Hyderabad Airport Metro Express

The Hyderabad Airport Express Metro or Corridor IV is an approved Hyderabad Metro line from Raidurg metro station to Rajiv Gandhi International Airport.[1][2] The total length of the line is 31 km (19 mi).[3] Hyderabad Airport Express Metro is fully funded by Government of Telangana through the engineering, procurement and construction (EPC) mode.[4]

Hyderabad Airport Express Metro
Overview
Other name(s)Corridor IV
StatusStopped
OwnerHyderabad Metro
LocaleHyderabad India
Termini
Stations10
WebsiteHAML
Service
TypeAirport Express Train
SystemRapid Transit
Operator(s)Hyderabad Airport Metro Limited (HAML)
History
Planned openingJanuary 2027; 3 years' time (2027-01)
Technical
Line length31 km (19 mi)
CharacterUnderground, and Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Route map

Raidurg Blue Line
Biodiversity Junction
Nanakramguda Junction
Puppalaguda
Narsingi
TS Police Academy / Manchirevula
Rajendranagar / Satamrai
Shamshabad
Airport Cargo
RGIA Terminal

History edit

On 26 March 2018, a special purpose vehicle company, Hyderabad Airport Metro Limited (HAML), was established by the Government of Telangana to develop the Hyderabad Airport Metro Express.[5][6] HMRL Managing Director N.V.S. Reddy (Venkatsatyanarayan Reddy Nallamilli) is also Managing Director of HAML, which is jointly promoted by HMRL , Hyderabad Metropolitan Development Authority (HMDA) and Telangana State Industrial Infrastructure Corporation (TSIIC).[7] In August 2019, TRS Working President, Minister for Municipal Administration & Urban Development, Industries and IT&C K. T. Rama Rao said that the work on Hyderabad Metro Airport Express from Raheja Mindspace to Shamshabad RGI Airport will start soon.[8] The alignment to Shamshabad RGI Airport from the Raidurg metro station will be through the new Khajaguda Link Road (Beside CARE Hospitals). In March 2021, the Government of Telangana allocated 1,000 crore for Hyderabad Metro Rail Ltd in the 2021-2022 state budget.[9][10] In September 2021, GMR Group, the company operating the Rajiv Gandhi International Airport (RGIA) in Hyderabad said that it will invest 519.52 crore towards metro connectivity at the airport.[11][12]

 
Roda mistry college gachibowli

In March 2022, Government of Telangana allocated 2,377.35 crore (US$300 million) to the Hyderabad Metro Rail (HMR) in the 2022-2023 state budget. The Government of Telangana announced funds worth 1,500 crore for the Hyderabad Metro Rail for taking up land acquisition, preparation of detailed project reports and other developmental work, 377.35 crore for Airport Metro connectivity[13] and 500 crore for Metro connectivity to the old city (for initiating Corridor II- Green Line works from MGBS to Falaknuma; 5.5 km (3.4 mi)).[14][15] The 31 km (19 mi) Airport Express Metro Corridor is proposed to have 29.3 km (18.2 mi) elevated and a 1.7 km (1.1 mi) underground section to connect to the airport terminal.[16] The airport route will have 9 elevated stations and one underground station.[17] The metro viaduct will cross the junction near IKEA store at about 21 metres (69 ft) high.[18] From Raidurg Metro terminal station, it will pass over Bio-diversity Junction, through Roda Mistry college lane, Khajaguda Junction, touching Outer Ring Road at Nanakramguda junction and traverse along ORR to Shamshabad Airport through the existing dedicated Metro Rail Right-of-Way.[19][20]

In February 2023, Government of Telangana allocated 500 crore (US$63 million) to the Hyderabad Airport Metro Express in the 2023-2024 state budget.[21][22] On 18 February 2023, HMRL Managing Director N.V.S. Reddy informed that Nanakramguda junction metro station will be designed as portal structure with three pillars and the station is required to be close to the junction.[23][24] Nanakramguda junction metro station will be about 2.5 km (1.6 mi) from Wipro circle. In June 2023, Managing director of HAML, NVS Reddy informed that order for 11 metro trains with three coaches each will be placed by the end of 2023.[25]

Foundation laying ceremony edit

 
Hyderabad Airport Express Metro foundation Stone

Chief Minister of Telangana K. Chandrashekar Rao laid the foundation stone for Hyderabad Airport Express Metro at Mindspace Junction on 9 December 2022.[26] It will be built at an approximate cost of 6,250 crore (US$780 million).[27] Hyderabad Airport Express Metro is a Telangana State Government funded project and will be completed by beginning of 2026. The existing corridor three (Blue line) from Raidurg Station to the new Airport Metro Raidurg Station will be extended by about 900 meters (2,953 ft),[28][23] thus it would be an integrated four-level station, somewhat similar to JBS Station of metro corridor-2 (Green line) and Ameerpet interchange station. The extended blue line terminal station and the Airport Metro station is planned as a combined interchange station one over the other.[29] The combined interchange station design is due to space constraints in front of L&T and Aurobindo buildings after IKEA junction. The first two levels will accommodate Airport Metro station and the top two levels will accommodate the extended blue line (Corridor 3) terminal station.

