fbpx
Wikipedia

NP Kunta Ultra Mega Solar Park

The NP Kunta Ultra Mega Solar Park, also known as Ananthapuram - I Ultra Mega Solar Park or Kadiri Ultra Mega Solar Park, is a solar park occupying a total area of 32 square kilometres (12 sq mi) in Nambulapulakunta mandal of Kadiri Constituency in Kadiri Division of Sri Sathya Sai district of the Indian state of Andhra Pradesh it is 35 km away from Kadiri.

NP Kunta Ultra Mega Solar Park
Official nameAnanthapur Ultra Mega Solar Park
CountryIndia
LocationNambulapulakunta mandal, Ananthapur district, Andhra Pradesh
Coordinates14°01′55″N 78°26′09″E / 14.03194°N 78.43583°E / 14.03194; 78.43583Coordinates: 14°01′55″N 78°26′09″E / 14.03194°N 78.43583°E / 14.03194; 78.43583
Commission date9 May 2016[1]
Owner(s)Andhra Pradesh Solar Power Corporation Private Limited (APSPCL)
Solar farm
TypeFlat-panel PV
Site resource5.5–6.0 kW⋅h/m2/d[2]
Site area32 km2 (12 sq mi)
Power generation
Units operational978.5 MW
Units planned1500 MW
Units under const. MW
External links
Websiteapspcl.ap.gov.in/content/npkuntasite

The first phase of the park was commissioned on 9 May 2016 with a capacity of 200 MW. An additional 50 MW capacity was commissioned on 29 July 2016. A further 750 MW was planned to have been commissioned by March 2018 in the second phase.

In August 2016, Tata Power Solar commissioned a 100 MW solar project at the park built over an area of 200 hectares (500 acres). This was the largest solar project commissioned using domestically manufactured solar cells and modules at the time.

In May 2018, Azure Power commissioned a 50 MW solar capacity at the park. In July 2018, Tata Power commissioned another 100 MW capacity, taking total commissioned capacity to 500 MW.

In July 2018, 750 MW were awarded for installation at 2.71/kW⋅h.

As of 30 April 2021, 978.5 MW capacity was commissioned by the following companies: Sprng Agnitra (250 MW), Ayana Solar (228.5 MW), SB Energy Solar (250 MW) and NTPC (250 MW).[3] Another 400 MW was installed by Tatas (100 MW), ACME (150 MW), Azure (50 MW) and FRV Ltd (100 MW) at adjacent Galiveedu Solar Park which is not part of NP Kunta Solar Park.

See also

References

  1. ^ "Power generation begins at Kunta ultra mega solar project | Business Standard News". Business-standard.com. Retrieved 14 September 2016.
  2. ^ "India Solar Resource - Global Horizontal Irradiance - Annual Average, by NREL, National Renewable Energy Laboratory".
  3. ^ "Status of Renewable Energy projects in Andhra Pradesh" (PDF). Retrieved 10 May 2021.

kunta, ultra, mega, solar, park, also, known, ananthapuram, ultra, mega, solar, park, kadiri, ultra, mega, solar, park, solar, park, occupying, total, area, square, kilometres, nambulapulakunta, mandal, kadiri, constituency, kadiri, division, sathya, district,. The NP Kunta Ultra Mega Solar Park also known as Ananthapuram I Ultra Mega Solar Park or Kadiri Ultra Mega Solar Park is a solar park occupying a total area of 32 square kilometres 12 sq mi in Nambulapulakunta mandal of Kadiri Constituency in Kadiri Division of Sri Sathya Sai district of the Indian state of Andhra Pradesh it is 35 km away from Kadiri NP Kunta Ultra Mega Solar ParkOfficial nameAnanthapur Ultra Mega Solar ParkCountryIndiaLocationNambulapulakunta mandal Ananthapur district Andhra PradeshCoordinates14 01 55 N 78 26 09 E 14 03194 N 78 43583 E 14 03194 78 43583 Coordinates 14 01 55 N 78 26 09 E 14 03194 N 78 43583 E 14 03194 78 43583Commission date9 May 2016 1 Owner s Andhra Pradesh Solar Power Corporation Private Limited APSPCL Solar farmTypeFlat panel PVSite resource5 5 6 0 kW h m2 d 2 Site area32 km2 12 sq mi Power generationUnits operational978 5 MWUnits planned1500 MWUnits under const MWExternal linksWebsiteapspcl wbr ap wbr gov wbr in wbr content wbr npkuntasite edit on Wikidata The first phase of the park was commissioned on 9 May 2016 with a capacity of 200 MW An additional 50 MW capacity was commissioned on 29 July 2016 A further 750 MW was planned to have been commissioned by March 2018 in the second phase In August 2016 Tata Power Solar commissioned a 100 MW solar project at the park built over an area of 200 hectares 500 acres This was the largest solar project commissioned using domestically manufactured solar cells and modules at the time In May 2018 Azure Power commissioned a 50 MW solar capacity at the park In July 2018 Tata Power commissioned another 100 MW capacity taking total commissioned capacity to 500 MW In July 2018 750 MW were awarded for installation at 2 71 kW h As of 30 April 2021 978 5 MW capacity was commissioned by the following companies Sprng Agnitra 250 MW Ayana Solar 228 5 MW SB Energy Solar 250 MW and NTPC 250 MW 3 Another 400 MW was installed by Tatas 100 MW ACME 150 MW Azure 50 MW and FRV Ltd 100 MW at adjacent Galiveedu Solar Park which is not part of NP Kunta Solar Park See also Edit India portal Renewable energy portalPower sector of Andhra Pradesh Kadapa Ultra Mega Solar Park Kurnool Ultra Mega Solar ParkReferences Edit Power generation begins at Kunta ultra mega solar project Business Standard News Business standard com Retrieved 14 September 2016 India Solar Resource Global Horizontal Irradiance Annual Average by NREL National Renewable Energy Laboratory Status of Renewable Energy projects in Andhra Pradesh PDF Retrieved 10 May 2021 Retrieved from https en wikipedia org w index php title NP Kunta Ultra Mega Solar Park amp oldid 1139438949, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.