The Capitol Corridor is a 168-mile (270 km) passenger train route in Northern California operated by Amtrak between San Jose, in the Bay Area, and Auburn, in the Sacramento Valley. The route is named after the two points most trains operate between, San Jose (which was the first state capital of California) and Sacramento (the current capital, with the State Capitol building). The route runs roughly parallel to I-880 and I-80. Some limited trips run between Oakland and San Jose. A single daily round trip runs between San Jose and Auburn, in the foothills of the Sierra Nevada. Capitol Corridor trains started in 1991.

Capitol Corridor
A Capitol Corridor train in Pinole, California, in 2011
Overview
Service typeInter-city rail, commuter rail
LocaleNorthern California
First serviceDecember 12, 1991 (1991-12-12)
Current operator(s)Capitol Corridor Joint Powers Authority, in partnership with Amtrak and Caltrans
Annual ridership674,039 (FY22) 90.2%[a][1]
Websitecapitolcorridor.org
Route
TerminiAuburn
San Jose
Stops17
Distance travelled168 miles (270 km)
Average journey time314 hours
Service frequency15 round trips (weekdays)
11 round trips (weekends)
Train number(s)520–553, 720–751
On-board services
Class(es)Coach Class
Disabled accessTrain lower level, all stations
Catering facilitiesCafé
Baggage facilitiesOverhead bins, luggage racks
Technical
Rolling stockCalifornia Cars
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Track owner(s)UP, JPBX
Route map
Colfax
discontinued
2000
0 mi
0 km
Auburn
14 mi
23 km
Rocklin
18 mi
29 km
Roseville
35 mi
56 km
Sacramento
49 mi
79 km
Davis
Fairfield–Vacaville
75 mi
121 km
Suisun–Fairfield
93 mi
150 km
Martinez
Hercules
planned
112 mi
180 km
Richmond
118 mi
190 km
Berkeley
120 mi
193 km
Emeryville
Oakland–16th Street
closed
1994
125 mi
201 km
Oakland–Jack London Square
130 mi
209 km
Oakland Coliseum
138 mi
222 km
Hayward
Ardenwood
2026
150 mi
241 km
Fremont
planned reroute
via Coast Line
Lick Mill (VTA)
161 mi
259 km
Santa Clara–Great America
165 mi
266 km
Santa Clara
168 mi
270 km
San Jose

All stations are accessible

Like all regional trains in California, the Capitol Corridor is operated by a joint powers authority. The Capitol Corridor Joint Powers Authority (CCJPA) is governed by a board that includes two elected representatives from each of eight counties the train travels through. The CCJPA contracts with the San Francisco Bay Area Rapid Transit District to provide day-to-day management, and Amtrak to operate and maintain the rolling stock (locomotives and passenger cars). The California Department of Transportation (Caltrans) provides the funding and also owns the rolling stock.

History

Former service

The First transcontinental railroad was completed to Oakland from the south in 1869. Following the completion of the California Pacific Railroad in 1879, most long-distance service of the Southern Pacific (SP) reached Oakland from the north. Long-distance service from the south ran to San Francisco via the Peninsula; some trains had Oakland sections. The Western Pacific Railroad (completed to Oakland in 1910) and Santa Fe Railroad (completed to Oakland in 1903 over the former California and Nevada Railroad track) ran primarily long-distance service with limited local stops. Commuter service around Oakland was largely provided by the electric interurban trains of the SP-owned East Bay Electric Lines (1911–1941) and Key System (1901–1958).

By the end of the 1930s, the SP operated five daily local round trips plus a number of long-distance trains between Oakland and Sacramento. The Oakland Lark and an unnamed local train (an Oakland connection for the Coast Daylight) provided local service between Oakland and San Jose on the Coast Line. The inland Niles Subdivision was served by a daily Oakland–Tracy local and a commute-timed Oakland–San Jose local (which ran via Centerville and part of the Coast Line on the northbound trip and Milpitas southbound).[2]

The increasing prevalence of auto ownership and improvements in local roads meant that numerous commuters began to drive their own vehicles rather than take the train. The decline in ridership resulted in SP discontinuing the Oakland–San Jose trip on the Niles Subdivision on September 29, 1940, followed by ending the Oakland–Tracy trip in 1941.[3]: 37, 40  The two Oakland–San Jose trips on the Coast Line were discontinued on May 1, 1960.[3]: 7  The last local service between Oakland and Sacramento was the Senator, discontinued by the SP on May 31, 1962 (though long-distance service continued).[4]: 140 

Capitols

 
A Capitols train at Sacramento in 1995

From the 1970s to the beginning of the 1990s, three Amtrak intercity trains operated in the Bay Area: the long-distance California Zephyr (Oakland/EmeryvilleChicago) and Coast Starlight (Los AngelesSeattle), and the regional San Joaquin (Bakersfield–Oakland).

