Johor–Singapore Causeway

The Johor–Singapore Causeway is a 1.056-kilometre (0.66 mi) causeway consisting of a combined railway and motorway bridge that links the city of Johor Bahru in Malaysia across the Straits of Johor to the district and town of Woodlands in Singapore. It was the only land connection between the two from 1928 until 1998, when the Tuas Second Link opened.

Johor–Singapore Causeway
As seen from Johor in 2023
Coordinates1°27′10″N 103°46′09″E / 1.452772°N 103.769153°E / 1.452772; 103.769153
Carries
CrossesStraits of Johor
LocaleJohor Bahru, Johor, Malaysia, Bangunan Sultan Iskandar
Woodlands, Singapore, Woodlands Checkpoint
Official nameJohor–Singapore Causeway
Maintained byPLUS Expressways (Malaysia)
Land Transport Authority (Singapore)
Characteristics
DesignCauseway
MaterialRubble
Total length1 km (0.62 mi) (Causeway) 2.4 km (1.5 mi) (Distance between both checkpoints)
Rail characteristics
No. of tracks1
Track gauge1,000 mm (3 ft 3+38 in)
ElectrifiedNo
History
Construction startAugust 1919
Construction end11 June 1924
Construction cost17 million Straits dollars (1918)
Opened28 June 1924
Inaugurated28 June 1924
Location
Johor–Singapore Causeway
Chinese name
Chinese新柔長堤
Transcriptions
Standard Mandarin
Hanyu PinyinXīn róu zhǎng dī
Malay name
MalayTambak Johor–Singapura
Tamil name
Tamilஜோகூர்-சிங்கப்பூர் காஸ்வே
Jōkūr-Ciṅkappūr kāsvē

The distance between Singapore's Woodlands Checkpoint and Malaysia's Bangunan Sultan Iskandar is approximately 2.4 km (1.5 mi). The causeway also serves as a water pipeline between the two countries.

It is one of the busiest border crossings in the world, with 350,000 travellers daily.[1][2] Many Malaysians continue to live in Malaysia and commute daily (with either public or private motorised transportation) to Singapore, enduring extremely long journey times with extreme heavy traffic congestion on weekdays.[3][4] The border is handled by immigration authorities of both countries at the Southern Integrated Gateway (Malaysia) and Woodlands Checkpoint (Singapore). Since 26 March 2022, both countries have permitted pedestrians to walk along the Causeway by foot,[5][6] but this is not common; pedestrian walking is generally limited to instances of standstill vehicular congestion on the Causeway which prevents passengers from boarding regular-hour cross-border public buses after clearing immigration.

History edit

 
Johor-Singapore Causeway in 2020, at the start of the COVID-19 pandemic.

Construction and opening edit

In the late 19th century, Singapore was transformed into a major international trading port[7] and was a steamship coaling station.[8] At the turn of the 20th century, British Malaya was transformed into a major producer and exporter of raw materials such as tin, rubber, gambier, and pepper for international markets.[9] The connection to Singapore from Johor was through a ferry link. Railways across the peninsula, and in Singapore from the ferry point to Tank Road in the south of Singapore completed the trade transport network within British Malaya.[10] From June 1909 onward, goods were transported on wagon-ferry,[11] while passengers were transported on passenger ferries (3 ferries from 1912 onward, 2 ferries before 1912).[12] The wagon-ferry could accommodate 6 wagons at a time,[11] while the passenger ferries had a capacity of about 160 each.[12] As international trade demands grew, it was necessary to operate the ferry link round-the-clock in 1911 to bring the commodities from British Malaya into Singapore to be transshipped.[13] Additional ferry steamers were constructed, however they soon were overloaded. The passenger steamers often had to exceed its designed limits, carrying "as many as 250 passengers".[13] Additionally, the increasing costs of the maintaining the ferries were a concern on the long-term viability of the ferries. The annual expenditure in 1912 was estimated to be 53,750 Straits dollars (£1.8 million in 2000).[14]

In 1917, Federated Malay States (FMS) Director of Public Works, W. Eyre Kenny's proposal to build a rubble causeway gained support among the Federal Council of the FMS.[14]His suggestion was to have the foundation to be laid in the soft "white and pink clays" at the proposed site, have an opening span for ships to be allowed through the bridge, and have the rubble sourced from the quarries at Pulau Ubin and Bukit Timah as there were ample granite being sold at reasonable prices. Among the alternatives to the Causeway design were a bridge or upgrading the wagon-ferries and train ferries.[15] The bridge proposal wasn't followed through because the Straits was too deep, going at 70 feet at some points and foundations would be lacking. An opening span would be required, and the bridge would require significant maintenance. The train ferries to replace the wagon-ferries would be too expensive as well.

The causeway proposal was accepted by FMS Chief Secretary and Straits Settlements Colonial Secretary, Edward Lewis Brockman, and Straits Settlements Governor and FMS High Commissioner, Sir Arthur Henderson Young. In 1917, Governor Young cited the six-fold increase in railway receipts in Singapore from 82,000 Straits dollars (£2.7 million in 2000) in 1912 to 480,000 Straits dollars (£11.8 million in 2000) in 1916 as an evidence to the rapid growth of the railway traffic, and thus the FMS Railway Administration could not defer any longer on the improvement works required.[16] The British government had consultant engineers Messrs Coode, Fitzmaurice, Wilson & Mitchell of Westminster to prepare plans for the eventual Causeway.[15] The plans were presented to the FMS, Straits Settlements and Johore governments in 1918. The plan was approved in 1919 after the sharing of the costs of constructing the Causeway, was negotiated between the three governments.[17]

By the engineering standards of its time, the Causeway was a technically challenging project.[15] It was also one of the largest engineering projects in Malaya then.[15] Many considerations were factored for the finalised design. Tidal studies were carried out prior to the construction and design features were incorporated in consideration to the structure itself, its surroundings, and continued ship passage through the Straits.[18] The orientation also factored in the current railway terminations on both shores. The design would be 3,465 feet long, 60 feet wide, sufficient enough for two lines of metre-gauge railway tracks and a 26 foot wide roadway, with space reserved for laying of water mains at a later date. Floodgates were incorporated at the lock to control the tides.[19]

The construction contract was awarded to Messrs Topham, Jones & Railton Ltd of London on 30 June 1919. The engineering firm had completed major works at the dockyards and harbour in Singapore, and had necessary work capacity and experience in the area available.[15] The contract allowed the firm a period of 5 years and 3 months to complete the construction. Construction started in August 1919, starting with the lock at Johore's bank. Sequence of construction would allow minimal disruption to existing shipping or ferrying services.

