fbpx
Wikipedia

Luton DART

The Luton DART is an airport rail link in Luton, Bedfordshire, England, which connects Luton Airport Parkway station and Luton Airport using a Cable Liner automated people mover system. DART is an acronym for Direct Air-Rail Transit. The line, which opened in March 2023, replaces the shuttle bus service, with the aim of reducing road congestion and reducing journey times from London St Pancras to the airport terminal to 32 minutes.

Luton DART
A Luton DART train in operation
Overview
OwnerLuton Borough Council
Transit typeAutomated guided people mover (light metro)
Number of lines1
Number of stations2
Annual ridership2.7 million[1]
Websitewww.lutondart.com
Operation
Began operation10 March 2023 (2023-03-10)[2]
Number of vehicles2
Headway225 seconds[3]
Technical
System length2,080 metres (1.29 miles)[3]
No. of tracks2
Top speed50.4 km/h (31.3 mph)[3]

History edit

Background edit

From the 1950s and 1960s, Luton Airport experienced an increase in business as a result of the growing package holiday market.[4][5] Although the Midland Main Line passed within 1 mile (1.6 km) of the airport, there was no dedicated railway station and public transport connections to Luton Airport were limited. A shuttle bus service operated from Luton railway station, to convey rail passengers 2 miles (3.2 km) from Luton town centre to the airport terminal.[6]

Luton Airport Parkway railway station opened in 1999, providing rail connections to central and south London, Gatwick Airport and Brighton on the Thameslink route, as well as services to the East Midlands. Although the new station was closer to the airport – 1 mile (1.6 km) to the west – it was still necessary to run a shuttle bus transfer service.[7][8][9]

The shuttle bus was considered to be unsatisfactory, and proposals were developed to replace the bus service with a new rail link. Several schemes were considered, including a 2007 proposal to replace the shuttle buses with segregated tracked transit conveyors,[10] and in 2015, a heavy rail spur link to the airport was also being considered.[11] The steep incline from the airport – approximately 40 metres (130 ft) downhill to Luton Airport Parkway station – presented engineering challenges to building any heavy rail link over the short distance to the airport terminal.[12]

In April 2016, London Luton Airport Ltd (LLAL) announced a scheme to create a light rail/automated guided people mover connection between the airport and Luton Airport Parkway station.[13] It was envisaged that the introduction of a light-rail link would reduce the journey time between London St Pancras and the airport terminal to less than 30 minutes.[12] At launch, that figure is 32 minutes.[14]

Construction edit

 
Luton Airport Parkway DART station under construction (February 2020)

The Luton DART link was approved by Luton Borough Council in June 2017.[15][16] Construction work commenced in April 2018, contracted to a VolkerFitzpatrick / Kier Group joint venture.[17][18]

The project involved construction of bridges over the A1081 road and tunnels, along with two stations in phase 1. The first station was built at Bartlett Square in Napier Park on the east side of Luton Airport Parkway station, and the final station at the airport.[19] In 2018, it was announced that the system would be a Cable Liner, manufactured by the Austrian transit manufacturer, Doppelmayr Cable Car (DCC), who also have a contract to operate the system for the first five years.[20] The vehicles were built by the Austrian cabin manufacturer Carvatech.[21]

In December 2019, a ready-constructed, 80-metre (260 ft)-long, 1,000-tonne (980-long-ton; 1,100-short-ton) curved bridge was moved into place over the A1081 road on large jacks.[22] Construction work on the line was halted briefly in April 2020 during the COVID-19 pandemic over concerns related to Coronavirus Health Protection Regulations, but resumed after a safety assessment.[23] The cable propulsion system was completed in February 2020 and work then began to install the people mover vehicles on the guide rails.[24] A new light rail terminus building has been constructed next to the railway station.[25]

Testing of the transit vehicles began in 2021. In August of that year, reports emerged of problems experienced with the traction or the pulley system during testing, and that a DART vehicle had become derailed. This was denied by LLAL.[26]

Opening edit

 
Luton Airport station platform

The system was originally scheduled to open in 2021. Following delays resulting from the COVID-19 pandemic, the opening date was revised to late 2022. The planned opening was later delayed due to further technical testing and development of the ticketing system.[27][28][29][30] A member of Luton Borough Council's overview and scrutiny board called for an independent investigation into Luton DART's two-year delay and £90 million budget increase.[31]

