fbpx
Wikipedia

Whistler Blackcomb

Whistler Blackcomb is a ski resort located in Whistler, British Columbia, Canada. By many measures it is the largest ski resort in North America and has the greatest uphill lift capacity. It features the Peak 2 Peak Gondola for moving between Whistler and Blackcomb mountains at the top. With all of this capacity, Whistler Blackcomb is also often the busiest ski resort, often surpassing 2 million visitors a year.

Whistler Blackcomb
Panorama of Whistler Blackcomb
LocationWhistler Mountain and Blackcomb Mountain
Nearest major cityVancouver
Coordinates50°06′30″N 122°56′33″W / 50.10833°N 122.94250°W / 50.10833; -122.94250
StatusOperating
OwnerVail Resorts
VerticalWhistler: 1,530 m (5,020 ft)
Blackcomb: 1,565 m (5,133 ft)
Top elevationWhistler: 2,182 m (7,160 ft)
Blackcomb: 2,436 m (7,992 ft)
Base elevationCreekside: 653 m (2,140 ft)
Village: 675 m (2,214 ft)
Skiable areaWhistler: 4,757 acres (1,925 ha)
Blackcomb: 3,414 acres (1,382 ha)
Runs200
35 – Easiest
110 – More Difficult
35 – Most Difficult
20 – Expert
Longest runPeak To Creek (Whistler), Green Road (Blackcomb): Both are 11 km (6.8 mi)
Lift system37 (Whistler 19)(Blackcomb 17)
5 gondolas
3 high-speed six-pack chairlifts
10 high-speed quad chairlifts
3 fixed grip chairlifts
15 surface lifts
Lift capacity69,939 skiers/hr[1]
  • Whistler: 36,148
  • Blackcomb: 33,791
Snowfall11.9m/year (467 in.)
SnowmakingWhistler: 325 acres
(131 hectares), 6.8%
Blackcomb: 382 acres
(154 hectares), 11.1%
WebsiteWhistler Blackcomb

Whistler was originally conceived as part of a bid to win the 1968 Winter Olympics. Although the bid failed, construction started anyway and the resort opened for the first time in January 1966. Blackcomb mountain, originally a separate entity, opened for business in December 1980. The two resorts underwent a period of intense rivalry through the 1980s and 90s, with constant upgrades and improvements that were unseen at other resorts. By the mid-1990s the area was repeatedly named the best resort in many skiing magazines. Intrawest, the BC real estate firm that developed Blackcomb, purchased Whistler in 1997 and fully merged their operations in 2003.

Whistler Blackcomb was the centrepiece of a renewed bid on the part of nearby Vancouver for the 2010 Winter Olympics, which they won in July 2003. Whistler Blackcomb hosted the alpine skiing events, including the men's and women's Olympic and Paralympic alpine skiing disciplines of downhill, Super-G, slalom, giant slalom and super combined. In contrast with Cypress Mountain – which hosted the freestyle skiing and all snowboard events, and was plagued with a lack of fresh, natural snow during the Olympics, leading to many complaints about hill quality – Whistler Blackcomb had the second-highest snowfall on record with 1,432 cm (over 14 metres) by the end of the 2009/10 season.[2]

Over the next decade, Intrawest expanded by purchasing additional ski resorts across North America, before expanding into golf and other resorts as well. Whistler Village, widely recognized for its livable design, formed the basis of similar Tyrolian-inspired developments at their expanding series of resorts, as well as other resorts that hired Intrawest to build similar developments on their behalf. In 2010 Intrawest sold off much of its 75% interest in Whistler Blackcomb Resort via a public share offering.

On August 8, 2016, American company Vail Resorts bought Whistler Blackcomb Holdings for C$1.39 billion. Nippon Cable's minority interest in Whistler Blackcomb resort has continued throughout the ownership changes, by way of ownership of a 25% interest of the Whistler and Blackcomb partnerships.

Description

The ski areas at Whistler and Blackcomb are situated on two ridge-lines running roughly northwest to southeast. The two are separated by a deep valley with Fitzsimmons Creek running along the valley floor. The main base area at Whistler Village is located on the northwest end of this valley, where Fitzsimmons Creek flows into the larger Green River, which forms a floodplain running north-south just to the west of the village area. The Sea-to-Sky Highway runs along the Green River valley. The ski runs generally run northwest towards the village area, or into the valley area between the two ridges. A small number of runs are located on the south side of the Whistler ridge, where they run to the Creekside Base area, some distance south of the main Whistler Village.

Whistler Mountain is the basis of the southern of the two ridges, on the right when looking at the Whistler-Blackcomb ski area from Whistler Village. It has a summit elevation of 2,184 meters (7,165 feet). The total vertical drop is 1,530 meters (5,020 feet) and 4,757 acres (1,925 ha) skiable inbound terrain. Whistler is served by a total of 19 lifts; 2 gondolas, 5 high-speed detachable quad chair lifts, 4 high-speed detachable sixpack chair lifts, 2 fixed grip triple chair lifts, 1 T-bar (called T-bars but parallel T-Bar was removed however towers and stations still mostly stand) and 7 carpet lifts. It also hosts the drive station for the Peak 2 Peak Gondola connecting it with Blackcomb mountain to the north. There are 4 on-hill restaurants, as well as a children's ski school. It is served by two base areas: Whistler Creek also known as creekside, the original base on its southwest flank, and Whistler Village on its northwest flank.

Blackcomb Mountain is the northern ridge, on the left when viewed from the village. It has a lift-serviced elevation of 2,240 metres (7,350 feet) at the top of the 7th Heaven chair – Blackcomb Mountain itself is higher at 2,440 meters (8,010 feet), but unlike Whistler, the peak is not lift-served. Blackcomb has a higher skiable vertical, at 1,565 meters (5,135 feet),[3] but less in-bound skiing area at 3,414 acres (1,382 ha). It is served by 15 lifts; 2 gondolas, 6 high-speed quads, 1 fixed-grip triple and 7 surface lifts (1 T-Bar and 5 carpet lifts), as well as the end-station for the Peak 2 Peak. Blackcomb is the location of the world-famous "Couloir Extreme" run, which is one of the top ten steep in-bound runs in the world, according to Skiing Magazine. Originally called the Saudan Couloir by local skiers even before it was part of the ski area, the company eventually had to drop the name when extreme skier Sylvain Saudan complained about the unauthorised use of his name.

The two previously separate ski areas of Whistler and Blackcomb were integrated into one operation in 1997[4] after Intrawest merged with Whistler Mountain Ski Corporation. Ticketing, pass, and access control systems for the two ski areas were fully integrated in 2003. Together, Whistler and Blackcomb form the largest ski area in North America at 8,171 acres (33 km2). Either mountain alone would be in the top-five in terms of size.

The mountains are accessed via four gondolas and one high-speed quad: Blackcomb Excalibur Gondola, Whistler Mountain Village Gondola, and Fitzsimmons Express in the village; the Blackcomb Gondola in Blackcomb Base/Upper Village; and the Whistler Creekside Gondola to the south in the Creekside area. The primary skiing terrain starts about one-third up the mountains. Ski-outs to the valley are usually possible during the months of December through April. The mid- and upper- areas are serviced by 10 high-speed detachable chairs and 5 fixed-grip lifts made by Lift Engineering, Doppelmayr and Poma. Two T-bars service the Horstman Glacier and the Whistler alpine regions and take skiers to the entrance to Blackcomb Glacier. The overall lift capacity, 65,507 skiers per hour, is the greatest in North America.

Before 2008 the only connection between the two mountains was via the village. The opening of the Peak 2 Peak Gondola on 12 December 2008 connected the two mountains at approximately 1,800 m (5,900 ft).[5] The lift has a total length of 4.4 km (2.7 mi) and the longest unsupported span for a lift of its kind in the world at 3.02 km (1.88 mi) while also having the highest ground clearance for a lift of its kind, 436 m (1,430 ft) above the valley floor.[6]

Whistler Village, which is part of the Resort Municipality of Whistler, a geo-political entity not directly associated with the resort company's operation, is situated at the base of the Whistler Mountain Village Gondola and Blackcomb Excalibur Gondola. The village incorporates community services, shops, entertainment venues, restaurants, bars, hotels, condominiums and vacation properties. The village is 675 m (2,215 ft) above sea level, and is located 137 km (85 mi) from Vancouver International Airport.

History

Early visitors

The valley area between Whistler and Blackcomb was first surveyed and documented in 1858 by Hudson's Bay men looking for an alternate route into the Cariboo area further north. Although little-used at the time, the route would later become one of the many paths used during the Gold Rush at the turn of the century. Known as the Pemberton Trail, the route followed a path similar to the Sea-to-Sky Highway, leading past the Whistler area to the present day town of Pemberton. In the 1860s British Naval surveyors named the mountain "London Mountain," but it soon garnered the nickname "Whistler" because of the shrill whistle made by the Western Hoary Marmots who lived among the rocks. Four lakes paralleled the route of Trail, the highest then being known as Summit Lake. However, there was another Summit Lake in BC, and in 1910 the name was changed to its current form, Alta Lake.[7]

One of the first permanent residents in the Alta Lake area was trapper John Millar, who set up a cabin next to the trail just south of the base of the mountain. During a trip to sell furs in Vancouver in 1911, Millar stopped at the Horseshoe Bar & Grill for dinner. The cook was Alex Philip from Maine, and Millar invited Philip to join him for dinner. Millar was a storyteller, and during the conversations that followed, he invited Philip to visit the Alta area. Alex and his wife Myrtle visited what was then known as Summit Lake several times over the next few years, and in 1913 they purchased 10 acres (40,000 m2) of land on the northwest corner of Alta Lake for $700.[7]

Rainbow Lodge and other early resorts

By 1914, the Philip's Rainbow Lodge fishing resort was completed with four bedrooms, a large living/dining area and a kitchen. The resort was named for the Rainbow trout that were the main attraction of the resort.[7] That same year, the Pacific Great Eastern Railway (PGE) reached the lake, from Squamish. Executives of the PGE suggested the Lodge host fishermen from Vancouver, which was now less than two days away (from three or more) via steamship to Squamish and then the PGE to Alta Lake. A standard rate of $2 for a week was applied, and the very first group arrived with 25 people. The resort was a hit.[7] Millar left when the railway arrived, looking to get further away from civilization.

Building followed demand, and over time the lodge grew to include an additional 45 buildings (cabins, tennis courts, general store, post office) and could accommodate 100 people. It became the most popular west coast resort for 30 years.[7][8] The Philips operated the Lodge until 1948 when they sold it to Alec and Audrey Greenwood. The main Lodge burnt down in 1977, but today the area has been preserved as Rainbow Park. The Philips both remained in the valley until their deaths. Alex died in 1968 at the age of 86, and Myrtle died in 1986 at the age of 95.[7]

Following the successful launch of Rainbow Lodge, several other tourist resorts set up in the valley. Russell Anderson Jordan opened the Alta Lake Hotel which burned down in 1930, and replaced it with Jordan's Lodge on nearby Nita Lake. Bert and Agnes Harrop built Harrop's Point in the 1920s. This became the Cypress Lodge in 1945 under its then-owner Dick Fairhurst, who built new cabins and a main lodge in the early 1960s. In 1972 the property was purchased by the Canadian Youth Hostel Association and it remained the Whistler Hostel until it was closed in 2010 when the association (now Hosteling International) opened a new, larger hostel. The original building is still standing today, home to the point artists centre and the Whistler sailing club. Cecilia and John Mansell moved to Alta Lake in 1945 and built the Hillcrest Lodge near today's Lakeside Park on Alta Lake. They sold it in 1965 to the Mason Family and others who operated it as Mount Whistler Lodge for skiers. The main lodge was burnt in a fire practice by the fire department in 1986.[7]

There was some commercial use of the London Mountain area as well. Logging had been carried out for some time, but the arrival of the railway in 1914 made this much more profitable and for several years there were a few sizable mills and lumber operations: The Barrs at Parkhurst Mill on Green Lake (to the north), and the Gebharts with the Rainbow Lumber Company on Alta Lake. The fur trade remained for some time, later supplanted by a mink and marten farm. Jimmy Fitzsimmons ran a prospecting support company, which led to mining surveys up Fitzsimmons Valley. The shafts can still be found on the Singing Pass trail.[7]

Olympic dreams

In 1960 the Canadian Olympic Association visited the west coast looking for potential sites for a future 1968 Winter Olympics. They initially looked at a site on Diamond Head[9] just north of Squamish, which was already developed to the extent of a single chairlift. However, they concluded that the area simply couldn't be developed properly, "it just wasn't the right terrain for a world-class resort."[7] Franz Wilhelmsen, a local businessman who had married into the Seagram family, had already come to the same conclusions when he had been scouting areas for a new ski resort. He met with the COA and convinced them to look further north in the London Mountain area, "And they were impressed."[7]

Encouraged by their positive reviews, Wilhelmsen organized the Garibaldi Olympic Development Association (GODA) to make a formal bid. At this time there was no road, no electricity, and no piped water or sewer in Alta Lake. Their bid for the Olympics was unsurprisingly rejected, and the Canadian bid was given to Calgary, who came in a close second place to Grenoble. Undaunted, Wilhelmsen decided to press ahead with development of a resort.[7]

In 1962 the Garibaldi Lifts Limited was formed with Franz Wilhelmsen as President. It had two main objectives, to finance and supervise required land/business studies, and to erect and operate ski lifts on London Mountain. The company had little experience in ski operations, so they hired Willy Schaeffler, a well known developer, to help them. Schaeffler proved as enthusiastic about London Mountain as COA and GODA had been. Schaeffler returned and wrote a good feasibility study about the Alta area, which had no mining claims.[7]

