fbpx
Wikipedia

Egleston station

Egleston was a rapid transit station in Boston, Massachusetts. It served the Washington Street Elevated, part of the MBTA's Orange Line. It was located over Egleston Square at the intersection of Washington Street and Columbus Avenue in the Roxbury neighborhood. The station opened in November 1909, and was closed in April 1987 when the Orange Line was rerouted to the west along the Southwest Corridor.

Egleston
Egleston station in October 1908, a year before opening
General information
LocationWashington Street at Columbus Avenue
Boston, Massachusetts
Coordinates42°18′57.26″N 71°5′53.53″W / 42.3159056°N 71.0982028°W / 42.3159056; -71.0982028
Owned byMassachusetts Bay Transportation Authority
Line(s)Washington Street Elevated
Platforms2 side platforms
Tracks2
History
OpenedNovember 22, 1909[1]: 291 
ClosedApril 30, 1987[1]: 326 
Services
Preceding station MBTA Following station
Green Street Orange Line
Closed 1987
Dudley Square
toward Oak Grove

History edit

Construction edit

 
Egleston station under construction in 1908

The Boston Elevated Railway constructed the Washington Street Elevated from downtown Boston to Dudley Square in 1901; an extension to Forest Hills was approved on January 4, 1904 and began construction on May 2, 1906.[2]: A1–A2  Construction of the elevated structure proceeded southbound and reached Egleston Square on August 20, 1906, although construction on the station did not start until 1907 because of delays in the design.[2]: 34, A2  The extension opened on November 22, 1909 with Egleston as the sole new intermediate station; Green Street to the south was added as an infill station in 1912.[1]: 291 

Architecture edit

The architectural design of the station was similar to the earlier stations designed by A.W. Longfellow Jr. at Dover and Northampton, with most exterior surfaces sheathed in copper, although it is not believed that Longfellow designed the station.[2]: 45–46  Its structural design incorporated improvements over the older stations, including the first use of reinforced concrete on the Elevated. The waiting room was suspended below the steel elevated structure, which allowed it to be larger than the between-the-tracks waiting rooms at Dover and Northampton. Anticipating use of eight-car trains due to higher than expected ridership, the station was built with 350-foot (110 m) side platforms rather than a 160-foot (49 m) island platform.[2]: 45–46 

Transfer station edit

 
1916 plans for the transfer station

Egleston was intended to serve as a transfer point for surface streetcar lines from Jamaica Plain and Dorchester in order to divert traffic from overcrowded Dudley station.[2]: 37  The staircases from the station waiting room originally led directly into Egleston Square itself (on the northwest side of Washington Street between Columbus Avenue and Atherton Street) and into the median of Washington Street, which required many streetcar passengers to cross lanes of traffic to reach the station.[2]: 37  In response to continued streetcar crowding at Dudley, the BERy built an off-street prepayment transfer station on the east side of the intersection, with an escalator and connecting bridge directly to the waiting room.[3][4] The transfer station and bridge were constructed in 1916 and opened on January 20, 1918.[2]: A2 [5]

Closure edit

 
Streetcar transfer area at Egleston shortly before bustitution

Streetcar service continued for several decades before bustitution; route 42 to Dudley was converted in September 1949, route 29 to Mattapan in September 1955, and route 40 to Arborway in December 1955.[1]: 34, 42  Route 43 – the last streetcar route into the Tremont Street subway via the Pleasant Street incline – was cut back from Egleston to Lenox Street in June 1956, although bustitution of the remaining section did not occur until 1961 and 1962.[1]: 43 

On December 5, 1960, the MTA began operating "modified express service" on the Elevated during the morning rush hour. Every other train bypassed four stops; Egleston was bypassed only by southbound trains, with northbound trains instead bypassing Northampton.[6][7] This was discontinued in September 1961 to reduce wait times at the skipped stations, all of which were outdoors.[8]

From 1979 to 1987, the Southwest Corridor was reconstructed to include the Orange Line as well as commuter rail and intercity service. Egleston station and the rest of the Washington Street Elevated closed on April 30, 1987; the relocated Orange Line opened on May 4, 1987.[1]: 326 

