Orange Line (MBTA)

The Orange Line is a rapid transit line operated by the Massachusetts Bay Transportation Authority (MBTA) as part of the MBTA subway system. The line runs south on the surface from Oak Grove station in Malden, Massachusetts through Malden and Medford, paralleling the Haverhill Line, then crosses the Mystic River on a bridge into Somerville, then into Charlestown. It passes under the Charles River and runs through Downtown Boston in the Washington Street Tunnel. The line returns to the surface in the South End, then follows the Southwest Corridor southwest in a cut through Roxbury and Jamaica Plain to Forest Hills station.

Orange Line
A southbound Orange Line train at North Station in 2024
Overview
LocaleGreater Boston
Termini
Stations20
Service
TypeRapid transit
SystemMBTA subway
Operator(s)Massachusetts Bay Transportation Authority
Rolling stockCRRC #14 Orange Line cars
Daily ridership201,000 (2019)[1]
History
OpenedJune 10, 1901
Technical
Line length11 mi (18 km)
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
ElectrificationThird rail600 V DC
Route map

All stations are accessible

The Orange Line operates during normal MBTA service hours (all times except late nights) with six-car trains. A 120-car fleet built in 1979–1981 is being replaced with a 152-car CRRC fleet from 2018 to 2023. The Orange Line is fully grade-separated; trains are driven by operators with automatic train control for safety. Wellington Carhouse in Medford is used for heavy maintenance and storage; a small yard at Forest Hills is also used for storage. All 20 Orange Line stations are fully accessible. Averaging 201,000 weekday passengers in 2019, the Orange Line has the second-highest ridership of the MBTA subway lines.

The Orange Line originated as the Main Line Elevated of the Boston Elevated Railway, which was built in 1901. It consisted of the Charlestown Elevated, Atlantic Avenue Elevated, Washington Street Elevated, and a portion of the previously-built Tremont Street subway. All of the original route has been replaced, beginning with the Washington Street Tunnel replacing the Tremont Street subway in 1908. The Washington Street Elevated was extended from Dudley Square to Forest Hills in 1909, with an infill station at Green Street in 1912; the Charlestown Elevated was extended from Sullivan Square to Everett in 1919. The Atlantic Avenue Elevated was closed in 1938.

The newly formed MBTA assigned colors to its subway lines in 1965, with the Main Line becoming the Orange Line. The Charlestown Elevated was closed in 1975; it was replaced by the Haymarket North Extension, which opened in phases from 1975 to 1977. The Southwest Corridor replaced the Washington Street Elevated in 1987, using an alignment originally intended for Interstate 95, completing the modern Orange Line alignment. The downtown stations were lengthened in the 1980s to allow six-car trains. Accessibility modifications began with some of those stations and were completed in 2005. Assembly opened as an infill station in 2014.

The Orange Line has struggled with reliability issues, including aging infrastructure and trains, since the 2010s. Despite the ongoing fleet replacement, several prominent incidents occurred in 2022. The entire Orange Line was replaced with buses from August 19 to September 18, 2022, to allow for accelerated repairs.

History edit

Construction edit

 
The Charlestown El running over the Charlestown Bridge

The Main Line of the electric Boston Elevated Railway opened in segments, starting in 1901. It proceeded from Sullivan Square along the Charlestown Elevated to the Canal Street incline near North Station. It was carried underground by the Tremont Street subway (now part of the Green Line), returning above ground at the Pleasant Street incline (now closed, located just south of Boylston station). A temporary link connected from there to the Washington Street Elevated, which in 1901 ran from this point via Washington Street to Dudley Square (which is most of what is now Phase 1 of the Silver Line).

Also in 1901, the Atlantic Avenue Elevated opened, branching at Causeway Street to provide an alternate route through downtown Boston (along the shoreline, where today there is no rail transit) to the Washington Street Elevated.

In 1908, a new Washington Street Tunnel opened, allowing Main Line service to travel from the Charlestown Elevated, underground via an additional new portal at the Canal Street incline, under downtown Boston and back up again to meet the Washington Street Elevated and Atlantic Avenue Elevated near Chinatown. The stations were richly decorated with tile work, mosaics, and copper; after criticism of the large Tremont Street subway headhouses, most entrances were comparatively modest and set into buildings.[2] Use of the parallel Tremont Street subway was returned exclusively to streetcars.

By 1909, the Washington Street Elevated had been extended south to Forest Hills. Trains from Washington Street were routed through the new subway, either all the way to Sullivan Square, or back around in a loop via the subway and then the Atlantic Avenue Elevated.

In 1919, the same year that the Atlantic Avenue Elevated was partially damaged in Boston's Great Molasses Flood, the Charlestown Elevated was extended north from Sullivan Square to Everett, over surface right-of-way parallel to Alford Street/Broadway, with a drawbridge over the Mystic River.[3] The Boston Elevated had long-term plans to continue this extension further north to Malden, a goal which would only be achieved decades later, under public ownership and not via the Everett route.

Closure of Atlantic Avenue Elevated and ownership changes edit

 
Rowes Wharf station on the Atlantic Avenue Elevated in 1942 – four years after closure – just before being demolished

Following a 1928 accident at a tight curve on Beach Street, the southern portion of the Atlantic Avenue Elevated, between South Station and Tower D on Washington Street, was closed (except for rush-hour trips from Dudley to North Station via the Elevated), breaking the loop; non-rush-hour Atlantic Avenue service was reduced to a shuttle between North and South Stations.[3] In 1938, the remainder of the Atlantic Avenue Elevated was closed, leaving the subway as the only route through downtown – what is now the Orange Line between Haymarket and Chinatown stations.

Ownership of the railway was transferred from the private Boston Elevated Railway to the public Metropolitan Transit Authority (MTA) in 1947; the MTA was itself reconstituted as the modern Massachusetts Bay Transportation Authority (MBTA) in 1964.

On December 5, 1960, the MTA began operating "modified express service" on the line during the morning rush hour. Every other train bypassed Green Street, Egleston (southbound) or Northampton (northbound), Dover, and Thompson Square stations.[4][5] This was discontinued in September 1961 to reduce wait times at the skipped stations, all of which were outdoors.[6]

Orange Line naming edit

 
Station sign at Boylston Street (now Chinatown) station in 1914. In 1967, the station was renamed Essex to avoid confusion with the preexisting Green Line station a block away.

The line was known as the Main Line Elevated under the Boston Elevated Railway, and the Forest Hills–Everett Elevated (Route 2 on maps[7]) under the Metropolitan Transportation Authority.

After taking over operations in August 1964, the MBTA began rebranding many elements of Boston's public transportation network. Colors were assigned to the rail lines on August 26, 1965, as part of a wider modernization developed by Cambridge Seven Associates. Peter Chermayeff assigned red, green, and blue to the other three lines based on geographic features; however, according to Chermayeff, the Main Line El "ended up being orange for no particular reason beyond color balance."[8] The firm originally planned for yellow instead of orange, but yellow was rejected after testing because yellow text was difficult to read on a white background.[9] (Yellow was later used for MBTA bus service). The MBTA and transit historians later claimed that orange came from Orange Street, an early name for what is now part of Washington Street.[10][11][9]

In January and February 1967, the four original Washington Street Tunnel stations were renamed. Transfer stations were given the same name for all lines: Winter and Summer stations plus Washington on the Red Line became Washington, Milk and State plus Devonshire on the Blue Line became State Street after the cross street, and Union and Friend plus Haymarket Square on the Green Line became Haymarket after Haymarket Square.[3] Boylston Street was renamed Essex to avoid confusion with nearby Boylston station on the Green Line.[3]

 
A train at City Square station in 1958

In May 1987, Essex was renamed Chinatown after the adjacent Chinatown neighborhood, and Washington renamed Downtown Crossing after the adjacent shopping district.[3] In March 2010, New England Medical Center station was renamed as Tufts Medical Center two years after the eponymous hospital changed its name.[3]

Rerouting of Charlestown and Everett service edit

 
Map of the original Main Line Elevated and related lines

The Boston Transportation Planning Review looked at the line in the 1970s, considering extensions to reach the Route 128 beltway, with termini at Reading in the north and Dedham in the south. As a result of this review, the Charlestown Elevated – which served the Charlestown neighborhood north of downtown Boston and the inner suburb of Everett – was demolished and replaced in 1975.

The Haymarket North Extension rerouted the Orange Line through an underwater crossing of the Charles River. Service in Charlestown was replaced with service along Boston and Maine tracks routed partially beneath an elevated section of Interstate 93, ultimately to Wellington and then to Oak Grove in Malden, Massachusetts, instead of Everett. Rail service to Everett was replaced with buses.

