fbpx
Wikipedia

Beijing Subway rolling stock

All Beijing Subway trains run on 1,435 mm (4 ft 8+12 in) standard gauge rail and draw power from the 750 V DC third rail, except those on Lines 6, 11 14, 16, 17 and 19, which use 1,500 V DC overhead wires.[1] Lines 6, 15, Fangshan, and Changping lines have a designed maximum service speed of 100 km/h (62 mph).[2] The Airport Line is linear motor driven with a designed maximum service speed of 110 km/h (68 mph)[3][4] All other Lines have a maximum service speed of 80 km/h (50 mph). Currently, Lines 1, 2, 4, 5, 8, 9, 10, 13, 15, Batong, Daxing, Changping, Fangshan, Yanfang, and Yizhuang lines use 6 car B size trains. Initially, the Batong line and Line 13 was originally used 4 car trains and now expanded into six.[5][6][7]

Most lines including Line 15 use the third rail to supply power.
A Line 2 DK16A train at the Beijing Railroad Station (2003).
A refurbished Line 2 DK16AG train at Jishuitan (2006).
A Line Batong SFX series train at Sihui (2006). The Batong Line was the first in the Beijing Subway to use rolling stock made by CSR Qingdao Sifang.
A Line 13 DKZ5 train at Xizhimen (2006).
A Line 1 DKZ4 train at Wangfujing (2006).
A Line 2 DKZ16 train (2011).

Type B Trains

The most common rolling stock of the Beijing Subway is the Type-B car, which has a carrying capacity of 245 passengers per car and top speed of 80 km/h (50 mph), drawing 750 V DC power from the third rail.[8] Most lines operate the six-car Type-B train set that can carry 1,460 passengers per train and transport 43,800 passengers per hour.[8] Lines 6 and 7 use eight-car Type-B train sets that can carry 1,960 passengers per train and 58,800 passengers per hour.[8] The Type-B trains sets of Lines 6 and 7 can draw 1,500 V DC power and can reach 100 km/h (62 mph). The Yanfang Line operates four-car Type-B train sets with ”driverless” automatic train operation.

Type A Trains

Type-A cars run on Lines 14, 16, 17, 19 and under construction Lines 3 and 12. They are 3.1 meters longer, and 20 cm wider than Type-B cars with a designed capacity of 310 passengers per car and 10 sets of doors per train compared to 8 sets of doors per train on Type-B cars.[9][8] Type A cars draw 1,500 V DC power from overhead wire and can reach 100 km/h (62 mph). Line 14 uses six-car Type A train sets which can carry 1,860 passengers per train and allow for throughput of up to 55,800 passengers per hour per direction. Line 16 uses eight-car Type-A train sets which can carry 2,480 passengers per train and allow for throughput of up 74,400 passengers per hour per direction.[8]

Type L trains

The Capital Airport Express has its distinct 4-car linear motor train sets, powered by 750 V DC electricity via the third rail, and can reach a maximum speed of 110 km/h (68 mph).[10][11] The under construction Line 28 will also use L type trains but 6 cars long.

Type D Trains

The Daxing Airport Express uses Type-D train sets with top operational speed of 160 km/h (99 mph).[12][13] These trains are powered by 25 kV 50 Hz AC overhead wires. The eight-car train sets have seven passenger cars and one car to carry luggage.[13] The under construction Line 22 will also use eight-car Type-D trains.

Maglev

The S1 Line's maglev trains feature six-car train sets that run on 1,500 V DC power and can reach 100 km/h (62 mph).[14] Compared to subway trains that run on conventional track, the maglev train has a smaller minimum turning radius of 75 meters compared to 200 meters, can climb steeper slope of 53‰ versus 40‰ and emits less noise.[15] The six-car train set can carry 1,032 passengers.[15]

Light Rail Transit

The Xijiao LRT and Yizhuang Tram Line T1 operates five-car trams that draw 750 V DC from overhead lines and can reach 70 km/h (43 mph).

Manufacturers

From the subway's inception to 2003, all Beijing subway trains were manufactured by CNR Changchun Railway Vehicles Co. Ltd. All rolling stock on Lines 2, 5, 6,[16] 9, 10, 13, 15, Yizhuang line, Capital Airport Express and some of Line 1, 14, 16, and Yanfang line stocks[3][17][18] are produced by CNR Changchun.[19] However, CSR Qingdao Sifang Co., Ltd. has recently produced rolling stock for the Beijing subway. CSR Sifang produced all the trains for Lines 4,[20][21] 8, Daxing,[21] Changping,[22] Daxing Airport Express and some of Line 1,[23] 14,[17][24][25] 16, and Yanfang line.

