fbpx
Wikipedia

Line 8 (Beijing Subway)

Line 8 of the Beijing Subway (Chinese: 北京地铁8号线; pinyin: běijīng dìtiě bāhàoxiàn) is a rapid transit line in Beijing. It sits on the central axis of Beijing. Line 8's color is green. It is 49.5 km (30.8 mi) in length with 35 stations (34 in operation). The most recent extension is the central section from National Art Museum to Zhushikou, opened on 31 December 2021.

Line 8
Line 8 train at Yinghai station
Overview
Other name(s)M8 (planned name)
Olympic Branch Line (Chinese: 奥运支线) (for Beitucheng to Forest Park South Gate Section)
StatusOperational
LocaleDongcheng, Chaoyang, Haidian, and Changping districts
Beijing
TerminiZhuxinzhuang - Yinghai
Stations35 (34 in operation)
Service
TypeRapid transit
SystemBeijing Subway
Operator(s)Beijing Mass Transit Railway Operation Corp., Ltd
Depot(s)Pingxifu, Yinghai
Rolling stock6-car Type B (SFM12, SFM42)
Daily ridership303,100 (2014 Avg.)[1]
431,000 (2014 Peak)[2]
History
OpenedJuly 19, 2008; 15 years ago (2008-07-19)
Technical
Line length49.5 km (30.8 mi)
CharacterUnderground & Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Operating speed80 km/h (50 mph)
Route map

Zhuxinzhuang
Yuzhi Lu
Pingxifu
Pingxifu depot
Huilongguan Dongdajie
Huoying
Yuxin
Xixiaokou
Yongtaizhuang
Qing river
Lincuiqiao
water body of Olympic Forest Park
Forest Park South Gate
Olympic Park
Olympic Sports Center
Beitucheng
outer – inner
Xiaoyue river
Anhuaqiao
Line 12 (to be opened 2023)
Andeli Beijie
North Hucheng river
outer – inner
Gulou Dajie
Shichahai
Jin river
Nanluogu Xiang
National Art Museum
Jinyu Hutong
Wangfujing
inner – outer
Qianmen
Zhushikou
Tianqiao
South Hucheng river
Yongdingmenwai
Muxiyuan
Haihutun
Liangshui river
outer – inner
Dahongmen
(not open) Line 10
Dahongmennan
Fengshuang railway
Heyi
Donggaodi
Huojian Wanyuan
Wufutang
Demao
Yinghai
Yinghai depot


Route edit

North Section edit

In the north, Line 8 begins at Zhuxinzhuang on the Changping Line and heads east to Huilongguan Residential Area and then south through the Line 13 arc at Huoying, to the Olympic Park station on Line 15. The line enters the Line 10 loop at Beitucheng and then the Line 2 loop at Gulou Dajie before reaching Nanluogu Xiang on Line 6, and then to National Art Museum.

Apart from the Zhuxinzhuang station and an 1.7 km (1.056 mi) section of elevated track leading therefrom, the entire line runs underground.

Central Section edit

Three stations (Jinyu Hutong, Wangfujing and Qianmen) on the central section opened on 31 December 2021.

South Section edit

The south section of Line 8, from Zhushikou to Yinghai, is 16.4 km (10.190 mi) long and has a 2.06 km (1.280 mi) elevated section. All stations are underground, except for Demao and Yinghai stations, which are elevated.

