fbpx
Wikipedia

Casablanca Tramway

The Casablanca Tramway (Arabic: طرامواي الدار البيضاء Ṭrāmwāy ad-Dār al-Bayḍā’) is a low-floor tram system in Casablanca, Morocco. As of 2019, it consists of two lines - T1 from Sidi Moumen to Lissasfa, and T2 from Sidi Bernoussi to Aïn Diab—which intersect at 2 points and form a 47 km (29 mi) network with 71 stations. Two additional lines, T3 and T4, are scheduled to open in 2024.[1][2]

Casablanca Tramway
Alstom Citadis vehicle on line T1 at Place des Nations-Unies station
Overview
Native nameArabic: طرامواي الدار البيضاء
LocaleCasablanca, Morocco
Stations71
Websitehttp://www.casatramway.ma
Service
TypeTramway
Services2
Operator(s)RATP Dev Casablanca
Rolling stock74 Alstom Citadis 302
Daily ridership220,000 (2019)
Ridership12
History
Opened13 December 2012 (2012-12-13)
Technical
Line length47.5 km (29.5 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed19 km/h (12 mph)
Route map

History edit

The Casablanca Tramway is the second modern tram system in Morocco, after the Rabat–Salé tramway, but is longer and has more stations.

It was first inaugurated by King Muhammad VI on 12 December 2012. At that time, it consisted of one 31-kilometre (19 mi) Y-shaped line with 48 stops, connecting Sidi Moumen in the east with Ain Diab and the Facultés district in the west. The line forked toward Ain Diab and Facultés after Abdelmoumen Station.

A second line was opened on 24 January 2019. It connects Sidi Bernoussi to Ain Diab, using the segment of the previously existing line from the split to Ain Diab. Line 1 was also extended from Facultés to Lissasfa.[2]

Construction edit

Project management on the first line was provided by Casablanca Transports en Site Aménagé ("Casa Transports"), a limited company created for the purpose in March 2009. Stakeholders were the Ministry of Finance & the Interior, local government (the Grand Casablanca regional government, the Casablanca préfecture and Casablanca urban commune), and several institutional investors (King Hassan II, CDG Capital, Banque Populaire du Maroc, and ONCF). Casa Transports awarded the construction contract to a global group headed by the French group Systra. Project support was subcontracted to the Spanish group Ayesa Tecnología.[3]

Preparatory work started in 2009, with the construction of the first line starting in 2010.[4] The line was inaugurated on 12 December 2012 by King Mohammed VI, with French Prime Minister Jean-Marc Ayrault in attendance. Commercial services started the next day.[5][6]

The 20 km (12 mi) of Zones 1 and 3 were constructed by Yapı Merkezi, and the 10 km (6.2 mi) of Zone 2 was constructed by Colas Rail.

Current network edit

Line Terminus Opening Length (km) Stations
  Lissasfa ↔ Sidi Moumen 2012 23,5 38
  Aïn Diab Plage ↔ Sidi Bernoussi 2019 22,5 33
  Gare de Casa-Port ↔ Hay El Wahda 2024 14 20
  Parc de la Ligue Arabe ↔ Mohammed Erradi 2024 12,5 19
TOTAL 72,5 110

Line T1 edit

As of 2019, Line 1 of the Casablanca Tramway serves 36 stations between termini in Sidi Moumen and Lissasfa.[2] The line is 23.5 km (14.6 mi) long and takes 73 minutes from one terminus to the other.[7] It opened in December 2012 and was extended in January 2019.[2]

Line T2 edit

As of January 24, 2019, the 17 km (11 mi) Line T2 runs from Ain Diab to Sidi Bernoussi, via the Ain Sebaa, Hay Hassani, Al Fida and Derb Sultan districts. It uses the segment from the split to Ain Diab in the previous configuration, in addition to the new line.[8][9]

Operations edit

Travel time between termini is around 69 minutes from Facultés and 77 minutes from Hay Hassani. With a 75% priority at junctions, the average speed comes close to 19 kilometres per hour (12 mph). On weekdays, the tramway runs from 06:30 to 22:00 at weekends it runs from 06:30 to 23:30. Service averages were planned to be every 4+12 minutes in peak hours and 8+12 minutes off-peak.[10]

