fbpx
Wikipedia

Gudur–Renigunta section

Gudur–Renigunta section connects Gudur Junction and Renigunta Junction in the Indian state of Andhra Pradesh.[1] Further, this section connects Howrah–Chennai main line at Gudur and Guntakal–Renigunta section at Renigunta.

Gudur–Renigunta section
Tirumala Express is one of the oldest train on this section
Overview
StatusOperational
OwnerIndian Railways
LocaleAndhra Pradesh
Termini
Service
Operator(s)South Central Railway zone
History
Opened1957; 66 years ago (1957)
Technical
Line length134.78 km (83.75 mi)
Number of tracks2
Track gauge1,676 mm (5 ft 6 in)

km
km
Gudur Junction
000
317
Gudur Junction
Kondagunta
010
Vendodu
019
326
Odur
Nidigallu
028
332
Pedapaiya
Venkatagiri
036
Yataluru
042
345
Nayadupeta
Yellakaru
048
Akkurti
056
Sri Kalahasti
060
Rachagunnari
067
361
Doravari Chatram
Yerpedu
074
364
Polireddipalem
Renigunta Junction
083
Tiruchanur
087
980 m
1072 yd
Tirumala Hill
372
Sullurupeta
Tirupati
093
375
Akkampet
Tirupati West Halt
095
385
Tada
Chandragiri
105
Kotala
107
392
Arambakkam
Mungilapattu
115
402
Elavur
Panapakkam
121
407
Gummidipudi
Pakala Junction
135
413
Kavaraippetta
Brahma Arani River
Putalupattu
146
420
Ponneri
RVS Nagar
157
425
Anupambattu
Chittoor
165
429
Minjur
Siddampalli
173
434
Nandiambakkam
Peyanpalli
183
433
Athipattu
Ramapuram
192
434
Athipattu Pudhunagar
Bommasamudram
198
Ennore Port
Katpadi Junction
208
Pud1
097
HPCL Terminal
Taduku
099
Vallur TPS
Puttur
106
Vepagunta
111
Ekambarakuppam
122
Nagari
124
439
Ennore
Venkatanarasimharajuvaripeta
128
440
Kathivakkam
443
Wimco Nagar
Popai
131
Tiruttani
139
446
Tiruvottiyur
Arakkonam Junction
153
CPC Manali Refinery
Perambur Loco Works
448
V. O. C. Nagar
Perambur Carriage Works
450
Tondiarpet
Perambur
Vyasarpadi Jeeva
451
Korukkupet
Basin Bridge
453
Chennai Central
455
km
km
Sources:




Google Maps
India Rail Info/Vijayawada–Chennai Jan Shatabdi
Gudur–Tirupati Passenger
Arakkonam–Cuddapah Passenger
Tirupati–Katpadi Passenger

History

It was owned by Madras and Southern Mahratta Railway.[2] The section is a broad-gauge railway line which was opened on 23 August 1957.[3][4] The line was sanctioned in the year 1997–98.[1]

Jurisdiction

This branch line is having a length of 134.78 km (83.75 mi) under the Guntakal railway division, excluding Gudur of Vijayawada railway division under South Central Railway zone.[5]

References

  1. ^ a b "Surveys" (PDF). South Central Railway, Indian Railways. 24 July 2015. p. 3. Retrieved 3 May 2019.
  2. ^ Government Of Madras Staff, Government of Madras (1942). Gazetteer of the Nellore District: Brought Upto 1938 (reprint ed.). Asian Educational Services. ISBN 978-81-206-1851-0. Retrieved 22 February 2016.
  3. ^ "Time Line and Milestones of Events (SCR)". South Central Railway. Retrieved 22 February 2016.
  4. ^ "Classification of Lines" (PDF). The Institution of Permanent Way Engineers (India). p. 3. Retrieved 22 February 2016.
  5. ^ "Divisional Map". South Central Railway. Retrieved 22 February 2016.

