Warragamba Dam is a heritage-listed dam in the outer South Western Sydney suburb of Warragamba, Wollondilly Shire in New South Wales, Australia. It is a concrete gravity dam, which creates Lake Burragorang, the primary reservoir for water supply for the city of Sydney. The dam wall is located approximately 65 kilometres (40 mi) W of Sydney central business district, 4½ km SW of the town of Wallacia, and 1 km NW of the village of Warragamba.

Warragamba Dam
Warragamba Dam wall
Location of the Warragamba Dam
in New South Wales
CountryAustralia
LocationWarragamba, New South Wales
Coordinates33°52′59″S 150°35′44″E / 33.88306°S 150.59556°E / -33.88306; 150.59556Coordinates: 33°52′59″S 150°35′44″E / 33.88306°S 150.59556°E / -33.88306; 150.59556
PurposePotable water supply
StatusOperational
Construction began1948; 75 years ago (1948)
Opening date14 October 1960; 62 years ago (1960-10-14)
Owner(s)WaterNSW
Dam and spillways
Type of damGravity dam
ImpoundsWarragamba River
Height142 m (466 ft)
Length351 m (1,152 ft)
Width (base)104 m (341 ft)
Dam volume3,000,000 tonnes (3,300,000 short tons; 3,000,000 long tons)
SpillwaysTwo
Spillway typeControlled chute spillways with five crest gates and a central drum; automatic operation
Reservoir
CreatesLake Burragorang
Total capacity2,031 GL (4.47×1011 imp gal; 5.37×1011 US gal)
Catchment area9,051 km2 (3,495 sq mi)
Surface area75 km2 (29 sq mi)
Maximum length52 km (32 mi)
Maximum water depth105 m (344 ft)
Normal elevation180 m (590 ft)
Power Station
Operator(s)Eraring Energy
Commission date1959; 64 years ago (1959)
Decommission date2001; 22 years ago (2001)
TypeConventional
Turbines1
Installed capacity50 MW
Website
Warragamba Dam at WaterNSW
Official nameWarragamba Emergency Scheme
TypeState heritage (built)
Designated18 November 1999; 23 years ago (1999-11-18)
Reference no.1376
TypeWater Supply Reservoir/ Dam
CategoryUtilities - Water
BuildersMetropolitan Water Sewerage and Drainage Board

The dam was devised as part of a collective engineering response to Sydney's critical water shortage during World War II and was originally known as the Warragamba Emergency Scheme. Constructed between 1948 and 1960, the dam created capacity for a reservoir of 2,031 gigalitres (4.47×1011 imp gal; 5.37×1011 US gal) and is fed by a catchment area of 9,051 square kilometres (3,495 sq mi). The surface area of the lake covers 75 square kilometres (29 sq mi) of the now-flooded Burragorang Valley. It was designed and built by the Metropolitan Water Sewerage and Drainage Board. A small hydroelectric power station was incorporated into the design of the dam but has been disconnected from the grid since 2001.

The property is owned by WaterNSW, an agency of the Government of New South Wales. The dam was added to the New South Wales State Heritage Register on 18 November 1999.

Drought has severely depleted the level of the dam at times: on 8 February 2007 it recorded an all-time low of 32.5% of capacity. On 2 March 2012, it overflowed for the first time in fourteen years. It overflowed again in 2016, March 2021[1] and March 2022.[2]

History

One of the first places in the Gundungurra traditional homelands that most appealed to the Anglo-Celtic settlers were the river flats of the Burragorang Valley (now flooded under Lake Burragorang). Even before the valley was officially surveyed in 1827-1828, many early settlers were already squatting on blocks that they planned to officially occupy following the issue of freehold title grants. From the Burragorang Valley and using Aboriginal pathways, other valleys to the west were occupied and developed by the settlers with construction of outstations and stock routes. These cattle entrepreneurs were then followed by cedar-wood extractors and miners.[3]

In 1845, Paweł Strzelecki drew attention to the Warragamba River as a water supply catchment; in 1867, supporters proposed a dam.[4]

The Gundungurra traditional owners resisted the taking of their lands, and, relying on various laws of the colony at the time, continually applied for official ownership. Although their individual claims failed, in some kind of recognition of the significance of the designated tracts of land claimed, six Aboriginal Reserves (under the control of the NSW Aborigines Protection Board) were formally declared in the Burragorang Valley. Even after these reserves were revoked, many of the traditional owners remained, quietly refusing to leave their traditional homelands.[3]

Finally pushed into the "Gully", a fringe development in West Katoomba from about 1894, the Gully community stayed together for more than 60 years until dispossessed of the Gully by the then Blue Mountains Shire Council so a group of local businessmen could develop a speedway that became known as the Catalina Race Track. The Gully people kept talking about areas of land they had walked in as children - the nearby Megalong and Kanimbla Valleys and the Burragorang Valley. They knew of the profound significance of these valleys for their parents and grandparents.[5][3]

Between 1867 and 1946, supporters of Strzelecki's proposal proposed various schemes before the site and design of the current dam received approval.[4]