Casa Transport awarded a five-year contract to operate the tramway to the CasaTram consortium of RATP Group, Caisse de dépôt et de gestion and Transinvest as partners.[11][12] In January 2016 RATP Group became the sole shareholder.[13]

Following a competitive tender process, RATP Group was awarded a further contract until December 2029 having beaten bids from a National Express / ALSA / ONCF consortium and Transdev.[14][15][16]

Engie Ineo and Engie Cofely Morocco supplied signaling and other systems for Line 2 as well as an extension of Line 1.[17][18]

Rolling stock edit

The tramway is operated by 74 Alstom Citadis type 302 low-floor trams, built by Alstom in France.[19][20][21] The final assembly was completed in Reichshoffen, Alsace. Trams have air conditioning and tinted windows, and an information system in both Arabic and French. They run typically in pairs with a total length of 65 metres (213 ft).[22] A further 50 are to be delivered in 2018 to operate Line T2.[23][24]

In July 2017, Alstom, Bombardier / CAF, CRRC Zhuzhou Locomotive and Škoda Transportation were shortlisted to bid for a contract for 100 trams for Lines T3 and T4.[25]

Fares edit

Ticket prices are subsidised by the Moroccan government and the city of Casablanca, and set at a flat rate of 6 dirhams per journey, with a weekly season ticket at 60 dirhams and a monthly season ticket at 230 dirhams. Fares are paid by a paper smart card at turnstiles on each station platform.[26] Students get a reduced monthly season ticket of 150 dirhams.[26] A combined tram and bus fare is being considered.[when?]

Usage edit

In the first month of service, between 40,000 and 45,000 passengers used the service each day, on average.[27] A survey in June 2013 recorded 70,000 commuters.[28] By 2013, the tramway had met its objectives by carrying over 100,000 passengers a day.[29] From 2015, 255,000 passengers a day are expected on Line T1.[28]

Incidents edit

Tramway operations have resulted in many accidents: in the first 13 months, 180 accidents were reported.[30][31]

  • On 1 April 2013, a lorry hit a tramcar at full speed. Both the lorry and tram drivers were injured, according to a witness. The impact was so hard that part of the tram was derailed.[32][33]
  • On 2 August 2013, a man was crushed to death.[34]
  • Two days later on 4 August 2013, a motorcyclist was hit by a tram and died.[34]
  • On 14 January 2014, a man died after being hit by a tram.[35]
  • On 24 April 2014, a 26-year-old woman was fatally injured by the tram.[36][37]
  • On 4 July 2014, a coach owned by a private firm failed to give way to the tram and struck it. Part of the tram was derailed.
  • On 13 January 2015, a rider who entered the tram platform died after being hit.[38]
  • On 8 November 2017, two teenagers on a motorcycle were injured after hitting a tram line.
  • On 26 December 2017, two women were struck crossing the tramway and were injured.

Future edit

 
Projected plan of the Casablanca Tramway network in conjunction with commuter rail and rapid transit buses for the period 2022–2030 (presented February 2017).

The Schéma directeur d'aménagement urbain (SDAU, "Master plan of the Director of urban planning")[8] and the Plan de déplacement urbain (PDU, "Urban transport plan")[9] for Greater Casablanca foresee a final network of 4 tramway lines, two traversal (T1, T2) and two radial (T3, T4). These lines will interchange with the now cancelled Casablanca Metro and the operational Al Bidaoui suburban railways.[8][9] Casablanca will have a network totalling 76 route km (47+14 route mi), costing 5.9 billion dirhams.[28]

Lines T3 and T4 edit

Long-term plans in the SDAU[8] and PDU[9] are for new lines T3 (14 km (8.7 mi)) and T4 (13 km (8.1 mi).

