fbpx
Wikipedia

Nevada–California–Oregon Railway

The Nevada–California–Oregon Railway was a 3 ft (914 mm) narrow gauge railroad originally planned to connect Reno, Nevada, to the Columbia River. However, only 238 mi (383 km) of track were laid so service never extended beyond Lakeview, Oregon. Because of the company’s reputation for mismanagement, it was often called the "Narrow, Crooked & Ornery" railroad.[1]

Nevada–California–Oregon Railway
Original plan for NCO rail network
NCO station in Reno, Nevada
Overview
HeadquartersReno, Nevada (1880-1918); Alturas, California (1918-1925)
LocaleCalifornia, Oregon, and Nevada
Dates of operation1880 (1880)–1925 (1925)
SuccessorSouthern Pacific Company
Technical
Track gauge3 ft (914 mm)
Length238 mi (383 km)

History edit

 
Route at time of being absorbed in 1929

The railroad was organized in Reno in June 1880 as the Nevada and Oregon Railroad. It was decided that the best plan was to build north to the Columbia River to service cattle ranches and farms in northeastern California and eastern Oregon. The northern terminus was to be The Dalles, Oregon, since that city was located on the Columbia River and had no eastern or southern rail connections at that time.[2]

The company decided to lay 3 ft (914 mm) gauge track because it was cheaper than 4 ft 8+12 in (1,435 mm) standard gauge construction. Site survey and grading work for the railroad began in December 1880. The first spike was driven in Reno on May 28, 1881.[3] However, the company was short of money so construction was slow. In addition, the board of directors was plagued by corruption and intrigue. One board meeting actually ended with a gun fight between two members. For a period of time, there were two separate boards of directors trying to run the company.[1]

The railroad reached Oneida, California, 30 mi (48 km) north of Reno, on October 2, 1882.[3] Regular service between the two cities began a month later. However, track construction remained slow, and the company’s business problems continued to grow. The Moran Brothers bank in New York was the company’s largest investor. In April 1884, the bank took full control of the railroad, purchasing the company at a court ordered auction for just over $372,000. The company spent the next few years improving existing lines and trying to build up local business.[1]

On January 1, 1893, the name of the railroad was changed to the Nevada–California–Oregon.

The next northward extension commenced in 1899. In April 1902, the line reached Madeline, California. The tracks were extended to Likely, California, in October 1907; Alturas, California, in December 1908; and finally, Lakeview, Oregon, on 10 January 1912.[3] The company planned to continue north through Prineville, Oregon, to The Dalles, with separate branches running west to Klamath Falls and on to the Rogue River Valley, and over the Cascade Mountains to Eugene, Oregon, in the Willamette Valley. However, no further construction ever took place.[1]

Locomotives were converted from wood fuel to oil-burners by 1910. Financially, the railroad's best year was 1913, but decline followed quickly[2] as traffic shifted to the recently completed standard-gauge Western Pacific Railroad and Southern Pacific branch to Susanville. The railroad's last rolling stock purchase was in 1915 when two locomotives, three passenger cars, two mail cars, and 78 freight cars from the dismantled Florence and Cripple Creek Railroad were obtained for the bargain price of $22,750.[4] In 1917, the company began selling branch lines in California. The next year, the Reno station was closed, and the company headquarters and maintenance shop were relocated to Alturas. By 1922, the railroad was in serious financial trouble, and the Moran Bank wanted out of the business. On April 30, 1925, the Southern Pacific Company purchased the company. By 1928, Southern Pacific had converted all the remaining Nevada–California–Oregon track to 4 ft 8+12 in (1,435 mm) standard gauge and sold its 3 ft (914 mm) gauge equipment.[1][3] Several locomotives subsequently ran on the former Carson and Colorado Railroad.[5] One was sold to the Pacific Coast Railway, and later passed to the Oahu Railway and Land Company during World War II.[6] On October 20, 1985, Southern Pacific abandoned the 54.45-mile (87.63 km) section between Lakeview, Oregon and Alturas, California, which is now operated by Lake County Oregon as the Lake County Railroad, running about 20 cars per week in two trips per week. At Alturas it joins with Union Pacific.

Stations edit

 
Lakeview station photographed in 1915
 
General Office Building
 
Reno Depot

The Nevada–California–Oregon Railroad built classic brick depots in Reno and Lakeview. A smaller stone masonry station was constructed in Alturas.[2] All three passenger depots still exist, and are listed on the United States National Register of Historic Places along with the locomotive house and machine shop in Reno.[7] The N-C-O railway office in Alturas and the depot at Lakeview are examples of the 1880s style of architecture known as Mission Revival. The features include solid massive walls with buttressing, broad unadorned wall surfaces, wide projecting eaves, low-pitched tile roofs, corridors with Roman aqueduct-like arches, terraced bell towers and mission belfry facades. (See The Journal of the Modoc County Historical Society, No. 11, 1989.) The style showed up at Stanford University, the Southern Pacific depot in Santa Barbara and the Mission Inn in Riverside. The architect for many N-C-O buildings was Carl Werner of San Francisco. However, he did not design the railroad's three main depots.

