fbpx
Wikipedia

Interstate 355

Interstate 355 (I-355), also known as the Veterans Memorial Tollway, is an Interstate Highway and tollway in the western and southwest suburbs of Chicago in the U.S. state of Illinois. Like most other toll roads in the northeastern portion of the state, I-355 is maintained by the Illinois State Toll Highway Authority (ISTHA). I-355 runs from I-80 in New Lenox north to I-290 in Itasca,[1] a distance of 32.5 miles (52.3 km).[a] With the exception of a four-mile (6.4 km) expansion in 2009, from U.S. Route 34 (US 34, Ogden Avenue) to 75th Street, the highway is six lanes wide for its entire length.[2]

Interstate 355

Veterans Memorial Tollway
I-355 highlighted in red
Route information
Auxiliary route of I-55
Maintained by ISTHA and IDOT
Length32.5 mi[a] (52.3 km)
ExistedDecember 24, 1989–present
HistoryExtended to I-80 on November 11, 2007
NHSEntire route
Major junctions
South end I-80 in New Lenox
Major intersections
North end I-290 in Itasca
Location
CountryUnited States
StateIllinois
CountiesWill, Cook, DuPage
Highway system
Interchange with I-55 in Bolingbrook, formerly the southern terminus of I-355

The tollway authority opened I-355 as the North–South Tollway in 1989 to ease congestion on Illinois Route 53 (IL 53), a parallel two-lane state highway in central DuPage County. Initially, I-355 ran from I-55 north to I-290. The new highway helped cut travel times for commuters traveling north and south in the county. According to commercial real estate developers at the time, the new tollway also opened the western suburbs of Chicago to commercial and industrial development.[3]

On November 11, 2007, the tollway authority opened a southern extension of I-355, which runs 12.5 miles (20.1 km) between I-55 and I-80. The extension was routed through Will County and a small portion of Cook County, which together formed one of Illinois' fastest-growing regions at the time. The tollway authority expected the extension to cut travel times in the region by 20 percent.[4] Upon the extension's opening, the tollway authority changed the name of the tollway to "Veterans Memorial Tollway".

History edit

Early history edit

From 1963 to 1970, the Illinois Department of Transportation (IDOT) planned and built a new expressway north from Army Trail Road through Schaumburg to the Northwest Tollway (now the Jane Addams Memorial Tollway). After its completion, IDOT rerouted IL 53 onto this new expressway from Rohlwing Road.[5][6][b]

The original alignment of I-355 was defined in the Chicago Area Transportation Study (abbreviated CATS) Transportation Plan of April 1962. The plan called for a supplemental system of limited-access expressways to be built in the Chicago metropolitan area by 1980, and defined corridors where the expressways were to be located. Most of these corridors, including the Des Plaines River expressway, the Crosstown Expressway running north–south along the west side of Chicago, and most of a proposed northern extension of IL 53 were scrapped because of intense local opposition.[8]

Initially, state and county officials anticipated building a freeway for the expressway south of Army Trail Road, similar to the existing freeway north of Army Trail Road. In 1979, Chicago mayor Jane Byrne canceled plans for the proposed Crosstown Expressway. Following the move, Congress gave the rights to half of the $200 million (equivalent to $677 million in 2023[9]) that had been earmarked for the Crosstown Expressway to DuPage County. However, county officials found this amount insufficient for construction of the new freeway. The officials then handed authority for the project over to the tollway authority, and spent the money on other projects in the county.[10]

In June 1984, Republican minority leader of the Illinois House of Representatives James "Pate" Philip helped push through legislation authorizing the construction of the tollway, then referred to as simply the DuPage Tollway.[11] Officials at the Morton Arboretum, one of the nation's premier woodland research centers, promptly filed a federal lawsuit to block construction of the tollway. They also promised to prevent the tollway authority from obtaining environmental approval from federal officials.[12]

In April 1985, the two agencies came to an agreement regarding construction of the new tollway. To protect the arboretum from salt spray and other pollutants caused by cars on the tollway, the tollway authority agreed to build I-355 below grade around the perimeter of the arboretum. The tollway authority would build a water collection system to divert runoff from the arboretum. In addition, they would build earthen berms along the new road, preventing salt spray from damaging arboretum plants. In exchange, the DuPage County Forest Preserve District agreed to a 99-year lease providing 189 acres (0.76 km2) of its land to the arboretum for the development of an "urban vegetation laboratory". Under the agreement, Morton Arboretum agreed to charge DuPage County residents lower admissions one day of the week, build a bicycle path connecting the arboretum to nearby forest preserves, and begin a joint clean-streams program to improve the water quality of DuPage County's lakes and streams.[12] In January 1986, the tollway paid out $2.5 million (equivalent to $5.9 million in 2023[9]) to a trust fund as a part of the settlement to help finance the arboretum's new programs.[13]

The U.S. Army Corps of Engineers released a preliminary environmental impact statement on March 13, 1986. At a public hearing a month later, arboretum executives and Woodridge officials strongly criticized the report as "fatally flawed" and a repeat of tollway-provided research, including typographical errors. The opposition also cited outdated and inaccurate data regarding wetlands replacement, salt dispersion, and the lack of compensation to residents for lowered property values.[14] The tollway authority agreed to run the road below-grade at 75th Street instead of as a 28-foot-high (8.5 m) elevated highway. In addition, they agreed to spend an extra $1 million (equivalent to $2.36 million in 2023[9]) on the redesigned elevation and interchange.[15]

The Corps of Engineers issued a permit for the tollway on October 8, 1986, rejecting last-minute concerns from the Sierra Club to reroute the toll road around sections of Churchill Woods Prairie, between Glen Ellyn and Lombard. The permit allowed the first two earth moving contracts issued by the tollway authority to move forward.[16] The tollway authority put the total cost of 17.7 miles (28.5 km) of new pavement at $450 million (equivalent to $1.04 billion in 2023[9]). Of the total cost, $325 million (equivalent to $748 million in 2023[9]) was allocated for construction, $30 million (equivalent to $69 million in 2023[9]) to alleviating environmental concerns, including moving and enlarging 117 acres (0.47 km2) of wetlands, and $30 million (equivalent to $69 million in 2023[9]) for utility relocation. Work in 1987 consisted primarily of excavation, embankment building and land acquisition.[17]

Because of problems with pavement on other roads in the system and anticipation of heavy traffic on the new Interstate, the tollway authority decided to pave I-355 with pavement expected to last 20 years. Construction workers laid concrete on the tollway to a thickness of 12 inches (30 cm) over an 8-inch (20 cm) sub-base. The new pavement also incorporated fly ash and less cement, allowing the pavement to achieve maximum strength faster than pure concrete.[18]

One of the last issues settled prior to the opening of the tollway was the highway's number. Originally, tollway officials designated the new road I-355. Early in 1988, however, the tollway administration received a letter from the Federal Highway Administration (FHWA) indicating that the highway should be named Interstate 455. FHWA policy at the time dictated that auxiliary Interstate routes that join two other Interstate Highways should start with an even number. IDOT argued the highway more closely resembles a spur from I-55.[19] Ultimately, the tollway authority kept the I-355 designation.

Governor James R. Thompson and U.S. Secretary of Transportation Samuel K. Skinner dedicated the North–South Tollway on December 22, 1989. When it opened, officials estimated travel times from Schaumburg to Oak Brook would be reduced from 55 minutes to 34 minutes, and from Wheaton to Darien from 60 to 34 minutes. Tollway officials also estimated that 200,000 cars per day would use I-355.[3] This figure has since been shown to be slightly optimistic, with maximum average daily traffic values approaching 170,200 only at the northern end of the Interstate. The initial length of I-355 was 20.01 miles (32.20 km) from I-55 north to I-290.[1]

Opening edit

 
I-355 at the Illinois Prairie Path, looking south towards Downers Grove in the distance

I-355 opened at the stroke of midnight on December 24, 1989. As a Christmas gift, the first two days of operation were free.[3] Because of lower traffic counts at the north and south ends of the highway and lack of construction money, tollway officials built the road with four lanes from North Avenue (IL 64) to the Ronald Reagan Memorial Tollway (I-88) on the north end, and around I-55 on the south end. As early as 1991, tollway officials had drawn up plans to widen the highway to three lanes in each direction.[20] Widening from North Avenue to Butterfield Road (IL 56) took place in 1995.[21] The old lines marking the former shoulder can still be seen in the right lane as a result of the tollway authority's attempt to grind them away.

