fbpx
Wikipedia

Chennai Central metro station

Chennai Central Metro, officially known as Puratchi Thalaivar Dr. M.G. Ramachandran Central metro station, is an underground metro station on the North-South Corridor of the Blue Line and Green Line of Chennai Metro in Chennai, India.[2][3] Central metro station is spread over an area of 30,000 square metres (320,000 sq ft).[2] On 31 July 2020, It has been named by Government of Tamil Nadu as Puratchi Thalaivar Dr. M.G. Ramachandran Central Metro to honor the All India Anna Dravida Munnetra Kazhagam founder and the former Chief Minister of Tamil Nadu M. G. Ramachandran.[4]


M.G.R. Central Metro
Chennai Metro station
Entrance of the station
General information
Other namesMGR Central Metro / Chennai Central Metro
LocationKannappar Thidal, Poongavanapuram,
Chennai – 600003, Tamil Nadu,
 India
Coordinates13°04′53″N 80°16′22″E / 13.081464°N 80.272752°E / 13.081464; 80.272752
Owned byChennai Metro Rail Limited
Operated byChennai Metro Rail Limited
Line(s)Blue Line Green Line  Inter Corridor Line 
PlatformsIsland platform
Platform-1 to 4 → St. Thomas Mount
Platform-5 → Chennai International Airport (to be extended to Kilambakkam in the future)
Platform-6 → Wimco Nagar Depot
Tracks6
Construction
Structure typeUnderground, 3xDouble track
Depth28 metres (92 ft)
Platform levels3
Parking Available
Bicycle facilitiesFree Bicycle Available
AccessibleYes
Other information
Station codeSCC
Websitehttp://chennaimetrorail.org
History
Opened25 May 2018; 5 years ago (2018-05-25) (Green Line)
10 February 2019; 5 years ago (2019-02-10) (Blue Line)
Electrified2x Single-phase 25 kV 50 Hz AC overhead catenary
Passengers
201910,500[1]
Rank2
Services
Preceding station Chennai Metro Following station
High Court Blue Line Government Estate
Blue Line
(Future Service)
Government Estate
towards Kilambakkam
Terminus Green Line Egmore
Route map
Wimco Nagar Depot
Wimco Nagar Depot
Wimco Nagar
Tiruvottriyur
Thiruvottriyur Theradi
Kaladipet
Toll Gate
New Washermanpet
Tondiarpet
Sir Theagaraya College
Washermanpet
Mannadi
High Court
M.G.R Central
Green Line
Government Estate
LIC
Thousand Lights
AG – DMS
Teynampet
Nandanam
Saidapet
Little Mount
Guindy
Arignar Anna Alandur
Nanganallur Road
Meenambakkam
Chennai International Airport
Location

The station edit

 
Central Metro Station Chennai

The station is an underground, two-level station[5] on Poonamallee High Road in front of the Chennai Central railway station and the Ripon Building. The station is one of the two metro stations where Corridor I (AirportWimco Nagar) of the project will intersect with Corridor II (Chennai Central Metro–St Thomas Mount via Egmore and CMBT Metro), the other being the Alandur metro station. The metro station, being constructed at a depth of 28 m (92 ft), will be the largest of all metro stations in the city with an area of over 30,000 m2 (320,000 sq ft).[2] The three-level metro station will cover a length of 410 metres and will have a width of 35 metres.[3] Unlike the other metro stations which have four entry points, the Chennai Central Railway Station will have six entry/exit points for access to Park suburban and Park Town MRTS stations, Ripon Building, Rajiv Gandhi Government General Hospital, and Chennai Central railway station.[6][7] The station will act as a transit point for passengers from the Chennai Central railway station, Park Town, and Park railway stations.[8] It is estimated that more than 100,000 commuters will use the station daily.[9]

The station is one of the few in the corridor that will have parking facilities.[10] Space will be allocated for parking in a basement area for about 500 cars and 1,000 two-wheelers. There are also plans to have the airport check-in facility in one of the basement levels at the station, which will allow air passengers to complete the check-in procedures at the station itself.[11] A bus bay has also been planned opposite the station.[12]

The station is one of the three stations in the Chennai Metro Rail network that will have 230-kV receiving sub-stations for power supply from the state's electricity grid. The other two are Koyambedu and Arignar Anna Alandur Metro.[13]

The station was opened on 25 May 2018.[3] As of December 2019, the station had a daily footfall of about 9,500 passengers,[1] up from about 7,700 in February 2019,[14] making it the second busiest metro station in the city after Thirumangalam.