On 6 December 2022, King Charles III visited the Luton DART during a royal visit to the town. He unveiled a plaque commemorating his visit before travelling on the new transit system.[32][33]

Passenger trials began in February 2023,[34] with a second batch of trials announced for March. The service opened to all passengers for four hours per day on 10 March. It subsequently opened for 24 hours per day on 27 March 2023.[2][35]

Operation edit

 
Interior of DART shuttle train

Luton DART is operated by a subsidiary company wholly owned by London Luton Airport Limited (LLAL, trading as Luton Rising). It operates 24 hours a day, with trains running every four minutes throughout the day and every eight to 15 minutes at other times. The journey time is under four minutes.[35][36][37]

Route edit

 
Map of the transit route

The 2.1 km (1.3 mi) DART line begins at Luton DART Parkway, a purpose-built station adjoining Luton Airport Parkway railway station, which provides an interchange with East Midlands Railway and Thameslink passenger rail services. The DART platforms are located on a new upper level above the current station, and are connected to the main-line rail platforms via a new footbridge and concourse, complete with lifts and escalators. The concourse includes separate barrier lines for main line rail and DART, with an unpaid area in between.[19][25]

DART vehicles head southeastwards along a 350-metre (380-yard) viaduct. After crossing the A1081 road, the vehicles curve eastwards along a 1.1 km (0.68-mile) cutting and concrete trough before entering a 350-metre cut-and-cover tunnel under the airport apron.

The eastern airport terminus is located at a new subterranean station underneath the drop-off area in front of the terminal building. Access to a surface level concourse and barrier line is provided by escalators and lifts; the airport terminal is a 150 metres (490 ft) covered but outdoor walk from the station concourse.[19]

Track and rolling stock edit

 
Aerial view of Luton Airport in February 2022; the Luton DART line crosses the picture from the mainline railway station in the bottom-left, terminating at the airport in the centre of the photo

Luton DART is operated using Cable Liner automated people mover technology manufactured by Doppelmayr Cable Car. The line uses the Cable Liner's Double Shuttle configuration, with two unconnected tracks, each with its own independent cable haulage system. There are two four-section articulated trains, with one on each track. Each train has a capacity of 170 passengers, and operates at a maximum running speed of 50.4 km/h (31.3 mph). A four-minute interval service requires the use of both trains, whilst an eight-minute interval can be maintained with a single train in service.[3]

Fares and ticketing edit

The single fare for the DART is £4.90, and through tickets to Luton Airport are available, from all stations on the National Rail. Luton residents can register for half-price travel, and holders of concessionary travel passes, disabled blue badge holders and airport workers can register for free travel. Registration for both half-price and free travel must be done online, at least 72 hours before travel, and tickets obtained online once registration is authorised; passes are not accepted at the barriers.[38][39][40][41][42]

The £4.90 DART fare has been criticised as too expensive for the short journey; at £3.95 per mile, it is claimed by The Guardian to be the most expensive train in Britain by distance.[43]

East Midlands Railway states that through tickets to destinations across the UK will be available. A "walk up" fare from the airport to London St Pancras will cost £22.40 one way, which it says is similar in price to other airport rail links in the UK (such as Heathrow Express), though at least 25 per cent of Advance tickets will be sold at £10 one way or less.[40]

Interchange edit

 
Luton Airport Parkway station concourse

East Midlands Railway services between London St Pancras and Corby, previously branded as "EMR Connect", were rebranded to "Luton Airport Express" following the opening of the DART.[44] They run every 30 minutes and operate non-stop between Luton Airport Parkway and London St Pancras with a journey time of 24 minutes. To the north of the airport, they also serve Luton, Bedford, Wellingborough and Kettering.[14][45]

Thameslink also provides service to Luton Airport Parkway, with six trains an hour calling at the station in both directions during the day. To the north trains run to Luton and Bedford, and to the south they serve London St Pancras and continue to various destinations to the south of London, including Brighton, Gatwick Airport and Rainham. The journey time to St Pancras varies between 40 and 50 minutes depending on the stopping pattern.[45][46]