Stations edit

Station Name Connections Nearby Bus Stops Distance
km[3]
Location
English Chinese
Zhuxinzhuang 朱辛庄  Changping  417 463 560 871 880 898 899 昌19 昌73 C122 专49 0.000 0.000 Changping
Yuzhi Lu 育知路 463 560 昌19 昌25 快速直达专线202 专79 专80 专102 2.318 2.318
Pingxifu 平西府 344 428 460 461 996 快速直达专线202 专131 专192 1.985 4.303
Huilongguan Dongdajie 回龙观东大街 367 441 462 478 558 607 681 996 C113 快速直达专线203 夜38 专21 专40 专52 专78 专101 专192 专193 2.056 6.359
Huoying 霍营  13 
( S2 via   HKP)
371 462 478 551 558 606 607 681 专21 专40 专52 专192 1.114 7.473
Yuxin 育新 315 355 371 379 393 398 432 462 606 607 614 617 693 昌75 专89 专139 1.894 9.367 Changping / Haidian
Xixiaokou 西小口 379 专89 1.543 10.910 Haidian
Yongtaizhuang 永泰庄 81 379 476 490 专43 专89 1.041 11.951
Lincuiqiao 林萃桥 81 379 478 510 专44 2.553 14.504 Chaoyang
Senlin Gongyuan Nanmen (Forest Park South Gate) 森林公园南门 2.555 17.059
Aolinpike Gongyuan (Olympic Park) 奥林匹克公园  15  311 319 379 450 466 484 695 1.016 18.075
Aoti Zhongxin (Olympic Sports Center) 奥体中心 607 1.667 19.742
Beitucheng 北土城  10  5 21 81 82 92 113 142 380 409 515 607 620 653 694 夜6 夜9 专8 0.900 20.642
Anhuaqiao 安华桥 5 21 82 92 113 142 300 300快 302 328 361 368 380 387 409 601 604 607 671 847 921 944 快速直达专线93 快速直达专线178 夜6 夜30 1.018 21.660 Xicheng / Chaoyang
Andeli Beijie 安德里北街 60 82 142 380 409 夜36 专7 1.274 22.934 Dongcheng
Gulou Dajie 鼓楼大街  2  27 44 60 82 200 380 409 夜20 夜36 专51 1.083 24.017 Dongcheng / Xicheng
Shichahai 什刹海 5 60 107 124 135 观光3 1.188 25.205
Nanluogu Xiang 南锣鼓巷  6  3 4 13 42 60 82 115 118 612 夜2 夜3 夜10 夜21 0.902 26.107 Dongcheng
Zhongguo Meishuguan (National Art Museum) 中国美术馆 2 58 101 104 108 109 111 128 夜13 夜18 夜21 1.437 27.544
Jinyu Hutong 金鱼胡同 103 141 观光2 夜18 夜21 0.873 28.417
Wangfujing 王府井  1  1 41 52 103 120 141 观光2 夜1 夜17 夜18 夜21 0.762 29.179
Qianmen 前门  2  2 5 8 9 20 22 44 48 59 66 67 82 93 120 137 141 142 332 599 622 901快 BRT1(快速公交1) 观光1 观光2 夜2 夜5 夜17 夜18 1.857 31.036
Zhushikou 珠市口  7  2 5 20 23 48 57 59 66 93 120 141 622 观光1 夜2 夜7 夜10 夜17 夜18 1.085 32.121 Dongcheng / Xicheng
Tianqiao 天桥 2 7 15 20 35 36 53 71 72 90 93 105 106 110 120 141 622 BRT1(快速公交1) 观光1 夜2 夜11 专153 专155 0.881 33.002
Yongdingmenwai 永定门外  14  2 7 25 40 71 72 93 120 622 828 849 943 997 BRT1(快速公交1) 夜2 专153 专202 1.800 34.802 Dongcheng
Muxiyuan 木樨园 2 50 51 54 62 71 72 93 120 300 300快 324 366快 368 497 622 652 665 678 679 687 820 827 828 839 848 849 943 954 957 973 997 BRT1(快速公交1) 夜2 夜23 夜24 夜30 专18 专130 0.741 35.543
Haihutun 海户屯 54 71 324 622 678 687 827 BRT1(快速公交1) 夜2 专34 0.845 36.388 Fengtai
Dahongmen 大红门  10 
Dahongmennan 大红门南 54 324 343 366 400 400快 485 501 511 602 622 685 687 825 827 829 990 BRT1(快速公交1) 夜2 专13 专163 1.678 38.066
Heyi 和义 54 324 366 485 501 622 685 827 BRT1(快速公交1) 夜2 2.446 40.512
Donggaodi 东高地 324 353 354 366 501 556 622 685 BRT1(快速公交1) 夜2 1.537 42.049
Huojian Wanyuan 火箭万源 576 680 BRT1(快速公交1) 1.215 43.264
Wufutang 五福堂 555 576 680 926 BRT1(快速公交1) 兴42 1.684 44.948 Daxing
Demao 德茂 453 555 926 兴29 专56 2.076 47.024
Yinghai 瀛海 555 573 926 兴31 兴38 兴49区 兴63 兴72 兴74 兴75 兴80 1.510 48.534

History edit

Line 8 has been planned and built in several phases.

 
Forest motif inside the station
 
Olympic Green Station platform
 
Beitucheng Station platform

Phase I (Olympic Branch Line) edit

Line 8 was planned as the subway line that follows Beijing's central north–south axis.[4][5] The first section of Line 8 to be built was the four-station segment from Beitucheng to Forest Park South Gate, 4.35 km (2.703 mi) in length, that serves the Olympic Green. This section was included in Beijing's bid for the 2008 Summer Olympics, which was awarded to the city in 2001. Originally, Beijing's subway planners also considered building a subway extension line off of Line 13 or Line 5 to serve the Olympic Green but ultimately chose to build Line 8 as a branch off of Line 10.[6] Construction began in 2004.[7] With other Olympic venues also under construction, Phase I of Line 8 was built using the cut-and-cover method to reduce the difficulty of construction.[8] The Olympic Branch Line, as Line 8 Phase I was known, entered into operation together with Line 10 on July 19, 2008. It serves the Olympic Green, located due north of the city centre, during the 2008 Summer Olympics. The Phase I only included 4 stations. Access was originally restricted to riders with an Olympic Register Card or a ticket to an event at the Olympic Games or Paralympic Games on the day of the event. In early October 2008, the line was fully opened to the public.

Phase II edit

On December 8, 2007, while Phase I of Line 8 was still under construction, work began on Phase II to extend Line 8 in both directions along the city's north–south central axis.[9] In Phase II was estimated to cost ¥10.1 billion and was scheduled to be completed by 2012.[10][11]

Northern extension to Huilongguan Dongdajie edit

The northern extension to Huilongguan Dongdajie, 10.7 km (6.649 mi) in length with 6 stations, extended Line 8 from the South Gate of Forest Park to Huilongguan Dongdajie in Changping District beyond the Line 13 arc. Land clearing for Phase II began in December 2007.[10][12] Tunnel boring machines began work on October 16, 2009.[13] In the fall of 2011, the entire Line 8 shut down and the entire line including the Phase II northern extension reopened on December 31, 2011.[13]

The Lincuiqiao station, just west of the Olympic Forest Park, was originally planned as an emergency stop, but was added at the behest of nearby residents and their municipal people's congress representative, Tian Yuan, who argued that the 5.1 km (3.169 mi) gap between South Gate of Forest Park and Yongtaizhuang made subway access inconvenient for residents along Lincui Road.[14] Lincuiqiao was officially added as a station to Phase II plans in December 2008.

