The A11 motorway (Croatian: Autocesta A11) is an incomplete motorway in Croatia, 30 kilometres (19 miles) long. It connects the Jakuševec interchange of the Zagreb bypass, to the south of Zagreb, to Velika Gorica and onwards to Sisak, but currently reaches only the Lekenik exit, as of the planned 42-kilometre (26 mi) route, 30 km (19 mi) are completed. The motorway is planned as a north–south transportation corridor for commuter traffic between the cities.

A11 motorway
Autocesta A11
Autocesta Zagreb - Sisak
in use under construction planned
other motorways
Route information
Length30 km (19 mi)
42 km (26.1 mi) planned
Major junctions
North end A3 near Velika Gorica
South end D30 near Poljana Lekenička
Location
CountryCroatia
CountiesZagreb County, City of Zagreb, Sisak-Moslavina County
Major citiesVelika Gorica
Highway system

The A11 motorway tender procedures and construction works were initiated in 2006. After several delays attributed to planning and land ownership issues, as well as funding and lack of political support, the first section of the A11 was opened in 2009, just 9 kilometres (5.6 miles) long. The delays continued to hinder progress of development of the route, and in 2010 construction works were restarted. The A11 motorway construction was criticized as too expensive in comparison to other Croatian motorways and as a site of political promotion and bickering. In November 2015, the A11 was first connected to the national motorway network at the Jakuševec interchange, which serves as its connection to the A3 motorway. As of 2016, the motorway does not have a scheduled completion date.

The motorway consists of two traffic lanes and an emergency lane in each driving direction separated by a central reservation. Both intersections of the A11 motorway are grade separated. As of January 2016, there are five exits along the route, and one rest area. The motorway is tolled on the sections south of Velika Gorica using a ticket system, while the remainder is toll-free, like the rest of the Zagreb and Velika Gorica bypass roads.

Route description edit

 
Velika Gorica jug interchange

The A11 motorway is an incomplete north–south motorway in Croatia, spanning D30 and D31 state roads south of Velika Gorica.[1] The designed motorway route is of regional importance as it is planned to gradually take over traffic from state road network in the area, especially the D30 which carries a significant commuter traffic volume between Zagreb, Velika Gorica and Sisak. As of January 2016, 30 kilometres (19 miles) of the route are open to traffic, connecting the D31 and the D30 roads at Velika Gorica and Poljana Lekenička exits respectively. The D30 and the D31 have a shared intersection in Velika Gorica itself, providing an alternative route to the motorway section.[2][3] Legally designated termini of the A11 motorway are the Jakuševec interchange on the Zagreb bypass and Sisak.[2]

The A11 motorway has at least two traffic lanes and an emergency lane in each direction along its entire length. The Velika Gorica interchange is a cloverleaf interchange. The A11 route is not tolled from Jakuševec up to the Mraclin mainline toll plaza, after which point it is tolled at the Buševec and Lekenik exits, which comprise trumpet interchanges.

An automatic traffic monitoring and guidance system is in place along the motorway. It consists of measuring, control and signaling devices located in zones where driving conditions may vary, such as at interchanges, viaducts, bridges and zones where fog and strong wind are known to occur. The system uses variable traffic signs to communicate changing driving conditions, possible restrictions and other information to motorway users.[4] The A11 motorway mainly runs through a plain, south of Sava River, requiring no major structures except for the exit interchanges themselves.

History edit

 
Velika Gorica jug interchange and the A11 route (bottom) approaching the A3 motorway (left) as it passes Zagreb Airport

The Zagreb–Sisak motorway was defined as a priority traffic route by the Government of Croatia in Motorway development plan for the 2005–2008 period. The route defined at the time fully complied with county development plans, except in a 4-kilometre (2.5 mi) segment south of the Zagreb bypass, which required changes of the spatial planning documents of the City of Zagreb and the Zagreb County.[5] Hrvatske autoceste developed a preliminary study of the route, proposing to connect the A11 to Zagreb at the Zagreb bypass and the Sarajevska Road, requiring a tunnel below Zagreb railway shunting yard. The plan also required moving the A3 motorway Buzin interchange approximately 2.5 kilometres (1.6 miles) to the west. The plans refer to the moved interchange as Sveta Klara interchange.[6] That scheme planned completion of the motorway to the south of Velika Gorica by 2007, to Lekenik by 2008 and later on to Sisak. At the time the cost of the first section between Velika Gorica and Buševec was estimated at 328 million kuna (44.3 million euro), and the extension to Lekenik was valued at 586 million kuna (79.1 million euro).[7] In February and March 2006, Government of Croatia performed tender procedure for the 8.3-kilometre (5.2 mi) northernmost section of the A11 spanning the Jakuševec interchange and the Velika Gorica jug exit. At the time, the cost of the section was estimated at 770 million kuna (104 million euro) and the construction works were scheduled to be completed by June 15, 2007.[8] On April 4, commencement of the works between the Velika Gorica jug interchange and Hrašće Turopoljsko was announced. The contract was won by a joint venture comprising Viadukt, Hidroelektra, Konstruktor and Strabag, at a price of 202 million kuna (27.3 million euro) without VAT, and the works were scheduled to be completed by June 15, 2007.[9]

