fbpx
Wikipedia

Expeditionary Transfer Dock

An Expeditionary Transfer Dock (ESD), formerly the Mobile Landing Platform (MLP), is designed to be a semi-submersible, flexible, modular platform providing the US Navy with the capability to perform large-scale logistics movements such as the transfer of vehicles and equipment from sea to shore. These ships significantly reduce the dependency on foreign ports and provide support in the absence of port availability. The class also houses a sub-class variant called the Expeditionary Mobile Base (ESB), formerly the Afloat Forward Staging Base (AFSB).

USNS John Glenn (T-ESD-2) sea trials in 2014
Class overview
BuildersGeneral Dynamics
OperatorsUnited States Navy
Planned5
Building4
General characteristics
Tonnage>60,000 metric dwt[1]
Length785 ft (239 m)[1]
Beam164 ft (50 m)[1]
Draft39.37 ft (12.00 m)[1]
Propulsion
  • 4 × MAN/B&W medium speed diesels
  • 24MW diesel electric plant, twin screw propellers
  • 2MW azimuth bow thruster[1]
Speed>15 knots (28 km/h; 17 mph)[1]
Range9,500 nautical miles (17,600 km; 10,900 mi) at 15 knots[1]
Boats & landing
craft carried
3 LCAC
Aviation facilitiesESB variant: Hangar for 2 × CH-53 and large flight deck

The ESD and ESB are part of a new ship class added in 2015 with an E as a new designator, similar to the L-class amphibious ships, S-class submarines, A-class auxiliaries and more. These three E-class ships were previously listed as seabasing ships in the Naval Vessel Register.

In May 2011, General Dynamics NASSCO received a $744 million contract modification to fully fund the construction of the first two ships of the class, USNS Montford Point (ESD-1) and USNS John Glenn (ESD-2). Additional funding of $115 million for long lead time material and advanced design was awarded in August 2011.

The first ship of the ESD program, USNS Montford Point (ESD-1) was delivered in May 2013, and the second ship, USNS John Glenn (ESD-2), was delivered May 20, 2013.

In 2012, a third MLP, USS Lewis B. Puller (ESB-3), was added to the contract and reconfigured as an Expeditionary Mobile Base (ESB), or formerly known as an MLP Afloat Forward Staging Base (AFSB). All three ships have been delivered to the U.S. Navy.

In September 2015, the Navy decided to redesignate the MLP as the Expeditionary Transfer Dock (ESD) and the AFSB as the Expeditionary Mobile Base (ESB).[2]

The Navy plans to procure six Expeditionary Mobile Bases (ESBs) in total, with a fourth (ESB-6) ordered in FY2018, a fifth (ESB-7) ordered in FY2019, and the sixth and final ship (ESB-8) with an order date yet to be determined.[3]

In mid-2022, the Marine Corps announced its intention to retire both ESD ships[4] after less than a decade of active service, but this was rejected by Congress in December of 2022.[5] The ships were subsequently placed in reduced operating status.

Design edit

 
A computer-generated image depicting the Expeditionary Transfer Dock design

The Expeditionary Transfer Dock concept is a large auxiliary support ship to facilitate the 'seabasing' of an amphibious landing force by acting as a floating base or transfer station that can be prepositioned off the target area.[6][7] Troops, equipment, and cargo would be transferred to the ESD by large-draft ships, from where they can be moved ashore by shallower-draft vessels, landing craft like the Landing Craft Air Cushion (LCAC), or helicopters.[6][7] For transferring vehicles from the larger ships to the ESD, the vessels were originally to be fitted with a Vehicle Transfer System: a ramp connecting the two ships alongside and able to compensate for the movements of both vessels while underway.[8]

 
USNS John Glenn (T-ESD-2) naming, Feb 2014

A preliminary design by General Dynamics envisioned a ship that carried six LCACs, with the ability to turn around (dock, unload or load, then launch) two landing craft simultaneously from the stern.[8] The ESDs were to host a brigade-size force, sail at 20 knots (37 km/h; 23 mph), and have a maximum range of 9,000 nautical miles (17,000 km; 10,000 mi).[8] Each ship was to cost US$1.5 billion to build,[8] but cutbacks to defense spending planned for the fiscal year 2011 budget forced the downscaling of the design in mid-2009.[8]

General Dynamics identified the civilian Alaska-class oil tanker (built by the subsidiary National Steel and Shipbuilding Company) as a suitable basis for an "ESD 'Lite'", with the design modified into a float-on/float-off vessel that could be built for US$500 million per ship.[8] As part of the cost trade-off, the Vehicle Transfer System was scrapped in favor of skin-to-skin mooring of a host ship alongside the ESD, and the LCAC complement was reduced to three.[8] The new design is 785 feet (239 m) long, with a beam of 164 feet (50 m), a top speed of over 15 knots (28 km/h; 17 mph), and a maximum range of 9,500 nautical miles (17,600 km; 10,900 mi).[1] Converteam supplies an integrated power system and vessel automation system for the ESD.[9]

USS Ponce edit

In March 2013 Chief of Naval Operations Jonathan Greenert showed PowerPoint of the ESD-Expeditionary Mobile Base (ESD-ESB), a proposed variant of the ESD with increased accommodation, a hangar and large flight deck on piers above the semi-submersible deck,[10][11] This was first proposed in January 2012, around the time of the sudden announcement that USS Ponce would be converted as an interim AFSB(I) (ESB).[12] The ESD-ESB could be used to support special forces and intelligence gathering[13] as a base for helicopters, MV-22 Osprey tiltrotors and even the F-35B stealth fighter,[10] but the main role of the Ponce will be operating minesweeping MH-53E Sea Dragon helicopters.[12] As of March 2013 "a number of variations" of the ESD were being considered;[11] the ESB can fulfill many of the roles of a $2.5 billion "big deck" amphibious ship at a quarter of the price.[10]