Southern extension to Guloudajie edit

The southern extension to Guloudajie, 3.28 km (2.04 mi) in length, opened on December 30, 2012. Travel time from Huilongguan to the Second Ring Road was reduced by a half-hour.[15] Daily ridership reached 203,000 in March 2013.[16]

Phase II sections opened at the end of 2013 edit

On December 28, 2013, Line 8 reached 26.614 km (16.537 mi) in length with the opening of the Changping-Line 8 Connector and the southern extension to Nanluoguxiang.[17][18]

Changping-Line 8 Connector edit

 
Line 8 train at the Zhuxinzhuang Station

The Changping-Line 8 Connector, also known as the Changba Connector Line (昌八联络线) or Changba Connector, is a 6.3-kilometre-long (3.9 mi) extension of Line 8 from Huilongguan Dongdajie to Zhuxinzhuang on the Changping Line.[17] The Changba Connector contains three stations: Pingxifu, Yuzhilu and Zhuxinzhuang, and forms the northernmost section of Line 8.[17] The Changba Connector was designed to alleviate passenger traffic on Line 13 by allowing Changping Line riders heading to destinations in eastern Beijing to switch to Line 8 at Zhuxingzhuang instead of transferring to Line 13 at Xi'erqi. The connector was built from April 2011 to September 2013 and entered operation at the end of 2013.[17][18]

Southern extension to Nanluoguxiang edit

South of Guloudajie, Line 8 was extended a further 2.16 km (1.34 mi) through Shichahai station to Nanluogu Xiang station on December 28, 2013.[19]

Phase II southern extension to National Art Museum edit

The one-station extension from Nanluoguxiang to National Art Museum was opened on 30 December 2018.[20][21]

Phase III & IV edit

In Phase III & IV, Line 8 will be extended further south from the National Art Museum through Qianmen and Yongdingmen to beyond the southern 5th Ring Road. The line will veer to the east of the central axis to avoid passing under the Forbidden City and Tian'anmen Square, before returning to the central axis alignment at Qianmen.

Planning began in 2009.[22] Plans of Line 8 in Phase III & IV showed 16 stations for 21.0 km (13.0 mi).[23] Phase III includes 14 stations and Phase IV includes 2 stations, Demao and Yinghai. Phase III was scheduled to be built by 2015[24] but the commencement of construction was not set to begin until October 2013.[25] The section from National Art Museum to Zhushikou started construction in November 2016.[26]

On 30 December 2018, the southernmost section of Phase III, and Phase IV, from Zhushikou to Yinghai was opened (12 stations were opened, Dahongmen was not opened).[20][21]

The section between National Art Museum and Zhushikou, which includes 3 stations (Jinyu Hutong, Wangfujing and Qianmen) opened on 31 December 2021.[26]

Future Development edit

Through service with Changping line edit

Through service between Line 8 and Changping line via Zhuxinzhuang station is under planning.[27][28]

Southern extension edit

A further southern extension from Yinghai to the China-Japan Innovation Cooperation Demonstration Zone is under planning.[29] The extension is entirely in Daxing District of Beijing.

Opening timeline edit

Segment Commencement Length Station(s) Name
Forest Park South Gate — Beitucheng 19 July 2008 3.583 km (2.23 mi) 3 Phase 1 (Olympic Branch line)
Olympic Sports Center 10 October 2008 Infill station 1
Huilongguan Dongdajie — Forest Park South Gate 31 December 2011 10.700 km (6.65 mi) 6 Phase 2 (northern section)
Beitucheng — Gulou Dajie 30 December 2012 3.375 km (2.10 mi) 2 Phase 2 (1st southern section)
Gulou Dajie — Nanluogu Xiang 28 December 2013 2.090 km (1.30 mi) 2 Phase 2 (2nd southern section)
Zhuxinzhuang — Huilongguan Dongdajie 6.359 km (3.95 mi) 3 Changping & Line 8 connector project
Andeli Beijie 26 December 2015 Infill station 1
Nanluogu Xiang — National Art Museum 30 December 2018 1.88 km (1.17 mi)[30] 1 Phase 2 (3rd southern section)
Zhushikou — Yinghai 16.4 km (10.19 mi) 12 Phase 3 (southern section) & Phase 4
National Art Museum — Zhushikou 31 December 2021 4.3 km (2.67 mi)[31] 3 Phase 3 (northern section)

Rolling Stock edit

During the Olympics Line 8 borrowed DKZ15 trains from Line 10; after the opening of the first sections of Phase II new CSR Sifang Locomotive SFM12 trains dedicated to Line 8 were rolled out.[32]

Model Image Manufacturer Year Built Amount in Service Fleet Numbers Depot
SFM12   CRRC Qingdao Sifang
Beijing Subway Rolling Stock Equipment
2010 40 08 001–08 040 Pingxifu
Yinghai
SFM42   2019 72 08 041–08 112

