fbpx
Wikipedia

Kyushu Shinkansen

The Kyushu Shinkansen (九州新幹線, Kyūshū Shinkansen) is a Japanese Shinkansen high-speed railway network. It is an extension of the San'yō Shinkansen from Honshu connecting the city of Fukuoka (Hakata Station) in the north of Japan's Kyushu Island to the city of Kagoshima (Kagoshima-Chuo Station) in the south. The line runs parallel to the existing Kagoshima Main Line and is operated by Kyushu Railway Company (JR Kyushu).

Kyushu Shinkansen
800 Series Shinkansen Tsubame at Shin-Minamata Station in November 2004
Overview
Native name九州新幹線
Owner JRTT
LocaleKyushu (Fukuoka, Saga, Nagasaki[partial], Kumamoto, and Kagoshima Prefectures)
Termini
Stations12 (Kagoshima Route)
5 (Nagasaki Route)
Color on map     Red (#FF0000)
Service
TypeHigh-speed rail (Shinkansen)
SystemShinkansen
ServicesMizuho, Sakura, Tsubame
Operator(s) JR Kyushu
Depot(s)Kumamoto
Sendai
Omura (Western Kyushu Route)
Rolling stock800 series
N700-7000/8000 series
History
Opened13 March 2004; 19 years ago (2004-03-13) (Kagoshima-Chuo to Shin-Yatsuhiro)
12 March 2011; 12 years ago (2011-03-12) (The entire Kagoshima Route)
23 September 2022; 5 months ago (2022-09-23) (Nagasaki to Takeo Onsen)
Unknown (The Entire Nagasaki Route)
Technical
Line length256.8 km (159.6 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Minimum radius4,000 m (2.5 mi; 13,000 ft)
Electrification25 kV 60 Hz AC (overhead line)
Operating speed260 km/h (162 mph)
Route map

The southernmost 127 km (79 mi) section of the track was constructed first, opening on 13 March 2004. The dual-track offered a significant improvement in transit time over the equivalent single-track section of the Kagoshima Main Line, despite the need for passengers to change to a Relay Tsubame narrow gauge train at Shin-Yatsushiro, and the remainder of the journey to Hakata Station. The northernmost 130 km (81 mi) section opened on 12 March 2011, enabling through-services to Shin-Osaka (and with an interchange, to Tokyo). However, opening ceremonies were cancelled due to the 2011 Tōhoku earthquake and tsunami,[1]

The Nishi Kyushu Shinkansen route to Nagasaki (from Takeo-Onsen to Nagasaki) opened on 23 September 2022.[2][3] A cross-platform interchange to a relay service called 'Relay Kamome' at Takeo-Onsen station offers a connection to Hakata.[4][5][6]

Kagoshima Route

Construction of the Kagoshima Route (鹿児島ルート) began in 1991, and the first segment between Kagoshima and Shin-Yatsushiro opened on 13 March 2004. This initial section cut travel times between the two cities from 2 hours and 10 minutes to 35 minutes and reduced the time between Hakata and Kagoshima from 4 hours to 2 hours. When the entire line was completed, the travel time from Hakata to Kagoshima was further reduced to about an hour and 20 minutes. As of 2012, the maximum line speed is 260 km/h (160 mph) between Hakata and Kagoshima.[7] Like all Shinkansen lines, the Kyushu Shinkansen is standard gauge.[citation needed]

The line's Sakura and Mizuho services often operate through to Shin-Ōsaka Station via the San'yō Shinkansen. All-stop trains are named Tsubame ("Swallow"), the name of the former Hakata-Kagoshima limited express service, and are solely truncated to the Kyushu Shinkansen.