Warragamba Emergency Scheme

In 1910, Ernest de Burgh, Chief Engineer for Water Supply and Sewerage, in the NSW Public Works Department prepared a proposal for a dam on the Warragamba River and followed it up in 1918 with more detailed plans. His proposals were passed onto the newly formed Metropolitan Water and Sewerage and Drainage Board in 1925 when it took over from the P.W.D. The completion of the Warragamba Emergency Scheme required during its peak 1,000 waged employees at the Headworks, and a further 1,000 on the Pipeline. All buildings used in the construction of the Emergency Scheme were designed for later re-use as cottages for the future maintenance and operations personnel. Some of these buildings were relocated from elsewhere. The main works office was the original police station at the Nepean Dam site.[3]

In 1940, a weir and water pumping station, known as the Warragamba Emergency Scheme, reached completion, just downstream of the main dam site,[4] located on the east bank of the Warragamba River. Access to the site was along the road currently known as Weir Road. Major elements of the construction works still extant include the weir, a 10-cable cableway, shads, batching plants, roads, electrical substation, chlorination plant, maintenance staff accommodation, balance reservoir, Megarritys Bridge, water pumping station, tunnels, and associated pipelines.[3]

1948–1960: construction of current dam

In 1943 the Metropolitan Water, Sewerage and Drainage Board invited the geologist William Browne to investigate a proposed site. Browne found a more suitable site and continued as geological adviser until completion.[6] The site was reviewed and approved by Dr John Savage, considered the pre-eminent expert in this field, and formally accepted by the Metropolitan Water, Sewerage and Drainage Board on 2 October 1946.[4] The Board appointed Thomas Upton as the engineer.

The Warragamba River flows through a gorge that varies in width from 300 to 600 metres (980 to 1,970 ft), and is 100 metres (330 ft) in depth. This gorge opens at its upper end into a large valley, the Burragorang Valley. This river configuration allows for a relatively short but high dam wall, in the gorge, to impound a vast quantity of water.[4]

Dam construction began in 1948 and was completed in 1960. The resulting dam of the Warragamba River formed Lake Burragorang, which is one of the largest reservoirs for urban water supply in the world.[citation needed]

The dam wall comprises 1,612,000 cubic yards (1,232,000 m3) of concrete. It was laid as interlocking blocks roughly 17 metres (56 ft) on each side, which were later grouted together to form a continuous, monolithic wall. It is so large that engineers had to use two techniques to prevent the temperature from becoming too hot as the concrete set. One was to add ice to the wet concrete, the first application of this technique in Australia. The other was to embed cooling pipes into the concrete and circulate chilled water through the pipes. As a result, the dam wall was cooled in a few months instead of the estimated 100 years it would have taken to cool naturally.[4]

Description and recent works

The dam impounds the Coxs, Kowmung, Nattai, Wingecarribee, Wollondilly, and Warragamba rivers, within the Hawkesbury-Nepean catchment.[7]

The dam created capacity for a reservoir of 2,027 gigalitres (4.46×1011 imp gal; 5.35×1011 US gal) and is fed by a catchment area of 9,051 square kilometres (3,495 sq mi). The surface area of the lake covers 75 square kilometres (29 sq mi) of the now flooded Burragorang Valley.[7]

Spillway

 
Warragamba Dam

The main spillway has five crest gates: A central drum gate with a 27 metres (89 ft) clear span with a pair of radial gates on each side. Each radial gate has a 12 metres (39 ft) clear span. The drum gate is hinged along the upstream edge to the upstream crest and lowers into the dam wall to allow water to flow over it. When fully open, it forms a continuation of the crest profile.[4] All gates open automatically as the dam passes full water level, or can be manually opened.[4][8] The auxiliary spillway is normally closed by a series of fuse plugs that are designed to be washed away in the event of an extreme flood event.[9]

As originally designed, the dam could safely withstand a peak inflow of 500,000 cubic feet per second (14,000 m3/s), leading to a peak discharge of 354,000 cubic feet per second (10,000 m3/s) down the spillway.[4] Following a 1987 and 1989 re-evaluation of the potential rainfall and flood risks, the New South Wales Government authorised for the dam wall to be raised by 5 metres (16 ft) and constructed an auxiliary spillway on the east bank of the dam.[8]

Power generation

There was also a hydroelectric power station at the dam that could generate 50 megawatts (67,000 hp),[10][11] transmitting its output over a 132kV transmission line to Penrith Substation. Water levels very rarely became high enough to allow operation of the generators. By 2001, it was rarely used and was disconnected from the electricity grid.[12]

21st century re-engineering and enhancements

In 2006, the Warragamba Deep Water Storage Recovery Project, part of the Metropolitan Water Plan, penetrated the base of the dam wall to allow the previously inaccessible lowest water in the reservoir to be available. This new outlet was below the minimum level required for gravity flow, which delivered water from the existing outlets. The project constructed a new pumping station downstream of the dam. The new pumping station is within the Emergency Scheme pumping station chamber. This project provided access to eight per cent more water or approximately six months of extra supply. On 15 April 2006, the project reached a major milestone when it increased the available storage from 1,857 gigalitres (6.56×1010 cu ft) to 2,027 gigalitres (7.16×1010 cu ft).[7]

Enhancements to the dam were completed in 2009, including the addition of an auxiliary spillway to manage extreme flood events.[9]