References edit

  1. ^ . 首都之窗 (in Chinese). 2014-08-22. Archived from the original on 2015-01-05. Retrieved 2014-09-14.
  2. ^ . 北京地铁 (in Chinese). 2014-05-01. Archived from the original on 2015-05-05. Retrieved 2015-05-04.
  3. ^ "8号线路网车站站间距信息". 2022-02-18.
  4. ^ 北京地铁周末"三线齐发" 机场线票价尚未公布. 新闻中心 (in Chinese). 2008-07-18. from the original on 2013-10-29. Retrieved 2009-07-28.
  5. ^ 穿越时代与历史轴线 北京地铁八号线兼顾生活与休闲. 2008.sina.com.cn (in Chinese). 2007-12-12. from the original on 2007-12-24. Retrieved 2009-07-28.
  6. ^ Song, Fangcan 宋方灿, ed. (2002-12-30). . 中国新闻网 (in Chinese). Archived from the original on 2013-12-05.
  7. ^ . 新华网 (in Chinese). 2004-12-16. Archived from the original on 2015-09-23.
  8. ^ 地铁10号线一期和奥运支线线路示意图. 北京市交通委员会 (in Chinese). Retrieved 2009-07-28.[permanent dead link]
  9. ^ . 人民网 (in Chinese). 2007-12-10. Archived from the original on 2015-06-10.
  10. ^ a b "[Line 8 Phase II Information Page at the Beijing Infrastructure Investment Co. Ltd]".[dead link]
  11. ^ . Sohu.com (in Chinese). 2008-10-08. Archived from the original on 2008-10-11. Oct. 8, 2008
  12. ^ The Changping District government commenced land clearing for Line 8's extension in December 2007. . 新浪房产 (in Chinese). 2008-01-30. Archived from the original on 2011-10-04.
  13. ^ a b . 新华网 (in Chinese). 2009-10-17. Archived from the original on 2012-11-02.
  14. ^ 北京地铁8号线规划增设林萃桥南站. 新闻中心 (in Chinese). 2008-12-28. from the original on 2010-01-12. Retrieved 2021-11-24.]
  15. ^ (Chinese)北京地铁公布最新线路全图, Beijing Youth Daily, 2012-12-12.
  16. ^ . Beijing Subway. Archived from the original on 2013-03-22. Retrieved 2013-03-10.
  17. ^ a b c d . 人民网 (in Chinese). 2013-10-08. Archived from the original on 2013-10-13. Retrieved 2013-10-09.
  18. ^ a b (Chinese) "京地铁8号线南北新线周六开通 中国美术馆站暂缓开通" <北京晚报> 2014-01-05 at the Wayback Machine 2013-12-25
  19. ^ (Chinese)北京地铁公布最新线路全图, Beijing Youth Daily, 2012-12-12"
  20. ^ a b http://news.ynet.com/2018/12/30/1600990t70.html. {{cite web}}: Missing or empty |title= (help)[dead link]
  21. ^ a b . 新京报 (in Chinese). 2018-09-20. Archived from the original on 2018-10-05. Retrieved 2018-10-04.
  22. ^ 北京地铁8号线二期将南延至大兴区. CCTV.com (in Simplified Chinese). 2009-05-27. from the original on 2011-07-23. Retrieved 2009-10-18.
  23. ^ . 人民网 (in Chinese). 2018-09-07. Archived from the original on 2018-10-05. Retrieved 2018-10-04.
  24. ^ Wang, Yi 王祎 (2011-06-15). . 新浪地产 (in Simplified Chinese). Archived from the original on 2012-04-26. Retrieved 2012-01-02.
  25. ^ 北京地铁8号线三期本月开工 预计2017年建成. 中国新闻网 (in Chinese). 2013-10-04. from the original on 2013-12-05. Retrieved 2013-10-09.
  26. ^ a b 北京地铁8号线剩余段空载试运行顺利启动. 中铁十六局集团有限公司 (in Chinese). 2021-09-23. from the original on 2021-09-26. Retrieved 2021-09-26. 直到2016年11月才得以实现进场,并开始了长达5年的施工建设
  27. ^ "代表建议:高峰期地铁公交执行联乘优惠". 2023-01-16. 下一步,昌平线、8号线也有望贯通运行,为乘客节省换乘时间
  28. ^ "北京市人民政府关于印发《北京市"十四五"时期交通发展建设规划》的通知". Archived from the original on 2022-05-07.
  29. ^ (PDF). p. 4. Archived from the original (PDF) on 2022-02-11.
  30. ^ 两条地铁线路年内将"升级". news.sina.cn (in Chinese). 2018-10-18. from the original on 2019-10-08. Retrieved 2019-10-08.
  31. ^ 北京7条计划年底通车地铁线路全部空载试运行. 新京报 (in Chinese). 2021-09-16. from the original on 2021-09-16. Retrieved 2021-09-26.
  32. ^ 北京三条地铁新线今日14时开通 北京西站通地铁. 腾讯新闻 (in Chinese). 2011-12-31. from the original on 2012-01-19. Retrieved 2013-05-09.

Sources edit

  • . 中华人民共和国国家发展和改革委员会 (in Chinese). 2012-11-16. Archived from the original on 2012-11-19. Retrieved 2012-11-16.
  • . 京华时 (in Chinese). 2011-04-17. Archived from the original on 2013-10-31. Retrieved 2012-10-27.