The extension was unique among Boston transit lines as it contained a third express track between Wellington and Community College stations. These stations, along with Sullivan Sq, have two island platform stations as opposed to the more normal single island stations found on the southern side of the Orange Line. This express track was designed for the never-built extension north of Oak Grove to Reading. The third track would have allowed peak-direction express service as well as places to terminate trains. Service north of Oak Grove was planned to have longer headways to account for the lower projected ridership. This extension was opposed by residents of Melrose who preferred restored commuter rail service. Because of this, the express track ends at Wellington and a single commuter rail track continues parallel to the Orange Line north to Reading.

Closure of Washington Street Elevated edit

 
View under Washington Street Elevated, looking south from Bartlett Street (1973)

Construction of Interstate 95 into downtown Boston was cancelled in 1972 after local protest over the necessary demolition. However, land for I-95's Southwest Corridor through Roxbury had already been cleared of buildings; moreover, the state had already committed to using this vacant land for transportation purposes.[12] As a result, instead of an 8-lane Interstate highway with a relocated Orange Line running in its median (in a manner similar to the Chicago Transit Authority's Dan Ryan, Congress, and O'Hare branches), the space would be occupied by the realigned Orange Line, a reconstructed three-track mainline for Amtrak's Northeast Corridor and MBTA Commuter Rail trains, and a linear park. After this re-routing was accomplished in 1987, the Washington Street Elevated was torn down, the last major segment of the original elevated line to be demolished.

 
The modern view from the platform at Chinatown shows the remains of the Washington Street Tunnel that led to the Elevated in the distance. In the foreground, the tracks curve rightward into the Southwest Corridor.

Between April 30 and May 3, 1987, the Washington Street Elevated south of the Chinatown station was closed to allow the Orange Line to be tied into the new Southwest Corridor. On May 4, 1987, the Orange Line was rerouted from the southern end of the Washington Street Tunnel onto the new Southwest Corridor. Instead of rising up to elevated tracks, it now veered west at the Massachusetts Turnpike and followed the Pike and the old Boston and Albany Railroad right-of-way to the existing MBTA Commuter Rail stop at Back Bay. It then continued along new tracks, partially covered and partially open but depressed, to Forest Hills. This MBTA right-of-way is also shared by Amtrak as part of the national Northeast Corridor intercity passenger rail service.

External videos
  Orange Line El Stations, 11:42, April 30, 1987, Boston TV Digital News[13]

While ending more or less at the same terminus (Forest Hills), the new routing passes significantly to the west of its previous route on Washington Street; local residents were promised "equal or better" replacement service. Originally, plans provided for light rail vehicles street running in mixed traffic, from Washington Street to Dudley Square, then diverting southeastward on Warren Street towards Dorchester. In 2002, Phase 1 of the Silver Line bus rapid transit was added to connect Washington Street to the downtown subways, attempting to address this service need. This replacement service was controversial, as many residents preferred the return of rail transportation.[14]

Station renovations edit

In the mid-1980s, the MBTA spent $80 million to extend the platforms of seven Red Line and three Orange Line stations (Essex, Washington, and State) to allow the use of six-car trains.[15] Washington and Essex were made fully accessible, as was the northbound platform at Essex. The Southwest Corridor station opened in 1987 were all fully accessible. Six-car trains entered service on August 18, 1987.[3] Oak Grove was also renovated around 1987.[16]

This left only Haymarket, five stations on the Haymarket North Extension, and the southbound platform at Chinatown inaccessible by the 1990 passage of the Americans with Disabilities Act.[17] Construction at Sullivan Square and Wellington began in 1991.[10] Haymarket was retrofitted with elevators in 2000.[16] The 1975-built North Station was expanded into a "superstation" with a cross-platform transfer to the Green Line; elevators were in installed in 2001, though the Green Line did not use the station until 2004.[16][3] The southbound platform at Chinatown was made accessible in 2002.[18][16] Renovations to Community College and Malden Center were completed in 2005, making the Orange Line the first of the four original MBTA subway lines to become fully accessible.[18]

Assembly edit

 
Assembly station on its first day of service in September 2014

In the early 2000s, Somerville began planning an infill station between Sullivan and Wellington to serve the new Assembly Square development. The $57 million station was funded by the state's Executive Office of Housing and Economic Development, FTA Section 5309 New Starts program, and Federal Realty Investment Trust (the developer of Assembly Square).[19] Construction began in late 2011 and finished in mid 2014.[20] The new station, Assembly, opened on September 2, 2014.[21] It was the first new station on the MBTA subway system since 1987.[21]

Reliability issues and repairs edit

During the unusually brutal winter of 2014–2015, the entire MBTA system was shut down on several occasions by heavy snowfalls. The aboveground sections of the Orange and Red lines were particularly vulnerable due to their exposed third rail, which iced over during storms. When a single train stopped due to power loss, other trains soon stopped as well; without continually running trains pushing snow off the rails, the lines were quickly covered in snow. (Because the Blue Line was built with overhead lines on its surface section due to its proximity to corrosive salt air, it was not subject to icing issues.)

 
Fenced-off faregates at Back Bay during the August–September 2022 closure

Starting in 2015, the MBTA began implementing its $83.7 million Winter Resiliency Program, much of which focused on preventing similar issues with the Orange and Red lines. The Southwest Corridor section of the Orange Line is located in a trench and is protected from the worst weather, but the 1970s-built Haymarket North Extension had older infrastructure and was in worse shape. From Sullivan Square north, it is exposed to the weather and largely built on an embankment, rendering it more vulnerable. That section is receiving new heated third rail, switch heaters, and snow fences to reduce the impacts of inclement weather.[22][23] The work requires bustitution of the line from Sullivan Square to Oak Grove on certain weeknights and weekends.[24][25]

In October 2018, the MBTA awarded a $218 million signal contract for the Red and Orange Lines, which was planned to allow 4.5-minute headways on the Orange Line beginning in 2022.[26]

On July 22, 2022, an Orange Line train caught fire while crossing the Mystic River. A metal sill along the underside of the train came loose and came into contact with the third rail, igniting sparks. Passengers had to jump out of the train onto the tracks, and one woman jumped into the river below and swam to shore. There were no injuries or casualties.[27]

Following various reliability issues on the Orange Line, the MBTA announced that it would close the entire line for renovations from August 19 to September 18, 2022.[28][29] During the closure, the MBTA conducted accelerated repairs to track, ties, signals, and concrete walls, as well as replacing two crossovers. This was intended to remove speed restrictions and improve safety and reliability. The shutdown also gave time for more new CRRC cars to be delivered and put into service; after the closure, service on the line resumed with new trains almost all the time.[30][31] However, the work was not enough to eliminate all slow zones, and temporary slow zones were added where work was performed. By early October, a round trip on the full line was 13 minutes slower than before the shutdown, and 20 minutes slower than it would be without any slow zones.[32] On October 25, the MBTA sent a letter to Senator Ed Markey, who had been investigating the project, detailing work needed during November and December to lift remaining slow zones, ranging from always-planned to unexpectedly necessary tasks.[33]

Historical routes edit

Route diagram templates of the various Orange Line routes over its history
1901–1908 1908–1938
 
 
Everett
opened 1919
 
 
 
 
Sullivan Square
 
Thompson Square
 
City Square
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
North Station
 
 
Canal Street incline to
Washington Street subway
 
 
Battery Street
 
 
 
 
Friend-Union
 
 
 
 
 
Milk-State
 
 
 
 
 
 
State Street
 
 
 
 
 
 
 
 
Rowes Wharf
 
 
 
 
 
Summer
 
 
 
 
 
 
South Station
 
 
 
 
 
 
Boylston-Essex
 
 
Beach Street
closed 1919
 
 
 
 
Dover
 
Northampton
 
Dudley Square
 
Egleston
opened 1909
 
Green Street
opened 1912
 
Forest Hills
opened 1909  
1938–1975 1975–1987
1987–present Notes
  • Haymarket and State got their modern names in 1967. Downtown Crossing and Chinatown also changed names in 1967, but changed again in 1987.
  • New England Medical Center was renamed Tufts Medical Center in 2010.