The Beijing Subway Rolling Stock Equipment Co. Ltd., a wholly owned subsidiary of the Beijing Mass Transit Railway Operation Corp., provides local assemblage, maintenance and repair services. It has also made trains for line 7, Batong, and Fangshan lines.

History

First Generation

In the 1960s to mid-1970s, the Beijing Subway used DK2 and DK3 models made in Changchun. The DK stands for diandong keche or electrically-operated passenger car.[26] These models and their derivatives, the DK3G, DK20, DK16A, BD1 and BD2 are classified by the Beijing Subway as the first generation.[27] In recent decades, the Beijing Subway Rolling Stock Equipment Co. refurbished the DK16A and DK20 models, which remained in use well into the first decade of the 21st century.[28] The refurbished DK16AG trains entered into service on Line 2 in 2005.[29]

Pyongyang Metro DK4 cars

During the opening of Line 13 some ex-Pyongyang Metro Changchun DK4 cars were used until the new order of cars replaced them.

Second Generation

From the 1980 to the early 1990s, the subway introduced several new models including the DK6, DK9 and their derivatives the DK11, DK16 and GTO.[30] The M-series trains that appeared on Lines 2 and 13 were made by Japan's Tokyu Car Corporation.[31][32][33]

Third Generation

In 1998, the subway began deploying a new generation of train sets that featured variable voltage variable frequency (VVVF) control mechanisms. These models include the DKZ4, DKZ5, and the DKZ6.[34] DKZ stands for diandong keche zu or electric passenger train sets.[26] CNR Changchun also made 174 DK28-DK31 metro cars, which uses VVVF inverters and AC motors for Line 1,[35] and 136 DK32-34 trains for Line 13.[36] In 2005, the Batong line began using SFX01 and SFX02 trains made by CSR Qingdao Sifang.[26] The 40 trains of the Airport Express were made by a joint-venture between CRRC Changchun and Bombardier Transportation, and uses Bombardier's Innovia Advanced Rapid Transit (ART) 200 technology.[33][37]

Fourth Generation

Since 2017, trains have been ordered with capabilities for unattended automatic train operation. Starting with the DKZ70 and SFM16 trains on the Yanfang Line. Since then trains on the Daxing Airport Express, Lines 11, 17 and 19 operate or are capable of operating in GoA4 unattended train operation mode.

Current Fleet

Model Image Type Manufacturer Year Built Amount in Service Fleet Numbers Line(s) Served Depot Notes
DKZ4   6B CNR Changchun 1998 31 S401–S431  1  Sihui Refurbished 2007
DKZ5   6B CNR Changchun
Beijing Subway Rolling Stock Equipment
2002 55 H401
H403–H456
 13  Huilongguan Refurbished 2015–2018
DKZ6   6B CNR Changchun 1 H402 Refurbished 2015
SFM01   6B CSR Qingdao Sifang
Beijing Subway Rolling Stock Equipment
2003 19 TQ401–TQ408
TQ414–TQ424
 Batong  Tuqiao Refurbished 2015–2019
SFM02   6B CSR Qingdao Sifang 5 TQ409–TQ413
DKZ13   6B CNR Changchun
Beijing Subway Rolling Stock Equipment
2006 61 TP401–TP461  5  Taipingzhuang
Songjiazhuang
Currently being refurbished[38]
DKZ16   6B CNR Changchun
Beijing Subway Rolling Stock Equipment
50 T401–T450  2  Taipinghu
SFM04   6B CSR Qingdao Sifang 39 G432–G470  1  Gucheng
DKZ15   6B CNR Changchun
Beijing Subway Rolling Stock Equipment
CNR Dalian
2007 43 W401–W443  10  Wanliu
Wulu
QKZ5   4LB CNR/CRRC Changchun
Bombardier
10 L1 101–L1 110  Capital Airport  Tianzhu Based on the INNOVIA ART 200
SFM05   6B CSR Qingdao Sifang 2008
2010
73 001–053
061–093
 4   Daxing  Longbeicun
Majiapu
Nanzhaolu
SFM07   6B CSR Qingdao Sifang
Beijing Subway Rolling Stock Equipment
2008[39] 6 TQ425–TQ430  Batong  Tuqiao Refurbished 2016–2019
BJD01BDK03   6B CNR Changchun
Beijing Subway Rolling Stock Equipment
2009
2019–2020
44 FS001–FS021