Pre-construction survey work for alignment finalization edit

In December 2022, Hyderabad Airport Metro Ltd (HAML) engaged two survey teams to gather ground data for alignment finalization and determining the station locations.[30] In January 2023, K. T. Rama Rao sought Central Government’s in-principle approval for Hyderabad airport express metro project.[31][32][33] To expedite grounding of Hyderabad airport metro works, this pre-construction activity was taken up simultaneously.[34] The survey work is done by using both the satellite based Differential GPS and the Electronic Total station.[35] Till 14 January 2023, the survey of 21 km (13 mi) from Raidurg metro station to Fort Grand underpass near Shamshabad was completed[36][37] and remaining 10 km (6.2 mi) will be completed by January 2023 end. Thereafter, peg marking of the airport metro alignment will start.[37] On 31 January 2023, HMRL Managing Director N.V.S. Reddy informed that Metro pillars will be located in the central median of the widened service road from Nanakramguda junction to TSPA (APPA) junction.[38][39][40] On 28 February 2023, HMRL Managing Director N.V.S. Reddy informed that survey for the airport Metro corridor is completed and peg marking of its alignment on the ground has begun.[41][42][43] Aluminium boards with a retro-reflective sheet for visibility at night are also being embedded in the central median.[44][45] On 27 March 2023, HMRL Managing Director N.V.S. Reddy informed that alignment has been fixed and peg marking for the Airport Metro project is completed. Soil testing has commenced, through in-situ tests and laboratory tests of borehole soil samples up to a depth of about 40 feet (12 m) from road surface, before finalising the exact locations for the pillars.[46] Soil testing would be done by engineering wing in 100 locations for erecting pillars, over a period of two months.[47]

On 26 April 2023, HAML Managing Director, NVS Reddy inspected the Shamshabad airport metro stretch of Airport Metro alignment of about 1.3 km (0.81 mi) on Rajendranagar hillock.[19][48] On 30 April 2023, Hyderabad Airport Metro Limited (HAML) Managing Director N.V.S. Reddy and others inspected Delhi Airport Metro Express by travelling on it, examining the check-in facility on the city side at New Delhi station.[49][50] On 15 May 2023, HAML Managing Director N.V.S. Reddy informed that provision has also been kept for construction of four additional stations in future.[51][52][53]

Selection of General Consultant edit

On 3 December 2022, Hyderabad Airport Metro Limited (HAML) invited Expression of Interest (EoI cum RfQ) for selection of General Consultant (GC) for the Design and Build (DB) of Airport Express.[54][55] Technical experts and field engineers with sound domain knowledge and experience will be in the GC, to work in tandem with the techno-managerial team of HAML. The last date for Submission of EOI is December 13, 2022, and the last date for bid submission is January 20, 2023.[56] Pre Application Conference for this was held in Hyderabad on 6 December 2022 , Marigold Hotel, Green Lands, Begumpet.[57] About 23 reputed national and international engineering consultancy firms participated in the meeting. By 21 December 2022, 5 consortiums applied for the Request for qualifications (RfQ) for the General Consultants (GC) for the Hyderabad Airport Metro project.[58]

# Pre-qualified Bidders for RfQ for the General Consultants (GC)
1 SYSTRA(France) + RITES + DB Engineering & Consulting(Germany)
2 Ayesa Ingenieria y Arquitectura (Spain) + Nippon Koei(Japan) + Aarvee Associates
3 Technica y Proyectos (Spain) + PINI Group(Switzerland)
4 AECOM India + Egis Rail (France) + Egis India
5 Consulting Engineers Group + Korea National Railway(South Korea)

On 28 December 2022, after evaluation of their applications, Hyderabad Airport Metro Limited (HAML) declared that all the five consortia had qualified to participate in the next stage bid documents[59][60] i.e., the Request for proposal (RfP) and they will have to submit their bids by January 20, 2023.[61][62] On 20 April 2023, SYSTRA(France) + RITES + DB Engineering & Consulting(Germany) was selected as the General Consultants (GC) for the Airport Metro project, based on the recommendations of a technical committee.[63] SYSTRA-led consortium got the highest technical score for its credentials and gave the lowest financial quote of 98.54 crore (US$12 million) to provide engineering consultancy services.[64] The immediate task of the General Consultant was to prepare engineering, procurement and construction (EPC) tender documents for selecting the contractor for the Airport Metro Project.[65][66] The SYSTRA-led consortium would deploy 18 experts of different railway engineering disciplines and about 70 senior and field engineering personnel during the construction of Airport Metro Project.

Selection of Consultant for marking right of way (RoW) edit

In December 2022, Hyderabad Airport Metro Limited (HAML) invited bids for clearing vegetation and marking right-of-way (RoW) from Mindspace Junction to RGIA Airport.[67][68] Consultants would be asked to finish the project within three months. The successful bidder would not be allowed to chop trees.

# Starting Section for marking RoW Terminal section Sanctioned Amount (in )
1 MindSpace junction My Home Avatar, Narsingi 95 lakh
2 Rajapushpa Provincia Apartment, Narsingi, TSPA 80 lakh
3 Rajiv Gruhakalpa Bengaluru highway 75 lakh
4 Chevella road Musi river, Rajendranagar 90 lakh
5 ORR exit , Rajendranagar Shivam Road 86 lakh
6 Shamshabad junction RGIA, Hyderabad 98 lakh