Station listing edit

Location Station Opened Notes and connections
Malden   Oak Grove March 20, 1977   MBTA Commuter Rail: Haverhill
  MBTA bus: 131, 132, 137
  Malden Center December 27, 1975   MBTA Commuter Rail: Haverhill
  MBTA bus: 97, 99, 101, 104, 105, 106, 108, 131, 132, 137, 411, 430
Medford   Wellington September 6, 1975   MBTA bus: 97, 99, 100, 106, 108, 110, 112, 134
Somerville   Assembly September 2, 2014
Charlestown, Boston   Sullivan Square April 7, 1975 Original elevated station was open from June 10, 1901, to April 4, 1975.
  MBTA bus: 86, 89, 90, 91, 92, 93, 95, 101, 104, 105, 109, CT2
  Community College
North End, Boston   North Station Original elevated station was open from June 10, 1901, to April 4, 1975.
  MBTA subway:  Green  (D, E)
  MBTA Commuter Rail: Fitchburg, Lowell, Haverhill, Newburyport/Rockport
  MBTA bus: 4
  Amtrak: Downeaster
  EZRide
  Haymarket November 30, 1908   MBTA subway:  Green  (D, E)
  MBTA bus: 4, 92, 93, 111, 354, 426, 428, 450
Downtown Boston   State   MBTA subway:  Blue 
  MBTA bus: 4, 92, 93, 354
  Downtown Crossing   MBTA subway:  Red   Silver  (SL5)
  MBTA bus: 7, 11, 501, 504, 505
At Park Street:    Green  (B, C, D, E);   43
Chinatown, Boston   Chinatown   MBTA subway:  Silver  (SL4, SL5)
  MBTA bus: 11
  Tufts Medical Center May 4, 1987   MBTA subway:  Silver  (SL4, SL5)
  MBTA bus: 11, 43
Back Bay, Boston   Back Bay   MBTA Commuter Rail: Framingham/Worcester, Franklin/Foxboro, Needham, Providence/Stoughton
  MBTA bus: 10, 39
  Amtrak: Acela, Northeast Regional, and Lake Shore Limited
South End, Boston   Massachusetts Avenue   MBTA bus: 1
Roxbury, Boston   Ruggles   MBTA Commuter Rail: Franklin/Foxboro, Needham, Providence/Stoughton
  MBTA bus: 8, 15, 19, 22, 23, 28, 43, 44, 45, 47, CT2, CT3
  Roxbury Crossing   MBTA bus: 15, 22, 23, 28, 44, 45, 66, MIS
  Jackson Square   MBTA bus: 14, 22, 29, 41, 44
Jamaica Plain, Boston   Stony Brook
  Green Street
  Forest Hills   MBTA Commuter Rail: Franklin/Foxboro, Needham, Providence/Stoughton
  MBTA bus: 16, 21, 30, 31, 32, 34, 34E, 35, 36, 37, 38, 39, 40, 42, 50, 51

Rolling stock edit

Series # Year built Manufacturer Car
length
Car
width
Photo Fleet numbers
(total ordered)
Number in service
(as of March 2024)[34]
#14

Orange Line

2018–2023 CRRC 65 ft (20 m) 9 ft 3 in (2.82 m)  
  • 1400–1551
    (152 total)
104
 
Interior of a new #14 CRRC car

The Orange Line is standard-gauge heavy rail and uses a third rail for power. The newer cars are being built by CRRC in a newly-constructed plant in Springfield, Massachusetts, with 152 cars on order, along with additional cars for the Red Line. All in-service Orange Line trains run in six-car consists. Cars of the fleet are 65 feet (20 m) long and 9 ft 3 in (2.8 m) wide, with three pairs of doors on each side.

As of February 2022, weekday peak and afternoon service was scheduled to operate on 8-minute headways, with headways ranging from 8 to 12 minutes at other times. Vehicle utilization ranged between 8 trains (48 cars) and 13 trains (78 cars).[35] However, rolling stock availability and longer trip times due to slow zones reduced service. By July 2023, headways were 10–12 minutes on weekdays.[36] This was improved to nine-minute headways on August 27, 2023.[37]

Former rolling stock edit

 
Older 1200-series Orange Line train leaving Assembly station

The "T" previously had a fleet of Pullman-Standard heavy rail cars for the Orange Line. These cars, known as 01100s, had been in service since the 1950s, and saw service on both the elevated and the northern extension before they were retired in 1981. Several remained on the property as Red Line work cars for some time before being scrapped.[38] Units 01178-01179 are preserved at the Seashore Trolley Museum in Kennebunkport, Maine.[34]

From 1981 to 2022, the Orange Line used a fleet of Hawker-Siddeley heavy rail cars. These cars, nicknamed Orange Blossoms, featured reinforced roofs for pantographs. It was thought that if the Orange Line was extended, they would opt to use overhead collection. But since these extensions were never built, pantographs were never installed. The 01200s, along with the Blue Line's 0600 cars manufactured at the same time, were based on the designs of the PATH PA3. After 41 years of service, the last 01200s ran on August 19, 2022 before the shutdown, and began to be sent to scrap on September 22, 2022.[39] Almost all will be processed by the contractor Costello to remove hazardous materials and be recycled; two were offered to the Seashore Trolley Museum but not accepted.[40]

New CRRC trains edit

 
A CRRC-built #14 Orange Line train at Chinatown station

In late 2008, the MBTA began the planning process for new Orange and Red Line vehicles. The agency originally planned for a simultaneous order for 146 Orange Line cars (to replace the whole fleet) and 74 Red Line cars (to replace the older 1500 and 1600 series cars). A similar order was used in the late 1970s for the current Orange Line cars and the old Blue Line cars, ordered at the same time and largely identical except for size and color.[41] In October 2013, MassDOT announced plans for a $1.3 billion subway car order for the Orange and Red Lines, which would provide 152 new Orange Line cars to replace the existing 120-car fleet and add more frequent service.[42]

On October 22, 2014, the MassDOT Board awarded a $566.6 million contract to a China based manufacturer CNR (which became part of CRRC the following year) to build 152 replacement railcars for the Orange Line, as well as additional cars for the Red Line.[43] The other bidders were Bombardier Transportation, Kawasaki Heavy Industries and Hyundai Rotem. CNR began building the cars at a new manufacturing plant in Springfield, Massachusetts, with initial deliveries expected in 2018 and all cars in service by 2023.[43] The Board forwent federal funding to allow the contract to specify the cars be built in Massachusetts, to create a local railcar manufacturing industry.[44] In conjunction with the new rolling stock, the remainder of the $1.3 billion allocated for the project would pay for testing, signal improvements and expanded maintenance facilities, as well as other related expenses.[43] Sixty percent of the car's components are sourced from the United States.[45]

After delays due to issues with the train's control system, the first new train entered revenue service on August 14, 2019;[46][47] Replacement of the signal system is expected to be complete by 2022 on the Orange Line; the total cost is $218 million for both the Red and Orange Lines.[48]

While waiting for new cars, service has deteriorated due to maintenance problems with the old cars. The number of trains at rush hour was reduced from 17 (102 cars) to 16 (96 cars) in 2011; in the same year, daily ridership surpassed 200,000.[49] Increased running times – largely due to longer dwell times from increased ridership – resulted in headways being lengthened from 5 minutes before 2011 to 6 minutes in 2016. The increased fleet size with the new trains will allow headways to be reduced to between 4 and 5 minutes at peak.[50] In the interim, a 2016 test of platform markings at North Station which show boarding passengers where to stand to avoid blocking alighting passengers resulted in a one-third decrease in dwell times.[51]

The new cars have faced several issues since their August entry into service. In November 2019, a car derailed while undergoing initial testing at the Wellington yard. The last car of a six car trainset had jumped the rails while going over a switch, however no major damage had been reported. Several months earlier, the first two trainsets were taken out of service due to safety issues following the inadvertent opening of a passenger door while the train was in motion.[52] Cars were also rechecked in early December 2019, after issues with sounds combined with passenger overload necessitated removal from service.[53][54] The first train was restored to service in January 2020.[55] The trains were pulled again on March 16, 2021, after a derailment involving one of the cars.[56] Buses replaced trains around the site of the derailment until April 12.[57] The CRRC cars remained out of service as of July 2021; defective side bearer pads were identified as a contributing factor. These dampen the movements of the trucks (which include the wheels) with respect to the car bodies, but were found to be wearing in such a way as to produce too much friction.[58] The first of the CRRC trainsets was returned to revenue service on August 20, after modifications were approved by the MBTA's Safety Department and the Department of Public Utilities.[59] The new cars were again removed from service on May 19–23, 2022, after a braking issue on one car due to an incorrectly installed bolt,[60][61] and again between June and July 2022 due to a battery failure.[62] In December 2022, some new cars were removed from service due to failed power cables causing electric arcing on axles.[63]

The CRRC contract requires delivery of all Orange Line cars by January 2022, with a fine of $500 per day per car for late deliveries. Delays began to accumulate in 2019, and then facilities in China and Springfield had to shut down and operate at reduced capacity for parts of 2020 due to the COVID-19 pandemic. As of September 2022, 78 of 152 new cars had been put in service on the Orange Line. This was enough for service almost all the time because of the rush hour service cap introduced after an FTA safety audit identified insufficient staffing of subway dispatchers. The MBTA indicated it would assess which delays were the fault of the contractor at the end of the contract.[64] In 2023, cars were being delivered incomplete with incomplete paint repairs, connectors seen hanging on underframes, and parts sanded down to bare metal.[65] The MBTA and CRRC have collaborated to resolve quality issues. In August 2023, MBTA General Manager has reported that the new Orange Line cars are exhibiting an average of approximately 114,000 miles traveled between failures, which surpasses the contractual requirement of 90,000 miles by over a quarter.[66]

Facilities edit

 
Orange Line trains in Wellington Carhouse, the Orange Line's heavy maintenance facility, in 2014

The Orange Line has two tracks for most of its length; a third track is present between Wellington station and the Charles River portal.[67] This track is used to bypass construction on the other two tracks and for testing newly delivered cars for the Orange Line. The primary maintenance and storage facility is at Wellington station.[67] Had the Orange Line been extended to Reading, the third track would have been the northbound local track, and the present-day northbound track would likely have become a bi-directional express track.

