fbpx
Wikipedia

U.S. Route 50 in Kansas

U.S. Route 50 (US-50) is a major east–west route of the U.S. Highway system, stretching just over 3,000 miles (4,800 km) from Interstate 80 (I-80) in West Sacramento, California, to Maryland Route 528 (MD 528) in Ocean City, Maryland, on the Atlantic Ocean. In the U.S. state of Kansas, US-50 is a main east–west highway serving the southwestern, central and northeastern parts of the state. Kansas City is the only metropolitan area US-50 serves in the state, but the highway does serve several other larger towns in Kansas such as (from west to east) Garden City, Dodge City, Hutchinson, Newton and Emporia.

U.S. Highway 50

US-50 highlighted in red
Route information
Maintained by KDOT, and the cities of Cimarron, Dodge City and Emporia
Length447.93 mi[1] (720.87 km)
Existed1927[2]–present
Major junctions
West end US 50 / US 400 at Colorado state line
Major intersections US-83 in Garden City

US-400 in Dodge City
US-56 from Dodge City to Kinsley US-281 near St. John
I-135 / US-81 / K-15 in Newton
I-35 / Kansas Turnpike in Emporia
US-59 in Ottawa
US-169 / K-7 in Olathe
I-35 / US-169 / US-56 / I-435 in Lenexa

US-69 in Overland Park
East end I-435 / US 50 at State Line Road between Leawood, Kansas and Kansas City, Missouri
Location
CountryUnited States
StateKansas
CountiesHamilton, Kearny, Finney, Gray, Ford, Edwards, Stafford, Reno, Harvey, Marion, Chase, Lyon, Coffey, Osage, Franklin, Miami, Johnson
Highway system
  • Kansas State Highway System
K-49 K-51

US-50 was established in Kansas by 1927, and at that time split into two branch routes in Kansas. The US-50 split began in Garden City and ended slightly west of Baldwin City. In Garden City, the split began at Kansas Avenue and Main Street. US-50N continued east on Kansas Ave. and went through Jetmore, Larned, Great Bend, Lyons, McPherson and Baldwin City. US-50S ran along current US-50. The routes rejoined near what is now the intersection of US-56 and K-33. US-50N was replaced by US-156 from Garden City to Great Bend and by US-56 the rest of the way. US-156 is now known as K-156. The split was removed during the late 1950s.

Route description edit

US-50 enters the state running concurrently with US-400, which joins US-50 at Granada, Colorado. The first town it runs through is Coolidge. Syracuse is the first county seat (Hamilton County). In western Kansas, US-50 parallels the Arkansas River.

 
US-50 at its junction with US-77
 
US 50 Eastbound west of Emporia

US-50 then enters Kearny County and passes through the towns of Lakin and Deerfield before entering Finney County. West of the Old US-50 and Big Lowe Road overpass in Holcomb, US-50 splits into four lanes and the speed limit increases to 70 MPH until east of the intersection with US-83. The highway then tapers back into two lanes at the 3rd Street intersection and remains so until the intersection with Bus-50 south of town. US-50 then passes through the towns of Ingalls, Cimarron, Dodge City, Kinsley, and Hutchinson before it heads to Newton. In Newton, US-50 joins I-135 for a short time before it angles northeast to Emporia, another meat-packing town as well as the home of Emporia State University. US-50 then joins I-35 and it overlaps that interstate for most of the rest of the way in Kansas.

US-50, along with I-35, then passes through a place known as "BETO Junction," which is where it meets US-75, north of Burlington. The letters in the acronym stand for Burlington, Emporia, Topeka and Ottawa, which are the cities to the south, west, north and east, respectively.

From there, US-50 passes through Olathe and meets I-435 in Lenexa. At this point. US-50 leaves I-35 and joins I-435 for the rest of its trip in Kansas.

The entire 1.369 miles (2 km) section of US-50 in Cimarron is maintained by the city.[3] The entire 1.662 section within Dodge City is maintained by the city. The section in Emporia from Graphic Arts Road to the east city limit is maintained by the city.