Other recent[when?] major work includes a complete upgrade of the three passenger lifts within the dam wall, an upgrade of the travelling crest crane and a complete upgrade of the four water supply outlets in the valve house, which includes the replacement of the major valves.[citation needed]

Proposed raising of dam wall

Since 2017, WaterNSW has been working on a risk-mitigation project, aimed at protecting human life and property in the floodplain catchment area in case of major flooding, primarily by raising the dam wall by up to 17 metres (56 ft).[13] Infrastructure NSW's rationale is based on the fact that up to 134,000 people live and work on the floodplain, and urban growth could greatly increase this number in decades to come; giving the dam a greater capacity would enable holding back floodwaters before releasing it in a controlled fashion, reducing the need for urgent evacuations.[13]

However, there are concerns for the more than 50 recognised Aboriginal heritage sites in the 6,000 hectares (15,000 acres) of World Heritage Area that would be flooded, parts of which were badly burnt in the 2019–2020 bushfires in Australia. The box gum grassy woodlands are home to threatened species of birds, including up to 50% of the remaining population of the critically endangered regent honeyeater, as well as koalas and greater gliders.[14]

In September 2020, the New South Wales Government was ordered by the federal Department of Agriculture, Water and the Environment to re-do their Indigenous heritage work, concerned that NSW has not adequately addressed the concerns of Gundungurra and other traditional owners in their cultural heritage surveys.[15] The federal review also said that the environmental impact assessment lacked detail on how the project could affect species such as the platypus and echidna. Engineering experts have also questioned the modelling done by Infrastructure NSW.[16]

Catchment

The catchment area is 9,051 square kilometres (3,495 sq mi). The areas closest to the lake, making up around 30% of the total catchment, are restricted access special areas. Most of the rest

Although the engineers did not design Warragamba Dam as a flood control measure, it can mitigate flooding by holding floodwaters back while the reservoir fills.[citation needed]

Dam level crises and water restrictions

There have been times when drought has seriously depleted the dam. In March 1983, Lake Burragorang's level reached a low of 45.4% of capacity, only to reach the maximum level in the mid-1990s; as a consequence, the gates were opened (there was a significant spill in August 1998[16]). Between 1998 and 2007 the catchment area experienced extremely low rainfall (in December 2004, the dam dropped to 38.8% of capacity, the lowest on record to date[17]) and on 8 February 2007 it recorded an all-time low of 32.5% of capacity.[18]

The New South Wales State Government tried to reduce this risk by implementing water restrictions[19] and commissioned the construction of a desalination plant, at Kurnell. Heavy rains between June 2007 and February 2008 restored the dam level to around 67%. Despite this, Level 3 water restrictions remained in place until 21 June 2009.[20]

On 29 February 2012, it was reported that the dam was likely to overflow for the first time in fourteen years, due to continuing heavy rain in the region.[20] The dam began spilling at 18:53 (AEDT) on 2 March 2012 and again on 20 April 2012.[21][22][23][16]

The dam reached full capacity on 17 August 2020, compared with it being less than half full a year previously.[13] During a days long severe weather event, affecting much of New South Wales, it overflowed for the first time since 2016 on 20 March 2021.[1] In March 2022, following heavy rains across NSW and Queensland, the dam once again overflowed, flooding areas downstream.[24]

Warragamba Dam again reached 100% capacity on the 26th of November 2021 and began spilling following a prolonged period of rain in NSW.[25]

Statistical overview

Key dam structures
Height 142 metres (466 ft)
Length 351 metres (1,152 ft)
Thickness at top 8.5 metres (28 ft)
Thickness at base 104 metres (341 ft)
Width of central spillway 94.5 metres (310 ft)
Width of auxiliary spillway (at mouth) 190 metres (620 ft)
Length of auxiliary spillway 700 metres (2,300 ft)
Hydro-electric plant capacity 50 megawatts (67,000 hp)
Key reservoir statistics
Available storage (when full) 2,027 gigalitres (7.16×1010 cu ft)
Total capacity (when full) 2,031 gigalitres (7.17×1010 cu ft)
Surface area 75 square kilometres (29 sq mi)
Length of lake 52 kilometres (32 mi)
Length of foreshores 354 kilometres (220 mi)
Deepest point 105 metres (344 ft)
Catchment area 9,051 square kilometres (3,495 sq mi)
Average annual rainfall 840 millimetres (33 in)

Access and recreation

Warragamba Dam was a popular picnic spot for Sydneysiders, but access to the public was restricted after 1999 due to A$240 million of upgrades in that time. It reopened to the public on 8 November 2009.[26]

Access to the dam wall and terrace gardens opened from 23 December 2012 to 28 January 2013 at weekends and public holidays.