Of the three lines, only the Coast Starlight ran between San Jose and Sacramento—once a day in each direction, and at inconvenient times (southbound early in the morning, northbound in the evening). In 1977, Amtrak approved an additional Oakland–Sacramento round trip, the Sacramentan; the service was never operated.[5]

In 1990, California voters passed two ballot propositions providing $105 million to expand service along the route. The new service, named Capitols, debuted on December 12, 1991, with three daily round trips between San Jose and Sacramento. Of these, a single round trip continued to Roseville, an eastern Sacramento suburb.[6][7]

One of the ballot propositions, Proposition 116, provided the name Capitol Corridor—so named because it links the location of California's first state capital, San Jose, with the current capital, Sacramento. State Capitol buildings were operated in each city.[3]: 7  The service was known as the Capitols until April 29, 2001, when Amtrak renamed it the Capitol Corridor.[8][9]

Service changes

 
Interior of the Capitol Corridor train

The Capitols originally ran via the Coast Line from Elmhurst to Santa Clara, with no stops between Oakland and San Jose. In 1992, after the completion of track and signal work, the Capitols were rerouted onto the Niles Subdivision further inland between Elmhurst and Newark. The new route allowed the addition of infill stations at Fremont in 1993 and Hayward in 1997.[3]: 33  The Oakland 16th Street station, which had been damaged by the 1989 Loma Prieta earthquake, was closed in 1994. It was replaced by new stations at Emeryville in 1993 and Oakland-Jack London Square in 1995.[3]: 33  Additional infill stations were added at Santa Clara – Great America in 1993, Oakland Coliseum (with a close connection to BART) in 2005, the Caltrain station in Santa Clara-University in 2012, and Fairfield–Vacaville in 2017.[10]

One daily round trip was extended east to Colfax via Rocklin and Auburn on January 26, 1998. The trip was cut back to Auburn (with the Rocklin stop retained) on February 27, 2000.[3]: 73 

Service was gradually increased from the original three daily round trips. The fifth round trip was added in November 1998, followed by the sixth in February 1999.[11]

Installation of positive train control along the route was completed by November 2018.[12]

In response to low ridership as a result of the COVID-19 pandemic, the Capitol Corridor schedule was reduced to five daily trips on March 21, 2020, with discontinued Auburn service and many trips ending in Oakland. Three runs were added back on June 1 and Auburn service restored.[13]

Proposed expansion

New stations

Additional stations have been proposed along the route at Hercules, Benicia, and Dixon.[citation needed]

 
A Capitol Corridor train passing the site of the planned Hercules station

Vision Plan

The Capitol Corridor Vision Implementation Plan is a long-range outline of possible improvements to the service; several realignments along existing and new right-of-ways were considered and studied. Near-term suggested improvements include double tracking between San Jose and a realignment to the Coast Subdivision, and a new station at the Ardenwood Park-and-Ride, followed by track improvements between Emeryville and Richmond. Later goals include tunneling under Jack London Square to eliminate the street-running section there, rerouting freight traffic over another right-of-way between Sacramento and Martinez, and eventual electrification of the line.[14]

The 2018 Senate Bill 1 allocated $93 million in funds for the Capitol Corridor, partially for planning the realignment to the Coast Subdivision.[15] As of June 2020, the Draft Environmental Impact Report for the realignment (branded as South Bay Connect) is expected to be completed at the end of 2020, followed by the Final Environmental Impact Report a year later. Design is to take place in 2022–23, with construction beginning in 2024.[16] The project is to have a single new station at Ardenwood (at SR 84); stations at Hayward (at SR 92) and Newark Junction were considered but rejected.[16][17]

Extensions

Two daily Capitol Corridor round trips, along with some Caltrain service, were planned to be extended to Salinas as part of the Monterey County Rail Extension.[18] Initial service will have intermediate stops at existing Caltrain stations at Tamien, Morgan Hill, and Gilroy; future phases will add new stations at Castroville and Pajaro/Watsonville.[19]

A third track between Sacramento and Roseville is planned to start construction in 2021,[20] which would allow an initial increase from one round trip per day to three, with plans for up to ten.[20][21] Extension east to Reno, Nevada was deemed unlikely in the Vision Implementation Plan due to heavy freight traffic over Donner Pass and lack of funding,[14] though plans for such an expansion were studied in 2022[22] with 83% of respondents indicating they would use the service if more frequent passenger rail were provided between Sacramento and Reno.[23]

Extending service to downtown San Francisco by crossing the bay is being considered as part of a proposed second Transbay Tube. A study of a joint project providing a second crossing for BART began in 2019.[20][24] San Francisco has not had direct intercity rail service since 1971.

Frequency and ridership

 
Capitol Corridor route map

During fiscal year 2017 the Capitol Corridor service carried 1,607,277 passengers, a 2.9% increase over FY2016.[25] Revenue in FY2017 was $33,970,000, a 5.3% increase over FY2016, with a 57% farebox recovery ratio.[25] It is the fourth busiest Amtrak route by ridership, surpassed only by the Northeast Regional, Acela Express, and Pacific Surfliner. In large part due to the route's success, as of 2017, Sacramento is the busiest station on the route, the seventh busiest in the Amtrak system and the second busiest in California.[26]

The Capitol Corridor is used by commuters between the Sacramento area and the Bay Area as an alternative to driving on congested Interstate 80. Monthly passes and discounted trip tickets are available. Many politicians, lobbyists, and aides live in the Bay Area and commute to their jobs in Sacramento, including those connecting to the train via Amtrak Thruway Motorcoach from San Francisco,[27] while workers in the Oakland, San Francisco, and Silicon Valley employment centers take the Capitol Corridor trains from their less expensive homes in Solano County and the Sacramento metropolitan area.[28]

Starting on August 28, 2006, the Capitol Corridor had 16 weekday trains each way between Oakland and Sacramento, up from twelve in 2005 and three in 1992. (Seven of the sixteen ran to/from San Jose.) According to its management, ridership on the Capitol Corridor trains tripled between 1998 and 2005.[29] On August 13, 2012, the Capitol Corridor dropped from 16 to 15 weekday round trips between Oakland and Sacramento; one round trip was discontinued due to high fuel costs, low ridership, and a new ability to store an extra train overnight in a Sacramento railyard.[30]

As of October 2022, trains run as follows:[31]

