fbpx
Wikipedia

Barauni–Samastipur section

The BarauniSamastipur section is a railway line connecting Barauni to Samastipur in the Indian state of Bihar. The 50.54 km (31 mi) line passes through the plains of North Bihar and the Gangetic Plain in Bihar.

BarauniSamastipur section
Samastipur Junction is an important station on Barauni–Samastipur section
Overview
StatusOperational
OwnerIndian Railways
LocaleBihar
Termini
Stations11
Service
TypePassenger and freight train line
Services
Operator(s)Indian Railways, East Central Railway
Depot(s)Freight terminals:
Garhara Yard in Barauni and
Karpurigram in Samastipur
Rolling stockWDM-2, WDM-3A, WDS-5, WDP-4 and WDG-4
History
Opened1886
Technical
Line length50.54 km (31 mi)
Track length120 km (75 mi)
Number of tracks2 (electrified)
Track gauge5 ft 6 in (1,676 mm) broad gauge
Electrification25 kV 50 Hz AC OHLE
(between 2011–December 2014)
opened on 24 December 2014[1]
Operating speedup to 120 km/h (75 mph)
Highest elevation55 m (180 ft)

Electrification edit

Former Railway Minister Lalu Prasad Yadav announced for the electrification of the Barauni–Samastipur–Muzaffarpur–Hajipur line and Muzaffarpur–Gorakhpur line (via Hajipur, Raxaul and Sitamarhi) in the Rail Budget 2008. The electrification began in 2011 and was completed in 2014.[2]

The electrification work was completed in December 2014 itself. But the first passenger train to run with an electric locomotive was Maurya Express w.e.f. 23 November 2015.

Stations edit

There are 9 stations between Barauni and Samastipur Junction.[3]

Station code Station name Distance (km)
BJU Barauni 0
BUJ Barauni Flag 2.71
TGA Teghra 7.35
BCA Bachwara Junction 16.35
STJT Sathajagat 22.80
DSS Dalsinghsarai 27.34
BSRA Basarhia Halt 31.57
NAZJ Nazirganj 35.21
UJP Ujiarpur 41.49
BLRI Belari Halt 45.93
SPJ Samastipur Junction 50.54

Speed limit edit

The Barauni–Samastipur–Muzaffarpur–Hajipur line is not an A-Class line of Indian Railways. So maximum speed is restricted to 110 km/h.

Sidings and workshops edit

The following sidings and workshops exist on the line:[4]

See also edit

References edit

  1. ^ "सपना साकार, अब फर्राटे भरेगी विद्युत ट्रेन". Jagran (in Hindi). 22 December 2014.
  2. ^ "पटरी पर दौड़ी सीआरएस की इलेक्ट्रिक ट्रेन". Jagran (in Hindi). 27 November 2014.
  3. ^ "Indian Railways Map". India Rail Info.
  4. ^ . East Central Railway. Archived from the original on 12 April 2016.

|

barauni, samastipur, section, railway, line, connecting, barauni, samastipur, indian, state, bihar, line, passes, through, plains, north, bihar, gangetic, plain, bihar, samastipur, junction, important, station, overviewstatusoperationalownerindian, railwaysloc. The Barauni Samastipur section is a railway line connecting Barauni to Samastipur in the Indian state of Bihar The 50 54 km 31 mi line passes through the plains of North Bihar and the Gangetic Plain in Bihar Barauni Samastipur sectionSamastipur Junction is an important station on Barauni Samastipur sectionOverviewStatusOperationalOwnerIndian RailwaysLocaleBiharTerminiBarauniSamastipurStations11ServiceTypePassenger and freight train lineServicesBarauni Samastipur Muzaffarpur Hajipur line Muzaffarpur Gorakhpur line via Hajipur Raxaul and Sitamarhi Barauni Gorakhpur Raxaul and Jainagar linesOperator s Indian Railways East Central RailwayDepot s Freight terminals Garhara Yard in Barauni andKarpurigram in SamastipurRolling stockWDM 2 WDM 3A WDS 5 WDP 4 and WDG 4HistoryOpened1886TechnicalLine length50 54 km 31 mi Track length120 km 75 mi Number of tracks2 electrified Track gauge5 ft 6 in 1 676 mm broad gaugeElectrification25 kV 50 Hz AC OHLE between 2011 December 2014 opened on 24 December 2014 1 Operating speedup to 120 km h 75 mph Highest elevation55 m 180 ft Contents 1 Electrification 2 Stations 3 Speed limit 4 Sidings and workshops 5 See also 6 ReferencesElectrification editFormer Railway Minister Lalu Prasad Yadav announced for the electrification of the Barauni Samastipur Muzaffarpur Hajipur line and Muzaffarpur Gorakhpur line via Hajipur Raxaul and Sitamarhi in the Rail Budget 2008 The electrification began in 2011 and was completed in 2014 2 The electrification work was completed in December 2014 itself But the first passenger train to run with an electric locomotive was Maurya Express w e f 23 November 2015 Stations editThere are 9 stations between Barauni and Samastipur Junction 3 Station code Station name Distance km BJU Barauni 0BUJ Barauni Flag 2 71TGA Teghra 7 35BCA Bachwara Junction 16 35STJT Sathajagat 22 80DSS Dalsinghsarai 27 34BSRA Basarhia Halt 31 57NAZJ Nazirganj 35 21UJP Ujiarpur 41 49BLRI Belari Halt 45 93SPJ Samastipur Junction 50 54Speed limit editThe Barauni Samastipur Muzaffarpur Hajipur line is not an A Class line of Indian Railways So maximum speed is restricted to 110 km h Sidings and workshops editThe following sidings and workshops exist on the line 4 100 diesel locomotive yard capacity at Samastipur Freight terminal at Karpurigram railway station Workshop for wagon maintenance at Samastipur Barauni Thermal Power Station Barauni Indian Oil Corporation Barauni Major freight terminal at Garhara YardSee also editMuzaffarpur Gorakhpur line via Hajipur Raxaul and Sitamarhi Barauni Gorakhpur Raxaul and Jainagar lines Muzaffarpur Hajipur section Samastipur Muzaffarpur section Muzaffarpur Junction Samastipur Junction East Central Railway zoneReferences edit सपन स क र अब फर र ट भर ग व द य त ट र न Jagran in Hindi 22 December 2014 पटर पर द ड स आरएस क इल क ट र क ट र न Jagran in Hindi 27 November 2014 Indian Railways Map India Rail Info Path Breaking Initiatives East Central Railway Archived from the original on 12 April 2016 Retrieved from https en wikipedia org w index php title Barauni Samastipur section amp oldid 1139213597, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.