In September 2011, six months after the line's completion, JR Kyushu reported a year-over-year increase in ridership of 64% to the southern part of Kyushu (between Kumamoto and Kagoshima), easily surpassing the 40% increase projected by the company. By the first anniversary, ridership had increased, mainly from tourists from Kansai and Chugoku.[8] In northern Kyushu, where there is fierce competition with conventional JR rapid service, the private Nishi-Nippon Railroad, and expressway buses, Shinkansen ridership increased by only 38% (compared to the now-discontinued conventional express Relay Tsubame), falling short of estimates.[9]

Nishi Kyushu (Nagasaki) Route

A Shinkansen line from Fukuoka to Nagasaki, initially known as the Nagasaki Shinkansen (長崎新幹線), was laid out in the 1973 Basic Plan. Renamed as the Nagasaki Route (長崎ルート), then changed to the Nishi Kyushu Route (西九州ルート, Nishi Kyūshū rūto) in 1995, the segment between Takeo-Onsen and Nagasaki, Nishi Kyushu Shinkansen, opened for service on 23 September 2022.[10][11]

Other planned routes

According to the Shinkansen Basic Plan laid out in 1973, two other routes would accompany the Kagoshima and West Kyushu (Nagasaki) routes: the East Kyushu Shinkansen, from Hakata to Kagoshima-Chūō via Ōita and Miyazaki, paralleling the Nippō Main Line; and the Trans-Kyushu Shinkansen, linking Kumamoto and Ōita, and connecting with the also-planned Shikoku Shinkansen to Matsuyama, Takamatsu and Osaka. These plans have been shelved indefinitely and are unlikely to be reconsidered until the Shinkansen lines that are already under construction are completed.

Station list

  • Tsubame trains stop at all stations. For Mizuho and Sakura, all trains stop at stations marked "●", while some trains stop at those marked "▲". All trains stop at Hakata, Kumamoto and Kagoshima-Chūō.

Legend:

All trains stop
Some trains stop
All trains pass
Station Japanese Distance from
Hakata (km)
Distance from
Shin-Ōsaka (km)
Mizuho Sakura Tsubame Transfers Location
Kagoshima Route
Currently operational
Through services towards Shin-Ōsaka via the Sanyō Shinkansen[12]
Hakata 博多 0.0 553.7 Hakata,
Fukuoka City
Fukuoka
Shin-Tosu 新鳥栖 26.3 580.0 Tosu Saga
Kurume 久留米 32.0 585.7 Kurume Fukuoka
Chikugo-Funagoya 筑後船小屋 47.9 601.6
  •      Kagoshima Main Line
Chikugo
Shin-Ōmuta 新大牟田 59.7 613.4 Ōmuta
Shin-Tamana 新玉名 76.3 630.0 Tamana Kumamoto
Kumamoto 熊本 98.2 651.9
Nishi-ku, Kumamoto
Shin-Yatsushiro 新八代 130.0 683.7
  •      Kagoshima Main Line
Yatsushiro
Shin-Minamata 新水俣 172.8 726.5 Minamata
Izumi 出水 188.8 742.5 Hisatsu Orange Railway Line Izumi Kagoshima
Sendai 川内 221.5 775.2
Satsumasendai
Kagoshima-Chūō 鹿児島中央 256.8 810.5
Kagoshima

Services

Kagoshima route

Services not leaving the Kyushu Shinkansen are operated by 6-car 800 Series trains, with a maximum speed of 260 km/h (160 mph).[7] The trains were developed by Hitachi, and based on the 700 series trains already in service on the Tokaido/Sanyo Shinkansen line.

8-car N700-7000 and N700-8000 series trains are used on through-running services between Shin-Osaka and Kagoshima-Chūō. The first set (S1) was delivered to Hakata Depot in October 2008.[13]

Three services operate on the line, in order of speed: Mizuho, Sakura, and Tsubame. The Mizuho makes two return trips between Shin-Osaka and Kagoshima-Chūō during the morning hours, and two return trips during the evening, with an end-to-end journey time of 3 hours 45 minutes. Sakura services run once per hour throughout the day between Shin-Osaka and Kagoshima-Chūō making additional stops, with an end-to-end travel time of 4 hours 10 minutes. There are also one to two Sakura services every hour between Hakata and either Kumamoto or Kagoshima-Chūō. Tsubame trains operate the all-stations shuttle service between Hakata and Kumamoto once to twice per hour, with some services operating to/from Kagoshima-Chūō.[14] Mizuho trains can not be used by foreign passengers traveling with a Japan Rail Pass.