Station layout edit

Chennai Central track layout
 
 
 
 
P6
 
 
P5
 
 
 
 
Station with two tracks and one Island platform
Chennai Central track layout
 
 
 
 
to Train Terminates Here
P4
P2
 
 
P1
P3
 
 
 
 
Station with four tracks and two Island platforms
G Street Level Exit / Entrance
M Mezzanine Fare control, station agent
B1 Platform 1
Westbound
Towards ← St. Thomas Mount next station is Chennai Egmore
Island platform | Doors will open on the right  
Platform 2
Eastbound
Towards ← St. Thomas Mount next station is Chennai Egmore
B2 Platform 3
Westbound
Towards ← St. Thomas Mount next station is Chennai Egmore
Island platform | Doors will open on the right  
Platform 4
Eastbound
Towards ← St. Thomas Mount next station is Chennai Egmore
B3 Platform 5
Southbound
Towards → Chennai International Airport next station is Government Estate (to be further extended to Kilambakkam in the future)
Island platform | Doors will open on the right  
Platform 6
Northbound
Towards ← Wimco Nagar Depot next station is High Court

Landscape edit

The Chennai Corporation has plans to develop a park over the Chennai Central Metro. Chennai Metro Rail Limited has agreed to a proposal by the Chennai Corporation of extending the Ripon Buildings Park over the Chennai Central underground metro station. Waterproof structures will be created over the station to facilitate the creation of the park. A portion of the park, which will cover more than six acres of the premises of Ripon Buildings and Victoria Public Hall, will be developed on a waterproof concrete slab area, measuring 210 metres by 10 metres. Visitors to the Ripon Buildings Park, Amma Maaligai and Victoria Public Hall will have access to the Chennai Central Metro through some of its seven entry points.[3]

See also edit

References edit

  1. ^ a b Sekar, Sunitha (25 December 2019). "After a slow start, Metro sees steady uptick in ridership". The Hindu. Chennai: Kasturi & Sons. p. 4. Retrieved 28 December 2019.
  2. ^ a b c "After snatching case, CMRL to install more cameras in stations". The Times of India. 7 June 2019. Retrieved 9 June 2019.
  3. ^ a b c d Xavier Lopez, Aloysius (14 September 2014). "Civic body plans spot of greenery over Metro station". The Hindu. Chennai. Retrieved 2 October 2014..
  4. ^ "Tamil Nadu government to rename three metro rail stations in Chennai after late Chief Ministers". The New Indian Express. 31 July 2020. Retrieved 31 July 2020.
  5. ^ "Entry to Ripon Buildings from P.H. Road opens up". The Hindu. Chennai. 4 February 2014. Retrieved 16 February 2014.
  6. ^ Sekar, Sunitha (11 December 2013). "When Chennai Central becomes the city's transport hub". The Hindu. Chennai. Retrieved 19 January 2014.
  7. ^ Sekar, Sunitha (12 July 2018). "New entry point for Central Metro opens". The Hindu. Chennai. Retrieved 15 July 2018.
  8. ^ "Metro rail seals fate of shops near Central". The Hindu. Chennai. 22 July 2012. Retrieved 5 August 2012.
  9. ^ Ayyapan, V; Christin Mathew Philip (30 August 2011). . The Times of India. Chennai. Archived from the original on 5 November 2013. Retrieved 24 November 2012.
  10. ^ "Single train trip to equal 16 buses, 300 cars and 600 bikes". The Hindu. Chennai. 29 August 2012. Retrieved 25 November 2012.
  11. ^ Sekar, Sunitha (20 December 2013). "Parking lot for Chennai Metro station to come up under land". The Hindu. Chennai. Retrieved 19 January 2014.
  12. ^ Ayyappan, V. (8 August 2014). "At 40m, Ashok Nagar to be highest metro station". The Times of India. Chennai: The Times Group. Retrieved 4 October 2014.
  13. ^ "Metro rail sets up units to power trains, stations to meet year-end deadline to start services". The Times of India. Chennai. 15 April 2014. Retrieved 18 April 2014.
  14. ^ Sekar, Sunitha (21 February 2019). "Metro users jump to 90,000". The Hindu. Retrieved 1 March 2019.