Heritage listing

The Emergency Scheme is representative of the collective engineering response to Sydney's critical water shortage during the Second World War period. It was the first stage in the storage and extraction of water from the Warragamba River, and was preliminary to the Waragamba Dam. All of the components are excellent examples of the civil engineering skills of the times; the Balance Reservoir is particularly significant because it provides a stilling pool downstream of Warragamba Dam for the purpose of flood discharge; the group of five cottages associated with the construction of the dam are considered to be of high significance because they housed the operations staff between 1940 and 1959. These have since been incorporated into the Warragamba township, one of the largest townships in the Shire of Wollondilly.[3]

The Warragamba Emergency Scheme was listed on the New South Wales State Heritage Register on 18 November 1999, having satisfied the following criteria:[3]

  • The place possesses uncommon, rare or endangered aspects of the cultural or natural history of New South Wales.
  • This item is assessed as historically rare statewide and as well as scientifically rare statewide.[3]

In popular culture

  • Warragamba Slammer is a popular phrase used in Australian pubs and restaurants throughout greater Sydney as a reference to tap water.[27]

See also

References

  1. ^ a b "Warragamba Dam overflows for first time in years amid NSW 'extreme weather event'". ABC News. Australian Broadcasting Corporation. 20 March 2021. Retrieved 20 March 2021.
  2. ^ "NSW flood: Sydney residents west and northwest evacuated after Warragamba dam overflows | Floods off the east coast of Australia 2022". 2 March 2022.
  3. ^ a b c d e f g h "Warragamba Emergency Scheme". New South Wales State Heritage Register. Department of Planning and Environment. H01376. Retrieved 2 June 2018.   Text is licensed by State of New South Wales (Department of Planning and Environment) under CC-BY 4.0 licence.
  4. ^ a b c d e f g h i Aird, W. V. (1961). The water supply, sewerage, and drainage of Sydney. Sydney: Metropolitan Water, Sewerage and Drainage Board. pp. 106–117. An account of the development and history of the water supply, sewerage, and drainage systems of Sydney and the near south coast from their beginnings with the first settlement to 1960.
  5. ^ Johnson, 2009, 4.
  6. ^ Vallance, T. G. Browne, William Rowan (1884–1975). Australian Dictionary of Biography. National Centre of Biography, Australian National University. Retrieved 6 April 2013.
  7. ^ a b c "Warragamba Dam". Sydney Catchment Authority. Government of New South Wales. Retrieved 14 October 2020.
  8. ^ a b "Warragamba: A dam full of myths". Sydney Catchment Authority. Retrieved 3 March 2012.
  9. ^ a b . Sydney Catchment Authority. Government of New South Wales. 31 May 2011. Archived from the original on 11 April 2013. Retrieved 6 April 2013.
  10. ^ . Generation Portfolio. Eraring Energy. Archived from the original on 21 March 2012.
  11. ^ . Generation Portfolio. Eraring Energy. Archived from the original on 11 April 2013.
  12. ^ "Annual Report" (PDF). Eraring Energy. 2012. p. 18. Retrieved 6 April 2013.
  13. ^ a b c Cox, Lisa; Morton, Adam (19 August 2020). "Warragamba Dam: is western Sydney about to flood and would raising the dam wall help?". The Guardian. Retrieved 18 September 2020.
  14. ^ Cox, Lisa (11 September 2020). "'Mud and dead trees': the dire environmental effects of raising Warragamba dam wall". The Guardian. Retrieved 18 September 2020.
  15. ^ Calderwood, Kathleen (11 September 2020). "Plans to raise Warragamba Dam wall could see flood destroy Indigenous artefacts, leaked document says". ABC News. Australian Broadcasting Corporation. Retrieved 18 September 2020.
  16. ^ a b c Cox, Lisa (17 September 2020). "NSW government ordered to revisit world heritage assessments for Warragamba Dam expansion". the Guardian. Retrieved 18 September 2020.
  17. ^ Warragamba Dam hits lowest level by ABC News Friday, 10 December 2004
  18. ^ "Bulk Water Storage & Supply Report". Sydney Catchment Authority. Government of New South Wales. 8 February 2007.
  19. ^ . Sydney Water Corporation. Archived from the original on 28 May 2007.
  20. ^ a b "Warragamba Dam to spill Friday morning: BoM". ABC TV. Australia. 2 March 2012. Retrieved 2 March 2012.
  21. ^ "SCAN" (PDF). The Sydney Catchment Authority’s quarterly newsletter. Sydney Catchment Authority. Autumn 2012. p. 3. Retrieved 6 April 2013.
  22. ^ "Warragamba Dam finally spills". Sydney Morning Herald. AAP. 2 March 2012. Retrieved 2 March 2012.
  23. ^ "Warragamba bursts, flood warning issued". Sydney Morning Herald. AAP. 20 April 2012. Retrieved 20 April 2012.
  24. ^ "NSW flood: Sydney residents west and northwest evacuated after Warragamba dam overflows | Floods off the east coast of Australia 2022". 2 March 2022.
  25. ^ Gorrey, Sally Rawsthorne, Megan (27 November 2021). "Warragamba Dam spills, 21 flood warnings across the state". The Sydney Morning Herald. Retrieved 13 December 2021.
  26. ^ "Warragmba (sic) Dam will re-open to public". ABC News. Australia. 13 July 2009. Retrieved 13 July 2009.
  27. ^ "Warragamba Slammer". Sydney Water.

Bibliography

  • "Warragamba Dam". 2007.
  • Attraction Homepage (2007). "Warragamba Dam".
  • Johnson, Dianne (2009). 'The Katoomba Gully People's resistance to dispossession' in History Council of NSW Bulletin, Winter.
  • Graham Brooks and Associates Pty Ltd (1996). Sydney Water Heritage Study.