Invitation to tender for construction contracts edit

On 15 May 2023, Hyderabad Airport Metro Limited invited open tender for design and construction work of Airport Metro Line.[69][70] The estimated contract value is 5,688 crore (US$710 million) and contract period is 3 years.[71][51] The last date for submission of bids is 5 July 2023.[72] The selected EPC Contractor must start the ground works of Hyderabad Airport Metro Express by September 2023.[73][74] On 14 June 2023, a pre-bid meeting with prospective construction firms was held at the Hyderabad Metro Rail (HMR) office, where 13 companies like L&T, Alstom, Siemens, Tata Projects IRCON, RVNL, BEML, Pandrol Rahee Technologies, etc. participated,[75] who were informed that soil testing was underway.[76][77] The original submission date was extended by 1 week and the bids are slated to opened on 12 July 2023.[78] After the bids were opened on 13 July 2023, L&T & NCC Ltd (formerly Nagarjuna Construction Company) emerged as the two competing bidders for the Hyderabad Airport Metro project.[79] The two construction firms have submitted security deposit of 29 crore rupees each in bank guarantees.[80] L&T emerged as the lowest bidder, after the bids were opened on 14 August 2023.[81]

Finances edit

Hyderabad Metropolitan Development Authority (HMDA) and GMR Group contributed 625 crore (US$78 million) each, or 10 per cent of the project's cost.[82][83]

Stations edit

Hyderabad Airport Express Metro
# Station Name Opened Connections Alignment
English Telugu
1 Raidurg రాయదుర్గ్ Yet to start construction Airport Shuttle
Blue Line
Elevated
2 Biodiversity Junction జీవవైవిధ్య జంక్షన్ None Elevated
3 Nanakramguda Junction నానక్రంగూడ జంక్షన్ None Elevated
4 Puppalaguda పుప్పల్‌గూడా None Elevated
5 Narsingi నార్సింగి None Elevated
6 TS Police Academy/Manchirevula టి ఎస్ పోలీస్ అకాడమీ/మంచిరేవుల None Elevated
7 Rajendranagar/Satamrai రాజేంద్రనగర్ / సతామ్రాయి None Elevated
8 Shamshabad శంషాబాద్ None Elevated
9 Airport Cargo ఎయిర్పోర్ట్ కార్గో None Elevated
10 RGIA Terminal ఆర్ జి ఐ ఎ టెర్మినల్ None Underground

Depot edit

On 10 August 2023, GMR Airport was asked to hand over 48 acres of land for taking up construction of depot.[84]

Benefits beyond airport connectivity edit

Air passengers will be able to check-in and part with their baggage at Raidurg metro station itself and reach the Boarding gates directly at Rajiv Gandhi International Airport.[85][86] Multi-location check-in facility at the metro station will be crucial public transport link for southern Hyderabad and suburban areas. The Hyderabad airport Express metro will provide a crucial link for the GMR Aerocity Hyderabad at Adibatla and proposed Hyderabad Pharma City. The travelling time from Mindspace junction to Hyderabad airport will be 26 minutes. There will be a provision of half-height platform screen doors (PSD) for improved passenger safety.[87] There will be bolster-less bogies and Automated fare collection (AFC) gates at each station. In order to keep passengers informed about the flights, there will be a Flight information display system (FIDS) and information desk at all Hyderabad airport metro stations. The Hyderabad Airport Express Metro's airport station will be underneath the passenger terminal and will transport passengers to the gates through lifts, escalators and stairs.[88]

The Airport Metro connects several residential areas along its route like Rajendranagar, Budwel, Narsingi, Kismatpur, TS Police Academy, Shamshabad etc. This area houses around 5 Lakh people. Airport Metro project is planned as an opportunity to facilitate development of city outskirts for providing affordable housing for lower income groups and better accommodation for middle class at lower costs. The project is designed not only for Airport passengers but also for reverse commute of those who stay in extended parts of the city to reach their work places in city within about 20 minutes. Vacant Government land parcels would be identified near stations to provide good parking facilities. Multi-armed Skywalks with landings on all sides of junctions will be provided for easy access and to make Airport Metro a preferred commute option. Airport Metro is being dovetailed to facilitate and cater to this unprecedented growth of Hyderabad.

Second airport connectivity from Falaknuma edit

There is a proposal to give a second connectivity to Rajiv Gandhi International Airport, Shamshabad from Falaknuma in Old City.[89][90][91]