From 1962 to 1965 Garibaldi Lifts raised funds and began development of the ski area on the south side of the mountain. The government agreed that they would set aside a 56-acre (230,000 m2) plot at the base of the mountain for Garibaldi Lifts to buy, and agreed to bring the highway to the base of the mountain if they could raise enough money. By 1965 they had reached their goal of raising $800,000 and started planning for development. However, they were not happy with the name, and on August 27, 1965 London Mountain officially became Whistler Mountain.[7]

By 1965 the Provincial Government had completed a narrow gravel road from Vancouver. Electricity arrived the same year with the installation of a substation along the lines from Bridge River. Everything was in place, and the Alta area became a hive of development.[7] GODA made a bid for the 1972 Winter Olympics, but Banff won again and eventually lost to Japan.[7]

Whistler opens

By the fall of 1965 the ski area featured a four-person gondola to the mountain's mid-station, a double chairlift to the alpine tree line (the Red Chair), and two T-bars, all provided by GMD Mueller. In addition, a day lodge was constructed and six ski runs cut into the hill. Whistler officially opened for skiing for the first time on January 15, 1966. The new mountain won instant acclaim for its vertical drop, good snow conditions, and huge alpine area. The only problem at the time was the road, it was a dirt logging track, which was only plowed on Saturday, to the detriment of Friday travelers.[7]

With real infrastructure in place, in 1968 GODA made another bid for the 1976 Winter Olympics, and this time the joint Vancouver/Garibaldi won the Canadian nomination. However, in 1970 when Montreal won the voting for the 1976 Summer Olympics, Vancouver/Garibaldi was removed from further consideration and the games eventually went to Denver, Colorado. In a stunning turn of events, Denver turned down the games after winning the bidding.[10] The games were then offered to the other North American entry, Vancouver/Garibaldi, but political turmoil due to the recent change in government led to their bid being withdrawn as well, and in desperation the IOC returned the games to Innsbruck for a second time in a row.[11]

The gravel road was paved to Whistler in 1966, and on to Pemberton in 1969. The Blue and Green chairlifts were added in 1970, providing access to additional terrain. In 1972 these were joined by the Olive and Orange chairlifts. A parallel lift to the Green Chair to alleviate crowds came in 1974, and the Little Red Chair came in 1978. The Roundhouse, an on-mountain lodge and restaurant, was completed in 1980. This new lodge provided respite for cold skiers who had survived the long ride up on the Red Chair.

Whistler Village

In 1974 the provincial New Democratic Party of British Columbia was interested in developing tourism and took a number of steps affecting Whistler. At the time, the Alta Lake area was overdeveloped, so the government instituted a development freeze while they studied the problem. The only solution was to continue development in another location. They quickly decided to focus on the table between Whistler and Blackcomb, about 4 km to the north of the existing facilities on Alta Lake. At that time this was the site of the Alta Lake dump, and the remains of a Volkswagen Van are still buried under the modern village.[7]

In 1975 the Resort Municipality of Whistler (RMOW) was formed, the first Resort Municipality in Canada and also the first place in British Columbia since Canadian prohibition where bars were allowed to be open on Sunday. The act also created the Whistler Village Land Company who would oversee all development of the new Whistler Village. In 1977 the provincial government named Al Raine the Provincial Ski Area Co-ordinator, in charge of expanding BC's skiing capabilities. Raine was previously National Coach for the Canadian Women's Ski Team, and was married to famous Canadian skier Nancy Greene. Raine saw the potential in developing Blackcomb Mountain, then part of the Garibaldi Provincial Park, and joined the Whistler city council. The Blackcomb area was currently zoned for logging, but Raine and Greene successfully lobbied the government to remove the zoning and allow development as a ski area.[7]

In 1977 the Municipality hired Sutcliffe Griggs Moodie Development Consultants to design a layout for Whistler Village's development. However, their design was considered too conventional and allowed too much car traffic. Raine recommended Eldon Beck, who had been the primary designer at Vail, celebrated for its layout. Beck's designs included a pedestrian Main Street Village Stroll and an elevated covered walkway system, limiting all vehicles to the outside of the developed area. To this day the village retains this basic design in spite of dramatic expansions, and has won worldwide acclaim in architecture circles.[7]

In January 1978, 53 acres (210,000 m2) of crown land were given to the Whistler municipality to develop the town centre. The first sod for the village was turned on August 18, 1978 by first Mayor Pat Carleton. By 1979 many amenities were in place, including Municipal Hall, Fire Hall, Health Care Centre, and Elementary School. Phase 1 expansion included 11 parcels in the modern Village Square area, including the Whistler Conference Centre, a variety of hotels, restaurants, grocery store, hardware store, etc. An enormous underground garage was built to support all of the buildings in the area, completed before any construction could start above it.[7] The first hotel, the Blackcomb Lodge, anchors the Village Square area to this day.

Blackcomb opens

 
Blackcomb Mountain logo, 1980–1985. The green leaf represents Aspen's ownership. The red and black skis were common to early marketing.

In 1978 a call for bids was issued to develop Blackcomb for skiing. The bidding to develop Blackcomb was contested by two companies, the Aspen Skiing Company, and the newly formed Blackcomb Skiing Enterprises (BSE).[7] Aspen, having recently developed the Fortress Mountain Resort in Alberta, won the contest. A new company, Fortress Mountain Resorts, was formed with a 50–50 partnership between Aspen and the Business Development Bank of Canada. The new competition, paid for partially by tax dollars, was not initially appreciated by Whistler.

Initial development of the mountain included four triple chairlifts (later named Cruiser, Stoker, Catskinner and Fitzsimmons) and one double chairlift, all supplied by Lift Engineering (Yan Lifts). The double chair was installed on the lower Gear Jammer run where the tube park is located today and was used as a beginner chair at a reduced speed. This area was also the first area to get permanent underground snow making pipes supplying snow making guns up the south side of the run. At the time the lifts were referred to only by number.

Blackcomb opened for skiing on December 6, 1980,[8] along with the newly constructed village. To ensure guests could continue to easily access Whistler from the new village, three triple chairlifts were added to Whistler for the same season; the Village, Olympic, and Black Chairs which met up with the top of the Orange chair at the top of the men's downhill course. Whistler's original base at Alta Lake began to be referred to as Whistler Creek, or Creekside, after the creek that runs through the area.

Competition and buildout

Throughout the 1980s the two ski areas competed strongly for ticket sales among the village visitors, which led to a rapid buildout of new lifts that opened new areas and improved ride times.

In 1982, "Chair 6" (later rebranded Jersey Cream) opened in the Horstman Creek drainage on Blackcomb. Whistler cut new trails along the northern flank of the mountain. In 1983 Blackcomb acquired a used T-Bar from Fortress Mountain and installed it on a south-facing slope, in full view of Whistler Mountain. This 7th lift was coined the Seventh Heaven T-Bar and gave access to high alpine and glaciated terrain. It also gave Blackcomb the highest lift-serviced vertical drop of any ski area in North America, with the top of the lift at 7,494 feet (2,284 m). Blackcomb promoted themselves as the "Mile High Mountain".

Whistler responded in 1986 with the opening of the Peak Chair to the summit of Whistler Mountain at 7,160 feet (2,180 m), acquiring a Poma triple chairlift from the closed Pikes Peak ski area in Colorado. Although not as high as Seventh Heaven, this lift opened up Whistler Mountain's alpine terrain, and allowed access to the Harmony Bowl area. The new terrain made Whistler the largest alpine ski area in North America.[8]

Skiers could buy a Blackcomb pass, a Whistler pass, or a Dual Mountain pass. Locals loved when tourists would ask "Where is Dual Mountain?"[7]

Intrawest buys Blackcomb

 
Blackcomb Mountain, as seen looking north from Whistler Mountain. The trails served by Seventh Heaven are seen face-on just right of mid-frame, the upper half of these trails are not obvious in the large "bowl" along the top of the peak. The majority of Blackcomb's trails run down the slope to the left, and are not easily visible in this picture.

In 1986, Blackcomb's assets and real estate rights were bought by fledgling real estate developer Intrawest. Intrawest was an early developer of timeshare listings, and saw the potential in developing the ski resort with condominium assets as a timeshare destination.[12]

Intrawest immediately carried out massive upgrades on Blackcomb. They started by moving the Seventh Heaven T-Bar across the ridge to the Horstman Glacier, still running up to the peak, and supplemented it with the Showcase T-Bar to service Blackcomb Glacier. Doppelmayr replaced Seventh Heaven in its original alignment with a high-speed quad chairlift, and built two additional high-speed quads, the Wizard and Solar Coaster lifts, which cut the ride time from the base area to Rendezvous from 45 minutes to 15. The Rendezvous Restaurant was redubbed Base 2 and the moniker moved to the restaurant at the top of the Solar Coaster lift.

Renewed competition

In response to Blackcomb Mountain's construction of three high-speed quads, Whistler Mountain undertook one of the biggest ski-lift construction projects ever realized in Canada at the time, the construction of the Whistler Express Gondola. Carrying passengers 1,157 m (3,796 ft) vertically and 5 km (3.1 mi) horizontally over 63 support towers, the lift opened on November 24, 1988. In 1990 Whistler began upgrading its aging fleet of fixed grip chairlifts with the addition of its first high-speed quad chairlift. The Green Chair Express, which replaced the two Green Chairs, was built by Lift Engineering (Yan), and substantially cut long lift queues in the Green area of the mountain. A year later, Whistler Mountain replaced three double chairlifts and the original Creekside gondola with two high-speed quad chairlifts, the Quicksilver Express and Redline Express lifts, also built by Lift Engineering. In 1994, the Blue Chair was removed and replaced with a Poma high speed quad named the Harmony Express, providing access to Little Whistler Peak.

In 1994, Blackcomb made what would be its last major lift expansion until 2018 with the replacement of the lower mountain triple chairlifts. Stoker was replaced with a high speed quad in a longer alignment known as the Excelerator Express, while Fitzsimmons and Cruiser were replaced with the Excalibur Gondola. The second is dubbed by some as the "gondola to nowhere" since it does not connect with any restaurant or access additional terrain. However, it allowed rapid access to Blackcomb for Whistler Village traffic, who previously had to take three or four chairlifts to Rendezvous (Fitzsimmons, Stoker, Cruiser, and Jersey Cream, with 3 of those being slower chairs; or Fitzsimmons, Wizard and Solar Coaster). The Excelerator also opened up a vast area of intermediate-difficulty terrain to the left of Solar Coaster and below Jersey Cream that was previously neglected and under-utilized, because skiers who traveled those slopes frequently had to go all the way to the bottom of the mountain, which was over-skied and icy.

This competition had driven development of the two mountains at a rate no other resorts could come close to matching. In 1992, Snow Country Magazine voted Whistler the Number One Ski Resort in North America. Similar No. 1 rankings quickly followed from other major magazines, and between 1992 and 2000 it won No. 1 ranking from one of the major magazines every year. In 1996, it became the only resort in history to be simultaneously named No. 1 by Snow Country, SKI and Skiing magazines.[8]

Intrawest buys Whistler

 
Whistler Mountain, as seen looking south from Blackcomb Mountain. The original Whistler area starts mid-frame and extends down and to the right. Whistler Peak is just to the right of the fold. To the left of the peak is the Harmony Bowl area, Little Whistler Peak, and then the recently opened Symphony Bowl. The Black Tusk can be seen in the distance between Whistler Peak and Little Whistler.

In 1997, the Whistler Mountain Ski Corporation was also bought out by Intrawest.[8]

Like their expansion on Blackcomb, Intrawest immediately started a major build-out on Whistler. The Quicksilver lift was replaced with a Poma gondola, the Creekside Gondola, while the Green Chair Express and Redline lifts were removed and replaced with Doppelmayr high-speed quad chair lifts, aptly named the Emerald Express and Big Red Express lifts. The original Roundhouse was demolished and a new lodge built in its place. Around this time Intrawest began marketing the two mountains as one large ski area under the name "Whistler-Blackcomb". On April 20, 1999, Whistler Blackcomb became the first North American ski resort to top 2 million skier visits in one season.

1998 saw the replacement of the Peak Chair with a high-speed quad. The original Peak Chair was renamed Franz's Chair and moved parallel to Big Red with a return station approximately halfway up Big Red's lift line. Franz's runs primarily in early and late season, when lower altitudes are not well covered. The Black Chair was replaced with a high-speed quad, the Garbanzo Express. The Fitzsimmons Express was added in 2000, following the line of the long-gone Village Chair and roughly paralleling the lower part of the gondola. The top of Fitzsimmons and the bottom of Garbanzo are co-located in the Village Gondola Olympic station area, providing extra lift capacity from the Whistler Village to the top of the mid-mountain zone in addition to the gondola itself. It is the second lift with the Fitszimmons name, the original lift being a triple chairlift replaced by Stage 1 of the Excalibur Gondola in 1994.

Starting in 2000, Intrawest started redeveloping the Creekside area with new village layout. Throughout, Intrawest also extensively developed the summertime attractions, notably golf and mountain biking. Today, Whistler Blackcomb averages 2 million visitors during the ski season, but another 2.5 during the summer.[7]

Whistler Blackcomb's 2006/2007 season saw Doppelmayr construct the Symphony Express, a high speed quad that begins towards the bottom of the Symphony Amphitheater and carries riders to the top of Piccolo.[13] One of the original names suggested for this lift was Piccolo Express.[14]

A more ambitious upgrade was the Peak 2 Peak Gondola, opened to provide a direct connection between the Roundhouse on Whistler and Rendezvous on Blackcomb. Peak-to-Peak opened for the first time on December 12, 2008, but low snowfall meant it was rockbound at the time. The first summer operation day was June 6, 2009.