Future developments edit

As part of the proposals for the expansion of Luton Airport, it is envisaged that the DART line would be extended eastwards to terminate at a new station serving Terminal 2.[47][48]

References edit

  1. ^ "Luton Dart welcomes 2.7m passengers in a year". BBC News. 31 March 2024. Retrieved 31 March 2024.
  2. ^ a b "Luton Dart airport shuttle welcomes first passengers". BBC News. 10 March 2023. from the original on 28 March 2023. Retrieved 10 March 2023.
  3. ^ a b c d "London Luton Airport Direct Air-to-Rail Link | References | Doppelmayr Cable Car". www.dcc.at. Doppelmayr Group. December 2017. from the original on 24 March 2023. Retrieved 8 May 2023.
  4. ^ "Airport History". London Luton Airport. Archived from the original on 29 June 2007. Retrieved 16 July 2007.
  5. ^ "Luton Airport marks 80th birthday". BBC News. 16 July 2018. from the original on 19 October 2019. Retrieved 19 October 2019.
  6. ^ Beddall, David (30 October 2022). Luton's Transport: A Journey Through Time. Pen & Sword. p. 11. ISBN 978-1-5267-5561-2. Retrieved 22 June 2022.
  7. ^ Haywood, Russell (23 March 2016). Railways, Urban Development and Town Planning in Britain: 1948–2008. Routledge. p. 225. ISBN 978-1-317-07164-8. Retrieved 22 June 2022.
  8. ^ Shannon, Paul D. (30 November 2019). British Railway Infrastructure Since 1970: An Historical Overview. Pen & Sword. pp. 128–129. ISBN 978-1-5267-3480-8. Retrieved 22 June 2022.
  9. ^ David, Gareth (30 September 2017). Railway Renaissance: Britain's Railways After Beeching. Pen & Sword. p. 195. ISBN 978-1-4738-6202-9. Retrieved 22 June 2022.
  10. ^ . The Monitor. Archived from the original on 28 September 2007. Retrieved 17 July 2007.
  11. ^ "Luton Airport reveals plans for new direct rail service". Railway Technology. 21 July 2015. from the original on 12 August 2015. Retrieved 26 July 2015.
  12. ^ a b Topham, Gwyn (15 April 2016). "Luton airport to replace bus transfers with £200m light rail link". The Guardian. from the original on 15 April 2016. Retrieved 15 April 2016.
  13. ^ "Luton airport peoplemover plan announced". Railway Gazette International. 15 April 2016. from the original on 16 April 2016.
  14. ^ a b "Luton Airport Express". East Midlands Railway. from the original on 10 March 2023. Retrieved 10 March 2023.
  15. ^ "New railway connection to London Luton Airport approved". BBC News. 22 June 2017. from the original on 22 June 2017. Retrieved 11 September 2019.
  16. ^ . Metro Report International. Sutton: DVV Media Group. 6 July 2017. Archived from the original on 11 July 2017.
  17. ^ "Work begins on new £225 million rail link at Luton Airport". ITV News Anglia. 17 April 2018. from the original on 18 April 2018. Retrieved 11 September 2019.
  18. ^ "VolkerFitzpatrick-Kier jv wins £119m Luton airport rail link". Construction Enquirer. January 2018. from the original on 2 January 2018.
  19. ^ a b c Horgan, Rob (30 April 2021). "Luton Dart: Autonomous rail link between airport and station nears completion". New Civil Engineer. from the original on 31 March 2022. Retrieved 18 June 2022.
  20. ^ "Doppelmayr Cable Car to build Cable Liner in London" (Press release). 18 April 2018. from the original on 22 December 2018. Retrieved 22 December 2018.
  21. ^ "Luton Dart". Carvatech. from the original on 6 April 2023. Retrieved 8 September 2020.
  22. ^ Sketchley, Elisha (3 December 2019). "1,000 tonne Luton DART bridge opens". Planning, BIM & Construction Today. from the original on 5 April 2023. Retrieved 20 May 2020.
  23. ^ Patel, Holly (21 April 2020). . www.lutontoday.co.uk. Archived from the original on 25 April 2020. Retrieved 20 May 2020.
  24. ^ "DART train between London Luton Airport and St Pancras one step closer". ITV News. 20 February 2021. from the original on 20 February 2021. Retrieved 22 February 2021.