Expansion of the yard and carhouse was needed for the larger CRRC fleet. Yard work was substantially completed in August 2023, while carhouse expansion is expected to be complete in mid-2024.[68]

References edit

  1. ^ "Quarterly Ridership Update: Third Quarter FY19" (PDF). Massachusetts Bay Transportation Authority. May 20, 2019. p. 6.
  2. ^ Coburn, Frederick W. (November 1910). "Rapid Transit and Civic Beauty". New Boston. Vol. 1, no. 7. pp. 307–314 – via Google Books.
  3. ^ a b c d e f g h Belcher, Jonathan (June 27, 2015). "Changes to Transit Service in the MBTA district" (PDF). NETransit. Retrieved August 5, 2015.
  4. ^ "MTA Advisory Board Supports Cuts". The Boston Globe. December 1, 1960. pp. 1, 15 – via Newspapers.com.
  5. ^ "M.T.A. Express Train Gets 'A' From Riders". The Boston Globe. December 5, 1960. p. 13 – via Newspapers.com.
  6. ^ "M.T.A. Dropping Morning Express". The Boston Globe. September 27, 1961. p. 10 – via Newspapers.com.
  7. ^ Lufkin, Richard F. (1966). System Route Map (Map). Massachusetts Bay Transportation Authority – via Wikimedia Commons.
  8. ^ Byrnes, Mark (September 17, 2018). "How Boston Got Its 'T'". CityLab. I remember sitting in my Cambridge office preparing for a meeting with the MBTA in which I would be proposing colored lines. I had markers in front of me and I chose red for the line that went to Harvard since it's a well-known institution whose main color is crimson. One line went up the North Shore of Boston up to the coastal areas, so it seemed obvious to call that the Blue Line. The line that serves Olmsted's Emerald Necklace was an obvious choice for green. And then the fourth line ended up being orange for no particular reason beyond color balance.
  9. ^ a b Ba Tran, Andrew (June 2012). . Boston Globe. Archived from the original on July 21, 2017. The Everett-Forest Hills Main Line Elevated was renamed the Orange Line on Aug. 25, 1965. The name comes from a section of Washington Street between Essex and Dover streets that had the name Orange Street until the early 19th century, said Clarke. However, according to architecture firm Cambridge Seven Associates, the Orange Line's color was a design choice after the yellow color option did not test well.
  10. ^ a b Sanborn, George M. (1992). . Massachusetts Bay Transportation Authority. Archived from the original on 2019-11-27. Retrieved 2016-01-19 – via MIT.
  11. ^ "Curiosity Carcards" (PDF). Massachusetts Bay Transportation Authority. 2012.
  12. ^ Anderson, Steve. "Southwest Expressway (I-95, unbuilt)". bostonroads.com. Retrieved August 3, 2013.
  13. ^ "Orange Line El Stations". Boston TV Digital News. WGBH. April 30, 1987. Retrieved September 15, 2016.
  14. ^ "Roxbury-Dorchester-Mattapan Transit Needs Study" (PDF). Massachusetts Department of Transportation. September 2012. p. 53. Retrieved October 4, 2017.
  15. ^ 1985 Annual Report. Massachusetts Bay Transportation Authority. 1985. p. 13 – via Internet Archive.
  16. ^ a b c d Tran Systems and Planners Collaborative (August 24, 2007). "Evaluation of MBTA Paratransit and Accessible Fixed Route Transit Services: Final Report" (PDF). Massachusetts Bay Transportation Authority.
  17. ^ Operations Directorate Planning Division (November 1990). "Ridership and Service Statistics" (3 ed.). Massachusetts Bay Transportation Authority. pp. 1–4 – via Internet Archive.
  18. ^ a b "Accessibility Projects at the MBTA" (PDF). Massachusetts Bay Transportation Authority. March 2005.
  19. ^ Moskowitz, Eric (October 6, 2011). . Boston Globe. Archived from the original on May 27, 2012. Retrieved October 7, 2011.
  20. ^ Coughlin, Kerri (October 25, 2011). . Tufts Daily. Archived from the original on December 4, 2011. Retrieved June 13, 2012.
  21. ^ a b Hofherr, Justine (August 27, 2014). "Somerville's New Assembly Square MBTA Station to Open Next Week". Boston Globe. Retrieved August 27, 2014.
  22. ^ Vaccaro, Adam (September 23, 2015). "Winter is coming, and the MBTA is getting ready". Boston Globe. Retrieved October 4, 2015.
  23. ^ "Gov. Baker Announces $83.7 Million MBTA Winter Resiliency Plan" (Press release). Massachusetts Bay Transportation Authority. June 4, 2015.
  24. ^ "Winter Resiliency Work Continues on the Red Line: WEEKEND TRAIN SERVICE BETWEEN JFK/UMASS AND QUINCY CENTER SUSPENDED" (Press release). Massachusetts Bay Transportation Authority. September 9, 2015.
  25. ^ "Weekend Orange Line Service Suspended between Sullivan and North Stations". MBTA Massachusetts Bay Transportation Authority. Retrieved November 3, 2017.
  26. ^ Jessen, Klark (October 2, 2018). "MBTA Awards Signal Upgrade Contract for Red and Orange Lines" (Press release). Massachusetts Department of Transportation.
  27. ^ "Dozens of passengers jump out windows of Orange Line train that caught fire". WCVB. July 22, 2022. Retrieved July 23, 2022.
  28. ^ Rios, Simón (August 3, 2022). "MBTA riders fume over plans to close Orange Line for 30 days". WBUR News. Retrieved August 5, 2022.
  29. ^ "There are still unanswered questions about the Orange Line shutdown, set for Aug. 19". Boston Globe. August 4, 2022. Retrieved August 5, 2022.
  30. ^ "Building A Better T: Major Orange Line Revitalization Work to Be Accelerated during 30-day Shutdown of Entire Line" (Press release). Massachusetts Bay Transportation Authority. August 3, 2022.
  31. ^ Taylor Dolven (September 18, 2022). "T to reopen Orange Line after unprecedented month-long closure". The Boston Globe.
  32. ^ Dolven, Taylor (October 7, 2022). . Boston Globe. Archived from the original on October 7, 2022.
  33. ^ MBTA letter to Senator Ed Markey
  34. ^ a b "The MBTA Vehicle Inventory Page". NETransit. September 20, 2022. Retrieved July 1, 2023.
  35. ^ Belcher, Jonathan (January–February 2023). "MBTA Vehicle Inventory as of February 28, 2023". Rollsign. Vol. 60, no. 1–2. Boston Street Railway Association. p. 4.
  36. ^
orange, line, mbta, orange, line, rapid, transit, line, operated, massachusetts, transportation, authority, mbta, part, mbta, subway, system, line, runs, south, surface, from, grove, station, malden, massachusetts, through, malden, medford, paralleling, haverh. The Orange Line is a rapid transit line operated by the Massachusetts Bay Transportation Authority MBTA as part of the MBTA subway system The line runs south on the surface from Oak Grove station in Malden Massachusetts through Malden and Medford paralleling the Haverhill Line then crosses the Mystic River on a bridge into Somerville then into Charlestown It passes under the Charles River and runs through Downtown Boston in the Washington Street Tunnel The line returns to the surface in the South End then follows the Southwest Corridor southwest in a cut through Roxbury and Jamaica Plain to Forest Hills station Orange LineA southbound Orange Line train at North Station in 2024OverviewLocaleGreater BostonTerminiOak GroveForest HillsStations20ServiceTypeRapid transitSystemMBTA subwayOperator s Massachusetts Bay Transportation AuthorityRolling stockCRRC 14 Orange Line carsDaily ridership201 000 2019 1 HistoryOpenedJune 10 1901TechnicalLine length11 mi 18 km Track gauge4 ft 8 1 2 in 1 435 mm standard gaugeElectrificationThird rail 600 V DCRoute mapAll stations are accessibleHaymarket North ExtensionOak GroveMalden CenterWellingtonCarhouse WellingtonMystic RiverAssemblySullivan SquareCommunity CollegeCharles RiverGreen Line to LechmereNorth StationWashington Street TunnelHaymarketGreen Line outboundStateDowntown CrossingChinatownTufts Medical CenterBack BaySouthwest CorridorMassachusetts AvenueRugglesRoxbury CrossingJackson SquareStony BrookGreen StreetForest HillsThis diagram viewtalkeditThe Orange Line operates during normal MBTA service hours all times except late nights with six car trains A 120 car fleet built in 1979 1981 is being replaced with a 152 car CRRC fleet from 2018 to 2023 The Orange Line is fully grade separated trains are driven by operators with automatic train control for safety Wellington Carhouse in Medford is used for heavy maintenance and storage a small yard at Forest Hills is also used for storage All 20 Orange Line stations are fully accessible Averaging 201 000 weekday passengers in 2019 the Orange Line has the second highest ridership of the MBTA subway lines The Orange Line originated as the Main Line Elevated of the Boston Elevated Railway which was built in 1901 It consisted of the Charlestown Elevated Atlantic Avenue Elevated Washington Street Elevated and a portion of the previously built Tremont Street subway All of the original route has been replaced beginning with the Washington Street Tunnel replacing the Tremont Street subway in 1908 The Washington Street Elevated was extended from Dudley Square to Forest Hills in 1909 with an infill station at Green Street in 1912 the Charlestown Elevated was extended from Sullivan Square to Everett in 1919 The Atlantic Avenue Elevated was closed in 1938 The newly formed MBTA assigned colors to its subway lines in 1965 with the Main Line becoming the Orange Line The Charlestown Elevated was closed in 1975 it was replaced by the Haymarket North Extension which opened in phases from 1975 to 