Line T3 will connect the Sidi Othmane district to the El Hank district via the city centre to Casa-Port railway station, and T4 will connect the Sbata and Lissasfa districts via the Aïn Chock and the Facultés district.[8][9]

See also edit

References edit

  1. ^ "Présentation des lignes T3 et T4". Société de développement local. Retrieved 11 January 2023.
  2. ^ a b c d "Inauguration Officielle De La Ligne T2 Du Tramway De Casablanca Et De L'extension De La Ligne T1" [Official Inauguration of Line T2 of the Casablanca Tramway and the Extension of Line T1] (PDF) (Press release) (in French). Casablanca. Casa Transport SA. 2 January 2019. Retrieved 20 May 2019.
  3. ^ . Casablanca Transport (in French). Archived from the original on 13 January 2014.
  4. ^ "Casablanca Tramway, Morocco". Railway Technology.
  5. ^ "Inauguration of Casablanca's first tram line in Morocco". Euro Transport Magazine. 12 December 2012.
  6. ^ "Royal opening launches Casablanca trams". Railway Gazette International. 14 December 2012.
  7. ^ "Casa Tramway". casa-tram.ma/ (in Arabic). Retrieved 21 May 2019.
  8. ^ a b c d e Allal, Sakrouhi (October 2008). [Master plan of the Director of Urban Planning] (PDF). Agence urbaine de Casablanca (in French). Archived from the original (PDF) on 12 July 2018. Retrieved 23 October 2014.
  9. ^ a b c d e [REQUIREMENTS FOR URBAN TRANSPORT IN CASABLANCA – Public transport projects on dedicated land] (PDF) (in French). 13 November 2007. Archived from the original (PDF) on 1 September 2013. Retrieved 23 October 2014.
  10. ^ . Casa Tram. Archived from the original on 25 March 2016.
  11. ^ Barrow, Keith (16 July 2012). "Casablanca light rail operations contract awarded". International Railway Journal.
  12. ^ "Casablanca tram operating contract awarded". Metro Report International. 16 July 2012.
  13. ^ "RATP Dev is now the sole shareholder of Casa-Tram". Railway Pro. 6 January 2016.
  14. ^ . Morocco World News. 12 June 2017. Archived from the original on 29 September 2017.
  15. ^ Barrow, Keith (13 June 2017). "RATP Dev to retain Casablanca tram operating contract". International Railway Journal.
  16. ^ "RATP Dev retains Casablanca operating contract". Metro Report International. 20 September 2017.
  17. ^ "Engie wins Casablanca tram extension contracts". International Railway Journal. 2 January 2017.
  18. ^ "Casablanca tramway extension contracts awarded". Metro Report International. 4 January 2017.
  19. ^ "La ville de Casablanca choisit le Citadis d'Alstom pour son futur réseau de tramway" [The town of Casablanca chooses Alstom Citadis for its new tramway network] (Press release) (in French). Alstom. 18 November 2009. Archived from the original on 15 February 2013. Retrieved 11 December 2012.
  20. ^ "Casablanca chooses Citadis trams". Metro Report International. 17 November 2009.