See also edit

References edit

  1. ^ "From start to finish, Hyderabad Airport Metro expected to be smooth affair".
  2. ^ "Wait for next phase of Hyderabad Metro rail gets longer".
  3. ^ "Airport Express Metro to be elevated with 2.5-km underground stretch near RGIA".
  4. ^ "After many twists and turns, Hyderabad metro's second phase finally in motion".
  5. ^ "Metro Rail to airport may not take off".
  6. ^ "Govt's 'open offer' to private firms for Airport Metro".
  7. ^ "Hyderabad Express Metro: 5 consortiums qualify for final bids".
  8. ^ "Work on Airport Express metro to begin soon: KTR | Hyderabad News". The Times of India.
  9. ^ "Telangana Budget: No allocation for GHMC, HMDA". 18 March 2021.
  10. ^ "Telangana: ₹1000 crore allocated for Hyderabad Metro Rail in ₹2.30 lakh crore budget 2021-22".
  11. ^ "GHIAL to invest Rs 500 crore for metro connectivity at Hyderabad airport". The Times of India.
  12. ^ "GMR to invest over Rs 500 crore in Hyderabad Airport metro link project". The Economic Times.
  13. ^ "Hyderabad: Telangana govt allocates funds for metro connectivity to old city, airport".
  14. ^ Geetanath, V. (7 March 2022). "Plans for metro connectivity to Hyderabad's Old City revived". The Hindu.
  15. ^ "HMRL tops in budgetary allocation for city departments". 8 March 2022.
  16. ^ "Hyderabad: Metro's airport service to have underground stretch | Hyderabad News". The Times of India.
  17. ^ Geetanath, V. (2 September 2019). "Airport Metro to have underground section connecting to passenger terminal". The Hindu – via www.thehindu.com.
  18. ^ "Officials take stock of engineering hurdles in Hyderabad Airport Metro".
  19. ^ a b "Hyderabad Airport Metro will be tackling two hillocks on the way".
  20. ^ "Telangana announces 31-km Metro line from Madhapur to airport".
  21. ^ "₹2.5k crore puts Metro expansion on fast track".
  22. ^ "Rs 2,500 crore for Metro rail expansion in Hyderabad".
  23. ^ a b "Metro line to be extended up to Mindspace junction for multi-level Raidurg station in Hyderabad".
  24. ^ "Hyderabad Airport Metro line: inspection to assess the challenges for construction".
  25. ^ "11 trains to operate on Airport line".
  26. ^ "KCR lays foundation stone for Hyderabad Airport Express Metro".
  27. ^ "Airport Express Metro on track, Telangana CM K Chandrasekhar Rao to lay foundation on December 9".
  28. ^ "Hyderabad Airport Metro works to be fast-tracked".
  29. ^ "HAML all set to fast track Hyd Airport Metro works".
  30. ^ "HAML to fast track Hyderabad Airport Metro".
  31. ^ "Telangana minister KT Rama Rao sends Rs 13,000 crore wish list to Centre".
  32. ^ "Allocate more for Hyderabad projects in Union Budget, KTR writes to Centre".
  33. ^ "KTR seeks special package for Hyderabad in Union Budget".
  34. ^ "Airport Metro works in full swing".
  35. ^ "HAML completes 21 km of pre-construction survey work".
  36. ^ "Pre-construction works for Hyderabad Airport Metro works in full swing".
  37. ^ a b "Airport metro progressing at a brisk pace".
  38. ^ "Airport Metro to minimise acquisition of private properties".
  39. ^ "Hyderabad Airport Metro to finetune alignment for station location".
  40. ^ "Avoid land acquisition for Airport Metro: HAML MD to officials".
  41. ^ "Hyd Airport metro peg marking work begins".
  42. ^ "Airport Metro project survey completed, peg marking on".
  43. ^ "Survey completed for Hyderabad Airport Metro".
  44. ^ "Hyderabad Airport Metro survey ready".
  45. ^ "Hyderabad Airport Metro: Works on ground begin with peg markings along corridor".
  46. ^ "Soil testing commences for Airport Metro".
  47. ^ "Soil testing announced for 31km metro corridor to Hyderabad airport".
  48. ^ "Metro alignment at Rajendranagar stretch examined in Hyderabad".
  49. ^ "Hyderabad Airport Metro officials take a ride on Delhi Airport line".
  50. ^ "HAML MD visits Del airport Metro to study facilities & operations".
  51. ^ a b "Hyderabad Airport Metro invites global tenders, keeps open option for 4 more stations for future needs".
  52. ^ "HAML invites global tenders for EPC contractor for Hyderabad Airport Metro".
  53. ^ "Telangana calls global tenders for Airport Metro".
  54. ^ "tender haml1" (PDF).
  55. ^ "tender haml2" (PDF).
  56. ^ "Hyderabad Airport Metro Rail extends last date for submission of bids for GC".
  57. ^ "Airport Metro will be 'high-speed work', will need partners having 'extraordinary targets': HAML MD".
  58. ^ "Five consortiums bid for Hyderabad Airport Metro Corridor GC".
  59. ^ "Five engineering groups selected to bid for Hyderabad airport metro".
  60. ^ "Five consortiums qualify for Hyderabad Airport Metro GC bids".
  61. ^ "Five consortiums qualify Hyderabad Airport Metro bid, to submit by Jan 20".
  62. ^ "All five consortia qualify for final bid for Hyderabad Airport Metro GC".
  63. ^ "Systra-led group selected as consultants for Airport Metro".
  64. ^ "Engineering consultant selected for Hyderabad Airport Metro".
  65. ^ "Systra-led consortium picked as Airport Metro consultant".
  66. ^ "Old City Metro project in limbo, while Hyderabad Airport line moves ahead".
  67. ^ "Airport Metro papers move at top speed".
  68. ^ "Jungle clearance for airport metro project begins in Telangana".
  69. ^ "International Competitive bidding ICB" (PDF).
  70. ^ "Hyderabad Metro Rail invites tenders for Airport corridor at Rs 5,688 cr contract value".
  71. ^ "Global tenders invited for Airport Metro project".
  72. ^ "Global tenders invited for Airport Metro project".
  73. ^ "Airport Metro works scheduled to commence from Sept".
  74. ^ "GMR Airport to contribute 10% for Hyderabad Airport Metro Project".
  75. ^ "Hyderabad airport metro: 13 companies participate in pre-bidding meeting".
  76. ^ "13 companies partipate in Hyd airport metro pre-bid meeting".
  77. ^ "Pre-bid meeting for Hyderabad Airport Metro project held".
  78. ^ "Airport Metro bids to be opened on July 12".
  79. ^ "L&T, NCC in race for Hyderabad Airport Metro work".
  80. ^ "L&T and NCC in race to bag Airport Metro Project, bid for Rs 5,688cr tender".
  81. ^ "L&T is lowest bidder for Hyderabad Airport Metro project".
  82. ^ "We will build Metro without Central funds, asserts CM KCR".
  83. ^ "Chief Minister K Chandrasekhar Rao asks officials to plan for future infra needs of capital".
  84. ^ "GMR Airport asked to hand over 48 acres of land for Metro rail depot".
  85. ^ "Once Hyderabad Airport Metro opens, air passengers can check in at Metro station: HMRL MD".
  86. ^ "We want Hyderabad Airport Metro to be better than Hong Kong and Gatwick in terms of experience: HMRL MD".
  87. ^ "Airport Metro to have seating, better aesthetics and an aerodynamic model".
  88. ^ "SCR junks plan to extend railway line to RGIA".
  89. ^ "KTR directs HMRL to draw plans for another Metro line to airport".
  90. ^ "Metro to Hyderabad airport via Falaknuma too!".
  91. ^ "Metro corridors to crisscross Hyderabad for airport link".