1977 The Southwest Corridor replaced the Washington Street Elevated in 1987 using an alignment originally intended for Interstate 95 completing the modern Orange Line alignment The downtown stations were lengthened in the 1980s to allow six car trains Accessibility modifications began with some of those stations and were completed in 2005 Assembly opened as an infill station in 2014 The Orange Line has struggled with reliability issues including aging infrastructure and trains since the 2010s Despite the ongoing fleet replacement several prominent incidents occurred in 2022 The entire Orange Line was replaced with buses from August 19 to September 18 2022 to allow for accelerated repairs Contents 1 History 1 1 Construction 1 2 Closure of Atlantic Avenue Elevated and ownership changes 1 3 Orange Line naming 1 4 Rerouting of Charlestown and Everett service 1 5 Closure of Washington Street Elevated 1 6 Station renovations 1 7 Assembly 1 8 Reliability issues and repairs 1 9 Historical routes 2 Station listing 3 Rolling stock 3 1 Former rolling stock 3 2 New CRRC trains 3 3 Facilities 4 References 5 External linksHistory editSee also History of the MBTA Construction edit nbsp The Charlestown El running over the Charlestown BridgeThe Main Line of the electric Boston Elevated Railway opened in segments starting in 1901 It proceeded from Sullivan Square along the Charlestown Elevated to the Canal Street incline near North Station It was carried underground by the Tremont Street subway now part of the Green Line returning above ground at the Pleasant Street incline now closed located just south of Boylston station A temporary link connected from there to the Washington Street Elevated which in 1901 ran from this point via Washington Street to Dudley Square which is most of what is now Phase 1 of the Silver Line Also in 1901 the Atlantic Avenue Elevated opened branching at Causeway Street to provide an alternate route through downtown Boston along the shoreline where today there is no rail transit to the Washington Street Elevated In 1908 a new Washington Street Tunnel opened allowing Main Line service to travel from the Charlestown Elevated underground via an additional new portal at the Canal Street incline under downtown Boston and back up again to meet the Washington Street Elevated and Atlantic Avenue Elevated near Chinatown The stations were richly decorated with tile work mosaics and copper after criticism of the large Tremont Street subway headhouses most entrances were comparatively modest and set into buildings 2 Use of the parallel Tremont Street subway was returned exclusively to streetcars By 1909 the Washington Street Elevated had been extended south to Forest Hills Trains from Washington Street were routed through the new subway either all the way to Sullivan Square or back around in a loop via the subway and then the Atlantic Avenue Elevated In 1919 the same year that the Atlantic Avenue Elevated was partially damaged in Boston s Great Molasses Flood the Charlestown Elevated was extended north from Sullivan Square to Everett over surface right of way parallel to Alford Street Broadway with a drawbridge over the Mystic River 3 The Boston Elevated had long term plans to continue this extension further north to Malden a goal which would only be achieved decades later under public ownership and not via the Everett route Closure of Atlantic Avenue Elevated and ownership changes edit nbsp Rowes Wharf station on the Atlantic Avenue Elevated in 1942 four years after closure just before being demolishedFollowing a 1928 accident at a tight curve on Beach Street the southern portion of the Atlantic Avenue Elevated between South Station and Tower D on Washington Street was closed except for rush hour trips from Dudley to North Station via the Elevated breaking the loop non rush hour Atlantic Avenue service was reduced to a shuttle between North and South Stations 3 In 1938 the remainder of the Atlantic Avenue Elevated was closed leaving the subway as the only route through downtown what is now the Orange Line between Haymarket and Chinatown stations Ownership of the railway was transferred from the private Boston Elevated Railway to the public Metropolitan Transit Authority MTA in 1947 the MTA was itself reconstituted as the modern Massachusetts Bay Transportation Authority MBTA in 1964 On December 5 1960 the MTA began operating modified express service on the line during the morning rush hour Every other train bypassed Green Street Egleston southbound or Northampton northbound Dover and Thompson Square stations 4 5 This was discontinued in September 1961 to reduce wait times at the skipped stations all of which were outdoors 6 Orange Line naming edit nbsp Station sign at Boylston Street now Chinatown station in 1914 In 1967 the station was renamed Essex to avoid confusion with the preexisting Green Line station a block away The line was known as the Main Line Elevated under the Boston Elevated Railway and the Forest Hills Everett Elevated Route 2 on maps 7 under the Metropolitan Transportation Authority After taking over operations in August 1964 the MBTA began rebranding many elements of Boston s public transportation network Colors were assigned to the rail lines on August 26 1965 as part of a wider modernization developed by Cambridge Seven Associates Peter Chermayeff assigned red green and blue to the other three lines based on geographic features however according to Chermayeff the Main Line El ended up being orange for no particular reason beyond color balance 8 The firm originally planned for yellow instead of orange but yellow was rejected after testing because yellow text was difficult to read on a white background 9 Yellow was later used for MBTA bus service The MBTA and transit historians later claimed that orange came from Orange Street an early name for what is now part of Washington Street 10 11 9 In January and February 1967 the four original Washington Street Tunnel stations were renamed Transfer stations were given the same name for all lines Winter and Summer stations plus Washington on the Red Line became Washington Milk and State plus Devonshire on the Blue Line became State Street after the cross street and Union and Friend plus Haymarket Square on the Green Line became Haymarket after Haymarket Square 3 Boylston Street was renamed Essex to avoid confusion with nearby Boylston station on the Green Line 3 nbsp A train at City Square station in 1958In May 1987 Essex was renamed Chinatown after the adjacent Chinatown neighborhood and Washington renamed Downtown Crossing after the adjacent shopping district 3 In March 2010 New England Medical Center station was renamed as Tufts Medical Center two years after the eponymous hospital changed its name 3 Rerouting of Charlestown and Everett service edit This section does not cite any sources Please help improve this section by adding citations to reliable sources Unsourced material may be challenged and removed July 2023 Learn how and when to remove this template message nbsp Map of the original Main Line Elevated and related linesThe Boston Transportation Planning Review looked at the line in the 1970s considering extensions to reach the Route 128 beltway with termini at Reading in the north and Dedham in the south As a result of this review the Charlestown Elevated which served the Charlestown neighborhood north of downtown Boston and the inner suburb of Everett was demolished and replaced in 1975 The Haymarket North Extension rerouted the Orange Line through an underwater crossing of the Charles River Service in Charlestown was replaced with service along Boston and Maine tracks routed partially beneath an elevated section of Interstate 93 ultimately to Wellington and then to Oak Grove in Malden Massachusetts instead of Everett Rail service to Everett was replaced with buses The extension was unique among Boston transit lines as it contained a third express track between Wellington and Community College stations These stations along with Sullivan Sq have two island platform stations as opposed to the more normal single island stations found on the southern side of the Orange Line This express track was designed for the never built extension north of Oak Grove to Reading The third track would have allowed peak direction express service as well as places to terminate trains Service north of Oak Grove was planned to have longer headways to account for the lower projected ridership This extension was opposed by residents of Melrose who preferred restored commuter rail service Because of this the express track ends at Wellington and a single commuter rail track continues parallel to the Orange Line north to Reading Closure of Washington Street Elevated edit nbsp View under Washington Street Elevated looking south from Bartlett Street 1973 Construction of Interstate 95 into downtown Boston was cancelled in 1972 after local protest over the necessary demolition However land for I 95 s Southwest Corridor through Roxbury had already been cleared of buildings moreover the state had already committed to using this vacant land for transportation purposes 12 