  • Auburn - San Jose: 1 round trip daily
  • Sacramento - San Jose: 6 round trips on weekdays, 7 round trips on weekends
  • Sacramento - Oakland Jack London Square: 6 round trips on weekdays, 4 round trips on weekends

Stations and connections

Location Station Service began Service ended Connections
Colfax Colfax 1998 2000 Now served by California Zephyr
Auburn Auburn 1998   Amtrak Thruway to Sacramento[32]
  Local bus: Placer County Transit
Rocklin Rocklin 1998   Amtrak Thruway to Sacramento[32]
Roseville Roseville 1991   Amtrak: California Zephyr
  Amtrak Thruway to Sacramento[32]
Sacramento Sacramento Valley Station 1991   Amtrak: California Zephyr, Coast Starlight, San Joaquins
  Sacramento RT: Gold
  Amtrak Thruway to Stateline, Auburn, Reno, Sparks, Stockton–Downtown, Redding[32]
Davis Davis 1991   Amtrak: California Zephyr, Coast Starlight
  Amtrak Thruway to Stockton, Redding[32]
Fairfield Fairfield–Vacaville 2017   Local bus: FAST
Suisun City Suisun–Fairfield 1991   Local bus: FAST, Delta Breeze, VINE Transit, SolTrans
Martinez Martinez 1991   Amtrak: California Zephyr, Coast Starlight, San Joaquins
  Amtrak Thruway to Napa, Santa Rosa, Arcata, McKinleyville, Sacramento[32]
  Local bus: County Connection, Tri Delta Transit, WestCAT
Hercules Hercules Planned
Richmond Richmond Transit Center 1991   Amtrak: California Zephyr, San Joaquins
  BART: Orange Line Red Line
  Local bus: AC Transit
Berkeley Berkeley 1991   Local bus: AC Transit
Emeryville Emeryville 1993   Amtrak: California Zephyr, Coast Starlight, San Joaquins
  Amtrak Thruway to San Francisco[32]
  Local bus: AC Transit, Emery Go-Round
Oakland 16th Street 1991 1994
Jack London Square 1995   Amtrak: Coast Starlight, San Joaquins
  Amtrak Thruway to San Luis Obispo, Santa Barbara, San Jose[32]
  Local bus: AC Transit
Oakland Coliseum 2005   BART: Orange Line Blue Line Berryessa–Daly City Beige Line
  Local bus: AC Transit
Hayward Hayward 1997   Local bus: AC Transit
Fremont Fremont 1993   Altamont Corridor Express
  Local bus: AC Transit
Ardenwood Planned
Santa Clara Santa Clara – Great America 1993   Altamont Corridor Express
  VTA Light Rail:   Green Line,   Orange Line (at Lick Mill)
  Local bus: VTA Bus
Santa Clara 2012   Altamont Corridor Express
  Caltrain
  Local bus: VTA Bus
San Jose San Jose Diridon 1991   Amtrak: Coast Starlight
  Altamont Corridor Express
  Caltrain
  VTA Light Rail:   Green Line
  Intercity bus:   Amtrak Thruway,[32]   Greyhound Lines,   Megabus
  Local bus: VTA Bus, Santa Cruz METRO
Tamien Planned   Caltrain
  VTA Light Rail:   Blue Line
Morgan Hill Morgan Hill Planned   Caltrain
Gilroy Gilroy Planned   Caltrain
Pajaro Pajaro/Watsonville Planned
Castroville Castroville Planned
Salinas Salinas Planned   Amtrak: Coast Starlight

Governance

 
A Capitol Corridor train with CCJPA-maintained California Cars and Amtrak-maintained P42 diesel locomotive passing through Alviso in 2016

The Capitol Corridor is fully funded by the state through Caltrans Division of Rail and Mass Transportation (DRMT). Caltrans managed the line from its inception in 1991 to 1997, but in 1998 the administration of the route was transferred to Capitol Corridor Joint Powers Authority (CCJPA), formed by transit agencies of which the Capitol Corridor serves in order to have more local control, while still funded by Caltrans. CCJPA in turn contracted with BART for day-to-day management and staff support; also, CCJPA makes decisions on the service level of Capitol Corridor, capital improvements along the route, and passenger amenities aboard the trains.[33]

The Capitol Corridor Joint Powers Authority is governed by a board of directors which consists of 16 representatives from its member agencies:

Equipment

 
A typical Capitol Corridor train with a Charger locomotive and California Cars and a Superliner car.

The Capitol Corridor and its administration agency, the CCJPA, are responsible for the maintenance of the Amtrak California's Northern California fleet, which is used by both the Capitol Corridor and the San Joaquin routes.

When the Capitol Corridor debuted in 1991, it used Amtrak F40PH locomotives and Amtrak Horizon Fleet cars. Dash 8 locomotives were also used as they were brand new at the time. This equipment was used until the mid-1990s when most of the current state-purchased equipment arrived.

The current Northern California fleet includes fifteen EMD F59PHI locomotives (numbered 2001 through 2015), eight Siemens Charger locomotives (numbered 2101 through 2108) and a large number of bi-level coaches and café cars which are known as "California Cars". All cars are named after mountains and rivers of California. There are two series of California Cars, the 8000 series and the newer 6000 series. Standard Amtrak equipment such as the GE P42DC, Amtrak's main locomotive, standard Amtrak Dash 8 locomotives, and Superliner cars can appear on Capitol Corridor trains as substitutes.

In rarer cases, F59PHIs from the Amtrak Surfliner and Cascades trains were used before they were sold to Metra. Before 2012, Caltrain EMD F40PH and MPI MP36PH-3C locomotives have been used as substitutes engines, and entire Caltrain trainsets have also been seen during busy periods, such as the peak Thanksgiving holiday weekend.