  • Reno depot: The architect for the Reno depot was Frederick DeLongchamps.
  • Alturas depot: The Alturas depot was built by Martin and Diamond, no architect is listed on the NRHP.
  • Lakeview depot: The Lakeview depot was designed by Frederick DeLongchamps.

Locomotives edit

Number Builder Type Date Works number Notes[4]
Santa Cruz H.K. Porter, Inc. 0-6-0 1875 Built for the Santa Cruz and Felton Railroad; purchased in 1881 for use during construction; sold to Lake Valley Railroad in 1884
1 Baldwin Locomotive Works 4-4-0 December 1884 7527 purchased new; retired 1915
2 Baldwin Locomotive Works 4-4-0 December 1884 7528 purchased new; retired 1918
3 Baldwin Locomotive Works 4-4-0 August 1887 8791 purchased new as Erasmus Gest; moved to SP's Carson and Colorado Railway (C&C) in 1928. Not used by SP. Tender to SP #14.
1st #4 Baldwin Locomotive Works 2-8-0 September 1888 9518 purchased new as Charles Moran; sold to Tonopah Railroad in 1904
2nd #4 Baldwin Locomotive Works 4-6-0 October 1899 17124 purchased new as #6 Camya; renumbered in 1904; moved to C&C in 1928; not used by SP; tender to SP #14.
5 Baldwin Locomotive Works 4-6-0 November 1899 17123 purchased new as Amedee; rebuilt 1925; moved to C&C in 1928
2nd #6 Baldwin Locomotive Works 4-6-0 April 1903 22020 purchased new as #8; renumbered in 1904; moved to C&C in 1928
7 Baldwin Locomotive Works 4-6-0 April 1903 22012 purchased new; moved to C&C in 1928. Not used by SP. Tender to SP #17.
8 Baldwin Locomotive Works 4-6-0 August 1907 31445 purchased new; moved to C&C in 1928
9 Baldwin Locomotive Works 4-6-0 November 1909 34036 purchased new; moved to C&C in 1928
10 Baldwin Locomotive Works 4-6-0 1910 34528 purchased new; became Pacific Coast Railway #110 in 1929
11 Baldwin Locomotive Works 4-6-0 December 1911 37398 purchased new; became Pacific Coast Railway #111 in 1929
12 Baldwin Locomotive Works 4-6-0 December 1911 37394 purchased new; moved to C&C in 1928; renumbered SP #18
14 Baldwin Locomotive Works 2-8-0 April 1914 41300 purchased new; moved to C&C in 1928; renumbered SP #1; to Nevada County Narrow Gauge #9 in 1933.
22 Schenectady Locomotive Works 4-6-0 November 1899 5399 built as Florence and Cripple Creek Railroad #22; purchased 1915; moved to C&C in 1929
23 Schenectady Locomotive Works 4-6-0 January 1900 5420 built as Florence and Cripple Creek Railroad #23; purchased 1915; retired 1921

Further reading edit

  • Turner, George (1974). Slim Rails through the Sand (3rd ed.). Trans-Anglo Books. ISBN 0-87046-016-1.
  • Myrick, David. Railroads of Nevada and Eastern California (Vol. 1). Howell-North Books, 1962.

References edit

  1. ^ a b c d e "Nevada-California-Oregon Railroad" 2007-08-27 at the Wayback Machine, High Desert Rails Railroading in Oregon's Outback (web-site maintained by Jeff Moore), updated as of 15 October 2007.
  2. ^ a b c "N-C-O RY", Gauge on the Net—Old Time Narrow Gauge Railroading, Cedar Ridge, California, 2007. September 27, 2007, at the Wayback Machine
  3. ^ a b c d Armstrong, Tom, "Nevada-California-Oregon Railway", Slim Rails, 2000.
  4. ^ a b Myrick, David (1955). "Nevada-California-Oregon Railway". The Western Railroader. Francis A. Guido. 18 (188): 5, 14, 15&19.
  5. ^ Turner 1974, p.46
  6. ^ Chiddix, Jim; Simpson, MacKinnon (2004). Next Stop Honolulu!. Honolulu, Hawaii: Sugar Cane Press. p. 323. ISBN 0-9706213-1-0.
  7. ^ National Register of Historic Places, National Park Service, Washington, DC, December 5, 2007.

