fbpx
Wikipedia

Wuhan–Shiyan high-speed railway

The Wuhan–Shiyan high-speed railway is a high-speed passenger-dedicated line (PDL) in Hubei, China. It opened on 29 November 2019, connecting the city of Wuhan with the major automotive manufacturing centre of Shiyan in the northwest of the province.[1]

Wuhan–Shiyan high-speed railway
Overview
StatusOperational
OwnerChina Railway
LocaleHubei province, China
Termini
Service
TypePassenger dedicated railway
Operator(s)China Railway Wuhan Group
History
Opened29 November 2019
Technical
Line length399 km (248 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Electrification50 Hz 25 kV(AC
Operating speed350 km/h (217 mph)

The 399 kilometres (248 mi) long railway has a design speed of 350 km/h (217 mph). The line starts from Hankou Station, a railhub with connections on:

The line runs northwest from Wuhan via Xiaogan to Xiangyang (where it intersects another new high-speed line running from Zhengzhou southwest to Wanzhou) to Shiyan.[2] The line from Hankou to Xiaogan incorporates an existing inter-city railway, the Wuhan–Xiaogan intercity railway, which continues to provide intercity services using mainly C-class trains.

The railway is part of the Wuhan to Xi’an railway, the connecting 300 km (190 mi) PDL from Shiyan to Xi’an is expected to be completed in 2023.[1]

The existing Wuhan–Xiaogan intercity railway has stations at:

  • Hankou
  • Houhu
  • Jinyintan
  • Panlongcheng (planned but not yet constructed)
  • Tianhe Airport
  • Tianhejie
  • Minji
  • Maochen
  • Huaiyin
  • Xiaogan Dong (East)

The new section of the railway runs from Xiaogan Dong (East) to Shiyan Dong (East) and has intermediate stations at:

  • Yunmeng Dong (East),
  • Anluxi,
  • Suizhou Nan (South),
  • Suixian,
  • Zaoyang,
  • Xiangyang Dong (East),
  • Guchen Bei (North),
  • Danjiangkou,
  • Wudangshan Xi (West),

These stations are served by mainly G-class trains, some of which also call at Tianhe Airport.

In December 2019 there were 11 trains per day in each direction along the line, the fastest time between the terminals is now 1 hour 57 minutes (for example trains G6817 and G6818) the slowest direct train on the line takes 2 hour and 57 minutes and stops at most stations (train G6816).[3]

See also edit

References edit

  1. ^ a b "Wuhan – Shiyan high speed line opens". Railway Gazette International. 29 November 2019. Retrieved 1 December 2019.
  2. ^ "Wuhan-Shiyan High Speed Railway Put into Operation on November 29". China Railway. 29 November 2019. Retrieved 20 December 2019.
  3. ^ "Shiyandong to Hankou Trains (十堰东 - 汉口)". Trip.com. Retrieved 19 December 2019. (To repeat search, change date to a day in the future)