External links edit

  Media related to Hyderabad Airport Express Metro at Wikimedia Commons

  • Hyderabad Airport Metro Ltd

hyderabad, airport, metro, express, hyderabad, airport, express, metro, corridor, approved, hyderabad, metro, line, from, raidurg, metro, station, rajiv, gandhi, international, airport, total, length, line, hyderabad, airport, express, metro, fully, funded, go. The Hyderabad Airport Express Metro or Corridor IV is an approved Hyderabad Metro line from Raidurg metro station to Rajiv Gandhi International Airport 1 2 The total length of the line is 31 km 19 mi 3 Hyderabad Airport Express Metro is fully funded by Government of Telangana through the engineering procurement and construction EPC mode 4 Hyderabad Airport Express MetroOverviewOther name s Corridor IVStatusStoppedOwnerHyderabad MetroLocaleHyderabad IndiaTerminiRaidurgRGIA TerminalStations10WebsiteHAMLServiceTypeAirport Express TrainSystemRapid TransitOperator s Hyderabad Airport Metro Limited HAML HistoryPlanned openingJanuary 2027 3 years time 2027 01 TechnicalLine length31 km 19 mi CharacterUnderground and ElevatedTrack gauge1 435 mm 4 ft 8 1 2 in standard gaugeElectrification25 kV 50 Hz AC overhead catenaryRoute mapLegendRaidurg Blue LineBiodiversity JunctionNanakramguda JunctionPuppalagudaNarsingiTS Police Academy ManchirevulaRajendranagar SatamraiShamshabadAirport CargoRGIA Terminal Contents 1 History 1 1 Foundation laying ceremony 1 2 Pre construction survey work for alignment finalization 1 3 Selection of General Consultant 1 4 Selection of Consultant for marking right of way RoW 1 5 Invitation to tender for construction contracts 2 Finances 3 Stations 4 Depot 5 Benefits beyond airport connectivity 6 Second airport connectivity from Falaknuma 7 See also 8 References 9 External linksHistory editOn 26 March 2018 a special purpose vehicle company Hyderabad Airport Metro Limited HAML was established by the Government of Telangana to develop the Hyderabad Airport Metro Express 5 6 HMRL Managing Director N V S Reddy Venkatsatyanarayan Reddy Nallamilli is also Managing Director of HAML which is jointly promoted by HMRL Hyderabad Metropolitan Development Authority HMDA and Telangana State Industrial Infrastructure Corporation TSIIC 7 In August 2019 TRS Working President Minister for Municipal Administration amp Urban Development Industries and IT amp C K T Rama Rao said that the work on Hyderabad Metro Airport Express from Raheja Mindspace to Shamshabad RGI Airport will start soon 8 The alignment to Shamshabad RGI Airport from the Raidurg metro station will be through the new Khajaguda Link Road Beside CARE Hospitals In March 2021 the Government of Telangana allocated 1 000 crore for Hyderabad Metro Rail Ltd in the 2021 2022 state budget 9 10 In September 2021 GMR Group the company operating the Rajiv Gandhi International Airport RGIA in Hyderabad said that it will invest 519 52 crore towards metro connectivity at the airport 11 12 nbsp Roda mistry college gachibowliIn March 2022 Government of Telangana allocated 2 377 35 crore US 300 million to the Hyderabad Metro Rail HMR in the 2022 2023 state budget The Government of Telangana announced funds worth 1 500 crore for the Hyderabad Metro Rail for taking up land acquisition preparation of detailed project reports and other developmental work 377 35 crore for Airport Metro connectivity 13 and 500 crore for Metro connectivity to the old city for initiating Corridor II Green Line works from MGBS to Falaknuma 5 5 km 3 4 mi 14 15 The 31 km 19 mi Airport Express Metro Corridor is proposed to have 29 3 km 18 2 mi elevated and a 1 7 km 1 1 mi underground section to connect to the airport terminal 16 The airport route will have 9 elevated stations and one underground station 17 The metro viaduct will cross the junction near IKEA store at about 21 metres 69 ft high 18 From Raidurg Metro terminal station it will pass over Bio diversity Junction through Roda Mistry college lane Khajaguda Junction touching Outer Ring Road at Nanakramguda junction and traverse along ORR to Shamshabad Airport through the existing dedicated Metro Rail Right of Way 19 20 In February 2023 Government of Telangana allocated 500 crore US 63 million to the Hyderabad Airport Metro Express in the 2023 2024 state budget 21 22 On 18 February 2023 HMRL Managing Director N V S Reddy informed that Nanakramguda junction metro station will be designed as portal structure with three pillars and the station is required to be close to the junction 23 24 Nanakramguda junction metro station will be about 2 5 km 1 6 mi from Wipro circle In June 2023 Managing director of HAML NVS Reddy informed that order for 11 metro trains with three coaches each will be placed by the end of 2023 25 Foundation laying ceremony edit nbsp Hyderabad Airport Express Metro foundation StoneChief Minister of Telangana K Chandrashekar Rao laid the foundation stone for Hyderabad Airport Express Metro at Mindspace Junction on 9 December 2022 26 It will be built at an approximate cost of 6 250 crore US 780 million 27 Hyderabad Airport Express Metro is a Telangana State Government funded project and will be completed by beginning of 2026 The existing corridor three Blue line from Raidurg Station to the new Airport Metro Raidurg Station will be extended by about 900 meters 2 953 ft 28 23 thus it would be an integrated four level station somewhat similar to JBS Station of metro corridor 2 Green line and Ameerpet interchange station The extended blue line terminal station and the Airport Metro station