As a result instead of an 8 lane Interstate highway with a relocated Orange Line running in its median in a manner similar to the Chicago Transit Authority s Dan Ryan Congress and O Hare branches the space would be occupied by the realigned Orange Line a reconstructed three track mainline for Amtrak s Northeast Corridor and MBTA Commuter Rail trains and a linear park After this re routing was accomplished in 1987 the Washington Street Elevated was torn down the last major segment of the original elevated line to be demolished nbsp The modern view from the platform at Chinatown shows the remains of the Washington Street Tunnel that led to the Elevated in the distance In the foreground the tracks curve rightward into the Southwest Corridor Between April 30 and May 3 1987 the Washington Street Elevated south of the Chinatown station was closed to allow the Orange Line to be tied into the new Southwest Corridor On May 4 1987 the Orange Line was rerouted from the southern end of the Washington Street Tunnel onto the new Southwest Corridor Instead of rising up to elevated tracks it now veered west at the Massachusetts Turnpike and followed the Pike and the old Boston and Albany Railroad right of way to the existing MBTA Commuter Rail stop at Back Bay It then continued along new tracks partially covered and partially open but depressed to Forest Hills This MBTA right of way is also shared by Amtrak as part of the national Northeast Corridor intercity passenger rail service External videos nbsp Orange Line El Stations 11 42 April 30 1987 Boston TV Digital News 13 While ending more or less at the same terminus Forest Hills the new routing passes significantly to the west of its previous route on Washington Street local residents were promised equal or better replacement service Originally plans provided for light rail vehicles street running in mixed traffic from Washington Street to Dudley Square then diverting southeastward on Warren Street towards Dorchester In 2002 Phase 1 of the Silver Line bus rapid transit was added to connect Washington Street to the downtown subways attempting to address this service need This replacement service was controversial as many residents preferred the return of rail transportation 14 Station renovations edit In the mid 1980s the MBTA spent 80 million to extend the platforms of seven Red Line and three Orange Line stations Essex Washington and State to allow the use of six car trains 15 Washington and Essex were made fully accessible as was the northbound platform at Essex The Southwest Corridor station opened in 1987 were all fully accessible Six car trains entered service on August 18 1987 3 Oak Grove was also renovated around 1987 16 This left only Haymarket five stations on the Haymarket North Extension and the southbound platform at Chinatown inaccessible by the 1990 passage of the Americans with Disabilities Act 17 Construction at Sullivan Square and Wellington began in 1991 10 Haymarket was retrofitted with elevators in 2000 16 The 1975 built North Station was expanded into a superstation with a cross platform transfer to the Green Line elevators were in installed in 2001 though the Green Line did not use the station until 2004 16 3 The southbound platform at Chinatown was made accessible in 2002 18 16 Renovations to Community College and Malden Center were completed in 2005 making the Orange Line the first of the four original MBTA subway lines to become fully accessible 18 Assembly edit nbsp Assembly station on its first day of service in September 2014Main article Assembly station In the early 2000s Somerville began planning an infill station between Sullivan and Wellington to serve the new Assembly Square development The 57 million station was funded by the state s Executive Office of Housing and Economic Development FTA Section 5309 New Starts program and Federal Realty Investment Trust the developer of Assembly Square 19 Construction began in late 2011 and finished in mid 2014 20 The new station Assembly opened on September 2 2014 21 It was the first new station on the MBTA subway system since 1987 21 Reliability issues and repairs edit During the unusually brutal winter of 2014 2015 the entire MBTA system was shut down on several occasions by heavy snowfalls The aboveground sections of the Orange and Red lines were particularly vulnerable due to their exposed third rail which iced over during storms When a single train stopped due to power loss other trains soon stopped as well without continually running trains pushing snow off the rails the lines were quickly covered in snow Because the Blue Line was built with overhead lines on its surface section due to its proximity to corrosive salt air it was not subject to icing issues nbsp Fenced off faregates at Back Bay during the August September 2022 closureStarting in 2015 the MBTA began implementing its 83 7 million Winter Resiliency Program much of which focused on preventing similar issues with the Orange and Red lines The Southwest Corridor section of the Orange Line is located in a trench and is protected from the worst weather but the 1970s built Haymarket North Extension had older infrastructure and was in worse shape From Sullivan Square north it is exposed to the weather and largely built on an embankment rendering it more vulnerable That section is receiving new heated third rail switch heaters and snow fences to reduce the impacts of inclement weather 22 23 The work requires bustitution of the line from Sullivan Square to Oak Grove on certain weeknights and weekends 24 25 In October 2018 the MBTA awarded a 218 million signal contract for the Red and Orange Lines which was planned to allow 4 5 minute headways on the Orange Line beginning in 2022 26 On July 22 2022 an Orange Line train caught fire while crossing the Mystic River A metal sill along the underside of the train came loose and came into contact with the third rail igniting sparks Passengers had to jump out of the train onto the tracks and one woman jumped into the river below and swam to shore There were no injuries or casualties 27 Following various reliability issues on the Orange Line the MBTA announced that it would close the entire line for renovations from August 19 to September 18 2022 28 29 During the closure the MBTA conducted accelerated repairs to track ties signals and concrete walls as well as replacing two crossovers This was intended to remove speed restrictions and improve safety and reliability The shutdown also gave time for more new CRRC cars to be delivered and put into service after the closure service on the line resumed with new trains almost all the time 30 31 However the work was not enough to eliminate all slow zones and temporary slow zones were added where work was performed By early October a round trip on the full line was 13 minutes slower than before the shutdown and 20 minutes slower than it would be without any slow zones 32 On October 25 the MBTA sent a letter to Senator Ed Markey who had been investigating the project detailing work needed during November and December to lift remaining slow zones ranging from always planned to unexpectedly necessary tasks 33 Historical routes edit Route diagram templates of the various Orange Line routes over its history1901 1908 1908 1938Charlestown Elevated nbsp Sullivan Square nbsp Thompson Square opened 1902 nbsp City Square nbsp nbsp nbsp Charles River nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp Atlantic Avenue Elevated nbsp nbsp North Station nbsp nbsp nbsp nbsp Canal Street incline toTremont Street subway nbsp nbsp Battery Street nbsp nbsp Haymarket nbsp nbsp nbsp nbsp Adams Square nbsp nbsp nbsp nbsp nbsp Scollay Square nbsp nbsp nbsp nbsp nbsp nbsp State Street nbsp nbsp nbsp nbsp East Boston Tunnel nbsp nbsp Rowes Wharf nbsp BRB amp L ferry nbsp nbsp Park Street nbsp nbsp South Station nbsp nbsp nbsp Boylston nbsp nbsp Pleasant Street incline nbsp nbsp nbsp Pleasant Street nbsp nbsp nbsp Beach Street nbsp nbsp nbsp Washington Street Elevated nbsp Dover nbsp Northampton nbsp Dudley SquareThis diagram viewtalkedit Charlestown Elevated nbsp nbsp Everett opened 1919 nbsp nbsp nbsp Mystic River nbsp Sullivan Square nbsp Thompson Square nbsp City Square nbsp nbsp nbsp Charles River nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp Atlantic Avenue Elevated nbsp nbsp North Station nbsp nbsp nbsp nbsp Canal Street incline toWashington Street subway nbsp nbsp Battery Street nbsp nbsp nbsp nbsp Friend Union nbsp nbsp nbsp nbsp nbsp Milk State nbsp nbsp nbsp nbsp nbsp nbsp State Street nbsp nbsp nbsp nbsp East Boston Tunnel nbsp nbsp nbsp nbsp Rowes Wharf nbsp BRB amp L ferry nbsp nbsp nbsp nbsp nbsp Summer nbsp nbsp nbsp nbsp nbsp nbsp South Station nbsp nbsp nbsp nbsp nbsp Dorchester Tunnel nbsp nbsp Boylston Essex nbsp nbsp Beach Street closed 1919 nbsp nbsp nbsp Washington Street Elevated nbsp Dover nbsp Northampton nbsp Dudley Square nbsp Egleston opened 1909 nbsp Green Street opened 1912 nbsp Forest Hills opened 1909 nbsp This diagram viewtalkedit1938 1975 1975 1987Charlestown Elevated nbsp nbsp Everett nbsp nbsp nbsp Mystic River nbsp Sullivan Square nbsp