  25. ^ a b "Transforming Luton Airport Parkway". www.thameslinkrailway.com. Govia Thameslink Railway Ltd. from the original on 29 May 2022. Retrieved 24 June 2022.
  26. ^ Duncan, Euan (3 August 2021). "'Testing problems' with £225m Luton DART, meeting told". www.lutontoday.co.uk. from the original on 3 August 2021. Retrieved 29 June 2022.
  27. ^ "Luton DART". Luton Rising. London Luton airport Ltd. 6 September 2021. from the original on 18 June 2022. Retrieved 18 June 2022.
  28. ^ Horgan, Rob (5 October 2022). "Luton Airport's £260M autonomous light rail link delayed". New Civil Engineer. from the original on 5 October 2022. Retrieved 12 October 2022.
  29. ^ Duncan, Euan (4 October 2022). "£225million DART air to rail transport link for Luton Airport delayed until 2023". www.lutontoday.co.uk. from the original on 4 October 2022. Retrieved 12 October 2022.
  30. ^ "Luton airport shuttle used by King to open by Easter". BBC News. 5 January 2023. from the original on 5 January 2023. Retrieved 5 January 2023.
  31. ^ "Investigate airport shuttle delay, councillor says". BBC News. 24 January 2023. from the original on 24 January 2023. Retrieved 15 March 2023.
  32. ^ Hutchinson, Laura (6 December 2022). "In Pictures: King Charles rides Luton DART during visit to the town". Luton Today. from the original on 6 December 2022. Retrieved 8 December 2022.
  33. ^ "King Charles III boards delayed Luton DART airport shuttle". BBC News. 6 December 2022. from the original on 6 December 2022. Retrieved 8 December 2022.
  34. ^ Duncan, Euan (2 February 2023). "Luton DART: Passenger trials take place on £290m air-rail transit system". Luton Today. from the original on 3 February 2023.
  35. ^ a b "Luton DART will officially open on Monday - connecting Luton Airport to national rail services in under 4 minutes".
  36. ^ "Luton Airport's new £225m DART project will be run by a new subsidiary company". www.lutontoday.co.uk. 2 August 2022. from the original on 3 August 2022. Retrieved 24 August 2022.
  37. ^ "FAQs". Luton DART. Retrieved 10 May 2023.
  38. ^ Duncan, Euan (19 October 2022). "Fares for new Luton Airport DART transport system unveiled". bedfordshirelive. Retrieved 25 October 2022.
  39. ^ Preston, Olivia (6 March 2023). "Luton DART set to replace shuttle bus service by end of March". Luton Today. Retrieved 6 March 2023.
  40. ^ a b "Luton airport Dart rail shuttle finally set to open – at a price". The Independent. 9 March 2023. Retrieved 26 March 2023. East Midlands Railway, which will provide the Luton Airport Express service as part of its normal network from London via Luton to Bedford and Corby, says at least 25 per cent of Advance tickets between the capital and the airport will be sold at £10 one way or less – including the Dart portion of the journey. The full "walk-up" fare is £22.40 one way, which is comparable with the express rail links serving Heathrow, Gatwick and Stansted from central London.
  41. ^ "Luton Residents". Luton DART. Retrieved 9 May 2023.
  42. ^ "General Concessions". Luton DART. Retrieved 9 May 2023.
  43. ^ "Luton Dart: 'the most expensive train in Britain' opens for business". The Guardian. 3 March 2023.
  44. ^ Longhorn, Danny (19 April 2023). "East Midlands Railway launch Luton Airport Express". Rail Business Daily.
  45. ^ a b "Table C - Bedford, Luton and St Albans to London, Sutton, Medway Towns, Gatwick Airport and the South Coast". Thameslink. Retrieved 9 May 2023.
  46. ^ "Go to the airport with Thameslink". Thameslink. Retrieved 9 May 2023.
  47. ^ (PDF). London Luton Airport Ltd. October 2019. pp. 4, 26. Archived from the original (PDF) on 18 October 2019.
  48. ^ "Welcome to our expansion proposals". Luton Rising. 30 January 2022. from the original on 15 February 2022. Retrieved 21 June 2022.