Nishi Kyushu route

Services are operated by 6-car N700S series trains with a service type named Kamome.[15]

Incidents

2016 Kumamoto earthquakes

On the evening of 14 April 2016, the entire length of the Kagoshima Route was shut down after the first of two powerful earthquakes struck Kumamoto prefecture. There was extensive damage along the route, including cracks in elevated support structures at 25 locations[16] and collapsed sound insulation walls in nearly 80 locations.[17]

An 800 series train was derailed near Kumamoto Station after the first tremor, while the train was deadheading. On 18 April, JR Kyushu began attempts to return the derailed train to the tracks.[16]

On 27 April 2016, the line reopened with reduced speed and service frequency.[18]

2021 Attempted arson

On the morning of 8 November 2021, a 69-year old man from Fukuoka attempted to set a Sakura Shinkansen service on fire.[19] The train, Sakura #401, was travelling between Kumamoto and Shin-Yatsuhiro stations at the time of the attempted arson. No casualties were reported. According to the perpetrator, the motive of the incident was to replicate the October 2021 Tokyo attack.

References

  1. ^ [The entire Kyushu Shinkansen line opens Hakata-Kagoshima Chuo 38 years after the plan was decided]. nishinippon.co.jp (in Japanese). 13 March 2011. Archived from the original on 14 March 2011. Retrieved 11 June 2022.
  2. ^ "Construction of new bullet train route starts in Kyushu : National : …". Daily Yomiuri Online. 18 February 2013. Archived from the original on 18 February 2013. Retrieved 11 June 2022.
  3. ^ [Construction plan / route] (in Japanese). Pref.nagasaki.jp. Archived from the original on 27 January 2012. Retrieved 11 June 2022.
  4. ^ . railwaygazette.com. 29 October 2020. Archived from the original on 1 November 2020. Retrieved 11 June 2022.
  5. ^ 2022年度秋頃に西九州新幹線が開業します!列車名「かもめ」 [The West Kyushu Shinkansen will open in the fall of 2022! Train name "Kamome"]. jrkyushu.co.jp (in Japanese). Retrieved 11 June 2022.
  6. ^ "JR初の新型特急「783系」は型破りな異端児だった 「ハイパーサルーン」の愛称でJR九州の主力担う" [JR's first new limited express "783 series" is the mainstay of JR Kyushu under the nickname of "Hyper Saloon", which was an unconventional heretic.]. Toyokeizai Online (in Japanese). 30 July 2021. Retrieved 11 June 2022.
  7. ^ a b "300km/hのトップランナー" [300 km/h Top Runners]. Japan Railfan Magazine (in Japanese). Vol. 52, no. 612. Japan: Kōyūsha Co., Ltd. April 2012. p. 14.
  8. ^ . japantimes.co.jp. 13 March 2012. Archived from the original on 14 March 2022. Retrieved 11 June 2022.
  9. ^ Tsuchiya, Ryō (12 September 2011), , The Asahi Shimbun (in Japanese), archived from the original on 26 September 2011, retrieved 12 September 2011
  10. ^ [Kyushu Shinkansen Nagasaki route]. nagasaki-np.co.jp. Nagasaki-np.co.jp. 9 October 2007. Archived from the original on 31 August 2008. Retrieved 11 June 2022.
  11. ^ [About the opening date of the West Kyushu Shinkansen] (PDF). jrkyushu.co.jp (in Japanese). 2 February 2022. Archived from the original (PDF) on 1 May 2022. Retrieved 11 June 2022.
  12. ^ Only Mizuho and Sakura services run through to the Sanyō Shinkansen.
  13. ^ 山陽・九州新幹線直通用車両 量産先行車 [Sanyo / Kyushu Shinkansen direct train vehicle mass production precedent vehicle]. Japan Railfan Magazine (in Japanese). Japan. 2008. pp. 64–67.
  14. ^ (Press release) (in Japanese). JR Kyushu. 17 December 2010. Archived from the original on 20 December 2010. Retrieved 19 December 2010.
  15. ^ 西九州新幹線の最高速度、開通後の時短効果は? もしかして料金が高くなってしまうのでは……? [What is the maximum speed of the West Kyushu Shinkansen and the time saving effect after opening? Maybe the price will be higher?]. nlab.itmedia.co.jp (in Japanese). 25 August 2021. Retrieved 11 June 2022.
  16. ^ a b . asahi.com. The Asahi Shimbun. 18 April 2016. Archived from the original on 18 April 2016. Retrieved 11 June 2022.
  17. ^ "Reopening of Kyushu Shinkansen still a long way off". Mainichi Daily News. Mainichi Japan. 19 April 2016. Retrieved 19 April 2016.
  18. ^ . NHK WORLD. NHK. Archived from the original on 30 April 2016. Retrieved 11 June 2022.
  19. ^ "Man Arrested after Setting Fire on Kyushu Shinkansen Train". nippon.com. 8 November 2021. Retrieved 6 September 2022.