is planned as a combined interchange station one over the other 29 The combined interchange station design is due to space constraints in front of L amp T and Aurobindo buildings after IKEA junction The first two levels will accommodate Airport Metro station and the top two levels will accommodate the extended blue line Corridor 3 terminal station Pre construction survey work for alignment finalization edit In December 2022 Hyderabad Airport Metro Ltd HAML engaged two survey teams to gather ground data for alignment finalization and determining the station locations 30 In January 2023 K T Rama Rao sought Central Government s in principle approval for Hyderabad airport express metro project 31 32 33 To expedite grounding of Hyderabad airport metro works this pre construction activity was taken up simultaneously 34 The survey work is done by using both the satellite based Differential GPS and the Electronic Total station 35 Till 14 January 2023 the survey of 21 km 13 mi from Raidurg metro station to Fort Grand underpass near Shamshabad was completed 36 37 and remaining 10 km 6 2 mi will be completed by January 2023 end Thereafter peg marking of the airport metro alignment will start 37 On 31 January 2023 HMRL Managing Director N V S Reddy informed that Metro pillars will be located in the central median of the widened service road from Nanakramguda junction to TSPA APPA junction 38 39 40 On 28 February 2023 HMRL Managing Director N V S Reddy informed that survey for the airport Metro corridor is completed and peg marking of its alignment on the ground has begun 41 42 43 Aluminium boards with a retro reflective sheet for visibility at night are also being embedded in the central median 44 45 On 27 March 2023 HMRL Managing Director N V S Reddy informed that alignment has been fixed and peg marking for the Airport Metro project is completed Soil testing has commenced through in situ tests and laboratory tests of borehole soil samples up to a depth of about 40 feet 12 m from road surface before finalising the exact locations for the pillars 46 Soil testing would be done by engineering wing in 100 locations for erecting pillars over a period of two months 47 On 26 April 2023 HAML Managing Director NVS Reddy inspected the Shamshabad airport metro stretch of Airport Metro alignment of about 1 3 km 0 81 mi on Rajendranagar hillock 19 48 On 30 April 2023 Hyderabad Airport Metro Limited HAML Managing Director N V S Reddy and others inspected Delhi Airport Metro Express by travelling on it examining the check in facility on the city side at New Delhi station 49 50 On 15 May 2023 HAML Managing Director N V S Reddy informed that provision has also been kept for construction of four additional stations in future 51 52 53 Selection of General Consultant edit On 3 December 2022 Hyderabad Airport Metro Limited HAML invited Expression of Interest EoI cum RfQ for selection of General Consultant GC for the Design and Build DB of Airport Express 54 55 Technical experts and field engineers with sound domain knowledge and experience will be in the GC to work in tandem with the techno managerial team of HAML The last date for Submission of EOI is December 13 2022 and the last date for bid submission is January 20 2023 56 Pre Application Conference for this was held in Hyderabad on 6 December 2022 Marigold Hotel Green Lands Begumpet 57 About 23 reputed national and international engineering consultancy firms participated in the meeting By 21 December 2022 5 consortiums applied for the Request for qualifications RfQ for the General Consultants GC for the Hyderabad Airport Metro project 58 Pre qualified Bidders for RfQ for the General Consultants GC 1 SYSTRA France RITES DB Engineering amp Consulting Germany 2 Ayesa Ingenieria y Arquitectura Spain Nippon Koei Japan Aarvee Associates3 Technica y Proyectos Spain PINI Group Switzerland 4 AECOM India Egis Rail France Egis India5 Consulting Engineers Group Korea National Railway South Korea On 28 December 2022 after evaluation of their applications Hyderabad Airport Metro Limited HAML declared that all the five consortia had qualified to participate in the next stage bid documents 59 60 i e the Request for proposal RfP and they will have to submit their bids by January 20 2023 61 62 On 20 April 2023 SYSTRA France RITES DB Engineering amp Consulting Germany was selected as the General Consultants GC for the Airport Metro project based on the recommendations of a technical committee 63 SYSTRA led consortium got the highest technical score for its credentials and gave the lowest financial quote of 98 54 crore US 12 million to provide engineering consultancy services 64 The immediate task of the General Consultant was to prepare engineering procurement and construction EPC tender documents for selecting the contractor for the Airport Metro Project 65 66 The SYSTRA led consortium would deploy 18 experts of different railway engineering disciplines and about 70 senior and field engineering personnel during the construction of Airport Metro Project Selection of Consultant for marking right of way RoW edit In December 2022 Hyderabad Airport Metro Limited HAML invited bids for clearing vegetation and marking right of way RoW from Mindspace Junction to RGIA Airport 67 68 Consultants would be asked to finish the project within three months The successful bidder would not be allowed to chop trees Starting Section for marking RoW Terminal section Sanctioned Amount in 1 MindSpace junction My Home Avatar Narsingi 95 lakh2 Rajapushpa Provincia