References

  1. ^ "Amtrak Fiscal Year 2022 Ridership" (PDF). Amtrak. November 29, 2022. Retrieved December 6, 2022.
  2. ^ "Time Table for the Western Division #229 To Take Effect Tuesday, August 1, 1939 at 12:01 A. M." (PDF). Southern Pacific Railroad. August 1, 1939.
  3. ^ a b c d e f Vurek, Matthew Gerald (2016). Images of Modern America: California’s Capitol Corridor. Arcadia Publishing. ISBN 9781467124171.
  4. ^ Solomon, Brian (2005). Southern Pacific Passenger Trains. Voyageur Press. ISBN 9781610605076.
  5. ^ Rodda, Richard (October 28, 1977). "Amtrak-Bart Station Opens". Sacramento Bee. p. 3 – via Newspapers.com.  
  6. ^ "Train links Sacramento, Bay Area". Lodi News-Sentinel. December 12, 1991 – via Google News.
  7. ^ "New route serves variety of passenger needs". Sacramento Bee. December 13, 1991. pp. A1, A26 (second column) – via Newspapers.com.
  8. ^ Amtrak National Timetable: Spring-Summer 2001. Amtrak. April 29, 2001. p. 62 – via Museum of Railway Timetables.
  9. ^ National Timetable: Winter 2000 - Spring 2001. Amtrak. October 29, 2000. p. 62 – via Museum of Railway Timetables.
  10. ^ "Coming Monday, November 13: New Schedule and Opening of Fairfield–Vacaville Station" (Press release). Capitol Corridor Joint Powers Authority. November 2, 2017.
  11. ^ "Caltrans Increases Service" (PDF). Intercity Rail Passenger Systems Update (6): 11. December 1999.
  12. ^ "Capitol Corridor ready to start fleet PTC implementation". Progressive Railroading. 6 November 2018. Retrieved 8 November 2018.
  13. ^ Hamann, Emily (4 June 2020). "Capitol Corridor adds back Amtrak service". Sacramento Business Journal. Retrieved 18 June 2020.
  14. ^ a b "CAPITOL CORRIDOR VISION IMPLEMENTATION PLAN" (PDF). Capitol Corridor. Capitol Corridor Joint Powers Authority. Retrieved 21 June 2017.
  15. ^ "New Funding, New Enhancements to the Capitol Corridor" (Press release). Capitol Corridor Joint Powers Authority. October 9, 2018. Retrieved October 27, 2018.
  16. ^ a b "Capitol Corridor South Bay Connect" (PDF). Capitol Corridor Joint Powers Authority. June 2020.
  17. ^ "Capitol Corridor South Bay Connect: Project Definition Report" (PDF). Capitol Corridor Joint Powers Authority. November 2019.
  18. ^ Rahaim, Nick (January 5, 2017). "Frank's Fish Market will close to pave way for new Salinas train station". Monterey County Weekly.
  19. ^ "TAMC Selects LAN as Part of Construction Management Team for Salinas Rail Extension". Mass Transit. 3 January 2018. Retrieved 2 February 2018.
  20. ^ a b c "CAPITOL CORRIDOR INTERCITY PASSENGER RAIL SERVICE ANNUAL BUSINESS PLAN FY2019-20–FY2020-21" (PDF). Capitol Corridor. CCJPA. Retrieved 8 May 2019.
  21. ^ "Sac-Roseville Third Track". Capitol Corridor Joint Powers Authority.
  22. ^ Sullivan, Molly (October 27, 2022). "Capitol Corridor to Reno? Caltrans, Placer transit planners seeking feedback on train expansion". Sacramento Bee. Retrieved 30 October 2022.
  23. ^ "Rail Study | PDF | Public Transport | Reno". Scribd. Retrieved 2023-04-29.
  24. ^ Matier, Phil (February 6, 2019). "BART, Amtrak assess building new shared transbay crossing -". SF Chronicle. Retrieved 6 February 2019.
  25. ^ a b "Performance Report 2017" (PDF). Capitol Corridor Joint Powers Authority.
  26. ^ "State of California FY2017 Fact Sheet" (PDF). Amtrak. November 2017. Retrieved June 6, 2018.
  27. ^ Whiting, Sam (February 3, 2008). "Riding That Train". San Francisco Chronicle.
  28. ^ Cabanatuan, Michael (December 26, 2000). "Capitol Corridor Ridership Grows On Stretching Bay Area Commutes". San Francisco Chronicle.
  29. ^ Capitol Corridor's Largest Service Increase Ever Brings More Direct Trains To Sacramento October 13, 2006, at the Wayback Machine
  30. ^ "Capitol Corridor to Adjust Service Between Oakland and Sacramento". Capitol Corridor Joint Powers Authority. August 7, 2012. Effective Monday, August 13, 2012, for the first time in 20 years of service the Capitol Corridor Joint Powers Authority (CCJPA) will reduce the number of weekday trains it operates. On August 13 the CCJPA will discontinue Trains 518 and 553.
  31. ^ "Capitol Corridor schedule". Amtrak. June 17, 2019. Retrieved January 19, 2023.
  32. ^ a b c d e f g h i (PDF). Amtrak. June 17, 2019. Archived from the original (PDF) on July 4, 2019. Retrieved April 12, 2020.
  33. ^ Sheehan, Tim (June 26, 2015). "Valley agency takes control of Amtrak San Joaquin trains". Fresno Bee. Retrieved 11 February 2016.

Notes

  1. ^ Amtrak's Fiscal Year (FY) runs from October 1 of the prior year to September 30 of the named year.