After the new road opened, congestion decreased considerably on nearby north–south arteries. The DuPage County Division of Transportation calculated that congestion had decreased on IL 53 by 20%, and the volume of cars on nearby north–south roads IL 53, IL 59 and IL 83 had decreased. On IL 53 between Ogden Avenue and Roosevelt Road, traffic counts sank from 21,400 to 11,800 vehicles per day. In addition, traffic on the exit ramp from the Tri-State Tollway (I-294) to I-55 dropped 10 percent in 12 months. Drivers also reported decreases in travel time from one end of the county to the other of up to 40 minutes.[22][23] However, the opening of the tollway also greatly increased congestion on I-290 near the northern terminus. A construction project in the summer months of 1990 widened I-290 just north of the tollway, at a cost of $2–2.5 million (equivalent to $41.2 million–51.5 million in 2023[9]).[22]

In spite of the apparent success of the tollway opening, traffic counts and projected toll revenues were initially lower than projected, with an estimated 65,000 motorists per day traveling along the tollway, generating $55,000–65,000 (equivalent to $113,000–134,000 in 2023[9]) in daily toll revenues. In addition, a spate of lawsuits were filed regarding the payment of contractors and subcontractors. Numerous liens filed by subcontractors against the tollway were settled in June, 1990 at a cost of $10.1 million (equivalent to $20.8 million in 2023[9]).[24][25] The tollway authority released an additional $1 million (equivalent to $1.95 million in 2023[9]) in May 1992 to further settle claims made by the general contractor, entering arbitration soon afterwards to settle another $1.6–27 million (equivalent to $3.12 million–52.7 million in 2023[9]) the contractor claimed it was owed.[26] By 2005, average annual daily traffic values had risen to a range of 77,400 to 170,200 vehicles per day.[1]

As early as 1989, the tollway authority had discussed implementing automatic toll collection across the entire system to relieve congestion caused by traffic stopping at mainline toll barriers.[27] The tollway authority began testing I-Pass, the tollway system's electronic payment method, on the entire stretch of I-355 in 1993 at various tollbooths; by September 1994, every plaza on I-355 accepted I-Pass.[28] By 1998, the tollway authority had installed dedicated I-Pass lanes (lanes specifically set aside for electronic toll collections) at both mainline toll barriers.[29] In 1999, I-355 became the first tollway to receive I-Pass Express Lanes (also known as open road tolling, or ORT). With the installation of the express lanes, vehicles with I-Pass could be tolled at highway speeds of 55 miles per hour (89 km/h).[30] In 2005, the tollway authority widened the express lanes from two lanes to three lanes in each direction. This allowed the number of express lanes to match the number of travel lanes on the tollway.[31]

Unlike the other tollways in the tollway system at the time, there were no oases on the Veterans Memorial Tollway when it was opened. This is primarily due to the widespread access to food and fuel throughout the western suburbs when construction began in the late 1980s.[32] When the southern extension was opened in Will County in 2007, that segment of road also did not have any oases.

Southern extension edit

 
Des Plaines River Valley Bridge during Roll the Tollway opening ceremonies on November 11, 2007

In addition to the original alignment of I-355, the Transportation Plan of April 1962 included the concept of a route that ran from Bolingbrook south to Joliet. After the northern portion of I-355 opened in 1989, the Illinois General Assembly authorized the tollway authority to begin studying the southern extension of I-355.[33][34]

The discovery of the Hine's Emerald Dragonfly, an endangered species, and related concerns for the environmental health of the Des Plaines River wetlands in 1995, ignited a series of legal challenges that delayed construction of the I-355 extension for several years. The Sierra Club filed a lawsuit in 1996 to block planning of the southern extension. In January 1997, a federal judge sided with the Sierra Club, halting construction of the southern extension while the state appealed. In 1999, the state dropped its appeal and amended the environmental impact study (EIS) to meet the Sierra Club's concerns.[33] The state released the supplemental EIS in 2000, and in 2002 the FHWA issued a Record of Decision, allowing construction of the tollway to proceed after six years of delays. Land acquisition and utility relocation took place in 2004. Governor Rod Blagojevich's $5.6 billion Congestion-Relief Program for the Illinois Tollway passed the General Assembly in September 2004, with $729.3 million being set aside for the extension (equivalent to $8.66 billion and $1.13 billion in 2023[9], respectively).[35] Bidding on an excavation contract passed on November 18, 2004 with construction beginning several days later.[36]

To document and reduce the impact of construction on the dragonfly's habitat, construction crews agreed to keep carcasses of any dragonfly kills. In addition, the tollway authority funded the construction of separate habitats for the dragonfly near the Waterfall Glen Forest Preserve in Lemont and in two other preserves in Cook and Will counties.[37] In late 2005, construction began on the roadway of the 12.5-mile-long (20.1 km) southern extension of I-355 from I-55 in Bolingbrook to I-80 in New Lenox.[4]

Another controversy erupted in February 2006, when the tollway authority threatened to build the tollway with no interchanges unless the suburbs through which the new extension ran contributed $20 million (equivalent to $29.1 million in 2023[9]) for construction of the interchanges. This marked the first time that the tollway authority had required local municipalities to contribute funds for interchange construction.[38] The towns of Homer Glen, Lemont, New Lenox, Lockport and Will County agreed in a June 2006 intergovernmental agreement to provide $20 million in both cash and in-kind contributions for the interchanges.[39]

The southern extension is expected to become an economic catalyst for municipalities located along the tollway. The Village of New Lenox estimates that it will receive an additional $12 million in sales taxes after its two malls are built out. In Lockport, officials have announced that new Home Depot and SuperTarget stores are planned for the areas near 159th Street and I-355. Commercial developers are also building large warehouse facilities in areas near the Lockport interchanges.[40]

One of "the most impressive engineering feats on the state's 274 miles [441 km] of toll roads"[36] is the Des Plaines River Valley Bridge, a bridge over the Des Plaines River, the Chicago Sanitary and Ship Canal, the Illinois and Michigan Canal, Bluff Road, New Avenue, numerous railroads, and a major Commonwealth Edison utility corridor. The bridge is 1.3 miles (2.1 km) long, and constituted $125 million of the cost of the extension. Work on the bridge included the construction of 34 piers and elevation of existing high-voltage electricity lines to accommodate the highway.[4] To limit the number of piers in the valley, the tollway authority built the bridge with both 170-foot (52 m) pre-stressed bulb tee girders and 270-foot (82 m) post-tensioned segmental concrete girders. This was $12 million (equivalent to $17 million in 2023[9]) cheaper than the concrete box girder design option, and $50 million (equivalent to $70.8 million in 2023[9]) less than the steel plate girder design option. A design-build clause in the original contract for the bridge, in addition to success in the design-build contracts on the 2004–07 Tri-State Tollway widening and reconstruction, allowed project managers to redesign and build the new bridge.[41]

The tollway authority held a ribbon cutting and dedication ceremony on Veterans Day (November 11), 2007, officially renaming the entire length of I-355 the Veterans Memorial Tollway.[42] Ceremonies were held on the tollway near the 127th Street interchange in Lemont, at 147th Street in Homer Glen, and at US 6 in New Lenox. In addition to the dedication, the tollway authority sponsored a Charity Walk/Run/Roll and "Roll the Tollway", a charity pre-opening bicycle ride on the highway's south extension.[43] After noting the success of the festival, a tollway spokesman announced plans to repeat the event annually, including the closure of the entire southern extension.[44] He later clarified the tollway's position, indicating that while the extension would probably not be closed in its entirety in the future, a possible five-mile (8.0 km) ride across the Des Plaines River Valley Bridge may be held.[45] At around 10:00 p.m. on November 11, a group of Illinois State Police vehicles and tollway maintenance vehicles escorted the first motorists southbound along the I-355 extension, stopping at each interchange to remove barricades. By the time the maintenance crews began to remove barricades along the northbound lanes of the extension, a group of 50 to 60 vehicles had gathered behind the crews.[46]

Veterans Memorial Trail edit

As part of constructing the southern extension, the tollway authority donated a 15-to-20-foot-wide (5–6 m) corridor to local municipalities for the construction of a multi-use trail, named the Veterans Memorial Trail, that will run along most of the length of the tollway from I-80 to I-55.[47] Completion of the trail is expected to cost $10 million, with funding to be provided by local communities along the path. A new construction fund for the trail was created from registration fees collected for "Roll the Tollway".[48] The Active Transportation Alliance announced on January 29, 2008 that about $108,000 (equivalent to $150,000 in 2023[9]) was raised through "Roll the Tollway". Of this amount, $70,000 (equivalent to $97,000 in 2023[9]) was set aside for preliminary engineering studies on the 10.5-mile (16.9 km) bicycle trail. The remaining amount was directed towards advocacy efforts for the Chicago Bicycle Federation and other local bicycle clubs.[49]