The first indication of delays came in March 2007, when the national government started trading accusations with authorities of the Zagreb County. The government accused the county authorities of willfully slowing down the project as the county failed to adopt required amendments of their spatial planning documents. In turn, the county accused the government of insufficient project funding and that accusations levied by the central government were intended to disguise lack of money.[10] This situation led to announcements made in 2008, that the motorway would be built from the direction of Sisak, however that was not immediately feasible as land was not purchased and construction design had to be adjusted. Even so, the works were announced to start north of Sisak at the beginning of 2009.[11] The plan to start construction in 2009 from Sisak were confirmed in July 2008, when Hrvatske autoceste denied rumors that the route may be shortened to the northern outskirts of Sisak, instead of Mošćenica suburb of Petrinja located immediately to the south of Sisak.[12] By August 2008, the planning of a tunnel under Zagreb shunting yard was abandoned in favor of a viaduct extending to the north of the planned Jakuševec interchange. Construction of the latter started shortly afterwards, but stalled.[13]

On May 9, 2009, the first section of the A11 motorway was completed and opened to traffic, spanning Velika Gorica and Buševec exits. The section is 9 kilometres (5.6 miles) long, and contains 6 bridges, 4 flyovers, 2 wildlife crossings, a viaduct and an underpass. Total cost of the section was reported to be 657 million kuna (88.8 million euro). At the opening ceremony, it was announced that the entire route between Zagreb and Mošćenica shall be completed by 2011.[14] In May 2009, new construction contracts were made for the Buševec–Sisak section of the route, only to be cancelled in September of the same year. The cancellation was attributed to change of funding sources and models, and new contracts were announced for November 2009.[15]

Since the opening of the first A11 motorway section, the project was criticized by political opposition parties as excessively expensive, citing estimated cost of 14.8 million euro per kilometer and comparing it to cost of somewhat more than 4 million euro per kilometer cost of the A1 motorway to Split. Hrvatske autoceste, operator of the motorway, defended the price as a result of unfavorable, silty ground along the route requiring large quantities of backfill and transportation of the backfill material.[16][17] Furthermore, Hrvatske autoceste rejected the claims of cost per kilometer of the A11 and the A1. The company which operates both of the motorways claimed that the average price of the A1 motorway was 7.1 million euro per kilometer and that the average cost per kilometer of the A11 stands at 11.3 million euro, further citing high transport cost of the backfill material caused by remote location of the closest quarry which is approximately 100 kilometres (62 miles) away.[18] Construction of the A11 motorway was also criticized as an example of interference of politics in road construction, where construction sites are perceived as generally serving as ribbon-cutting ceremony sites during election campaigns.[19]

In April 2010, the entire A11 motorway route between Zagreb bypass and Sisak, at the time with the planned length of 47.9-kilometre (29.8 mi), was planned to be completed within two and a half years, at a cost of 5.1 billion kuna (689 million euro).[20]

Construction works on the 11.2-kilometre (7.0 mi) Buševec–Lekenik section commenced in April 2010, when completion of the section was announced for 2011. The section required construction of two bridges, six flyovers, four culverts, Lekenik toll plaza and Peščenica rest area. The construction works contract was awarded to Konstruktor, Hidroelektra and Osijek Koteks. Value of the contract works is 645 million kuna (87.1 million euro), including VAT.[21][20] The subsection was opened for traffic in April 2015, and the cost was 700 million kuna (about 95 million euro), excluding VAT, and was to date the most expensive motorway ever built by Croatian Motorways Ltd.[22]

The 11-kilometre (6.8 mi) Jakuševec–Velika Gorica jug section of the A11 spans Zagreb suburban area and its completion was repeatedly delayed due to changes of legislation, land acquisition and funding issues.[13][23][6] In November 2015, that section of the motorway was opened, connecting the Jakuševec and Velika Gorica jug interchanges, at a total cost of 1.645 billion kuna (222.2 million euro).[24] The section contains some of the most significant structures on the route, a 743-metre (2,438 ft) Odra Viaduct that spans a railway and a road, and a 322-metre (1,056 ft) bridge crossing the Sava-Odra Canal. The Jakuševec – Velika Gorica section is part of a system of roads constructed to bypass the city of Velika Gorica.[25]

Further construction edit

The future access road to the A11 from the direction of Zagreb via the Sarajevska street and onto the Jakuševec interchange will require a large overpass to span the width of the Croatian Railways marshalling station located there, and as of 2015 preparatory investments were being made.[26]

In the Lekenik–Sisak section, preparatory works first commenced in 2011, entailing relocation of utilities along the planned motorway route.[27] In May 2012, Hrvatske autoceste proposed cancellation of construction works south of Lekenik.[28] Later the plans were restored, but the total investment in the section remained relatively small, in 2015 only 623,000 kuna (84,189 euro).[26]

The plans for finishing this motorway has been restored on the start of 2021, when government announced that project will be over in 2023.[29] Construction of 11 km motorway will cost 300.000.000 Croatian kuna(40.000.000 Euros) and will be over in 2 years from start of work.[30]

When completed, the A11 shall be tolled between Velika Gorica jug exit and Sisak, unlike the sections between Velika Gorica jug and Jakuševec interchanges which shall remain toll free as a part of the Zagreb bypass.[31]