External links

KML is from Wikidata
  • Official website  
  • Capitol Corridor – Amtrak

capitol, corridor, amtrak, capitols, redirects, here, amtrak, line, connecting, washington, chicago, capitol, limited, amtrak, train, mile, passenger, train, route, northern, california, operated, amtrak, between, jose, area, auburn, sacramento, valley, route,. Amtrak Capitols redirects here For the Amtrak line connecting Washington D C and Chicago see Capitol Limited Amtrak train The Capitol Corridor is a 168 mile 270 km passenger train route in Northern California operated by Amtrak between San Jose in the Bay Area and Auburn in the Sacramento Valley The route is named after the two points most trains operate between San Jose which was the first state capital of California and Sacramento the current capital with the State Capitol building The route runs roughly parallel to I 880 and I 80 Some limited trips run between Oakland and San Jose A single daily round trip runs between San Jose and Auburn in the foothills of the Sierra Nevada Capitol Corridor trains started in 1991 Capitol CorridorA Capitol Corridor train in Pinole California in 2011OverviewService typeInter city rail commuter railLocaleNorthern CaliforniaFirst serviceDecember 12 1991 1991 12 12 Current operator s Capitol Corridor Joint Powers Authority in partnership with Amtrak and CaltransAnnual ridership674 039 FY22 90 2 a 1 Websitecapitolcorridor wbr orgRouteTerminiAuburnSan JoseStops17Distance travelled168 miles 270 km Average journey time31 4 hoursService frequency15 round trips weekdays 11 round trips weekends Train number s 520 553 720 751On board servicesClass es Coach ClassDisabled accessTrain lower level all stationsCatering facilitiesCafeBaggage facilitiesOverhead bins luggage racksTechnicalRolling stockCalifornia CarsTrack gauge4 ft 8 1 2 in 1 435 mm standard gaugeTrack owner s UP JPBXRoute mapLegendCalifornia Zephyrto ChicagoColfax discontinued20000 mi0 km Auburn14 mi23 km Rocklin18 mi29 km RosevillePlacer CountySacramento CountyAmerican RiverSan Joaquins to BakersfieldCoast Starlight to Seattle35 mi56 km SacramentoRT Light Railto Historic FolsomSacramento CountyYolo County I Street Bridgeover Sacramento River49 mi79 km DavisYolo CountySolano CountyFairfield Vacaville75 mi121 km Suisun FairfieldSolano CountyContra Costa County Benicia Martinez Bridgeover Carquinez StraitSan Joaquinto Bakersfield93 mi150 km MartinezHercules planned112 mi180 km RichmondContra Costa CountyAlameda County Cerrito Creek118 mi190 km Berkeley120 mi193 km EmeryvilleOakland 16th Street closed1994BARTto San Francisco125 mi201 km Oakland Jack London Square130 mi209 km Oakland ColiseumBART to Berryessa North San Jose Dublin Pleasanton138 mi222 km HaywardAlameda CreekACEto Stockton DowntownArdenwood 2026150 mi241 km Fremontplanned reroutevia Coast LineAlameda CountySanta Clara County Coyote CreekLick Mill VTA 161 mi259 km Santa Clara Great AmericaCaltrainto San Francisco165 mi266 km Santa ClaraVTAto Winchester Transit Center168 mi270 km San Jose222 mi357 km extension toSalinas VTAto Tamien222 mi357 km extension toSalinas currently served bythe Coast Starlight TamienVTAto Santa TeresaMorgan HillGilroySanta Clara CountyMonterey CountyPajaro Watsonville plannedCastroville plannedSalinasCoast Starlightto Los AngelesAll stations are accessibleThis diagram viewtalkeditLike all regional trains in California the Capitol Corridor is operated by a joint powers authority The Capitol Corridor Joint Powers Authority CCJPA is governed by a board that includes two elected representatives from each of eight counties the train travels through The CCJPA contracts with the San Francisco Bay Area Rapid Transit District to provide day to day management and Amtrak to operate and maintain the rolling stock locomotives and passenger cars The California Department of Transportation Caltrans provides the funding and also owns the rolling stock Contents 1 History 1 1 Former service 1 2 Capitols 1 3 Service changes 1 4 Proposed expansion 1 4 1 New stations 1 4 2 Vision Plan 1 4 3 Extensions 2 Frequency and ridership 3 Stations and connections 4 Governance 5 Equipment 6 References 7 Notes 8 External linksHistory EditFormer service Edit The First transcontinental railroad was completed to Oakland from the south in 1869 Following the completion of the California Pacific Railroad in 1879 most long distance service of the Southern Pacific SP reached Oakland from the north Long distance service from the south ran to San Francisco via the Peninsula some trains had Oakland sections The Western Pacific Railroad completed to Oakland in 1910 and Santa Fe Railroad completed to Oakland in 1903 over the former California and Nevada Railroad track ran primarily long distance service with limited local stops Commuter service around Oakland was largely provided by the electric interurban trains of the SP owned East Bay Electric Lines 1911 1941 and Key System 1901 1958 By the end of the 1930s the SP operated five daily local round trips plus a number of long distance trains between Oakland and Sacramento The Oakland Lark and an unnamed local train an Oakland connection for the Coast Daylight provided local service between Oakland and San Jose on the Coast Line The inland Niles Subdivision was served by a daily Oakland Tracy local and a commute timed Oakland San Jose local which ran via Centerville and part of the Coast Line on the northbound trip and Milpitas southbound 2 The increasing prevalence of auto ownership and improvements in local roads meant that numerous commuters began to drive their own vehicles rather than take the train The decline in ridership resulted in SP discontinuing the Oakland San Jose trip on the Niles Subdivision on September 29 1940 followed by ending the Oakland Tracy trip in 1941 