The initial engineering phase of the bike trail has been completed in the form of the I-355 Area Trails Master Plan, a framework created by Housel Lavigne Associates designed to distribute the work of creating and funding the trail among local communities. The Forest Preserve District of Will County has begun work on the Veterans Memorial Trail from International Parkway, Woodridge, to 135th Street, Romeoville, and will then extend the trail to US 6 in the Village of New Lenox. This addition will link the trail to a number of businesses in New Lenox, including a shopping mall currently being constructed, Silver Cross Hospital, and medical offices.[47] The Omnibus Appropriations Act included $470,000 (equivalent to $641,000 in 2023[9]) in federal funding for construction of the first phase of the trail.[50]

Route description edit

 
Detailed map of I-355

The southern terminus of I-355 is northeast of New Lenox, where the highway intersects I-80. I-355 is routed north and slightly west through rural, hilly portions of Will County. Just after the US 6 interchange (mile 1.0), tollway drivers pay a toll at Spring Creek Toll Plaza, the only toll plaza on the southern extension of I-355. It continues north through the rural sections of Will County, having exits that serve the towns of Homer Glen and Lockport. At 135th Street (approximately mile 8.0) in Lemont, I-355 briefly enters Cook County. After an interchange at 127th Street (mile 9.0), I-355 crosses over the Des Plaines River on the Des Plaines River Valley Bridge before returning to Will County. Shortly north of the bridge, I-355 intersects I-55 at Bolingbrook (mile 12.5). Multiple flyover ramps connect all directions of both highways.[34][51][52]

North of I-55, I-355 continues to run almost due north through the established western suburbs of Chicago in DuPage County. Travelers pay another toll just north of Boughton Road, at the Boughton Road Toll Plaza (mile 13.5). Continuing north, I-355 has another multiple flyover interchange with I-88 (miles 19.5 and 23.0), officially designated the Ronald Reagan Memorial Tollway. On the southern end of the interchange, northbound I-355 has exits to both directions of I-88. I-355 then swings below I-88 and runs side-by-side with the other tollway for one mile (1.6 km). Southbound exits to both directions of I-88 are at the northern end of the interchange. At the Army Trail Road Toll Plaza (mile 29.0), through traffic pays the last toll of the tollway. I-355 has no tolls north of the Army Trail Road exit (mile 30) in Addison. There is one untolled exit (mile 31.5) at US 20 (Lake Street) north of the tollway. I-355 terminates at the I-290 interchange near the border of the villages of Itasca and Addison.[34][51][52]

As a result of a toll rate increase effective January 1, 2012, the northernmost two toll plazas (Boughton Road and Army Trail Road) charge $1.90 cash and $0.95 for cars with I-Pass and E-ZPass. The Spring Creek Toll Plaza charges $3.80 for travelers paying with cash and $1.90 for I-Pass and E-ZPass.[53][54] All three toll plazas force traffic paying with cash to exit right into an area separate from the dedicated I-Pass lanes. Drivers paying with cash then pay their tolls at staffed plaza tollbooths.[55] I-Pass and E-ZPass equipped cars and trucks are permitted to stay on the mainline and pay tolls at highway speeds in the tollway's ORT lanes.[56]

On I-355, the only control cities that are actual cities are Joliet, St. Louis, Missouri, and from I-80, Rockford.[57] Other control cities on I-355 are limited to general areas of suburban Chicago. For example, control cities for I-355 while on I-55 are "West Suburbs"[58] and "Southwest Suburbs".[59] The control city for areas north of I-88 are "Northwest Suburbs".[60]

Because of increasing congestion, the Veterans Memorial Tollway has been widened to eight lanes between 75th Street and US 34. The tollway authority added the four-mile (6.4 km), $60.4-million project (equivalent to $85.5 million in 2023[9]) to its Congestion Relief Plan in mid-2007, and the new lanes opened on October 24, 2009.[61]

Exit list edit

CountyLocationmi[51]kmExitDestinationsNotes[51]
WillNew Lenox0.00.00  I-80 – Iowa, IndianaSouthern terminus; southern end of Veterans Memorial Tollway; signed as exits 0A (east) and 0B (west); I-80 exit 140
1.01.61  US 6 (Southwest Highway)Toll (northbound exit and southbound entrance)
LockportHomer Glen line3.55.6Spring Creek Toll Plaza 99[62]
5.08.04  IL 7 (159th Street)Toll (southbound exit and northbound entrance)
7.512.17  IL 171 (Archer Avenue) / 143rd StreetToll (southbound exit and northbound entrance)
CookLemont9.014.58127th StreetToll (southbound exit and northbound entrance)
Des Plaines River12.019.3Des Plaines River Valley Bridge
WillBolingbrook12.520.112  I-55 – Chicago, St. Louis
  Historic US 66 (Joliet Road)
Signed as exits 12A (north) and 12B (south); I-55 exit 269; exit 12A provides an exit ramp to Joliet road west
13.521.713Boughton RoadToll (northbound exit and southbound entrance); to 87th Street
DuPage14.523.3Boughton Road Toll Plaza 89
Woodridge15.524.915  CR 33 (75th Street)Toll (southbound exit and northbound entrance)
17.027.417 
 
 
 
CR 38 east (63rd Street) / CR 2 west (Hobson Road)
Toll (southbound exit and northbound entrance)
LisleDowners Grove
village line
18.529.818  CR 17 (Maple Avenue)Toll (southbound exit and northbound entrance)
19.531.419
20B
  US 34 (Ogden Avenue)Signed as exits 19 southbound and 20B northbound; southbound exit ramp merges with I-88 eastbound exit ramp to US 34
Downers Grove19.5–
22.5
31.4–
36.2
20 
 
 
 
I-88 Toll / IL 110 (CKC) (Ronald Reagan Memorial Tollway) – Aurora, Chicago
Signed as exit 20A northbound; I-88 west exit 131, east exits 131–132; I-88 and I-355 run side-by-side for over two miles (3.2 km) at this point
22.536.222  IL 56 (Butterfield Road)Toll (northbound exit and southbound entrance)
Glen EllynLombard
village line
24.539.424  IL 38 (Roosevelt Road)Toll (northbound exit and southbound entrance)
Glendale HeightsLombard
village line
28.045.127  IL 64 (North Avenue)Toll (northbound exit and southbound entrance)
29.046.7Army Trail Road Toll Plaza 73
Addison30.048.329  CR 11 (Army Trail Road)Northern end of Veterans Memorial Tollway
31.550.731  US 20 (Lake Street)
AddisonItasca
village line
32.552.3  
 
 
 
 
 
I-290 to IL 53 north / I-90 Toll – Rockford, Chicago
Northern terminus; I-290 exit 7
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also edit

Notes edit

  1. ^ a b I-355 originally ran 20.01 miles (32.20 km) from I-55 to I-290, according to Illinois' 2005 GIS data. The southern extension added 12.5 miles (20.1 km) to this length, according to the Illinois State Toll Highway Authority.
  2. ^ The 2006 National Bridge Inventory database shows the IL 19 bridge over I-290 dated to 1971. The I-290 bridge over now I-355, and I-355 bridge over US 20 are dated to 1970.[7]