History edit

 
Santa Fe Trail sign along US-50

US-50 was established in Kansas by 1927, and at that time split into two branch routes. Branch routes were once common along the U.S. highway system but have always been discouraged. Branch routes that remain exist mostly in Kentucky and Tennessee. The US-50 split began in Garden City and ended near Baldwin City. In Garden City, the split began at Kansas Avenue and Main Street. US-50N continued east on Kansas Ave. and went through Jetmore, Larned, Great Bend, Lyons, McPherson and Baldwin City. US-50S ran along current US-50. The routes rejoined near what is now the intersection of US-56 and K-33.[2][4]

The first route considered for US-56 was via US-40 from Ellsworth to Topeka and K-4 and US-59 via Atchison to St. Joseph, Missouri.[5] A revised route adopted in March 1955, due to AASHO objections to the original route, which traveled concurrently with other U.S. Highways for over half of its length, followed K-14, K-18, US-24, K-63, K-16, and US-59 via Lincoln and Manhattan.[6][7] In July 1955, the US-50N Association proposed a plan that would have eliminated US-50N by routing US 56 along most of its length, from Larned east to Baldwin Junction, and then along US-59 to Lawrence and K-10 to Kansas City; towns on US-50N west of Larned, which would have been bypassed, led a successful fight against this.[8][9] However, in September of that year, the Kansas Highway Commission accepted that plan, taking US-56 east to Kansas City.[10] On June 27, 1956, the AASHO Route Numbering Committee considered this refined plan for US-56, between Springer, New Mexico and Kansas City, Missouri, with a short US-156 along the remaining portion of US-50N from Larned west to Garden City.[11] The entirety of US-156 was decommissioned on April 1, 1981, and redesignated as K-156.[12][13][14]

In mid 2019, work began to convert the junction with US-281 to an enhanced roundabout. The roundabout includes outer diamond shape lanes for oversized loads to bypass the roundabout. The former intersection with US-281 was dangerous as only US-281 traffic had to stop and therefore was the location of several injury and fatal accidents.[15] Between 2002 and 2012, there were 21 accidents, resulting in one fatality.[16] On March 4, 2020, traffic was rerouted, from a four-way stop and temporary asphalt detour, onto the permanent concrete outer roads for the roundabout.[17] The roundabout was completed and opened up to traffic on May 22, 2020. Venture Corporation from Great Bend, was the primary contractor for the $5.2 million project.[18]

On July 20, 2020 work began on a project to reconstruct US-50 from Road E5 to a half mile east of Road F in Lyon County. The project will widen the highway to 4-lanes for one mile. Improvements also will be made at the Road E5 and Road F intersections. Koss Construction Company of Topeka is the primary contractor of the $7.8 million project.[19]

Future edit

In May 2020, KDOT's Eisenhower Legacy Transportation Plan was announced. One project included in the statewide plan will complete the four-lane expressway between Garden City and Dodge City.[20]

Junction list edit

CountyLocationmi
[21]
kmExitDestinationsNotes
HamiltonCoolidge0.0000.000 
 
 
 
US 50 west / US 400 west
Continuation into Colorado
Syracuse16.09425.901 
 
K-27 north (McDow Street) – Tribune
West end of concurrency with K-27
16.62426.754 
 
K-27 south (Main Street) – Johnson City
East end of concurrency with K-27
KearnyLakin43.96570.755  K-25 (Main Street) – Ulysses, Leoti
FinneyHolcomb59.84896.316Big Lowe Road – HolcombDiamond interchange
Garden City65.848105.972 
 
 
 
 
 
 
 
US-83 north / US 50 Bus. east / US 83 Bus. south – Garden City, Scott City
Diamond interchange; west end of concurrency with US-83
69.618112.039  K-156 (Kansas Avenue) / Mary StreetPair of half-diamond interchanges with one-way ramps connecting Mary Street and K-156
71.156114.514 
 
 
 
 
US-83 south / US 50 Bus. west (Fulton Street) – Garden City, Liberal
Partial cloverleaf interchange; east end of concurrency with US-83
GrayCimarron102.427164.840  K-23 (Main Street) – Meade, Dighton
Ford116.681187.780 
 
US-400 east – Greensburg, Hugoton
East end of concurrency with US-400
Dodge City126.349203.339 
 
 
 
US-56 west / US-283 south – Dodge City, Minneola
West end of concurrencies with US-56 and US-283
Wright128.085206.133 
 
US-283 north – Jetmore
East end of concurrency with US-283
EdwardsKinsley156.245251.452 
 
US-56 east – Great Bend
East end of concurrency with US-56
157.363253.251  US-183 (Niles Avenue) – Greensburg, La Crosse
Belpre175.192281.944 
 
K-19 north (Larned Street) – Larned
Stafford194.427312.900  US-281 – Great Bend, Pratt
Reno232.954374.903 
 
K-61 south (John Neal Memorial Highway) – Pratt
Interchange; west end of concurrency with K-61
238.462383.767 
 
 
 