FS022–FS044

 Fangshan  Yancun
SFM13   6B CSR/CRRC Qingdao Sifang 2009
2019
32 CP001–CP032  Changping  Dingsi Road
Ming Tombs
DKZ31   6B CNR Changchun 2010 28 15 001–15 028  15  Maquanying
Fengbo
DKZ32   6B CNR Changchun 23 YZ001–YZ023  Yizhuang  Songjiazhuang
Taihu
SFM12SFM42   6B CSR/CRRC Qingdao Sifang
Beijing Subway Rolling Stock Equipment
40 08 001–08 040  8  Pingxifu
Yinghai
DKZ33BDK05   6B CNR/CRRC Changchun
Beijing Subway Rolling Stock Equipment
2011
2019
37 09 001–09 037  9  Guogongzhuang
DKZ34   6B CNR Changchun
Beijing Subway Rolling Stock Equipment
CNR Dalian
2011 41 10 044–10 084  10  Wanliu
Wulu
DKZ47   8B CNR/CRRC Changchun 2011
2013
2018
99 06 001–06 099  6  Wulu
Wuliqiao
Dongxiaoying
DKZ53   6A CNR Changchun 2012 38 201–238  14  Maquanying
Zhangyicun
SFM18   6A CSR Qingdao Sifang 25 239–263  14 
BDK01BDK04   8B Beijing Subway Rolling Stock Equipment 2013 68 07 001–07 068  7  Jiaohuachang
Zhangjiawan
DKZ46   6B CNR Changchun
Beijing Subway Rolling Stock Equipment
CNR Dalian
32 10 085–10 116  10  Wanliu
Wulu
DKZ76   4B CRRC Changchun 2014-2016 15 YF001–YF015  Yanfang  Yancun North
DKZ93SFM40   8A CRRC ChangchunCSR Qingdao Sifang 2016-2019 63 301–364  16  Beianhe
SFM16   4B CRRC Qingdao Sifang 2016 1 YF016  Yanfang  Yancun North
SFM40   8A CRRC Qingdao Sifang 2016– 29 336–364  16  Beianhe
SFM42   6B CRRC Qingdao Sifang
Beijing Subway Rolling Stock Equipment
2019 72 08 041–08 112  8  Pingxifu
Yinghai
BDK06   6B Beijing Subway Rolling Stock Equipment 2019– 12 TQ431–TQ437

01108-01112

 Batong  Tuqiao

Sihui

Cinova-160   8D, 4D CRRC Qingdao Sifang 2019 (8 Car Train),
2020 (4 Car Train)
16 JC001–JC008,
JC010–JC013 (8 Car Train),
JC401–JC404 (4 Car Train)
 Daxing Airport  Cigezhuang

New Airport North

CJ3 City Type 8D CRRC Changchun 2019 1 JC009
SFM79CCD5035   8A CRRC Qingdao SifangCRRC Changchun 2019– 35 501–518, 539–555  17 
SFM80CCD5034   8A CRRC Qingdao SifangCRRC Changchun 2019– 25 19 001–19 025  19 
ZBM04   4A Beijing Subway Rolling Stock Equipment 2020 5 11 001–11 005  11 
CCD3004   4LB CRRC Changchun 2021 5 L1 111–L1 115  Capital Airport  Tianzhu Based on the INNOVIA ART 200