External links edit

  • Official Beijing Subway Website
  • Line 8 Phase II Information Page at the Beijing Infrastructure Investment Co. Ltd.[permanent dead link]

line, beijing, subway, line, beijing, subway, chinese, 北京地铁8号线, pinyin, běijīng, dìtiě, bāhàoxiàn, rapid, transit, line, beijing, sits, central, axis, beijing, line, color, green, length, with, stations, operation, most, recent, extension, central, section, fr. Line 8 of the Beijing Subway Chinese 北京地铁8号线 pinyin beijing ditie bahaoxian is a rapid transit line in Beijing It sits on the central axis of Beijing Line 8 s color is green It is 49 5 km 30 8 mi in length with 35 stations 34 in operation The most recent extension is the central section from National Art Museum to Zhushikou opened on 31 December 2021 Line 8Line 8 train at Yinghai stationOverviewOther name s M8 planned name Olympic Branch Line Chinese 奥运支线 for Beitucheng to Forest Park South Gate Section StatusOperationalLocaleDongcheng Chaoyang Haidian and Changping districtsBeijingTerminiZhuxinzhuang YinghaiStations35 34 in operation ServiceTypeRapid transitSystemBeijing SubwayOperator s Beijing Mass Transit Railway Operation Corp LtdDepot s Pingxifu YinghaiRolling stock6 car Type B SFM12 SFM42 Daily ridership303 100 2014 Avg 1 431 000 2014 Peak 2 HistoryOpenedJuly 19 2008 15 years ago 2008 07 19 TechnicalLine length49 5 km 30 8 mi CharacterUnderground amp ElevatedTrack gauge1 435 mm 4 ft 8 1 2 in standard gaugeElectrification750 V DC third railOperating speed80 km h 50 mph Route mapLegend Changping Xishankou connects Changping line Zhuxinzhuang Changping line Xitucheng Yuzhi Lu Pingxifu Pingxifu depot Huilongguan Dongdajie Huoying Line 13 Xizhimen Dongzhimen Huangtudian railway station BCR line S2 Yuxin Xixiaokou Yongtaizhuang Qing river Lincuiqiao water body of Olympic Forest Park Forest Park South Gate Line 15 Olympic Park Qinghua Donglu Xikou Fengbo Olympic Sports Center connects Line 10 Anzhenmen Beitucheng Line 10 outer inner Xiaoyue river Anhuaqiao Line 12 to be opened 2023 Sijiqingqiao Dongbabei Andeli Beijie North Hucheng river outer inner Gulou Dajie Line 2 Shichahai Jin river Jin anqiao Nanluogu Xiang Line 6 Lucheng National Art Museum Jinyu Hutong Wangfujing Line 1 Fushouling Universal Resort inner outer Beijing underground cross city railway crossing Qianmen Line 2 Zhushikou Line 7 Beijing West railway station Universal Resort Tianqiao South Hucheng river Jinghu railway etc Zhangguozhuang Shangezhuang Yongdingmenwai Line 14 Muxiyuan Haihutun Liangshui river outer inner Dahongmen not open Line 10 Dahongmennan Fengshuang railway Heyi Donggaodi Huojian Wanyuan Wufutang Demao Yinghai Yinghai depot vte Contents 1 Route 1 1 North Section 1 2 Central Section 1 3 South Section 2 Stations 3 History 3 1 Phase I Olympic Branch Line 3 2 Phase II 3 2 1 Northern extension to Huilongguan Dongdajie 3 2 2 Southern extension to Guloudajie 3 3 Phase II sections opened at the end of 2013 3 3 1 Changping Line 8 Connector 3 3 2 Southern extension to Nanluoguxiang 3 4 Phase II southern extension to National Art Museum 3 5 Phase III amp IV 4 Future Development 4 1 Through service with Changping line 4 2 Southern extension 5 Opening timeline 6 Rolling Stock 7 References 8 Sources 9 External linksRoute editThis section does not cite any sources Please help improve this section by adding citations to reliable sources Unsourced material may be challenged and removed March 2024 Learn how and when to remove this message North Section edit In the north Line 8 begins at Zhuxinzhuang on the Changping Line and heads east to Huilongguan Residential Area and then south through the Line 13 arc at Huoying to the Olympic Park station on Line 15 The line enters the Line 10 loop at Beitucheng and then the Line 2 loop at Gulou Dajie before reaching Nanluogu Xiang on Line 6 and then to National Art Museum Apart from the Zhuxinzhuang station and an 1 7 km 1 056 mi section of elevated track leading therefrom the entire line runs underground Central Section edit Three stations Jinyu Hutong Wangfujing and Qianmen on the central section opened on 31 December 2021 South Section edit The south section of Line 8 from Zhushikou to Yinghai is 16 4 km 10 190 mi long and has a 2 06 km 1 280 mi elevated section All stations are underground except for Demao and Yinghai stations which are elevated Stations editStation Name Connections Nearby Bus Stops Distancekm 3 Location English Chinese Zhuxinzhuang 朱辛庄 Changping 417 463 560 871 880 898 899 昌19 昌73 C122 专49 0 000 0 000 Changping Yuzhi Lu 育知路 463 560 昌19 昌25 快速直达专线202 专79 专80 专102 