wuhan, shiyan, high, speed, railway, high, speed, passenger, dedicated, line, hubei, china, opened, november, 2019, connecting, city, wuhan, with, major, automotive, manufacturing, centre, shiyan, northwest, province, overviewstatusoperationalownerchina, railw. The Wuhan Shiyan high speed railway is a high speed passenger dedicated line PDL in Hubei China It opened on 29 November 2019 connecting the city of Wuhan with the major automotive manufacturing centre of Shiyan in the northwest of the province 1 Wuhan Shiyan high speed railwayOverviewStatusOperationalOwnerChina RailwayLocaleHubei province ChinaTerminiHankouShiyan EastServiceTypePassenger dedicated railwayOperator s China Railway Wuhan GroupHistoryOpened29 November 2019TechnicalLine length399 km 248 mi Track gauge1 435 mm 4 ft 8 1 2 in Electrification50 Hz 25 kV AC Operating speed350 km h 217 mph vteWuhan Shiyan railwayLegendWuhan Shiyan railway and connectionsHefei Wuhan passenger railwayto HefeiMacheng Wuhanto MachengShijiazhuang Wuhan high speed railwayto ShijiazhuangHengdian Dong East Shijiazhuang Wuhan high speed railwayto WuhanMinji TianhejieHengdian Wuhan Bei North Maochen Tianhe AirportZhujiawan ShekouHuaiyin Panlongcheng planned Sanchabu DanshuichiXiaogan JinyintanXiaogan Dong East End of Wuhan Xiaogan intercity railwayBeijing Guangzhou railwayto Beijing HouhuStart of Wuhan Shiyan railway HankouBeijing Guangzhou railwayto GuangzhouXingdun both lines DuoluokouWujiashanXingou Wuhan Yichang railwayto YichangXiaxindianXiexindian Gepu railwayto ChangjiangbuXiexindian Gepu railwayto ChangjiangbuGepuYunmeng Dong East YunmengAnlu Anlu Xi West PinglinMapingSuizhou Suizhou Nan South Xiaolin Lishan railwayto XiaolinLishan SuixianTangxianzhenSuiyangdianXinglongjiZaoyangJuwanXiangzhou formerly Xiangyang Dong Xiangyang Dong East Jiaozuo Liuzhou railwayto LiuzhouXiangyang Bei North Jiaozuo Liuzhou railwayto YueshanMapengFreight only Haoji Railwayto Ji an Freight only Haoji Railwayto HaolebaojiChenjiahuLaohekou Dong East Hankou Danjiangkou railwayto DanjiangkouGuchen Bei North HuangkangGuchengDanjiangkou HuangjiayingWudangshan Xi West LangheWudangshanBailangShiyan Dong East ShiyanUnder ConstructionXiangyang Chongqing railwayto XinglongchangMixed traffic linesHigh speed line amp passenger dedicated linesFreight only linesThe 399 kilometres 248 mi long railway has a design speed of 350 km h 217 mph The line starts from Hankou Station a railhub with connections on Hefei Wuhan passenger railway Shijiazhuang Wuhan high speed railway Wuhan Yichang railway Beijing Guangzhou railway Xiexindian Gepu railway Macheng Wuhan railway and Hankou Danjiangkou railway The line runs northwest from Wuhan via Xiaogan to Xiangyang where it intersects another new high speed line running from Zhengzhou southwest to Wanzhou to Shiyan 2 The line from Hankou to Xiaogan incorporates an existing inter city railway the Wuhan Xiaogan intercity railway which continues to provide intercity services using mainly C class trains The railway is part of the Wuhan to Xi an railway the connecting 300 km 190 mi PDL from Shiyan to Xi an is expected to be completed in 2023 1 The existing Wuhan Xiaogan intercity railway has stations at Hankou Houhu Jinyintan Panlongcheng planned but not yet constructed Tianhe Airport Tianhejie Minji Maochen Huaiyin Xiaogan Dong East The new section of the railway runs from Xiaogan Dong East to Shiyan Dong East and has intermediate stations at Yunmeng Dong East Anluxi Suizhou Nan South Suixian Zaoyang Xiangyang Dong East Guchen Bei North Danjiangkou Wudangshan Xi West These stations are served by mainly G class trains some of which also call at Tianhe Airport In December 2019 there were 11 trains per day in each direction along the line the fastest time between the terminals is now 1 hour 57 minutes for example trains G6817 and G6818 the slowest direct train on the line takes 2 hour and 57 minutes and stops at most stations train G6816 3 See also editShanghai Wuhan Chengdu passenger railway Hankou Danjiangkou railwayReferences edit a b Wuhan Shiyan high speed line opens Railway Gazette International 29 November 2019 Retrieved 1 December 2019 Wuhan Shiyan High Speed Railway Put into Operation on November 29 China Railway 29 November 2019 Retrieved 20 December 2019 Shiyandong to Hankou Trains 十堰东 汉口 Trip com Retrieved 19 December 2019 To repeat search change date to a day in the future Retrieved from https en wikipedia org w index php title Wuhan Shiyan high speed railway amp oldid 1167257616, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.