References edit

  1. ^ a b c Illinois Technology Transfer Center (2005). . Illinois Department of Transportation. Archived from the original on August 10, 2007. Retrieved November 8, 2007.
  2. ^ Google (December 17, 2007). "General satellite view of the three-laned I-355 (hybrid view to indicate where the highway is)" (Map). Google Maps. Google. Retrieved December 17, 2007.
  3. ^ a b c Hausner, Les (December 22, 1989). "Opening of I-355 will put some zip in Du Page traffic". Chicago Sun Times. Retrieved January 11, 2008.
  4. ^ a b c Illinois Tollway (2007). "I-355 South Extension". Archived from the original on November 7, 2007. Retrieved November 17, 2007.
  5. ^ Rand McNally & Company (1967). Chicago Vicinity Map (Map). Chicago: Rand McNally & Company. Retrieved November 28, 2007 – via Broer Maps Online.
  6. ^ United States Geological Survey (July 1, 1978). "Chicago Area topographic map" (Map). Microsoft Research Maps. Microsoft. Retrieved January 21, 2008.
  7. ^ Staff. . National Bridge Inventory. Federal Highway Administration. Archived from the original on October 31, 2013. Retrieved January 21, 2008.
  8. ^ Plummer, Andy (2007). (PDF). Archived from the original (PDF) on February 16, 2008. Retrieved December 21, 2007.
  9. ^ a b c d e f g h i j k l m n o p q r s t Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the MeasuringWorth series.
  10. ^ Chicago Tribune Editorial Board (March 6, 1985). "Buzzard highway". Chicago Tribune. Retrieved January 11, 2008.
  11. ^ Chicago Tribune (January 29, 1985). "Sox, DuPage batting stadium idea around". Chicago Tribune. Retrieved January 11, 2008.
  12. ^ a b Schmeltzer, John (April 29, 1985). "Arboretum accepts plan for tollway". Chicago Tribune. Retrieved January 11, 2008.
  13. ^ Schmeltzer, John (January 29, 1986). "Tollway gives $2.5 million to arboretum". Chicago Tribune. Retrieved January 11, 2008.
  14. ^ Schmeltzer, John (April 10, 1986). "Toll road impact report blasted". Chicago Tribune. Retrieved January 11, 2008.
  15. ^ Schmeltzer, John (May 29, 1986). "Tollway plans digs for answer". Chicago Tribune. Retrieved January 11, 2008.
  16. ^ Schmeltzer, John (October 9, 1986). "Bulldozers rev up for a tollway". Chicago Tribune. Retrieved January 11, 2008.
  17. ^ Mehler, Neil H. (August 19, 1987). "Tollway work rides a wave of good luck". Chicago Tribune. Retrieved January 11, 2008.
  18. ^ Mehler, Neil H. (April 26, 1988). "Tollway tries to get rock-solid pavement". Chicago Tribune. Retrieved January 11, 2008.
  19. ^ Cuhry, Daniel (July 30, 1988). "Numbers game keeps tollway nameless". The Daily Herald. Arlington Heights, IL. Retrieved January 24, 2008.
  20. ^ Szymczak, P. Davis (December 25, 1991). "State, motorists get money's worth in North–South Tollway". Chicago Tribune. Retrieved January 11, 2008.
  21. ^ Mills, Steve (December 15, 1995). "I-355 work dominates toll projects". Chicago Tribune. Retrieved January 11, 2008.
  22. ^ a b Kamin, Blair (April 20, 1990). "New tollway helps some, hurts some". Chicago Tribune. Retrieved January 11, 2008.
  23. ^ Washburn, Gary (December 17, 1990). "New tollway is surpassing expectations". Chicago Tribune. Retrieved January 11, 2008.
  24. ^ Chicago Tribune (June 21, 1990). "$10 million released to pay for tollway". Chicago Tribune. Retrieved January 11, 2008.
  25. ^ Enstad, Robert (April 29, 1990). "Suits pile up on north–south Tollway". Chicago Tribune. Retrieved January 11, 2008.
  26. ^ Chicago Tribune (May 29, 1992). "$1 million payout ok'd for toll work". Chicago Tribune. Retrieved January 11, 2008.
  27. ^ Washburn, Gary (April 20, 1989). "State reveals traffic plan to combat area gridlock". Chicago Tribune. Retrieved January 26, 2008.
  28. ^ Gillis, Michael (November 18, 1993). "On I-355, change is no longer a constant: New device collects tolls automatically". Chicago Sun-Times. Retrieved January 11, 2008.
  29. ^ Presecky, William (August 13, 1997). "Tollbooth to nowhere put to the test: Vacant Lemont tract a proving ground for new I-Pass technology". Chicago Tribune. Retrieved January 11, 2008.
  30. ^ Mannion, Annemarie (February 6, 1999). "Toll plaza gets up to speed: I-Pass express lanes debut at Boughton Road site". Chicago Tribune. Retrieved January 11, 2008.
  31. ^ Hilkevitch, Jon (November 21, 2005). "Open-road toll lanes wait for Blagojevich". Chicago Tribune. Retrieved January 11, 2008.
  32. ^ Kemp, Jan (June 28, 2006). . Archived from the original on 2007-11-23. Retrieved November 15, 2007. Via an interview/response through the Daily Herald.
  33. ^ a b The Herald News (November 11, 2007). "Tollway timeline". The Herald News. Joliet, IL. Retrieved January 11, 2008.
  34. ^ a b c Rand McNally (2006). The Road Atlas (Map). Chicago: Rand McNally. p. 46.
  35. ^ Illinois State Toll Highway Authority (2007). . Illinois State Toll Highway Authority. Archived from the original on October 25, 2007. Retrieved November 15, 2007.
  36. ^ a b Ziemba, Stanley (May 13, 2007). "Bridge to southwest around the corner". Chicago Tribune. Retrieved January 11, 2008.
  37. ^ "Endangered Dragonfly Relocated For Interstate". Chicago: WMAQ-TV. February 26, 2007. Retrieved March 15, 2007.
  38. ^ Ziemba, Stanley (February 5, 2006). "A tollway that has no exits?". Chicago Tribune. Retrieved January 11, 2008.
  39. ^ Cain, Cindy Wojdyla (June 2, 2006). "County to vote on I-355 local contribution plan". Chicago Sun Times. Retrieved January 11, 2008.
  40. ^ Graf, Tony; Ferrell, Patrick (November 11, 2007). "I-355 extension will change travel". The Herald News. Joliet, IL. Retrieved November 12, 2007.
  41. ^ Marsh, Don (October 1, 2007). . Concrete Products. Archived from the original on October 30, 2007. Retrieved November 15, 2007.
  42. ^ Staff. "Homer Glen Announces Its Portion of the I-355 Grand Opening Celebrations" (PDF) (Press release). City of Homer Glen. Archived from the original (PDF) on June 30, 2012. Retrieved April 2, 2012.
  43. ^ Staff (2007). (Press release). Illinois State Toll Highway Authority. Archived from the original on August 24, 2007. Retrieved August 29, 2007.
  44. ^ WMAQ-TV (November 12, 2007). "Will County Commuters Hit Open Road On I-355". Chicago: WMAQ-TV. Retrieved November 12, 2007.
  45. ^ Tridgell, Guy (November 14, 2007). "Unique I-355 bike ride will not happen again". The Herald News. Joliet, IL. Retrieved January 11, 2008.
  46. ^ O'Brien, Ken (November 13, 2007). "Veterans Memorial Tollway: I-355 extension traffic flowing smoothly". The Herald News. Joliet, IL. Retrieved January 11, 2008.
  47. ^ a b Lafferty, Susan DeMar (June 22, 2009). "I-355 Communities Hope to Connect Via Trails". SouthtownStar. Sun-Times News Group. p. A3.
  48. ^ Komperda, Jack (November 11, 2007). "Can a Sunday bike ride get new trail started?". Daily Herald. Retrieved November 12, 2007.
  49. ^ O'Hara, Margo (January 29, 2008). "Roll the Tollway raises more than $100,000 for trail, bicycle advocacy" (Press release). Chicago Bicycle Federation. Retrieved January 30, 2008.[permanent dead link]
  50. ^ Staff (May 4, 2010). (Press release). Office of Senator Durbin. Archived from the original on October 15, 2010. Retrieved October 2, 2010.
  51. ^ a b c d Illinois State Toll Highway Authority (2007). (Map). Illinois State Toll Highway Authority. Archived from the original on November 19, 2007. Retrieved November 25, 2007.
  52. ^ a b OpenStreetMap. Street maps topographic maps (Map). ACME Mapper. Retrieved January 26, 2008.
  53. ^ Illinois State Toll Highway Authority (2007). (PDF) (Map). Illinois State Toll Highway Authority. Archived from the original (PDF) on September 27, 2007. Retrieved June 9, 2007.
  54. ^ . Illinois Tollway. Archived from the original on June 23, 2012. Retrieved July 8, 2012.
  55. ^ Staff (2007). . Illinois State Toll Highway Authority. Archived from the original on July 15, 2007. Retrieved December 18, 2007.
  56. ^ Staff (2007). "About I-Pass". Illinois State Toll Highway Authority. Archived from the original on July 21, 2008. Retrieved November 28, 2007.
  57. ^ Staff. (Highway guide sign). Addison, IL: Illinois State Toll Highway Authority. Archived from the original on February 16, 2008. Retrieved December 28, 2007.
  58. ^ Staff. (Highway guide sign). Bolingbrook, IL: Illinois Department of Transportation. Archived from the original on February 3, 2014. Retrieved April 2, 2012.
  59. ^ Staff. I-55 Guide Sign at I-355 South (Highway guide sign). Bolingbrook, IL: Illinois Department of Transportation.
  60. ^ Staff. I-88 Guide Sign at I-355 (Highway guide sign). Downers Grove, IL: Illinois State Toll Highway Authority.
  61. ^ Staff. (Press release). Illinois State Toll Highway Authority. Archived from the original on October 25, 2009. Retrieved October 26, 2009.
  62. ^ Hilkevitch, Jon (October 22, 2007). . Chicago Tribune. Archived from the original on November 21, 2007. Retrieved October 23, 2007.