External links

  • Official website (in Japanese)

kyushu, shinkansen, 九州新幹線, kyūshū, shinkansen, japanese, shinkansen, high, speed, railway, network, extension, shinkansen, from, honshu, connecting, city, fukuoka, hakata, station, north, japan, kyushu, island, city, kagoshima, kagoshima, chuo, station, south,. The Kyushu Shinkansen 九州新幹線 Kyushu Shinkansen is a Japanese Shinkansen high speed railway network It is an extension of the San yō Shinkansen from Honshu connecting the city of Fukuoka Hakata Station in the north of Japan s Kyushu Island to the city of Kagoshima Kagoshima Chuo Station in the south The line runs parallel to the existing Kagoshima Main Line and is operated by Kyushu Railway Company JR Kyushu Kyushu Shinkansen800 Series Shinkansen Tsubame at Shin Minamata Station in November 2004OverviewNative name九州新幹線OwnerJRTTLocaleKyushu Fukuoka Saga Nagasaki partial Kumamoto and Kagoshima Prefectures TerminiHakataKagoshima Chuō Nagasaki Western Kyushu Route Stations12 Kagoshima Route 5 Nagasaki Route Color on map Red FF0000 ServiceTypeHigh speed rail Shinkansen SystemShinkansenServicesMizuho Sakura TsubameOperator s JR KyushuDepot s KumamotoSendaiOmura Western Kyushu Route Rolling stock800 seriesN700 7000 8000 seriesHistoryOpened13 March 2004 19 years ago 2004 03 13 Kagoshima Chuo to Shin Yatsuhiro 12 March 2011 12 years ago 2011 03 12 The entire Kagoshima Route 23 September 2022 5 months ago 2022 09 23 Nagasaki to Takeo Onsen Unknown The Entire Nagasaki Route TechnicalLine length256 8 km 159 6 mi Track gauge1 435 mm 4 ft 8 1 2 in standard gaugeMinimum radius4 000 m 2 5 mi 13 000 ft Electrification25 kV 60 Hz AC overhead line Operating speed260 km h 162 mph Route mapThe southernmost 127 km 79 mi section of the track was constructed first opening on 13 March 2004 The dual track offered a significant improvement in transit time over the equivalent single track section of the Kagoshima Main Line despite the need for passengers to change to a Relay Tsubame narrow gauge train at Shin Yatsushiro and the remainder of the journey to Hakata Station The northernmost 130 km 81 mi section opened on 12 March 2011 enabling through services to Shin Osaka and with an interchange to Tokyo However opening ceremonies were cancelled due to the 2011 Tōhoku earthquake and tsunami 1 The Nishi Kyushu Shinkansen route to Nagasaki from Takeo Onsen to Nagasaki opened on 23 September 2022 2 3 A cross platform interchange to a relay service called Relay Kamome at Takeo Onsen station offers a connection to Hakata 4 5 6 Contents 1 Kagoshima Route 2 Nishi Kyushu Nagasaki Route 3 Other planned routes 4 Station list 5 Services 5 1 Kagoshima route 5 2 Nishi Kyushu route 6 Incidents 6 1 2016 Kumamoto earthquakes 6 2 2021 Attempted arson 7 References 8 External linksKagoshima Route EditConstruction of the Kagoshima Route 鹿児島ルート began in 1991 and the first segment between Kagoshima and Shin Yatsushiro opened on 13 March 2004 This initial section cut travel times between the two cities from 2 hours and 10 minutes to 35 minutes and reduced the time between Hakata and Kagoshima from 4 hours to 2 hours When the