External links edit

  • Official website
  • Video simulation: "Doppelmayr Cable Car: "DART Cable Liner" London Luton Airport, UK". YouTube. Doppelmayr Seilbahnen. 2018. Retrieved 22 December 2018.
  • Mid-construction drone footage: "Luton DART Fly Through". YouTube. Luton Council. January 2021. Retrieved 24 February 2021.

luton, dart, airport, rail, link, luton, bedfordshire, england, which, connects, luton, airport, parkway, station, luton, airport, using, cable, liner, automated, people, mover, system, dart, acronym, direct, rail, transit, line, which, opened, march, 2023, re. The Luton DART is an airport rail link in Luton Bedfordshire England which connects Luton Airport Parkway station and Luton Airport using a Cable Liner automated people mover system DART is an acronym for Direct Air Rail Transit The line which opened in March 2023 replaces the shuttle bus service with the aim of reducing road congestion and reducing journey times from London St Pancras to the airport terminal to 32 minutes Luton DARTA Luton DART train in operationOverviewOwnerLuton Borough CouncilTransit typeAutomated guided people mover light metro Number of lines1Number of stations2Annual ridership2 7 million 1 Websitewww wbr lutondart wbr comOperationBegan operation10 March 2023 2023 03 10 2 Number of vehicles2Headway225 seconds 3 TechnicalSystem length2 080 metres 1 29 miles 3 No of tracks2Top speed50 4 km h 31 3 mph 3 System mapLegend Midland main line Luton Airport Parkway A1081 London Luton Airport Depot Contents 1 History 1 1 Background 1 2 Construction 1 3 Opening 2 Operation 2 1 Route 2 2 Track and rolling stock 2 3 Fares and ticketing 2 4 Interchange 3 Future developments 4 References 5 External linksHistory editBackground edit From the 1950s and 1960s Luton Airport experienced an increase in business as a result of the growing package holiday market 4 5 Although the Midland Main Line passed within 1 mile 1 6 km of the airport there was no dedicated railway station and public transport connections to Luton Airport were limited A shuttle bus service operated from Luton railway station to convey rail passengers 2 miles 3 2 km from Luton town centre to the airport terminal 6 Luton Airport Parkway railway station opened in 1999 providing rail connections to central and south London Gatwick Airport and Brighton on the Thameslink route as well as services to the East Midlands Although the new station was closer to the airport 1 mile 1 6 km to the west it was still necessary to run a shuttle bus transfer service 7 8 9 The shuttle bus was considered to be unsatisfactory and proposals were developed to replace the bus service with a new rail link Several schemes were considered including a 2007 proposal to replace the shuttle buses with segregated tracked transit conveyors 10 and in 2015 a heavy rail spur link to the airport was also being considered 11 The steep incline from the airport approximately 40 metres 130 ft downhill to Luton Airport Parkway station presented engineering challenges to building any heavy rail link over the short distance to the airport terminal 12 In April 2016 London Luton Airport Ltd LLAL announced a scheme to create a light rail automated guided people mover connection between the airport and Luton Airport Parkway station 13 It was envisaged that the introduction of a light rail link would reduce the journey time between London St Pancras and the airport terminal to less than 30 minutes 12 At launch that figure is 32 minutes 14 Construction edit nbsp Luton Airport Parkway DART station under construction February 2020 The Luton DART link was approved by Luton Borough Council in June 2017 15 16 Construction work commenced in April 2018 contracted to a VolkerFitzpatrick Kier Group joint venture 17 18 The project involved construction of bridges over the A1081 road and tunnels along with two stations in phase 1 The first station was built at Bartlett Square in Napier Park on the east side of Luton Airport Parkway station and the final station at the airport 19 In 2018 it was announced that the system would be a Cable Liner manufactured by the Austrian transit manufacturer Doppelmayr Cable Car DCC who also have a contract to operate the system for the first five years 20 The vehicles were built by the Austrian cabin manufacturer Carvatech 21 In December 2019 a ready constructed 80 metre 260 ft long 1 000 tonne 980 long ton 1 100 short ton curved bridge was moved into place over the A1081 road on large jacks 22 Construction work on the line was halted