Attribution

  This Wikipedia article was originally based on Warragamba Emergency Scheme, entry number 01376 in the New South Wales State Heritage Register published by the State of New South Wales (Department of Planning and Environment) 2018 under CC-BY 4.0 licence, accessed on {{{accessdate}}}.

External links

  Media related to Warragamba Dam at Wikimedia Commons

  • WaterNSW - Warragamba Dam
  • FloodSafe NSW Warragamba FAQ

warragamba, heritage, listed, outer, south, western, sydney, suburb, warragamba, wollondilly, shire, south, wales, australia, concrete, gravity, which, creates, lake, burragorang, primary, reservoir, water, supply, city, sydney, wall, located, approximately, k. Warragamba Dam is a heritage listed dam in the outer South Western Sydney suburb of Warragamba Wollondilly Shire in New South Wales Australia It is a concrete gravity dam which creates Lake Burragorang the primary reservoir for water supply for the city of Sydney The dam wall is located approximately 65 kilometres 40 mi W of Sydney central business district 4 km SW of the town of Wallacia and 1 km NW of the village of Warragamba Warragamba DamWarragamba Dam wallLocation of the Warragamba Damin New South WalesCountryAustraliaLocationWarragamba New South WalesCoordinates33 52 59 S 150 35 44 E 33 88306 S 150 59556 E 33 88306 150 59556 Coordinates 33 52 59 S 150 35 44 E 33 88306 S 150 59556 E 33 88306 150 59556PurposePotable water supplyStatusOperationalConstruction began1948 75 years ago 1948 Opening date14 October 1960 62 years ago 1960 10 14 Owner s WaterNSWDam and spillwaysType of damGravity damImpoundsWarragamba RiverHeight142 m 466 ft Length351 m 1 152 ft Width base 104 m 341 ft Dam volume3 000 000 tonnes 3 300 000 short tons 3 000 000 long tons SpillwaysTwoSpillway typeControlled chute spillways with five crest gates and a central drum automatic operationReservoirCreatesLake BurragorangTotal capacity2 031 GL 4 47 1011 imp gal 5 37 1011 US gal Catchment area9 051 km2 3 495 sq mi Surface area75 km2 29 sq mi Maximum length52 km 32 mi Maximum water depth105 m 344 ft Normal elevation180 m 590 ft Power StationOperator s Eraring EnergyCommission date1959 64 years ago 1959 Decommission date2001 22 years ago 2001 TypeConventionalTurbines1Installed capacity50 MWWebsiteWarragamba Dam at WaterNSWNew South Wales Heritage RegisterOfficial nameWarragamba Emergency SchemeTypeState heritage built Designated18 November 1999 23 years ago 1999 11 18 Reference no 1376TypeWater Supply Reservoir DamCategoryUtilities WaterBuildersMetropolitan Water Sewerage and Drainage BoardThe dam was devised as part of a collective engineering response to Sydney s critical water shortage during World War II and was originally known as the Warragamba Emergency Scheme Constructed between 1948 and 1960 the dam created capacity for a reservoir of 2 031 gigalitres 4 47 1011 imp gal 5 37 1011 US gal and is fed by a catchment area of 9 051 square kilometres 3 495 sq mi The surface area of the lake covers 75 square kilometres 29 sq mi of the now flooded Burragorang Valley It was designed and built by the Metropolitan Water Sewerage and Drainage Board A small hydroelectric power station was incorporated into the design of the dam but has been disconnected from the grid since 2001 The property is owned by WaterNSW an agency of the Government of New South Wales The dam was added to the New South Wales State Heritage Register on 18 November 1999 Drought has severely depleted the level of the dam at times on 8 February 2007 it recorded an all time low of 32 5 of capacity On 2 March 2012 it overflowed for the first time in fourteen years It overflowed again in 2016 March 2021 1 and March 2022 2 Contents 1 History 1 1 Warragamba Emergency Scheme 1 2 1948 1960 construction of current dam 2 Description and recent works 2 1 Spillway 2 2 Power generation 2 3 21st century re engineering and enhancements 2 4 Proposed raising of dam wall 3 Catchment 3 1 Dam level crises and water restrictions 4 Statistical overview 5 Access and recreation 6 Heritage listing 7 In popular culture 8 See also 9 References 9 1 Bibliography 9 2 Attribution 10 External linksHistory EditOne of the first places in the Gundungurra traditional homelands that most appealed to the Anglo Celtic settlers were the river flats of the Burragorang Valley now flooded under Lake Burragorang Even before the valley was officially surveyed in 1827 1828 many early settlers were already squatting on blocks that they planned to officially occupy following the issue of freehold title grants From the Burragorang Valley and using Aboriginal pathways other valleys to the west were occupied and developed by the settlers with construction of outstations and stock routes These cattle entrepreneurs were then followed by cedar wood extractors and miners 3 In 1845 Pawel Strzelecki drew attention to the Warragamba River as a water supply catchment in 1867 supporters proposed a dam 4 The Gundungurra traditional owners resisted the taking of their lands and relying on various laws of the colony at the time continually applied for official ownership Although their individual claims failed in some kind of recognition of the significance of the designated tracts of land claimed six Aboriginal Reserves under the control of the NSW Aborigines Protection Board were formally declared in the Burragorang Valley Even after these reserves were revoked many of the traditional owners remained quietly refusing to leave their traditional homelands 3 Finally pushed into the Gully a fringe development in West Katoomba from about 1894 the Gully community stayed together for more than 60 years until dispossessed of the Gully by the then Blue Mountains Shire Council so a group of local