Renewed Olympic bid

 
A statue of Ilanaaq, mascot of the 2010 Olympics, located at the top of the Whistler Village Gondola on Whistler Mountain

As Whistler Blackcomb continued to win awards – eight consecutive by 2000 – the resort formed the basis of a renewed Olympics bid, this time for the 2010 Winter Olympics. Calgary also bid for the Canadian entry, as their equipment from the 1988 Winter Olympics was already in place and allowed them to offer a low-cost bid, as did Quebec City, which lost the 2002 bid. Calgary was eliminated in close voting on November 21, 1998, and Vancouver-Whistler won the second round of voting on December 3. In IOC voting Pyeongchang, South Korea won the initial round, which eliminated Salzburg, but in the second round on July 2, 2003, they won every one of Salzburg's supporters and bested Pyeongchang 56-53.

Reorganization

In 2006 Intrawest was purchased by the alternative asset management firm, Fortress Investment Group. Three weeks before the opening of the 2010 Olympics, Fortress failed to make payment on its loan used to buy out Intrawest. This caused its creditors to force Intrawest to divest itself of several of its resort holdings in 2009 and 2010 which included a partial sale of Whistler Blackcomb, in order to reduce its debt load.[15] This was achieved through a public offering of shares of Whistler Blackcomb Holdings Inc on the Toronto Stock Exchange in 2010. The net outcome of the reorganization is that Whistler Blackcomb Holdings is the managing partner and controls 75% of the partnerships which own the assets of Whistler Blackcomb. The remaining 25% of the partnerships are owned by Nippon Cable. Intrawest sold its remaining 24% stake in Whistler Blackcomb to KSL Capital Partners in 2012.[16]

2010 Olympic Games

For the 2010 Winter Olympics, Whistler hosted the alpine skiing events. The men's skiing took place on the Dave Murray Downhill course, while women's skiing took place on a new course, which started on Wild Card, cut across Jimmy's Joker to Franz's Run and connected at the bottom of the Dave Murray Downhill. In order to serve the spectators and judges who needed to travel only to the timing area a short distance above the Creekside base, a temporary high-speed quad was built by Doppelmayr, known as the Timing Flats Express, in the Creekside base. This alleviated demand on the main gondola and other lifts that serve the starting areas, much higher up the mountain. After the Olympics, it was dismantled and sold to Sunshine Village, Alberta and replaced the Strawberry chair.

In preparation for the Games, Google Maps launched a Google Maps Street View partnership with Whistler to map out the various Olympic venues and many of the ski runs there. The imagery was taken with cameras mounted on the back of snowmobiles and included panoramas from the Dave Murray Downhill run to the peak of Whistler and to the top of 7th Heaven.[17][18]

Blackcomb hosted the bobsled, luge and skeleton events at The Whistler Sliding Centre. Whistler Olympic Park hosted Olympic and Paralympic biathlon, cross-country skiing, Nordic combined and ski jumping, some distance to the south of the Creekside area in the Callaghan Valley.

The British Columbia government paid $600 million for major upgrades to the Sea-to-Sky Highway,[19] which carried the majority of visitors to the alpine sites.

Notable accomplishments for Whistler athletes in the 2010 Olympic Games: Ashleigh McIvor won the first gold ever in Ski Cross, an inaugural Olympic event; Maëlle Ricker won gold in Snowboard Cross; Siblings Mike and Britt Janyk competed in alpine skiing events on the mountain they grew up skiing; Ski cross athlete Julia Murray, daughter of Dave Murray, competed in her first of likely many Olympic Games.

2010s

Summer 2010 had two lift construction projects at Creekside Base. The Timing Flats Express, used for passenger transport for the games, was removed and rebuilt as the Strawberry Express at Sunshine Village, Alberta, Canada. The second project was the construction of the Kadenwood Gondola, providing access to the Kadenwood Estate Homes from the Creekside base. Built by Doppelmayr-CTEC, it is a pulse gondola with 8 passenger cabins in two groups of 2.

Whistler Blackcomb announced plans on January 18, 2013 regarding plans for two high-speed detachable chairlift installations for the 2013–2014 Season.[20] Ultimately, Doppelmayr constructed a new high speed six pack to replace the Harmony Express lift, upgrading its capacity from 2,400 to 3,600 persons per hour. The lift was installed ahead of the 2013–2014 winter season in the same location as the existing quad lift. Leitner-Poma reinstalled the original Harmony Express equipment in the Crystal Ridge zone of Blackcomb as the Crystal Ridge Express lift, replacing the shorter and slower Crystal triple chair lift. While the Crystal Ridge Express ends at the same location as that of the removed triple at Crystal Hut, it starts lower down the mountain just below the Blackcomb Glacier Road near the base of Rock n' Roll. The lift line for this lift had been cut many years prior in anticipation of construction, and allows for the runs in this area to be lapped without needing to return to the Excelerator Express.

In 2014, new 8 person cabins were bought to upgrade the Village Gondola, the existing cabins having been in service since 1988. Sigma, a subsidiary of Leitner-Poma who originally installed the lift, were contracted to produce the new cabins.[21]

In May 2015, Whistler Blackcomb announced that both mountains would be declared smoke-free environments, President and CEO Dave Brownlie was quoted as saying "We have made the decision...to preserve the pristine alpine environment our guests come here for,". He continued to highlight a need for a safer workplace for employees and experience for guests, "We also recognize as a leader in the outdoor adventure and wellness industry and as the largest employer in the Whistler community, we have a responsibility to our guests and staff to provide a safe and healthy environment for work and play. We believe implementing this new policy aligns with this goal."[22]

In April 2016, a $345-million three-phase development plan, named 'Renaissance,' was announced by the mountain, described as the "largest and most exciting investment in the Company's history." On-mountain improvements to skiing and snowboard activities includes a replacement of the Magic Chair with a new high-speed lift and the addition of night skiing in the same area during phase one. Additionally, during phase two and three the Franz, Catskinner, and Olympic chairs will be replaced with new high-speed lifts, a new gondola will be constructed from Creekside Base on Whistler Mountain, two new chairlifts will be added in Bagel and Khyber Bowls, and two new high-speed lifts will replace Wizard and Solar Coaster.[23] The Renaissance developments reflect many of the proposals included in the resort master plan updated at the end of 2013.[24][25][26]

Additional projects part of Renaissance include a 163,000-square-foot water park with water slides, a mountain roller coaster, a suspension bridge atop Whistler Mountain's peak, expansion of Whistler Mountain Bike Park, new parking facilities and housing developments, a new 'Blackcomb Grind' hiking trail, and a revitalization of Blackcomb's base.[27] The start of this project will be subject to government approval and the renegotiation of the Company's master development agreements and negotiation of a proposed business partnership with local First Nations. Once approval is granted, Phase One projects and expansions will take two years to construct.[28]

On August 8, 2016, it was announced that Whistler Blackcomb Holdings, which owned 75% of the Whistler and Blackcomb partnerships, would be sold to Vail Resorts of Colorado for C$1.4 billion, which also saw the addition of the resort to the Epic Pass.[29]

For 2018, Doppelmayr carried out two major lift projects. On Blackcomb, a new two-stage ten passenger gondola replaced the Wizard Express and Solar Coaster chairlifts, with a midway turn station where the predecessor quads met. Like the Whistler Village and Excalibur Gondolas, it was built so that the two segments can be operated as one continuous lift or as two separate lifts. While this happened, the Emerald Express on Whistler was replaced with a high-speed six pack, and similar to Harmony five years earlier, the original lift was relocated to Blackcomb where it replaced the Catskinner lift. The Catskinner Express runs on a modified alignment compared to its predecessor, starting below the Magic Castle whereas the triple started at the base of the Nintendo Terrain Park.[30]

2020s

Due to the COVID-19 pandemic, Whistler was forced to close for the remainder of the ski season. Vail gave refunds to anyone who booked a trip during the closing time.[31] However, the 2020-2021 season was in operation. To comply with provincial safety protocols, all guests must wear a mask when skiing, in gondolas or in lift lineups and social distancing in crowded spaces to reduce transmission of the disease.[32]Except for a brief closure in March 2021,[33] operations remained like this for the rest of the season. The 2021-2022 season saw similar rules in the resort.[34]

In 2020, the Horstman T-bar was closed down and dismantled as the glacier it was built on receded. However, glacier skiing is still an activity during the summer, only in the upper regions with the Showcase T-bar.[35]

For the 2022-2023 winter season as part of Vail's Epic Lift Upgrade project, Doppelmayr replaced the Creekside Gondola and the Big Red Express, upgrading them to a ten passenger gondola and a high speed six pack chair respectively. The new Creekside Gondola increased its lift capacity by 35% and the new Big Red Express increased its lift capacity by 30%. In May 2022, the old cabins and chairs of the two lifts were put on sale and were sold for charity.[36] Since the Creekside Gondola is also a mountain biking lift in the summer, during construction, bikers were allowed to bring their bikes in the Whistler Village Gondola cabins and the Garbanzo Express lift opened earlier. However, due to shipping delays, the Creekside Gondola and Big Red Express were only completed until December 2022. From the start of the 2022-2023 winter season before the opening of the two new lifts, shuttle buses transported guests from the Creekside area to the main village.[37][38][39][40]

Major Events

Major Lifts

Winter Lifts

Lift Name Length Vertical Type Ride Time Hourly
Capacity
Mountain Make Year
Peak 2 Peak Gondola 4,400 m 36 m 3S Gondola 11 min 4,200 Doppelmayr 2008
Blackcomb Gondola 4,100 m 1,180 m 10 Person Gondola 13 min 4,000 Blackcomb Mountain Doppelmayr 2018
Whistler Village Gondola 4,957 m 1,157 m 8 Person Gondola 15 min 2,800 Whistler Mountain Poma 1988
Creekside Gondola 2,050 m 644 m 10 Person Gondola 7 min 3,200 Whistler Mountain Doppelmayr 2022
Excalibur Gondola 2,204 m 367 m 8 Person Gondola 7.2 min 2,600 Blackcomb Mountain Doppelmayr 1994
Kadenwood Gondola [private use only] 925 m 228 m 8x2x2 Pulse Gondola 6.1 min 160 Whistler Mountain Doppelmayr 2010
Harmony 6 Express 1,772 m 524 m High Speed Six Pack 5.9 min 3,600 Whistler Mountain Doppelmayr 2013
Emerald 6 Express 1,756 m 422 m High Speed Six Pack 6.5 min 3,600 Whistler Mountain Doppelmayr 2018
Big Red Express 2,495 m 555 m High Speed Six Pack 8.2 min 3,600 Whistler Mountain Doppelmayr 2022
Fitzsimmons Express 1,744 m 343 m High Speed Quad 5.8 min 1,850 Whistler Mountain Doppelmayr 2000
Symphony Express 2,158 m 509 m High Speed Quad 7.2 min 2,400 Whistler Mountain Doppelmayr 2006
Garbanzo Express 2,115 m 657 m High Speed Quad 6.9 min 2,800 Whistler Mountain Doppelmayr 2002
Peak Express 1,073 m 401 m High Speed Quad 3.6 min 2,500 Whistler Mountain Doppelmayr 1998
Excelerator Express 1,655 m 509 m High Speed Quad 5.4 min 2,800 Blackcomb Mountain Doppelmayr 1994
Jersey Cream Express 1,414 m 375 m High Speed Quad 4.7 min 2,800 Blackcomb Mountain Doppelmayr 1989
7th Heaven Express 1,753 m 588 m High Speed Quad 5.8 min 2,800 Blackcomb Mountain Doppelmayr 1986
Glacier Express 1,882 m 599 m High Speed Quad 6.3 min 2,500 Blackcomb Mountain Doppelmayr 1992
Catskinner Express 1,375 m 321 m High Speed Quad 5 min 2,400 Blackcomb Mountain Doppelmayr 2018
Crystal Ridge Express 1,708 m 535 m High Speed Quad 5.9 min 2,400 Blackcomb Mountain Poma 2013
Franz's Chair 1,161 m 272 m Triple Chairlift 8.4 min 1,405 Whistler Mountain Poma 1998
Olympic Chair 726 m 123 m Triple Chairlift 5.3 min 1,800 Whistler Mountain Lift Engineering (Yan) 1980
Magic Chair 621 m 94 m Triple Chairlift 6.1 min 1,530 Blackcomb Mountain Yan Lift 1994
Showcase 521 m 148 m T-bar 3.2 min 1,034 Blackcomb Mountain Doppelmayr 1989
T-Bars 703 m 188 m T-bar 4.2 min 1,515 Whistler Mountain Mueller 1965

Summer Lifts

Lift Name Length Vertical Type Ride Time Hourly
Capacity
Mountain Make Year
Peak 2 Peak Gondola 4,400 m 36 m 3S Gondola 28 11 min 4,200 Doppelmayr 2008
Blackcomb Gondola 4,100 m 1,180 m 10 Person Gondola 4,000 Blackcomb Mountain Doppelmayr 2018
Whistler Village Gondola 5,000 m 1,157 m 8 Person Gondola 30 min Whistler Mountain Poma 1988
Creekside Gondola 10 Person Gondola Whistler Mountain Doppelmayr 2022
Fitzsimmons Express 347 m High Speed Quad Whistler Mountain Doppelmayr 1999
Garbanzo Express 660 m High Speed Quad Whistler Mountain Doppelmayr 1999
Peak Express 401 m High Speed Quad Whistler Mountain Doppelmayr 1998

Terrain Aspects[41]

  • North: 55%
  • West: 40%
  • East: 2%
  • South: 3%

Other facilities

Whistler Mountain Bike Park

 
Aerial View of the Whistler Bike Park

The Whistler Mountain Bike Park celebrated its 10th anniversary in 2008. Having consistently grown since its inception, it sees an average of 100,000 bikers each summer.[citation needed]

The Whistler Mountain Bike Park uses the Fitzsimmons and Garbanzo quad chairlifts, as well as the Whistler Village Gondola and Creekside Gondola to shuttle bikers to around midstation, at 1,200 m (3,900 ft). The park has 47+ trails for all skill levels totaling 250 km + of trails. There are smooth trails with gentle banked corners for beginners, steep twisty trails for intermediates, tight trails with jumps and stunts for advanced riders, and challenging trails with giant jumps, drops, and root-strewn terrain for the experts.