entire line was completed the travel time from Hakata to Kagoshima was further reduced to about an hour and 20 minutes As of 2012 the maximum line speed is 260 km h 160 mph between Hakata and Kagoshima 7 Like all Shinkansen lines the Kyushu Shinkansen is standard gauge citation needed The line s Sakura and Mizuho services often operate through to Shin Ōsaka Station via the San yō Shinkansen All stop trains are named Tsubame Swallow the name of the former Hakata Kagoshima limited express service and are solely truncated to the Kyushu Shinkansen In September 2011 six months after the line s completion JR Kyushu reported a year over year increase in ridership of 64 to the southern part of Kyushu between Kumamoto and Kagoshima easily surpassing the 40 increase projected by the company By the first anniversary ridership had increased mainly from tourists from Kansai and Chugoku 8 In northern Kyushu where there is fierce competition with conventional JR rapid service the private Nishi Nippon Railroad and expressway buses Shinkansen ridership increased by only 38 compared to the now discontinued conventional express Relay Tsubame falling short of estimates 9 Nishi Kyushu Nagasaki Route EditMain article Nishi Kyushu Shinkansen A Shinkansen line from Fukuoka to Nagasaki initially known as the Nagasaki Shinkansen 長崎新幹線 was laid out in the 1973 Basic Plan Renamed as the Nagasaki Route 長崎ルート then changed to the Nishi Kyushu Route 西九州ルート Nishi Kyushu ruto in 1995 the segment between Takeo Onsen and Nagasaki Nishi Kyushu Shinkansen opened for service on 23 September 2022 10 11 Other planned routes EditAccording to the Shinkansen Basic Plan laid out in 1973 two other routes would accompany the Kagoshima and West Kyushu Nagasaki routes the East Kyushu Shinkansen from Hakata to Kagoshima Chuō via Ōita and Miyazaki paralleling the Nippō Main Line and the Trans Kyushu Shinkansen linking Kumamoto and Ōita and connecting with the also planned Shikoku Shinkansen to Matsuyama Takamatsu and Osaka These plans have been shelved indefinitely and are unlikely to be reconsidered until the Shinkansen lines that are already under construction are completed Station list EditSee also Nishi Kyushu Shinkansen Stations Tsubame trains stop at all stations For Mizuho and Sakura all trains stop at stations marked while some trains stop at those marked All trains stop at Hakata Kumamoto and Kagoshima Chuō Legend All trains stop Some trains stop All trains passStation Japanese Distance fromHakata km Distance fromShin Ōsaka km Mizuho Sakura Tsubame Transfers LocationKagoshima RouteCurrently operational Through services towards Shin Ōsaka via the Sanyō Shinkansen 12 Hakata 博多 0 0 553 7 San yō Shinkansen through service Hakata Minami Line Kagoshima Main Line Fukuhoku Yutaka Line Kukō Line Hakata Fukuoka City FukuokaShin Tosu 新鳥栖 26 3 580 0 Nagasaki Line Tosu SagaKurume 久留米 32 0 585 7 Kagoshima Main Line Kyudai Main Line Kurume FukuokaChikugo Funagoya 筑後船小屋 47 9 601 6 Kagoshima Main Line ChikugoShin Ōmuta 新大牟田 59 7 613 4 ŌmutaShin Tamana 新玉名 76 3 630 0 Tamana KumamotoKumamoto 熊本 98 2 651 9 Hōhi Main Line Kagoshima Main