businessmen could develop a speedway that became known as the Catalina Race Track The Gully people kept talking about areas of land they had walked in as children the nearby Megalong and Kanimbla Valleys and the Burragorang Valley They knew of the profound significance of these valleys for their parents and grandparents 5 3 Between 1867 and 1946 supporters of Strzelecki s proposal proposed various schemes before the site and design of the current dam received approval 4 Warragamba Emergency Scheme Edit In 1910 Ernest de Burgh Chief Engineer for Water Supply and Sewerage in the NSW Public Works Department prepared a proposal for a dam on the Warragamba River and followed it up in 1918 with more detailed plans His proposals were passed onto the newly formed Metropolitan Water and Sewerage and Drainage Board in 1925 when it took over from the P W D The completion of the Warragamba Emergency Scheme required during its peak 1 000 waged employees at the Headworks and a further 1 000 on the Pipeline All buildings used in the construction of the Emergency Scheme were designed for later re use as cottages for the future maintenance and operations personnel Some of these buildings were relocated from elsewhere The main works office was the original police station at the Nepean Dam site 3 In 1940 a weir and water pumping station known as the Warragamba Emergency Scheme reached completion just downstream of the main dam site 4 located on the east bank of the Warragamba River Access to the site was along the road currently known as Weir Road Major elements of the construction works still extant include the weir a 10 cable cableway shads batching plants roads electrical substation chlorination plant maintenance staff accommodation balance reservoir Megarritys Bridge water pumping station tunnels and associated pipelines 3 1948 1960 construction of current dam Edit In 1943 the Metropolitan Water Sewerage and Drainage Board invited the geologist William Browne to investigate a proposed site Browne found a more suitable site and continued as geological adviser until completion 6 The site was reviewed and approved by Dr John Savage considered the pre eminent expert in this field and formally accepted by the Metropolitan Water Sewerage and Drainage Board on 2 October 1946 4 The Board appointed Thomas Upton as the engineer The Warragamba River flows through a gorge that varies in width from 300 to 600 metres 980 to 1 970 ft and is 100 metres 330 ft in depth This gorge opens at its upper end into a large valley the Burragorang Valley This river configuration allows for a relatively short but high dam wall in the gorge to impound a vast quantity of water 4 Dam construction began in 1948 and was completed in 1960 The resulting dam of the Warragamba River formed Lake Burragorang which is one of the largest reservoirs for urban water supply in the world citation needed The dam wall comprises 1 612 000 cubic yards 1 232 000 m3 of concrete It was laid as interlocking blocks roughly 17 metres 56 ft on each side which were later grouted together to form a continuous monolithic wall It is so large that engineers had to use two techniques to prevent the temperature from becoming too hot as the concrete set One was to add ice to the wet concrete the first application of this technique in Australia The other was to embed cooling pipes into the concrete and circulate chilled water through the pipes As a result the dam wall was cooled in a few months instead of the estimated 100 years it would have taken to cool naturally 4 Description and recent works EditThe dam impounds the Coxs Kowmung Nattai Wingecarribee Wollondilly and Warragamba rivers within the Hawkesbury Nepean catchment 7 The dam created capacity for a reservoir of 2 027 gigalitres 4 46 1011 imp gal 5 35 1011 US gal and is fed by a catchment area of 9 051 square kilometres 3 495 sq mi The surface area of the lake covers 75 square kilometres 29 sq mi of the now flooded Burragorang Valley 7 Spillway Edit Warragamba DamThe main spillway has five crest gates A central drum gate with a 27 metres 89 ft clear span with a pair of radial gates on each side Each radial gate has a 12 metres 39 ft clear span The drum gate is hinged along the upstream edge to the upstream crest and lowers into the dam wall to allow water to flow over it When fully open it forms a continuation of the crest profile 4 All gates open automatically as the dam passes full water level or can be manually opened 4 8 The auxiliary spillway is normally closed by a series of fuse plugs that are designed to be washed away in the event of an extreme flood event 9 As originally designed the dam could safely withstand a peak inflow of 500 000 cubic feet per second 14 000 m3 s leading to a peak discharge of 354 000 cubic feet per second 10 000 m3 s down the spillway 4 Following a 1987 and 1989 re evaluation of the potential rainfall and flood risks the New South Wales Government authorised for the dam wall to be raised by 5 metres 16 ft and constructed an auxiliary spillway on the east bank of the dam 8 Power generation Edit There was also a hydroelectric power station at the dam that could generate 50 megawatts 67 000 hp 10 11 transmitting its output over a 132kV transmission line to Penrith Substation Water levels very rarely became high enough to allow operation of the generators By 2001 it was rarely used and was disconnected from the electricity grid 12 21st century re engineering and enhancements Edit In 2006 the Warragamba Deep Water Storage Recovery Project part of the Metropolitan Water Plan penetrated the base of the dam wall to allow the previously inaccessible lowest water in the reservoir to be available This new outlet was below the minimum level