 
Riders waiting in the Fitzsimmons chairlift line

During the summer, high speed quad chairlifts (Fitzsimmons and Garbanzo) used by the bike park have every second chair replaced with a bike rack. These racks fit four bikes, three in grooves and one on a hook on the side of the chair. The bikers then get on the next chair which is a normal passenger carrier.

The bike park has three zones: the Fitzsimmons Zone (the lower zone), the Garbanzo Zone (the upper zone) and the Creekside Zone. All riders take either the Village Gondola or the Fitzsimmons quad to the Olympic Station area. Then intermediate and advanced riders can take the Garbanzo quad up further to the Garbanzo zone. Garbanzo riders can then return to midstation or Whistler Village, the base of the bike park. The Creekside Zone can be accessed via the Creekside Gondola or by riding through the Garbanzo Zone. From the top of Garbanzo to the village is an impressive 1,100 m (3,600 ft) vertical descent; eclipsed only by the descent from the top gondola station or the top of the Peak Chair, the highest accessible point on the mountain. "A-Line" is the most well-known track. The Boneyard Slopestyle Course is part of the Fitzsimmons Zone and is located at the very bottom of the bike park, visible from the base of Whistler Mountain. The Boneyard features a collection of high-intermediate and advanced slopestyle features, including drops, dirt jumps, and more.[citation needed]

Each summer since 2004, the park hosts Crankworx, the largest annual freeride mountain biking competition in North America. Another major competition, Harvest Huckfest, was held there each fall from 2002 to 2008.

Whistler Blackcomb's Tube Park

For the 2005–06 ski season, Blackcomb Mountain opened the Tube Park to allow for recreational tubing at the resort. The tube park is located at Base II alongside the Village Run.

Incidents

Quicksilver Express grip failure, December 23, 1995

The lift operator on the Quicksilver lift pressed the button to make a routine stop, to allow a fallen skier to get out of the way of the unloading ramp. Instead, the emergency brake activated, sending shockwaves down the cable. Grips on at least two of the chairs slipped, and caused chairs to slide down the cable and slam into each other. In all, eight were injured, and two were killed in one of the worst ski lift accidents in North America.[42][43] The lift's manufacturer, Lift Engineering/Yan, entered bankruptcy after the incident in July 1996.[44] The cause was found to be a design fault in the Yan detachable grip. The Quicksilver lift was removed and replaced by the Creekside Gondola. The other two Yan high speed quads on Whistler, Greenline and Redline, were replaced with Doppelmayr high speed quads the year after that, with all new terminals, grips and chairs, and renamed as the Emerald Express and Big Red Express respectively.

Excalibur Gondola Collapse, December 16, 2008

The Excalibur gondola had a major malfunction on December 16, 2008, when the upper portion of one of the lift towers detached and collapsed, causing several of the gondola cabins to drop near to the ground,[45] leaving 53[46] people trapped on the lower section of the lift line. Firefighters rescued passengers from a cabin dangling over Fitzsimmons Creek, and from another gondola that landed on a bus shelter. The third cabin had crashed into the trees, narrowly missing a condominium. Twelve people suffered minor injuries.[47] According to Whistler-Blackcomb, a joint in the tower separated due to the buildup of ice from water that had seeped into the tower.[48] The undamaged upper half of the lift running from Blackcomb's Base 2 was reopened on Saturday December 20.[49] After repairs were made to the collapsed tower, the whole lift was back in service on Wednesday December 24.[50]

Harmony Express grip failure, February 18, 2009

 
Four sheaves make up this lift tower's uphill sheave train. A similar train is off-frame to the left, guiding the cable as it returns downhill.

The lift operations team on Whistler's Harmony Express had been experiencing some problems with the lift during the day of Wednesday, February 18, 2009. That night, a grooming machine operator found a chair had fallen from the lift at Tower 11.

At the tops of the lift towers are a series of wheels known as sheaves, or sheave trains as there are almost always more than one in a row. Towers typically have two sheave trains, one for the uphill-moving side of the cable loop, and one for the downhill side. Upon inspection the next morning, maintenance crews discovered that the sheave train on the downhill side of tower 11 had failed, and that the sheave had turned into the path of a chair and forced it off the cable. The cause was later determined to be a failed bolt, and all of the bolts were replaced.[51]

The lift reopened on Sunday, February 22, 2009. The affected chair No. 37 was temporarily removed from operation; it has since been replaced.

Whistler T-Bars summer maintenance incident, August 31, 2009

On Monday, August 31, 2009, two Lift Maintenance employees were injured when the lift began to move, after being given the go-ahead while a maintenance person was safety-harnessed to the tower. The person remained attached to both the tower and the maintenance carrier while the second employee was secured to the carrier. The safety harness ended up pulling so hard on the maintenance carrier, the carrier became detached from the cable and dropped to the rocky ground below, severely injuring the worker in it. The employee hanging from the tower only received bruises.[52]

Big Red Express Bolt Failure, December 6, 2009

On Sunday, December 6, 2009, at 8:55 am, a passenger aboard the Big Red Express on Whistler Mountain noticed that a sheave train had broken off Tower 31 and had fallen to the ground. They immediately notified the lift operator at the top terminal (2 towers away) and Whistler Blackcomb Lift Maintenance department. After almost a 30-minute inspection, they determined the issue was not severe enough to evacuate the lift. The lift was run at low speed to evacuate all passengers. All passengers were finally off the lift just before 10 am. The lift was closed down for the day, repaired, and back in operation Monday, December 7.[53]

Photographs

See also

References

  1. ^ "Mountain Info". Whistler Blackcomb. Retrieved January 3, 2023.
  2. ^ "piquenewsmagasine.com". Retrieved February 19, 2019.
  3. ^ "Whistler Blackcomb Ski Guide". Retrieved September 21, 2011.
  4. ^ . Archived from the original on February 22, 2007.
  5. ^ Johnston, Greg (December 12, 2008). "Tram catches air between summits". Seattle Post-Intelligencer. The Hearst Corporation. Retrieved December 13, 2008.
  6. ^ . Whistler-Blackcomb. Archived from the original on April 27, 2014. Retrieved December 13, 2008.
  7. ^ a b c d e f g h i j k l m n o p q r s t u v w Walking
  8. ^ a b c d e History
  9. ^ "Diamond Head (mountain)". BC Geographical Names.
  10. ^ John Sanko, "Colorado only state ever to turn down Olympics" June 1, 2009, at the Wayback Machine, Denver Rocky Mountain News, October 12, 1999
  11. ^ "Innsbruck 1976". IOC. April 24, 2018.
  12. ^ Intrawest
  13. ^ . Whistlerblackcomb.com. Archived from the original on July 18, 2011. Retrieved March 10, 2011.
  14. ^ . Whistlerblackcomb.com. March 31, 2006. Archived from the original on July 20, 2011. Retrieved March 10, 2011.
  15. ^ . montrealgazette.com. Canwest Publishing. January 20, 2010. Archived from the original on January 24, 2010. Retrieved February 15, 2010.
  16. ^ Blackcomb, Whistler. "KSL Capital Partners Acquires 24% Interest in Whistler Blackcomb Holdings Inc". www.prnewswire.com.
  17. ^ "Google Lat Long: Street View hits slopes at Whistler". February 9, 2010. Retrieved February 25, 2023.
  18. ^ "Google Street View expands across Canada". CBC. February 9, 2010. Retrieved February 25, 2023.
  19. ^ (PDF). Archived from the original (PDF) on June 11, 2011. Retrieved March 10, 2011.
  20. ^ . Archived from the original on April 24, 2013. Retrieved March 17, 2013.
  21. ^ . Archived from the original on March 5, 2014. Retrieved March 5, 2014.
  22. ^ "Whistler Blackcomb resort bans smoking completely". CBC News. May 15, 2015.
  23. ^ Landsman, Peter. "Whistler Blackcomb Unveils $345 Million Renaissance". Lift Blog. Retrieved April 7, 2016.
  24. ^ Landsman, Peter (November 15, 2015). "Whistler Blackcomb's Next 20 Years". Lift Blog. Retrieved April 12, 2016.
  25. ^ . Archived from the original on December 31, 2017. Retrieved April 12, 2016.
  26. ^ . Archived from the original on December 31, 2017. Retrieved April 12, 2016.
  27. ^ Kenneth, Chan. . Vancity Buzz. Archived from the original on December 31, 2017. Retrieved April 7, 2016.
  28. ^ . Whistler Blackcomb. April 5, 2016. Archived from the original on July 9, 2017. Retrieved April 7, 2016.
  29. ^ Dmitrieva, Katia; Gopal, Prashant (August 8, 2016). "Vail to Buy Whistler Blackcomb Ski Resort for $1.05 Billion". Bloomberg News. Retrieved August 9, 2016.
  30. ^ "Whistler Ski Holidays | Skiing Whistler | Ski Independence". www.ski-i.com. Retrieved August 22, 2018.
  31. ^ Boynton, Sean (March 17, 2020). "Whistler Blackcomb closed for the rest of the ski season due to coronavirus". Global News. Retrieved March 3, 2023.
  32. ^ Lovgreen, Tina (November 26, 2020). "Whistler Blackcomb opens for the ski season as day-trippers told to stay away". Retrieved March 3, 2023.
  33. ^ Chan, Kenneth (March 29, 2021). "Whistler Blackcomb to close for several weeks due to rising COVID-19 cases". Daily Hive News. Retrieved March 3, 2023.
  34. ^ Dukeson, Thomas (November 24, 2021). "Opening Day: Know Before You Go". Whistler Blackcomb. Retrieved March 3, 2023.
  35. ^ Hodgson, T. (2021, January 12). Wake Up Call. Ski Mag. https://www.skimag.com/ski-resort-life/horstman-t-bar-removed/ Retrieved on 28 August 2021.
  36. ^ "Whistler Creekside's Red Chair, gondola cabins to go up for sale". Pique Magazine. April 24, 2022. Retrieved February 21, 2023.
  37. ^ "NEWLY UPGRADED CREEKSIDE GONDOLA OFFICIALLY OPENS AT WHISTLER BLACKCOMB". Whistler Blackcomb Newsroom. Retrieved February 21, 2023.
  38. ^ "An Update on Lift Upgrade Projects". Whistler Blackcomb. December 22, 2022. Retrieved February 21, 2023.
  39. ^ Lalonde, Megan (December 22, 2022). "Just in time for Christmas, the Creekside Gondola is finally ready". North Shore News. Retrieved February 21, 2022.
  40. ^ McKall, Terry (April 17, 2022). "Whistler Creekside Zone closed for summer 2022". Cycling Magazine. Retrieved February 21, 2023.
  41. ^ ZRankings, Best Ski Resorts. "ZRankings Topographical Terrain Survey". ZRankings. ZRankings. Retrieved October 27, 2015.
  42. ^ Nixon, Emily Disaster and Emergency Management: The Quicksilver Chairlift Incident April 8, 2008, at the Wayback Machine, Graduating Essay, University of Victoria, Geography Dept., April 2004
  43. ^ Pyn, Larry (February 9, 2008). . Vancouver Sun. Canada: Canwest Interactive. Archived from the original on April 17, 2008. Retrieved February 29, 2008.
  44. ^ Markels, Alex (January 16, 1997). "The Rise, Fall and Return of a Ski-Lift Entrepreneur". The Wall Street Journal. Dow Jones & Company. Retrieved February 29, 2008.
  45. ^ "Gondola tower snaps at ski resort". BBC News channel. December 17, 2008. Retrieved December 17, 2008.
  46. ^ . Whistler-Blackcomb. December 17, 2008. Archived from the original on July 18, 2011. Retrieved December 17, 2008.
  47. ^ Culbert, Lori; Mary Frances Hill; Jennifer Miller (December 16, 2008). . Vancouver Sun. Canada: Pacific Newspaper Group. Archived from the original on August 15, 2020. Retrieved December 17, 2008.
  48. ^ . Whistler-Blackcomb. December 17, 2008. Archived from the original on July 18, 2011. Retrieved December 17, 2008.
  49. ^ . Whistler Blackcomb Resort. December 19, 2008. Archived from the original on July 18, 2011. Retrieved December 31, 2008.
  50. ^ . Whistler Blackcomb Resort. December 23, 2008. Archived from the original on July 18, 2011. Retrieved December 31, 2008.
  51. ^ . Whistlerblackcomb.com. February 21, 2009. Archived from the original on July 18, 2011. Retrieved March 10, 2011.
  52. ^ "Whistler, CANADA". Pique newsmagazine. Retrieved March 10, 2011.
  53. ^ . Whistlerblackcomb.com. Archived from the original on July 18, 2011. Retrieved March 10, 2011.

