fbpx
Wikipedia

Grande Ceinture line

The Grande Ceinture line (French: Ligne de Grande Ceinture, English: Big Belt Line) is a railway line around Paris, located 15 kilometres (9.3 mi) from the Boulevard Périphérique. The decision to build it was taken at the end of the 19th century, to connect the radial lines linking the capital to the provinces and provide relief to the busy Petite Ceinture Line (English: Small Belt Line).

Grande Ceinture line
A train travels on the line near Sucy-en-Brie
Overview
Native nameLigne de Grande Ceinture
OwnerSNCF
LocaleÎle-de-France
Service
TypeHeavy rail
Route number990 000
History
Commenced1875
Opened1877
Completed1886
Technical
Line length157 km (98 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification
Route map

Description edit

The Grande Ceinture is now entirely dedicated to freight traffic in its northern and eastern section between Sartrouville and Villeneuve-Saint-Georges, linking up the western (Normandy), northern (Picardie, Benelux, Great Britain), east (Lorraine, Alsace, Germany) and south-eastern and south-western routes and their extensions into Italy, Switzerland and Spain, and the connections between the different factories of Île-de-France. It linked up the marshalling yards of Achères, Villeneuve-Saint-Georges and Bourget until the closure of the first two of these in 2005–2006. Intense traffic (more than 200 trains a day) on certain sections, notably in Seine-Saint-Denis, are at saturation level.

To the west, a short section, between Sartrouville and Achères, is used in common with the Paris-Rouen line, and with one of the branches of RER A.

The southern section, between Versailles-Chantiers and Juvisy is also used by suburban trains (RER C) and TGV services (Le Havre-Rouen-Lyon-Marseille link).

Only the Achères-Versailles section is out of use; it was partially reopened to passenger traffic on 12 December 2004 on the Saint-Germain-en-Laye-Noisy-le-Roi section (projet GCO). Further development has seen the section from St Cyr L'École to Saint Germain reopen with a tram-train service starting in 2022. Phase 2 of this project will see the extension of the tram-train to Achères.

History edit

 
The station at Bobigny in 1984
 
The gare d'Épinay-sur-Seine on the Ligne des Grésillons (now RER line C). The Grande Ceinture passes on the second bridge.

Construction edit

Decided upon in 1875, the Grande Ceinture opened in 1877 between Noisy-le-Sec and Villeneuve-Saint-Georges. On 16 July, a passenger service was put in place between gare de l'Est and gare d'Austerlitz.

In 1882, the section between Noisy-le-Sec, Le Bourget and Achères was inaugurated. A station was built at Saint-Germain-en-Laye.

In 1883, the section between Juvisy and Versailles was opened, then in 1886 that between Villeneuve-Saint-Georges and Massy-Palaiseau. This last section was demanded by the army.

In 1939, most of the Grande Ceinture closed to passenger traffic, which was left with only the Versailles - Massy-Palaiseau - Juvisy-sur-Orge section. The line thus became principally mercantile in traffic.

Passenger traffic between Orly and Pont-de-Rungis reopened in 1969, then that between Pont-de-Rungis and Massy-Palaiseau in 1977. On 30 September 1979, this latter section was integrated into RER C.

Between 2005 and the end of 2006 the marshalling yards of Achères and Villeneuve-Saint-Georges closed ; the Grande Ceinture thus no longer links the marshalling yard at Le Bourget to the radial lines.

Grande ceinture stratégique edit

Grande ceinture complémentaire edit

In 1924 it was decided to create the "Grande Ceinture complémentaire" between Noisy-le-Sec and Sucy-Bonneuil. This line opened in 1928 for freight and in 1932 for passenger traffic. The section between Bobigny and Sucy-Bonneuil was built later.

Exploitation by the Syndicat edit

The syndicat du Chemin de fer de grande ceinture edit

Deserted by travellers edit

 
Extract from the May 1914 timetables for passenger services on the Grande Ceinture

The Grande Ceinture's role always erred towards freight rather than passenger transportation. As one can see on the timetables in May 1914, the number of passenger trains of travelers was limited, as was their speed. Running through areas that were then under-urbanised and not linking into the necessary suburban rail-routes, it is thus unsurprising that the Grande Ceinture's passenger service proved unable to withstand the increasing use of cars, buses and other modes of transport.

Electrification edit

The desire to introduce large freight trains onto the Grande Ceinture gave rise to the project to electrify its southern section with a continuous current of 1500 Volts. At the end of January 1945, the decision was taken to electrify the Valenton-Juvisy (via Orly) section, and electric services on this section were running as early as September of the same year. In its wake, the Juvisy-Versailles and Orly-Massy sections were also electrified, with electric trains going into service on them on February 6, 1947.