In October 2020, the MBTA began installation of center-running bus lanes on Columbus Avenue, including bus platforms at Weld Street just east of Egleston Square to serve MBTA bus routes 22, 29, and 44.[9][10] The bus lanes opened on November 1, 2021.[11]

References edit

  1. ^ a b c d e f Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association. Page numbers are accurate to the .
  2. ^ a b c d e f g Zaitzevsky, Cynthia R. (July 1986). "Written Historical and Descriptive Data" (PDF). National Park Service / Historic American Engineering Record. Retrieved 26 June 2015.
  3. ^ Cheney, Frank; Sammarco, Anthony M. (2000). When Boston Rode The El. Arcadia Publishing. pp. 109–118. ISBN 9780738504629.
  4. ^ "Boston Profits By Elevated Railway Station Improvements". Electric Railway Journal. 48 (7). McGraw-Hill: 258–263. 12 August 1916 – via Internet Archive.
  5. ^ Annual report of the directors of the Boston Elevated Railway Company. Vol. 2. Boston Elevated Railway. 1919. p. 14 – via Internet Archive.
  6. ^ "MTA Advisory Board Supports Cuts". The Boston Globe. December 1, 1960. pp. 1, 15 – via Newspapers.com.
  7. ^ "M.T.A. Express Train Gets 'A' From Riders". The Boston Globe. December 5, 1960. p. 13 – via Newspapers.com.
  8. ^ "M.T.A. Dropping Morning Express". The Boston Globe. September 27, 1961. p. 10 – via Newspapers.com.
  9. ^ "Work Begins on Columbus Avenue" (Press release). Massachusetts Bay Transportation Authority. October 23, 2020.
  10. ^ Howard Stein Hudson (July 8, 2020). "Columbus Avenue Bus Priority Roll Plan" (PDF). Boston Transportation Department.
  11. ^ "MBTA and City of Boston Cut Ribbon on New England's First Center-Running Bus Lane on Columbus Avenue" (Press release). Massachusetts Bay Transportation Authority. November 4, 2021.