On 24 April 1920, a ceremony was held to mark the laying of the foundation stone.[20] The Johore Sultan, Sultan Ibrahim, the newly appointed Governor of Straits Settlements and High Commissioner of the FMS, Sir Laurence Guillemard, his wife among other invited guests graced the ceremony on board Sea Belle, a sea yacht, in the middle of the Straits. The ceremony commenced with prayers and Governor Guillemard was invited to pull a silken cord which activated machinery to empty a load of rubble from a barge into the water. Sirens from the surrounding ships then greeted the now emptied barge. A second barge of rubble was emptied as well with air tolak bala and air doa selamat being poured into the Straits. A gun salute of five rounds fired from Bukit Timbalan marked the end of the ceremony.

British Malaya was impacted by the Depression of 1920–21 as she was a primary source for many commodities internationally. The constructions process was thus under intense public scrutiny and criticism.[21][22][23][24] Additionally, the British Admiralty would like to have the locks be widened and deepened to accommodate British warships. However, it was found to be difficult to engineer and was very costly. The FMS and Straits Settlements government thus had considered dropping the project.[25]

In January 1923, the lock was open for local sea craft. On 1 October, the partially completed Causeway was officially opened to passenger traffic. The Causeway was officially completed in 1924 when the finishing touches to the lock was done. With an estimated cost 17 million Straits dollars (£277 million in 2000),[26] over 2,300 staff and labourers were employed to during the course of the construction. An opening ceremony was conducted in Johore on 28 June 1924. The Johore Sultan and Governor Guillemard graced the ceremony which a ribbon cutting ceremony was held. A special holiday was declared in Johore for more of the public to take part in the festivities. The opening marked a new era which uninterrupted communications between Singapore and Bangkok now exists.[27] The administration of the Causeway was formalised in 1925 with the formation of the Johore Causeway Control Committee. Under FMSR, the committee was given full autonomy to oversee the efficient management and maintenance of the Causeway.[28]

World War II and post-war period edit

 
 
Left: The severed causeway on the eve of Japanese invasion in 1942. Right: The causeway just after the Japanese surrender in 1945.

As the Japanese invasion of Malaya drew to a close, the Allied forces under the command of Lieutenant-General Arthur Percival began retreating from their positions in Johore, crossing the Causeway in the early hours of 31 January 1942. The Causeway was then blown up with two explosions. The first wrecked the lock's lift-bridge, while the second caused a 70 feet wide gap in the Causeway and severed the water-carrying pipelines as well. Though this action forced the Japanese to cross the Straits elsewhere, they soon took the city and constructed a girder bridge over the gap.[29]

The bridge remained in its war-torn state until the return of the British after the surrender of the Imperial Japanese forces. The girder bridge was replaced with two Bailey bridge extensions in February 1946, with the rubble of the demolished lift bridge cleared and the railway tracks re-laid. Reconstruction plans of lock channel and lift bridge were looked at in the late 1940s, but were subsequently shelved since demand for water passage through the Causeway wasn't substantial enough to justify the reconstruction costs.

During the Malayan Emergency of 1948 to 1960, as a strategic conduit between Singapore and Malaya, travellers were subjected to stringent security measures to impede the movement of enemy combatants and weapons between Singapore and Malaya. The checks, together with attacks on railway lines further aggravated the traffic congestion on the Causeway. Additionally, the Causeway would be further congested during public holidays and festive seasons.

Independence and border control edit

 
Travelling on the Causeway in a bus in 1973.

The Causeway first became an international border when the Federation of Malaya achieved independence on 31 August 1957. Plans were made to introduce immigration controls at the Causeway, however, a system of strict identity card checks was implemented instead. The Causeway became an internal state border when the Federation of Malaya, Singapore, Sabah and Sarawak merged to form Malaysia on 16 September 1963.

On 22 July 1964, as part of a curfew after racial riots in Singapore, the Causeway was closed to travellers without police permission. It was reopened during non-curfew hours the following day and normal traffic had resumed by 26 July.

After Singapore's separation from Malaysia on 9 August 1965, the Causeway became the border connector between the two countries. Immigration checkpoints were built on both sides, with passport controls implemented on the Singaporean side from June 1967 and on the Malaysian side from September.

Toll collection at the Causeway checkpoint began on 1 November 1984, with ten lanes in total. The toll booths were built by the Malaysian Highway Authority.[30] By December, over S$384,000 worth of toll money were collected. The toll collection reduced traffic congestions in the Causeway. Toll payments were collected for the Malaysian federal government.[31]

To support the ever-increasing trade and foot traffic on the Causeway, both the Malaysian and Singapore governments carried out works to widen the Causeway multiple times as well as to improve checkpoint facilities. Singapore replaced its checkpoint in 1999, followed by Malaysia in 2008. A second border crossing bridge, the Malaysia–Singapore Second Link between Tanjung Kupang and Tuas, was completed in 1998.

 
Johor–Singapore Causeway in 2021, amidst the COVID-19 pandemic.

In response to the COVID-19 pandemic, Malaysia instituted a nationwide movement control order on 18 March 2020 and closed the country's borders, affecting hundreds of thousands of cross-border commuters between Malaysia and Singapore.[32][33] However, the flow of cargo, goods and food supplies continued.[34] On 29 November 2021, authorities of both countries eased their land border controls, and began to allow a restricted daily flow of 2,880 residents to travel between the countries by the Causeway under a vaccinated travel lane scheme via designated bus services.[1] However as the infections of the SARS-CoV-2 Omicron variant spiked, the number of travellers allowed was halved between 23 December 2021 and 20 January 2022.[2] The quota of daily passengers was increased to 3,420 on 14 March 2022.[8] From 1 April 2022, the quota was lifted with no restrictions imposed on the mode of travel across the land connections.[18][21]

Traffic volume edit

The Causeway is regularly described as one of the busiest land crossings in the world.[35][36] It has been estimated that between 250,000 - 400,000 on a typical day.[37][38]

In March 2023, it was reported that about 376,000 people crossed Singapore's land checkpoints (including both the Causeway and the Second Link) every day.[39]

Between 16 June and 18 June 2023, during the school holidays period in Singapore, it was reported that an average of 406,000 persons crossed the Causeway each day, with a peak of 430,000 crossings on 16 June 2023.[40]

On 28 March 2024, according to the Immigration and Checkpoints Authority, 510,000 people crossed the Singapore-Malaysia land borders ahead of a 3-day Good Friday weekend. This was reported to be the highest traffic at Singapore's land borders in a single day. There were continuous tailbacks at Woodlands Checkpoint throughout the day, with queues extending beyond the Seletar Expressway.[41]

Border checkpoints edit

Southern Integrated Gateway edit

 
Sultan Iskandar Building, at the northern end of the Causeway in Johor Bahru

The Southern Integrated Gateway consists of the Sultan Iskandar Building and the Johor Bahru Sentral railway station (JB Sentral).