2 318 2 318 Pingxifu 平西府 344 428 460 461 996 快速直达专线202 专131 专192 1 985 4 303 Huilongguan Dongdajie 回龙观东大街 367 441 462 478 558 607 681 996 C113 快速直达专线203 夜38 专21 专40 专52 专78 专101 专192 专193 2 056 6 359 Huoying 霍营 13 S2 via nbsp HKP 371 462 478 551 558 606 607 681 专21 专40 专52 专192 1 114 7 473 Yuxin 育新 315 355 371 379 393 398 432 462 606 607 614 617 693 昌75 专89 专139 1 894 9 367 Changping Haidian Xixiaokou 西小口 379 专89 1 543 10 910 Haidian Yongtaizhuang 永泰庄 81 379 476 490 专43 专89 1 041 11 951 Lincuiqiao 林萃桥 81 379 478 510 专44 2 553 14 504 Chaoyang Senlin Gongyuan Nanmen Forest Park South Gate 森林公园南门 2 555 17 059 Aolinpike Gongyuan Olympic Park 奥林匹克公园 15 311 319 379 450 466 484 695 1 016 18 075 Aoti Zhongxin Olympic Sports Center 奥体中心 607 1 667 19 742 Beitucheng 北土城 10 5 21 81 82 92 113 142 380 409 515 607 620 653 694 夜6 夜9 专8 0 900 20 642 Anhuaqiao 安华桥 5 21 82 92 113 142 300 300快 302 328 361 368 380 387 409 601 604 607 671 847 921 944 快速直达专线93 快速直达专线178 夜6 夜30 1 018 21 660 Xicheng Chaoyang Andeli Beijie 安德里北街 60 82 142 380 409 夜36 专7 1 274 22 934 Dongcheng Gulou Dajie 鼓楼大街 2 27 44 60 82 200 380 409 夜20 夜36 专51 1 083 24 017 Dongcheng Xicheng Shichahai 什刹海 5 60 107 124 135 观光3 1 188 25 205 Nanluogu Xiang 南锣鼓巷 6 3 4 13 42 60 82 115 118 612 夜2 夜3 夜10 夜21 0 902 26 107 Dongcheng Zhongguo Meishuguan National Art Museum 中国美术馆 2 58 101 104 108 109 111 128 夜13 夜18 夜21 1 437 27 544 Jinyu Hutong 金鱼胡同 103 141 观光2 夜18 夜21 0 873 28 417 Wangfujing 王府井 1 1 41 52 103 120 141 观光2 夜1 夜17 夜18 夜21 0 762 29 179 Qianmen 前门 2 2 5 8 9 20 22 44 48 59 66 67 82 93 120 137 141 142 332 599 622 901快 BRT1 快速公交1 观光1 观光2 夜2 夜5 夜17 夜18 1 857 31 036 Zhushikou 珠市口 7 2 5 20 23 48 57 59 66 93 120 141 622 观光1 夜2 夜7 夜10 夜17 夜18 1 085 32 121 Dongcheng Xicheng Tianqiao 天桥 2 7 15 20 35 36 53 71 72 90 93 105 106 110 120 141 622 BRT1 快速公交1 观光1 夜2 夜11 专153 专155 0 881 33 002 Yongdingmenwai 永定门外 14 2 7 25 40 71 72 93 120 622 828 849 943 997 BRT1 快速公交1 夜2 专153 专202 1 800 34 802 Dongcheng Muxiyuan 木樨园 2 50 51 54 62 71 72 93 120 300 300快 324 366快 368 497 622 652 665 678 679 687 820 827 828 839 848 849 943 954 957 973 997 BRT1 快速公交1 夜2 夜23 夜24 夜30 专18 专130 0 741 35 543 Haihutun 海户屯 54 71 324 622 678 687 827 BRT1 快速公交1 夜2 专34 0 845 36 388 Fengtai Dahongmen 大红门 10 Dahongmennan 大红门南 54 324 343 366 400 400快 485 501 511 602 622 685 687 825 827 829 990 BRT1 快速公交1 夜2 专13 专163 1 678 38 066 Heyi 和义 54 324 366 485 501 622 685 827 BRT1 快速公交1 夜2 2 446 40 512 Donggaodi 东高地 324 353 354 366 501 556 622 685 BRT1 快速公交1 夜2 1 537 42 049 Huojian Wanyuan 火箭万源 576 680 BRT1 快速公交1 1 215 43 264 Wufutang 五福堂 555 576 680 926 BRT1 快速公交1 兴42 1 684 44 948 Daxing Demao 德茂 453 555 926 兴29 专56 2 076 47 024 Yinghai 瀛海 555 573 926 兴31 兴38 兴49区 兴63 兴72 兴74 兴75 兴80 1 510 48 534History editLine 8 has been planned and built in several phases nbsp Forest motif inside the station nbsp South Gate of Forest Park Station Exit A nbsp Olympic Green Station platform nbsp Olympic Green Station nbsp Beitucheng Station platform nbsp Beitucheng Station Exit D1 Phase I Olympic Branch Line edit Line 8 was planned as the subway line that follows Beijing s central north south axis 4 5 The first section of Line 8 to be built was the four station segment from Beitucheng to Forest Park South Gate 4 35 km 2 703 mi in length that serves the Olympic Green This section was included in Beijing s bid for the 2008 Summer Olympics which was awarded to the city in 2001 Originally Beijing s subway planners also considered building a subway extension line off of Line 13 or Line 5 to serve the Olympic Green but ultimately chose to build Line 8 as a branch off of Line 10 6 Construction began in 2004 7 With other Olympic venues also under construction Phase I of Line 8 was built using the cut and cover method to reduce the difficulty of construction 8 The Olympic Branch Line as Line 8 Phase I was known entered into operation together with Line 10 on July 19 2008 It serves the Olympic Green located due north of the city centre during the 2008 Summer Olympics The Phase I only included 4 stations Access was originally restricted to riders with an Olympic Register Card or a ticket to an event at the Olympic Games or Paralympic Games on the day of the event In early October 2008 the line was fully opened to the public Phase II edit On December 8 2007 while Phase I of Line 8 was still under construction work began on Phase II to extend Line 8 in both directions along the city s north south central axis 9 In Phase II was estimated to cost 10 1 billion and was scheduled to be completed by 2012 10 11 Northern extension to Huilongguan Dongdajie