External links edit

KML is from Wikidata
  • Illinois Tollway Highway Authority
  • Historic, Current & Average Travel Times For The Veterans Memorial Tollway

interstate, also, known, veterans, memorial, tollway, interstate, highway, tollway, western, southwest, suburbs, chicago, state, illinois, like, most, other, toll, roads, northeastern, portion, state, maintained, illinois, state, toll, highway, authority, isth. Interstate 355 I 355 also known as the Veterans Memorial Tollway is an Interstate Highway and tollway in the western and southwest suburbs of Chicago in the U S state of Illinois Like most other toll roads in the northeastern portion of the state I 355 is maintained by the Illinois State Toll Highway Authority ISTHA I 355 runs from I 80 in New Lenox north to I 290 in Itasca 1 a distance of 32 5 miles 52 3 km a With the exception of a four mile 6 4 km expansion in 2009 from U S Route 34 US 34 Ogden Avenue to 75th Street the highway is six lanes wide for its entire length 2 Interstate 355Veterans Memorial TollwayI 355 highlighted in redRoute informationAuxiliary route of I 55Maintained by ISTHA and IDOTLength32 5 mi a 52 3 km ExistedDecember 24 1989 presentHistoryExtended to I 80 on November 11 2007NHSEntire routeMajor junctionsSouth endI 80 in New LenoxMajor intersectionsUS 6 in New Lenox I 55 Historic US 66 in Bolingbrook US 34 in Downers Grove I 88 Toll IL 110 CKC in Downers Grove US 20 in AddisonNorth endI 290 in ItascaLocationCountryUnited StatesStateIllinoisCountiesWill Cook DuPageHighway systemInterstate Highway SystemMain Auxiliary Suffixed Business FutureIllinois State Highway SystemInterstate US State Tollways Scenic IL 351 IL 390Interchange with I 55 in Bolingbrook formerly the southern terminus of I 355The tollway authority opened I 355 as the North South Tollway in 1989 to ease congestion on Illinois Route 53 IL 53 a parallel two lane state highway in central DuPage County Initially I 355 ran from I 55 north to I 290 The new highway helped cut travel times for commuters traveling north and south in the county According to commercial real estate developers at the time the new tollway also opened the western suburbs of Chicago to commercial and industrial development 3 On November 11 2007 the tollway authority opened a southern extension of I 355 which runs 12 5 miles 20 1 km between I 55 and I 80 The extension was routed through Will County and a small portion of Cook County which together formed one of Illinois fastest growing regions at the time The tollway authority expected the extension to cut travel times in the region by 20 percent 4 Upon the extension s opening the tollway authority changed the name of the tollway to Veterans Memorial Tollway Contents 1 History 1 1 Early history 1 2 Opening 1 3 Southern extension 1 4 Veterans Memorial Trail 2 Route description 3 Exit list 4 See also 5 Notes 6 References 7 External linksHistory editEarly history edit From 1963 to 1970 the Illinois Department of Transportation IDOT planned and built a new expressway north from Army Trail Road through Schaumburg to the Northwest Tollway now the Jane Addams Memorial Tollway After its completion IDOT rerouted IL 53 onto this new expressway from Rohlwing Road 5 6 b The original alignment of I 355 was defined in the Chicago Area Transportation Study abbreviated CATS Transportation Plan of April 1962 The plan called for a supplemental system of limited access expressways to be built in the Chicago metropolitan area by 1980 and defined corridors where the expressways were to be located Most of these corridors including the Des Plaines River expressway the Crosstown Expressway running north south along the west side of Chicago and most of a proposed northern extension of IL 53 were scrapped because of intense local opposition 8 Initially state and county officials anticipated building a freeway for the expressway south of Army Trail Road similar to the existing freeway north of Army Trail Road In 1979 Chicago mayor Jane Byrne canceled plans for the proposed Crosstown Expressway Following the move Congress gave the rights to half of the 200 million equivalent to 677 million in 2023 9 that had been earmarked for the Crosstown Expressway to DuPage County However county officials found this amount insufficient for construction of the new freeway The officials then handed authority for the project over to the tollway authority and spent the money on other projects in the county 10 In June 1984 Republican minority leader of the Illinois House of Representatives James Pate Philip helped push through legislation authorizing the construction of the tollway then referred to as simply the DuPage Tollway 11 Officials at the Morton Arboretum one of the nation s premier woodland research centers promptly filed a federal lawsuit to block construction of the tollway They also promised to prevent the tollway authority from obtaining environmental approval from federal officials 12 In April 1985 the two agencies came to an agreement regarding construction of the new tollway To protect the arboretum from salt spray and other pollutants caused by cars on the tollway the tollway authority agreed to build I 355 below grade around the perimeter of the arboretum The tollway authority would build a water collection system to divert runoff from the arboretum In addition they would build earthen berms along the new road preventing salt spray from damaging arboretum plants In exchange the DuPage County Forest Preserve District agreed to a 99 year lease providing 189 acres 0 76 km2 of its land to the arboretum for the development of an urban vegetation laboratory Under the agreement Morton Arboretum agreed to charge DuPage County residents lower admissions one day of the week build a bicycle path connecting the arboretum to nearby forest preserves and begin a joint clean streams program to improve the water quality of DuPage County s lakes and streams 12 In January 1986 the tollway paid out 2 5 million equivalent to 5 9 million in 2023 9 to a trust fund as a part of the settlement to help finance the arboretum s new programs 13 The U S Army Corps of Engineers released a preliminary environmental impact statement on March 13 1986 At a public hearing a month later arboretum executives and Woodridge officials strongly criticized the report as fatally flawed and a repeat of tollway provided research including typographical errors The opposition also cited outdated and inaccurate data regarding wetlands replacement salt dispersion and the lack of compensation to residents for lowered property values 14 The tollway authority agreed to run the road below grade at 75th Street instead of as a 28 foot high 8 5 m elevated highway In addition they agreed to spend an extra 1 million equivalent to 2 36 million in 2023 9 on the redesigned elevation and interchange 15 The Corps of Engineers issued a permit for the tollway on October 8 1986 rejecting last minute concerns from the Sierra Club to reroute the toll road around sections of Churchill Woods Prairie between Glen Ellyn and Lombard The permit allowed the first two earth moving contracts issued by the tollway authority to move forward 16 The tollway authority put the total cost of 17 7 miles 28 5 km of new pavement at 450 million equivalent to 1 04 billion in 2023 9 Of the total cost 325 million equivalent to 748 million in 2023 9 was allocated for construction 30 million equivalent to 69 million in 2023 9 to alleviating environmental concerns including moving and enlarging 117 acres 0 47 km2 of wetlands and 30 million equivalent to 69 million in 2023 9 for utility relocation Work in 1987 consisted primarily of excavation embankment building and land acquisition 17 Because of problems with pavement on other roads in the system and anticipation of heavy traffic on the new Interstate the tollway authority decided to pave I 355 with pavement expected to last 20 years Construction workers laid concrete on the tollway to a thickness of 12 inches 30 cm over an 8 inch 20 cm sub base The new pavement also incorporated fly ash and less cement allowing the pavement to achieve maximum strength faster than pure concrete 18 One of the last issues settled prior to the opening of the tollway was the highway s number Originally tollway officials designated the new road I 355 Early in 1988 however the tollway administration received a letter from the Federal Highway Administration FHWA indicating that the highway should be named Interstate 455 FHWA policy at the time dictated that auxiliary Interstate routes that join two other Interstate Highways should start with an even number IDOT argued the highway more closely resembles a spur from I 55 19 Ultimately the tollway authority kept the I 355 designation Governor James R Thompson and U S Secretary of Transportation Samuel K Skinner dedicated the North South Tollway on December 22 1989 When it opened officials estimated travel times from Schaumburg to Oak Brook would be reduced from 55 