  21. ^ "Casablanca tram contracts awarded". Railway Gazette International. 15 November 2010.
  22. ^ Alstom (12 December 2012). "Inauguration of Casablanca's first tram line in Morocco" (Press release).
  23. ^ . International Railway Journal. 13 October 2015. Archived from the original on 4 October 2017. Retrieved 4 October 2017.
  24. ^ "Casablanca orders 50 more Cttadis trams". Metro Report International. 13 October 2015.
  25. ^ Barrow, Keith (26 July 2017). "Four shortlisted for Casablanca LRV contract". International Railway Journal.
  26. ^ a b "Tramway de Casablanca – le ticket à 6 dirhams" [Casablanca Tramway – tickets 6 dirhams]. L'Economiste. 30 November 2012. Retrieved 13 December 2012.
  27. ^ "Débuts en douceur pour le tramway de Casablanca" [Smooth start for the Casablanca Tramway]. Le Soir (Belgium) (in French). 23 January 2013. Retrieved 23 January 2013.[dead link]
  28. ^ a b c .Benlahrech, Ryadh (2013). "Le tramway qui facilite le train-train: Spécial Villes" [The tramway which eases commuting]. Jeune Afrique (in French) (4): 68. ISSN 1950-1285.
  29. ^ Djama, Nasser (19 December 2013). "Après le succès du tramway, Casablanca va préparer son futur métro aérien en 2014" [After the success of the tramway, Casablanca gets ready for Skytrain in 2014]. L'Usine Maroc (in French). Retrieved 23 October 2014.
  30. ^ Zerrour, Laila (16 April 2014). "Tramway de Casablanca: Une quinzaine d accidents par mois" [Casablanca Tramway: Around 15 accidents a month]. aujourdhui.ma (in French). Retrieved 23 October 2014.
  31. ^ "Maroc: près de 15 accidents par mois liés au tramway à Casablanca" [Morocco: Nearly 15 accidents a month on the Casablanca Tramway]. Le Soir (Belgium) (in French). 13 January 2014. Retrieved 23 October 2014.[dead link]
  32. ^ [Casablanca Tram: Three hurt in accident]. La Nouvelle Tribune (in French). 1 April 2013. Archived from the original on 12 May 2014. Retrieved 23 October 2014.
  33. ^ [Lorry hits tram in Casablanca]. L'Observateur du Maroc (in French). 1 April 2013. Archived from the original on 20 June 2017. Retrieved 23 October 2014.
  34. ^ a b "Accidents de la circulation: Casa Tram part en "guerre"" [Traffic accidents: Casa Tram's part in the "war"]. L'Economiste (in French). 6 August 2013. Retrieved 23 October 2014.
  35. ^ "Un mort après un accident de tramway à Casablanca" [One dead after Casablanca tram accident]. Bladi.net (in French). 14 January 2014. Retrieved 23 October 2014.
  36. ^ Farkouch, Kenza (24 April 2014). "Casablanca: Une femme mortellement heurtée par le tramway" [Casablanca: Woman fatally injured by tram]. Yabiladi (in French). Retrieved 23 October 2014.
  37. ^ [Casablanca Tramway: One more accident, this time fatal]. Biladi Maroc (in French). Archived from the original on 4 March 2016. Retrieved 23 October 2014.
  38. ^ "Casablanca: Un accident de tramway fait une victime". yabiladi.com (in French). 14 January 2015.