References

  1. ^ . 2013-04-16. Archived from the original on 2013-05-09. Retrieved 2013-05-06.
  2. ^ New Beijing subway to ease traffic congestion, Wu Wenjie, deputy director of China Railway Tunnel Group, China Daily. Reporter ZHENG Xin. 2012-11-26.
  3. ^ a b "Linear Motor Commuter for Beijing" CNR website 2010-03-13 at the Wayback Machine Accessed Mar. 27, 2010
  4. ^ 机场线轨道车辆有哪些先进设计?. 2008-08-22. Retrieved 2009-11-27.
  5. ^ . 2008-08-08. Archived from the original on August 13, 2008. Retrieved 2009-08-02.
  6. ^ 北京地铁流量迫近400万 计划新车上线城铁扩编. 2008-07-09. Retrieved 2009-02-04.
  7. ^ . 2009-03-26. Archived from the original on 2009-03-31. Retrieved 2009-08-02.
  8. ^ a b c d e 北京地铁16号线将首次采用"8A"车辆编组 运能提高70% (in Simplified Chinese). Xinhua. 2013-04-24.
  9. ^ (in Simplified Chinese). Xinhua News. 2014-04-29. Archived from the original on January 7, 2016.
  10. ^ New Beijing subway to ease traffic congestion, Wu Wenjie, deputy director of China Railway Tunnel Group, China Daily. Reporter ZHENG Xin.[1] 2012-11-26.
  11. ^ "Linear Motor Commuter for Beijing" CNR website 13 March 2010 at the Wayback Machine Accessed Mar. 27, 2010
  12. ^ "北京市轨道交通第二期建设规划调整环境影响报告书(征求意见稿)". www.bii.com.cn. Retrieved 2019-05-24.
  13. ^ a b 北京新机场线全面铺轨 车辆采用7节载客车+1节行李车 (in Simplified Chinese). 新京报. 2018-12-06.
  14. ^ (in Simplified Chinese). 京华时报. 2010-08-04. Archived from the original on February 9, 2019. Retrieved February 8, 2019.
  15. ^ a b 北京首条磁浮将开通 一条线路为何耗时18年 (in Simplified Chinese). 解放日报. 2017-11-20.
  16. ^ "北京地铁6号线斥资30亿购进512辆新车". 2011-01-30. Retrieved 2011-02-04.
  17. ^ a b 涂露芳 (2012-12-09). . Archived from the original on 2013-12-14. Retrieved 2013-05-06.
  18. ^ (Chinese) 吉林日报 March 3, 2014, at the Wayback Machine July 31, 2009
  19. ^ ""北车制造"北京15号线和亦庄线地铁同日开通". 中国北车股份有限公司. 2010-12-31. Archived from the original on 2013-04-25. Retrieved 2011-02-03.
  20. ^ . 中国南车股份有限公司. 2009-09-28. Archived from the original on 2009-10-01. Retrieved 2009-11-27.
  21. ^ a b "南车中标北京地铁大兴线". 2009-07-31. Retrieved 2011-02-03.
  22. ^ "时速100公里地铁车辆在中国南车下线". 2010-09-08. Retrieved 2011-02-03.
  23. ^ "北京地铁一号线新型列车亮相". 新浪网. 2007-09-21. Retrieved 2009-11-27.
  24. ^ (Chinese) [2] July 8, 2011, at the Wayback Machine July 30, 2009
  25. ^ (Chinese)"青岛造" 最高运营时速100公里[dead link] Dec. 31, 2009
  26. ^ a b c "Robert McConnell's Beijing Subway Webpage" Accessed Mar. 27,2010
  27. ^ (Chinese) 第一代电动客车 December 31, 2009, at the Wayback Machine Accessed Mar. 27, 2010
  28. ^ (Chinese) 厂修车介绍 December 31, 2009, at the Wayback Machine Accessed Mar. 27, 2010
  29. ^ (Chinese)DK16大修改造车 2007-10-14 at the Wayback Machine Accessed Mar. 27, 2010
  30. ^ (Chinese) 第二代电动客车 December 31, 2009, at the Wayback Machine Accessed Mar. 27, 2010
  31. ^ (Chinese) Accessed Mar. 28, 2010
  32. ^ (Chinese) "M车" December 31, 2009, at the Wayback Machine Accessed Mar. 28, 2010
  33. ^ a b . Archived from the original on 2016-03-04. Retrieved 2018-11-04.
  34. ^ (Chinese) [3] December 31, 2009, at the Wayback Machine Accessed Mar. 27, 2010
  35. ^ "DK28 Metro Car with VVVF Inverter" 2016-03-03 at the Wayback Machine Accessed Mar. 27, 2010
  36. ^ "DK32 Commuter Train for Beijing"[permanent dead link] Accessed Mar. 27, 2010
  37. ^ "Bombardier Awarded Contract in China for the Beijing Capital International Airport Link With Connection to Summer 2008 Olympic Games Village" Business Wire Mar. 20, 2006
  38. ^ "公司动态 | 厚积薄发 开物成务 不断优化服务设施提升乘车体验". mp.weixin.qq.com (in Chinese). Retrieved 2021-01-20.
  39. ^ "北京地下鉄八通線". 2427junction.com. Retrieved 2020-12-02.