Expeditionary Mobile Base (ESB) variants edit

 
ESB variant USS Lewis B. Puller

Unlike the first two Expeditionary Transfer Dock (ESD), the Lewis B. Puller-class, or sub-variant, of Expeditionary Mobile Base (ESB) vessels serve to support special forces missions, counter-piracy/smuggling operations, maritime security operations, and mine clearance, as well as humanitarian aid and disaster relief missions.[14] In order to support these extended roles, the ESBs will have military detachments in addition to the civil service mariners.[15]

ESB vessels are designed to support low-intensity missions, allowing more expensive, high-value amphibious warfare ships and surface combatant warships to be re-tasked for more demanding operational missions for the U.S. Navy.[16] These ESB variants are slated to operate in the Middle East and the Pacific Ocean.[17]

Like the first two Expeditionary Transfer Dock, the overall design of the T-ESB-3 and T-ESB-4 is based on the hull of the civilian Alaska-class oil tanker.[17] Both ESB variants will be outfitted with support facilities for its mine-sweeping, special operations, and other expeditionary missions. An accommodation barge will also be carried to support up to 298 additional mission-related personnel.[16] Their aviation facilities include a 52,000 sq ft (4,800 m2) flight deck[18] with landing spots for two heavy-lift transport CH-53 helicopters, as well as additional deck space for two more CH-53s. Lewis B. Puller will also have a helicopter hangar, an ordnance storage magazine, underway replenishment facilities, and deck space for mission-related equipment storage.[16] The addition of a flight deck makes the ship more top-heavy, and so less stable in heavy seas. The deck is made with two operating spots and two parking spots, plus room to store two in the hangar. The mission deck's ability to submerge to launch landing craft was disabled and instead a crane, capable of carrying 11 metric tons (12 short tons) and moving a 41 ft (12 m) boat in up to sea state 3, carries watercraft, towed arrays, and unmanned vehicles into the water.[19]

The United States Navy ordered T-ESB-3 in February 2012 as part of the Fiscal Year 2013 appropriation for the U.S. Department of Defense via the National Defense Sealift Fund (NDSF).[16][20] The keel-laying ceremony for MKP-3 took place at the General Dynamics NASSCO shipyard in San Diego, California, on 5 November 2013.[21][22]

On 16 January 2014, at the Surface Naval Association's national symposium, the head of NAVSEA's Strategic and Theater Sealift program, Captain Henry Stevens, announced that the MV-22 Osprey tilt-rotor aircraft would be evaluated for potential operations on board the Expeditionary Mobile Base ESD variant. The testing and certification of MH-53E helicopters for minesweeping operations from ESB support ships was slated to begin during fiscal year 2016. Additionally, Captain Stevens noted that the F-35B STOVL strike fighter was not then being considered for ESB operations because of exhaust heat from F-35B damaging the flight decks of U.S. Navy amphibious assault ships.[23] Some outfitting and specialized equipment specific to the V-22 was needed to support it, but little engineering work or modifications to the ship needed to be done;[19] upon Lewis B. Puller's deployment, it had been upgraded to support V-22 operations by Special Operations Forces.[24]

On 19 December 2014, U.S. Navy's Naval Sea Systems Command awarded a US$498M contract to General Dynamics NASSCO for the construction of second ESB variant, the as-yet unnamed T-ESB-4. This vessel will be built at the NASSCO shipyard in San Diego, California, with a scheduled completion date of 2018.[25]

On 15 January 2021 Secretary of the Navy Kenneth J. Braithwaite announced that ESB-7 will be named USS Robert Simanek in honor of PFC Simanek, a Marine who was awarded the Medal of Honor during the Korean War.[26]

Concept testing edit

 
USNS Watkins (back) and heavy lift ship MV Mighty Servant 1 moored side-by-side off San Diego during a demonstration of the Expeditionary Transfer Dock concept in 2005.

In September 2005, the United States Navy approved trials of the ESD concept, to test the feasibility of seabasing for an amphibious operation.[7] The heavy lift ship MV Mighty Servant 1 served as the substitute for the ESD, while the roll-on/roll-off vessel USNS Watkins played the role of a planned type of transport ship for the United States Maritime Prepositioning Force.[7] The first part of the trial consisted of the two ships transferring cargo between themselves while anchored in Puget Sound.[7] After successfully completing this, the vessels sailed to San Diego, where cargo was transferred from Watkins to Mighty Servant 1, then taken ashore by LCACs; slightly submerging the deck of the heavy lift ship allowed the hovercraft to "'fly' aboard".[7]

A second series of tests was conducted off Norfolk, Virginia in September and October 2006, with USNS Red Cloud and MV Mighty Servant 3.[6] This time, the ships were moored together while underway, during which vehicles drove from Red Cloud onto Mighty Servant 3, then embarked aboard LCACs.[6] In February 2010, Mighty Servant 3 joined USNS Soderman for further trials in the Gulf of Mexico.[6] During these, personnel and a wide range of vehicles, from Humvees to M1 Abrams tanks, were transferred to, then launched from Mighty Servant 3, in conditions up to Sea State 4.[6] The transferring cargo was later reduced to Sea State 3 conditions, after some design changes.[27]

Construction edit

 
ESD John Glenn at NASSCO, in San Diego

In August 2010, the National Steel and Shipbuilding Company in San Diego was awarded a US$115 million contract to design the Mobile Landing Platform, and build the first ship.[6][28] Construction on the first vessel began in July 2011.[29]

By January 2016, the names for the four ships were announced:[30][31] The name for the fifth ship was announced in November 2017[32]