required for gravity flow which delivered water from the existing outlets The project constructed a new pumping station downstream of the dam The new pumping station is within the Emergency Scheme pumping station chamber This project provided access to eight per cent more water or approximately six months of extra supply On 15 April 2006 the project reached a major milestone when it increased the available storage from 1 857 gigalitres 6 56 1010 cu ft to 2 027 gigalitres 7 16 1010 cu ft 7 Enhancements to the dam were completed in 2009 including the addition of an auxiliary spillway to manage extreme flood events 9 Other recent when major work includes a complete upgrade of the three passenger lifts within the dam wall an upgrade of the travelling crest crane and a complete upgrade of the four water supply outlets in the valve house which includes the replacement of the major valves citation needed Proposed raising of dam wall Edit Since 2017 WaterNSW has been working on a risk mitigation project aimed at protecting human life and property in the floodplain catchment area in case of major flooding primarily by raising the dam wall by up to 17 metres 56 ft 13 Infrastructure NSW s rationale is based on the fact that up to 134 000 people live and work on the floodplain and urban growth could greatly increase this number in decades to come giving the dam a greater capacity would enable holding back floodwaters before releasing it in a controlled fashion reducing the need for urgent evacuations 13 However there are concerns for the more than 50 recognised Aboriginal heritage sites in the 6 000 hectares 15 000 acres of World Heritage Area that would be flooded parts of which were badly burnt in the 2019 2020 bushfires in Australia The box gum grassy woodlands are home to threatened species of birds including up to 50 of the remaining population of the critically endangered regent honeyeater as well as koalas and greater gliders 14 In September 2020 the New South Wales Government was ordered by the federal Department of Agriculture Water and the Environment to re do their Indigenous heritage work concerned that NSW has not adequately addressed the concerns of Gundungurra and other traditional owners in their cultural heritage surveys 15 The federal review also said that the environmental impact assessment lacked detail on how the project could affect species such as the platypus and echidna Engineering experts have also questioned the modelling done by Infrastructure NSW 16 Catchment EditThe catchment area is 9 051 square kilometres 3 495 sq mi The areas closest to the lake making up around 30 of the total catchment are restricted access special areas Most of the restAlthough the engineers did not design Warragamba Dam as a flood control measure it can mitigate flooding by holding floodwaters back while the reservoir fills citation needed Dam level crises and water restrictions Edit There have been times when drought has seriously depleted the dam In March 1983 Lake Burragorang s level reached a low of 45 4 of capacity only to reach the maximum level in the mid 1990s as a consequence the gates were opened there was a significant spill in August 1998 16 Between 1998 and 2007 the catchment area experienced extremely low rainfall in December 2004 the dam dropped to 38 8 of capacity the lowest on record to date 17 and on 8 February 2007 it recorded an all time low of 32 5 of capacity 18 The New South Wales State Government tried to reduce this risk by implementing water restrictions 19 and commissioned the construction of a desalination plant at Kurnell Heavy rains between June 2007 and February 2008 restored the dam level to around 67 Despite this Level 3 water restrictions remained in place until 21 June 2009 20 On 29 February 2012 it was reported that the dam was likely to overflow for the first time in fourteen years due to continuing heavy rain in the region 20 The dam began spilling at 18 53 AEDT on 2 March 2012 and again on 20 April 2012 21 22 23 16 The dam reached full capacity on 17 August 2020 compared with it being less than half full a year previously 13 During a days long severe weather event affecting much of New South Wales it overflowed for the first time since 2016 on 20 March 2021 1 In March 2022 following heavy rains across NSW and Queensland the dam once again overflowed flooding areas downstream 24 Warragamba Dam again reached 100 capacity on the 26th of November 2021 and began spilling following a prolonged period of rain in NSW 25 Statistical overview EditKey dam structuresHeight 142 metres 466 ft Length 351 metres 1 152 ft Thickness at top 8 5 metres 28 ft Thickness at base 104 metres 341 ft Width of central spillway 94 5 metres 310 ft Width of auxiliary spillway at mouth 190 metres 620 ft Length of auxiliary spillway 700 metres 2 300 ft Hydro electric plant capacity 50 megawatts 67 000 hp Key reservoir statisticsAvailable storage when full 2 027 gigalitres 7 16 1010 cu ft Total capacity when full 2 031 gigalitres 7 17 1010 cu ft Surface area 75 square kilometres 29 sq mi Length of lake 52 kilometres 32 mi Length of foreshores 354 kilometres 220 mi Deepest point 105 metres 344 ft Catchment area 9 051 square kilometres 3 495 sq mi Average annual rainfall 840 millimetres 33 in Access and recreation EditWarragamba Dam was a popular picnic spot for Sydneysiders but access to the public was restricted after 1999 due to A 240 million of upgrades in that time It reopened to the public on 8 November 2009 26 Access to the dam wall and terrace gardens opened from 23 December 2012 to 28 January 2013 at weekends and public holidays Heritage listing EditThe Emergency Scheme is representative of the collective engineering response to Sydney s