K-14 north / K-96 west (Nickerson Boulevard) – Lyons
Partial cloverleaf interchange; west end of expressway; west end of concurrencies with K-14 and K-96
South Hutchinson239.974386.201 
 
 
 
K-14 south / K-96 east / Main Street north – South Hutchinson, Wichita
East end of concurrencies with K-14 and K-96
240.957387.783Scott Boulevard / McNew Road
Hutchinson242.535390.322 
 
K-61 north (Ken Kennedy Freeway) / Lorraine Street south – McPherson
East end of concurrency with K-61
  Airport Road / Yoder RoadEast end of expressway; serves Hutchinson Municipal Airport
Harvey264.566425.778 
 
K-89 south – Halstead
Newton271.238436.515Meridian RoadPartial cloverleaf interchange; west end of freeway
272.514438.569Anderson Avenue
273.514440.178 
 
  K-15 north (Kansas Avenue)
Partial cloverleaf interchange; west end of concurrency with K-15; serves Newton Medical Center
274.272441.398 
 
I-135 south (US-81 / K-15 south) – Wichita
Full Y interchange; east end of concurrency with K-15; west end of concurrency with I-135/US-81; I-135 exit 30
275.037–
275.543
442.629–
443.443
31First Street / Broadway StreetPair of half-diamond interchanges with one-way ramps connecting First Street and Broadway Street; exit number follows I-135
276.373444.779  
 
I-135 / US-81 north – Salina
Eastbound exit westbound entrance; east end of concurrency with I-135/US-81; I-135 exit number 33
277.406446.44212th StreetWestbound exit and eastbound entrance; access via Old Trail Road; east end of freeway
MarionFlorence302.524486.865  US-77 / 8th Street east – Marion, El DoradoRoundabout
ChaseElmdale320.589515.938 
 
K-150 west – Marion
Eastern terminus of K-150
Strong City327.581527.191  K-177 – Cottonwood Falls, Council GrovePartial cloverleaf interchange
LyonEmporia345.346555.781 
 
 
 
 
 
To I-35 / I-335 / Kansas Turnpike – Kansas City, Wichita, Topeka
Roundabout with connector to I-35; I-35 Exit 127A
348.128560.258  K-99 (Commercial Street) – Olpe, Admire
350.438563.975 
 
I-35 south – Wichita
Diamond interchange; west end of concurrency with I-35; I-35 exit 133
Jackson Township135County Road R1
138County Road U
141  K-130 – Neosho Rapids, Hartford
CoffeyLebo148  K-131 – Lebo
Key West Township155  US-75 – Lyndon, Burlington
OsageMelvern160 
 
K-31 north – Melvern
Southern end of K-31 concurrency
162 
 
K-31 south – Waverly
Northern end of K-31 concurrency
FranklinWilliamsburg170Williamsburg, PomonaFormerly designated as K-273
Homewood Township176Homewood
Ottawa182Eisenhower Road
183 
 
US-59 south – Garnett
Southern end of US-59 concurrency
Harrison Township18515th Street
Ottawa187  K-68 – Ottawa, Louisburg
188 
 
US-59 north – Lawrence
Northern end of US-59 concurrency
Franklin Township193Tennessee Road
Wellsville198  K-33 – Wellsville
Miami
No major junctions
JohnsonEdgerton202Sunflower Road – Edgerton
Gardner Township205Homestead LaneDiverging diamond interchange
Gardner207Gardner Road
210 
 
US-56 west – Gardner
Southern end of US-56 concurrency
Olathe214Lone Elm Road, 159th Street
215 
 
  US-169 south / K-7 – Paola
Southern end of US-169 concurrency
217Old Highway 56Southbound exit and northbound entrance
218Santa Fe
220119th Street
Lenexa 
 
I-35 north (US-56 east / US-169 north) – Des Moines
Exit 222A on I-35; east end of concurrency with I-35/US-56/US-169
 
 
I-435 west
Exit 83 on I-435; west end of concurrency with I-435
Overlap with I-435
Leawood447.93720.87 
 
 
 
I-435 east / US 50 east
Continuation into Kansas City, Missouri
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Special routes edit

In Garden City. US-50 and US-83 each have business routes. They both start at the same place, at the junction of US-50, 83 and 400 about one mile (1.6 km) north of town. They run concurrently along the former alignments of US-50 and 83 through town to the intersection of Main Street and Fulton Street. At that point, the business routes split and Business 50 heads east to meet up with US-50, 83 and 400 east of town.