External links

  • Official Beijing Subway Website
  • World Subways by Robert McConnell

beijing, subway, rolling, stock, beijing, subway, trains, standard, gauge, rail, draw, power, from, third, rail, except, those, lines, which, overhead, wires, lines, fangshan, changping, lines, have, designed, maximum, service, speed, airport, line, linear, mo. All Beijing Subway trains run on 1 435 mm 4 ft 8 1 2 in standard gauge rail and draw power from the 750 V DC third rail except those on Lines 6 11 14 16 17 and 19 which use 1 500 V DC overhead wires 1 Lines 6 15 Fangshan and Changping lines have a designed maximum service speed of 100 km h 62 mph 2 The Airport Line is linear motor driven with a designed maximum service speed of 110 km h 68 mph 3 4 All other Lines have a maximum service speed of 80 km h 50 mph Currently Lines 1 2 4 5 8 9 10 13 15 Batong Daxing Changping Fangshan Yanfang and Yizhuang lines use 6 car B size trains Initially the Batong line and Line 13 was originally used 4 car trains and now expanded into six 5 6 7 Most lines including Line 15 use the third rail to supply power A Line 2 DK16A train at the Beijing Railroad Station 2003 A refurbished Line 2 DK16AG train at Jishuitan 2006 A Line Batong SFX series train at Sihui 2006 The Batong Line was the first in the Beijing Subway to use rolling stock made by CSR Qingdao Sifang A Line 13 DKZ5 train at Xizhimen 2006 A Line 1 DKZ4 train at Wangfujing 2006 A Line 2 DKZ16 train 2011 Contents 1 Type B Trains 2 Type A Trains 3 Type L trains 4 Type D Trains 5 Maglev 6 Light Rail Transit 7 Manufacturers 8 History 8 1 First Generation 8 1 1 Pyongyang Metro DK4 cars 8 2 Second Generation 8 3 Third Generation 8 4 Fourth Generation 9 Current Fleet 10 References 11 External linksType B Trains EditThe most common rolling stock of the Beijing Subway is the Type B car which has a carrying capacity of 245 passengers per car and top speed of 80 km h 50 mph drawing 750 V DC power from the third rail 8 Most lines operate the six car Type B train set that can carry 1 460 passengers per train and transport 43 800 passengers per hour 8 Lines 6 and 7 use eight car Type B train sets that can carry 1 960 passengers per train and 58 800 passengers per hour 8 The Type B trains sets of Lines 6 and 7 can draw 1 500 V DC power and can reach 100 km h 62 mph The Yanfang Line operates four car Type B train sets with driverless automatic train operation Type A Trains EditType A cars run on Lines 14 16 17 19 and under construction Lines 3 and 12 They are 3 1 meters longer and 20 cm wider than Type B cars with a designed capacity of 310 passengers per car and 10 sets of doors per train compared to 8 sets of doors per train on Type B cars 9 8 Type A cars draw 1 500 V DC power from overhead wire and can reach 100 km h 62 mph Line 14 uses six car Type A train sets which can carry 1 860 passengers per train and allow for throughput of up to 55 800 passengers per hour per direction Line 16 uses eight car Type A train sets which can carry 2 480 passengers per train and allow for throughput of up 74 400 passengers per hour per direction 8 Type L trains EditThe Capital Airport Express has its distinct 4 car linear motor train sets powered by 750 V DC electricity via the third rail and can reach a maximum speed of 110 km h 68 mph 10 11 The under construction Line 28 will also use L type trains but 6 cars long Type D Trains EditThe Daxing Airport Express uses Type D train sets with top operational speed of 160 km h 99 mph 12 13 