Apartment Narsingi TSPA 80 lakh3 Rajiv Gruhakalpa Bengaluru highway 75 lakh4 Chevella road Musi river Rajendranagar 90 lakh5 ORR exit Rajendranagar Shivam Road 86 lakh6 Shamshabad junction RGIA Hyderabad 98 lakhInvitation to tender for construction contracts edit On 15 May 2023 Hyderabad Airport Metro Limited invited open tender for design and construction work of Airport Metro Line 69 70 The estimated contract value is 5 688 crore US 710 million and contract period is 3 years 71 51 The last date for submission of bids is 5 July 2023 72 The selected EPC Contractor must start the ground works of Hyderabad Airport Metro Express by September 2023 73 74 On 14 June 2023 a pre bid meeting with prospective construction firms was held at the Hyderabad Metro Rail HMR office where 13 companies like L amp T Alstom Siemens Tata Projects IRCON RVNL BEML Pandrol Rahee Technologies etc participated 75 who were informed that soil testing was underway 76 77 The original submission date was extended by 1 week and the bids are slated to opened on 12 July 2023 78 After the bids were opened on 13 July 2023 L amp T amp NCC Ltd formerly Nagarjuna Construction Company emerged as the two competing bidders for the Hyderabad Airport Metro project 79 The two construction firms have submitted security deposit of 29 crore rupees each in bank guarantees 80 L amp T emerged as the lowest bidder after the bids were opened on 14 August 2023 81 Finances editHyderabad Metropolitan Development Authority HMDA and GMR Group contributed 625 crore US 78 million each or 10 per cent of the project s cost 82 83 Stations editMain article List of Hyderabad Metro stations Hyderabad Airport Express Metro Station Name Opened Connections AlignmentEnglish Telugu1 Raidurg ర యద ర గ Yet to start construction Airport Shuttle Blue Line Elevated2 Biodiversity Junction జ వవ వ ధ య జ క షన None Elevated3 Nanakramguda Junction న నక ర గ డ జ క షన None Elevated4 Puppalaguda ప ప పల గ డ None Elevated5 Narsingi న ర స గ None Elevated6 TS Police Academy Manchirevula ట ఎస ప ల స అక డమ మ చ ర వ ల None Elevated7 Rajendranagar Satamrai ర జ ద రనగర సత మ ర య None Elevated8 Shamshabad శ ష బ ద None Elevated9 Airport Cargo ఎయ ర ప ర ట క ర గ None Elevated10 RGIA Terminal ఆర జ ఐ ఎ ట ర మ నల None UndergroundDepot editOn 10 August 2023 GMR Airport was asked to hand over 48 acres of land for taking up construction of depot 84 Benefits beyond airport connectivity editAir passengers will be able to check in and part with their baggage at Raidurg metro station itself and reach the Boarding gates directly at Rajiv Gandhi International Airport 85 86 Multi location check in facility at the metro station will be crucial public transport link for southern Hyderabad and suburban areas The Hyderabad airport Express metro will provide a crucial link for the GMR Aerocity Hyderabad at Adibatla and proposed Hyderabad Pharma City The travelling time from Mindspace junction to Hyderabad airport will be 26 minutes There will be a provision of half height platform screen doors PSD for improved passenger safety 87 There will be bolster less bogies and Automated fare collection AFC gates at each station In order to keep passengers informed about the flights there will be a Flight information display system FIDS and information desk at all Hyderabad airport metro stations The Hyderabad Airport Express Metro s airport station will be underneath the passenger terminal and will transport passengers to the gates through lifts escalators and stairs 88 The Airport Metro connects several residential areas along its route like Rajendranagar Budwel Narsingi Kismatpur TS Police Academy Shamshabad etc This area houses around 5 Lakh people Airport Metro project is planned as an opportunity to facilitate development of city outskirts for providing affordable housing for lower income groups and better accommodation for middle class at lower costs The project is designed not only for Airport passengers but also for reverse commute of those who stay in extended parts of the city to reach their work places in city within about 20 minutes Vacant Government land parcels would be identified near stations to provide good parking facilities Multi armed Skywalks with landings on all sides of junctions will be provided for easy access and to make Airport Metro a preferred commute option Airport Metro is being dovetailed to facilitate and cater to this unprecedented growth of Hyderabad Second airport connectivity from Falaknuma editThere is a proposal to give a second connectivity to Rajiv Gandhi International Airport Shamshabad from Falaknuma in Old City 89 90 91 See also editTransport in Hyderabad Hyderabad Multi Modal Transport System Airport Express MTR Namma Metro ORR Airport Metro Line Delhi Airport Metro Express Mumbai Airport Express Line Portal nbsp TransportReferences edit From start to finish Hyderabad Airport Metro expected to be smooth affair Wait for next phase of Hyderabad Metro rail gets longer Airport Express Metro to be elevated with 2 5 km underground stretch near RGIA After many twists and turns Hyderabad metro s second phase finally in motion Metro Rail to airport may not take off Govt s open offer to private firms for Airport Metro Hyderabad Express Metro 5 consortiums qualify for final bids Work on Airport Express metro to begin soon KTR Hyderabad News The Times of India Telangana Budget No allocation for GHMC HMDA 18 March 2021 Telangana 1000 crore allocated for Hyderabad Metro Rail in 2 30 lakh crore budget 2021 22 GHIAL to invest Rs 500 crore for metro