List of ships edit

Prefix Name Hull No. Notes
Montford Point-class (ESD-variant)
USNS Montford Point T-ESD-1 Inactive, Reduced Operating Status, 23 February 2022[33]
USNS John Glenn T-ESD-2 Inactive, Reduced Operating Status, 10 January 2020[34]
Lewis B. Puller-subclass (ESB-variant)
USS Lewis B. Puller ESB-3 Commissioned: 17 August 2017
USS Hershel "Woody" Williams ESB-4 Commissioned: 7 March 2020
USS Miguel Keith ESB-5 Commissioned: 8 May 2021
USS John L. Canley ESB-6 Christened: 25 June 2022
USS Robert E. Simanek ESB-7 Under construction: 27 May 2022
USNS Hector A. Cafferata Jr. T-ESB-8 Ordered: 8 April 2022[35]

Orders for the second and third vessels were made in the 2013 and 2015 fiscal years.[8] The keel for the first Montford Point-class Expeditionary Transfer Dock was laid on 19 January 2012.[36] Construction of John Glenn begin on 17 April 2012,[37] by which time the Montford Point was 48% complete.[37] The Montford Point was christened in San Diego on March 2, 2013. Montford Point completed final contract trials on 13 September 2013; John Glenn was floated off on 15 September and construction began on Lewis B. Puller on 19 September 2013.[38][39]

In March 2012 the USN requested a fourth ship in the FY14 budget of the National Defense Sealift Fund, and proposed that both T-ESB-3 and T-ESB-4 would be ESD-ESB variants.[13] Congress rejected both requests on the grounds that Ponce could do the job and ESBs should in any case be funded out of the main Navy account.[40] As of March 2013 the Chief of Naval Operations was still planning to buy two ESD and two ESD-ESB variants despite the uncertainty caused by the sequester,[10] in fact the late-2012 "Vision for the 2025 Surface Fleet" by the head of Naval Surface Forces envisages buying more MLP variants as a cheap alternative to traditional amphibious ships.[11]

On 19 December 2014, U.S. Navy's Naval Sea Systems Command announced the construction of the second ESB variant, the then-unnamed T-ESB-4. This vessel would be built at the NASSCO shipyard in San Diego, California, with a scheduled completion date of 2018. It was anticipated that T-ESB-4 would be assigned to the Pacific Ocean, and like the other ESD ships, will be operated by the Military Sealift Command.[25] In January 2016, it was announced that T-ESB-4 would be named USNS Hershel "Woody" Williams, after a World War II Marine Corps infantryman who earned a Medal of Honor in the Battle of Iwo Jima.[41] Construction of the ship began in October 2015.[42] It was christened on 21 October 2017 and delivered to Military Sealift Command on 22 February 2018 and entered service the same day.[43]

ESB-5, the fifth vessel in the class, and the third ESB variant, began construction in January 2017 at NASSCO.[42]

Ship re-designation edit

Effective 4 September 2015, U.S. Secretary of the Navy Ray Mabus officially announced the creation of a new ship designation, "E" for expeditionary support. Joint High Speed Vessel (JHSV) will be called Expeditionary Fast Transport, or EPF; the Mobile Landing Platform (MLP) will be called Expeditionary Transfer Dock, or ESD; and the Afloat Forward Staging Base (AFSB) variant of the MLP will be called Expeditionary Mobile Base, or ESB. The new designation was pursuant to a memorandum sent to Secretary Mabus from Chief of Naval Operations Admiral Jonathan Greenert dated 31 August 2015.[44]

Commissioning edit

In January 2020, the Navy announced that it will commission all ESBs as warships, meaning they will carry the prefix USS, following the 2017 commissioning of Lewis B. Puller. As a result, they will be crewed by a mix of Navy sailors and civilian mariners from Military Sealift Command. Navy spokesman Lieutenant Tim Pietrack told USNI News: "This re-designation provides combatant commanders greater operational flexibility to employ this platform in accordance with the laws of armed conflict. The Secretary of the Navy approved the commissioning of all ESBs following feedback from the employment of ESB-3 and expected employment of subsequent ships of the class. Prior to commissioning, the ESB class was limited to defensive actions during times governed by the laws of armed conflict. Post-commissioning, these ships have greater mission flexibility throughout the [range of military operations].[45]

Proposed ESD retirement edit

In mid-2022, the Marine Corps announced its intention to retire the two ESD ships. Although they were cheap to buy compared to amphibious assault ships and demonstrated seabasing concepts, they were limited to connecting with sealift vessels at wave heights below three feet, and payload, fuel capacity and accommodation space were reduced to cut costs. This led to the decision to retire the ships to prioritize other vessels, such as the more successful ESBs.[46] The proposed retirement of the two ships was rejected by Congress in December of 2022.[47]

See also edit

  • USS Inchon - amphibious ship converted in 1996 to something like an ESB.