Line Kumamoto City Tram Kumamoto Ekimae Nishi ku KumamotoShin Yatsushiro 新八代 130 0 683 7 Kagoshima Main Line YatsushiroShin Minamata 新水俣 172 8 726 5 Hisatsu Orange Railway Line MinamataIzumi 出水 188 8 742 5 Hisatsu Orange Railway Line Izumi KagoshimaSendai 川内 221 5 775 2 Hisatsu Orange Railway Line Kagoshima Main Line SatsumasendaiKagoshima Chuō 鹿児島中央 256 8 810 5 Ibusuki Makurazaki Line Kagoshima Main Line Kagoshima City Tram Kagoshima Chuō Ekimae KagoshimaServices EditKagoshima route Edit Services not leaving the Kyushu Shinkansen are operated by 6 car 800 Series trains with a maximum speed of 260 km h 160 mph 7 The trains were developed by Hitachi and based on the 700 series trains already in service on the Tokaido Sanyo Shinkansen line 8 car N700 7000 and N700 8000 series trains are used on through running services between Shin Osaka and Kagoshima Chuō The first set S1 was delivered to Hakata Depot in October 2008 13 Three services operate on the line in order of speed Mizuho Sakura and Tsubame The Mizuho makes two return trips between Shin Osaka and Kagoshima Chuō during the morning hours and two return trips during the evening with an end to end journey time of 3 hours 45 minutes Sakura services run once per hour throughout the day between Shin Osaka and Kagoshima Chuō making additional stops with an end to end travel time of 4 hours 10 minutes There are also one to two Sakura services every hour between Hakata and either Kumamoto or Kagoshima Chuō Tsubame trains operate the all stations shuttle service between Hakata and Kumamoto once to twice per hour with some services operating to from Kagoshima Chuō 14 Mizuho trains can not be used by foreign passengers traveling with a Japan Rail Pass Nishi Kyushu route Edit Main article Nishi Kyushu Shinkansen Services Services are operated by 6 car N700S series trains with a service type named Kamome 15 Incidents Edit2016 Kumamoto earthquakes Edit Main article 2016 Kumamoto earthquakes On the evening of 14 April 2016 the entire length of the Kagoshima Route was shut down after the first of two powerful earthquakes struck Kumamoto prefecture There was extensive damage along the route including cracks in elevated support structures at 25 locations 16 and collapsed sound insulation walls in nearly 80 locations 17 An 800 series train was derailed near Kumamoto Station after the first tremor while the train was deadheading On 18 April JR Kyushu began attempts to return the derailed train to the tracks 16 On 27 April 2016 the line reopened with reduced speed and service frequency 18 2021 Attempted arson Edit On the morning of 8 November 2021 a 69 year old man from Fukuoka attempted to set a Sakura Shinkansen service on fire 19 The train Sakura 401 was travelling between Kumamoto and Shin Yatsuhiro stations at the time of the attempted arson No casualties were reported According to the perpetrator the motive of the incident was to replicate the October 2021 Tokyo attack References Edit 九州新幹線全線開通 博多 鹿児島中央 計画決定から38年 西日本新聞 The entire Kyushu Shinkansen line opens Hakata Kagoshima Chuo 38 years after the plan was decided nishinippon co jp in