External links edit

  • Official Website for Chennai Metro Rail Limited

chennai, central, metro, station, chennai, central, metro, officially, known, puratchi, thalaivar, ramachandran, central, metro, station, underground, metro, station, north, south, corridor, blue, line, green, line, chennai, metro, chennai, india, central, met. Chennai Central Metro officially known as Puratchi Thalaivar Dr M G Ramachandran Central metro station is an underground metro station on the North South Corridor of the Blue Line and Green Line of Chennai Metro in Chennai India 2 3 Central metro station is spread over an area of 30 000 square metres 320 000 sq ft 2 On 31 July 2020 It has been named by Government of Tamil Nadu as Puratchi Thalaivar Dr M G Ramachandran Central Metro to honor the All India Anna Dravida Munnetra Kazhagam founder and the former Chief Minister of Tamil Nadu M G Ramachandran 4 M G R Central MetroChennai Metro stationEntrance of the stationGeneral informationOther namesMGR Central Metro Chennai Central MetroLocationKannappar Thidal Poongavanapuram Chennai 600003 Tamil Nadu IndiaCoordinates13 04 53 N 80 16 22 E 13 081464 N 80 272752 E 13 081464 80 272752Owned byChennai Metro Rail LimitedOperated byChennai Metro Rail LimitedLine s Blue Line Green Line Inter Corridor Line PlatformsIsland platform Platform 1 to 4 St Thomas MountPlatform 5 Chennai International Airport to be extended to Kilambakkam in the future Platform 6 Wimco Nagar DepotTracks6ConstructionStructure typeUnderground 3xDouble trackDepth28 metres 92 ft Platform levels3ParkingAvailableBicycle facilitiesFree Bicycle AvailableAccessibleYesOther informationStation codeSCCWebsitehttp chennaimetrorail orgHistoryOpened25 May 2018 5 years ago 2018 05 25 Green Line 10 February 2019 5 years ago 2019 02 10 Blue Line Electrified2x Single phase 25 kV 50 Hz AC overhead catenaryPassengers201910 500 1 Rank2ServicesPreceding station Chennai Metro Following station High Courttowards Wimco Nagar Depot Blue Line Government Estatetowards Chennai International Airport Blue Line Future Service Government Estatetowards Kilambakkam Terminus Green Line Egmoretowards St Thomas MountRoute mapLegend Chennai Suburban RailwayWest South Line Wimco Nagar Depot Wimco Nagar Depot Wimco Nagar Tiruvottriyur Thiruvottriyur Theradi Kaladipet Toll Gate New Washermanpet Tondiarpet Sir Theagaraya College Washermanpet Mannadi High Court Chennai Suburban RailwaySouth Line amp South West Line M G R Central Green Line Green Line Cooum River Government Estate LIC Thousand Lights AG DMS Teynampet Nandanam Saidapet Adyar River Little Mount Guindy Chennai Suburban RailwaySouth Line amp South West Line Kathipara Junction Arignar Anna Alandur Green Line Green Line Nanganallur Road Meenambakkam Chennai International Airport Chennai Suburban RailwaySouth Line Legend Chennai Suburban RailwaySouth Line amp South West Line Blue Line M G R Central Blue LineMRTS Egmore Chennai Suburban RailwaySouth Line amp South West Line Nehru Park Kilpauk Medical College Pachaiyappa s College Shenoy Nagar Anna Nagar East Anna Nagar Tower Thirumangalam Inner Ring Road Cooum River NH4 Koyambedu depot Koyambedu Jayalalithaa CMBT Arumbakkam Vadapalani Ashok Nagar Adyar River Ekkattuthangal Kathipara Junction Arignar Anna Alandur Blue Line Blue Line St Thomas Mount MRTS Chennai Suburban RailwaySouth Line amp South West LineLocation Contents 1 The station 2 Station layout 3 Landscape 4 See also 5 References 6 External linksThe station edit nbsp Central Metro Station Chennai The station is an underground two level station 5 on Poonamallee High Road in front of the Chennai Central railway station and the Ripon Building The station is one of the two metro stations where Corridor I Airport Wimco Nagar of the project will intersect with Corridor II Chennai Central Metro St Thomas Mount via Egmore and CMBT Metro the other being the Alandur metro station The metro station being constructed at a depth of 28 m 92 ft will be the largest of all metro stations in the city with an area of over 30 000 m2 320 000 sq ft 2 The three level metro station will cover a length of 410 metres and will have a width of 35 metres 3 Unlike the other metro stations which have four entry points the Chennai Central Railway Station will have six entry exit points for access to Park suburban and Park Town MRTS stations Ripon Building Rajiv Gandhi Government General Hospital and Chennai Central railway station 6 7 The station will act as a transit point for passengers from the Chennai Central railway station Park Town and Park railway stations 8 It is estimated that more than 100 000 commuters will use the station daily 9 The station is one of the few in the corridor that will have parking facilities 10 Space will be allocated for parking in a basement area for about 500 cars and 1 000 two