The radial lines at the exit to gare du Nord and gare de l'Est were electrified, running single-phase 25 kV 50 Hz at the end of the 1950s. In this era, electrifying the Grande Ceinture's eastern section became necessary so that freight trains could run along the Ceinture without a break. To this end, the junction section from Stains (Paris-Creil line) to Noisy-le-Sec was switched on as an electric line on 21 July 1959. The Argenteuil-Stains and Bobigny-Gagny sections on the "Complémentaire" were, in their turn, electrified with 25 kV on 14 September 1970.

 
A freight train in the direction of Valenton en route to the sheds at Villemomble, now out of use.

TGV use edit

From the winter service in 1984 onwards, a new direct TGV link from Lille to Lyon was proposed using the Grande Ceinture Est routes from the junction at Stains to Valenton. Traffic then runs through Noisy-le-Sec but certain trains also loan the "Complémentaire" if there are engineering works or other disruptions. The success of this new scheme led SNCF to offer a second daily round-trip ticket as early as 1985. Until 1986, trains were coupled at Valenton with a new direct Rouen-Lyon service, using the Grande Ceinture Sud, from Versailles-Chantiers to Valenton through Massy-Palaiseau. The TGV Lille-Lyon no longer uses the Grande Ceinture since the opening of the LGV Interconnexion Est in 1994.

TGV Normandie-Roissy edit

There are plans to build a TGV link between Normandy and l'aéroport de Roissy, using the LGV Normandie, the Grande Ceinture Nord until Stains, or a new interchange station onto the LGV Nord. This project appeared in the preliminaries of the SDRIF of November 2006.

Gallery edit

See also edit

References edit

  • Carrière, Bruno; Collardey, Bernard (1992). L'aventure de la Grande ceinture (in French) (La vie du rail ed.). Paris.{{cite book}}: CS1 maint: location missing publisher (link)
  • Banaudo, J. (1982). Trains oubliés volume 4: L'État, le Nord, les Ceintures (in French) (du Cabri ed.).
  • Hebdomadaire (6 November 1966). "La vie du Rail" (in French). No. 1069. {{cite magazine}}: Cite magazine requires |magazine= (help)

External links edit

  • Association Sauvegarde Petite Ceinture (history, photos, projects) (in French)
  • Petite Ceinture Info (history, news, projects and interactive maps) (in French)