minutes to 34 minutes and from Wheaton to Darien from 60 to 34 minutes Tollway officials also estimated that 200 000 cars per day would use I 355 3 This figure has since been shown to be slightly optimistic with maximum average daily traffic values approaching 170 200 only at the northern end of the Interstate The initial length of I 355 was 20 01 miles 32 20 km from I 55 north to I 290 1 Opening edit nbsp I 355 at the Illinois Prairie Path looking south towards Downers Grove in the distanceI 355 opened at the stroke of midnight on December 24 1989 As a Christmas gift the first two days of operation were free 3 Because of lower traffic counts at the north and south ends of the highway and lack of construction money tollway officials built the road with four lanes from North Avenue IL 64 to the Ronald Reagan Memorial Tollway I 88 on the north end and around I 55 on the south end As early as 1991 tollway officials had drawn up plans to widen the highway to three lanes in each direction 20 Widening from North Avenue to Butterfield Road IL 56 took place in 1995 21 The old lines marking the former shoulder can still be seen in the right lane as a result of the tollway authority s attempt to grind them away After the new road opened congestion decreased considerably on nearby north south arteries The DuPage County Division of Transportation calculated that congestion had decreased on IL 53 by 20 and the volume of cars on nearby north south roads IL 53 IL 59 and IL 83 had decreased On IL 53 between Ogden Avenue and Roosevelt Road traffic counts sank from 21 400 to 11 800 vehicles per day In addition traffic on the exit ramp from the Tri State Tollway I 294 to I 55 dropped 10 percent in 12 months Drivers also reported decreases in travel time from one end of the county to the other of up to 40 minutes 22 23 However the opening of the tollway also greatly increased congestion on I 290 near the northern terminus A construction project in the summer months of 1990 widened I 290 just north of the tollway at a cost of 2 2 5 million equivalent to 41 2 million 51 5 million in 2023 9 22 In spite of the apparent success of the tollway opening traffic counts and projected toll revenues were initially lower than projected with an estimated 65 000 motorists per day traveling along the tollway generating 55 000 65 000 equivalent to 113 000 134 000 in 2023 9 in daily toll revenues In addition a spate of lawsuits were filed regarding the payment of contractors and subcontractors Numerous liens filed by subcontractors against the tollway were settled in June 1990 at a cost of 10 1 million equivalent to 20 8 million in 2023 9 24 25 The tollway authority released an additional 1 million equivalent to 1 95 million in 2023 9 in May 1992 to further settle claims made by the general contractor entering arbitration soon afterwards to settle another 1 6 27 million equivalent to 3 12 million 52 7 million in 2023 9 the contractor claimed it was owed 26 By 2005 average annual daily traffic values had risen to a range of 77 400 to 170 200 vehicles per day 1 As early as 1989 the tollway authority had discussed implementing automatic toll collection across the entire system to relieve congestion caused by traffic stopping at mainline toll barriers 27 The tollway authority began testing I Pass the tollway system s electronic payment method on the entire stretch of I 355 in 1993 at various tollbooths by September 1994 every plaza on I 355 accepted I Pass 28 By 1998 the tollway authority had installed dedicated I Pass lanes lanes specifically set aside for electronic toll collections at both mainline toll barriers 29 In 1999 I 355 became the first tollway to receive I Pass Express Lanes also known as open road tolling or ORT With the installation of the express lanes vehicles with I Pass could be tolled at highway speeds of 55 miles per hour 89 km h 30 In 2005 the tollway authority widened the express lanes from two lanes to three lanes in each direction This allowed the number of express lanes to match the number of travel lanes on the tollway 31 Unlike the other tollways in the tollway system at the time there were no oases on the Veterans Memorial Tollway when it was opened This is primarily due to the widespread access to food and fuel throughout the western suburbs when construction began in the late 1980s 32 When the southern extension was opened in Will County in 2007 that segment of road also did not have any oases Southern extension edit nbsp Des Plaines River Valley Bridge during Roll the Tollway opening ceremonies on November 11 2007In addition to the original alignment of I 355 the Transportation Plan of April 1962 included the concept of a route that ran from Bolingbrook south to Joliet After the northern portion of I 355 opened in 1989 the Illinois General Assembly authorized the tollway authority to begin studying the southern extension of I 355 33 34 The discovery of the Hine s Emerald Dragonfly an endangered species and related concerns for the environmental health of the Des Plaines River wetlands in 1995 ignited a series of legal challenges that delayed construction of the I 355 extension for several years The Sierra Club filed a lawsuit in 1996 to block planning of the southern extension In January 1997 a federal judge sided with the Sierra Club halting construction of the southern extension while the state appealed In 1999 the state dropped its appeal and amended the environmental impact study EIS to meet the Sierra Club s concerns 33 The state released the supplemental EIS in 2000 and in 2002 the FHWA issued a Record of Decision allowing construction of the tollway to proceed after six years of delays Land acquisition and utility relocation took place in 2004 Governor Rod Blagojevich s 5 6 billion Congestion Relief Program for the Illinois Tollway passed the General Assembly in September 2004 with 729 3 million being set aside for the extension equivalent to 8 66 billion and 1 13 billion in 2023 9 respectively 35 Bidding on an excavation contract passed on November 18 2004 with construction beginning several days later 36 To document and reduce the impact of construction on the dragonfly s habitat construction crews agreed to keep carcasses of any dragonfly kills In addition the tollway authority funded the construction of separate habitats for the dragonfly near the Waterfall Glen Forest Preserve in Lemont and in two other preserves in Cook and Will counties 37 In late 2005 construction began on the roadway of the 12 5 mile long 20 1 km southern extension of I 355 from I 55 in Bolingbrook to I 80 in New Lenox 4 Another controversy erupted in February 2006 when the tollway authority threatened to build the tollway with no interchanges unless the suburbs through which the new extension ran contributed 20 million equivalent to 29 1 million in 2023 9 for construction of the interchanges This marked the first time that the tollway authority had required local municipalities to contribute funds for interchange construction 38 The towns of Homer Glen Lemont New Lenox Lockport and Will County agreed in a June 2006 intergovernmental agreement to provide 20 million in both cash and in kind contributions for the interchanges 39 The southern extension is expected to become an economic catalyst for municipalities located along the tollway The Village of New Lenox estimates that it will receive an additional 12 million in sales taxes after its two malls are built out In Lockport officials have announced that new Home Depot and SuperTarget stores are planned for the areas near 159th Street and I 355 Commercial developers are also building large warehouse facilities in areas near the Lockport interchanges 40 One of the most impressive engineering feats on the state s 274 miles 441 km of toll roads 36 is the Des Plaines River Valley Bridge a bridge over the Des Plaines River the Chicago Sanitary and Ship Canal the Illinois and Michigan Canal Bluff Road New Avenue numerous railroads and a major Commonwealth Edison utility corridor The bridge is 1 3 miles 2 1 km long and constituted 125 million of the cost of the extension Work on the bridge included the construction of 34 piers and elevation of existing high voltage electricity lines to accommodate the highway 4 To limit the number of piers in the valley the tollway authority built the bridge with both 170 foot 52 m pre stressed bulb tee girders and 270 foot 82 m post tensioned segmental concrete girders This was 12 million equivalent to 17 million in 2023 9 cheaper than the concrete box girder design option and 50 million equivalent to 70 8 million in 2023 9 less than the steel plate girder design option A design build clause in the original contract for the bridge in addition to success in the design build contracts on the 2004 07 Tri State Tollway widening and reconstruction allowed project managers to redesign and build the new bridge 41 The tollway authority held a ribbon cutting and dedication ceremony on Veterans Day