Ultimately, when completed the A11 is planned to have eight interchanges, as well as a 270-metre (890 ft) arch bridge spanning the Kupa River, and a 710-metre (2,330 ft) viaduct north of the Jakuševec interchange, across the Zagreb shunting yard.[32]

Traffic volume edit

Traffic is regularly counted and reported by Hrvatske autoceste, operator of the motorway, and results are published by Hrvatske ceste. In 2015, the traffic count sites on the A11 motorway route were located at the Mraclin mainline toll site and at the Buševec exit. Both sites recorded the annual average daily traffic (AADT) and the average summer daily traffic (ASDT).[33]

A11 traffic volume details
Road Counting site AADT ASDT Notes
  A11 2031 Mraclin - jug 1,985 1,636
  A11 2047 Buševec 1,784 1,480

The section of the A11 between Velika Gorica jug and Jakuševec interchanges, which was completed in November 2015, is expected to start carrying a substantially increased volume of traffic compared to the existing A11 route because it is expected to take over a significant portion of the D30 state road traffic.[clarification needed] The D30 state road, parallel to the Jakuševec–Velika Gorica jug section of the A11 carries estimated AADT of 31,458 vehicles, measured at Velika Mlaka north of Velika Gorica.[33] The Kurilovec counting site south of Velika Gorica, located near the Velika Gorica jug interchange, carries AADT of 4,721 vehicles.[33]

Exit list edit

County km Exit Name[34] Destination[2] Notes[35]
City of Zagreb 0.0 1 Jakuševec   A3
  E70
Connection to the A3 motorway and the Zagreb bypass
1.0 2 Odra-Mlaka Connection to Odra and Mlaka
Zagreb County 2.3 3 Velika Gorica sjever (north)   D30 Connection to Velika Gorica
8.7 4 Velika Gorica jug (south)   D31 Connection to Velika Gorica
12.1   Mraclin toll plaza
18.1 5 Buševec   Ž3116 Connection to Buševec and the D30 state road
Sisak-Moslavina 29.4 6 Lekenik   D30
  Ž3230
Connection to Lekenik and Poljana Lekenička; As of November 2015, the southern terminus
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Unopened