wheelers There are also plans to have the airport check in facility in one of the basement levels at the station which will allow air passengers to complete the check in procedures at the station itself 11 A bus bay has also been planned opposite the station 12 The station is one of the three stations in the Chennai Metro Rail network that will have 230 kV receiving sub stations for power supply from the state s electricity grid The other two are Koyambedu and Arignar Anna Alandur Metro 13 The station was opened on 25 May 2018 3 As of December 2019 the station had a daily footfall of about 9 500 passengers 1 up from about 7 700 in February 2019 14 making it the second busiest metro station in the city after Thirumangalam Station layout editChennai Central track layout Legend nbsp nbsp nbsp nbsp to High Court P6 nbsp nbsp P5 nbsp nbsp to Government Estate nbsp nbsp Station with two tracks and one Island platformChennai Central track layout Legend nbsp nbsp nbsp nbsp to Train Terminates Here P4P2 nbsp nbsp P1P3 nbsp nbsp to Chennai Egmore nbsp nbsp Station with four tracks and two Island platforms G Street Level Exit Entrance M Mezzanine Fare control station agent B1 Platform 1Westbound Towards St Thomas Mount next station is Chennai Egmore Island platform Doors will open on the right nbsp Platform 2Eastbound Towards St Thomas Mount next station is Chennai Egmore B2 Platform 3Westbound Towards St Thomas Mount next station is Chennai Egmore Island platform Doors will open on the right nbsp Platform 4Eastbound Towards St Thomas Mount next station is Chennai Egmore B3 Platform 5Southbound Towards Chennai International Airport next station is Government Estate to be further extended to Kilambakkam in the future Island platform Doors will open on the right nbsp Platform 6Northbound Towards Wimco Nagar Depot next station is High CourtLandscape editSee also Central Square Chennai The Chennai Corporation has plans to develop a park over the Chennai Central Metro Chennai Metro Rail Limited has agreed to a proposal by the Chennai Corporation of extending the Ripon Buildings Park over the Chennai Central underground metro station Waterproof structures will be created over the station to facilitate the creation of the park A portion of the park which will cover more than six acres of the premises of Ripon Buildings and Victoria Public Hall will be developed on a waterproof concrete slab area measuring 210 metres by 10 metres Visitors to the Ripon Buildings Park Amma Maaligai and Victoria Public Hall will have access to the Chennai Central Metro through some of its seven entry points 3 See also edit nbsp India portal List of Chennai metro stations Railway stations in Chennai Rajiv Chowk metro stationReferences edit a b Sekar Sunitha 25 December 2019 After a slow start Metro sees steady uptick in ridership The Hindu Chennai Kasturi amp Sons p 4 Retrieved 28 December 2019 a b c After snatching case CMRL to install more cameras in stations The Times of India 7 June 2019 Retrieved 9 June 2019 a b c d Xavier Lopez Aloysius 14 September 2014 Civic body plans spot of greenery over Metro station The Hindu Chennai Retrieved 2 October 2014 Tamil Nadu government to rename three metro rail stations in Chennai after late Chief Ministers The New Indian Express 31 July 2020 Retrieved 31 July 2020 Entry to Ripon Buildings from P H Road opens up The Hindu Chennai 4 February 2014 Retrieved 16 February 2014 Sekar Sunitha 11 December 2013 When Chennai Central becomes the city s transport hub The Hindu Chennai Retrieved 19 January 2014 Sekar Sunitha 12 July 2018 New entry point for Central Metro opens The Hindu Chennai Retrieved 15 July 2018 Metro rail seals fate of shops near Central The Hindu Chennai 22 July 2012 Retrieved 5 August 2012 Ayyapan V Christin Mathew Philip 30 August 2011 Chennai Central the hulk among Metro stations The Times of India Chennai Archived from the original on 5 November 2013 Retrieved 24 November 2012 Single train trip to equal 16 buses 300 cars and 600 bikes The Hindu Chennai 29 August 2012 Retrieved 25 November 2012 Sekar Sunitha 20 December 2013 Parking lot for Chennai Metro station to come up under land The Hindu Chennai Retrieved 19 January 2014 Ayyappan V 8 August 2014 At 40m Ashok Nagar to be highest metro station The Times of India Chennai The Times Group Retrieved 4 October 2014 Metro rail sets up units to power trains stations to meet year end deadline to start services The Times of India Chennai 15 April 2014 Retrieved 18 April 2014 Sekar Sunitha 21 February 2019 Metro users jump to 90 000 The Hindu Retrieved 1 March 2019 External links editOfficial Website for Chennai Metro Rail Limited Retrieved from https en wikipedia org w index php title Chennai Central metro station amp oldid 1216829632, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.