grande, ceinture, line, french, ligne, grande, ceinture, english, belt, line, railway, line, around, paris, located, kilometres, from, boulevard, périphérique, decision, build, taken, 19th, century, connect, radial, lines, linking, capital, provinces, provide,. The Grande Ceinture line French Ligne de Grande Ceinture English Big Belt Line is a railway line around Paris located 15 kilometres 9 3 mi from the Boulevard Peripherique The decision to build it was taken at the end of the 19th century to connect the radial lines linking the capital to the provinces and provide relief to the busy Petite Ceinture Line English Small Belt Line Grande Ceinture lineA train travels on the line near Sucy en BrieOverviewNative nameLigne de Grande CeintureOwnerSNCFLocaleIle de FranceServiceTypeHeavy railRoute number990 000HistoryCommenced1875Opened1877Completed1886TechnicalLine length157 km 98 mi Number of tracks2Track gauge1 435 mm 4 ft 8 1 2 in standard gaugeElectrificationOverhead line 1 500 V DC Sucy Bonneuil Versailles Matelots 25 kV 50 Hz AC Versailles Matelots Saint Germain en Laye and Acheres Sucy Bonneuil Route map Contents 1 Description 2 History 2 1 Construction 2 1 1 Grande ceinture strategique 2 1 2 Grande ceinture complementaire 2 2 Exploitation by the Syndicat 2 2 1 The syndicat du Chemin de fer de grande ceinture 2 2 2 Deserted by travellers 2 3 Electrification 3 TGV use 3 1 TGV Normandie Roissy 4 Gallery 5 See also 6 References 7 External linksDescription editThe Grande Ceinture is now entirely dedicated to freight traffic in its northern and eastern section between Sartrouville and Villeneuve Saint Georges linking up the western Normandy northern Picardie Benelux Great Britain east Lorraine Alsace Germany and south eastern and south western routes and their extensions into Italy Switzerland and Spain and the connections between the different factories of Ile de France It linked up the marshalling yards of Acheres Villeneuve Saint Georges and Bourget until the closure of the first two of these in 2005 2006 Intense traffic more than 200 trains a day on certain sections notably in Seine Saint Denis are at saturation level To the west a short section between Sartrouville and Acheres is used in common with the Paris Rouen line and with one of the branches of RER A The southern section between Versailles Chantiers and Juvisy is also used by suburban trains RER C and TGV services Le Havre Rouen Lyon Marseille link Only the Acheres Versailles section is out of use it was partially reopened to passenger traffic on 12 December 2004 on the Saint Germain en Laye Noisy le Roi section projet GCO Further development has seen the section from St Cyr L Ecole to Saint Germain reopen with a tram train service starting in 2022 Phase 2 of this project will see the extension of the tram train to Acheres History edit nbsp The station at Bobigny in 1984 nbsp The gare d Epinay sur Seine on the Ligne des Gresillons now RER line C The Grande Ceinture passes on the second bridge Construction edit Decided upon in 1875 the Grande Ceinture opened in 1877 between Noisy le Sec and Villeneuve Saint Georges On 16 July a passenger service was put in place between gare de l Est and gare d Austerlitz In 1882 the section between Noisy le Sec Le Bourget and Acheres was inaugurated A station was built at Saint Germain en Laye In 1883 the section between Juvisy and Versailles was opened then in 1886 that between Villeneuve Saint Georges and Massy Palaiseau This last section was demanded by the army In 1939 most of the Grande Ceinture closed to passenger traffic which was left with only the Versailles Massy Palaiseau Juvisy sur Orge section The line thus became principally mercantile in traffic Passenger traffic between Orly and Pont de Rungis reopened in 1969 then that between Pont de Rungis and Massy Palaiseau in 1977 On 30 September 1979 this latter section was integrated into RER C Between 2005 and the end of 2006 the marshalling yards of Acheres and Villeneuve Saint Georges closed the Grande Ceinture thus no longer links the marshalling yard at Le Bourget to the radial lines Grande ceinture strategique edit Grande ceinture complementaire edit In 1924 it was decided to create the Grande Ceinture complementaire between Noisy le Sec and Sucy Bonneuil This line opened in 1928 for freight and in 1932 for passenger traffic The section between Bobigny and Sucy Bonneuil was built later Exploitation by the Syndicat edit The syndicat du Chemin de fer de grande ceinture edit Deserted by travellers edit nbsp Extract from the May 1914 timetables for passenger services on the Grande Ceinture The Grande Ceinture s role always erred towards freight rather than passenger transportation As one can see on the timetables in May 1914 the number of passenger trains of travelers was limited as was their speed Running through areas that were then under urbanised and not linking into the necessary suburban rail routes it is thus unsurprising that the Grande Ceinture s passenger service proved unable to withstand the increasing use of cars buses and other modes of transport Electrification edit The desire to introduce large freight trains onto the Grande Ceinture gave rise to the project to electrify its southern section with a continuous current of 1500 Volts At the end of January 1945 the decision was taken to electrify the Valenton Juvisy via Orly section and electric services on this section were running as early as September of the same year In its wake the Juvisy Versailles and Orly Massy sections were also electrified with electric trains going into service on them on February 6 1947 The radial lines at the exit to gare du Nord and gare de l Est were electrified running single phase 25 kV 50 Hz at the end of the 1950s In this era electrifying the Grande Ceinture s eastern section became necessary so that freight trains could run along the Ceinture without a break To this end the junction section from Stains Paris Creil line to Noisy le Sec was switched on as an electric line on 21 July 1959 The Argenteuil Stains and Bobigny Gagny sections on the Complementaire were in their turn electrified with 25 kV on 14 September 1970 nbsp A freight train in the direction of Valenton en route to the sheds at Villemomble now out of use TGV use editFrom the winter service in 1984 onwards a new direct TGV link from Lille to Lyon was proposed using the Grande Ceinture Est routes from the junction at Stains to Valenton Traffic then runs through Noisy le Sec but certain trains also loan the Complementaire if there are engineering works or other disruptions The success of this new scheme led SNCF to offer a second daily round trip ticket as early as 1985 Until 1986 trains were coupled at Valenton with a new direct Rouen Lyon service using the Grande Ceinture Sud from Versailles Chantiers to Valenton through Massy Palaiseau The TGV Lille Lyon no longer uses the Grande Ceinture since the opening of the LGV Interconnexion Est in 1994 TGV Normandie Roissy edit There are plans to build a TGV link between Normandy and l aeroport de Roissy using the LGV Normandie the Grande Ceinture Nord until Stains or a new interchange station onto the LGV Nord This project appeared in the preliminaries of the SDRIF of November 2006 Gallery edit nbsp Bond of the Compagnie du chemin de fer de Grande Ceinture 1876 nbsp Exchange station at Bourget supplying the marshalling yard at Bourget DrancySee also editTangentielle Nord Tangentielle Ouest Tangentielle Sud Chemin de fer de Petite Ceinture Transilien Grande ceinture OuestReferences editCarriere Bruno Collardey Bernard 1992 L aventure de la Grande ceinture in French La vie du rail ed Paris a href Template Cite book html title Template Cite book cite book a CS1 maint location missing publisher link Banaudo J 1982 Trains oublies volume 4 L Etat le Nord les Ceintures in French du Cabri ed Hebdomadaire 6 November 1966 La vie du Rail in French No 1069 a href Template Cite magazine html title Template Cite magazine cite magazine a Cite magazine requires magazine help External links editAssociation Sauvegarde Petite Ceinture history photos projects in French Petite Ceinture Info history news projects and interactive maps in French Retrieved from https en wikipedia org w index php title Grande Ceinture line amp oldid 1221878331, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.