See also edit

Sources edit

  1. ^ . HUKA. Archived from the original on July 15, 2011. Retrieved September 8, 2010.
  2. ^ a b c [Decision on categorisation of public roads]. Narodne novine (in Croatian) (94/2014). July 31, 2014. Archived from the original on March 4, 2016. Retrieved June 25, 2016.
  3. ^ Overview map of the A11 (Map). Google Maps. Retrieved February 12, 2018.
  4. ^ . Hrvatske autoceste. 2007. pp. 130–133. ISBN 978-953-7491-09-3. Archived from the original (PDF) on 2011-02-18. Retrieved September 5, 2010.
  5. ^ Dean Sinovčić (3 April 2006). "Dva autoputa za preporod Velike Gorice" [Two motorways for revival of Velika Gorica] (in Croatian). Nacional. from the original on 12 June 2012. Retrieved 17 June 2016.
  6. ^ a b [Lively construction spring] (in Croatian). Radio Velika Gorica. April 16, 2009. Archived from the original on March 29, 2012. Retrieved September 19, 2011.
  7. ^ Mirjana Sošić (February 17, 2006). "Iz Siska u Zagreb ipak tunelom ispod zagrebačkoga ranžirnog kolodvora" [From Sisak to Zagreb through a tunnel under Zagreb shunting yard after all] (in Croatian). Poslovni dnevnik. Retrieved September 19, 2011.
  8. ^ M. Piškor (March 24, 2006). [Zagreb-Sisak motorway: Six tenders to build the first section]. Jutarnji list (in Croatian). Archived from the original on October 22, 2012. Retrieved September 19, 2011.
  9. ^ Dalibor Klobučar (April 4, 2006). "Sutra otvaranje radova na autocesti Zagreb - Sisak" [Zagreb-Sisak motorway construction works start tomorrow] (in Croatian). Poslovni dnevnik. Retrieved September 19, 2011.
  10. ^ Tomislav Kukec (March 7, 2007). [Croatian Democratic Union: Picula slows down construction of the A11]. Jutarnji list (in Croatian). Archived from the original on October 22, 2012. Retrieved September 19, 2011.
  11. ^ Mate Piškor (April 8, 2008). [Zagreb-Sisak motorway shall be built from direction of Sisak]. Jutarnji list (in Croatian). Archived from the original on October 22, 2012. Retrieved September 19, 2011.
  12. ^ "Gradnja autoceste Zagreb-Sisak počinje u proljeće 2009" [Construction of the Zagreb-Sisak motorway starts in the spring of 2009] (in Croatian). Nova TV. July 25, 2008. Retrieved September 19, 2011.
  13. ^ a b "Gradi se novi južni ulaz u Zagreb s dva čvorišta" [A new southern entrance to Zagreb, comprising two interchanges, is under construction] (in Croatian). Nova TV. August 11, 2008. Retrieved September 19, 2011.
  14. ^ [Prime minister ceremonially opens Zagreb-Sisak motorway section between Velika Gorica and Buševec] (in Croatian). Government of Croatia. May 9, 2009. Archived from the original on March 23, 2012. Retrieved September 19, 2011.
  15. ^ Mate Piškor (September 4, 2009). [Construction contracts cancelled: Has the recession taken the Sisak motorway away?]. Jutarnji list (in Croatian). Archived from the original on October 22, 2012. Retrieved September 19, 2011.
  16. ^ "Autocesta Zagreb-Sisak tri puta skuplja od Dalmatine!" [Zagreb-Sisak motorway three times more expensive than Dalmatina!] (in Croatian). Nova TV. April 9, 2010. Retrieved September 19, 2011.
  17. ^ "Kalmetin proračun: Autocesta Zagreb – Sisak triput skuplja od Dalmatine" [Kalmeta's budget: Zagreb-Sisak motorway three times more expensive than Dalmatina] (in Croatian). Nacional. April 9, 2010. from the original on 12 June 2012. Retrieved 17 June 2016.
  18. ^ "Demantij iz HAC-a: 'Dalmatina nije tri puta skuplja od autoceste Zagreb-Sisak'" [Hrvatske autoceste denies: Dalmatina is not three times more expensive than the Zagreb-Sisak motorway] (in Croatian). Nacional. April 9, 2010. from the original on 6 April 2012. Retrieved 17 June 2016.
  19. ^ Gordan Zubčić (February 14, 2011). "Država utrošila 2 milijarde kn za mostove i ceste prema ledinama" [Government spends 2 billion kuna for bridges and roads to meadows]. Slobodna Dalmacija (in Croatian). Retrieved September 19, 2011.
  20. ^ a b [Prime minister tours Zagreb-Sisak motorway construction site] (in Croatian). Government of Croatia. April 6, 2010. Archived from the original on March 23, 2012. Retrieved September 19, 2011.
  21. ^ "Kosor: 'Gradnjom autocesta spriječit ćemo da graditeljstvo padne na koljena'" [Kosor: 'Motorway construction to prevent failure of civil engineering sector'] (in Croatian). Nacional. April 6, 2010. from the original on 12 June 2012. Retrieved 17 June 2016.
  22. ^ "Autocesta Zagreb – Lekenik isplatit će se za 183 godine". Večernji list (in Croatian). 23 April 2015. Retrieved 12 June 2016.
  23. ^ Ivan Pandžić (March 7, 2011). "Pred izbore opet buja gradnja autocesta iako su planovi 'klimavi'" [Motorway construction flourishes again ahead of elections even though the plans are 'unstable'] (in Croatian). Poslovni dnevnik. Retrieved September 19, 2011.
  24. ^ "Otvorena nova dionica Jakuševec – Velika Gorica sa spojem na autocestu za Sisak". Večernji list (in Croatian). 3 November 2015. Retrieved 12 June 2016.
  25. ^ [Kosnica interchange] (PDF) (in Croatian). Ministry of Sea, Transport and Infrastructure. May 8, 2007. p. 2. Archived from the original (PDF) on October 25, 2014. Retrieved October 2, 2010.
  26. ^ a b (PDF) (in Croatian). Croatian Motorways. p. 9. Archived from the original (PDF) on 2015-03-16. Retrieved 12 June 2016.
  27. ^ [Plans for preparatory measures and activities for 2011 tourist season] (PDF) (in Croatian). Hrvatske autoceste. September 17, 2010. Archived from the original (PDF) on March 28, 2012. Retrieved September 19, 2011.
  28. ^ Krešimir Žabec (1 May 2012). "HAC odustaje od projekata vrijednih 9,5 milijardi kuna koje je naredio Ivo Sanader" [Hrvatske autoceste cancelling projects worth 9.5 billion kuna, ordered by Ivo Sanader]. Jutarnji list (in Croatian). Archived from the original on 2 August 2012. Retrieved 8 May 2012.
  29. ^ HINA (4 February 2021). "Autocesta Zagreb-Sisak bit će gotova već 2023. godine: Natječaj za 11 nedostajućih kilometara do kraja veljače". Novi List. Retrieved 22 May 2021.
  30. ^ Bohutinski, Josip (8 March 2021). "Završava se zadnja dionica dugo iščekivane autoceste A11: Od Siska do Zagreba za samo 20 minuta". večernji.hr. Večernji list. Retrieved 22 May 2021.
  31. ^ Iva Puljić-Šego (August 8, 2007). "Gradnja dionice od Jakuševca do Kušanca počinje u listopadu (preuzeto iz Večenjeg lista)" [Construction of Jakuševec-Kušanec section starts in October (taken from the Večernji list)] (in Croatian). Independent Road-workers Union. Retrieved September 19, 2011.
  32. ^ [Zagreb-Sisak motorway Buševec-Lekenik section works resumed] (in Croatian). Hrvatske autoceste. April 6, 2010. Archived from the original on March 28, 2012. Retrieved September 19, 2011.
  33. ^ a b c [Traffic counting on the roadways of Croatia in 2015 - digest] (PDF). Hrvatske ceste. April 2016. Archived from the original (PDF) on 2016-07-01. Retrieved June 12, 2016.
  34. ^ . Narodne novine (in Croatian). April 24, 2003. Archived from the original on October 4, 2011. Retrieved July 24, 2010.
  35. ^ [Motorways] (in Croatian). Hrvatske autoceste. Archived from the original on 2011-09-24. Retrieved September 19, 2011.

