fbpx
Wikipedia

Dashadong station

Dashadong Station (Chinese: 大沙东站), formerly Dashadi Station (大沙地站) during planning,[1][2] is an interchange station between Line 5[3] and Line 7 of the Guangzhou Metro. It is located underground the junction of East Dashadi Road (大沙地东路) and Zhendong Road (镇东路), in the Huangpu District.[4][5] Line 5 opened on 28 December 2009,[6] whilst Line 7 opened on 28 December 2023.[7]

Dashadong

大沙东
Line 7 platform
Chinese name
Simplified Chinese大沙东站
Traditional Chinese大沙東站
Literal meaningDasha East Station
Transcriptions
Standard Mandarin
Hanyu PinyinDàshādōng Zhàn
Yue: Cantonese
Jyutpingdaai6saa1dung1 zaam6
General information
LocationDashadi East Road (大沙地东路) and Zhendong Road (镇东路)
Huangpu District, Guangzhou, Guangdong
China
Coordinates23°06′21″N 113°27′29″E / 23.10585°N 113.45793°E / 23.10585; 113.45793
Operated byGuangzhou Metro Co. Ltd.
Line(s)     Line 5
     Line 7
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code5 23 (Line 5)
7 14 (Line 7)
History
Opened28 December 2009; 14 years ago (2009-12-28) (Line 5)
28 December 2023; 3 months ago (2023-12-28) (Line 7)
Services
Preceding station Guangzhou Metro Following station
Dashadi
towards Jiaokou
Line 5 Wenchong
Yufengwei
towards Meidi Dadao
Line 7 Jitang
towards Yanshan

It is the deepest station on the Phase 2 extension of Line 7.[8]

Station layout edit

Line 5 edit

G - Exits A, C
L1
Concourse
Lobby Customer Service, Shops, Vending machines, ATMs
Transfer passageway to Line  7 
L2
Equipment Area
- Station equipment
L3
Platforms
Platform 2    5  towards Jiaokou (Dashadi)
Island platform, doors will open on the left
Platform 1  5  towards Huangpu New Port (Wenchong)  

Line 7 edit

G - Exits D, E
Mezzanine Exit F buffer level Security check, Towards exit F and transfer passageway
L1
Concourse
Lobby Customer Service, Shops, Vending machines, ATMs
Transfer passageway Transfer passageway to Line  5 
Toilets, infant rooms (non-paid area)
L2
Equipment Area
- Station equipment
L3
Buffer Level
- Station equipment, towards concourse and platforms
L4
Platforms
Platform 4    7  towards Meidi Dadao (Yufengwei)
Island platform, doors will open on the left
Platform 3  7  towards Yanshan (Jitang)  

[8]

Exits edit

Exit number Exit location
Exit A Dashadi Donglu
Exit C Dashadi Donglu
Exit D Zhendong Lu
Exit E Dashadi Donglu
Exit F Dashadi Donglu

Gallery edit

References edit

  1. ^ (in Simplified Chinese). Archived from the original on 2009-09-30. Retrieved 2009-03-23.
  2. ^ (in Simplified Chinese). Archived from the original on 2011-09-27. Retrieved 2009-03-23.
  3. ^ Metro Line 5 Opens This December Archived 2012-08-03 at archive.today
  4. ^ (in Simplified Chinese). Archived from the original on 2011-07-08. Retrieved 2009-03-23.
  5. ^ 黄埔公园-大沙地区域:能否借地铁站起来? (in Simplified Chinese).
  6. ^ Guangzhou Metro line Five to Open in December 2009
  7. ^ "广州地铁七号线二期和五号线东延段开通运营,长洲岛派出舞狮喜迎开通". 新快报 (in Simplified Chinese). 2023-12-28. from the original on 2023-12-28. Retrieved 2024-01-05.
  8. ^ a b 郑慧梓 (2023-11-03). "冲刺年底开通,地铁七号线二期全线进入运营调试". 南方日报 (in Simplified Chinese). from the original on 2023-11-03. Retrieved 2024-01-05.