briefly in April 2020 during the COVID 19 pandemic over concerns related to Coronavirus Health Protection Regulations but resumed after a safety assessment 23 The cable propulsion system was completed in February 2020 and work then began to install the people mover vehicles on the guide rails 24 A new light rail terminus building has been constructed next to the railway station 25 Testing of the transit vehicles began in 2021 In August of that year reports emerged of problems experienced with the traction or the pulley system during testing and that a DART vehicle had become derailed This was denied by LLAL 26 Opening edit nbsp Luton Airport station platform The system was originally scheduled to open in 2021 Following delays resulting from the COVID 19 pandemic the opening date was revised to late 2022 The planned opening was later delayed due to further technical testing and development of the ticketing system 27 28 29 30 A member of Luton Borough Council s overview and scrutiny board called for an independent investigation into Luton DART s two year delay and 90 million budget increase 31 On 6 December 2022 King Charles III visited the Luton DART during a royal visit to the town He unveiled a plaque commemorating his visit before travelling on the new transit system 32 33 Passenger trials began in February 2023 34 with a second batch of trials announced for March The service opened to all passengers for four hours per day on 10 March It subsequently opened for 24 hours per day on 27 March 2023 2 35 Operation edit nbsp Interior of DART shuttle train Luton DART is operated by a subsidiary company wholly owned by London Luton Airport Limited LLAL trading as Luton Rising It operates 24 hours a day with trains running every four minutes throughout the day and every eight to 15 minutes at other times The journey time is under four minutes 35 36 37 Route edit nbsp Map of the transit route The 2 1 km 1 3 mi DART line begins at Luton DART Parkway a purpose built station adjoining Luton Airport Parkway railway station which provides an interchange with East Midlands Railway and Thameslink passenger rail services The DART platforms are located on a new upper level above the current station and are connected to the main line rail platforms via a new footbridge and concourse complete with lifts and escalators The concourse includes separate barrier lines for main line rail and DART with an unpaid area in between 19 25 DART vehicles head southeastwards along a 350 metre 380 yard viaduct After crossing the A1081 road the vehicles curve eastwards along a 1 1 km 0 68 mile cutting and concrete trough before entering a 350 metre cut and cover tunnel under the airport apron The eastern airport terminus is located at a new subterranean station underneath the drop off area in front of the terminal building Access to a surface level concourse and barrier line is provided by escalators and lifts the airport terminal is a 150 metres 490 ft covered but outdoor walk from the station concourse 19 Track and rolling stock edit nbsp Aerial view of Luton Airport in February 2022 the Luton DART line crosses the picture from the mainline railway station in the bottom left terminating at the airport in the centre of the photo Luton DART is operated using Cable Liner automated people mover technology manufactured by Doppelmayr Cable Car The line uses the Cable Liner s Double Shuttle configuration with two unconnected tracks each with its own independent cable haulage system There are two four section articulated trains with one on each track Each train has a capacity of 170 passengers and operates at a maximum running speed of 50 4 km h 31 3 mph A four minute interval service requires the use of both trains whilst an eight minute interval can be maintained with a single train in service 3 Fares and ticketing edit The single fare for the DART is 4 90 and through tickets to Luton Airport are available from all stations on the National Rail Luton residents can register for half price travel and holders of concessionary travel passes disabled blue badge holders and airport workers can register for free travel Registration for both half price and free travel must be done online at least 72 hours before travel and tickets obtained online once registration is authorised passes are not accepted at the barriers 38 39 40 41 42 The 4 90 DART fare has been criticised as too expensive for the short journey at 3 95 per mile it is claimed by The Guardian to be the most expensive train in Britain by distance 