Sultan Iskandar Building is the customs, immigration and quarantine (CIQ) complex handling road traffic and pedestrians. It was officially opened by the Malaysian Prime Minister, Abdullah Badawi on 1 December 2008 and went into full operations on 16 December 2008. The old Tanjung Puteri CIQ complex was subsequently demolished. As the new CIQ complex was located 1 km further inland from the old checkpoint, as well as the lack of a dedicated pedestrian walkway on the new access road, pedestrians are officially no longer allowed to cross the Causeway on foot, though it is tolerated during severe traffic congestion.

JB Sentral railway station is the main railway station of Johor Bahru since 21 October 2010, replacing the old Johor Bahru railway station. JB Sentral also serves as the southbound exit immigration and customs checkpoint for rail passengers heading toward Singapore.

Woodlands Checkpoint edit

 
Woodlands Checkpoint, at the southern end of the Causeway, in Singapore.

The new Woodlands Checkpoint, built partially on reclaimed land, was opened in 1999 to accommodate the increasing traffic flow and the soot which had enveloped the old customs complex over the years. The old customs complex, built in the early 1970s, at the junction between Woodlands Road and Woodlands Centre Road closed after the new checkpoint was opened in July 1999, although the motorcycle lane remained opened in the morning until 2001, and it had been reopened on 1 March 2008 for goods vehicles only.

The new checkpoint complex also houses the Woodlands Train Checkpoint, opened on 1 August 1998, as the Singapore railway border clearance facility, which was previously co-located with Malaysian immigration and customs at Tanjong Pagar railway station. The relocation to Woodlands caused disputes between the two countries, which was resolved in 2010. On 1 July 2011, Woodlands Train Checkpoint replaced Tanjong Pagar railway station as Singapore's inter-city railway station. Northbound rail passengers pass through co-located border clearance for both countries at Woodlands Train Checkpoint before boarding the train to Malaysia. Southbound rail passengers clear Malaysian exit controls at JB Sentral, and Singapore immigration and customs on arrival at Woodlands Train Checkpoint.

Attempts to have the causeway replaced edit

As far back as 1966, there were several calls by the Malaysians to remove the Causeway. In 1966, in the Johor state legislative council, the speaker said that the Causeway was "more a hindrance than anything else"[42] while a port should be built close to Johor Bahru to rejuvenate the city's economy. The state of Johor currently already has developed ports including Pasir Gudang and Tanjong Pelapas.

The second demand came in year 1986 when Israeli President Chaim Herzog visited Singapore. At that time, the Singapore Government was criticised by Malaysian politicians and the press for allowing his visit.

Under the Mahathir Mohamad administration, the Malaysian government scheduled to build a new customs, immigration and quarantine complex on a hilltop near the Johor Bahru railway station. A bridge was planned to link the new customs complex with the city square. The project was named Southern Integrated Gateway (Gerbang Selatan Bersepadu) by the government. The project was awarded to a construction company, Gerbang Perdana. During the construction, one of the two underpass channels located at the end of the old customs complex had been blocked. Roads exiting from the old customs complex have been diverted. The design envisages a re-direction of traffic flow to the new customs complex after the completion of the proposed new bridge to Singapore. The old customs complex will be torn down once the new customs complex begins operation. All this while, no agreement had been reached with the Singapore Government on replacing the causeway with a proposed new bridge.

The proposals on replacing the old causeway with a new bridge has resulted in a political rift between the two countries since the early 2000s. The Malaysian government envisioned that disagreement by Singapore to participate in the project would result in a crooked bridge above Malaysian waters with half the causeway remaining on the Singapore side. However, Singapore has hinted that it might agree to a bridge if its air force is allowed to use part of Johor's airspace. Malaysia refused the offer and negotiation is said to be still ongoing.[43]

In January 2006, Malaysia unilaterally announced that it is going ahead to build the new bridge on the Malaysian side, now referred to as scenic bridge.[44] The construction of the new scenic bridge on Malaysian side officially began on 10 March 2006, when the piling works of this bridge was completed,[45] but on 12 April 2006, construction was halted and scrapped by Mahathir's successor, Abdullah Ahmad Badawi, with growing complications in both negotiation (the conditions set by Singapore were strongly opposed by the people of Malaysia on grounds of national sovereignty) and legal matters with Singapore.[46]

In 2006, Badawi has said that "in [the] future, there won't be just one or two bridges between Malaysia and Singapore."[47] That same year however, the Sultan of Johor called for the demolition of the link, reasoning that the Causeway is undermining the state economy as it is causing a brain drain.[48][49]

Charges edit

Vehicles have to pay toll charges at both sides of the causeway. The toll plaza at the Malaysian side is operated by PLUS Expressway Berhad. In Singapore, the Vehicle Entry Permit (VEP) charges apply to cars and motorcycles that have utilised the 10-VEP free days.

See also edit

  • AH2
  • Malaysia–Singapore border
  • Øresund Bridge – between Denmark and Sweden
  • Hutchinson, F., Lin, S. and Bunnell, T. (2023) The Johor–Singapore Causeway: Celebrating and conceptualising its centenary. Journal of Southeast Asian Studies, 54(3): 355-366.