croatia, motorway, croatian, autocesta, incomplete, motorway, croatia, kilometres, miles, long, connects, jakuševec, interchange, zagreb, bypass, south, zagreb, velika, gorica, onwards, sisak, currently, reaches, only, lekenik, exit, planned, kilometre, route,. The A11 motorway Croatian Autocesta A11 is an incomplete motorway in Croatia 30 kilometres 19 miles long It connects the Jakusevec interchange of the Zagreb bypass to the south of Zagreb to Velika Gorica and onwards to Sisak but currently reaches only the Lekenik exit as of the planned 42 kilometre 26 mi route 30 km 19 mi are completed The motorway is planned as a north south transportation corridor for commuter traffic between the cities A11 motorwayAutocesta A11Autocesta Zagreb Sisakin use under construction planned other motorwaysRoute informationLength30 km 19 mi 42 km 26 1 mi plannedMajor junctionsNorth endA3 near Velika GoricaSouth endD30 near Poljana LekenickaLocationCountryCroatiaCountiesZagreb County City of Zagreb Sisak Moslavina CountyMajor citiesVelika GoricaHighway systemHighways in CroatiaThe A11 motorway tender procedures and construction works were initiated in 2006 After several delays attributed to planning and land ownership issues as well as funding and lack of political support the first section of the A11 was opened in 2009 just 9 kilometres 5 6 miles long The delays continued to hinder progress of development of the route and in 2010 construction works were restarted The A11 motorway construction was criticized as too expensive in comparison to other Croatian motorways and as a site of political promotion and bickering In November 2015 the A11 was first connected to the national motorway network at the Jakusevec interchange which serves as its connection to the A3 motorway As of 2016 the motorway does not have a scheduled completion date The motorway consists of two traffic lanes and an emergency lane in each driving direction separated by a central reservation Both intersections of the A11 motorway are grade separated As of January 2016 there are five exits along the route and one rest area The motorway is tolled on the sections south of Velika Gorica using a ticket system while the remainder is toll free like the rest of the Zagreb and Velika Gorica bypass roads Contents 1 Route description 2 History 3 Further construction 4 Traffic volume 5 Exit list 6 See also 7 SourcesRoute description edit nbsp Velika Gorica jug interchangeThe A11 motorway is an incomplete north south motorway in Croatia spanning D30 and D31 state roads south of Velika Gorica 1 The designed motorway route is of regional importance as it is planned to gradually take over traffic from state road network in the area especially the D30 which carries a significant commuter traffic volume between Zagreb Velika Gorica and Sisak As of January 2016 30 kilometres 19 miles of the route are open to traffic connecting the D31 and the D30 roads at Velika Gorica and Poljana Lekenicka exits respectively The D30 and the D31 have a shared intersection in Velika Gorica itself providing an alternative route to the motorway section 2 3 Legally designated termini of the A11 motorway are the Jakusevec interchange on the Zagreb bypass and Sisak 2 The A11 motorway has at least two traffic lanes and an emergency lane in each direction along its entire length The Velika Gorica interchange is a cloverleaf interchange The A11 route is not tolled from Jakusevec up to the Mraclin mainline toll plaza after which point it is tolled at the Busevec and Lekenik exits which comprise trumpet interchanges An automatic traffic monitoring and guidance system is in place along the motorway It consists of measuring control and signaling devices located in zones where driving conditions may vary such as at interchanges viaducts bridges and zones where fog and strong wind are known to occur The system uses variable traffic signs to communicate changing driving conditions possible restrictions and other information to motorway users 4 The A11 motorway mainly runs through a plain south of Sava River requiring no major structures except for the exit interchanges themselves History edit nbsp Velika Gorica jug interchange and the A11 route bottom approaching the A3 motorway left as it passes Zagreb AirportThe Zagreb Sisak motorway was defined as a priority traffic route by the Government of Croatia in Motorway development plan for the 2005 2008 period The route defined at the time fully complied with county development plans except in a 4 kilometre 2 5 mi segment south of the Zagreb bypass which required changes of the spatial planning documents of the City of Zagreb and the Zagreb County 5 Hrvatske autoceste developed a preliminary study of the route proposing to connect the A11 to Zagreb at the Zagreb bypass and the Sarajevska Road requiring a tunnel below Zagreb railway shunting yard The plan also required moving the A3 motorway Buzin interchange approximately 2 5 kilometres 1 6 miles to the west The plans refer to the moved interchange as Sveta Klara interchange 6 That scheme planned completion of the motorway to the south of Velika Gorica by 2007 to Lekenik by 2008 and later on to Sisak At the time the cost of the first section between Velika Gorica and Busevec was estimated at 328 million kuna 44 3 million euro and the extension to Lekenik was valued at 586 million kuna 79 1 million euro 7 In February and March 2006 Government of Croatia