Further reading

  • (Stats), "Mountain Stats", Whistler Blackcomb home page
  • (History), Whistler Blackcomb home page
  • (Look), "A Look at Whistler History", Whistler Museum & Archives Society
  • (Walking), "2010 Village Olympic Walking Tour", Whistler Museum & Archives Society
  • (Intrawest), "Intrawest Corporation Quick Facts", Intrawest Corp.

External links

  Media related to Whistler Blackcomb at Wikimedia Commons

  • Vancouver2010.com profile
  • Whistler Blackcomb official site

whistler, blackcomb, this, article, about, resort, municipality, whistler, british, columbia, other, pages, with, name, whistler, whistler, disambiguation, resort, located, whistler, british, columbia, canada, many, measures, largest, resort, north, america, g. This article is about the ski resort For the municipality see Whistler British Columbia For other pages with the name Whistler see Whistler disambiguation Whistler Blackcomb is a ski resort located in Whistler British Columbia Canada By many measures it is the largest ski resort in North America and has the greatest uphill lift capacity It features the Peak 2 Peak Gondola for moving between Whistler and Blackcomb mountains at the top With all of this capacity Whistler Blackcomb is also often the busiest ski resort often surpassing 2 million visitors a year Whistler BlackcombPanorama of Whistler BlackcombLocationWhistler Mountain and Blackcomb MountainNearest major cityVancouverCoordinates50 06 30 N 122 56 33 W 50 10833 N 122 94250 W 50 10833 122 94250StatusOperatingOwnerVail ResortsVerticalWhistler 1 530 m 5 020 ft Blackcomb 1 565 m 5 133 ft Top elevationWhistler 2 182 m 7 160 ft Blackcomb 2 436 m 7 992 ft Base elevationCreekside 653 m 2 140 ft Village 675 m 2 214 ft Skiable areaWhistler 4 757 acres 1 925 ha Blackcomb 3 414 acres 1 382 ha Runs200 35 Easiest 110 More Difficult 35 Most Difficult 20 ExpertLongest runPeak To Creek Whistler Green Road Blackcomb Both are 11 km 6 8 mi Lift system37 Whistler 19 Blackcomb 17 5 gondolas3 high speed six pack chairlifts10 high speed quad chairlifts 3 fixed grip chairlifts15 surface liftsLift capacity69 939 skiers hr 1 Whistler 36 148 Blackcomb 33 791Snowfall11 9m year 467 in SnowmakingWhistler 325 acres 131 hectares 6 8 Blackcomb 382 acres 154 hectares 11 1 WebsiteWhistler BlackcombWhistler was originally conceived as part of a bid to win the 1968 Winter Olympics Although the bid failed construction started anyway and the resort opened for the first time in January 1966 Blackcomb mountain originally a separate entity opened for business in December 1980 The two resorts underwent a period of intense rivalry through the 1980s and 90s with constant upgrades and improvements that were unseen at other resorts By the mid 1990s the area was repeatedly named the best resort in many skiing magazines Intrawest the BC real estate firm that developed Blackcomb purchased Whistler in 1997 and fully merged their operations in 2003 Whistler Blackcomb was the centrepiece of a renewed bid on the part of nearby Vancouver for the 2010 Winter Olympics which they won in July 2003 Whistler Blackcomb hosted the alpine skiing events including the men s and women s Olympic and Paralympic alpine skiing disciplines of downhill Super G slalom giant slalom and super combined In contrast with Cypress Mountain which hosted the freestyle skiing and all snowboard events and was plagued with a lack of fresh natural snow during the Olympics leading to many complaints about hill quality Whistler Blackcomb had the second highest snowfall on record with 1 432 cm over 14 metres by the end of the 2009 10 season 2 Over the next decade Intrawest expanded by purchasing additional ski resorts across North America before expanding into golf and other resorts as well Whistler Village widely recognized for its livable design formed the basis of similar Tyrolian inspired developments at their expanding series of resorts as well as other resorts that hired Intrawest to build similar developments on their behalf In 2010 Intrawest sold off much of its 75 interest in Whistler Blackcomb Resort via a public share offering On August 8 2016 American company Vail Resorts bought Whistler Blackcomb Holdings for C 1 39 billion Nippon Cable s minority interest in Whistler Blackcomb resort has continued throughout the ownership changes by way of ownership of a 25 interest of the Whistler and Blackcomb partnerships Contents 1 Description 2 History 2 1 Early visitors 2 2 Rainbow Lodge and other early resorts 2 3 Olympic dreams 2 4 Whistler opens 2 5 Whistler Village 2 6 Blackcomb opens 2 7 Competition and buildout 2 8 Intrawest buys Blackcomb 2 9 Renewed competition 2 10 Intrawest buys Whistler 2 11 Renewed Olympic bid 2 12 Reorganization 2 13 2010 Olympic Games 2 14 2010s 2 15 2020s 3 Major Events 4 Major Lifts 4 1 Winter Lifts 4 2 Summer Lifts 4 3 Terrain Aspects 41 5 Other facilities 5 1 Whistler Mountain Bike Park 5 2 Whistler Blackcomb s Tube Park 6 Incidents 6 1 Quicksilver Express grip failure December 23 1995 6 2 Excalibur Gondola Collapse December 16 2008 6 3 Harmony Express grip failure February 18 2009 6 4 Whistler T Bars summer maintenance incident August 31 2009 6 5 Big Red Express Bolt Failure December 6 2009 7 Photographs 8 See also 9 References 10 Further reading 11 External linksDescription EditThe ski areas at Whistler and Blackcomb are situated on two ridge lines running roughly northwest to southeast The two are separated by a deep valley with Fitzsimmons Creek running along the valley floor The main base area at Whistler Village is located on the northwest end of this valley where Fitzsimmons Creek flows into the larger Green River which forms a floodplain running north south just to the west of the village area The Sea to Sky Highway runs along the Green River valley The ski runs generally run northwest towards the village area or into the valley area between the two ridges A small number of runs are located on the south side of the Whistler ridge where they run to the Creekside Base area some distance south of the main Whistler Village Whistler Mountain is the basis of the southern of the two ridges on the right when looking at the Whistler Blackcomb ski area from Whistler Village It has a summit elevation of 2 184 meters 7 165 feet The total vertical drop is 1 530 meters 5 020 feet and 4 757 acres 1 925 ha skiable inbound terrain Whistler is served by a total of 19 lifts 2 gondolas 5 high speed detachable quad chair lifts 4 high speed detachable sixpack chair lifts 2 fixed grip triple chair lifts 1 T bar called T bars but parallel T Bar was removed however towers and stations still mostly stand and 7 carpet lifts It also hosts the drive station for the Peak 2 Peak Gondola connecting it with Blackcomb mountain to the north There are 4 on hill restaurants as well as a children s ski school It is served by two base areas Whistler Creek also known as creekside the original base on its southwest flank and Whistler Village on its northwest flank Blackcomb Mountain is the northern ridge on the left when viewed from the village It has a lift serviced elevation of 2 240 metres 7 350 feet at the top of the 7th Heaven chair Blackcomb Mountain itself is higher at 2 440 meters 8 010 feet but unlike Whistler the peak is not lift served Blackcomb has a higher skiable vertical at 1 565 meters 5 135 feet 3 but less in bound skiing area at 3 414 acres 1 382 ha It is served by 15 lifts 2 gondolas 6 high speed quads 1 fixed grip triple and 7 surface lifts 1 T Bar and 5 carpet lifts as well as the end station for the Peak 2 Peak Blackcomb is the location of the world famous Couloir Extreme run which is one of the top ten steep in bound runs in the world according to Skiing Magazine Originally called the Saudan Couloir by local skiers even before it was part of the ski area the company eventually had to drop the name when extreme skier Sylvain Saudan complained about the unauthorised use of his name The two previously separate ski areas of Whistler and Blackcomb were integrated into one operation in 1997 4 after Intrawest merged with Whistler Mountain Ski Corporation Ticketing pass and access control systems for the two ski areas were fully integrated in 2003 Together Whistler and Blackcomb form the largest ski area in North America at 8 171 acres 33 km2 Either mountain alone would be in the top five in terms of size The mountains are accessed via four gondolas and one high speed quad Blackcomb Excalibur Gondola Whistler Mountain Village Gondola and Fitzsimmons Express in the village the Blackcomb Gondola in Blackcomb Base Upper Village and the Whistler Creekside Gondola to the south in the Creekside area The primary skiing terrain starts about one third up the mountains Ski outs to the valley are usually possible during the months of December through April The mid and upper areas are serviced by 10 high speed detachable chairs and 5 fixed grip lifts made by Lift Engineering Doppelmayr and Poma Two T bars service the Horstman Glacier and the Whistler alpine regions and take skiers to the entrance to Blackcomb Glacier The overall lift capacity 65 507 skiers per hour is the greatest in North America Before 2008 the only connection between the two mountains was via the village The opening of the Peak 2 Peak Gondola on 12 December 2008 connected the two mountains at approximately 1 800 m 5 900 ft 5 The lift has a total length of 4 4 km 2 7 mi and the longest unsupported span for a lift of its kind in the world at 3 02 km 1 88 mi while also having the highest ground clearance for a lift of its kind 436 m 1 430 ft above the valley floor 6 Whistler Village which is part of the Resort Municipality of Whistler a geo political entity not directly associated with the resort company s operation is situated at the base of the Whistler Mountain Village Gondola and Blackcomb Excalibur Gondola The village incorporates community services shops entertainment venues restaurants bars hotels condominiums and vacation properties The village is 675 m 2 215 ft above sea level and is located 137 km 85 mi from Vancouver International Airport History EditEarly visitors Edit The valley area between Whistler and Blackcomb was first surveyed and documented in 1858 by Hudson s Bay men looking for an alternate route into the Cariboo area further north Although little used at the time the route would later become one of the many paths used during the Gold Rush at the turn of the century Known as the Pemberton Trail the route followed a path similar to the Sea to Sky Highway leading past the Whistler area to the present day town of Pemberton In the 1860s British Naval surveyors named the mountain London Mountain but it soon garnered the nickname Whistler because of the shrill whistle made by the Western Hoary Marmots who lived among the rocks Four lakes paralleled the route of Trail the highest then being known as Summit Lake However there was another Summit Lake in BC and in 1910 the name was changed to its current form Alta Lake 7 One of the first permanent residents in the Alta Lake area was trapper John Millar who set up a cabin next to the trail just south of the base of the mountain During a trip to sell furs in Vancouver in 1911 Millar stopped at the Horseshoe Bar amp Grill for dinner The cook was Alex Philip from Maine and Millar invited Philip to join him for dinner Millar was a storyteller and during the conversations that followed he invited Philip to visit the Alta area Alex and his wife Myrtle visited what was then known as Summit Lake several times over the next few years and in 1913 they purchased 10 acres 40 000 m2 of land on the northwest corner of Alta Lake for 700 7 Rainbow Lodge and other early resorts Edit By 1914 the Philip s Rainbow Lodge fishing resort was completed with four bedrooms a large living dining area and a kitchen The resort was named for the Rainbow trout that were the main attraction of the resort 7 That same year the Pacific Great Eastern Railway PGE reached the lake from Squamish Executives of the PGE suggested the Lodge host fishermen from Vancouver which was now less than two days away from three or more via steamship to Squamish and then the PGE to Alta Lake A standard rate of 2 for a week was applied and the very first group arrived with 25 people The resort was a hit 7 Millar left when the railway arrived looking to get further away from civilization Building followed demand and over time the lodge grew to include an additional 45 buildings cabins tennis courts general store post office and could accommodate 100 people It became the most popular west coast resort for 30 years 7 8 The Philips operated the Lodge until 1948 when they sold it to Alec and Audrey Greenwood The main Lodge burnt down in 1977 but today the area has been preserved as Rainbow Park The Philips both remained in the valley until their deaths Alex died in 1968 at the age of 86 and Myrtle died in 1986 at the age of 95 7 Following the successful launch of Rainbow Lodge several other tourist resorts set up in the valley Russell Anderson Jordan opened the Alta Lake Hotel which burned down in 1930 and replaced it with Jordan s Lodge on nearby Nita Lake Bert and Agnes Harrop built Harrop s Point in the 1920s This became the Cypress Lodge in 1945 under its then owner Dick Fairhurst who built new cabins and a main lodge in the early 1960s In 1972 the property was purchased by the Canadian Youth Hostel Association and it remained the Whistler Hostel until it was closed in 2010 when the association now Hosteling International opened a new larger hostel The original building is still standing today home to the point artists centre and the Whistler sailing club Cecilia and John Mansell moved to Alta Lake in 1945 and built the Hillcrest Lodge near today s Lakeside Park on Alta Lake They sold it in 1965 to the Mason Family and others who operated it as Mount Whistler Lodge for skiers The main lodge was burnt in a fire practice by the fire department in 1986 7 There was some commercial use of the London Mountain area as well Logging had been carried out for some time but the arrival of the railway in 1914 made this much more profitable and for several years there were a few sizable mills and lumber operations The Barrs at Parkhurst Mill on Green Lake to the north and the Gebharts with the Rainbow Lumber Company on Alta Lake The fur trade remained for some time later supplanted by a mink and marten farm Jimmy Fitzsimmons ran a prospecting support company which led to mining surveys up Fitzsimmons Valley The shafts can still be found on the Singing Pass trail 7 Olympic dreams Edit In 1960 the Canadian Olympic Association visited the west coast looking for potential sites for a future 1968 Winter Olympics They initially looked at a site on Diamond Head 9 just north of Squamish which was already developed to the extent of a single chairlift However they concluded that the area simply couldn t be developed properly it just wasn