External links edit

  Media related to Trams in Casablanca at Wikimedia Commons

  • Casablanca Tramway (official website) (in French and Arabic)

casablanca, tramway, arabic, طرامواي, الدار, البيضاء, Ṭrāmwāy, dār, bayḍā, floor, tram, system, casablanca, morocco, 2019, update, consists, lines, from, sidi, moumen, lissasfa, from, sidi, bernoussi, aïn, diab, which, intersect, points, form, network, with, s. The Casablanca Tramway Arabic طرامواي الدار البيضاء Ṭramway ad Dar al Bayḍa is a low floor tram system in Casablanca Morocco As of 2019 update it consists of two lines T1 from Sidi Moumen to Lissasfa and T2 from Sidi Bernoussi to Ain Diab which intersect at 2 points and form a 47 km 29 mi network with 71 stations Two additional lines T3 and T4 are scheduled to open in 2024 1 2 Casablanca TramwayAlstom Citadis vehicle on line T1 at Place des Nations Unies stationOverviewNative nameArabic طرامواي الدار البيضاءLocaleCasablanca MoroccoStations71Websitehttp www casatramway maServiceTypeTramwayServices2Operator s RATP Dev CasablancaRolling stock74 Alstom Citadis 302Daily ridership220 000 2019 Ridership12HistoryOpened13 December 2012 2012 12 13 TechnicalLine length47 5 km 29 5 mi Track gauge1 435 mm 4 ft 8 1 2 in standard gaugeOperating speed19 km h 12 mph Route map Contents 1 History 2 Construction 3 Current network 3 1 Line T1 3 2 Line T2 3 3 Operations 3 4 Rolling stock 3 5 Fares 3 6 Usage 3 7 Incidents 4 Future 4 1 Lines T3 and T4 5 See also 6 References 7 External linksHistory editThe Casablanca Tramway is the second modern tram system in Morocco after the Rabat Sale tramway but is longer and has more stations It was first inaugurated by King Muhammad VI on 12 December 2012 At that time it consisted of one 31 kilometre 19 mi Y shaped line with 48 stops connecting Sidi Moumen in the east with Ain Diab and the Facultes district in the west The line forked toward Ain Diab and Facultes after Abdelmoumen Station A second line was opened on 24 January 2019 It connects Sidi Bernoussi to Ain Diab using the segment of the previously existing line from the split to Ain Diab Line 1 was also extended from Facultes to Lissasfa 2 Construction editProject management on the first line was provided by Casablanca Transports en Site Amenage Casa Transports a limited company created for the purpose in March 2009 Stakeholders were the Ministry of Finance amp the Interior local government the Grand Casablanca regional government the Casablanca prefecture and Casablanca urban commune and several institutional investors King Hassan II CDG Capital Banque Populaire du Maroc and ONCF Casa Transports awarded the construction contract to a global group headed by the French group Systra Project support was subcontracted to the Spanish group Ayesa Tecnologia 3 Preparatory work started in 2009 with the construction of the first line starting in 2010 4 The line was inaugurated on 12 December 2012 by King Mohammed VI with French Prime Minister Jean Marc Ayrault in attendance Commercial services started the next day 5 6 The 20 km 12 mi of Zones 1 and 3 were constructed by Yapi Merkezi and the 10 km 6 2 mi of Zone 2 was constructed by Colas Rail Current network editLine Terminus Opening Length km Stations nbsp Lissasfa Sidi Moumen 2012 23 5 38 nbsp Ain Diab Plage Sidi Bernoussi 2019 22 5 33 nbsp Gare de Casa Port Hay El Wahda 2024 14 20 nbsp Parc de la Ligue Arabe Mohammed Erradi 2024 12 5 19TOTAL 72 5 110Line T1 edit As of 2019 update Line 1 of the Casablanca Tramway serves 36 stations between termini in Sidi Moumen and Lissasfa 2 The line is 23 5 km 14 6 mi long and takes 73 minutes from one terminus to the other 7 It opened in December 2012 and was extended in January 2019 2 Line T2 edit As of January 24 2019 update the 17 km 11 mi Line T2 runs from Ain Diab to Sidi Bernoussi via the Ain Sebaa Hay Hassani Al Fida and Derb Sultan districts It uses the segment from the split to Ain Diab in the previous configuration in addition to the new line 8 9 Operations edit Travel time between termini is around 69 minutes from Facultes and 77 minutes from Hay Hassani With a 75 priority at junctions the average speed comes close to 19 kilometres per hour 12 mph On weekdays the tramway runs from 06 30 to 22 00 at weekends it runs from 06 30 to 23 30 Service averages were planned to be every 4 1 2 minutes in peak hours and 8 1 2 minutes off peak 10 Casa Transport awarded a five year contract to operate the tramway to the CasaTram consortium of RATP Group Caisse de depot et de gestion and Transinvest as partners 11 12 In January 2016 RATP Group became the sole shareholder 13 Following a competitive tender