gudur, renigunta, section, connects, gudur, junction, renigunta, junction, indian, state, andhra, pradesh, further, this, section, connects, howrah, chennai, main, line, gudur, guntakal, renigunta, section, renigunta, tirumala, express, oldest, train, this, se. Gudur Renigunta section connects Gudur Junction and Renigunta Junction in the Indian state of Andhra Pradesh 1 Further this section connects Howrah Chennai main line at Gudur and Guntakal Renigunta section at Renigunta Gudur Renigunta sectionTirumala Express is one of the oldest train on this sectionOverviewStatusOperationalOwnerIndian RailwaysLocaleAndhra PradeshTerminiGudurReniguntaServiceOperator s South Central Railway zoneHistoryOpened1957 66 years ago 1957 TechnicalLine length134 78 km 83 75 mi Number of tracks2Track gauge1 676 mm 5 ft 6 in Legendkm kmVijayawada Gudur sectionGudur Junction 00 0 317 Gudur JunctionKondagunta 0 10Vendodu 0 19 326 OdurNidigallu 0 28Nadikudi Srikalahasti section 332 PedapaiyaVenkatagiri 0 36Yataluru 0 42 345 NayadupetaYellakaru 0 48Akkurti 0 56 NH 5Sri Kalahasti 0 60Rachagunnari 0 67 361 Doravari ChatramYerpedu 0 74Guntakal Renigunta section 364 PolireddipalemRenigunta Junction 0 83Tiruchanur 0 87 end of North Line serviceChennai Suburban Railway980 m1072 yd Tirumala Hill 372 SullurupetaTirupati 0 93 375 AkkampetTirupati West Halt 0 95 385 TadaChandragiri 105 Andhra PradeshTamil Nadu borderKotala 107 392 ArambakkamMungilapattu 115 402 ElavurPanapakkam 121 407 GummidipudiPakala Junction 135 413 KavaraippettaDharmavaram Pakala branch lineto Dharmavaram Junction Brahma Arani RiverPutalupattu 146 420 PonneriRVS Nagar 157 425 AnupambattuChittoor 165 429 MinjurSiddampalli 173 434 NandiambakkamPeyanpalli 183 433 AthipattuRamapuram 192 434 Athipattu PudhunagarBommasamudram 198 Larsen amp Toubro ShipyardAndhra PradeshTamil Nadu border Ennore PortChennai Bangalore line North ChennaiThermal Power StationKatpadi Junction 208Chennai Bangalore line Indian Oil Corporationto Viluppuram Junction amp PuducherryPud1 0 97 HPCL TerminalTaduku 0 99 Vallur TPSPuttur 106 Ennore CreekVepagunta 111 Ashok LeylandEkambarakuppam 122 TANGEDCO Ennore TPSNagari 124 439 EnnoreVenkatanarasimharajuvaripeta 128 440 KathivakkamAndhra PradeshTamil Nadu border 443 Wimco NagarPopai 131 MRF TyresTiruttani 139 Royal EnfieldChennai Bangalore line 446 TiruvottiyurArakkonam Junction 153to Chengalpattu Junction CPC Manali RefineryChennai Bangalore line amp Chennai Suburban Railway Tamil Nadu Petroproducts Ltd Integral Coach Factory Madras FertilizersPerambur Loco Works 448 V O C NagarPerambur Carriage Works 450 TondiarpetPerambur Bharat PetroleumVyasarpadi Jeeva 451 KorukkupetChennai diamond junctionBasin Bridge 453 Chennai Egmore Thanjavurmain lineChennai Central 455km kmSources Google MapsIndia Rail Info Vijayawada Chennai Jan Shatabdi Gudur Tirupati PassengerArakkonam Cuddapah Passenger Tirupati Katpadi PassengerHistory EditIt was owned by Madras and Southern Mahratta Railway 2 The section is a broad gauge railway line which was opened on 23 August 1957 3 4 The line was sanctioned in the year 1997 98 1 Jurisdiction EditThis branch line is having a length of 134 78 km 83 75 mi under the Guntakal railway division excluding Gudur of Vijayawada railway division under South Central Railway zone 5 References Edit a b Surveys PDF South Central Railway Indian Railways 24 July 2015 p 3 Retrieved 3 May 2019 Government Of Madras Staff Government of Madras 1942 Gazetteer of the Nellore District Brought Upto 1938 reprint ed Asian Educational Services ISBN 978 81 206 1851 0 Retrieved 22 February 2016 Time Line and Milestones of Events SCR South Central Railway Retrieved 22 February 2016 Classification of Lines PDF The Institution of Permanent Way Engineers India p 3 Retrieved 22 February 2016 Divisional Map South Central Railway Retrieved 22 February 2016 Retrieved from https en wikipedia org w index php title Gudur Renigunta section amp oldid 1007742621, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.