do not anticipate any inconvenience whatever to arise from the introduction of the Broad Gauge among the Narrow Gauge lines or a mixture of gauges on the same line On the contrary looking at express trains running at high speed which are now being introduced on the leading roads they deem it probable that many Companies possessing trunk lines on the Narrow Gauge principle may find it their interest to adopt both and the Directors have ascertained the perfect practicability of adding the Broad Gauge on the Grand Junction at a very reasonable cost Later spelt Abbotswood Abbot s Wood Junction to Norton Junction Rake says 10 February 1852 Boynton refers on page 30 to these trains making good connections with the GWR trains at Oxford If this is intended literally it seems to mean that for some of the time the Euston trains ran to Oxford station and reversed there instead of using the Yarnton Loop However MacDermot says page 508 volume I part 2 that the southern curve towards Oxford appears to have been used for goods traffic only there being no evidence that Oxford Worcester amp Wolverhampton passenger trains ever entered the North Western Station at Oxford References edit a b P J Long and W V Awdry The Birmingham and Gloucester Railway Alan Sutton Publishing Gloucester 1987 ISBN 0 86299 329 6 C G Maggs The Bristol and Gloucester Railway and the Avon and Gloucestershire Railway The Oakwood Press Witney second edition 1992 ISBN 0 85361 435 0 a b c d e f g h i j k l m n o p q r s t u v w x y z aa ab ac ad ae af ag ah ai aj ak al am an ao ap John Boynton The Oxford Worcester and Wolverhampton Railway Mid England Books Kidderminster 2002 ISBN 0 954 0839 0 3 a b c d e E T MacDermot History of the Great Western Railway volume I 1833 1863 part 1 published by the Great Western Railway London 1927 a b c Herbert Rake The Oxford Worcester and Wolverhampton Railway in the Railway Magazine January and February 1913 Norman W Webster Britain s First Trunk Line the Grand Junction Railway Adams and Dart Bath 1972 ISBN 0239 00105 2 pages 134 and 135 a b c d e f g h i j k l m n o p q r s t u v w x E T MacDermot History of the Great Western Railway volume I 1833 1863 part 2 published by the Great Western Railway London 1927 William J Skillern Stoke Works An Unusual Station in the Railway Magazine July 1953 a b c d e Clive Butcher The Railways of Stourbridge Oakwood Press Usk 1998 ISBN 0 85361 533 0 Lord Ward and Mr Glyn Railway Record 8 192 1851 Brian Lewis Brunel s Timber Bridges and Viaducts Ian Allan Publishing Hersham 2007 ISBN 978 0 7110 3218 7 a b c Vic Mitchell and Keith Smith Stratford upon Avon to Cheltenham Middleton Press Midhurst 1988 ISBN 1 901706 25 7 a b c d e f E T MacDermot History of the Great Western Railway volume II 1863 1921 published by the Great Western Railway London 1931 William Hemmings The Banbury and Cheltenham Direct Railway volume one Wild Swan Publications Didcot 2004 ISBN 1 874 103 88 7 Captain H W Tyler Report to Railway Department Board of Trade 16 October 1858 a b c d e f g M E Quick Railway Passenger Stations in England Scotland and Wales A Chronology The Railway and Canal Historical Society 2002 a b c d e f g R A Cooke Atlas of the Great Western Railway 1947 Wild Swan Publications Limited Didcot 1997 ISBN 1 874103 38 0 a b c d e f g Col M H Cobb The Railways of Great Britain A Historical Atlas Ian Allan Publishing Limited Shepperton 2003 ISBN 07110 3003 0 Report of the Railway Department of the Board of Trade on the London Worcester and Wolverhampton and on the Birmingham and Shrewsbury Districts by Samuel Laing et al at Project Gutenberg Retrieved from https en wikipedia org w index php title Oxford Worcester and Wolverhampton Railway amp oldid 1187487559, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.