References edit

  1. ^ a b "Clearing the Crossway". 9 June 2018. from the original on 2 July 2018. Retrieved 7 February 2019.
  2. ^ a b Lim, Yan Liang (13 October 2013). "A Look at Woodlands Checkpoint". The Straits Times. from the original on 23 March 2020. Retrieved 13 June 2019.
  3. ^ "Malaysia-Singapore commute a daily grind". Nikkei Asia. from the original on 5 May 2022. Retrieved 5 May 2022.
  4. ^ "'I don't want to commute anymore': Some Malaysian workers settle in Singapore even as land border reopens". CNA. from the original on 5 May 2022. Retrieved 5 May 2022.
  5. ^ "Ministry of International Trade and Industry, Malaysia". www.facebook.com. Retrieved 5 May 2022.
  6. ^ Tan, Lester. "FAQs about Malaysia-Singapore land borders' vaccinated travel effective 1 April 2022". www.humanresourcesonline.net. from the original on 19 April 2022. Retrieved 5 May 2022.
  7. ^ Lau & Alphonso (2011), p. 23.
  8. ^ a b Baker, Jim (2008). Crossroads (2nd Edn): A Popular History of Malaysia and Singapore. Singapore: Marshall Cavendish International Asia Pte Ltd. p. 92. ISBN 9789814435482.
  9. ^ Lau & Alphonso (2011), p. 19.
  10. ^ Lau & Alphonso (2011), p. 43.
  11. ^ a b Lau & Alphonso (2011), p. 49.
  12. ^ a b Lau & Alphonso (2011), p. 36.
  13. ^ a b Lau & Alphonso (2011), p. 50.
  14. ^ a b Lau & Alphonso (2011), p. 53.
  15. ^ a b c d e "The Causeway. A great engineering work completed". Straits Times. 5 July 1924. from the original on 7 August 2021. Retrieved 24 March 2019 – via Malayan Post (via NewspaperSG).
  16. ^ Lau & Alphonso (2011), p. 54.
  17. ^ Lau & Alphonso (2011), pp. 55–57.
  18. ^ a b "Johore Causeway. Design and Construction of The Undertaking". The Straits Times. 28 May 1925. p. 2. from the original on 21 March 2019. Retrieved 24 March 2019 – via NewspaperSG.
  19. ^ Lau & Alphonso (2011), pp. 58–61.
  20. ^ Lau & Alphonso (2011), pp. 77–81.
  21. ^ a b "Muddled Finances". The Straits Times. 15 December 1921. from the original on 24 March 2019. Retrieved 24 March 2019 – via NewspaperSG.
  22. ^ "F.M.S. Commerce. Meeting of Chamber at Ipoh". The Straits Times. 27 April 1922. from the original on 24 March 2019. Retrieved 24 March 2019 – via NewspaperSG.
  23. ^ "Sir Edward Brockman. His views on Present Malayan Conditions". The Straits Times. 8 July 1922. from the original on 24 March 2019. Retrieved 24 March 2019 – via NewspaperSG.
  24. ^ "Governors at Loggerheads". The Straits Times. 13 December 1922. from the original on 24 March 2019. Retrieved 24 March 2019 – via NewspaperSG.
  25. ^ Lau & Alphonso (2011), p. 83.
  26. ^ "Calculate Modern Values of Historic Concertina Prices". www.concertina.com. from the original on 26 October 2022. Retrieved 21 March 2019.
  27. ^ "The Johore Causeway". Malayan Saturday Post. 5 July 1924. from the original on 6 October 2019. Retrieved 6 October 2019 – via NewspaperSG.
  28. ^ Lau & Alphonso (2011), p. 124.
  29. ^ "THE KONEO IMPERIAL GUARDS DIVISION OF THE JAPANESE ARMY …". www.nas.gov.sg. from the original on 3 September 2022. Retrieved 7 April 2020.
  30. ^ "FOURTEEN LANES FOR CAUSEWAY TOLL". Singapore Monitor (Afternoon Edition). 26 October 1984. Retrieved 30 March 2024.
  31. ^ "$384,000 collected at Causeway". The Straits Times. 7 December 1984. Retrieved 30 March 2024.
  32. ^ "Malaysia announces movement control order after spike in Covid-19 cases (updated) | The Star Online". www.thestar.com.my. from the original on 18 March 2020. Retrieved 15 June 2023.
  33. ^ "Coronavirus: Bus services 170X and 950 suspended till March 31, other services halt Malaysia legs ahead of lockdown". The Straits Times. 17 March 2020. from the original on 18 March 2020. Retrieved 15 June 2023.
  34. ^ . CNA. Archived from the original on 18 March 2020. Retrieved 15 June 2023.
  35. ^ "Smoother trips for people working on both sides of Causeway with Johor-Singapore special economic zone: PM Lee". CNA. Retrieved 30 March 2024.
  36. ^ Noh, Mohamed Farid (18 March 2020). "All quiet at world's busiest causeway | New Straits Times". NST Online. Retrieved 30 March 2024.
  37. ^ "KTM train services between Johor Bahru and Woodlands to resume on Jun 19". CNA Lifestyle. Retrieved 30 March 2024.
  38. ^ TAN, BEN (30 March 2022). "Malaysia-Singapore border crossing set to reclaim title as one of world's busiest on April 1, with 400,000 travellers in first week". Malay Mail. Retrieved 30 March 2024.
  39. ^ "Heavy traffic expected at land checkpoints during upcoming Qing Ming festival and Good Friday weekend". CNA. Retrieved 30 March 2024.
  40. ^ "Heavy traffic expected at land checkpoints for Hari Raya Haji holiday". CNA. Retrieved 30 March 2024.
  41. ^ "Heavy traffic expected at land checkpoints during upcoming Qing Ming festival and Good Friday weekend". CNA. Retrieved 30 March 2024.
  42. ^ Chua, Lee Hoong (18 October 1997). "A case of blackmail?". The Straits Times. from the original on 20 June 2010. Retrieved 21 March 2019.
  43. ^ . New Straits Times. 9 February 2005. Archived from the original on 17 December 2005. (Posted on www.jeffooi.com)
  44. ^ "Malaysia to build crooked bridge". ABC News. 27 January 2006. Retrieved 15 June 2023.
  45. ^ . New Straits Times. 10 March 2006. Archived from the original on 1 April 2019.
  46. ^ . Prime Minister's Office, Malaysia. 12 April 2006. Archived from the original on 25 August 2007.
  47. ^ "'Singapore". The Edge Malaysia. 11 September 2006.
  48. ^ . AFP via The Nation. 3 November 2006. Archived from the original on 29 September 2007.
  49. ^ "Malaysian sultan calls for scrapping of causeway to Singapore". Bernama. 5 November 2006. from the original on 30 September 2007. Retrieved 5 November 2006.

Others edit

Works cited edit

  • Lau, Albert; Alphonso, G. (2011). The Causeway. Malaysia and Singapore: National Archives of Malaysia and National Archives of Singapore. ISBN 9789814266895.