These trains are powered by 25 kV 50 Hz AC overhead wires The eight car train sets have seven passenger cars and one car to carry luggage 13 The under construction Line 22 will also use eight car Type D trains Maglev EditThe S1 Line s maglev trains feature six car train sets that run on 1 500 V DC power and can reach 100 km h 62 mph 14 Compared to subway trains that run on conventional track the maglev train has a smaller minimum turning radius of 75 meters compared to 200 meters can climb steeper slope of 53 versus 40 and emits less noise 15 The six car train set can carry 1 032 passengers 15 Light Rail Transit EditThe Xijiao LRT and Yizhuang Tram Line T1 operates five car trams that draw 750 V DC from overhead lines and can reach 70 km h 43 mph Manufacturers EditFrom the subway s inception to 2003 all Beijing subway trains were manufactured by CNR Changchun Railway Vehicles Co Ltd All rolling stock on Lines 2 5 6 16 9 10 13 15 Yizhuang line Capital Airport Express and some of Line 1 14 16 and Yanfang line stocks 3 17 18 are produced by CNR Changchun 19 However CSR Qingdao Sifang Co Ltd has recently produced rolling stock for the Beijing subway CSR Sifang produced all the trains for Lines 4 20 21 8 Daxing 21 Changping 22 Daxing Airport Express and some of Line 1 23 14 17 24 25 16 and Yanfang line The Beijing Subway Rolling Stock Equipment Co Ltd a wholly owned subsidiary of the Beijing Mass Transit Railway Operation Corp provides local assemblage maintenance and repair services It has also made trains for line 7 Batong and Fangshan lines History EditFirst Generation Edit In the 1960s to mid 1970s the Beijing Subway used DK2 and DK3 models made in Changchun The DK stands for diandong keche or electrically operated passenger car 26 These models and their derivatives the DK3G DK20 DK16A BD1 and BD2 are classified by the Beijing Subway as the first generation 27 In recent decades the Beijing Subway Rolling Stock Equipment Co refurbished the DK16A and DK20 models which remained in use well into the first decade of the 21st century 28 The refurbished DK16AG trains entered into service on Line 2 in 2005 29 Pyongyang Metro DK4 cars Edit During the opening of Line 13 some ex Pyongyang Metro Changchun DK4 cars were used until the new order of cars replaced them Second Generation Edit From the 1980 to the early 1990s the subway introduced several new models including the DK6 DK9 and their derivatives the DK11 DK16 and GTO 30 The M series trains that appeared on Lines 2 and 13 were made by Japan s Tokyu Car Corporation 31 32 33 Third Generation Edit In 1998 the subway began deploying a new generation of train sets that featured variable voltage variable frequency VVVF control mechanisms These models include the DKZ4 DKZ5 and the DKZ6 34 DKZ stands for diandong keche zu or electric passenger train sets 26 CNR Changchun also made 174 DK28 DK31 metro cars which uses VVVF inverters and AC motors for Line 1 35 and 136 DK32 34 trains for Line 13 36 In 2005 the Batong line began using SFX01 and SFX02 trains made by CSR Qingdao Sifang 26 The 40 trains of the Airport Express were made by a joint venture between CRRC Changchun and Bombardier Transportation and uses Bombardier s Innovia Advanced Rapid Transit ART 200 technology 33 37 Fourth Generation EditSince 2017 trains have been ordered with capabilities for unattended automatic train operation Starting with the DKZ70 and SFM16 trains on the Yanfang Line Since then trains on the Daxing Airport Express Lines 11 17 