References edit

  1. ^ a b c d e f g h (PDF). General Dynamics NASSCO. 1 February 2014. pp. 14–16. Archived from the original (pdf) on 4 March 2016. Retrieved 28 September 2014.
  2. ^ "A New Class of Ship – 'Expeditionary Support'". Navy Times, 3 September 2015
  3. ^ "Navy Ship Names: Background for Congress". fas.org. 28 February 2019. Retrieved 2 March 2019.
  4. ^ "Marines still have big plans for seabasing ships as 2 head for mothballs". defensenews.com. 20 June 2022. Retrieved 18 September 2023.
  5. ^ "Congress is building a stronger fleet than the Navy". navytimes.com. 15 December 2022. Retrieved 17 December 2022.
  6. ^ a b c d e f g "The US Navy's Mobile Landing Platform Ships". Defense Industry Daily. Watershed Publishing. 18 August 2010. Retrieved 12 January 2011.
  7. ^ a b c d e f "Mobile Landing Platform [MLP]". GlobalSecurity.org. Retrieved 13 January 2011.
  8. ^ a b c d e f g h Scott, Richard (30 September 2010). "Floating world: US Navy eyes Mobile Landing Platform as sea base pontoon". International Defence Review. Jane's Information Group.
  9. ^ . Archived from the original on 2012-03-10. Retrieved 2011-10-27.
  10. ^ a b c d Freedberg Jr., Sydney J. (12 March 2013). . AOL Defense. Archived from the original on 23 March 2013. Retrieved 21 March 2013. Has image of the MLP-AFSB
  11. ^ a b c Cavas, Christopher P. (17 March 2013). "U.S. Navy Weighs Halving LCS Order". Defense News. Archived from the original on April 10, 2013.
  12. ^ a b Cavas, Christopher P. (27 January 2012). "New Floating Base Ships Coming for U.S. Navy". Defense News. Archived from the original on January 21, 2013.
  13. ^ a b "Senate Hearings 112 - DEPARTMENT OF DEFENSE APPROPRIATIONS FOR FISCAL YEAR 2013". U.S. Government Printing Office. 7 March 2012.
  14. ^ "Document: Navy's 30-Year Shipbuilding Plan for Fiscal Year 2015". news.usni.org. US Navy. 7 July 2014. Retrieved 7 July 2014.
  15. ^ Burgess, Richard R. (10 June 2015). "New Afloat Forward-Staging Base Ships to Have Mixed CIVMAR, Sailor Crews". SEAPOWER Magazine. Retrieved 10 June 2015.
  16. ^ a b c d "U.S. Navy Program Guide 2013" (PDF). United States Navy. 6 November 2013. Retrieved 5 December 2013. See pages 101–102
  17. ^ a b "Updated: Keel Laid for First Dedicated Afloat Forward Staging Base". USNI News Blog. United States Naval Institute. 6 November 2013. Retrieved 5 December 2013.
  18. ^ "Expeditionary Mobile Base USNS Lewis B. Puller Begins First Operational Deployment". navyrecognition.com. 12 July 2017. Retrieved 24 November 2020.
  19. ^ a b "Expeditionary Mobile Base Chesty Puller May Receive SOF Upgrades Before 5th Fleet Deployment". USNI.org. 2 November 2015. Retrieved 24 November 2020.
  20. ^ "Mobile Landing Platform (MLP) – Afloat Forward Staging Base". Military. GlobalSecurity.org. 15 November 2013. Retrieved 5 December 2013.
  21. ^ "Keel Laid for Future USNS Lewis B. Puller". NNS131105-20. Naval Sea Systems Command Office of Corporate Communications. 5 November 2013. Retrieved 5 December 2013.
  22. ^ "NASSCO Lays Keel of Third U.S. Navy Platform Ship". MarineLink.com. Maritime Activity Reports, Inc. 5 November 2013. Retrieved 5 December 2013.
  23. ^ Muñoz, Carlo (16 January 2014). "SNA 2014: Navy Eyes Osprey Flights for AFSB Fleet". United States Naval Institute. Retrieved 16 January 2014.
  24. ^ Eckstein, Megan (12 July 2017). "Expeditionary Sea Base USNS Lewis B. Puller Departs for Maiden Deployment". USNI.org. Retrieved 24 November 2020.
  25. ^ a b LaGrone, Sam (22 December 2014). "NASSCO Awarded $498 Million for Second Afloat Forward Staging Base". USNI News Blog. United States Naval Institute. Retrieved 22 December 2014.
  26. ^ "SECNAV Names Future Vessels while aboard Historic Navy Ship". United States Navy. 2021-01-15. Retrieved 2021-01-16.
  27. ^ "The US Navys Mobile Landing Platform Ships (MLP)". Defense Industry Daily. Retrieved 2018-09-17.
  28. ^ Robbins, Gary (14 August 2010). "General Dynamics gets $115M for 'pier at sea'". San Diego Union-Tribune. Retrieved 10 January 2011.
  29. ^ "Construction Begins on First Mobile Landing Platform". United States Navy. 30 June 2011. Retrieved 3 July 2011.
  30. ^ Military Sealift Command Press Release: Navy Names First Three Mobile Landing Platform Ships 2013-02-21 at the Wayback Machine
  31. ^ . www.navy.mil. Archived from the original on 24 April 2016. Retrieved 17 January 2022.
  32. ^ "SECNAV Spencer Names First Ship". usni.org. 6 November 2017. Retrieved 23 December 2017.
  33. ^ "USNS Montford Point (T-ESD-1)". nvr.navy.mil. 5 May 2022. Retrieved 17 December 2022.
  34. ^ "USNS John Glenn (T-ESD-2)". nvr.navy.mil. 5 May 2022. Retrieved 17 December 2022.
  35. ^ "ESB-8". nvr.navy.mil. 8 April 2022. Retrieved 2 March 2023.
  36. ^ "Keel Laid for Navy's First Mobile Landing Platform". Defense talk. 23 January 2012. Retrieved 31 January 2012.
  37. ^ a b "Начато строительство второго корабля типа MLP для ВМС США".
  38. ^ Cavas, Christopher (3 October 2013). "New Ship News – Sub launched, Carrier prepped, LCS delivered". Defense News. Archived from the original on 4 October 2013.
  39. ^ Hlad, Jennifer (2017-08-22). "Aboard the Navy's new sea base Lewis B. Puller, named for legendary Marine". Navy Times. Retrieved 2021-01-16. The U.S. Navy recently commissioned a first-in-its-class Expeditionary Sea Base to be named after the most storied Marine in the Corps' history.
  40. ^ "Committee Reports 112th Congress (2011-2012) House Report 112-493 DEPARTMENT OF DEFENSE APPROPRIATIONS BILL, 2013". Library of Congress.[permanent dead link]
  41. ^ "Secretary of the Navy Names Expeditionary Sea Base Ship". US Navy. 14 January 2016. Retrieved 28 January 2017.
  42. ^ a b "NASSCO starts construction of ESB 5". Marine Log. 27 January 2017. Retrieved 28 January 2017.
  43. ^ "Navy Accepts Delivery of USNS Hershel "Woody" Williams" (Press release). United States Navy. 23 February 2018. NNS180223-22. Retrieved 30 September 2020.
  44. ^ "Navy Renames Three Ship Classes, Creates 'Expeditionary' Designator in Naming System". USNI News Blog. United States Naval Institute. 4 September 2015. Retrieved 4 September 2015.
  45. ^ Eckstein, Megan (21 January 2020). "Navy Will Commission All Expeditionary Sea Bases as USS Warships". USNI News. United States Naval Institute. Retrieved 30 January 2020.
  46. ^ Marines still have big plans for seabasing ships as 2 head for mothballs. Defense News. 20 June 2022.
  47. ^ "Congress is building a stronger fleet than the Navy". navytimes.com. 15 December 2022. Retrieved 17 December 2022.