performed tender procedure for the 8 3 kilometre 5 2 mi northernmost section of the A11 spanning the Jakusevec interchange and the Velika Gorica jug exit At the time the cost of the section was estimated at 770 million kuna 104 million euro and the construction works were scheduled to be completed by June 15 2007 8 On April 4 commencement of the works between the Velika Gorica jug interchange and Hrasce Turopoljsko was announced The contract was won by a joint venture comprising Viadukt Hidroelektra Konstruktor and Strabag at a price of 202 million kuna 27 3 million euro without VAT and the works were scheduled to be completed by June 15 2007 9 The first indication of delays came in March 2007 when the national government started trading accusations with authorities of the Zagreb County The government accused the county authorities of willfully slowing down the project as the county failed to adopt required amendments of their spatial planning documents In turn the county accused the government of insufficient project funding and that accusations levied by the central government were intended to disguise lack of money 10 This situation led to announcements made in 2008 that the motorway would be built from the direction of Sisak however that was not immediately feasible as land was not purchased and construction design had to be adjusted Even so the works were announced to start north of Sisak at the beginning of 2009 11 The plan to start construction in 2009 from Sisak were confirmed in July 2008 when Hrvatske autoceste denied rumors that the route may be shortened to the northern outskirts of Sisak instead of Moscenica suburb of Petrinja located immediately to the south of Sisak 12 By August 2008 the planning of a tunnel under Zagreb shunting yard was abandoned in favor of a viaduct extending to the north of the planned Jakusevec interchange Construction of the latter started shortly afterwards but stalled 13 On May 9 2009 the first section of the A11 motorway was completed and opened to traffic spanning Velika Gorica and Busevec exits The section is 9 kilometres 5 6 miles long and contains 6 bridges 4 flyovers 2 wildlife crossings a viaduct and an underpass Total cost of the section was reported to be 657 million kuna 88 8 million euro At the opening ceremony it was announced that the entire route between Zagreb and Moscenica shall be completed by 2011 14 In May 2009 new construction contracts were made for the Busevec Sisak section of the route only to be cancelled in September of the same year The cancellation was attributed to change of funding sources and models and new contracts were announced for November 2009 15 Since the opening of the first A11 motorway section the project was criticized by political opposition parties as excessively expensive citing estimated cost of 14 8 million euro per kilometer and comparing it to cost of somewhat more than 4 million euro per kilometer cost of the A1 motorway to Split Hrvatske autoceste operator of the motorway defended the price as a result of unfavorable silty ground along the route requiring large quantities of backfill and transportation of the backfill material 16 17 Furthermore Hrvatske autoceste rejected the claims of cost per kilometer of the A11 and the A1 The company which operates both of the motorways claimed that the average price of the A1 motorway was 7 1 million euro per kilometer and that the average cost per kilometer of the A11 stands at 11 3 million euro further citing high transport cost of the backfill material caused by remote location of the closest quarry which is approximately 100 kilometres 62 miles away 18 Construction of the A11 motorway was also criticized as an example of interference of politics in road construction where construction sites are perceived as generally serving as ribbon cutting ceremony sites during election campaigns 19 In April 2010 the entire A11 motorway route between Zagreb bypass and Sisak at the time with the planned length of 47 9 kilometre 29 8 mi was planned to be completed within two and a half years at a cost of 5 1 billion kuna 689 million euro 20 Construction works on the 11 2 kilometre 7 0 mi Busevec Lekenik section commenced in April 2010 when completion of the section was announced for 2011 The section required construction of two bridges six flyovers four culverts Lekenik toll plaza and Pescenica rest area The construction works contract was awarded to Konstruktor Hidroelektra and Osijek Koteks Value of the contract works is 645 million kuna 87 1 million euro including VAT 21 20 The subsection was opened for traffic in April 2015 and the cost was 700 million kuna about 95 million euro excluding VAT and was to date the most expensive motorway ever built by Croatian Motorways Ltd 22 The 11 kilometre 6 8 mi Jakusevec Velika Gorica jug section of the A11 spans Zagreb suburban area and its completion was repeatedly delayed due to changes of legislation land acquisition and funding issues 13 23 6 In November 2015 that section of the motorway was opened connecting the Jakusevec and Velika Gorica jug interchanges at a total cost of 1 645 billion kuna 222 2 million euro 24 The section contains some of the most significant structures on the route a 743 metre 2 438 ft Odra Viaduct that spans a railway and a road and a 322 metre 1 056 ft bridge crossing the Sava Odra Canal The Jakusevec Velika Gorica section is part of a system of roads constructed