43 East Midlands Railway states that through tickets to destinations across the UK will be available A walk up fare from the airport to London St Pancras will cost 22 40 one way which it says is similar in price to other airport rail links in the UK such as Heathrow Express though at least 25 per cent of Advance tickets will be sold at 10 one way or less 40 Interchange edit nbsp Luton Airport Parkway station concourse East Midlands Railway services between London St Pancras and Corby previously branded as EMR Connect were rebranded to Luton Airport Express following the opening of the DART 44 They run every 30 minutes and operate non stop between Luton Airport Parkway and London St Pancras with a journey time of 24 minutes To the north of the airport they also serve Luton Bedford Wellingborough and Kettering 14 45 Thameslink also provides service to Luton Airport Parkway with six trains an hour calling at the station in both directions during the day To the north trains run to Luton and Bedford and to the south they serve London St Pancras and continue to various destinations to the south of London including Brighton Gatwick Airport and Rainham The journey time to St Pancras varies between 40 and 50 minutes depending on the stopping pattern 45 46 Future developments editAs part of the proposals for the expansion of Luton Airport it is envisaged that the DART line would be extended eastwards to terminate at a new station serving Terminal 2 47 48 References edit Luton Dart welcomes 2 7m passengers in a year BBC News 31 March 2024 Retrieved 31 March 2024 a b Luton Dart airport shuttle welcomes first passengers BBC News 10 March 2023 Archived from the original on 28 March 2023 Retrieved 10 March 2023 a b c d London Luton Airport Direct Air to Rail Link References Doppelmayr Cable Car www dcc at Doppelmayr Group December 2017 Archived from the original on 24 March 2023 Retrieved 8 May 2023 Airport History London Luton Airport Archived from the original on 29 June 2007 Retrieved 16 July 2007 Luton Airport marks 80th birthday BBC News 16 July 2018 Archived from the original on 19 October 2019 Retrieved 19 October 2019 Beddall David 30 October 2022 Luton s Transport A Journey Through Time Pen amp Sword p 11 ISBN 978 1 5267 5561 2 Retrieved 22 June 2022 Haywood Russell 23 March 2016 Railways Urban Development and Town Planning in Britain 1948 2008 Routledge p 225 ISBN 978 1 317 07164 8 Retrieved 22 June 2022 Shannon Paul D 30 November 2019 British Railway Infrastructure Since 1970 An Historical Overview Pen amp Sword pp 128 129 ISBN 978 1 5267 3480 8 Retrieved 22 June 2022 David Gareth 30 September 2017 Railway Renaissance Britain s Railways After Beeching Pen amp Sword p 195 ISBN 978 1 4738 6202 9 Retrieved 22 June 2022 Blue Skies Easing the Pressure The Monitor Archived from the original on 28 September 2007 Retrieved 17 July 2007 Luton Airport reveals plans for new direct rail service Railway Technology 21 July 2015 Archived from the original on 12 August 2015 Retrieved 26 July 2015 a b Topham Gwyn 15 April 2016 Luton airport to replace bus transfers with 200m light rail link The Guardian Archived from the original on 15 April 2016 Retrieved 15 April 2016 Luton airport peoplemover plan announced Railway Gazette International 15 April 2016 Archived from the original on 16 April 2016 a b Luton Airport Express East Midlands Railway Archived from the original on 10 March 2023 Retrieved 10 March 2023 New railway connection to London Luton Airport approved BBC News 22 June 2017 Archived from the original on 22 June 2017 Retrieved 11 September 2019 London Luton Airport peoplemover approved Metro Report International Sutton DVV Media Group 6 July 2017 Archived from the original on 11 July 2017 Work begins on new 225 million rail link at Luton Airport ITV News Anglia 17 April 2018 Archived from the original on 18 April 2018 Retrieved 11 September 2019 VolkerFitzpatrick Kier jv wins 119m Luton airport rail link Construction Enquirer January 2018 Archived from the original on 2 January 2018 a b c Horgan Rob 30 April 2021 Luton Dart Autonomous rail link between airport and station nears completion New Civil Engineer Archived from the original on 31 March 2022 Retrieved 18 June 2022 Doppelmayr Cable Car to build Cable Liner in London Press release 18 April 2018 Archived from the original on 22 December 2018 Retrieved 22 December 2018 Luton Dart Carvatech Archived from the original on 6 April 2023 Retrieved 8 September 2020 Sketchley Elisha 3 December 2019 1 000 tonne Luton DART