Further reading edit

  • Ilsa Sharp, (2005), SNP:Editions, The Journey – Singapore's Land Transport Story. ISBN 981-248-101-X

External links edit

  • Google Maps link showing the Causeway, with Johor Bahru at top and Singapore below. The Malaysia–Singapore boundary is located where the road surface changes colour midway.

johor, singapore, causeway, kilometre, causeway, consisting, combined, railway, motorway, bridge, that, links, city, johor, bahru, malaysia, across, straits, johor, district, town, woodlands, singapore, only, land, connection, between, from, 1928, until, 1998,. The Johor Singapore Causeway is a 1 056 kilometre 0 66 mi causeway consisting of a combined railway and motorway bridge that links the city of Johor Bahru in Malaysia across the Straits of Johor to the district and town of Woodlands in Singapore It was the only land connection between the two from 1928 until 1998 when the Tuas Second Link opened Johor Singapore CausewayAs seen from Johor in 2023Coordinates1 27 10 N 103 46 09 E 1 452772 N 103 769153 E 1 452772 103 769153CarriesMotor vehiclesBicyclesTrainsPedestriansCrossesStraits of JohorLocaleJohor Bahru Johor Malaysia Bangunan Sultan IskandarWoodlands Singapore Woodlands CheckpointOfficial nameJohor Singapore CausewayMaintained byPLUS Expressways Malaysia Land Transport Authority Singapore CharacteristicsDesignCausewayMaterialRubbleTotal length1 km 0 62 mi Causeway 2 4 km 1 5 mi Distance between both checkpoints Rail characteristicsNo of tracks1Track gauge1 000 mm 3 ft 3 3 8 in ElectrifiedNoHistoryConstruction startAugust 1919Construction end11 June 1924Construction cost17 million Straits dollars 1918 Opened28 June 1924Inaugurated28 June 1924Location Johor Singapore CausewayChinese nameChinese新柔長堤TranscriptionsStandard MandarinHanyu PinyinXin rou zhǎng diMalay nameMalayTambak Johor SingapuraTamil nameTamilஜ க ர ச ங கப ப ர க ஸ வ Jōkur Ciṅkappur kasve The distance between Singapore s Woodlands Checkpoint and Malaysia s Bangunan Sultan Iskandar is approximately 2 4 km 1 5 mi The causeway also serves as a water pipeline between the two countries It is one of the busiest border crossings in the world with 350 000 travellers daily 1 2 Many Malaysians continue to live in Malaysia and commute daily with either public or private motorised transportation to Singapore enduring extremely long journey times with extreme heavy traffic congestion on weekdays 3 4 The border is handled by immigration authorities of both countries at the Southern Integrated Gateway Malaysia and Woodlands Checkpoint Singapore Since 26 March 2022 both countries have permitted pedestrians to walk along the Causeway by foot 5 6 but this is not common pedestrian walking is generally limited to instances of standstill vehicular congestion on the Causeway which prevents passengers from boarding regular hour cross border public buses after clearing immigration Contents 1 History 1 1 Construction and opening 1 2 World War II and post war period 1 3 Independence and border control 1 4 Traffic volume 2 Border checkpoints 2 1 Southern Integrated Gateway 2 2 Woodlands Checkpoint 2 3 Attempts to have the causeway replaced 3 Charges 4 See also 5 References 5 1 Others 5 2 Works cited 6 Further reading 7 External linksHistory edit nbsp Johor Singapore Causeway in 2020 at the start of the COVID 19 pandemic Construction and opening edit In the late 19th century Singapore was transformed into a major international trading port 7 and was a steamship coaling station 8 At the turn of the 20th century British Malaya was transformed into a major producer and exporter of raw materials such as tin rubber gambier and pepper for international markets 9 The connection to Singapore from Johor was through a ferry link Railways across the peninsula and in Singapore from the ferry point to Tank Road in the south of Singapore completed the trade transport network within British Malaya 10 From June 1909 onward goods were transported on wagon ferry 11 while passengers were transported on passenger ferries 3 ferries from 1912 onward 2 ferries before 1912 12 The wagon ferry could accommodate 6 wagons at a time 11 while the passenger ferries had a capacity of about 160 each 12 As international trade demands grew it was necessary to operate the ferry link round the clock in 1911 to bring the commodities from British Malaya into Singapore to be transshipped 13 Additional ferry steamers were constructed however they soon were overloaded The passenger steamers often had to exceed its designed limits carrying as many as 250 passengers 13 Additionally the increasing costs of the maintaining the ferries were a concern on the long term viability of the ferries The annual expenditure in 1912 was estimated to be 53 750 Straits dollars 1 8 million in 2000 14 In 1917 Federated Malay States FMS Director of Public Works W Eyre Kenny s proposal to build a rubble causeway gained support among the Federal Council of the FMS 14 His suggestion was to have the foundation to be laid in the soft white and pink clays at the proposed site have an opening span for ships to be allowed through the bridge and have the rubble sourced from the quarries at Pulau Ubin and Bukit Timah as there were ample granite being sold at reasonable prices Among the alternatives to the Causeway design were a bridge or upgrading the wagon ferries and train ferries 15 The bridge proposal wasn t followed through because the Straits was too deep going at 70 feet at some points and foundations would be lacking An opening span would be required and the bridge would require significant maintenance The train ferries to replace the wagon ferries would be too expensive as well The causeway proposal was accepted by FMS Chief Secretary and Straits Settlements Colonial Secretary Edward Lewis Brockman and Straits Settlements Governor and FMS High Commissioner Sir Arthur Henderson Young In 1917 Governor Young cited the six fold increase in railway receipts in Singapore from 82 000 Straits dollars 2 7 million in 2000 in 1912 to 480 000 Straits dollars 11 8 million in 2000 in 1916 as an evidence to the rapid growth of the railway traffic and thus the FMS Railway Administration could not defer any longer on the improvement works required 16 The British government had consultant engineers Messrs Coode Fitzmaurice Wilson amp Mitchell of Westminster to prepare plans for the eventual Causeway 15 The plans were presented to the FMS Straits Settlements and Johore governments in 1918 The plan was approved in 1919 after the sharing of the costs of constructing the Causeway was negotiated between the three governments 17 By the engineering standards of its time the Causeway was a technically challenging project 15 It was also one of the largest engineering projects in Malaya then 15 Many considerations were factored for the finalised design Tidal studies were carried out prior to the construction and design features were incorporated in consideration to the structure itself its surroundings and continued ship passage