process RATP Group was awarded a further contract until December 2029 having beaten bids from a National Express ALSA ONCF consortium and Transdev 14 15 16 Engie Ineo and Engie Cofely Morocco supplied signaling and other systems for Line 2 as well as an extension of Line 1 17 18 Rolling stock edit The tramway is operated by 74 Alstom Citadis type 302 low floor trams built by Alstom in France 19 20 21 The final assembly was completed in Reichshoffen Alsace Trams have air conditioning and tinted windows and an information system in both Arabic and French They run typically in pairs with a total length of 65 metres 213 ft 22 A further 50 are to be delivered in 2018 to operate Line T2 23 24 In July 2017 Alstom Bombardier CAF CRRC Zhuzhou Locomotive and Skoda Transportation were shortlisted to bid for a contract for 100 trams for Lines T3 and T4 25 Fares edit Ticket prices are subsidised by the Moroccan government and the city of Casablanca and set at a flat rate of 6 dirhams per journey with a weekly season ticket at 60 dirhams and a monthly season ticket at 230 dirhams Fares are paid by a paper smart card at turnstiles on each station platform 26 Students get a reduced monthly season ticket of 150 dirhams 26 A combined tram and bus fare is being considered when Usage edit In the first month of service between 40 000 and 45 000 passengers used the service each day on average 27 A survey in June 2013 recorded 70 000 commuters 28 By 2013 the tramway had met its objectives by carrying over 100 000 passengers a day 29 From 2015 255 000 passengers a day are expected on Line T1 28 Incidents edit Tramway operations have resulted in many accidents in the first 13 months 180 accidents were reported 30 31 On 1 April 2013 a lorry hit a tramcar at full speed Both the lorry and tram drivers were injured according to a witness The impact was so hard that part of the tram was derailed 32 33 On 2 August 2013 a man was crushed to death 34 Two days later on 4 August 2013 a motorcyclist was hit by a tram and died 34 On 14 January 2014 a man died after being hit by a tram 35 On 24 April 2014 a 26 year old woman was fatally injured by the tram 36 37 On 4 July 2014 a coach owned by a private firm failed to give way to the tram and struck it Part of the tram was derailed On 13 January 2015 a rider who entered the tram platform died after being hit 38 On 8 November 2017 two teenagers on a motorcycle were injured after hitting a tram line On 26 December 2017 two women were struck crossing the tramway and were injured Future edit nbsp Projected plan of the Casablanca Tramway network in conjunction with commuter rail and rapid transit buses for the period 2022 2030 presented February 2017 The Schema directeur d amenagement urbain SDAU Master plan of the Director of urban planning 8 and the Plan de deplacement urbain PDU Urban transport plan 9 for Greater Casablanca foresee a final network of 4 tramway lines two traversal T1 T2 and two radial T3 T4 These lines will interchange with the now cancelled Casablanca Metro and the operational Al Bidaoui suburban railways 8 9 Casablanca will have a network totalling 76 route km 47 1 4 route mi costing 5 9 billion dirhams 28 Lines T3 and T4 edit Long term plans in the SDAU 8 and PDU 9 are for new lines T3 14 km 8 7 mi and T4 13 km 8 1 mi Line T3 will connect the Sidi Othmane district to the El Hank district via the city centre to Casa Port railway station and T4 will connect the Sbata and Lissasfa districts via the Ain Chock and the Facultes district 8 9 See also editCasablanca Busway Rabat Sale tramway Rail transport in Morocco Template Suburban railways in AfricaReferences edit Presentation des lignes T3 et T4 Societe de developpement local Retrieved 11 January 2023 a b c d Inauguration Officielle De La Ligne T2 Du Tramway De Casablanca Et De L extension De La Ligne T1 Official Inauguration of Line T2 of the Casablanca Tramway and the Extension of Line T1 PDF Press release in French Casablanca Casa Transport SA 2 January 2019 Retrieved 20 May 2019 Who is producing the project Casablanca Transport in French Archived from the original on 13 January 2014 Casablanca Tramway Morocco Railway Technology Inauguration of Casablanca s first tram line in Morocco Euro Transport Magazine 12 December 2012 Royal opening launches Casablanca trams Railway Gazette International 14 December 2012 Casa Tramway casa tram ma in Arabic Retrieved 21 May 2019 a b c d e Allal Sakrouhi October 2008 Schema directeur d amenagement urbain Master plan of the Director of Urban Planning PDF Agence urbaine de Casablanca in French Archived from the original PDF on 12 July 2018 