connectivity at Hyderabad airport The Times of India GMR to invest over Rs 500 crore in Hyderabad Airport metro link project The Economic Times Hyderabad Telangana govt allocates funds for metro connectivity to old city airport Geetanath V 7 March 2022 Plans for metro connectivity to Hyderabad s Old City revived The Hindu HMRL tops in budgetary allocation for city departments 8 March 2022 Hyderabad Metro s airport service to have underground stretch Hyderabad News The Times of India Geetanath V 2 September 2019 Airport Metro to have underground section connecting to passenger terminal The Hindu via www thehindu com Officials take stock of engineering hurdles in Hyderabad Airport Metro a b Hyderabad Airport Metro will be tackling two hillocks on the way Telangana announces 31 km Metro line from Madhapur to airport 2 5k crore puts Metro expansion on fast track Rs 2 500 crore for Metro rail expansion in Hyderabad a b Metro line to be extended up to Mindspace junction for multi level Raidurg station in Hyderabad Hyderabad Airport Metro line inspection to assess the challenges for construction 11 trains to operate on Airport line KCR lays foundation stone for Hyderabad Airport Express Metro Airport Express Metro on track Telangana CM K Chandrasekhar Rao to lay foundation on December 9 Hyderabad Airport Metro works to be fast tracked HAML all set to fast track Hyd Airport Metro works HAML to fast track Hyderabad Airport Metro Telangana minister KT Rama Rao sends Rs 13 000 crore wish list to Centre Allocate more for Hyderabad projects in Union Budget KTR writes to Centre KTR seeks special package for Hyderabad in Union Budget Airport Metro works in full swing HAML completes 21 km of pre construction survey work Pre construction works for Hyderabad Airport Metro works in full swing a b Airport metro progressing at a brisk pace Airport Metro to minimise acquisition of private properties Hyderabad Airport Metro to finetune alignment for station location Avoid land acquisition for Airport Metro HAML MD to officials Hyd Airport metro peg marking work begins Airport Metro project survey completed peg marking on Survey completed for Hyderabad Airport Metro Hyderabad Airport Metro survey ready Hyderabad Airport Metro Works on ground begin with peg markings along corridor Soil testing commences for Airport Metro Soil testing announced for 31km metro corridor to Hyderabad airport Metro alignment at Rajendranagar stretch examined in Hyderabad Hyderabad Airport Metro officials take a ride on Delhi Airport line HAML MD visits Del airport Metro to study facilities amp operations a b Hyderabad Airport Metro invites global tenders keeps open option for 4 more stations for future needs HAML invites global tenders for EPC contractor for Hyderabad Airport Metro Telangana calls global tenders for Airport Metro tender haml1 PDF tender haml2 PDF Hyderabad Airport Metro Rail extends last date for submission of bids for GC Airport Metro will be high speed work will need partners having extraordinary targets HAML MD Five consortiums bid for Hyderabad Airport Metro Corridor GC Five engineering groups selected to bid for Hyderabad airport metro Five consortiums qualify for Hyderabad Airport Metro GC bids Five consortiums qualify Hyderabad Airport Metro bid to submit by Jan 20 All five consortia qualify for final bid for Hyderabad Airport Metro GC Systra led group selected as consultants for Airport Metro Engineering consultant selected for Hyderabad Airport Metro Systra led consortium picked as Airport Metro consultant Old City Metro project in limbo while Hyderabad Airport line moves ahead Airport Metro papers move at top speed Jungle clearance for airport metro project begins in Telangana International Competitive bidding ICB PDF Hyderabad Metro Rail invites tenders for Airport corridor at Rs 5 688 cr contract value Global tenders invited for Airport Metro project Global tenders invited for Airport Metro project Airport Metro works scheduled to commence from Sept GMR Airport to contribute 10 for Hyderabad Airport Metro Project Hyderabad airport metro 13 companies participate in pre bidding meeting 13 companies partipate in Hyd airport metro pre bid meeting Pre bid meeting for Hyderabad Airport Metro project held Airport Metro bids to be opened on July 12 L amp T NCC in race for Hyderabad Airport Metro work L amp T and NCC in race to bag Airport Metro Project bid for Rs 5 688cr tender L amp T is lowest bidder for Hyderabad Airport Metro project We will build Metro without Central funds asserts CM KCR Chief Minister K Chandrasekhar Rao asks officials to plan for future infra needs of capital GMR Airport asked to hand over 48 acres of land for Metro rail depot Once Hyderabad Airport Metro opens air passengers can check in at Metro station HMRL MD We want Hyderabad Airport Metro to be better than Hong Kong and Gatwick in terms of experience HMRL MD Airport Metro to have seating better aesthetics and an aerodynamic model SCR junks plan to extend railway line to RGIA KTR directs HMRL to draw plans for another Metro line to airport Metro to Hyderabad airport via Falaknuma too Metro corridors to crisscross Hyderabad for airport link External links edit nbsp Wikimedia Commons has media related to Hyderabad Airport Express Metro nbsp Media related to Hyderabad Airport Express Metro at Wikimedia Commons Hyderabad Airport Metro Ltd Retrieved from https en wikipedia org w index php title Hyderabad Airport Metro Express amp oldid 1189784870, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.