expeditionary, transfer, dock, formerly, mobile, landing, platform, designed, semi, submersible, flexible, modular, platform, providing, navy, with, capability, perform, large, scale, logistics, movements, such, transfer, vehicles, equipment, from, shore, thes. An Expeditionary Transfer Dock ESD formerly the Mobile Landing Platform MLP is designed to be a semi submersible flexible modular platform providing the US Navy with the capability to perform large scale logistics movements such as the transfer of vehicles and equipment from sea to shore These ships significantly reduce the dependency on foreign ports and provide support in the absence of port availability The class also houses a sub class variant called the Expeditionary Mobile Base ESB formerly the Afloat Forward Staging Base AFSB USNS John Glenn T ESD 2 sea trials in 2014Class overviewBuildersGeneral DynamicsOperatorsUnited States NavyPlanned5Building4General characteristicsTonnage gt 60 000 metric dwt 1 Length785 ft 239 m 1 Beam164 ft 50 m 1 Draft39 37 ft 12 00 m 1 Propulsion4 MAN B amp W medium speed diesels 24MW diesel electric plant twin screw propellers 2MW azimuth bow thruster 1 Speed gt 15 knots 28 km h 17 mph 1 Range9 500 nautical miles 17 600 km 10 900 mi at 15 knots 1 Boats amp landing craft carried3 LCACAviation facilitiesESB variant Hangar for 2 CH 53 and large flight deckThe ESD and ESB are part of a new ship class added in 2015 with an E as a new designator similar to the L class amphibious ships S class submarines A class auxiliaries and more These three E class ships were previously listed as seabasing ships in the Naval Vessel Register In May 2011 General Dynamics NASSCO received a 744 million contract modification to fully fund the construction of the first two ships of the class USNS Montford Point ESD 1 and USNS John Glenn ESD 2 Additional funding of 115 million for long lead time material and advanced design was awarded in August 2011 The first ship of the ESD program USNS Montford Point ESD 1 was delivered in May 2013 and the second ship USNS John Glenn ESD 2 was delivered May 20 2013 In 2012 a third MLP USS Lewis B Puller ESB 3 was added to the contract and reconfigured as an Expeditionary Mobile Base ESB or formerly known as an MLP Afloat Forward Staging Base AFSB All three ships have been delivered to the U S Navy In September 2015 the Navy decided to redesignate the MLP as the Expeditionary Transfer Dock ESD and the AFSB as the Expeditionary Mobile Base ESB 2 The Navy plans to procure six Expeditionary Mobile Bases ESBs in total with a fourth ESB 6 ordered in FY2018 a fifth ESB 7 ordered in FY2019 and the sixth and final ship ESB 8 with an order date yet to be determined 3 In mid 2022 the Marine Corps announced its intention to retire both ESD ships 4 after less than a decade of active service but this was rejected by Congress in December of 2022 5 The ships were subsequently placed in reduced operating status Contents 1 Design 1 1 USS Ponce 1 2 Expeditionary Mobile Base ESB variants 2 Concept testing 3 Construction 3 1 List of ships 4 Ship re designation 5 Commissioning 5 1 Proposed ESD retirement 6 See also 7 ReferencesDesign edit nbsp A computer generated image depicting the Expeditionary Transfer Dock designThe Expeditionary Transfer Dock concept is a large auxiliary support ship to facilitate the seabasing of an amphibious landing force by acting as a floating base or transfer station that can be prepositioned off the target area 6 7 Troops equipment and cargo would be transferred to the ESD by large draft ships from where they can be moved ashore by shallower draft vessels landing craft like the Landing Craft Air Cushion LCAC or helicopters 6 7 For transferring vehicles from the larger ships to the ESD the vessels were originally to be fitted with a Vehicle Transfer System a ramp connecting the two ships alongside and able to compensate for the movements of both vessels while underway 8 nbsp USNS John Glenn T ESD 2 naming Feb 2014A preliminary design by General Dynamics envisioned a ship that carried six LCACs with the ability to turn around dock unload or load then launch two landing craft simultaneously from the stern 8 The ESDs were to host a brigade size force sail at 20 knots 37 km h 23 mph and have a maximum range of 9 000 nautical miles 17 000 km 10 000 mi 8 Each ship was to cost US 1 5 billion to build 8 but cutbacks to defense spending planned for the fiscal year 2011 budget forced the downscaling of the design in mid 2009 8 General Dynamics identified the civilian Alaska class oil tanker built by the subsidiary National Steel and Shipbuilding Company as a suitable basis for an ESD Lite with the design modified into a float on float off vessel that could be built for US 500 million per ship 8 As part of the cost trade off the Vehicle Transfer System was scrapped in favor of skin to skin mooring of a host ship alongside the ESD and the LCAC complement was reduced to three 8 The new design is 785 feet 239 m long with a beam of 164 feet 50 m a top speed of over 15 knots 28 km h 17 mph and a maximum range of 9 500 nautical miles 17 600 km 10 900 mi 1 Converteam supplies an integrated power system and vessel automation system for the ESD 9 USS Ponce edit In March 2013 Chief of Naval Operations Jonathan Greenert showed PowerPoint of the ESD Expeditionary Mobile Base ESD ESB a proposed variant of the ESD with increased accommodation a hangar and large flight deck on piers above the semi submersible deck 10 11 This was first proposed in January 2012 around the time of the sudden announcement that USS Ponce would be converted as an interim AFSB I ESB 12 The ESD ESB could be used to support special forces and intelligence gathering 13 as a base for helicopters