3 37 40 The two Oakland San Jose trips on the Coast Line were discontinued on May 1 1960 3 7 The last local service between Oakland and Sacramento was the Senator discontinued by the SP on May 31 1962 though long distance service continued 4 140 Capitols Edit A Capitols train at Sacramento in 1995From the 1970s to the beginning of the 1990s three Amtrak intercity trains operated in the Bay Area the long distance California Zephyr Oakland Emeryville Chicago and Coast Starlight Los Angeles Seattle and the regional San Joaquin Bakersfield Oakland Of the three lines only the Coast Starlight ran between San Jose and Sacramento once a day in each direction and at inconvenient times southbound early in the morning northbound in the evening In 1977 Amtrak approved an additional Oakland Sacramento round trip the Sacramentan the service was never operated 5 In 1990 California voters passed two ballot propositions providing 105 million to expand service along the route The new service named Capitols debuted on December 12 1991 with three daily round trips between San Jose and Sacramento Of these a single round trip continued to Roseville an eastern Sacramento suburb 6 7 One of the ballot propositions Proposition 116 provided the name Capitol Corridor so named because it links the location of California s first state capital San Jose with the current capital Sacramento State Capitol buildings were operated in each city 3 7 The service was known as the Capitols until April 29 2001 when Amtrak renamed it the Capitol Corridor 8 9 Service changes Edit Interior of the Capitol Corridor trainThe Capitols originally ran via the Coast Line from Elmhurst to Santa Clara with no stops between Oakland and San Jose In 1992 after the completion of track and signal work the Capitols were rerouted onto the Niles Subdivision further inland between Elmhurst and Newark The new route allowed the addition of infill stations at Fremont in 1993 and Hayward in 1997 3 33 The Oakland 16th Street station which had been damaged by the 1989 Loma Prieta earthquake was closed in 1994 It was replaced by new stations at Emeryville in 1993 and Oakland Jack London Square in 1995 3 33 Additional infill stations were added at Santa Clara Great America in 1993 Oakland Coliseum with a close connection to BART in 2005 the Caltrain station in Santa Clara University in 2012 and Fairfield Vacaville in 2017 10 One daily round trip was extended east to Colfax via Rocklin and Auburn on January 26 1998 The trip was cut back to Auburn with the Rocklin stop retained on February 27 2000 3 73 Service was gradually increased from the original three daily round trips The fifth round trip was added in November 1998 followed by the sixth in February 1999 11 Installation of positive train control along the route was completed by November 2018 12 In response to low ridership as a result of the COVID 19 pandemic the Capitol Corridor schedule was reduced to five daily trips on March 21 2020 with discontinued Auburn service and many trips ending in Oakland Three runs were added back on June 1 and Auburn service restored 13 Proposed expansion Edit New stations Edit Additional stations have been proposed along the route at Hercules Benicia and Dixon citation needed A Capitol Corridor train passing the site of the planned Hercules stationVision Plan Edit The Capitol Corridor Vision Implementation Plan is a long range outline of possible improvements to the service several realignments along existing and new right of ways were considered and studied Near term suggested improvements include double tracking between San Jose and a realignment to the Coast Subdivision and a new station at the Ardenwood Park and Ride followed by track improvements between Emeryville and Richmond Later goals include tunneling under Jack London Square to eliminate the street running section there rerouting freight traffic over another right of way between Sacramento and Martinez and eventual electrification of the line 14 The 2018 Senate Bill 1 allocated 93 million in funds for the Capitol Corridor partially for planning the realignment to the Coast Subdivision 15 As of June 2020 update the Draft Environmental Impact Report for the realignment branded as South Bay Connect is expected to be completed at the end of 2020 followed by the Final Environmental Impact Report a year later Design is to take place in 2022 23 with construction beginning in 2024 16 The project is to have a single new station at Ardenwood at SR 84 stations at Hayward at SR 92 and Newark Junction were considered but rejected 16 17 Extensions Edit Two daily Capitol Corridor round trips along with some Caltrain service were planned to be extended to Salinas as part of the Monterey County Rail Extension 18 Initial service will have intermediate stops at existing Caltrain stations at Tamien Morgan Hill and Gilroy future phases will add new stations at Castroville and Pajaro Watsonville 19 A third track between Sacramento and Roseville is planned to start construction in 2021 20 which would allow an initial increase from one round trip per day to three with plans for up to ten 20 21 Extension east to Reno Nevada was deemed unlikely in the Vision Implementation Plan due to heavy freight traffic over Donner Pass and lack of funding 14 though plans for such an expansion were studied in 2022 22 with 83 of respondents indicating they would use the service if more frequent passenger rail were provided between Sacramento and Reno 23 Extending service to downtown San Francisco by crossing the bay is being considered as part of a proposed second Transbay Tube A study of a joint project providing a second crossing for BART began in 2019 20 24 San Francisco has not had direct intercity rail service since 1971 Frequency and ridership Edit