Thompson Square nbsp City Square nbsp nbsp nbsp Charles River nbsp North Station nbsp Green Line nbsp Canal Street incline nbsp Washington Street subway nbsp Friend Union nbsp nbsp nbsp Milk State Blue Line nbsp nbsp nbsp Winter Summer Red Line nbsp Boylston Essex nbsp Washington Street Elevated nbsp Dover nbsp Northampton nbsp Dudley Square nbsp Egleston nbsp Green Street nbsp nbsp Green Line nbsp nbsp nbsp nbsp Forest Hills nbsp nbsp nbsp ArborwayThis diagram viewtalkedit Haymarket North Extension nbsp nbsp Oak Grove opened 1977 nbsp nbsp Malden Center nbsp nbsp nbsp Wellington nbsp nbsp nbsp Mystic River nbsp Sullivan Square nbsp nbsp Community College nbsp nbsp nbsp Charles River nbsp nbsp nbsp nbsp nbsp North Station nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp Haymarket Green Line nbsp Washington Street subway nbsp nbsp nbsp State Blue Line nbsp nbsp nbsp Washington Red Line nbsp Essex nbsp Washington Street Elevated nbsp Dover nbsp Northampton nbsp Dudley Square nbsp Egleston nbsp Green Street nbsp nbsp Green Line nbsp nbsp nbsp nbsp Forest Hills nbsp nbsp nbsp nbsp Arborway closed 1985This diagram viewtalkedit1987 present NotesHaymarket North Extension nbsp nbsp Oak Grove nbsp nbsp Malden Center nbsp nbsp nbsp Wellington nbsp nbsp nbsp Mystic River nbsp Assembly opened 2014 nbsp Sullivan Square nbsp nbsp Community College nbsp nbsp nbsp Charles River nbsp nbsp nbsp nbsp nbsp North Station nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp Haymarket Green Line nbsp Washington Street subway nbsp nbsp nbsp nbsp State Blue Line nbsp nbsp nbsp nbsp Downtown Crossing Red Line nbsp Chinatown nbsp Tufts Medical Center nbsp Back Bay nbsp nbsp nbsp nbsp Southwest Corridor Park nbsp nbsp nbsp nbsp nbsp Massachusetts Avenue nbsp nbsp nbsp nbsp nbsp Ruggles nbsp nbsp nbsp nbsp nbsp nbsp Roxbury Crossing nbsp nbsp nbsp nbsp nbsp Jackson Square nbsp nbsp nbsp nbsp nbsp Stony Brook nbsp nbsp nbsp nbsp nbsp Green Street nbsp nbsp Forest Hills nbsp This diagram viewtalkedit Haymarket and State got their modern names in 1967 Downtown Crossing and Chinatown also changed names in 1967 but changed again in 1987 New England Medical Center was renamed Tufts Medical Center in 2010 Station listing editLocation Station Opened Notes and connectionsMalden nbsp Oak Grove March 20 1977 nbsp MBTA Commuter Rail Haverhill nbsp MBTA bus 131 132 137 nbsp Malden Center December 27 1975 nbsp MBTA Commuter Rail Haverhill nbsp MBTA bus 97 99 101 104 105 106 108 131 132 137 411 430Medford nbsp Wellington September 6 1975 nbsp MBTA bus 97 99 100 106 108 110 112 134Somerville nbsp Assembly September 2 2014Charlestown Boston nbsp Sullivan Square April 7 1975 Original elevated station was open from June 10 1901 to April 4 1975 nbsp MBTA bus 86 89 90 91 92 93 95 101 104 105 109 CT2 nbsp Community CollegeNorth End Boston nbsp North Station Original elevated station was open from June 10 1901 to April 4 1975 nbsp MBTA subway Green D E nbsp MBTA Commuter Rail Fitchburg Lowell Haverhill Newburyport Rockport nbsp MBTA bus 4 nbsp Amtrak Downeaster nbsp EZRide nbsp Haymarket November 30 1908 nbsp MBTA subway Green D E nbsp MBTA bus 4 92 93 111 354 426 428 450Downtown Boston nbsp State nbsp MBTA subway Blue nbsp MBTA bus 4 92 93 354 nbsp Downtown Crossing nbsp MBTA subway Red Silver SL5 nbsp MBTA bus 7 11 501 504 505At Park Street nbsp Green B C D E nbsp 43Chinatown Boston nbsp Chinatown nbsp MBTA subway Silver SL4 SL5 nbsp MBTA bus 11 nbsp Tufts Medical Center May 4 1987 nbsp MBTA subway Silver SL4 SL5 nbsp MBTA bus 11 43Back Bay Boston nbsp Back Bay nbsp MBTA Commuter Rail Framingham Worcester Franklin Foxboro Needham Providence Stoughton nbsp MBTA bus 10 39 nbsp Amtrak Acela Northeast Regional and Lake Shore LimitedSouth End Boston nbsp Massachusetts Avenue nbsp MBTA bus 1Roxbury Boston nbsp Ruggles nbsp MBTA Commuter Rail Franklin Foxboro Needham Providence Stoughton nbsp MBTA bus 8 15 19 22 23 28 43 44 45 47 CT2 CT3 nbsp Roxbury Crossing nbsp MBTA bus 15 22 23 28 44 45 66 MIS nbsp Jackson Square nbsp MBTA bus 14 22 29 41 44Jamaica Plain Boston nbsp Stony Brook nbsp Green Street nbsp Forest Hills nbsp MBTA Commuter Rail Franklin Foxboro Needham Providence Stoughton nbsp MBTA bus 16 21 30 31 32 34 34E 35 36 37 38 39 40 42 50 51Rolling stock editSeries Year built Manufacturer Carlength Carwidth Photo Fleet numbers total ordered Number in service as of March 2024 update 34 14 Orange Line 2018 2023 CRRC 65 ft 20 m 9 ft 3 in 2 82 m nbsp 1400 1551 152 total 104 nbsp Interior of a new 14 CRRC carThe Orange Line is standard gauge heavy rail and uses a third rail for power The newer cars are being built by CRRC in a newly constructed plant in Springfield Massachusetts with 152 cars on order along with additional cars for the Red Line All in service Orange Line trains run in six car consists Cars of the fleet are 65 feet 20 m long and 9 ft 3 in 2 8 m wide with three pairs of doors on each side As of February 2022 update weekday peak and afternoon service was scheduled to operate on 8 minute headways with headways ranging from 8 to 12 minutes at other times Vehicle utilization ranged between 8 trains 48 cars and 13 trains 78 cars 35 However rolling stock availability and longer trip times due to slow zones reduced service By July 2023 headways were 10 12 minutes on weekdays 36 This was improved to nine minute headways on August 27 2023 37 Former rolling stock edit nbsp Older 1200 series Orange Line train leaving Assembly stationThe T previously had a fleet of Pullman Standard heavy rail cars for the Orange Line These cars known as 01100s had been in service since the 1950s and saw service on both the elevated and the northern extension before they were retired in 1981 Several remained on the property as Red Line work cars for some time before being scrapped 38 Units 01178 01179 are preserved at the Seashore Trolley Museum in Kennebunkport Maine 34 From 1981 to 2022 the Orange Line used a fleet of Hawker Siddeley heavy rail cars These cars nicknamed Orange Blossoms featured reinforced roofs for pantographs It was thought that if the Orange Line was extended they would opt to use overhead collection But since these extensions were never built pantographs were never installed The 01200s along with the Blue Line s 0600 cars manufactured at the same time were based on the designs of the PATH PA3 After 41 years of service the last 01200s ran on August 19 2022 before the shutdown and began to be sent to scrap on September 22 2022 39 Almost all will be processed by the contractor Costello to remove hazardous materials and be recycled two were offered to the Seashore Trolley Museum but not accepted 40 New CRRC trains edit nbsp A CRRC built 14 Orange Line train at Chinatown stationIn late 2008 the MBTA began the planning process for new Orange and Red Line vehicles The agency originally planned for a simultaneous order for 146 Orange Line cars to replace the whole fleet and 74 Red Line cars to replace the older 1500 and 1600 series cars A similar order was used in the late 1970s for the current Orange Line cars and the old Blue Line cars ordered at the same time and largely identical except for size and color 41 In October 2013 MassDOT announced plans for a 1 3 billion subway car order for the Orange and Red Lines which would provide 152 new Orange Line cars to replace the existing 120 car fleet and add more frequent service 42 On October 22 2014 the MassDOT Board awarded a 566 6 million contract to a China based manufacturer CNR which became part of CRRC the following year to build 152 replacement railcars for the Orange Line as well as additional cars for the Red Line 43 The other bidders were Bombardier Transportation Kawasaki Heavy Industries and Hyundai Rotem CNR began building the cars at a new manufacturing plant in Springfield Massachusetts with initial deliveries expected in 2018 and all cars in service by 2023 43 The Board forwent federal funding to allow the contract to specify the cars be built in Massachusetts to create a local railcar manufacturing industry 44 In conjunction with the new rolling stock the remainder of the 1 3 billion allocated for the project would pay for testing signal improvements and expanded maintenance facilities as well as other related expenses 43 Sixty percent of the car s components are sourced from the United States 45 After delays due to issues with the train s control system the first new train entered revenue service on August 14 2019 46 47 Replacement of the signal system is expected to be complete by 2022 on the Orange Line the total cost is 218 million for both the Red and Orange Lines 48 While waiting for new cars service has deteriorated due to maintenance problems with the old cars The number of trains at rush hour was reduced from 17 102 cars to 16 96 cars in 2011 in the same year daily ridership surpassed 200 000 49 Increased running times largely due to longer dwell times from increased ridership resulted in headways being lengthened from 5 minutes before 2011 to 6 minutes in 2016 The increased fleet size with the new trains will allow headways to be reduced to between 4 and 5 minutes at peak 