MV 22 Osprey tiltrotors and even the F 35B stealth fighter 10 but the main role of the Ponce will be operating minesweeping MH 53E Sea Dragon helicopters 12 As of March 2013 update a number of variations of the ESD were being considered 11 the ESB can fulfill many of the roles of a 2 5 billion big deck amphibious ship at a quarter of the price 10 Expeditionary Mobile Base ESB variants edit nbsp ESB variant USS Lewis B PullerUnlike the first two Expeditionary Transfer Dock ESD the Lewis B Puller class or sub variant of Expeditionary Mobile Base ESB vessels serve to support special forces missions counter piracy smuggling operations maritime security operations and mine clearance as well as humanitarian aid and disaster relief missions 14 In order to support these extended roles the ESBs will have military detachments in addition to the civil service mariners 15 ESB vessels are designed to support low intensity missions allowing more expensive high value amphibious warfare ships and surface combatant warships to be re tasked for more demanding operational missions for the U S Navy 16 These ESB variants are slated to operate in the Middle East and the Pacific Ocean 17 Like the first two Expeditionary Transfer Dock the overall design of the T ESB 3 and T ESB 4 is based on the hull of the civilian Alaska class oil tanker 17 Both ESB variants will be outfitted with support facilities for its mine sweeping special operations and other expeditionary missions An accommodation barge will also be carried to support up to 298 additional mission related personnel 16 Their aviation facilities include a 52 000 sq ft 4 800 m2 flight deck 18 with landing spots for two heavy lift transport CH 53 helicopters as well as additional deck space for two more CH 53s Lewis B Puller will also have a helicopter hangar an ordnance storage magazine underway replenishment facilities and deck space for mission related equipment storage 16 The addition of a flight deck makes the ship more top heavy and so less stable in heavy seas The deck is made with two operating spots and two parking spots plus room to store two in the hangar The mission deck s ability to submerge to launch landing craft was disabled and instead a crane capable of carrying 11 metric tons 12 short tons and moving a 41 ft 12 m boat in up to sea state 3 carries watercraft towed arrays and unmanned vehicles into the water 19 The United States Navy ordered T ESB 3 in February 2012 as part of the Fiscal Year 2013 appropriation for the U S Department of Defense via the National Defense Sealift Fund NDSF 16 20 The keel laying ceremony for MKP 3 took place at the General Dynamics NASSCO shipyard in San Diego California on 5 November 2013 21 22 On 16 January 2014 at the Surface Naval Association s national symposium the head of NAVSEA s Strategic and Theater Sealift program Captain Henry Stevens announced that the MV 22 Osprey tilt rotor aircraft would be evaluated for potential operations on board the Expeditionary Mobile Base ESD variant The testing and certification of MH 53E helicopters for minesweeping operations from ESB support ships was slated to begin during fiscal year 2016 Additionally Captain Stevens noted that the F 35B STOVL strike fighter was not then being considered for ESB operations because of exhaust heat from F 35B damaging the flight decks of U S Navy amphibious assault ships 23 Some outfitting and specialized equipment specific to the V 22 was needed to support it but little engineering work or modifications to the ship needed to be done 19 upon Lewis B Puller s deployment it had been upgraded to support V 22 operations by Special Operations Forces 24 On 19 December 2014 U S Navy s Naval Sea Systems Command awarded a US 498M contract to General Dynamics NASSCO for the construction of second ESB variant the as yet unnamed T ESB 4 This vessel will be built at the NASSCO shipyard in San Diego California with a scheduled completion date of 2018 25 On 15 January 2021 Secretary of the Navy Kenneth J Braithwaite announced that ESB 7 will be named USS Robert Simanek in honor of PFC Simanek a Marine who was awarded the Medal of Honor during the Korean War 26 Concept testing edit nbsp USNS Watkins back and heavy lift ship MV Mighty Servant 1 moored side by side off San Diego during a demonstration of the Expeditionary Transfer Dock concept in 2005 In September 2005 the United States Navy approved trials of the ESD concept to test the feasibility of seabasing for an amphibious operation 7 The heavy lift ship MV Mighty Servant 1 served as the substitute for the ESD while the roll on roll off vessel USNS Watkins played the role of a planned type of transport ship for the United States Maritime Prepositioning Force 7 The first part of the trial consisted of the two ships transferring cargo between themselves while anchored in Puget Sound 7 After successfully completing this the vessels sailed to San Diego where cargo was transferred from Watkins to Mighty Servant 1 then taken ashore by LCACs slightly submerging the deck of the heavy lift ship allowed the hovercraft to fly aboard 7 A second series of tests was conducted off Norfolk Virginia in September and October 2006 with USNS Red Cloud and MV Mighty Servant 3 6 This time the ships were moored together while underway during which vehicles drove from Red Cloud onto Mighty Servant 3 then embarked aboard LCACs 6 In February 2010 Mighty Servant 3 joined USNS Soderman for further trials in the Gulf of Mexico 6 During these personnel and a wide range of vehicles from Humvees to M1 Abrams tanks were transferred to then launched from Mighty Servant 3 in conditions up to Sea State 4 6 The transferring cargo was later reduced to Sea State 3 conditions after some design