November 11 2007 officially renaming the entire length of I 355 the Veterans Memorial Tollway 42 Ceremonies were held on the tollway near the 127th Street interchange in Lemont at 147th Street in Homer Glen and at US 6 in New Lenox In addition to the dedication the tollway authority sponsored a Charity Walk Run Roll and Roll the Tollway a charity pre opening bicycle ride on the highway s south extension 43 After noting the success of the festival a tollway spokesman announced plans to repeat the event annually including the closure of the entire southern extension 44 He later clarified the tollway s position indicating that while the extension would probably not be closed in its entirety in the future a possible five mile 8 0 km ride across the Des Plaines River Valley Bridge may be held 45 At around 10 00 p m on November 11 a group of Illinois State Police vehicles and tollway maintenance vehicles escorted the first motorists southbound along the I 355 extension stopping at each interchange to remove barricades By the time the maintenance crews began to remove barricades along the northbound lanes of the extension a group of 50 to 60 vehicles had gathered behind the crews 46 Veterans Memorial Trail edit As part of constructing the southern extension the tollway authority donated a 15 to 20 foot wide 5 6 m corridor to local municipalities for the construction of a multi use trail named the Veterans Memorial Trail that will run along most of the length of the tollway from I 80 to I 55 47 Completion of the trail is expected to cost 10 million with funding to be provided by local communities along the path A new construction fund for the trail was created from registration fees collected for Roll the Tollway 48 The Active Transportation Alliance announced on January 29 2008 that about 108 000 equivalent to 150 000 in 2023 9 was raised through Roll the Tollway Of this amount 70 000 equivalent to 97 000 in 2023 9 was set aside for preliminary engineering studies on the 10 5 mile 16 9 km bicycle trail The remaining amount was directed towards advocacy efforts for the Chicago Bicycle Federation and other local bicycle clubs 49 The initial engineering phase of the bike trail has been completed in the form of the I 355 Area Trails Master Plan a framework created by Housel Lavigne Associates designed to distribute the work of creating and funding the trail among local communities The Forest Preserve District of Will County has begun work on the Veterans Memorial Trail from International Parkway Woodridge to 135th Street Romeoville and will then extend the trail to US 6 in the Village of New Lenox This addition will link the trail to a number of businesses in New Lenox including a shopping mall currently being constructed Silver Cross Hospital and medical offices 47 The Omnibus Appropriations Act included 470 000 equivalent to 641 000 in 2023 9 in federal funding for construction of the first phase of the trail 50 Route description edit nbsp Detailed map of I 355The southern terminus of I 355 is northeast of New Lenox where the highway intersects I 80 I 355 is routed north and slightly west through rural hilly portions of Will County Just after the US 6 interchange mile 1 0 tollway drivers pay a toll at Spring Creek Toll Plaza the only toll plaza on the southern extension of I 355 It continues north through the rural sections of Will County having exits that serve the towns of Homer Glen and Lockport At 135th Street approximately mile 8 0 in Lemont I 355 briefly enters Cook County After an interchange at 127th Street mile 9 0 I 355 crosses over the Des Plaines River on the Des Plaines River Valley Bridge before returning to Will County Shortly north of the bridge I 355 intersects I 55 at Bolingbrook mile 12 5 Multiple flyover ramps connect all directions of both highways 34 51 52 North of I 55 I 355 continues to run almost due north through the established western suburbs of Chicago in DuPage County Travelers pay another toll just north of Boughton Road at the Boughton Road Toll Plaza mile 13 5 Continuing north I 355 has another multiple flyover interchange with I 88 miles 19 5 and 23 0 officially designated the Ronald Reagan Memorial Tollway On the southern end of the interchange northbound I 355 has exits to both directions of I 88 I 355 then swings below I 88 and runs side by side with the other tollway for one mile 1 6 km Southbound exits to both directions of I 88 are at the northern end of the interchange At the Army Trail Road Toll Plaza mile 29 0 through traffic pays the last toll of the tollway I 355 has no tolls north of the Army Trail Road exit mile 30 in Addison There is one untolled exit mile 31 5 at US 20 Lake Street north of the tollway I 355 terminates at the I 290 interchange near the border of the villages of Itasca and Addison 34 51 52 As a result of a toll rate increase effective January 1 2012 the northernmost two toll plazas Boughton Road and Army Trail Road charge 1 90 cash and 0 95 for cars with I Pass and E ZPass The Spring Creek Toll Plaza charges 3 80 for travelers paying with cash and 1 90 for I Pass and E ZPass 53 54 All three toll plazas force traffic paying with cash to exit right into an area separate from the dedicated I Pass lanes Drivers paying with cash then pay their tolls at staffed plaza tollbooths 55 I Pass and E ZPass equipped cars and trucks are permitted to stay on the mainline and pay tolls at highway speeds in the tollway s ORT lanes 56 On I 355 the only control cities that are actual cities are Joliet St Louis Missouri and from I 80 Rockford 57 Other control cities on I 355 are limited to general areas of suburban Chicago For example control cities for I 355 while on I 55 are West Suburbs 58 and Southwest Suburbs 59 The control city for areas north of I 88 are Northwest Suburbs 60 Because of increasing congestion the Veterans Memorial Tollway has been widened to eight lanes between 75th Street and US 34 The tollway authority added the four mile 6 4 km 60 4 million project equivalent to 85 5 million in 2023 9 to its Congestion Relief Plan in mid 2007 and the new lanes opened on October 24 2009 61 Exit list editCountyLocationmi 51 kmExitDestinationsNotes 51 WillNew Lenox0 00 00 nbsp I 80 Iowa IndianaSouthern terminus southern end of Veterans Memorial Tollway signed as exits 0A east and 0B west I 80 exit 1401 01 61 nbsp US 6 Southwest Highway Toll northbound exit and southbound entrance Lockport Homer Glen line3 55 6Spring Creek Toll Plaza 99 62 5 08 04 nbsp IL 7 159th Street Toll southbound exit and northbound entrance 7 512 17 nbsp IL 171 Archer Avenue 143rd StreetToll southbound exit and northbound entrance CookLemont9 014 58127th StreetToll southbound exit and northbound entrance Des Plaines River12 019 3Des Plaines River Valley BridgeWillBolingbrook12 520 112 nbsp I 55 Chicago St Louis nbsp Historic US 66 Joliet Road Signed as exits 12A north and 12B south I 55 exit 269 exit 12A provides an exit ramp to Joliet road west13 521 713Boughton RoadToll northbound exit and southbound entrance to 87th StreetDuPage14 523 3Boughton Road Toll Plaza 89Woodridge15 524 915 nbsp CR 33 75th Street Toll southbound exit and northbound entrance 17 027 417 nbsp nbsp nbsp nbsp CR 38 east 63rd Street CR 2 west Hobson Road Toll southbound exit and northbound entrance Lisle Downers Grovevillage line18 529 818 nbsp CR 17 Maple Avenue Toll southbound exit and northbound entrance 19 531 41920B nbsp US 34 Ogden Avenue Signed as exits 19 southbound and 20B northbound southbound exit ramp merges with I 88 eastbound exit ramp to US 34Downers Grove19 5 22 531 4 36 220 nbsp nbsp nbsp nbsp I 88 Toll IL 110 CKC Ronald Reagan Memorial Tollway Aurora ChicagoSigned as exit 20A northbound I 88 west exit 131 east exits 131 132 I 88 and I 355 run side by side for over two miles 3 2 km at this point22 536 222 nbsp IL 56 Butterfield Road Toll northbound exit and southbound entrance Glen Ellyn Lombardvillage line24 539 424 nbsp IL 38 Roosevelt Road Toll northbound exit and southbound entrance Glendale Heights Lombardvillage line28 045 127 nbsp IL 64 North Avenue Toll northbound exit and southbound entrance 29 046 7Army Trail Road Toll Plaza 73Addison30 048 329 nbsp CR 11 Army Trail Road Northern end of Veterans Memorial Tollway31 550 731 nbsp US 20 Lake Street Addison Itascavillage line32 552 3 nbsp nbsp nbsp nbsp nbsp nbsp nbsp I 290 to IL 53 north I 90 Toll Rockford ChicagoNorthern terminus I 290 exit 71 000 mi 1 609 km 1 000 km 0 621 mi Electronic toll collection Route transitionSee also edit nbsp Illinois portal nbsp U S Roads portalNotes edit a b I 355 originally ran 20 01 miles 32 20 km from I 55 to I 290 according to Illinois 2005 GIS data The southern extension added 12 5 miles 20 1 km to this length according to the Illinois State Toll Highway Authority The 2006 National Bridge Inventory database shows the IL 19 bridge over I 290 dated to 1971 The I 290 bridge over now I 355 and I 355 bridge over US 20 are dated to 1970 7 References edit