Capitol Corridor route mapDuring fiscal year 2017 the Capitol Corridor service carried 1 607 277 passengers a 2 9 increase over FY2016 25 Revenue in FY2017 was 33 970 000 a 5 3 increase over FY2016 with a 57 farebox recovery ratio 25 It is the fourth busiest Amtrak route by ridership surpassed only by the Northeast Regional Acela Express and Pacific Surfliner In large part due to the route s success as of 2017 update Sacramento is the busiest station on the route the seventh busiest in the Amtrak system and the second busiest in California 26 The Capitol Corridor is used by commuters between the Sacramento area and the Bay Area as an alternative to driving on congested Interstate 80 Monthly passes and discounted trip tickets are available Many politicians lobbyists and aides live in the Bay Area and commute to their jobs in Sacramento including those connecting to the train via Amtrak Thruway Motorcoach from San Francisco 27 while workers in the Oakland San Francisco and Silicon Valley employment centers take the Capitol Corridor trains from their less expensive homes in Solano County and the Sacramento metropolitan area 28 Starting on August 28 2006 the Capitol Corridor had 16 weekday trains each way between Oakland and Sacramento up from twelve in 2005 and three in 1992 Seven of the sixteen ran to from San Jose According to its management ridership on the Capitol Corridor trains tripled between 1998 and 2005 29 On August 13 2012 the Capitol Corridor dropped from 16 to 15 weekday round trips between Oakland and Sacramento one round trip was discontinued due to high fuel costs low ridership and a new ability to store an extra train overnight in a Sacramento railyard 30 As of October 2022 trains run as follows 31 Auburn San Jose 1 round trip daily Sacramento San Jose 6 round trips on weekdays 7 round trips on weekends Sacramento Oakland Jack London Square 6 round trips on weekdays 4 round trips on weekendsStations and connections EditLocation Station Service began Service ended ConnectionsColfax Colfax 1998 2000 Now served by California ZephyrAuburn Auburn 1998 Amtrak Thruway to Sacramento 32 Local bus Placer County TransitRocklin Rocklin 1998 Amtrak Thruway to Sacramento 32 Roseville Roseville 1991 Amtrak California Zephyr Amtrak Thruway to Sacramento 32 Sacramento Sacramento Valley Station 1991 Amtrak California Zephyr Coast Starlight San Joaquins Sacramento RT Gold Amtrak Thruway to Stateline Auburn Reno Sparks Stockton Downtown Redding 32 Davis Davis 1991 Amtrak California Zephyr Coast Starlight Amtrak Thruway to Stockton Redding 32 Fairfield Fairfield Vacaville 2017 Local bus FASTSuisun City Suisun Fairfield 1991 Local bus FAST Delta Breeze VINE Transit SolTransMartinez Martinez 1991 Amtrak California Zephyr Coast Starlight San Joaquins Amtrak Thruway to Napa Santa Rosa Arcata McKinleyville Sacramento 32 Local bus County Connection Tri Delta Transit WestCATHercules Hercules PlannedRichmond Richmond Transit Center 1991 Amtrak California Zephyr San Joaquins BART Orange Line Red Line Local bus AC TransitBerkeley Berkeley 1991 Local bus AC TransitEmeryville Emeryville 1993 Amtrak California Zephyr Coast Starlight San Joaquins Amtrak Thruway to San Francisco 32 Local bus AC Transit Emery Go RoundOakland 16th Street 1991 1994Jack London Square 1995 Amtrak Coast Starlight San Joaquins Amtrak Thruway to San Luis Obispo Santa Barbara San Jose 32 Local bus AC TransitOakland Coliseum 2005 BART Orange Line Blue Line Berryessa Daly City Beige Line Local bus AC TransitHayward Hayward 1997 Local bus AC TransitFremont Fremont 1993 Altamont Corridor Express Local bus AC TransitArdenwood PlannedSanta Clara Santa Clara Great America 1993 Altamont Corridor Express VTA Light Rail Green Line Orange Line at Lick Mill Local bus VTA BusSanta Clara 2012 Altamont Corridor Express Caltrain Local bus VTA BusSan Jose San Jose Diridon 1991 Amtrak Coast Starlight Altamont Corridor Express Caltrain VTA Light Rail Green Line Intercity bus Amtrak Thruway 32 Greyhound Lines Megabus Local bus VTA Bus Santa Cruz METROTamien Planned Caltrain VTA Light Rail Blue LineMorgan Hill Morgan Hill Planned CaltrainGilroy Gilroy Planned CaltrainPajaro Pajaro Watsonville PlannedCastroville Castroville PlannedSalinas Salinas Planned Amtrak Coast StarlightGovernance Edit A Capitol Corridor train with CCJPA maintained California Cars and Amtrak maintained P42 diesel locomotive passing through Alviso in 2016The Capitol Corridor is fully funded by the state through Caltrans Division of Rail and Mass Transportation DRMT Caltrans managed the line from its inception in 1991 to 1997 but in 1998 the administration of the route was transferred to Capitol Corridor Joint Powers Authority CCJPA formed by transit agencies of which the Capitol Corridor serves in order to have more local control while still funded by Caltrans CCJPA in turn contracted with BART for day to day management and staff support also CCJPA makes decisions on the service level of Capitol Corridor capital improvements along the route and passenger amenities aboard the trains 33 The Capitol Corridor Joint Powers Authority is governed by a board of directors which consists of 16 representatives from its member agencies Placer County Transportation Planning Agency PCTPA Solano Transportation Authority STA Yolo County Transportation District YCTD Sacramento Regional Transit District Sac RT San Francisco Bay Area Rapid Transit District BART Santa Clara Valley Transportation Authority VTA Equipment EditThis section does not cite any sources Please help improve this section by adding citations to reliable sources Unsourced material may be challenged and removed November 2018 Learn how and when to remove this template message A typical Capitol Corridor train with a Charger locomotive and California