changes 27 Construction edit nbsp ESD John Glenn at NASSCO in San DiegoIn August 2010 the National Steel and Shipbuilding Company in San Diego was awarded a US 115 million contract to design the Mobile Landing Platform and build the first ship 6 28 Construction on the first vessel began in July 2011 29 By January 2016 the names for the four ships were announced 30 31 The name for the fifth ship was announced in November 2017 32 List of ships edit Prefix Name Hull No NotesMontford Point class ESD variant USNS Montford Point T ESD 1 Inactive Reduced Operating Status 23 February 2022 33 USNS John Glenn T ESD 2 Inactive Reduced Operating Status 10 January 2020 34 Lewis B Puller subclass ESB variant USS Lewis B Puller ESB 3 Commissioned 17 August 2017USS Hershel Woody Williams ESB 4 Commissioned 7 March 2020USS Miguel Keith ESB 5 Commissioned 8 May 2021USS John L Canley ESB 6 Christened 25 June 2022USS Robert E Simanek ESB 7 Under construction 27 May 2022USNS Hector A Cafferata Jr T ESB 8 Ordered 8 April 2022 35 Orders for the second and third vessels were made in the 2013 and 2015 fiscal years 8 The keel for the first Montford Point class Expeditionary Transfer Dock was laid on 19 January 2012 36 Construction of John Glenn begin on 17 April 2012 37 by which time the Montford Point was 48 complete 37 The Montford Point was christened in San Diego on March 2 2013 Montford Point completed final contract trials on 13 September 2013 John Glenn was floated off on 15 September and construction began on Lewis B Puller on 19 September 2013 38 39 In March 2012 the USN requested a fourth ship in the FY14 budget of the National Defense Sealift Fund and proposed that both T ESB 3 and T ESB 4 would be ESD ESB variants 13 Congress rejected both requests on the grounds that Ponce could do the job and ESBs should in any case be funded out of the main Navy account 40 As of March 2013 update the Chief of Naval Operations was still planning to buy two ESD and two ESD ESB variants despite the uncertainty caused by the sequester 10 in fact the late 2012 Vision for the 2025 Surface Fleet by the head of Naval Surface Forces envisages buying more MLP variants as a cheap alternative to traditional amphibious ships 11 On 19 December 2014 U S Navy s Naval Sea Systems Command announced the construction of the second ESB variant the then unnamed T ESB 4 This vessel would be built at the NASSCO shipyard in San Diego California with a scheduled completion date of 2018 It was anticipated that T ESB 4 would be assigned to the Pacific Ocean and like the other ESD ships will be operated by the Military Sealift Command 25 In January 2016 it was announced that T ESB 4 would be named USNS Hershel Woody Williams after a World War II Marine Corps infantryman who earned a Medal of Honor in the Battle of Iwo Jima 41 Construction of the ship began in October 2015 42 It was christened on 21 October 2017 and delivered to Military Sealift Command on 22 February 2018 and entered service the same day 43 ESB 5 the fifth vessel in the class and the third ESB variant began construction in January 2017 at NASSCO 42 Ship re designation editEffective 4 September 2015 U S Secretary of the Navy Ray Mabus officially announced the creation of a new ship designation E for expeditionary support Joint High Speed Vessel JHSV will be called Expeditionary Fast Transport or EPF the Mobile Landing Platform MLP will be called Expeditionary Transfer Dock or ESD and the Afloat Forward Staging Base AFSB variant of the MLP will be called Expeditionary Mobile Base or ESB The new designation was pursuant to a memorandum sent to Secretary Mabus from Chief of Naval Operations Admiral Jonathan Greenert dated 31 August 2015 44 Commissioning editIn January 2020 the Navy announced that it will commission all ESBs as warships meaning they will carry the prefix USS following the 2017 commissioning of Lewis B Puller As a result they will be crewed by a mix of Navy sailors and civilian mariners from Military Sealift Command Navy spokesman Lieutenant Tim Pietrack told USNI News This re designation provides combatant commanders greater operational flexibility to employ this platform in accordance with the laws of armed conflict The Secretary of the Navy approved the commissioning of all ESBs following feedback from the employment of ESB 3 and expected employment of subsequent ships of the class Prior to commissioning the ESB class was limited to defensive actions during times governed by the laws of armed conflict Post commissioning these ships have greater mission flexibility throughout the range of military operations 45 Proposed ESD retirement edit In mid 2022 the Marine Corps announced its intention to retire the two ESD ships Although they were cheap to buy compared to amphibious assault ships and demonstrated seabasing concepts they were limited to connecting with sealift vessels at wave heights below three feet and payload fuel capacity and accommodation space were reduced to cut costs This led to the decision to retire the ships to prioritize other vessels such as the more successful ESBs 46 The proposed retirement of the two ships was rejected by Congress in December of 2022 47 See also editUSS Inchon amphibious ship converted in 1996 to something like an ESB References edit a b c d e f g h USNS John Glenn MLP 2 Christening Ceremony PDF General Dynamics NASSCO 1 February 2014 pp 14 16 Archived from the original pdf on 4 March 2016 Retrieved 28 September 2014 A New Class of Ship Expeditionary Support Navy Times 3 September 2015 Navy Ship Names Background for Congress fas org 28 February 2019 Retrieved 2 March 2019 Marines still have big plans for seabasing ships as 2 head for mothballs defensenews com 20 June 2022 Retrieved 18 