through the Straits 18 The orientation also factored in the current railway terminations on both shores The design would be 3 465 feet long 60 feet wide sufficient enough for two lines of metre gauge railway tracks and a 26 foot wide roadway with space reserved for laying of water mains at a later date Floodgates were incorporated at the lock to control the tides 19 The construction contract was awarded to Messrs Topham Jones amp Railton Ltd of London on 30 June 1919 The engineering firm had completed major works at the dockyards and harbour in Singapore and had necessary work capacity and experience in the area available 15 The contract allowed the firm a period of 5 years and 3 months to complete the construction Construction started in August 1919 starting with the lock at Johore s bank Sequence of construction would allow minimal disruption to existing shipping or ferrying services On 24 April 1920 a ceremony was held to mark the laying of the foundation stone 20 The Johore Sultan Sultan Ibrahim the newly appointed Governor of Straits Settlements and High Commissioner of the FMS Sir Laurence Guillemard his wife among other invited guests graced the ceremony on board Sea Belle a sea yacht in the middle of the Straits The ceremony commenced with prayers and Governor Guillemard was invited to pull a silken cord which activated machinery to empty a load of rubble from a barge into the water Sirens from the surrounding ships then greeted the now emptied barge A second barge of rubble was emptied as well with air tolak bala and air doa selamat being poured into the Straits A gun salute of five rounds fired from Bukit Timbalan marked the end of the ceremony British Malaya was impacted by the Depression of 1920 21 as she was a primary source for many commodities internationally The constructions process was thus under intense public scrutiny and criticism 21 22 23 24 Additionally the British Admiralty would like to have the locks be widened and deepened to accommodate British warships However it was found to be difficult to engineer and was very costly The FMS and Straits Settlements government thus had considered dropping the project 25 In January 1923 the lock was open for local sea craft On 1 October the partially completed Causeway was officially opened to passenger traffic The Causeway was officially completed in 1924 when the finishing touches to the lock was done With an estimated cost 17 million Straits dollars 277 million in 2000 26 over 2 300 staff and labourers were employed to during the course of the construction An opening ceremony was conducted in Johore on 28 June 1924 The Johore Sultan and Governor Guillemard graced the ceremony which a ribbon cutting ceremony was held A special holiday was declared in Johore for more of the public to take part in the festivities The opening marked a new era which uninterrupted communications between Singapore and Bangkok now exists 27 The administration of the Causeway was formalised in 1925 with the formation of the Johore Causeway Control Committee Under FMSR the committee was given full autonomy to oversee the efficient management and maintenance of the Causeway 28 World War II and post war period edit nbsp nbsp Left The severed causeway on the eve of Japanese invasion in 1942 Right The causeway just after the Japanese surrender in 1945 As the Japanese invasion of Malaya drew to a close the Allied forces under the command of Lieutenant General Arthur Percival began retreating from their positions in Johore crossing the Causeway in the early hours of 31 January 1942 The Causeway was then blown up with two explosions The first wrecked the lock s lift bridge while the second caused a 70 feet wide gap in the Causeway and severed the water carrying pipelines as well Though this action forced the Japanese to cross the Straits elsewhere they soon took the city and constructed a girder bridge over the gap 29 The bridge remained in its war torn state until the return of the British after the surrender of the Imperial Japanese forces The girder bridge was replaced with two Bailey bridge extensions in February 1946 with the rubble of the demolished lift bridge cleared and the railway tracks re laid Reconstruction plans of lock channel and lift bridge were looked at in the late 1940s but were subsequently shelved since demand for water passage through the Causeway wasn t substantial enough to justify the reconstruction costs During the Malayan Emergency of 1948 to 1960 as a strategic conduit between Singapore and Malaya travellers were subjected to stringent security measures to impede the movement of enemy combatants and weapons between Singapore and Malaya The checks together with attacks on railway lines further aggravated the traffic congestion on the Causeway Additionally the Causeway would be further congested during public holidays and festive seasons Independence and border control edit nbsp Travelling on the Causeway in a bus in 1973 The Causeway first became an international border when the Federation of Malaya achieved independence on 31 August 1957 Plans were made to introduce immigration controls at the Causeway however a system of strict identity card checks was implemented instead The Causeway became an internal state border when the Federation of Malaya Singapore Sabah and Sarawak merged to form Malaysia on 16 September 1963 On 22 July 1964 as part of a curfew after racial riots in Singapore the Causeway was closed to travellers without police permission It was reopened during non curfew hours the following day and normal traffic had resumed by 26 July After Singapore s separation from Malaysia on 9 August 1965 the Causeway became the border connector between the two countries Immigration checkpoints were built on both sides with passport controls implemented on the Singaporean side from June 1967 and on the Malaysian side from September Toll collection at the Causeway checkpoint began on 1 November 1984 with ten lanes in total The toll booths were built by the Malaysian Highway Authority 30 By December over S 384 000 worth of toll money were collected The toll collection reduced traffic congestions in the Causeway Toll payments were collected for the Malaysian federal government 31 To support the ever increasing trade and foot traffic on the Causeway both the Malaysian and Singapore governments carried out works to widen the Causeway multiple times as well as to improve checkpoint facilities Singapore replaced its checkpoint in 1999 followed by Malaysia in 2008 A second border crossing bridge the Malaysia Singapore Second Link between Tanjung Kupang and Tuas was completed in 1998 nbsp Johor Singapore Causeway in 2021 amidst the COVID 19 pandemic In response to the COVID 19 pandemic Malaysia instituted a nationwide movement control order on 18 March 2020 and closed the country s borders affecting hundreds of thousands of cross border commuters between Malaysia and Singapore 32 33 However the flow of cargo goods and food supplies continued 34 On 29 