critical water shortage during the Second World War period It was the first stage in the storage and extraction of water from the Warragamba River and was preliminary to the Waragamba Dam All of the components are excellent examples of the civil engineering skills of the times the Balance Reservoir is particularly significant because it provides a stilling pool downstream of Warragamba Dam for the purpose of flood discharge the group of five cottages associated with the construction of the dam are considered to be of high significance because they housed the operations staff between 1940 and 1959 These have since been incorporated into the Warragamba township one of the largest townships in the Shire of Wollondilly 3 The Warragamba Emergency Scheme was listed on the New South Wales State Heritage Register on 18 November 1999 having satisfied the following criteria 3 The place possesses uncommon rare or endangered aspects of the cultural or natural history of New South Wales This item is assessed as historically rare statewide and as well as scientifically rare statewide 3 In popular culture EditWarragamba Slammer is a popular phrase used in Australian pubs and restaurants throughout greater Sydney as a reference to tap water 27 See also Edit Water portal 1998 Sydney water crisis Warragamba township originally built to house dam builders References Edit a b Warragamba Dam overflows for first time in years amid NSW extreme weather event ABC News Australian Broadcasting Corporation 20 March 2021 Retrieved 20 March 2021 NSW flood Sydney residents west and northwest evacuated after Warragamba dam overflows Floods off the east coast of Australia 2022 2 March 2022 a b c d e f g h Warragamba Emergency Scheme New South Wales State Heritage Register Department of Planning and Environment H01376 Retrieved 2 June 2018 Text is licensed by State of New South Wales Department of Planning and Environment under CC BY 4 0 licence a b c d e f g h i Aird W V 1961 The water supply sewerage and drainage of Sydney Sydney Metropolitan Water Sewerage and Drainage Board pp 106 117 An account of the development and history of the water supply sewerage and drainage systems of Sydney and the near south coast from their beginnings with the first settlement to 1960 Johnson 2009 4 Vallance T G Browne William Rowan 1884 1975 Australian Dictionary of Biography National Centre of Biography Australian National University Retrieved 6 April 2013 a b c Warragamba Dam Sydney Catchment Authority Government of New South Wales Retrieved 14 October 2020 a b Warragamba A dam full of myths Sydney Catchment Authority Retrieved 3 March 2012 a b Warragamba Dam Auxiliary Spillway Sydney Catchment Authority Government of New South Wales 31 May 2011 Archived from the original on 11 April 2013 Retrieved 6 April 2013 Hydro Power Stations Warragamba Generation Portfolio Eraring Energy Archived from the original on 21 March 2012 Hydro Power Stations Warragamba Generation Portfolio Eraring Energy Archived from the original on 11 April 2013 Annual Report PDF Eraring Energy 2012 p 18 Retrieved 6 April 2013 a b c Cox Lisa Morton Adam 19 August 2020 Warragamba Dam is western Sydney about to flood and would raising the dam wall help The Guardian Retrieved 18 September 2020 Cox Lisa 11 September 2020 Mud and dead trees the dire environmental effects of raising Warragamba dam wall The Guardian Retrieved 18 September 2020 Calderwood Kathleen 11 September 2020 Plans to raise Warragamba Dam wall could see flood destroy Indigenous artefacts leaked document says ABC News Australian Broadcasting Corporation Retrieved 18 September 2020 a b c Cox Lisa 17 September 2020 NSW government ordered to revisit world heritage assessments for Warragamba Dam expansion the Guardian Retrieved 18 September 2020 Warragamba Dam hits lowest level by ABC News Friday 10 December 2004 Bulk Water Storage amp Supply Report Sydney Catchment Authority Government of New South Wales 8 February 2007 Mandatory Water Restrictions Sydney Water Corporation Archived from the original on 28 May 2007 a b Warragamba Dam to spill Friday morning BoM ABC TV Australia 2 March 2012 Retrieved 2 March 2012 SCAN PDF The Sydney Catchment Authority s quarterly newsletter Sydney Catchment Authority Autumn 2012 p 3 Retrieved 6 April 2013 Warragamba Dam finally spills Sydney Morning Herald AAP 2 March 2012 Retrieved 2 March 2012 Warragamba bursts flood warning issued Sydney Morning Herald AAP 20 April 2012 Retrieved 20 April 2012 NSW flood Sydney residents west and northwest evacuated after Warragamba dam overflows Floods off the east coast of Australia 2022 2 March 2022 Gorrey Sally Rawsthorne Megan 27 November 2021 Warragamba Dam spills 21 flood warnings across the state The Sydney Morning Herald Retrieved 13 December 2021 Warragmba sic Dam will re open to public ABC News Australia 13 July 2009 Retrieved 13 July 2009 Warragamba Slammer Sydney Water Bibliography Edit Warragamba Dam 2007 Attraction Homepage 2007 Warragamba Dam Johnson Dianne 2009 The Katoomba Gully People s resistance to dispossession in History Council of NSW Bulletin Winter Graham Brooks and Associates Pty Ltd 1996 Sydney Water Heritage Study Attribution Edit This Wikipedia article was originally based on Warragamba Emergency Scheme entry number 01376 in the New South Wales State Heritage Register published by the State of New South Wales Department of Planning and Environment 2018 under CC BY 4 0 licence accessed on accessdate External links Edit Media related to Warragamba Dam at Wikimedia Commons WaterNSW Warragamba Dam FloodSafe NSW Warragamba FAQ Retrieved from https en wikipedia org w index php title Warragamba Dam amp oldid 1146182884, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.