External links edit

  • High Desert Rails
  • Lakeview Railroad Passenger Station

nevada, california, oregon, railway, narrow, gauge, railroad, originally, planned, connect, reno, nevada, columbia, river, however, only, track, were, laid, service, never, extended, beyond, lakeview, oregon, because, company, reputation, mismanagement, often,. The Nevada California Oregon Railway was a 3 ft 914 mm narrow gauge railroad originally planned to connect Reno Nevada to the Columbia River However only 238 mi 383 km of track were laid so service never extended beyond Lakeview Oregon Because of the company s reputation for mismanagement it was often called the Narrow Crooked amp Ornery railroad 1 Nevada California Oregon RailwayOriginal plan for NCO rail networkNCO station in Reno NevadaOverviewHeadquartersReno Nevada 1880 1918 Alturas California 1918 1925 LocaleCalifornia Oregon and NevadaDates of operation1880 1880 1925 1925 SuccessorSouthern Pacific CompanyTechnicalTrack gauge3 ft 914 mm Length238 mi 383 km Contents 1 History 2 Stations 3 Locomotives 4 Further reading 5 References 6 External linksHistory edit nbsp Route at time of being absorbed in 1929The railroad was organized in Reno in June 1880 as the Nevada and Oregon Railroad It was decided that the best plan was to build north to the Columbia River to service cattle ranches and farms in northeastern California and eastern Oregon The northern terminus was to be The Dalles Oregon since that city was located on the Columbia River and had no eastern or southern rail connections at that time 2 The company decided to lay 3 ft 914 mm gauge track because it was cheaper than 4 ft 8 1 2 in 1 435 mm standard gauge construction Site survey and grading work for the railroad began in December 1880 The first spike was driven in Reno on May 28 1881 3 However the company was short of money so construction was slow In addition the board of directors was plagued by corruption and intrigue One board meeting actually ended with a gun fight between two members For a period of time there were two separate boards of directors trying to run the company 1 The railroad reached Oneida California 30 mi 48 km north of Reno on October 2 1882 3 Regular service between the two cities began a month later However track construction remained slow and the company s business problems continued to grow The Moran Brothers bank in New York was the company s largest investor In April 1884 the bank took full control of the railroad purchasing the company at a court ordered auction for just over 372 000 The company spent the next few years improving existing lines and trying to build up local business 1 On January 1 1893 the name of the railroad was changed to the Nevada California Oregon The next northward extension commenced in 1899 In April 1902 the line reached Madeline California The tracks were extended to Likely California in October 1907 Alturas California in December 1908 and finally Lakeview Oregon on 10 January 1912 3 The company planned to continue north through Prineville Oregon to The Dalles with separate branches running west to Klamath Falls and on to the Rogue River Valley and over the Cascade Mountains to Eugene Oregon in the Willamette Valley However no further construction ever took place 1 Locomotives were converted from wood fuel to oil burners by 1910 Financially the railroad s best year was 1913 but decline followed quickly 2 as traffic shifted to the recently completed standard gauge Western Pacific Railroad and Southern Pacific branch to Susanville The railroad s last rolling stock purchase was in 1915 when two locomotives three passenger cars two mail cars and 78 freight cars from the dismantled Florence and Cripple Creek Railroad were obtained for the bargain price of 22 750 4 In 1917 the company began selling branch lines in California The next year the Reno station was closed and the company headquarters and maintenance shop were relocated to Alturas By 1922 the railroad was in serious financial trouble and the Moran Bank wanted out of the business On April 30 1925 the Southern Pacific Company purchased the company By 1928 Southern Pacific had converted all the remaining Nevada California Oregon track to 4 ft 8 1 2 in 1 435 mm standard gauge and sold its 3 ft 914 mm gauge equipment 1 3 Several locomotives subsequently ran on the former Carson and Colorado Railroad 5 One was sold to the Pacific Coast Railway and later passed to the Oahu Railway and Land Company during World War II 6 On October 20 1985 Southern Pacific abandoned the 54 45 mile 87 63 km section between Lakeview Oregon and Alturas California which is now operated by Lake County Oregon as the Lake County Railroad running about 20 cars per week in two trips per