t the right terrain for a world class resort 7 Franz Wilhelmsen a local businessman who had married into the Seagram family had already come to the same conclusions when he had been scouting areas for a new ski resort He met with the COA and convinced them to look further north in the London Mountain area And they were impressed 7 Encouraged by their positive reviews Wilhelmsen organized the Garibaldi Olympic Development Association GODA to make a formal bid At this time there was no road no electricity and no piped water or sewer in Alta Lake Their bid for the Olympics was unsurprisingly rejected and the Canadian bid was given to Calgary who came in a close second place to Grenoble Undaunted Wilhelmsen decided to press ahead with development of a resort 7 In 1962 the Garibaldi Lifts Limited was formed with Franz Wilhelmsen as President It had two main objectives to finance and supervise required land business studies and to erect and operate ski lifts on London Mountain The company had little experience in ski operations so they hired Willy Schaeffler a well known developer to help them Schaeffler proved as enthusiastic about London Mountain as COA and GODA had been Schaeffler returned and wrote a good feasibility study about the Alta area which had no mining claims 7 From 1962 to 1965 Garibaldi Lifts raised funds and began development of the ski area on the south side of the mountain The government agreed that they would set aside a 56 acre 230 000 m2 plot at the base of the mountain for Garibaldi Lifts to buy and agreed to bring the highway to the base of the mountain if they could raise enough money By 1965 they had reached their goal of raising 800 000 and started planning for development However they were not happy with the name and on August 27 1965 London Mountain officially became Whistler Mountain 7 By 1965 the Provincial Government had completed a narrow gravel road from Vancouver Electricity arrived the same year with the installation of a substation along the lines from Bridge River Everything was in place and the Alta area became a hive of development 7 GODA made a bid for the 1972 Winter Olympics but Banff won again and eventually lost to Japan 7 Whistler opens Edit By the fall of 1965 the ski area featured a four person gondola to the mountain s mid station a double chairlift to the alpine tree line the Red Chair and two T bars all provided by GMD Mueller In addition a day lodge was constructed and six ski runs cut into the hill Whistler officially opened for skiing for the first time on January 15 1966 The new mountain won instant acclaim for its vertical drop good snow conditions and huge alpine area The only problem at the time was the road it was a dirt logging track which was only plowed on Saturday to the detriment of Friday travelers 7 With real infrastructure in place in 1968 GODA made another bid for the 1976 Winter Olympics and this time the joint Vancouver Garibaldi won the Canadian nomination However in 1970 when Montreal won the voting for the 1976 Summer Olympics Vancouver Garibaldi was removed from further consideration and the games eventually went to Denver Colorado In a stunning turn of events Denver turned down the games after winning the bidding 10 The games were then offered to the other North American entry Vancouver Garibaldi but political turmoil due to the recent change in government led to their bid being withdrawn as well and in desperation the IOC returned the games to Innsbruck for a second time in a row 11 The gravel road was paved to Whistler in 1966 and on to Pemberton in 1969 The Blue and Green chairlifts were added in 1970 providing access to additional terrain In 1972 these were joined by the Olive and Orange chairlifts A parallel lift to the Green Chair to alleviate crowds came in 1974 and the Little Red Chair came in 1978 The Roundhouse an on mountain lodge and restaurant was completed in 1980 This new lodge provided respite for cold skiers who had survived the long ride up on the Red Chair Whistler Village Edit In 1974 the provincial New Democratic Party of British Columbia was interested in developing tourism and took a number of steps affecting Whistler At the time the Alta Lake area was overdeveloped so the government instituted a development freeze while they studied the problem The only solution was to continue development in another location They quickly decided to focus on the table between Whistler and Blackcomb about 4 km to the north of the existing facilities on Alta Lake At that time this was the site of the Alta Lake dump and the remains of a Volkswagen Van are still buried under the modern village 7 In 1975 the Resort Municipality of Whistler RMOW was formed the first Resort Municipality in Canada and also the first place in British Columbia since Canadian prohibition where bars were allowed to be open on Sunday The act also created the Whistler Village Land Company who would oversee all development of the new Whistler Village In 1977 the provincial government named Al Raine the Provincial Ski Area Co ordinator in charge of expanding BC s skiing capabilities Raine was previously National Coach for the Canadian Women s Ski Team and was married to famous Canadian skier Nancy Greene Raine saw the potential in developing Blackcomb Mountain then part of the Garibaldi Provincial Park and joined the Whistler city council The Blackcomb area was currently zoned for logging but Raine and Greene successfully lobbied the government to remove the zoning and allow development as a ski area 7 In 1977 the Municipality hired Sutcliffe Griggs Moodie Development Consultants to design a layout for Whistler Village s development However their design was considered too conventional and allowed too much car traffic Raine recommended Eldon Beck who had been the primary designer at Vail celebrated for its layout Beck s designs included a pedestrian Main Street Village Stroll and an elevated covered walkway system limiting all vehicles to the outside of the developed area To this day the village retains this basic design in spite of dramatic expansions and has won worldwide acclaim in architecture circles 7 In January 1978 53 acres 210 000 m2 of crown land were given to the Whistler municipality to develop the town centre The first sod for the village was turned on August 18 1978 by first Mayor Pat Carleton By 1979 many amenities were in place including Municipal Hall Fire Hall Health Care Centre and Elementary School Phase 1 expansion included 11 parcels in the modern Village Square area including the Whistler Conference Centre a variety of hotels restaurants grocery store hardware store etc An enormous underground garage was built to support all of the buildings in the area completed before any construction could start above it 7 The first hotel the Blackcomb Lodge anchors the Village Square area to this day Blackcomb opens Edit Blackcomb Mountain logo 1980 1985 The green leaf represents Aspen s ownership The red and black skis were common to early marketing In 1978 a call for bids was issued to develop Blackcomb for skiing The bidding to develop Blackcomb was contested by two companies the Aspen Skiing Company and the newly formed Blackcomb Skiing Enterprises BSE 7 Aspen having recently developed the Fortress Mountain Resort in Alberta won the contest A new company Fortress Mountain Resorts was formed with a 50 50 partnership between Aspen and the Business Development Bank of Canada The new competition paid for partially by tax dollars was not initially appreciated by Whistler Initial development of the mountain included four triple chairlifts later named Cruiser Stoker Catskinner and Fitzsimmons and one double chairlift all supplied by Lift Engineering Yan Lifts The double chair was installed on the lower Gear Jammer run where the tube park is located today and was used as a beginner chair at a reduced speed This area was also the first area to get permanent underground snow making pipes supplying snow making guns up the south side of the run At the time the lifts were referred to only by number Blackcomb opened for skiing on December 6 1980 8 along with the newly constructed village To ensure guests could continue to easily access Whistler from the new village three triple chairlifts were added to Whistler for the same season the Village Olympic and Black Chairs which met up with the top of the Orange chair at the top of the men s downhill course Whistler s original base at Alta Lake began to be referred to as Whistler Creek or Creekside after the creek that runs through the area Competition and buildout Edit Throughout the 1980s the two ski areas competed strongly for ticket sales among the village visitors which led to a rapid buildout of new lifts that opened new areas and improved ride times In 1982 Chair 6 later rebranded Jersey Cream opened in the Horstman Creek drainage on Blackcomb Whistler cut new trails along the northern flank of the mountain In 1983 Blackcomb acquired a used T Bar from Fortress Mountain and installed it on a south facing slope in full view of Whistler Mountain This 7th lift was coined the Seventh Heaven T Bar and gave access to high alpine and glaciated terrain It also gave Blackcomb the highest lift serviced vertical drop of any ski area in North America with the top of the lift at 7 494 feet 2 284 m Blackcomb promoted themselves as the Mile High Mountain Whistler responded in 1986 with the opening of the Peak Chair to the summit of Whistler Mountain at 7 160 feet 2 180 m acquiring a Poma triple chairlift from the closed Pikes Peak ski area in Colorado Although not as high as Seventh Heaven this lift opened up Whistler Mountain s alpine terrain and allowed access to the Harmony Bowl area The new terrain made Whistler the largest alpine ski area in North America 8 Skiers could buy a Blackcomb pass a Whistler pass or a Dual Mountain pass Locals loved when tourists would ask Where is Dual Mountain 7 Intrawest buys Blackcomb Edit Blackcomb Mountain as seen looking north from Whistler Mountain The trails served by Seventh Heaven are seen face on just right of mid frame the upper half of these trails are not obvious in the large bowl along the top of the peak The majority of Blackcomb s trails run down the slope to the left and are not easily visible in this picture In 1986 Blackcomb s assets and real estate rights were bought by fledgling real estate developer Intrawest Intrawest was an early developer of timeshare listings and saw the potential in developing the ski resort with condominium assets as a timeshare destination 12 Intrawest immediately carried out massive upgrades on Blackcomb They started by moving the Seventh Heaven T Bar across the ridge to the Horstman Glacier still running up to the peak and supplemented it with the Showcase T Bar to service Blackcomb Glacier Doppelmayr replaced Seventh Heaven in its original alignment with a high speed quad chairlift and built two additional high speed quads the Wizard and Solar Coaster lifts which cut the ride time from the base area to Rendezvous from 45 minutes to 15 The Rendezvous Restaurant was redubbed Base 2 and the moniker moved to the restaurant at the top of the Solar Coaster lift Renewed competition Edit In response to Blackcomb Mountain s construction of three high speed quads Whistler Mountain undertook one of the biggest ski lift construction projects ever realized in Canada at the time the construction of the Whistler Express Gondola Carrying passengers 1 157 m 3 796 ft vertically and 5 km 3 1 mi horizontally over 63 support towers the lift opened on November 24 1988 In 1990 Whistler began upgrading its aging fleet of fixed grip chairlifts with the addition of its first high speed quad chairlift The Green Chair Express which replaced the two Green Chairs was built by Lift Engineering Yan and substantially cut long lift queues in the Green area of the mountain A year later Whistler Mountain replaced three double chairlifts and the original Creekside gondola with two high speed quad chairlifts the Quicksilver Express and Redline Express lifts also built by Lift Engineering In 1994 the Blue Chair was removed and replaced with a Poma high speed quad named the Harmony Express providing access to Little Whistler Peak In 1994 Blackcomb made what would be its last major lift expansion until 2018 with the replacement of the lower mountain triple chairlifts Stoker was replaced with a high speed quad in a longer alignment known as the Excelerator Express while Fitzsimmons and Cruiser were replaced with the Excalibur Gondola The second is dubbed by some as the gondola to nowhere since it does not connect with any restaurant or access additional terrain However it allowed rapid access to Blackcomb for Whistler Village traffic who previously had to take three or four chairlifts to Rendezvous Fitzsimmons Stoker Cruiser and Jersey Cream with 3 of those being slower chairs or Fitzsimmons Wizard and Solar Coaster The Excelerator also opened up a vast area of intermediate difficulty terrain to the left of Solar Coaster and below Jersey Cream that was previously neglected and under utilized because skiers who traveled those slopes frequently had to go all the way to the bottom of the mountain which was over skied and icy This competition had driven development of the two mountains at a rate no other resorts could come close to matching In 1992 Snow Country Magazine voted Whistler the Number One Ski Resort in North America Similar No 1 rankings quickly followed from other major magazines and between 1992 and 2000 it won No 1 ranking from one of the major magazines every year In 1996 it became the only resort in history to be simultaneously named No 1 by Snow Country SKI and Skiing magazines 8 Intrawest buys Whistler Edit Whistler Mountain as seen looking south from Blackcomb Mountain The original Whistler area starts mid frame and extends down and to the right Whistler Peak is just to the right of the fold To the left of the peak is the Harmony Bowl area Little Whistler Peak and then the recently opened Symphony Bowl The Black Tusk can be seen in the distance between Whistler Peak and Little Whistler In 1997 the Whistler Mountain Ski Corporation was also bought out by Intrawest 8 Like their expansion on Blackcomb Intrawest immediately started a major build out on Whistler The Quicksilver lift was replaced with a Poma gondola the Creekside Gondola while the Green Chair Express and Redline lifts were removed and replaced with Doppelmayr high speed quad chair lifts aptly named the Emerald Express and Big Red Express lifts The original Roundhouse was demolished and a new lodge built in its place Around this time Intrawest began marketing the two mountains as one large ski area under the name Whistler Blackcomb On April 20 1999 Whistler Blackcomb became the first North American ski resort to top 2 million skier visits in one season 1998 saw the replacement of the Peak Chair with a high speed