Cars and a Superliner car The Capitol Corridor and its administration agency the CCJPA are responsible for the maintenance of the Amtrak California s Northern California fleet which is used by both the Capitol Corridor and the San Joaquin routes When the Capitol Corridor debuted in 1991 it used Amtrak F40PH locomotives and Amtrak Horizon Fleet cars Dash 8 locomotives were also used as they were brand new at the time This equipment was used until the mid 1990s when most of the current state purchased equipment arrived The current Northern California fleet includes fifteen EMD F59PHI locomotives numbered 2001 through 2015 eight Siemens Charger locomotives numbered 2101 through 2108 and a large number of bi level coaches and cafe cars which are known as California Cars All cars are named after mountains and rivers of California There are two series of California Cars the 8000 series and the newer 6000 series Standard Amtrak equipment such as the GE P42DC Amtrak s main locomotive standard Amtrak Dash 8 locomotives and Superliner cars can appear on Capitol Corridor trains as substitutes In rarer cases F59PHIs from the Amtrak Surfliner and Cascades trains were used before they were sold to Metra Before 2012 Caltrain EMD F40PH and MPI MP36PH 3C locomotives have been used as substitutes engines and entire Caltrain trainsets have also been seen during busy periods such as the peak Thanksgiving holiday weekend References Edit Amtrak Fiscal Year 2022 Ridership PDF Amtrak November 29 2022 Retrieved December 6 2022 Time Table for the Western Division 229 To Take Effect Tuesday August 1 1939 at 12 01 A M PDF Southern Pacific Railroad August 1 1939 a b c d e f Vurek Matthew Gerald 2016 Images of Modern America California s Capitol Corridor Arcadia Publishing ISBN 9781467124171 Solomon Brian 2005 Southern Pacific Passenger Trains Voyageur Press ISBN 9781610605076 Rodda Richard October 28 1977 Amtrak Bart Station Opens Sacramento Bee p 3 via Newspapers com Train links Sacramento Bay Area Lodi News Sentinel December 12 1991 via Google News New route serves variety of passenger needs Sacramento Bee December 13 1991 pp A1 A26 second column via Newspapers com Amtrak National Timetable Spring Summer 2001 Amtrak April 29 2001 p 62 via Museum of Railway Timetables National Timetable Winter 2000 Spring 2001 Amtrak October 29 2000 p 62 via Museum of Railway Timetables Coming Monday November 13 New Schedule and Opening of Fairfield Vacaville Station Press release Capitol Corridor Joint Powers Authority November 2 2017 Caltrans Increases Service PDF Intercity Rail Passenger Systems Update 6 11 December 1999 Capitol Corridor ready to start fleet PTC implementation Progressive Railroading 6 November 2018 Retrieved 8 November 2018 Hamann Emily 4 June 2020 Capitol Corridor adds back Amtrak service Sacramento Business Journal Retrieved 18 June 2020 a b CAPITOL CORRIDOR VISION IMPLEMENTATION PLAN PDF Capitol Corridor Capitol Corridor Joint Powers Authority Retrieved 21 June 2017 New Funding New Enhancements to the Capitol Corridor Press release Capitol Corridor Joint Powers Authority October 9 2018 Retrieved October 27 2018 a b Capitol Corridor South Bay Connect PDF Capitol Corridor Joint Powers Authority June 2020 Capitol Corridor South Bay Connect Project Definition Report PDF Capitol Corridor Joint Powers Authority November 2019 Rahaim Nick January 5 2017 Frank s Fish Market will close to pave way for new Salinas train station Monterey County Weekly TAMC Selects LAN as Part of Construction Management Team for Salinas Rail Extension Mass Transit 3 January 2018 Retrieved 2 February 2018 a b c CAPITOL CORRIDOR INTERCITY PASSENGER RAIL SERVICE ANNUAL BUSINESS PLAN FY2019 20 FY2020 21 PDF Capitol Corridor CCJPA Retrieved 8 May 2019 Sac Roseville Third Track Capitol Corridor Joint Powers Authority Sullivan Molly October 27 2022 Capitol Corridor to Reno Caltrans Placer transit planners seeking feedback on train expansion Sacramento Bee Retrieved 30 October 2022 Rail Study PDF Public Transport Reno Scribd Retrieved 2023 04 29 Matier Phil February 6 2019 BART Amtrak assess building new shared transbay crossing SF Chronicle Retrieved 6 February 2019 a b Performance Report 2017 PDF Capitol Corridor Joint Powers Authority State of California FY2017 Fact Sheet PDF Amtrak November 2017 Retrieved June 6 2018 Whiting Sam February 3 2008 Riding That Train San Francisco Chronicle Cabanatuan Michael December 26 2000 Capitol Corridor Ridership Grows On Stretching Bay Area Commutes San Francisco Chronicle Capitol Corridor s Largest Service Increase Ever Brings More Direct Trains To Sacramento Archived October 13 2006 at the Wayback Machine Capitol Corridor to Adjust Service Between Oakland and Sacramento Capitol Corridor Joint Powers Authority August 7 2012 Effective Monday August 13 2012 for the first time in 20 years of service the Capitol Corridor Joint Powers Authority CCJPA will reduce the number of weekday trains it operates On August 13 the CCJPA will discontinue Trains 518 and 553 Capitol Corridor schedule Amtrak June 17 2019 Retrieved January 19 2023 a b c d e f g h i Capitol Corridor PDF Amtrak June 17 2019 Archived from the original PDF on July 4 2019 Retrieved April 12 2020 Sheehan Tim June 26 2015 Valley agency takes control of Amtrak San Joaquin trains Fresno Bee Retrieved 11 February 2016 Notes Edit Amtrak s Fiscal Year FY runs from October 1 of the prior year to September 30 of the named year External links Edit Wikimedia Commons has media related to Capitol Corridor KML file edit help Template Attached KML Capitol CorridorKML is from Wikidata Official website Capitol Corridor Amtrak Retrieved from https en wikipedia org w index php title Capitol Corridor amp oldid 1159269359, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.