Retrieved 23 October 2014 a b c d e PROBLEMATIQUE DES DEPLACEMENTS URBAINS A CASABLANCA Cas du projet de transport en commun en site propre TCSP REQUIREMENTS FOR URBAN TRANSPORT IN CASABLANCA Public transport projects on dedicated land PDF in French 13 November 2007 Archived from the original PDF on 1 September 2013 Retrieved 23 October 2014 Timetables Casa Tram Archived from the original on 25 March 2016 Barrow Keith 16 July 2012 Casablanca light rail operations contract awarded International Railway Journal Casablanca tram operating contract awarded Metro Report International 16 July 2012 RATP Dev is now the sole shareholder of Casa Tram Railway Pro 6 January 2016 French State Owned Company to Take Over Operation of Casablanca Tramway Morocco World News 12 June 2017 Archived from the original on 29 September 2017 Barrow Keith 13 June 2017 RATP Dev to retain Casablanca tram operating contract International Railway Journal RATP Dev retains Casablanca operating contract Metro Report International 20 September 2017 Engie wins Casablanca tram extension contracts International Railway Journal 2 January 2017 Casablanca tramway extension contracts awarded Metro Report International 4 January 2017 La ville de Casablanca choisit le Citadis d Alstom pour son futur reseau de tramway The town of Casablanca chooses Alstom Citadis for its new tramway network Press release in French Alstom 18 November 2009 Archived from the original on 15 February 2013 Retrieved 11 December 2012 Casablanca chooses Citadis trams Metro Report International 17 November 2009 Casablanca tram contracts awarded Railway Gazette International 15 November 2010 Alstom 12 December 2012 Inauguration of Casablanca s first tram line in Morocco Press release Casablanca orders Alstom LRVs for tram Line 2 International Railway Journal 13 October 2015 Archived from the original on 4 October 2017 Retrieved 4 October 2017 Casablanca orders 50 more Cttadis trams Metro Report International 13 October 2015 Barrow Keith 26 July 2017 Four shortlisted for Casablanca LRV contract International Railway Journal a b Tramway de Casablanca le ticket a 6 dirhams Casablanca Tramway tickets 6 dirhams L Economiste 30 November 2012 Retrieved 13 December 2012 Debuts en douceur pour le tramway de Casablanca Smooth start for the Casablanca Tramway Le Soir Belgium in French 23 January 2013 Retrieved 23 January 2013 dead link a b c Benlahrech Ryadh 2013 Le tramway qui facilite le train train Special Villes The tramway which eases commuting Jeune Afrique in French 4 68 ISSN 1950 1285 Djama Nasser 19 December 2013 Apres le succes du tramway Casablanca va preparer son futur metro aerien en 2014 After the success of the tramway Casablanca gets ready for Skytrain in 2014 L Usine Maroc in French Retrieved 23 October 2014 Zerrour Laila 16 April 2014 Tramway de Casablanca Une quinzaine d accidents par mois Casablanca Tramway Around 15 accidents a month aujourdhui ma in French Retrieved 23 October 2014 Maroc pres de 15 accidents par mois lies au tramway a Casablanca Morocco Nearly 15 accidents a month on the Casablanca Tramway Le Soir Belgium in French 13 January 2014 Retrieved 23 October 2014 dead link Tramway Casablanca Trois blesses dans un accident Casablanca Tram Three hurt in accident La Nouvelle Tribune in French 1 April 2013 Archived from the original on 12 May 2014 Retrieved 23 October 2014 Un camion heurte le tramway a Casablanca Lorry hits tram in Casablanca L Observateur du Maroc in French 1 April 2013 Archived from the original on 20 June 2017 Retrieved 23 October 2014 a b Accidents de la circulation Casa Tram part en guerre Traffic accidents Casa Tram s part in the war L Economiste in French 6 August 2013 Retrieved 23 October 2014 Un mort apres un accident de tramway a Casablanca One dead after Casablanca tram accident Bladi net in French 14 January 2014 Retrieved 23 October 2014 Farkouch Kenza 24 April 2014 Casablanca Une femme mortellement heurtee par le tramway Casablanca Woman fatally injured by tram Yabiladi in French Retrieved 23 October 2014 Tramway de Casablanca un accident de plus meurtrier cette fois Casablanca Tramway One more accident this time fatal Biladi Maroc in French Archived from the original on 4 March 2016 Retrieved 23 October 2014 Casablanca Un accident de tramway fait une victime yabiladi com in French 14 January 2015 External links edit nbsp Media related to Trams in Casablanca at Wikimedia Commons Casablanca Tramway official website in French and Arabic Retrieved from https en wikipedia org w index php title Casablanca Tramway amp oldid 1186343460, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.