a b c Illinois Technology Transfer Center 2005 T2 GIS Data Illinois Department of Transportation Archived from the original on August 10 2007 Retrieved November 8 2007 Google December 17 2007 General satellite view of the three laned I 355 hybrid view to indicate where the highway is Map Google Maps Google Retrieved December 17 2007 a b c Hausner Les December 22 1989 Opening of I 355 will put some zip in Du Page traffic Chicago Sun Times Retrieved January 11 2008 a b c Illinois Tollway 2007 I 355 South Extension Archived from the original on November 7 2007 Retrieved November 17 2007 Rand McNally amp Company 1967 Chicago Vicinity Map Map Chicago Rand McNally amp Company Retrieved November 28 2007 via Broer Maps Online United States Geological Survey July 1 1978 Chicago Area topographic map Map Microsoft Research Maps Microsoft Retrieved January 21 2008 Staff Database Search National Bridge Inventory Federal Highway Administration Archived from the original on October 31 2013 Retrieved January 21 2008 Plummer Andy 2007 The Chicago Area Transportation Study Creating the First Plan 1955 1962 PDF Archived from the original PDF on February 16 2008 Retrieved December 21 2007 a b c d e f g h i j k l m n o p q r s t Johnston Louis Williamson Samuel H 2023 What Was the U S GDP Then MeasuringWorth Retrieved November 30 2023 United States Gross Domestic Product deflator figures follow the MeasuringWorth series Chicago Tribune Editorial Board March 6 1985 Buzzard highway Chicago Tribune Retrieved January 11 2008 Chicago Tribune January 29 1985 Sox DuPage batting stadium idea around Chicago Tribune Retrieved January 11 2008 a b Schmeltzer John April 29 1985 Arboretum accepts plan for tollway Chicago Tribune Retrieved January 11 2008 Schmeltzer John January 29 1986 Tollway gives 2 5 million to arboretum Chicago Tribune Retrieved January 11 2008 Schmeltzer John April 10 1986 Toll road impact report blasted Chicago Tribune Retrieved January 11 2008 Schmeltzer John May 29 1986 Tollway plans digs for answer Chicago Tribune Retrieved January 11 2008 Schmeltzer John October 9 1986 Bulldozers rev up for a tollway Chicago Tribune Retrieved January 11 2008 Mehler Neil H August 19 1987 Tollway work rides a wave of good luck Chicago Tribune Retrieved January 11 2008 Mehler Neil H April 26 1988 Tollway tries to get rock solid pavement Chicago Tribune Retrieved January 11 2008 Cuhry Daniel July 30 1988 Numbers game keeps tollway nameless The Daily Herald Arlington Heights IL Retrieved January 24 2008 Szymczak P Davis December 25 1991 State motorists get money s worth in North South Tollway Chicago Tribune Retrieved January 11 2008 Mills Steve December 15 1995 I 355 work dominates toll projects Chicago Tribune Retrieved January 11 2008 a b Kamin Blair April 20 1990 New tollway helps some hurts some Chicago Tribune Retrieved January 11 2008 Washburn Gary December 17 1990 New tollway is surpassing expectations Chicago Tribune Retrieved January 11 2008 Chicago Tribune June 21 1990 10 million released to pay for tollway Chicago Tribune Retrieved January 11 2008 Enstad Robert April 29 1990 Suits pile up on north south Tollway Chicago Tribune Retrieved January 11 2008 Chicago Tribune May 29 1992 1 million payout ok d for toll work Chicago Tribune Retrieved January 11 2008 Washburn Gary April 20 1989 State reveals traffic plan to combat area gridlock Chicago Tribune Retrieved January 26 2008 Gillis Michael November 18 1993 On I 355 change is no longer a constant New device collects tolls automatically Chicago Sun Times Retrieved January 11 2008 Presecky William August 13 1997 Tollbooth to nowhere put to the test Vacant Lemont tract a proving ground for new I Pass technology Chicago Tribune Retrieved January 11 2008 Mannion Annemarie February 6 1999 Toll plaza gets up to speed I Pass express lanes debut at Boughton Road site Chicago Tribune Retrieved January 11 2008 Hilkevitch Jon November 21 2005 Open road toll lanes wait for Blagojevich Chicago Tribune Retrieved January 11 2008 Kemp Jan June 28 2006 Why isn t there an oasis on the North South tollway Archived from the original on 2007 11 23 Retrieved November 15 2007 Via an interview response through the Daily Herald a b The Herald News November 11 2007 Tollway timeline The Herald News Joliet IL Retrieved January 11 2008 a b c Rand McNally 2006 The Road Atlas Map Chicago Rand McNally p 46 Illinois State Toll Highway Authority 2007 Congestion Relief Program Summary Illinois State Toll Highway Authority Archived from the original on October 25 2007 Retrieved November 15 2007 a b Ziemba Stanley May 13 2007 Bridge to southwest around the corner Chicago Tribune Retrieved January 11 2008 Endangered Dragonfly Relocated For Interstate Chicago WMAQ TV February 26 2007 Retrieved March 15 2007 Ziemba Stanley February 5 2006 A tollway that has no exits Chicago Tribune Retrieved January 11 2008 Cain Cindy Wojdyla June 2 2006 County to vote on I 355 local contribution plan Chicago Sun Times Retrieved January 11 2008 Graf Tony Ferrell Patrick November 11 2007 I 355 extension will change travel The Herald News Joliet IL Retrieved November 12 2007 Marsh Don October 1 2007 Prairie Passage Concrete Products Archived from the original on October 30 2007 Retrieved November 15 2007 Staff Homer Glen Announces Its Portion of the I 355 Grand Opening Celebrations PDF Press release City of Homer Glen Archived from the original PDF on June 30 2012 Retrieved April 2 2012 Staff 2007 I 355 South Extension Open for Business Press release Illinois State Toll Highway Authority Archived from the original on August 24 2007 Retrieved August 29 2007 WMAQ TV November 12 2007 Will County Commuters Hit Open Road On I 355 Chicago WMAQ TV Retrieved November 12 2007 Tridgell Guy November 14 2007 Unique I 355 bike ride will not happen again The Herald News Joliet IL Retrieved January 11 2008 O Brien Ken November 13 2007 Veterans Memorial Tollway I 355 extension traffic flowing smoothly The Herald News Joliet IL Retrieved January 11 2008 a b Lafferty Susan DeMar June 22 2009 I 355 Communities Hope to Connect Via Trails SouthtownStar Sun Times News Group p A3 Komperda Jack November 11 2007 Can a Sunday bike ride get new trail started Daily Herald Retrieved November 12 2007 O Hara Margo January 29 2008 Roll the Tollway raises more than 100 000 for trail bicycle advocacy Press release Chicago Bicycle Federation Retrieved January 30 2008 permanent dead link Staff May 4 2010 Durbin Announces Funding for Illinois Bike Trails Press release Office of Senator Durbin Archived from the original on October 15 2010 Retrieved October 2 2010 a b c d Illinois State Toll Highway Authority 2007 Illinois Tollway Complimentary Map Map Illinois State Toll Highway Authority Archived from the original on November 19 2007 Retrieved November 25 2007 a b OpenStreetMap Street maps topographic maps Map ACME Mapper Retrieved January 26 2008 Illinois State Toll Highway Authority 2007 I 355 South Extension PDF Map Illinois State Toll Highway Authority Archived from the original PDF on September 27 2007 Retrieved June 9 2007 Rates by Toll Plaza Illinois Tollway Archived from the original on June 23 2012 Retrieved July 8 2012 Staff 2007 General Information Illinois State Toll Highway Authority Archived from the original on July 15 2007 Retrieved December 18 2007 Staff 2007 About I Pass Illinois State Toll Highway Authority Archived from the original on July 21 2008 Retrieved November 28 2007 Staff I 355 Guide Sign at Army Trail Road Highway guide sign Addison IL Illinois State Toll Highway Authority Archived from the original on February 16 2008 Retrieved December 28 2007 Staff I 55 Guide Sign at I 355 North Highway guide sign Bolingbrook IL Illinois Department of Transportation Archived from the original on February 3 2014 Retrieved April 2 2012 Staff I 55 Guide Sign at I 355 South Highway guide sign Bolingbrook IL Illinois Department of Transportation Staff I 88 Guide Sign at I 355 Highway guide sign Downers Grove IL Illinois State Toll Highway Authority Staff Westbound Veterans Memorial Tollway I 355 Resurface amp Widen Project Completion Brings New Lanes and Smooth Pavement 4 New Southbound Lanes to Open by Saturday Morning Northbound Work Completed at 75th Street Interchange Press release Illinois State Toll Highway Authority Archived from the original on October 25 2009 Retrieved October 26 2009 Hilkevitch Jon October 22 2007 New superhighway opening soon in Will Chicago Tribune Archived from the original on November 21 2007 Retrieved October 23 2007 External links edit nbsp Wikimedia Commons has media related to Interstate 355 KML file edit help Template Attached KML Interstate 355KML is from Wikidata Illinois Tollway Highway Authority Illinois Highway Ends Interstate 355 Historic Current amp Average Travel Times For The Veterans Memorial Tollway Retrieved from https en wikipedia org w index php title Interstate 355 amp oldid 1217056608, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.