November 2021 authorities of both countries eased their land border controls and began to allow a restricted daily flow of 2 880 residents to travel between the countries by the Causeway under a vaccinated travel lane scheme via designated bus services 1 However as the infections of the SARS CoV 2 Omicron variant spiked the number of travellers allowed was halved between 23 December 2021 and 20 January 2022 2 The quota of daily passengers was increased to 3 420 on 14 March 2022 8 From 1 April 2022 the quota was lifted with no restrictions imposed on the mode of travel across the land connections 18 21 Traffic volume edit The Causeway is regularly described as one of the busiest land crossings in the world 35 36 It has been estimated that between 250 000 400 000 on a typical day 37 38 In March 2023 it was reported that about 376 000 people crossed Singapore s land checkpoints including both the Causeway and the Second Link every day 39 Between 16 June and 18 June 2023 during the school holidays period in Singapore it was reported that an average of 406 000 persons crossed the Causeway each day with a peak of 430 000 crossings on 16 June 2023 40 On 28 March 2024 according to the Immigration and Checkpoints Authority 510 000 people crossed the Singapore Malaysia land borders ahead of a 3 day Good Friday weekend This was reported to be the highest traffic at Singapore s land borders in a single day There were continuous tailbacks at Woodlands Checkpoint throughout the day with queues extending beyond the Seletar Expressway 41 Border checkpoints editSouthern Integrated Gateway edit Main article Southern Integrated Gateway nbsp Sultan Iskandar Building at the northern end of the Causeway in Johor Bahru The Southern Integrated Gateway consists of the Sultan Iskandar Building and the Johor Bahru Sentral railway station JB Sentral Sultan Iskandar Building is the customs immigration and quarantine CIQ complex handling road traffic and pedestrians It was officially opened by the Malaysian Prime Minister Abdullah Badawi on 1 December 2008 and went into full operations on 16 December 2008 The old Tanjung Puteri CIQ complex was subsequently demolished As the new CIQ complex was located 1 km further inland from the old checkpoint as well as the lack of a dedicated pedestrian walkway on the new access road pedestrians are officially no longer allowed to cross the Causeway on foot though it is tolerated during severe traffic congestion JB Sentral railway station is the main railway station of Johor Bahru since 21 October 2010 replacing the old Johor Bahru railway station JB Sentral also serves as the southbound exit immigration and customs checkpoint for rail passengers heading toward Singapore Woodlands Checkpoint edit Main article Woodlands Checkpoint nbsp Woodlands Checkpoint at the southern end of the Causeway in Singapore The new Woodlands Checkpoint built partially on reclaimed land was opened in 1999 to accommodate the increasing traffic flow and the soot which had enveloped the old customs complex over the years The old customs complex built in the early 1970s at the junction between Woodlands Road and Woodlands Centre Road closed after the new checkpoint was opened in July 1999 although the motorcycle lane remained opened in the morning until 2001 and it had been reopened on 1 March 2008 for goods vehicles only The new checkpoint complex also houses the Woodlands Train Checkpoint opened on 1 August 1998 as the Singapore railway border clearance facility which was previously co located with Malaysian immigration and customs at Tanjong Pagar railway station The relocation to Woodlands caused disputes between the two countries which was resolved in 2010 On 1 July 2011 Woodlands Train Checkpoint replaced Tanjong Pagar railway station as Singapore s inter city railway station Northbound rail passengers pass through co located border clearance for both countries at Woodlands Train Checkpoint before boarding the train to Malaysia Southbound rail passengers clear Malaysian exit controls at JB Sentral and Singapore immigration and customs on arrival at Woodlands Train Checkpoint Attempts to have the causeway replaced edit As far back as 1966 there were several calls by the Malaysians to remove the Causeway In 1966 in the Johor state legislative council the speaker said that the Causeway was more a hindrance than anything else 42 while a port should be built close to Johor Bahru to rejuvenate the city s economy The state of Johor currently already has developed ports including Pasir Gudang and Tanjong Pelapas The second demand came in year 1986 when Israeli President Chaim Herzog visited Singapore At that time the Singapore Government was criticised by Malaysian politicians and the press for allowing his visit Under the Mahathir Mohamad administration the Malaysian government scheduled to build a new customs immigration and quarantine complex on a hilltop near the Johor Bahru railway station A bridge was planned to link the new customs complex with the city square The project was named Southern Integrated Gateway Gerbang Selatan Bersepadu by the government The project was awarded to a construction company Gerbang Perdana During the construction one of the two underpass channels located at the end of the old customs complex had been blocked Roads exiting from the old customs complex have been diverted The design envisages a re direction of traffic flow to the new customs complex after the completion of the proposed new bridge to Singapore The old customs complex will be torn down once the new customs complex begins operation All this while no agreement had been reached with the Singapore Government on replacing the causeway with a proposed new bridge The proposals on replacing the old causeway with a new bridge has resulted in a political rift between the two countries since the early 2000s The Malaysian government envisioned that disagreement by Singapore to participate in the project would result in a crooked bridge above Malaysian waters with half the causeway remaining on the Singapore side However Singapore has hinted that it might agree to a bridge if its air force is allowed to use part of Johor s airspace Malaysia refused the offer and negotiation is said to be still ongoing 43 In January 2006 Malaysia unilaterally announced that it is going ahead to build the new bridge on the Malaysian side now referred to as scenic bridge 44 The construction of the new scenic bridge on Malaysian side officially began on 10 March 2006 when the piling works of this bridge was completed 45 but on 12 April 2006 construction was halted and scrapped by Mahathir s successor Abdullah Ahmad Badawi with growing complications in both negotiation the conditions set by Singapore were strongly opposed by the people of Malaysia on grounds of national sovereignty and legal matters with Singapore 46 In 2006 Badawi has said that in the future there won t be just one or two bridges between Malaysia and Singapore 47 That same year however the