Japanese 13 March 2011 Archived from the original on 14 March 2011 Retrieved 11 June 2022 Construction of new bullet train route starts in Kyushu National Daily Yomiuri Online 18 February 2013 Archived from the original on 18 February 2013 Retrieved 11 June 2022 建設計画 ルート Construction plan route in Japanese Pref nagasaki jp Archived from the original on 27 January 2012 Retrieved 11 June 2022 Shorter N700S to serve Nagasaki railwaygazette com 29 October 2020 Archived from the original on 1 November 2020 Retrieved 11 June 2022 2022年度秋頃に西九州新幹線が開業します 列車名 かもめ The West Kyushu Shinkansen will open in the fall of 2022 Train name Kamome jrkyushu co jp in Japanese Retrieved 11 June 2022 JR初の新型特急 783系 は型破りな異端児だった ハイパーサルーン の愛称でJR九州の主力担う JR s first new limited express 783 series is the mainstay of JR Kyushu under the nickname of Hyper Saloon which was an unconventional heretic Toyokeizai Online in Japanese 30 July 2021 Retrieved 11 June 2022 a b 300km hのトップランナー 300 km h Top Runners Japan Railfan Magazine in Japanese Vol 52 no 612 Japan Kōyusha Co Ltd April 2012 p 14 Shinkansen spurs Kyushu Business japantimes co jp 13 March 2012 Archived from the original on 14 March 2022 Retrieved 11 June 2022 Tsuchiya Ryō 12 September 2011 南部好調 北部で苦戦 九州新幹線 全線開通から半年 南部好調 北部で苦戦 九州新幹線 全線開通から半年 The Asahi Shimbun in Japanese archived from the original on 26 September 2011 retrieved 12 September 2011 九州新幹線長崎ルート Kyushu Shinkansen Nagasaki route nagasaki np co jp Nagasaki np co jp 9 October 2007 Archived from the original on 31 August 2008 Retrieved 11 June 2022 西九州新幹線の開業日について About the opening date of the West Kyushu Shinkansen PDF jrkyushu co jp in Japanese 2 February 2022 Archived from the original PDF on 1 May 2022 Retrieved 11 June 2022 Only Mizuho and Sakura services run through to the Sanyō Shinkansen 山陽 九州新幹線直通用車両 量産先行車 Sanyo Kyushu Shinkansen direct train vehicle mass production precedent vehicle Japan Railfan Magazine in Japanese Japan 2008 pp 64 67 平成23年春ダイヤ改正 Press release in Japanese JR Kyushu 17 December 2010 Archived from the original on 20 December 2010 Retrieved 19 December 2010 西九州新幹線の最高速度 開通後の時短効果は もしかして料金が高くなってしまうのでは What is the maximum speed of the West Kyushu Shinkansen and the time saving effect after opening Maybe the price will be higher nlab itmedia co jp in Japanese 25 August 2021 Retrieved 11 June 2022 a b Pictures reveal serious damage to Shinkansen in Kyushu asahi com The Asahi Shimbun 18 April 2016 Archived from the original on 18 April 2016 Retrieved 11 June 2022 Reopening of Kyushu Shinkansen still a long way off Mainichi Daily News Mainichi Japan 19 April 2016 Retrieved 19 April 2016 Kyushu Shinkansen resumes after quakes News NHK WORLD English NHK WORLD NHK Archived from the original on 30 April 2016 Retrieved 11 June 2022 Man Arrested after Setting Fire on Kyushu Shinkansen Train nippon com 8 November 2021 Retrieved 6 September 2022 External links Edit Wikimedia Commons has media related to Kyushu Shinkansen Official website in Japanese Retrieved from https en wikipedia org w index php title Kyushu Shinkansen amp oldid 1136544680, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.