50 In the interim a 2016 test of platform markings at North Station which show boarding passengers where to stand to avoid blocking alighting passengers resulted in a one third decrease in dwell times 51 The new cars have faced several issues since their August entry into service In November 2019 a car derailed while undergoing initial testing at the Wellington yard The last car of a six car trainset had jumped the rails while going over a switch however no major damage had been reported Several months earlier the first two trainsets were taken out of service due to safety issues following the inadvertent opening of a passenger door while the train was in motion 52 Cars were also rechecked in early December 2019 after issues with sounds combined with passenger overload necessitated removal from service 53 54 The first train was restored to service in January 2020 55 The trains were pulled again on March 16 2021 after a derailment involving one of the cars 56 Buses replaced trains around the site of the derailment until April 12 57 The CRRC cars remained out of service as of July 2021 defective side bearer pads were identified as a contributing factor These dampen the movements of the trucks which include the wheels with respect to the car bodies but were found to be wearing in such a way as to produce too much friction 58 The first of the CRRC trainsets was returned to revenue service on August 20 after modifications were approved by the MBTA s Safety Department and the Department of Public Utilities 59 The new cars were again removed from service on May 19 23 2022 after a braking issue on one car due to an incorrectly installed bolt 60 61 and again between June and July 2022 due to a battery failure 62 In December 2022 some new cars were removed from service due to failed power cables causing electric arcing on axles 63 The CRRC contract requires delivery of all Orange Line cars by January 2022 with a fine of 500 per day per car for late deliveries Delays began to accumulate in 2019 and then facilities in China and Springfield had to shut down and operate at reduced capacity for parts of 2020 due to the COVID 19 pandemic As of September 2022 78 of 152 new cars had been put in service on the Orange Line This was enough for service almost all the time because of the rush hour service cap introduced after an FTA safety audit identified insufficient staffing of subway dispatchers The MBTA indicated it would assess which delays were the fault of the contractor at the end of the contract 64 In 2023 cars were being delivered incomplete with incomplete paint repairs connectors seen hanging on underframes and parts sanded down to bare metal 65 The MBTA and CRRC have collaborated to resolve quality issues In August 2023 MBTA General Manager has reported that the new Orange Line cars are exhibiting an average of approximately 114 000 miles traveled between failures which surpasses the contractual requirement of 90 000 miles by over a quarter 66 Facilities edit nbsp Orange Line trains in Wellington Carhouse the Orange Line s heavy maintenance facility in 2014The Orange Line has two tracks for most of its length a third track is present between Wellington station and the Charles River portal 67 This track is used to bypass construction on the other two tracks and for testing newly delivered cars for the Orange Line The primary maintenance and storage facility is at Wellington station 67 Had the Orange Line been extended to Reading the third track would have been the northbound local track and the present day northbound track would likely have become a bi directional express track Expansion of the yard and carhouse was needed for the larger CRRC fleet Yard work was substantially completed in August 2023 while carhouse expansion is expected to be complete in mid 2024 68 References edit Quarterly Ridership Update Third Quarter FY19 PDF Massachusetts Bay Transportation Authority May 20 2019 p 6 Coburn Frederick W November 1910 Rapid Transit and Civic Beauty New Boston Vol 1 no 7 pp 307 314 via Google Books a b c d e f g h Belcher Jonathan June 27 2015 Changes to Transit Service in the MBTA district PDF NETransit Retrieved August 5 2015 MTA Advisory Board Supports Cuts The Boston Globe December 1 1960 pp 1 15 via Newspapers com M T A Express Train Gets A From Riders The Boston Globe December 5 1960 p 13 via Newspapers com M T A Dropping Morning Express The Boston Globe September 27 1961 p 10 via Newspapers com Lufkin Richard F 1966 System Route Map Map Massachusetts Bay Transportation Authority via Wikimedia Commons Byrnes Mark September 17 2018 How Boston Got Its T CityLab I remember sitting in my Cambridge office preparing for a meeting with the MBTA in which I would be proposing colored lines I had markers in front of me and I chose red for the line that went to Harvard since it s a well known institution whose main color is crimson One line went up the North Shore of Boston up to the coastal areas so it seemed obvious to call that the Blue Line The line that serves Olmsted s Emerald Necklace was an obvious choice for green And then the fourth line ended up being orange for no particular reason beyond color balance a b Ba Tran Andrew June 2012 MBTA Orange Line s 111th anniversary Boston Globe Archived from the original on July 21 2017 The Everett Forest Hills Main Line Elevated was renamed the Orange Line on Aug 25 1965 The name comes from a section of Washington Street between Essex and Dover streets that had the name Orange Street until the early 19th century said Clarke However according to architecture firm Cambridge Seven Associates the Orange Line s color was a design choice after the yellow color option did not test well a b Sanborn George M 1992 A Chronicle of the Boston Transit System Massachusetts Bay Transportation Authority Archived from the original on 2019 11 27 Retrieved 2016 01 19 via MIT Curiosity Carcards PDF Massachusetts Bay Transportation Authority 2012 Anderson Steve Southwest Expressway I 95 unbuilt bostonroads com Retrieved August 3 2013 Orange Line El Stations Boston TV Digital News WGBH April 30 1987 Retrieved September 15 2016 Roxbury Dorchester Mattapan Transit Needs Study PDF Massachusetts Department of Transportation September 2012 p 53 Retrieved October 4 2017 1985 Annual Report Massachusetts Bay Transportation Authority 1985 p 13 via Internet Archive a b c d Tran Systems and Planners Collaborative August 24 2007 Evaluation of MBTA Paratransit and Accessible Fixed Route Transit Services Final Report PDF Massachusetts Bay Transportation Authority Operations Directorate Planning Division November 1990 Ridership and Service Statistics 3 ed Massachusetts Bay Transportation Authority pp 1 4 via Internet Archive a b Accessibility Projects at the MBTA PDF Massachusetts Bay Transportation Authority March 2005 Moskowitz Eric October 6 2011 MBTA board OK s millions for stations Boston Globe Archived from the original on May 27 2012 Retrieved October 7 2011 Coughlin Kerri October 25 2011 Construction on Assembly Square T stop to begin later this fall Tufts Daily Archived from the original on December 4 2011 Retrieved June 13 2012 a b Hofherr Justine August 27 2014 Somerville s New Assembly Square MBTA Station to Open Next Week Boston Globe Retrieved August 27 2014 Vaccaro Adam September 23 2015 Winter is coming and the MBTA is getting ready Boston Globe Retrieved October 4 2015 Gov Baker Announces 83 7 Million MBTA Winter Resiliency Plan Press release Massachusetts Bay Transportation Authority June 4 2015 Winter Resiliency Work Continues on the Red Line WEEKEND TRAIN SERVICE BETWEEN JFK UMASS AND QUINCY CENTER SUSPENDED Press release Massachusetts Bay Transportation Authority September 9 2015 Weekend Orange Line Service Suspended between Sullivan and North Stations MBTA Massachusetts Bay Transportation Authority Retrieved November 3 2017 Jessen Klark October 2 2018 MBTA Awards Signal Upgrade Contract for Red and Orange Lines Press release Massachusetts Department of Transportation Dozens of passengers jump out windows of Orange Line train that caught fire WCVB July 22 2022 Retrieved July 23 2022 Rios Simon August 3 2022 MBTA riders fume over plans to close Orange Line for 30 days WBUR News Retrieved August 5 2022 There are still unanswered questions about the Orange Line shutdown set for Aug 19 Boston Globe August 4 2022 Retrieved August 5 2022 Building A Better T Major Orange Line Revitalization Work to Be Accelerated during 30 day Shutdown of Entire Line Press release Massachusetts Bay Transportation Authority August 3 2022 Taylor Dolven September 18 2022 T to reopen Orange Line after unprecedented month long closure The Boston Globe Dolven Taylor October 7 2022 The shutdown was supposed to make the Orange Line faster It s slower data show Boston Globe Archived from the original on October 7 2022 MBTA letter to Senator Ed Markey a b The MBTA Vehicle Inventory Page NETransit September 20 2022 Retrieved July 1 2023 Belcher Jonathan January February 2023 MBTA Vehicle Inventory as of February 28 2023 Rollsign Vol 60 no 1 2 Boston Street Railway Association p 4 a, wikipedia, wiki, book, books, library,