quad The original Peak Chair was renamed Franz s Chair and moved parallel to Big Red with a return station approximately halfway up Big Red s lift line Franz s runs primarily in early and late season when lower altitudes are not well covered The Black Chair was replaced with a high speed quad the Garbanzo Express The Fitzsimmons Express was added in 2000 following the line of the long gone Village Chair and roughly paralleling the lower part of the gondola The top of Fitzsimmons and the bottom of Garbanzo are co located in the Village Gondola Olympic station area providing extra lift capacity from the Whistler Village to the top of the mid mountain zone in addition to the gondola itself It is the second lift with the Fitszimmons name the original lift being a triple chairlift replaced by Stage 1 of the Excalibur Gondola in 1994 Starting in 2000 Intrawest started redeveloping the Creekside area with new village layout Throughout Intrawest also extensively developed the summertime attractions notably golf and mountain biking Today Whistler Blackcomb averages 2 million visitors during the ski season but another 2 5 during the summer 7 Whistler Blackcomb s 2006 2007 season saw Doppelmayr construct the Symphony Express a high speed quad that begins towards the bottom of the Symphony Amphitheater and carries riders to the top of Piccolo 13 One of the original names suggested for this lift was Piccolo Express 14 A more ambitious upgrade was the Peak 2 Peak Gondola opened to provide a direct connection between the Roundhouse on Whistler and Rendezvous on Blackcomb Peak to Peak opened for the first time on December 12 2008 but low snowfall meant it was rockbound at the time The first summer operation day was June 6 2009 Renewed Olympic bid Edit A statue of Ilanaaq mascot of the 2010 Olympics located at the top of the Whistler Village Gondola on Whistler Mountain As Whistler Blackcomb continued to win awards eight consecutive by 2000 the resort formed the basis of a renewed Olympics bid this time for the 2010 Winter Olympics Calgary also bid for the Canadian entry as their equipment from the 1988 Winter Olympics was already in place and allowed them to offer a low cost bid as did Quebec City which lost the 2002 bid Calgary was eliminated in close voting on November 21 1998 and Vancouver Whistler won the second round of voting on December 3 In IOC voting Pyeongchang South Korea won the initial round which eliminated Salzburg but in the second round on July 2 2003 they won every one of Salzburg s supporters and bested Pyeongchang 56 53 Reorganization Edit In 2006 Intrawest was purchased by the alternative asset management firm Fortress Investment Group Three weeks before the opening of the 2010 Olympics Fortress failed to make payment on its loan used to buy out Intrawest This caused its creditors to force Intrawest to divest itself of several of its resort holdings in 2009 and 2010 which included a partial sale of Whistler Blackcomb in order to reduce its debt load 15 This was achieved through a public offering of shares of Whistler Blackcomb Holdings Inc on the Toronto Stock Exchange in 2010 The net outcome of the reorganization is that Whistler Blackcomb Holdings is the managing partner and controls 75 of the partnerships which own the assets of Whistler Blackcomb The remaining 25 of the partnerships are owned by Nippon Cable Intrawest sold its remaining 24 stake in Whistler Blackcomb to KSL Capital Partners in 2012 16 2010 Olympic Games Edit For the 2010 Winter Olympics Whistler hosted the alpine skiing events The men s skiing took place on the Dave Murray Downhill course while women s skiing took place on a new course which started on Wild Card cut across Jimmy s Joker to Franz s Run and connected at the bottom of the Dave Murray Downhill In order to serve the spectators and judges who needed to travel only to the timing area a short distance above the Creekside base a temporary high speed quad was built by Doppelmayr known as the Timing Flats Express in the Creekside base This alleviated demand on the main gondola and other lifts that serve the starting areas much higher up the mountain After the Olympics it was dismantled and sold to Sunshine Village Alberta and replaced the Strawberry chair In preparation for the Games Google Maps launched a Google Maps Street View partnership with Whistler to map out the various Olympic venues and many of the ski runs there The imagery was taken with cameras mounted on the back of snowmobiles and included panoramas from the Dave Murray Downhill run to the peak of Whistler and to the top of 7th Heaven 17 18 Blackcomb hosted the bobsled luge and skeleton events at The Whistler Sliding Centre Whistler Olympic Park hosted Olympic and Paralympic biathlon cross country skiing Nordic combined and ski jumping some distance to the south of the Creekside area in the Callaghan Valley The British Columbia government paid 600 million for major upgrades to the Sea to Sky Highway 19 which carried the majority of visitors to the alpine sites Notable accomplishments for Whistler athletes in the 2010 Olympic Games Ashleigh McIvor won the first gold ever in Ski Cross an inaugural Olympic event Maelle Ricker won gold in Snowboard Cross Siblings Mike and Britt Janyk competed in alpine skiing events on the mountain they grew up skiing Ski cross athlete Julia Murray daughter of Dave Murray competed in her first of likely many Olympic Games 2010s Edit Summer 2010 had two lift construction projects at Creekside Base The Timing Flats Express used for passenger transport for the games was removed and rebuilt as the Strawberry Express at Sunshine Village Alberta Canada The second project was the construction of the Kadenwood Gondola providing access to the Kadenwood Estate Homes from the Creekside base Built by Doppelmayr CTEC it is a pulse gondola with 8 passenger cabins in two groups of 2 Whistler Blackcomb announced plans on January 18 2013 regarding plans for two high speed detachable chairlift installations for the 2013 2014 Season 20 Ultimately Doppelmayr constructed a new high speed six pack to replace the Harmony Express lift upgrading its capacity from 2 400 to 3 600 persons per hour The lift was installed ahead of the 2013 2014 winter season in the same location as the existing quad lift Leitner Poma reinstalled the original Harmony Express equipment in the Crystal Ridge zone of Blackcomb as the Crystal Ridge Express lift replacing the shorter and slower Crystal triple chair lift While the Crystal Ridge Express ends at the same location as that of the removed triple at Crystal Hut it starts lower down the mountain just below the Blackcomb Glacier Road near the base of Rock n Roll The lift line for this lift had been cut many years prior in anticipation of construction and allows for the runs in this area to be lapped without needing to return to the Excelerator Express In 2014 new 8 person cabins were bought to upgrade the Village Gondola the existing cabins having been in service since 1988 Sigma a subsidiary of Leitner Poma who originally installed the lift were contracted to produce the new cabins 21 In May 2015 Whistler Blackcomb announced that both mountains would be declared smoke free environments President and CEO Dave Brownlie was quoted as saying We have made the decision to preserve the pristine alpine environment our guests come here for He continued to highlight a need for a safer workplace for employees and experience for guests We also recognize as a leader in the outdoor adventure and wellness industry and as the largest employer in the Whistler community we have a responsibility to our guests and staff to provide a safe and healthy environment for work and play We believe implementing this new policy aligns with this goal 22 In April 2016 a 345 million three phase development plan named Renaissance was announced by the mountain described as the largest and most exciting investment in the Company s history On mountain improvements to skiing and snowboard activities includes a replacement of the Magic Chair with a new high speed lift and the addition of night skiing in the same area during phase one Additionally during phase two and three the Franz Catskinner and Olympic chairs will be replaced with new high speed lifts a new gondola will be constructed from Creekside Base on Whistler Mountain two new chairlifts will be added in Bagel and Khyber Bowls and two new high speed lifts will replace Wizard and Solar Coaster 23 The Renaissance developments reflect many of the proposals included in the resort master plan updated at the end of 2013 24 25 26 Additional projects part of Renaissance include a 163 000 square foot water park with water slides a mountain roller coaster a suspension bridge atop Whistler Mountain s peak expansion of Whistler Mountain Bike Park new parking facilities and housing developments a new Blackcomb Grind hiking trail and a revitalization of Blackcomb s base 27 The start of this project will be subject to government approval and the renegotiation of the Company s master development agreements and negotiation of a proposed business partnership with local First Nations Once approval is granted Phase One projects and expansions will take two years to construct 28 On August 8 2016 it was announced that Whistler Blackcomb Holdings which owned 75 of the Whistler and Blackcomb partnerships would be sold to Vail Resorts of Colorado for C 1 4 billion which also saw the addition of the resort to the Epic Pass 29 For 2018 Doppelmayr carried out two major lift projects On Blackcomb a new two stage ten passenger gondola replaced the Wizard Express and Solar Coaster chairlifts with a midway turn station where the predecessor quads met Like the Whistler Village and Excalibur Gondolas it was built so that the two segments can be operated as one continuous lift or as two separate lifts While this happened the Emerald Express on Whistler was replaced with a high speed six pack and similar to Harmony five years earlier the original lift was relocated to Blackcomb where it replaced the Catskinner lift The Catskinner Express runs on a modified alignment compared to its predecessor starting below the Magic Castle whereas the triple started at the base of the Nintendo Terrain Park 30 2020s Edit Due to the COVID 19 pandemic Whistler was forced to close for the remainder of the ski season Vail gave refunds to anyone who booked a trip during the closing time 31 However the 2020 2021 season was in operation To comply with provincial safety protocols all guests must wear a mask when skiing in gondolas or in lift lineups and social distancing in crowded spaces to reduce transmission of the disease 32 Except for a brief closure in March 2021 33 operations remained like this for the rest of the season The 2021 2022 season saw similar rules in the resort 34 In 2020 the Horstman T bar was closed down and dismantled as the glacier it was built on receded However glacier skiing is still an activity during the summer only in the upper regions with the Showcase T bar 35 For the 2022 2023 winter season as part of Vail s Epic Lift Upgrade project Doppelmayr replaced the Creekside Gondola and the Big Red Express upgrading them to a ten passenger gondola and a high speed six pack chair respectively The new Creekside Gondola increased its lift capacity by 35 and the new Big Red Express increased its lift capacity by 30 In May 2022 the old cabins and chairs of the two lifts were put on sale and were sold for charity 36 Since the Creekside Gondola is also a mountain biking lift in the summer during construction bikers were allowed to bring their bikes in the Whistler Village Gondola cabins and the Garbanzo Express lift opened earlier However due to shipping delays the Creekside Gondola and Big Red Express were only completed until December 2022 From the start of the 2022 2023 winter season before the opening of the two new lifts shuttle buses transported guests from the Creekside area to the main village 37 38 39 40 Major Events Edit2010 Winter Olympics FIS Freestyle World Ski Championships 2001 FIS Snowboarding World Championships 2005 FIS Alpine Ski World Cup 1975 1982 1984 1986 1989 1993 1994 1995 2008 FIS Freestyle Skiing World Cup 1982 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002Major Lifts EditWinter Lifts Edit Lift Name Length Vertical Type Ride Time HourlyCapacity Mountain Make YearPeak 2 Peak Gondola 4 400 m 36 m 3S Gondola 11 min 4 200 Doppelmayr 2008Blackcomb Gondola 4 100 m 1 180 m 10 Person Gondola 13 min 4 000 Blackcomb Mountain Doppelmayr 2018Whistler Village Gondola 4 957 m 1 157 m 8 Person Gondola 15 min 2 800 Whistler Mountain Poma 1988Creekside Gondola 2 050 m 644 m 10 Person Gondola 7 min 3 200 Whistler Mountain Doppelmayr 2022Excalibur Gondola 2 204 m 367 m 8 Person Gondola 7 2 min 2 600 Blackcomb Mountain Doppelmayr 1994Kadenwood Gondola private use only 925 m 228 m 8x2x2 Pulse Gondola 6 1 min 160 Whistler Mountain Doppelmayr 2010Harmony 6 Express 1 772 m 524 m High Speed Six Pack 5 9 min 3 600 Whistler Mountain Doppelmayr 2013Emerald 6 Express 1 756 m 422 m High Speed Six Pack 6 5 min 3 600 Whistler Mountain Doppelmayr 2018Big Red Express 2 495 m 555 m High Speed Six Pack 8 2 min 3 600 Whistler Mountain Doppelmayr 2022Fitzsimmons Express 1 744 m 343 m High Speed Quad 5 8 min 1 850 Whistler Mountain Doppelmayr 2000Symphony Express 2 158 m 509 m High Speed Quad 7 2 min 2 400 Whistler Mountain Doppelmayr 2006Garbanzo Express 2 115 m 657 m High Speed Quad 6 9 min 2 800 Whistler Mountain Doppelmayr 2002Peak Express 1 073 m 401 m High Speed Quad 3 6 min 2 500 Whistler Mountain Doppelmayr 1998Excelerator Express 1 655 m 509 m High Speed Quad 5 4 min 2 800 Blackcomb Mountain Doppelmayr 1994Jersey Cream Express 1 414 m 375 m High Speed Quad 4 7 min 2 800 Blackcomb Mountain Doppelmayr 19897th Heaven Express 1 753 m 588 m High Speed Quad 5 8 min 2 800 Blackcomb Mountain Doppelmayr 1986Glacier Express 1 882 m 599 m High Speed Quad 6 3 min 2 500 Blackcomb Mountain Doppelmayr 1992Catskinner Express 1 375 m 321 m High Speed Quad 5 min 2 400 Blackcomb Mountain Doppelmayr 2018Crystal Ridge Express 1 708 m 535 m High Speed Quad 5 9 min 2 400 Blackcomb Mountain Poma 2013Franz s Chair 1 161 m 272 m Triple Chairlift 8 4 min 1 405 Whistler Mountain Poma 1998Olympic Chair 726 m 123 m Triple Chairlift 5 3 min 1 800 Whistler Mountain Lift Engineering Yan 1980Magic Chair 621 m 94 m Triple Chairlift 6 1 min 1 530 Blackcomb Mountain Yan Lift 1994Showcase 521 m 148 m T bar 3 2 min 1 034 Blackcomb Mountain Doppelmayr 1989T Bars 703 m 188 m T bar 4 2 min 1 515 Whistler Mountain Mueller 1965Summer Lifts Edit Lift Name Length Vertical Type Ride Time HourlyCapacity Mountain Make YearPeak 2 Peak Gondola 4 400 m 36 m 3S Gondola 28 11 min 4 200 Doppelmayr 2008Blackcomb Gondola 4 100 m 1 180 m 10 Person Gondola 4 000 Blackcomb Mountain Doppelmayr 2018Whistler Village Gondola 5 000 m 1 157 m 8 Person Gondola 