External links edit

  Media related to Egleston station at Wikimedia Commons

egleston, station, egleston, rapid, transit, station, boston, massachusetts, served, washington, street, elevated, part, mbta, orange, line, located, over, egleston, square, intersection, washington, street, columbus, avenue, roxbury, neighborhood, station, op. Egleston was a rapid transit station in Boston Massachusetts It served the Washington Street Elevated part of the MBTA s Orange Line It was located over Egleston Square at the intersection of Washington Street and Columbus Avenue in the Roxbury neighborhood The station opened in November 1909 and was closed in April 1987 when the Orange Line was rerouted to the west along the Southwest Corridor EglestonEgleston station in October 1908 a year before openingGeneral informationLocationWashington Street at Columbus Avenue Boston MassachusettsCoordinates42 18 57 26 N 71 5 53 53 W 42 3159056 N 71 0982028 W 42 3159056 71 0982028Owned byMassachusetts Bay Transportation AuthorityLine s Washington Street ElevatedPlatforms2 side platformsTracks2HistoryOpenedNovember 22 1909 1 291 ClosedApril 30 1987 1 326 ServicesPreceding station MBTA Following stationGreen Streettoward Forest Hills Orange LineClosed 1987 Dudley Squaretoward Oak Grove Contents 1 History 1 1 Construction 1 2 Architecture 1 3 Transfer station 1 4 Closure 2 References 3 External linksHistory editConstruction edit nbsp Egleston station under construction in 1908The Boston Elevated Railway constructed the Washington Street Elevated from downtown Boston to Dudley Square in 1901 an extension to Forest Hills was approved on January 4 1904 and began construction on May 2 1906 2 A1 A2 Construction of the elevated structure proceeded southbound and reached Egleston Square on August 20 1906 although construction on the station did not start until 1907 because of delays in the design 2 34 A2 The extension opened on November 22 1909 with Egleston as the sole new intermediate station Green Street to the south was added as an infill station in 1912 1 291 Architecture edit The architectural design of the station was similar to the earlier stations designed by A W Longfellow Jr at Dover and Northampton with most exterior surfaces sheathed in copper although it is not believed that Longfellow designed the station 2 45 46 Its structural design incorporated improvements over the older stations including the first use of reinforced concrete on the Elevated The waiting room was suspended below the steel elevated structure which allowed it to be larger than the between the tracks waiting rooms at Dover and Northampton Anticipating use of eight car trains due to higher than expected ridership the station was built with 350 foot 110 m side platforms rather than a 160 foot 49 m island platform 2 45 46 Transfer station edit nbsp 1916 plans for the transfer stationEgleston was intended to serve as a transfer point for surface streetcar lines from Jamaica Plain and Dorchester in order to divert traffic from overcrowded Dudley station 2 37 The staircases from the station waiting room originally led directly into Egleston Square itself on the northwest side of Washington Street between Columbus Avenue and Atherton Street and into the median of Washington Street which required many streetcar passengers to cross lanes of traffic to reach the station 2 37 In response to continued streetcar crowding at Dudley the BERy built an off street prepayment transfer station on the east side of the intersection with an escalator and connecting bridge directly to the waiting room 3 4 The transfer station and bridge were constructed in 1916 and opened on January 20 1918 2 A2 5 Closure edit nbsp Streetcar transfer area at Egleston shortly before bustitutionStreetcar service continued for several decades before bustitution route 42 to Dudley was converted in September 1949 route 29 to Mattapan in September 1955 and route 40 to Arborway in December 1955 1 34 42 Route 43 the last streetcar route into the Tremont Street subway via the Pleasant Street incline was cut back from Egleston to Lenox Street in June 1956 although bustitution of the remaining section did not occur until 1961 and 1962 1 43 On December 5 1960 the MTA began operating modified express service on the Elevated during the morning rush hour Every other train bypassed four stops Egleston was bypassed only by southbound trains with northbound trains instead bypassing Northampton 6 7 This was discontinued in September 1961 to reduce wait times at the skipped stations all of which were outdoors 8 From 1979 to 1987 the Southwest Corridor was reconstructed to include the Orange Line as well as commuter rail and intercity service Egleston station and the rest of the Washington Street Elevated closed on April 30 1987 the relocated Orange Line opened on May 4 1987 1 326 In October 2020 the MBTA began installation of center running bus lanes on Columbus Avenue including bus platforms at Weld Street just east of Egleston Square to serve MBTA bus routes 22 29 and 44 9 10 The bus lanes opened on November 1 2021 11 References edit a b c d e f Belcher Jonathan Changes to Transit Service in the MBTA district PDF Boston Street Railway Association Page numbers are accurate to the April 21 2018 version a b c d e f g Zaitzevsky Cynthia R July 1986 Written Historical and Descriptive Data PDF National Park Service Historic American Engineering Record Retrieved 26 June 2015 Cheney Frank Sammarco Anthony M 2000 When Boston Rode The El Arcadia Publishing pp 109 118 ISBN 9780738504629 Boston Profits By Elevated Railway Station Improvements Electric Railway Journal 48 7 McGraw Hill 258 263 12 August 1916 via Internet Archive Annual report of the directors of the Boston Elevated Railway Company Vol 2 Boston Elevated Railway 1919 p 14 via Internet Archive MTA Advisory Board Supports Cuts The Boston Globe December 1 1960 pp 1 15 via Newspapers com M T A Express Train Gets A From Riders The Boston Globe December 5 1960 p 13 via Newspapers com M T A Dropping Morning Express The Boston Globe September 27 1961 p 10 via Newspapers com Work Begins on Columbus Avenue Press release Massachusetts Bay Transportation Authority October 23 2020 Howard Stein Hudson July 8 2020 Columbus Avenue Bus Priority Roll Plan PDF Boston Transportation Department MBTA and City of Boston Cut Ribbon on New England s First Center Running Bus Lane on Columbus Avenue Press release Massachusetts Bay Transportation Authority November 4 2021 External links edit nbsp Media related to Egleston station at Wikimedia Commons Retrieved from https en wikipedia org w index php title Egleston station amp oldid 1192783490, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.