to bypass the city of Velika Gorica 25 Further construction editThe future access road to the A11 from the direction of Zagreb via the Sarajevska street and onto the Jakusevec interchange will require a large overpass to span the width of the Croatian Railways marshalling station located there and as of 2015 preparatory investments were being made 26 In the Lekenik Sisak section preparatory works first commenced in 2011 entailing relocation of utilities along the planned motorway route 27 In May 2012 Hrvatske autoceste proposed cancellation of construction works south of Lekenik 28 Later the plans were restored but the total investment in the section remained relatively small in 2015 only 623 000 kuna 84 189 euro 26 The plans for finishing this motorway has been restored on the start of 2021 when government announced that project will be over in 2023 29 Construction of 11 km motorway will cost 300 000 000 Croatian kuna 40 000 000 Euros and will be over in 2 years from start of work 30 When completed the A11 shall be tolled between Velika Gorica jug exit and Sisak unlike the sections between Velika Gorica jug and Jakusevec interchanges which shall remain toll free as a part of the Zagreb bypass 31 Ultimately when completed the A11 is planned to have eight interchanges as well as a 270 metre 890 ft arch bridge spanning the Kupa River and a 710 metre 2 330 ft viaduct north of the Jakusevec interchange across the Zagreb shunting yard 32 Traffic volume editTraffic is regularly counted and reported by Hrvatske autoceste operator of the motorway and results are published by Hrvatske ceste In 2015 the traffic count sites on the A11 motorway route were located at the Mraclin mainline toll site and at the Busevec exit Both sites recorded the annual average daily traffic AADT and the average summer daily traffic ASDT 33 A11 traffic volume detailsRoad Counting site AADT ASDT Notes nbsp A11 2031 Mraclin jug 1 985 1 636 nbsp A11 2047 Busevec 1 784 1 480The section of the A11 between Velika Gorica jug and Jakusevec interchanges which was completed in November 2015 is expected to start carrying a substantially increased volume of traffic compared to the existing A11 route because it is expected to take over a significant portion of the D30 state road traffic clarification needed The D30 state road parallel to the Jakusevec Velika Gorica jug section of the A11 carries estimated AADT of 31 458 vehicles measured at Velika Mlaka north of Velika Gorica 33 The Kurilovec counting site south of Velika Gorica located near the Velika Gorica jug interchange carries AADT of 4 721 vehicles 33 Exit list editThis article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table Please consult this guideline for information on how to create one Please improve this article if you can November 2021 County km Exit Name 34 Destination 2 Notes 35 City of Zagreb 0 0 1 Jakusevec nbsp A3 nbsp E70 Connection to the A3 motorway and the Zagreb bypass1 0 2 Odra Mlaka Connection to Odra and MlakaZagreb County 2 3 3 Velika Gorica sjever north nbsp D30 Connection to Velika Gorica8 7 4 Velika Gorica jug south nbsp D31 Connection to Velika Gorica12 1 nbsp Mraclin toll plaza18 1 5 Busevec nbsp Z3116 Connection to Busevec and the D30 state roadSisak Moslavina 29 4 6 Lekenik nbsp D30 nbsp Z3230 Connection to Lekenik and Poljana Lekenicka As of November 2015 the southern terminus1 000 mi 1 609 km 1 000 km 0 621 mi UnopenedSee also edit nbsp Croatia portal nbsp Roads portalInternational E road network Transport in CroatiaSources edit Overview of motorways and semi motorways HUKA Archived from the original on July 15 2011 Retrieved September 8 2010 a b c Odluka o razvrstavanju javnih cesta Decision on categorisation of public roads Narodne novine in Croatian 94 2014 July 31 2014 Archived from the original on March 4 2016 Retrieved June 25 2016 Overview map of the A11 Map Google Maps Retrieved February 12 2018 Croatian Motorways Hrvatske autoceste 2007 pp 130 133 ISBN 978 953 7491 09 3 Archived from the original PDF on 2011 02 18 Retrieved September 5 2010 Dean Sinovcic 3 April 2006 Dva autoputa za preporod Velike Gorice Two motorways for revival of Velika Gorica in Croatian Nacional Archived from the original on 12 June 2012 Retrieved 17 June 2016 a b Zivo graditeljsko proljece Lively construction spring in Croatian Radio Velika Gorica April 16 2009 Archived from the original on March 29 2012 Retrieved September 19 2011 Mirjana Sosic February 17 2006 Iz Siska u Zagreb ipak tunelom ispod zagrebackoga ranzirnog kolodvora From Sisak to Zagreb through a tunnel under Zagreb shunting yard after all in Croatian Poslovni dnevnik Retrieved September 19 2011 M Piskor March 24 2006 Autocesta Zagreb Sisak Sest ponuda za gradnju prve dionice Zagreb Sisak motorway Six tenders to build the first section Jutarnji list in Croatian Archived from the original on October 22 2012 Retrieved September 19 2011 Dalibor Klobucar April 4 2006 Sutra otvaranje radova na autocesti Zagreb Sisak Zagreb Sisak motorway construction works start tomorrow in Croatian Poslovni dnevnik Retrieved September 19 2011 Tomislav Kukec March 7 2007 HDZ Picula koci gradnju A11 Croatian Democratic Union Picula slows down construction of the A11 Jutarnji list in Croatian Archived from the original on October 22 2012 Retrieved September 19 2011 Mate Piskor April 8 2008 Autocesta Zagreb Sisak gradit ce se iz smjera Siska Zagreb Sisak motorway shall