week At Alturas it joins with Union Pacific Stations edit nbsp Lakeview station photographed in 1915 nbsp General Office Building nbsp Reno DepotThe Nevada California Oregon Railroad built classic brick depots in Reno and Lakeview A smaller stone masonry station was constructed in Alturas 2 All three passenger depots still exist and are listed on the United States National Register of Historic Places along with the locomotive house and machine shop in Reno 7 The N C O railway office in Alturas and the depot at Lakeview are examples of the 1880s style of architecture known as Mission Revival The features include solid massive walls with buttressing broad unadorned wall surfaces wide projecting eaves low pitched tile roofs corridors with Roman aqueduct like arches terraced bell towers and mission belfry facades See The Journal of the Modoc County Historical Society No 11 1989 The style showed up at Stanford University the Southern Pacific depot in Santa Barbara and the Mission Inn in Riverside The architect for many N C O buildings was Carl Werner of San Francisco However he did not design the railroad s three main depots Reno depot The architect for the Reno depot was Frederick DeLongchamps Alturas depot The Alturas depot was built by Martin and Diamond no architect is listed on the NRHP Lakeview depot The Lakeview depot was designed by Frederick DeLongchamps Locomotives editNumber Builder Type Date Works number Notes 4 Santa Cruz H K Porter Inc 0 6 0 1875 Built for the Santa Cruz and Felton Railroad purchased in 1881 for use during construction sold to Lake Valley Railroad in 18841 Baldwin Locomotive Works 4 4 0 December 1884 7527 purchased new retired 19152 Baldwin Locomotive Works 4 4 0 December 1884 7528 purchased new retired 19183 Baldwin Locomotive Works 4 4 0 August 1887 8791 purchased new as Erasmus Gest moved to SP s Carson and Colorado Railway C amp C in 1928 Not used by SP Tender to SP 14 1st 4 Baldwin Locomotive Works 2 8 0 September 1888 9518 purchased new as Charles Moran sold to Tonopah Railroad in 19042nd 4 Baldwin Locomotive Works 4 6 0 October 1899 17124 purchased new as 6 Camya renumbered in 1904 moved to C amp C in 1928 not used by SP tender to SP 14 5 Baldwin Locomotive Works 4 6 0 November 1899 17123 purchased new as Amedee rebuilt 1925 moved to C amp C in 19282nd 6 Baldwin Locomotive Works 4 6 0 April 1903 22020 purchased new as 8 renumbered in 1904 moved to C amp C in 19287 Baldwin Locomotive Works 4 6 0 April 1903 22012 purchased new moved to C amp C in 1928 Not used by SP Tender to SP 17 8 Baldwin Locomotive Works 4 6 0 August 1907 31445 purchased new moved to C amp C in 19289 Baldwin Locomotive Works 4 6 0 November 1909 34036 purchased new moved to C amp C in 192810 Baldwin Locomotive Works 4 6 0 1910 34528 purchased new became Pacific Coast Railway 110 in 192911 Baldwin Locomotive Works 4 6 0 December 1911 37398 purchased new became Pacific Coast Railway 111 in 192912 Baldwin Locomotive Works 4 6 0 December 1911 37394 purchased new moved to C amp C in 1928 renumbered SP 1814 Baldwin Locomotive Works 2 8 0 April 1914 41300 purchased new moved to C amp C in 1928 renumbered SP 1 to Nevada County Narrow Gauge 9 in 1933 22 Schenectady Locomotive Works 4 6 0 November 1899 5399 built as Florence and Cripple Creek Railroad 22 purchased 1915 moved to C amp C in 192923 Schenectady Locomotive Works 4 6 0 January 1900 5420 built as Florence and Cripple Creek Railroad 23 purchased 1915 retired 1921Further reading editTurner George 1974 Slim Rails through the Sand 3rd ed Trans Anglo Books ISBN 0 87046 016 1 Myrick David Railroads of Nevada and Eastern California Vol 1 Howell North Books 1962 References edit a b c d e Nevada California Oregon Railroad Archived 2007 08 27 at the Wayback Machine High Desert Rails Railroading in Oregon s Outback web site maintained by Jeff Moore updated as of 15 October 2007 a b c N C O RY Gauge on the Net Old Time Narrow Gauge Railroading Cedar Ridge California 2007 Archived September 27 2007 at the Wayback Machine a b c d Armstrong Tom Nevada California Oregon Railway Slim Rails 2000 a b Myrick David 1955 Nevada California Oregon Railway The Western Railroader Francis A Guido 18 188 5 14 15 amp 19 Turner 1974 p 46 Chiddix Jim Simpson MacKinnon 2004 Next Stop Honolulu Honolulu Hawaii Sugar Cane Press p 323 ISBN 0 9706213 1 0 National Register of Historic Places National Park Service Washington DC December 5 2007 External links edit nbsp Wikimedia Commons has media related to Nevada California Oregon Railway High Desert Rails Lakeview Railroad Passenger Station Retrieved from https en wikipedia org w index php title Nevada California Oregon Railway amp oldid 1064546115, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.