30 min Whistler Mountain Poma 1988Creekside Gondola 10 Person Gondola Whistler Mountain Doppelmayr 2022Fitzsimmons Express 347 m High Speed Quad Whistler Mountain Doppelmayr 1999Garbanzo Express 660 m High Speed Quad Whistler Mountain Doppelmayr 1999Peak Express 401 m High Speed Quad Whistler Mountain Doppelmayr 1998Terrain Aspects 41 Edit North 55 West 40 East 2 South 3 Other facilities EditWhistler Mountain Bike Park Edit Aerial View of the Whistler Bike Park The Whistler Mountain Bike Park celebrated its 10th anniversary in 2008 Having consistently grown since its inception it sees an average of 100 000 bikers each summer citation needed The Whistler Mountain Bike Park uses the Fitzsimmons and Garbanzo quad chairlifts as well as the Whistler Village Gondola and Creekside Gondola to shuttle bikers to around midstation at 1 200 m 3 900 ft The park has 47 trails for all skill levels totaling 250 km of trails There are smooth trails with gentle banked corners for beginners steep twisty trails for intermediates tight trails with jumps and stunts for advanced riders and challenging trails with giant jumps drops and root strewn terrain for the experts Riders waiting in the Fitzsimmons chairlift line During the summer high speed quad chairlifts Fitzsimmons and Garbanzo used by the bike park have every second chair replaced with a bike rack These racks fit four bikes three in grooves and one on a hook on the side of the chair The bikers then get on the next chair which is a normal passenger carrier The bike park has three zones the Fitzsimmons Zone the lower zone the Garbanzo Zone the upper zone and the Creekside Zone All riders take either the Village Gondola or the Fitzsimmons quad to the Olympic Station area Then intermediate and advanced riders can take the Garbanzo quad up further to the Garbanzo zone Garbanzo riders can then return to midstation or Whistler Village the base of the bike park The Creekside Zone can be accessed via the Creekside Gondola or by riding through the Garbanzo Zone From the top of Garbanzo to the village is an impressive 1 100 m 3 600 ft vertical descent eclipsed only by the descent from the top gondola station or the top of the Peak Chair the highest accessible point on the mountain A Line is the most well known track The Boneyard Slopestyle Course is part of the Fitzsimmons Zone and is located at the very bottom of the bike park visible from the base of Whistler Mountain The Boneyard features a collection of high intermediate and advanced slopestyle features including drops dirt jumps and more citation needed Each summer since 2004 the park hosts Crankworx the largest annual freeride mountain biking competition in North America Another major competition Harvest Huckfest was held there each fall from 2002 to 2008 Whistler Blackcomb s Tube Park Edit For the 2005 06 ski season Blackcomb Mountain opened the Tube Park to allow for recreational tubing at the resort The tube park is located at Base II alongside the Village Run Incidents EditQuicksilver Express grip failure December 23 1995 Edit The lift operator on the Quicksilver lift pressed the button to make a routine stop to allow a fallen skier to get out of the way of the unloading ramp Instead the emergency brake activated sending shockwaves down the cable Grips on at least two of the chairs slipped and caused chairs to slide down the cable and slam into each other In all eight were injured and two were killed in one of the worst ski lift accidents in North America 42 43 The lift s manufacturer Lift Engineering Yan entered bankruptcy after the incident in July 1996 44 The cause was found to be a design fault in the Yan detachable grip The Quicksilver lift was removed and replaced by the Creekside Gondola The other two Yan high speed quads on Whistler Greenline and Redline were replaced with Doppelmayr high speed quads the year after that with all new terminals grips and chairs and renamed as the Emerald Express and Big Red Express respectively Excalibur Gondola Collapse December 16 2008 Edit The Excalibur gondola had a major malfunction on December 16 2008 when the upper portion of one of the lift towers detached and collapsed causing several of the gondola cabins to drop near to the ground 45 leaving 53 46 people trapped on the lower section of the lift line Firefighters rescued passengers from a cabin dangling over Fitzsimmons Creek and from another gondola that landed on a bus shelter The third cabin had crashed into the trees narrowly missing a condominium Twelve people suffered minor injuries 47 According to Whistler Blackcomb a joint in the tower separated due to the buildup of ice from water that had seeped into the tower 48 The undamaged upper half of the lift running from Blackcomb s Base 2 was reopened on Saturday December 20 49 After repairs were made to the collapsed tower the whole lift was back in service on Wednesday December 24 50 Harmony Express grip failure February 18 2009 Edit Four sheaves make up this lift tower s uphill sheave train A similar train is off frame to the left guiding the cable as it returns downhill The lift operations team on Whistler s Harmony Express had been experiencing some problems with the lift during the day of Wednesday February 18 2009 That night a grooming machine operator found a chair had fallen from the lift at Tower 11 At the tops of the lift towers are a series of wheels known as sheaves or sheave trains as there are almost always more than one in a row Towers typically have two sheave trains one for the uphill moving side of the cable loop and one for the downhill side Upon inspection the next morning maintenance crews discovered that the sheave train on the downhill side of tower 11 had failed and that the sheave had turned into the path of a chair and forced it off the cable The cause was later determined to be a failed bolt and all of the bolts were replaced 51 The lift reopened on Sunday February 22 2009 The affected chair No 37 was temporarily removed from operation it has since been replaced Whistler T Bars summer maintenance incident August 31 2009 Edit On Monday August 31 2009 two Lift Maintenance employees were injured when the lift began to move after being given the go ahead while a maintenance person was safety harnessed to the tower The person remained attached to both the tower and the maintenance carrier while the second employee was secured to the carrier The safety harness ended up pulling so hard on the maintenance carrier the carrier became detached from the cable and dropped to the rocky ground below severely injuring the worker in it The employee hanging from the tower only received bruises 52 Big Red Express Bolt Failure December 6 2009 Edit On Sunday December 6 2009 at 8 55 am a passenger aboard the Big Red Express on Whistler Mountain noticed that a sheave train had broken off Tower 31 and had fallen to the ground They immediately notified the lift operator at the top terminal 2 towers away and Whistler Blackcomb Lift Maintenance department After almost a 30 minute inspection they determined the issue was not severe enough to evacuate the lift The lift was run at low speed to evacuate all passengers All passengers were finally off the lift just before 10 am The lift was closed down for the day repaired and back in operation Monday December 7 53 Photographs Edit A view of 7th Heaven on Blackcomb Mountain from Whistler Mountain Panorama of the two mountains The Wizard Express quad lift at the base of Blackcomb mountain since removed View from top of Jersey Cream run with Jersey Cream Bowl in the background 360 degree panorama from the top of Whistler Peak The Couloir Run on Blackcomb MountainSee also EditWhistler British Columbia the Resort Municipality of Whistler Whistler Mountain the geographical feature Blackcomb Peak the geographical feature Garibaldi Provincial Park Peak 2 Peak Gondola Intrawest Jack SoutherReferences Edit Mountain Info Whistler Blackcomb Retrieved January 3 2023 piquenewsmagasine com Retrieved February 19 2019 Whistler Blackcomb Ski Guide Retrieved September 21 2011 Intrawest History Archived from the original on February 22 2007 Johnston Greg December 12 2008 Tram catches air between summits Seattle Post Intelligencer The Hearst Corporation Retrieved December 13 2008 Whistler Blackcomb PEAK 2 PEAK Gondola Details Whistler Blackcomb Archived from the original on April 27 2014 Retrieved December 13 2008 a b c d e f g h i j k l m n o p q r s t u v w Walking a b c d e History Diamond Head mountain BC Geographical Names John Sanko Colorado only state ever to turn down Olympics Archived June 1 2009 at the Wayback Machine Denver Rocky Mountain News October 12 1999 Innsbruck 1976 IOC April 24 2018 Intrawest Symphony Amphitheatre amp the Symphony Express Whistlerblackcomb com Archived from the original on July 18 2011 Retrieved March 10 2011 New Piccolo Lift For The 2006 07 Season Whistlerblackcomb com March 31 2006 Archived from the original on July 20 2011 Retrieved March 10 2011 Intrawest on the auction block montrealgazette com Canwest Publishing January 20 2010 Archived from the original on January 24 2010 Retrieved February 15 2010 Blackcomb Whistler KSL Capital Partners Acquires 24 Interest in Whistler Blackcomb Holdings Inc www prnewswire com Google Lat Long Street View hits slopes at Whistler February 9 2010 Retrieved February 25 2023 Google Street View expands across Canada CBC February 9 2010 Retrieved February 25 2023 Microsoft Word S2S Capital Project Plan 3 doc PDF Archived from the original PDF on June 11 2011 Retrieved March 10 2011 2 New Lifts Announced Archived from the original on April 24 2013 Retrieved March 17 2013 Whistler Blackcomb Official Ski Resort Website Whistler BC Canada NEW CABINS FOR WHISTLER BLACKCOmb s VILLAGE GONDOLA INCLUDED IN 12 MILLION INVESTMENTS FOR WINTER 2014 2015 Archived from the original on March 5 2014 Retrieved March 5 2014 Whistler Blackcomb resort bans smoking completely CBC News May 15 2015 Landsman Peter Whistler Blackcomb Unveils 345 Million Renaissance Lift Blog Retrieved April 7 2016 Landsman Peter November 15 2015 Whistler Blackcomb s Next 20 Years Lift Blog Retrieved April 12 2016 Whistler Blackcomb Master Plan Update 2013 Whistler Archived from the original on December 31 2017 Retrieved April 12 2016 Whistler Blackcomb Master Plan Update 2013 Blackcomb Archived from the original on December 31 2017 Retrieved April 12 2016 Kenneth Chan Whistler Blackcomb to add indoor water park roller coaster and night skiing in 345 million plan Vancity Buzz Archived from the original on December 31 2017 Retrieved April 7 2016 Whistler Blackcomb Holdings Inc announces Whistler Blackcomb Renaissance long term strategic plan Whistler Blackcomb April 5 2016 Archived from the original on July 9 2017 Retrieved April 7 2016 Dmitrieva Katia Gopal Prashant August 8 2016 Vail to Buy Whistler Blackcomb Ski Resort for 1 05 Billion Bloomberg News Retrieved August 9 2016 Whistler Ski Holidays Skiing Whistler Ski Independence www ski i com Retrieved August 22 2018 Boynton Sean March 17 2020 Whistler Blackcomb closed for the rest of the ski season due to coronavirus Global News Retrieved March 3 2023 Lovgreen Tina November 26 2020 Whistler Blackcomb opens for the ski season as day trippers told to stay away Retrieved March 3 2023 Chan Kenneth March 29 2021 Whistler Blackcomb to close for several weeks due to rising COVID 19 cases Daily Hive News Retrieved March 3 2023 Dukeson Thomas November 24 2021 Opening Day Know Before You Go Whistler Blackcomb Retrieved March 3 2023 Hodgson T 2021 January 12 Wake Up Call Ski Mag https www skimag com ski resort life horstman t bar removed Retrieved on 28 August 2021 Whistler Creekside s Red Chair gondola cabins to go up for sale Pique Magazine April 24 2022 Retrieved February 21 2023 NEWLY UPGRADED CREEKSIDE GONDOLA OFFICIALLY OPENS AT WHISTLER BLACKCOMB Whistler Blackcomb Newsroom Retrieved February 21 2023 An Update on Lift Upgrade Projects Whistler Blackcomb December 22 2022 Retrieved February 21 2023 Lalonde Megan December 22 2022 Just in time for Christmas the Creekside Gondola is finally ready North Shore News Retrieved February 21 2022 McKall Terry April 17 2022 Whistler Creekside Zone closed for summer 2022 Cycling Magazine Retrieved February 21 2023 ZRankings Best Ski Resorts ZRankings Topographical Terrain Survey ZRankings ZRankings Retrieved October 27 2015 Nixon Emily Disaster and Emergency Management The Quicksilver Chairlift Incident Archived April 8 2008 at the Wayback Machine Graduating Essay University of Victoria Geography Dept April 2004 Pyn Larry February 9 2008 Minimizing the risks on B C s ski lifts Vancouver Sun Canada Canwest Interactive Archived from the original on April 17 2008 Retrieved February 29 2008 Markels Alex January 16 1997 The Rise Fall and Return of a Ski Lift Entrepreneur The Wall Street Journal Dow Jones amp Company Retrieved February 29 2008 Gondola tower snaps at ski resort BBC News channel December 17 2008 Retrieved December 17 2008 Excalibur Gondola Update Whistler Blackcomb December 17 2008 Archived from the original on July 18 2011 Retrieved December 17 2008 Culbert Lori Mary Frances Hill Jennifer Miller December 16 2008 Twelve injured rescue complete after Whistler gondola accident Vancouver Sun Canada Pacific Newspaper Group Archived from the original on August 15 2020 Retrieved December 17 2008 Whistler Blackcomb Operations To Resume Following Bc Safety Authority Secondary Inspection Whistler Blackcomb December 17 2008 Archived from the original on July 18 2011 Retrieved December 17 2008 Whistler Blackcomb press release Upper Line Of Excalibur Gondola Re Opens Saturday Whistler Blackcomb Resort December 19 2008 Archived from the original on July 18 2011 Retrieved December 31 2008 Whistler Blackcomb press release Excalibur Gondola Will Fully Re Open December 24 Whistler Blackcomb Resort December 23 2008 Archived from the original on July 18 2011 Retrieved December 31 2008 Whistler Harmony Chair Statement Whistlerblackcomb com February 21 2009 Archived from the original on July 18 2011 Retrieved March 10 2011 Whistler CANADA Pique newsmagazine Retrieved March 10 2011 Whistler Whistler Blackcomb Media Statement Whistlerblackcomb com Archived from the original on July 18 2011 Retrieved March 10 2011 Further reading Edit Stats Mountain Stats Whistler Blackcomb home page History History Whistler Blackcomb home page Look A Look at Whistler History Whistler Museum amp Archives Society Walking 2010 Village Olympic Walking Tour Whistler Museum amp Archives Society Intrawest Intrawest Corporation Quick Facts Intrawest Corp External links Edit Media related to Whistler Blackcomb at Wikimedia Commons Vancouver2010 com profile Whistler Blackcomb official site Whistler Blackcomb 2010 Winter Games Retrieved from https en wikipedia org w index php title Whistler Blackcomb amp oldid 1158487977, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.