be built from direction of Sisak Jutarnji list in Croatian Archived from the original on October 22 2012 Retrieved September 19 2011 Gradnja autoceste Zagreb Sisak pocinje u proljece 2009 Construction of the Zagreb Sisak motorway starts in the spring of 2009 in Croatian Nova TV July 25 2008 Retrieved September 19 2011 a b Gradi se novi juzni ulaz u Zagreb s dva cvorista A new southern entrance to Zagreb comprising two interchanges is under construction in Croatian Nova TV August 11 2008 Retrieved September 19 2011 Predsjednik Vlade svecano otvorio dionicu autoceste Zagreb Sisak između Velike Gorice i Busevca Prime minister ceremonially opens Zagreb Sisak motorway section between Velika Gorica and Busevec in Croatian Government of Croatia May 9 2009 Archived from the original on March 23 2012 Retrieved September 19 2011 Mate Piskor September 4 2009 Raskidaju se ugovori o gradnji Je li kriza pojela autocestu do Siska Construction contracts cancelled Has the recession taken the Sisak motorway away Jutarnji list in Croatian Archived from the original on October 22 2012 Retrieved September 19 2011 Autocesta Zagreb Sisak tri puta skuplja od Dalmatine Zagreb Sisak motorway three times more expensive than Dalmatina in Croatian Nova TV April 9 2010 Retrieved September 19 2011 Kalmetin proracun Autocesta Zagreb Sisak triput skuplja od Dalmatine Kalmeta s budget Zagreb Sisak motorway three times more expensive than Dalmatina in Croatian Nacional April 9 2010 Archived from the original on 12 June 2012 Retrieved 17 June 2016 Demantij iz HAC a Dalmatina nije tri puta skuplja od autoceste Zagreb Sisak Hrvatske autoceste denies Dalmatina is not three times more expensive than the Zagreb Sisak motorway in Croatian Nacional April 9 2010 Archived from the original on 6 April 2012 Retrieved 17 June 2016 Gordan Zubcic February 14 2011 Drzava utrosila 2 milijarde kn za mostove i ceste prema ledinama Government spends 2 billion kuna for bridges and roads to meadows Slobodna Dalmacija in Croatian Retrieved September 19 2011 a b Predsjednica Vlade obisla gradiliste na autocesti Zagreb Sisak Prime minister tours Zagreb Sisak motorway construction site in Croatian Government of Croatia April 6 2010 Archived from the original on March 23 2012 Retrieved September 19 2011 Kosor Gradnjom autocesta sprijecit cemo da graditeljstvo padne na koljena Kosor Motorway construction to prevent failure of civil engineering sector in Croatian Nacional April 6 2010 Archived from the original on 12 June 2012 Retrieved 17 June 2016 Autocesta Zagreb Lekenik isplatit ce se za 183 godine Vecernji list in Croatian 23 April 2015 Retrieved 12 June 2016 Ivan Pandzic March 7 2011 Pred izbore opet buja gradnja autocesta iako su planovi klimavi Motorway construction flourishes again ahead of elections even though the plans are unstable in Croatian Poslovni dnevnik Retrieved September 19 2011 Otvorena nova dionica Jakusevec Velika Gorica sa spojem na autocestu za Sisak Vecernji list in Croatian 3 November 2015 Retrieved 12 June 2016 Cvor Kosnica Kosnica interchange PDF in Croatian Ministry of Sea Transport and Infrastructure May 8 2007 p 2 Archived from the original PDF on October 25 2014 Retrieved October 2 2010 a b Plan građenja i odrzavanja autocesta za 2015 godinu PDF in Croatian Croatian Motorways p 9 Archived from the original PDF on 2015 03 16 Retrieved 12 June 2016 Planovi pripremnih mjera i aktivnosti za turisticku sezonu 2011 Plans for preparatory measures and activities for 2011 tourist season PDF in Croatian Hrvatske autoceste September 17 2010 Archived from the original PDF on March 28 2012 Retrieved September 19 2011 Kresimir Zabec 1 May 2012 HAC odustaje od projekata vrijednih 9 5 milijardi kuna koje je naredio Ivo Sanader Hrvatske autoceste cancelling projects worth 9 5 billion kuna ordered by Ivo Sanader Jutarnji list in Croatian Archived from the original on 2 August 2012 Retrieved 8 May 2012 HINA 4 February 2021 Autocesta Zagreb Sisak bit ce gotova vec 2023 godine Natjecaj za 11 nedostajucih kilometara do kraja veljace Novi List Retrieved 22 May 2021 Bohutinski Josip 8 March 2021 Zavrsava se zadnja dionica dugo iscekivane autoceste A11 Od Siska do Zagreba za samo 20 minuta vecernji hr Vecernji list Retrieved 22 May 2021 Iva Puljic Sego August 8 2007 Gradnja dionice od Jakusevca do Kusanca pocinje u listopadu preuzeto iz Vecenjeg lista Construction of Jakusevec Kusanec section starts in October taken from the Vecernji list in Croatian Independent Road workers Union Retrieved September 19 2011 Nastavak radova na autocesti Zagreb Sisak na dionici Busevec Lekenik Zagreb Sisak motorway Busevec Lekenik section works resumed in Croatian Hrvatske autoceste April 6 2010 Archived from the original on March 28 2012 Retrieved September 19 2011 a b c Brojanje prometa na cestama Republike Hrvatske godine 2015 Traffic counting on the roadways of Croatia in 2015 digest PDF Hrvatske ceste April 2016 Archived from the original PDF on 2016 07 01 Retrieved June 12 2016 Regulation on motorway markings chainage interchange exit rest area numbers and names Narodne novine in Croatian April 24 2003 Archived from the original on October 4 2011 Retrieved July 24 2010 Autoceste Motorways in Croatian Hrvatske autoceste Archived from the original on 2011 09 24 Retrieved September 19 2011 Retrieved from https en wikipedia org w index php title A11 Croatia amp oldid 1175600362, wikipedia, wiki, book, books, library,