September 2023 Congress is building a stronger fleet than the Navy navytimes com 15 December 2022 Retrieved 17 December 2022 a b c d e f g The US Navy s Mobile Landing Platform Ships Defense Industry Daily Watershed Publishing 18 August 2010 Retrieved 12 January 2011 a b c d e f Mobile Landing Platform MLP GlobalSecurity org Retrieved 13 January 2011 a b c d e f g h Scott Richard 30 September 2010 Floating world US Navy eyes Mobile Landing Platform as sea base pontoon International Defence Review Jane s Information Group 20110803 US Navy Mobile Landing Platform Archived from the original on 2012 03 10 Retrieved 2011 10 27 a b c d Freedberg Jr Sydney J 12 March 2013 CNO Adm Greenert Emphasizes Navy s Bright Future Not Budget Crisis AOL Defense Archived from the original on 23 March 2013 Retrieved 21 March 2013 Has image of the MLP AFSB a b c Cavas Christopher P 17 March 2013 U S Navy Weighs Halving LCS Order Defense News Archived from the original on April 10 2013 a b Cavas Christopher P 27 January 2012 New Floating Base Ships Coming for U S Navy Defense News Archived from the original on January 21 2013 a b Senate Hearings 112 DEPARTMENT OF DEFENSE APPROPRIATIONS FOR FISCAL YEAR 2013 U S Government Printing Office 7 March 2012 Document Navy s 30 Year Shipbuilding Plan for Fiscal Year 2015 news usni org US Navy 7 July 2014 Retrieved 7 July 2014 Burgess Richard R 10 June 2015 New Afloat Forward Staging Base Ships to Have Mixed CIVMAR Sailor Crews SEAPOWER Magazine Retrieved 10 June 2015 a b c d U S Navy Program Guide 2013 PDF United States Navy 6 November 2013 Retrieved 5 December 2013 See pages 101 102 a b Updated Keel Laid for First Dedicated Afloat Forward Staging Base USNI News Blog United States Naval Institute 6 November 2013 Retrieved 5 December 2013 Expeditionary Mobile Base USNS Lewis B Puller Begins First Operational Deployment navyrecognition com 12 July 2017 Retrieved 24 November 2020 a b Expeditionary Mobile Base Chesty Puller May Receive SOF Upgrades Before 5th Fleet Deployment USNI org 2 November 2015 Retrieved 24 November 2020 Mobile Landing Platform MLP Afloat Forward Staging Base Military GlobalSecurity org 15 November 2013 Retrieved 5 December 2013 Keel Laid for Future USNS Lewis B Puller NNS131105 20 Naval Sea Systems Command Office of Corporate Communications 5 November 2013 Retrieved 5 December 2013 NASSCO Lays Keel of Third U S Navy Platform Ship MarineLink com Maritime Activity Reports Inc 5 November 2013 Retrieved 5 December 2013 Munoz Carlo 16 January 2014 SNA 2014 Navy Eyes Osprey Flights for AFSB Fleet United States Naval Institute Retrieved 16 January 2014 Eckstein Megan 12 July 2017 Expeditionary Sea Base USNS Lewis B Puller Departs for Maiden Deployment USNI org Retrieved 24 November 2020 a b LaGrone Sam 22 December 2014 NASSCO Awarded 498 Million for Second Afloat Forward Staging Base USNI News Blog United States Naval Institute Retrieved 22 December 2014 SECNAV Names Future Vessels while aboard Historic Navy Ship United States Navy 2021 01 15 Retrieved 2021 01 16 The US Navys Mobile Landing Platform Ships MLP Defense Industry Daily Retrieved 2018 09 17 Robbins Gary 14 August 2010 General Dynamics gets 115M for pier at sea San Diego Union Tribune Retrieved 10 January 2011 Construction Begins on First Mobile Landing Platform United States Navy 30 June 2011 Retrieved 3 July 2011 Military Sealift Command Press Release Navy Names First Three Mobile Landing Platform Ships Archived 2013 02 21 at the Wayback Machine Secretary of the Navy Names Expeditionary Sea Base Ship www navy mil Archived from the original on 24 April 2016 Retrieved 17 January 2022 SECNAV Spencer Names First Ship usni org 6 November 2017 Retrieved 23 December 2017 USNS Montford Point T ESD 1 nvr navy mil 5 May 2022 Retrieved 17 December 2022 USNS John Glenn T ESD 2 nvr navy mil 5 May 2022 Retrieved 17 December 2022 ESB 8 nvr navy mil 8 April 2022 Retrieved 2 March 2023 Keel Laid for Navy s First Mobile Landing Platform Defense talk 23 January 2012 Retrieved 31 January 2012 a b Nachato stroitelstvo vtorogo korablya tipa MLP dlya VMS SShA Cavas Christopher 3 October 2013 New Ship News Sub launched Carrier prepped LCS delivered Defense News Archived from the original on 4 October 2013 Hlad Jennifer 2017 08 22 Aboard the Navy s new sea base Lewis B Puller named for legendary Marine Navy Times Retrieved 2021 01 16 The U S Navy recently commissioned a first in its class Expeditionary Sea Base to be named after the most storied Marine in the Corps history Committee Reports 112th Congress 2011 2012 House Report 112 493 DEPARTMENT OF DEFENSE APPROPRIATIONS BILL 2013 Library of Congress permanent dead link Secretary of the Navy Names Expeditionary Sea Base Ship US Navy 14 January 2016 Retrieved 28 January 2017 a b NASSCO starts construction of ESB 5 Marine Log 27 January 2017 Retrieved 28 January 2017 Navy Accepts Delivery of USNS Hershel Woody Williams Press release United States Navy 23 February 2018 NNS180223 22 Retrieved 30 September 2020 Navy Renames Three Ship Classes Creates Expeditionary Designator in Naming System USNI News Blog United States Naval Institute 4 September 2015 Retrieved 4 September 2015 Eckstein Megan 21 January 2020 Navy Will Commission All Expeditionary Sea Bases as USS Warships USNI News United States Naval Institute Retrieved 30 January 2020 Marines still have big plans for seabasing ships as 2 head for mothballs Defense News 20 June 2022 Congress is building a stronger fleet than the Navy navytimes com 15 December 2022 Retrieved 17 December 2022 Retrieved from https en wikipedia org w index php title Expeditionary Transfer Dock amp oldid 1176007978 Expeditionary Mobile Base ESB variants, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.