edit The northern extension to Huilongguan Dongdajie 10 7 km 6 649 mi in length with 6 stations extended Line 8 from the South Gate of Forest Park to Huilongguan Dongdajie in Changping District beyond the Line 13 arc Land clearing for Phase II began in December 2007 10 12 Tunnel boring machines began work on October 16 2009 13 In the fall of 2011 the entire Line 8 shut down and the entire line including the Phase II northern extension reopened on December 31 2011 13 The Lincuiqiao station just west of the Olympic Forest Park was originally planned as an emergency stop but was added at the behest of nearby residents and their municipal people s congress representative Tian Yuan who argued that the 5 1 km 3 169 mi gap between South Gate of Forest Park and Yongtaizhuang made subway access inconvenient for residents along Lincui Road 14 Lincuiqiao was officially added as a station to Phase II plans in December 2008 Southern extension to Guloudajie edit The southern extension to Guloudajie 3 28 km 2 04 mi in length opened on December 30 2012 Travel time from Huilongguan to the Second Ring Road was reduced by a half hour 15 Daily ridership reached 203 000 in March 2013 16 Phase II sections opened at the end of 2013 edit On December 28 2013 Line 8 reached 26 614 km 16 537 mi in length with the opening of the Changping Line 8 Connector and the southern extension to Nanluoguxiang 17 18 Changping Line 8 Connector edit nbsp Line 8 train at the Zhuxinzhuang Station The Changping Line 8 Connector also known as the Changba Connector Line 昌八联络线 or Changba Connector is a 6 3 kilometre long 3 9 mi extension of Line 8 from Huilongguan Dongdajie to Zhuxinzhuang on the Changping Line 17 The Changba Connector contains three stations Pingxifu Yuzhilu and Zhuxinzhuang and forms the northernmost section of Line 8 17 The Changba Connector was designed to alleviate passenger traffic on Line 13 by allowing Changping Line riders heading to destinations in eastern Beijing to switch to Line 8 at Zhuxingzhuang instead of transferring to Line 13 at Xi erqi The connector was built from April 2011 to September 2013 and entered operation at the end of 2013 17 18 Southern extension to Nanluoguxiang edit South of Guloudajie Line 8 was extended a further 2 16 km 1 34 mi through Shichahai station to Nanluogu Xiang station on December 28 2013 19 Phase II southern extension to National Art Museum edit The one station extension from Nanluoguxiang to National Art Museum was opened on 30 December 2018 20 21 Phase III amp IV edit In Phase III amp IV Line 8 will be extended further south from the National Art Museum through Qianmen and Yongdingmen to beyond the southern 5th Ring Road The line will veer to the east of the central axis to avoid passing under the Forbidden City and Tian anmen Square before returning to the central axis alignment at Qianmen Planning began in 2009 22 Plans of Line 8 in Phase III amp IV showed 16 stations for 21 0 km 13 0 mi 23 Phase III includes 14 stations and Phase IV includes 2 stations Demao and Yinghai Phase III was scheduled to be built by 2015 24 but the commencement of construction was not set to begin until October 2013 25 The section from National Art Museum to Zhushikou started construction in November 2016 26 On 30 December 2018 the southernmost section of Phase III and Phase IV from Zhushikou to Yinghai was opened 12 stations were opened Dahongmen was not opened 20 21 The section between National Art Museum and Zhushikou which includes 3 stations Jinyu Hutong Wangfujing and Qianmen opened on 31 December 2021 26 Future Development editThrough service with Changping line edit Through service between Line 8 and Changping line via Zhuxinzhuang station is under planning 27 28 Southern extension edit A further southern extension from Yinghai to the China Japan Innovation Cooperation Demonstration Zone is under planning 29 The extension is entirely in Daxing District of Beijing Opening timeline editSegment Commencement Length Station s Name Forest Park South Gate Beitucheng 19 July 2008 3 583 km 2 23 mi 3 Phase 1 Olympic Branch line Olympic Sports Center 10 October 2008 Infill station 1 Huilongguan Dongdajie Forest Park South Gate 31 December 2011 10 700 km 6 65 mi 6 Phase 2 northern section Beitucheng Gulou Dajie 30 December 2012 3 375 km 2 10 mi 2 Phase 2 1st southern section Gulou Dajie Nanluogu Xiang 28 December 2013 2 090 km 1 30 mi 2 Phase 2 2nd southern section Zhuxinzhuang Huilongguan Dongdajie 6 359 km 3 95 mi 3 Changping amp Line 8 connector project Andeli Beijie 26 December 2015 Infill station 1 Nanluogu Xiang