dashadong, station, confused, with, dashadi, station, another, station, guangzhou, metro, huangpu, district, dashadong, station, chinese, 大沙东站, formerly, dashadi, station, 大沙地站, during, planning, interchange, station, between, line, line, guangzhou, metro, loc. Not to be confused with Dashadi station another station of Guangzhou Metro in Huangpu District Dashadong Station Chinese 大沙东站 formerly Dashadi Station 大沙地站 during planning 1 2 is an interchange station between Line 5 3 and Line 7 of the Guangzhou Metro It is located underground the junction of East Dashadi Road 大沙地东路 and Zhendong Road 镇东路 in the Huangpu District 4 5 Line 5 opened on 28 December 2009 6 whilst Line 7 opened on 28 December 2023 7 Dashadong大沙东Line 7 platformChinese nameSimplified Chinese大沙东站Traditional Chinese大沙東站Literal meaningDasha East StationTranscriptionsStandard MandarinHanyu PinyinDashadōng ZhanYue CantoneseJyutpingdaai6saa1dung1 zaam6General informationLocationDashadi East Road 大沙地东路 and Zhendong Road 镇东路 Huangpu District Guangzhou GuangdongChinaCoordinates23 06 21 N 113 27 29 E 23 10585 N 113 45793 E 23 10585 113 45793Operated byGuangzhou Metro Co Ltd Line s Line 5 Line 7Platforms4 2 island platforms Tracks4ConstructionStructure typeUndergroundAccessibleYesOther informationStation code5 23 Line 5 7 14 Line 7 HistoryOpened28 December 2009 14 years ago 2009 12 28 Line 5 28 December 2023 3 months ago 2023 12 28 Line 7 ServicesPreceding station Guangzhou Metro Following station Dashaditowards Jiaokou Line 5 Wenchongtowards Huangpu New Port Yufengweitowards Meidi Dadao Line 7 Jitangtowards Yanshan It is the deepest station on the Phase 2 extension of Line 7 8 Contents 1 Station layout 1 1 Line 5 1 2 Line 7 2 Exits 3 Gallery 4 ReferencesStation layout editLine 5 edit G Exits A C L1Concourse Lobby Customer Service Shops Vending machines ATMsTransfer passageway to Line 7 L2Equipment Area Station equipment L3Platforms Platform 2 nbsp 5 towards Jiaokou Dashadi Island platform doors will open on the left Platform 1 5 towards Huangpu New Port Wenchong nbsp Line 7 edit G Exits D E Mezzanine Exit F buffer level Security check Towards exit F and transfer passageway L1Concourse Lobby Customer Service Shops Vending machines ATMs Transfer passageway Transfer passageway to Line 5 Toilets infant rooms non paid area L2Equipment Area Station equipment L3Buffer Level Station equipment towards concourse and platforms L4Platforms Platform 4 nbsp 7 towards Meidi Dadao Yufengwei Island platform doors will open on the left Platform 3 7 towards Yanshan Jitang nbsp 8 Exits editExit number Exit location Exit A Dashadi Donglu Exit C Dashadi Donglu Exit D Zhendong Lu Exit E Dashadi Donglu Exit F Dashadi DongluGallery edit nbsp Line 5 platform nbsp Line 5 concourse nbsp Transfer passageway nbsp Line 7 concourse nbsp Line 7 buffer areaReferences edit 广州地铁五号线概况 in Simplified Chinese Archived from the original on 2009 09 30 Retrieved 2009 03 23 广州地铁站以企业命名引来居民不满导致改名 in Simplified Chinese Archived from the original on 2011 09 27 Retrieved 2009 03 23 Metro Line 5 Opens This December Archived 2012 08 03 at archive today 廣州地鐵五號線投標申請人報名提交資料一覽表 in Simplified Chinese Archived from the original on 2011 07 08 Retrieved 2009 03 23 黄埔公园 大沙地区域 能否借地铁站起来 in Simplified Chinese Guangzhou Metro line Five to Open in December 2009 广州地铁七号线二期和五号线东延段开通运营 长洲岛派出舞狮喜迎开通 新快报 in Simplified Chinese 2023 12 28 Archived from the original on 2023 12 28 Retrieved 2024 01 05 a b 郑慧梓 2023 11 03 冲刺年底开通 地铁七号线二期全线进入运营调试 南方日报 in Simplified Chinese Archived from the original on 2023 11 03 Retrieved 2024 01 05 Retrieved from https en wikipedia org w index php title Dashadong station amp oldid 1195280785, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.