and 19 operate or are capable of operating in GoA4 unattended train operation mode Current Fleet EditModel Image Type Manufacturer Year Built Amount in Service Fleet Numbers Line s Served Depot NotesDKZ4 6B CNR Changchun 1998 31 S401 S431 1 Sihui Refurbished 2007DKZ5 6B CNR ChangchunBeijing Subway Rolling Stock Equipment 2002 55 H401H403 H456 13 Huilongguan Refurbished 2015 2018DKZ6 6B CNR Changchun 1 H402 Refurbished 2015SFM01 6B CSR Qingdao SifangBeijing Subway Rolling Stock Equipment 2003 19 TQ401 TQ408 TQ414 TQ424 Batong Tuqiao Refurbished 2015 2019SFM02 6B CSR Qingdao Sifang 5 TQ409 TQ413DKZ13 6B CNR ChangchunBeijing Subway Rolling Stock Equipment 2006 61 TP401 TP461 5 TaipingzhuangSongjiazhuang Currently being refurbished 38 DKZ16 6B CNR ChangchunBeijing Subway Rolling Stock Equipment 50 T401 T450 2 TaipinghuSFM04 6B CSR Qingdao Sifang 39 G432 G470 1 GuchengDKZ15 6B CNR ChangchunBeijing Subway Rolling Stock EquipmentCNR Dalian 2007 43 W401 W443 10 WanliuWuluQKZ5 4LB CNR CRRC ChangchunBombardier 10 L1 101 L1 110 Capital Airport Tianzhu Based on the INNOVIA ART 200SFM05 6B CSR Qingdao Sifang 20082010 73 001 053061 093 4 Daxing LongbeicunMajiapuNanzhaoluSFM07 6B CSR Qingdao SifangBeijing Subway Rolling Stock Equipment 2008 39 6 TQ425 TQ430 Batong Tuqiao Refurbished 2016 2019BJD01BDK03 6B CNR ChangchunBeijing Subway Rolling Stock Equipment 20092019 2020 44 FS001 FS021 FS022 FS044 Fangshan YancunSFM13 6B CSR CRRC Qingdao Sifang 20092019 32 CP001 CP032 Changping Dingsi RoadMing TombsDKZ31 6B CNR Changchun 2010 28 15 001 15 028 15 MaquanyingFengboDKZ32 6B CNR Changchun 23 YZ001 YZ023 Yizhuang SongjiazhuangTaihuSFM12SFM42 6B CSR CRRC Qingdao SifangBeijing Subway Rolling Stock Equipment 40 08 001 08 040 8 PingxifuYinghaiDKZ33BDK05 6B CNR CRRC ChangchunBeijing Subway Rolling Stock Equipment 20112019 37 09 001 09 037 9 GuogongzhuangDKZ34 6B CNR ChangchunBeijing Subway Rolling Stock EquipmentCNR Dalian 2011 41 10 044 10 084 10 WanliuWuluDKZ47 8B CNR CRRC Changchun 201120132018 99 06 001 06 099 6 WuluWuliqiaoDongxiaoyingDKZ53 6A CNR Changchun 2012 38 201 238 14 MaquanyingZhangyicunSFM18 6A CSR Qingdao Sifang 25 239 263 14 BDK01BDK04 8B Beijing Subway Rolling Stock Equipment 2013 68 07 001 07 068 7 JiaohuachangZhangjiawanDKZ46 6B CNR ChangchunBeijing Subway Rolling Stock EquipmentCNR Dalian 32 10 085 10 116 10 WanliuWuluDKZ76 4B CRRC Changchun 2014 2016 15 YF001 YF015 Yanfang Yancun NorthDKZ93SFM40 8A CRRC ChangchunCSR Qingdao Sifang 2016 2019 63 301 364 16 BeianheSFM16 4B CRRC Qingdao Sifang 2016 1 YF016 Yanfang Yancun NorthSFM40 8A CRRC Qingdao Sifang 2016 29 336 364 16 BeianheSFM42 6B CRRC Qingdao SifangBeijing Subway Rolling Stock Equipment 2019 72 08 041 08 112 8 PingxifuYinghaiBDK06 6B Beijing Subway Rolling Stock Equipment 2019 12 TQ431 TQ437 01108 01112 Batong Tuqiao SihuiCinova 160 8D 4D CRRC Qingdao Sifang 2019 8 Car Train 2020 4 Car Train 16 JC001 JC008 JC010 JC013 8 Car Train JC401 JC404 4 Car Train Daxing Airport Cigezhuang New Airport NorthCJ3 City Type 8D CRRC Changchun 2019 1 JC009SFM79CCD5035 8A CRRC Qingdao SifangCRRC Changchun 2019 35 501 518 539 555 17 SFM80CCD5034 8A CRRC Qingdao SifangCRRC Changchun 2019 25 19 001 19 025 19 ZBM04 4A Beijing Subway Rolling Stock Equipment 2020 5 11 001 11 005 11 CCD3004 4LB CRRC Changchun 2021 5 L1 111 L1 115 Capital Airport Tianzhu Based on the INNOVIA ART 200References Edit 交通委谈轨道交通14号线西段开通试运营情况 2013 04 16 Archived from the original on 2013 05 09 Retrieved 2013 05 06 New Beijing subway to ease