bridge opens Planning BIM amp Construction Today Archived from the original on 5 April 2023 Retrieved 20 May 2020 Patel Holly 21 April 2020 Work restarts on the Luton DART after review of how government s COVID 19 guidance was being implemented www lutontoday co uk Archived from the original on 25 April 2020 Retrieved 20 May 2020 DART train between London Luton Airport and St Pancras one step closer ITV News 20 February 2021 Archived from the original on 20 February 2021 Retrieved 22 February 2021 a b Transforming Luton Airport Parkway www thameslinkrailway com Govia Thameslink Railway Ltd Archived from the original on 29 May 2022 Retrieved 24 June 2022 Duncan Euan 3 August 2021 Testing problems with 225m Luton DART meeting told www lutontoday co uk Archived from the original on 3 August 2021 Retrieved 29 June 2022 Luton DART Luton Rising London Luton airport Ltd 6 September 2021 Archived from the original on 18 June 2022 Retrieved 18 June 2022 Horgan Rob 5 October 2022 Luton Airport s 260M autonomous light rail link delayed New Civil Engineer Archived from the original on 5 October 2022 Retrieved 12 October 2022 Duncan Euan 4 October 2022 225million DART air to rail transport link for Luton Airport delayed until 2023 www lutontoday co uk Archived from the original on 4 October 2022 Retrieved 12 October 2022 Luton airport shuttle used by King to open by Easter BBC News 5 January 2023 Archived from the original on 5 January 2023 Retrieved 5 January 2023 Investigate airport shuttle delay councillor says BBC News 24 January 2023 Archived from the original on 24 January 2023 Retrieved 15 March 2023 Hutchinson Laura 6 December 2022 In Pictures King Charles rides Luton DART during visit to the town Luton Today Archived from the original on 6 December 2022 Retrieved 8 December 2022 King Charles III boards delayed Luton DART airport shuttle BBC News 6 December 2022 Archived from the original on 6 December 2022 Retrieved 8 December 2022 Duncan Euan 2 February 2023 Luton DART Passenger trials take place on 290m air rail transit system Luton Today Archived from the original on 3 February 2023 a b Luton DART will officially open on Monday connecting Luton Airport to national rail services in under 4 minutes Luton Airport s new 225m DART project will be run by a new subsidiary company www lutontoday co uk 2 August 2022 Archived from the original on 3 August 2022 Retrieved 24 August 2022 FAQs Luton DART Retrieved 10 May 2023 Duncan Euan 19 October 2022 Fares for new Luton Airport DART transport system unveiled bedfordshirelive Retrieved 25 October 2022 Preston Olivia 6 March 2023 Luton DART set to replace shuttle bus service by end of March Luton Today Retrieved 6 March 2023 a b Luton airport Dart rail shuttle finally set to open at a price The Independent 9 March 2023 Retrieved 26 March 2023 East Midlands Railway which will provide the Luton Airport Express service as part of its normal network from London via Luton to Bedford and Corby says at least 25 per cent of Advance tickets between the capital and the airport will be sold at 10 one way or less including the Dart portion of the journey The full walk up fare is 22 40 one way which is comparable with the express rail links serving Heathrow Gatwick and Stansted from central London Luton Residents Luton DART Retrieved 9 May 2023 General Concessions Luton DART Retrieved 9 May 2023 Luton Dart the most expensive train in Britain opens for business The Guardian 3 March 2023 Longhorn Danny 19 April 2023 East Midlands Railway launch Luton Airport Express Rail Business Daily a b Table C Bedford Luton and St Albans to London Sutton Medway Towns Gatwick Airport and the South Coast Thameslink Retrieved 9 May 2023 Go to the airport with Thameslink Thameslink Retrieved 9 May 2023 Future LuToN Statutory Consultation 2019 PDF London Luton Airport Ltd October 2019 pp 4 26 Archived from the original PDF on 18 October 2019 Welcome to our expansion proposals Luton Rising 30 January 2022 Archived from the original on 15 February 2022 Retrieved 21 June 2022 External links edit nbsp Wikimedia Commons has media related to Luton DART Official website Video simulation Doppelmayr Cable Car DART Cable Liner London Luton Airport UK YouTube Doppelmayr Seilbahnen 2018 Retrieved 22 December 2018 Mid construction drone footage Luton DART Fly Through YouTube Luton Council January 2021 Retrieved 24 February 2021 Retrieved from https en wikipedia org w index php title Luton DART amp oldid 1216560425, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.