National Art Museum 30 December 2018 1 88 km 1 17 mi 30 1 Phase 2 3rd southern section Zhushikou Yinghai 16 4 km 10 19 mi 12 Phase 3 southern section amp Phase 4 National Art Museum Zhushikou 31 December 2021 4 3 km 2 67 mi 31 3 Phase 3 northern section Rolling Stock editDuring the Olympics Line 8 borrowed DKZ15 trains from Line 10 after the opening of the first sections of Phase II new CSR Sifang Locomotive SFM12 trains dedicated to Line 8 were rolled out 32 Model Image Manufacturer Year Built Amount in Service Fleet Numbers Depot SFM12 nbsp CRRC Qingdao SifangBeijing Subway Rolling Stock Equipment 2010 40 08 001 08 040 PingxifuYinghai SFM42 nbsp 2019 72 08 041 08 112References edit 晚高峰加小圈车 地铁6号线满载率降12 首都之窗 in Chinese 2014 08 22 Archived from the original on 2015 01 05 Retrieved 2014 09 14 4月30日北京地铁日客运量再创新纪录 北京地铁 in Chinese 2014 05 01 Archived from the original on 2015 05 05 Retrieved 2015 05 04 8号线路网车站站间距信息 2022 02 18 北京地铁周末 三线齐发 机场线票价尚未公布 新闻中心 in Chinese 2008 07 18 Archived from the original on 2013 10 29 Retrieved 2009 07 28 穿越时代与历史轴线 北京地铁八号线兼顾生活与休闲 2008 sina com cn in Chinese 2007 12 12 Archived from the original on 2007 12 24 Retrieved 2009 07 28 Song Fangcan 宋方灿 ed 2002 12 30 北京奥运场馆明年七月动工 会徽已有满意方案 中国新闻网 in Chinese Archived from the original on 2013 12 05 北京市3条在建地铁今年完成投资40亿元 新华网 in Chinese 2004 12 16 Archived from the original on 2015 09 23 地铁10号线一期和奥运支线线路示意图 北京市交通委员会 in Chinese Retrieved 2009 07 28 permanent dead link 北京5条地铁新线同时开工 总里程近140公里 人民网 in Chinese 2007 12 10 Archived from the original on 2015 06 10 a b Line 8 Phase II Information Page at the Beijing Infrastructure Investment Co Ltd dead link 北京地铁10号线和8号线将于2012年通车 图 Sohu com in Chinese 2008 10 08 Archived from the original on 2008 10 11 Oct 8 2008 The Changping District government commenced land clearing for Line 8 s extension in December 2007 北京地铁8号线昌平站点启动拆迁 新浪房产 in Chinese 2008 01 30 Archived from the original on 2011 10 04 a b 北京地铁8号线开始盾构施工 新华网 in Chinese 2009 10 17 Archived from the original on 2012 11 02 北京地铁8号线规划增设林萃桥南站 新闻中心 in Chinese 2008 12 28 Archived from the original on 2010 01 12 Retrieved 2021 11 24 Chinese 北京地铁公布最新线路全图 Beijing Youth Daily 2012 12 12 Official Ridership Beijing Subway Archived from the original on 2013 03 22 Retrieved 2013 03 10 a b c d 北京地铁昌八线开始试车 运行时间10分钟 人民网 in Chinese 2013 10 08 Archived from the original on 2013 10 13 Retrieved 2013 10 09 a b Chinese 京地铁8号线南北新线周六开通 中国美术馆站暂缓开通 lt 北京晚报 gt Archived 2014 01 05 at the Wayback Machine 2013 12 25 Chinese 北京地铁公布最新线路全图 Beijing Youth Daily 2012 12 12 a b http news ynet com 2018 12 30 1600990t70 html a href Template Cite web html title Template Cite web cite web a Missing or empty title help dead link a b 6号线西延 8号线三期 8号线四期开始空载试运行 新京报 in Chinese 2018 09 20 Archived from the original on 2018 10 05 Retrieved 2018 10 04 北京地铁8号线二期将南延至大兴区 CCTV com in Simplified Chinese 2009 05 27 Archived from the original on 2011 07 23 Retrieved 2009 10 18 北京地铁8号线珠市口至瀛海站年底开通 20日起空载试运行 人民网 in Chinese 2018 09 07 Archived from the original on 2018 10 05 Retrieved 2018 10 04 Wang Yi 王祎 2011 06 15 北京地铁八号线三期 初步规划14站 新浪地产 in Simplified Chinese Archived from the original on 2012 04 26 Retrieved 2012 01 02 北京地铁8号线三期本月开工 预计2017年建成 中国新闻网 in Chinese 2013 10 04 Archived from the original on 2013 12 05 Retrieved 2013 10 09 a b 北京地铁8号线剩余段空载试运行顺利启动 中铁十六局集团有限公司 in Chinese 2021 09 23 Archived from the original on 2021 09 26 Retrieved 2021 09 26 直到2016年11月才得以实现进场 并开始了长达5年的施工建设 代表建议 高峰期地铁公交执行联乘优惠 2023 01 16 下一步 昌平线 8号线也有望贯通运行 为乘客节省换乘时间 北京市人民政府关于印发 北京市 十四五 时期交通发展建设规划 的通知 Archived from the original on 2022 05 07 北京中日创新合作示范区 PDF p 4 Archived from the original PDF on 2022 02 11 两条地铁线路年内将 升级 news sina cn in Chinese 2018 10 18 Archived from the original on 2019 10 08 Retrieved 2019 10 08 北京7条计划年底通车地铁线路全部空载试运行 新京报 in Chinese 2021 09 16 Archived from the original on 2021 09 16 Retrieved 2021 09 26 北京三条地铁新线今日14时开通 北京西站通地铁 腾讯新闻 in Chinese 2011 12 31 Archived from the original on 2012 01 19 Retrieved 2013 05 09 Sources edit北京市城市轨道交通近期建设规划调整 2007 2016年 通过批准 中华人民共和国国家发展和改革委员会 in Chinese 2012 11 16 Archived from the original on 2012 11 19 Retrieved 2012 11 16 地铁8号线三期拟年内开工 京华时 in Chinese 2011 04 17 Archived from the original on 2013 10 31 Retrieved 2012 10 27 External links edit nbsp Wikimedia Commons has media related to Line 8 Beijing Subway Official Beijing Subway Website Line 8 Phase II Information Page at the Beijing Infrastructure Investment Co Ltd permanent dead link Retrieved from https en wikipedia org w index php title Line 8 Beijing Subway amp oldid 1222560522, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.