traffic congestion Wu Wenjie deputy director of China Railway Tunnel Group China Daily Reporter ZHENG Xin 2012 11 26 a b Linear Motor Commuter for Beijing CNR website Archived 2010 03 13 at the Wayback Machine Accessed Mar 27 2010 机场线轨道车辆有哪些先进设计 2008 08 22 Retrieved 2009 11 27 北京地铁2号线全部更换空调车 八通线扩编完成 2008 08 08 Archived from the original on August 13 2008 Retrieved 2009 08 02 北京地铁流量迫近400万 计划新车上线城铁扩编 2008 07 09 Retrieved 2009 02 04 13号线列车扩改任务全部完成 增至六节车厢 2009 03 26 Archived from the original on 2009 03 31 Retrieved 2009 08 02 a b c d e 北京地铁16号线将首次采用 8A 车辆编组 运能提高70 in Simplified Chinese Xinhua 2013 04 24 北京14号线5月初先开7站 大肚列车 可并肩站5人 in Simplified Chinese Xinhua News 2014 04 29 Archived from the original on January 7 2016 New Beijing subway to ease traffic congestion Wu Wenjie deputy director of China Railway Tunnel Group China Daily Reporter ZHENG Xin 1 2012 11 26 Linear Motor Commuter for Beijing CNR website Archived 13 March 2010 at the Wayback Machine Accessed Mar 27 2010 北京市轨道交通第二期建设规划调整环境影响报告书 征求意见稿 www bii com cn Retrieved 2019 05 24 a b 北京新机场线全面铺轨 车辆采用7节载客车 1节行李车 in Simplified Chinese 新京报 2018 12 06 北京磁悬浮S1线西段通过环评 不会造成电磁污染 in Simplified Chinese 京华时报 2010 08 04 Archived from the original on February 9 2019 Retrieved February 8 2019 a b 北京首条磁浮将开通 一条线路为何耗时18年 in Simplified Chinese 解放日报 2017 11 20 北京地铁6号线斥资30亿购进512辆新车 2011 01 30 Retrieved 2011 02 04 a b 涂露芳 2012 12 09 14号线大容量新车下线 Archived from the original on 2013 12 14 Retrieved 2013 05 06 Chinese 吉林日报 Archived March 3 2014 at the Wayback Machine July 31 2009 北车制造 北京15号线和亦庄线地铁同日开通 中国北车股份有限公司 2010 12 31 Archived from the original on 2013 04 25 Retrieved 2011 02 03 向共和国60华诞献礼 南车造地铁在京投入运营 中国南车股份有限公司 2009 09 28 Archived from the original on 2009 10 01 Retrieved 2009 11 27 a b 南车中标北京地铁大兴线 2009 07 31 Retrieved 2011 02 03 时速100公里地铁车辆在中国南车下线 2010 09 08 Retrieved 2011 02 03 北京地铁一号线新型列车亮相 新浪网 2007 09 21 Retrieved 2009 11 27 Chinese 2 Archived July 8 2011 at the Wayback Machine July 30 2009 Chinese 青岛造 最高运营时速100公里 dead link Dec 31 2009 a b c Robert McConnell s Beijing Subway Webpage Accessed Mar 27 2010 Chinese 第一代电动客车 Archived December 31 2009 at the Wayback Machine Accessed Mar 27 2010 Chinese 厂修车介绍 Archived December 31 2009 at the Wayback Machine Accessed Mar 27 2010 Chinese DK16大修改造车 Archived 2007 10 14 at the Wayback Machine Accessed Mar 27 2010 Chinese 第二代电动客车 Archived December 31 2009 at the Wayback Machine Accessed Mar 27 2010 Chinese 东急 Accessed Mar 28 2010 Chinese M车 Archived December 31 2009 at the Wayback Machine Accessed Mar 28 2010 a b Nanyue Express Archived from the original on 2016 03 04 Retrieved 2018 11 04 Chinese 3 Archived December 31 2009 at the Wayback Machine Accessed Mar 27 2010 DK28 Metro Car with VVVF Inverter Archived 2016 03 03 at the Wayback Machine Accessed Mar 27 2010 DK32 Commuter Train for Beijing permanent dead link Accessed Mar 27 2010 Bombardier Awarded Contract in China for the Beijing Capital International Airport Link With Connection to Summer 2008 Olympic Games Village Business Wire Mar 20 2006 公司动态 厚积薄发 开物成务 不断优化服务设施提升乘车体验 mp weixin qq com in Chinese Retrieved 2021 01 20 北京地下鉄八通線 2427junction com Retrieved 2020 12 02 External links Edit Wikimedia Commons has media related to Beijing Subway rolling stock Wikivoyage has a travel guide for Beijing Official Beijing Subway Website World Subways by Robert McConnell Retrieved from https en wikipedia org w index php title Beijing Subway rolling stock amp oldid 1122735600, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.