Sultan of Johor called for the demolition of the link reasoning that the Causeway is undermining the state economy as it is causing a brain drain 48 49 Charges editVehicles have to pay toll charges at both sides of the causeway The toll plaza at the Malaysian side is operated by PLUS Expressway Berhad In Singapore the Vehicle Entry Permit VEP charges apply to cars and motorcycles that have utilised the 10 VEP free days See also editAH2 Malaysia Singapore border Oresund Bridge between Denmark and Sweden Hutchinson F Lin S and Bunnell T 2023 The Johor Singapore Causeway Celebrating and conceptualising its centenary Journal of Southeast Asian Studies 54 3 355 366 References edit a b Clearing the Crossway 9 June 2018 Archived from the original on 2 July 2018 Retrieved 7 February 2019 a b Lim Yan Liang 13 October 2013 A Look at Woodlands Checkpoint The Straits Times Archived from the original on 23 March 2020 Retrieved 13 June 2019 Malaysia Singapore commute a daily grind Nikkei Asia Archived from the original on 5 May 2022 Retrieved 5 May 2022 I don t want to commute anymore Some Malaysian workers settle in Singapore even as land border reopens CNA Archived from the original on 5 May 2022 Retrieved 5 May 2022 Ministry of International Trade and Industry Malaysia www facebook com Retrieved 5 May 2022 Tan Lester FAQs about Malaysia Singapore land borders vaccinated travel effective 1 April 2022 www humanresourcesonline net Archived from the original on 19 April 2022 Retrieved 5 May 2022 Lau amp Alphonso 2011 p 23 a b Baker Jim 2008 Crossroads 2nd Edn A Popular History of Malaysia and Singapore Singapore Marshall Cavendish International Asia Pte Ltd p 92 ISBN 9789814435482 Lau amp Alphonso 2011 p 19 Lau amp Alphonso 2011 p 43 a b Lau amp Alphonso 2011 p 49 a b Lau amp Alphonso 2011 p 36 a b Lau amp Alphonso 2011 p 50 a b Lau amp Alphonso 2011 p 53 a b c d e The Causeway A great engineering work completed Straits Times 5 July 1924 Archived from the original on 7 August 2021 Retrieved 24 March 2019 via Malayan Post via NewspaperSG Lau amp Alphonso 2011 p 54 Lau amp Alphonso 2011 pp 55 57 a b Johore Causeway Design and Construction of The Undertaking The Straits Times 28 May 1925 p 2 Archived from the original on 21 March 2019 Retrieved 24 March 2019 via NewspaperSG Lau amp Alphonso 2011 pp 58 61 Lau amp Alphonso 2011 pp 77 81 a b Muddled Finances The Straits Times 15 December 1921 Archived from the original on 24 March 2019 Retrieved 24 March 2019 via NewspaperSG F M S Commerce Meeting of Chamber at Ipoh The Straits Times 27 April 1922 Archived from the original on 24 March 2019 Retrieved 24 March 2019 via NewspaperSG Sir Edward Brockman His views on Present Malayan Conditions The Straits Times 8 July 1922 Archived from the original on 24 March 2019 Retrieved 24 March 2019 via NewspaperSG Governors at Loggerheads The Straits Times 13 December 1922 Archived from the original on 24 March 2019 Retrieved 24 March 2019 via NewspaperSG Lau amp Alphonso 2011 p 83 Calculate Modern Values of Historic Concertina Prices www concertina com Archived from the original on 26 October 2022 Retrieved 21 March 2019 The Johore Causeway Malayan Saturday Post 5 July 1924 Archived from the original on 6 October 2019 Retrieved 6 October 2019 via NewspaperSG Lau amp Alphonso 2011 p 124 THE KONEO IMPERIAL GUARDS DIVISION OF THE JAPANESE ARMY www nas gov sg Archived from the original on 3 September 2022 Retrieved 7 April 2020 FOURTEEN LANES FOR CAUSEWAY TOLL Singapore Monitor Afternoon Edition 26 October 1984 Retrieved 30 March 2024 384 000 collected at Causeway The Straits Times 7 December 1984 Retrieved 30 March 2024 Malaysia announces movement control order after spike in Covid 19 cases updated The Star Online www thestar com my Archived from the original on 18 March 2020 Retrieved 15 June 2023 Coronavirus Bus services 170X and 950 suspended till March 31 other services halt Malaysia legs ahead of lockdown The Straits Times 17 March 2020 Archived from the original on 18 March 2020 Retrieved 15 June 2023 Flow of goods food supplies cargo to continue between Singapore and Malaysia PM Lee CNA Archived from the original on 18 March 2020 Retrieved 15 June 2023 Smoother trips for people working on both sides of Causeway with Johor Singapore special economic zone PM Lee CNA Retrieved 30 March 2024 Noh Mohamed Farid 18 March 2020 All quiet at world s busiest causeway New Straits Times NST Online Retrieved 30 March 2024 KTM train services between Johor Bahru and Woodlands to resume on Jun 19 CNA Lifestyle Retrieved 30 March 2024 TAN BEN 30 March 2022 Malaysia Singapore border crossing set to reclaim title as one of world s busiest on April 1 with 400 000 travellers in first week Malay Mail Retrieved 30 March 2024 Heavy traffic expected at land checkpoints during upcoming Qing Ming festival and Good Friday weekend CNA Retrieved 30 March 2024 Heavy traffic expected at land checkpoints for Hari Raya Haji holiday CNA Retrieved 30 March 2024 Heavy traffic expected at land checkpoints during upcoming Qing Ming festival and Good Friday weekend CNA Retrieved 30 March 2024 Chua Lee Hoong 18 October 1997 A case of blackmail The Straits Times Archived from the original on 20 June 2010 Retrieved 21 March 2019 Shahrir Samah Replies Have I burnt my bridges New Straits Times 9 February 2005 Archived from the original on 17 December 2005 Posted on www jeffooi com Malaysia to build crooked bridge ABC News 27 January 2006 Retrieved 15 June 2023 Scenic bridge to open in 2009 New Straits Times 10 March 2006 Archived from the original on 1 April 2019 M sia Stops Construction Of Bridge To Replace Johor Causeway Prime Minister s Office Malaysia 12 April 2006 Archived from the original on 25 August 2007 Singapore The Edge Malaysia 11 September 2006 Malaysian sultan calls for scrapping of causeway to Singapore AFP via The Nation 3 November 2006 Archived from the original on 29 September 2007 Malaysian sultan calls for scrapping of causeway to Singapore Bernama 5 November 2006 Archived from the original on 30 September 2007 Retrieved 5 November 2006 Others edit New Ten VEP Free Days Scheme And Shorter VEP Operating Hours news release Land Transport Authority Singapore 15 May 2005 Works cited edit Lau Albert Alphonso G 2011 The Causeway Malaysia and Singapore National Archives of Malaysia and National Archives of Singapore ISBN 9789814266895 Further reading editIlsa Sharp 2005 SNP Editions The Journey Singapore s Land Transport Story ISBN 981 248 101 XExternal links edit nbsp Wikimedia Commons has media related to Johor Singapore Causeway Google Maps link showing the Causeway with Johor Bahru at top and Singapore below The Malaysia Singapore boundary is located where the road surface changes colour midway Border crossing Singapore Malaysia History of Singapore Immigration Portals nbsp Malaysia nbsp Singapore nbsp Roads Retrieved from https en wikipedia org w index php title Johor Singapore Causeway amp oldid 1216279003, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.