US-50 once had alternate routings in Garden City and Dodge City and business routes in Dodge City and Ottawa. Former Alternate 50 in Garden City is now known as Campus Drive. Its purpose was to connect US-50 travelers to then-US-156 without having to go all the way into downtown. Its purpose was taken over by Spur US-83 in the 1970s. Spur US-83 is now the bypass around Garden City that carries highways 50, 83 and 400.

Former Alternate 50 at Dodge City is now the main route for US-50. Business 50 in Dodge City was decommissioned when the US-400 bypass was built to the south and west of that city. Business 50 in Ottawa ran along the former US-50 alignment through Ottawa.

References edit

  1. ^ Federal Highway Administration, National Highway Planning Network GIS data version 2005.08
  2. ^ a b Rand McNally and Company (1927). "Kansas" (Map). Rand McNally Auto Road Atlas of the United States and Ontario, Quebec, and the Maritime Provinces of Canada, with a Brief Description of the National Parks and Monuments. 1:1,600,000. Chicago: Rand McNally and Company. pp. 54–55. OCLC 2078375. Retrieved August 24, 2020 – via Rumsey Collection.
  3. ^ Kansas Department of Transportation (January 1, 2012). "Resolution Designating City Connecting Links in State Highway System". Topeka: Kansas Department of Transportation. Retrieved September 7, 2020.
  4. ^ "1932 Kansas Highway Map" (PDF). Kansas Department of Transportation. Retrieved 9 October 2014.
  5. ^ Great Bend Daily Tribune, January 6, 1955
  6. ^ Great Bend Daily Tribune, New US-55 Route Approved Here, March 20, 1955
  7. ^ Atchison Daily Globe, March 20, 1955
  8. ^ Great Bend Daily Tribune, July 26, 1955
  9. ^ Great Bend Daily Tribune, July 29, 1955
  10. ^ Great Bend Daily Tribune, Highway Boosters Here Oppose New US-55 Plan, September 16, 1955
  11. ^ Oklahoma Department of Transportation, Chronological History Documentation: US 56 (correspondence between ODOT, AASHO, and other DOTs)
  12. ^ Resolution to redesignate a Highway (Map). KDOT. Retrieved August 24, 2020.
  13. ^ "1956 Kansas Highway Map" (PDF). Kansas Department of Transportation. Retrieved 9 October 2014.
  14. ^ "1957 Kansas Highway Map" (PDF). Kansas Department of Transportation. Retrieved 9 October 2014.
  15. ^ Rose, Gale. "Roundabout work begins near St. John". Salina: Salina Journal. Retrieved 24 August 2020.
  16. ^ Rose, Gale. "It's roundabout time at St. John". Pratt: Pratt Tribune. Retrieved 24 August 2020.
  17. ^ "Traffic flow change at U.S 50/281 roundabout work zone" (PDF). Kansas Department of Transportation. Retrieved 4 March 2020.
  18. ^ Green, John. "US-50/281 roundabout opens in Stafford County". Hutchinson: The Hutchinson News. Retrieved 24 August 2020.
  19. ^ Kansas Department of Transportation (July 20, 2020). "U.S. 50 T-WORKS project in Lyon County now underway". Topeka: Kansas Department of Transportation. Retrieved August 24, 2020.
  20. ^ Kansas Department of Transportation (May 2020). "Expansion Pipeline May 2020" (PDF). Topeka: Kansas Department of Transportation. Retrieved August 31, 2020.
  21. ^ Kansas Department of Transportation. . Archived from the original on September 24, 2014. Retrieved 2012-11-10.

External links edit

KML is not from Wikidata
  • Kansas Highway Maps: Current, Historic, KDOT
  • 1926 US Highway Map, Department of Agriculture


  U.S. Route 50
Previous state:
Colorado
Kansas Next state:
Missouri

route, kansas, this, article, about, section, entire, route, route, route, major, east, west, route, highway, system, stretching, just, over, miles, from, interstate, west, sacramento, california, maryland, route, ocean, city, maryland, atlantic, ocean, state,. This article is about the section of U S Route 50 in Kansas For the entire route see U S Route 50 U S Route 50 US 50 is a major east west route of the U S Highway system stretching just over 3 000 miles 4 800 km from Interstate 80 I 80 in West Sacramento California to Maryland Route 528 MD 528 in Ocean City Maryland on the Atlantic Ocean In the U S state of Kansas US 50 is a main east west highway serving the southwestern central and northeastern parts of the state Kansas City is the only metropolitan area US 50 serves in the state but the highway does serve several other larger towns in Kansas such as from west to east Garden City Dodge City Hutchinson Newton and Emporia U S Highway 50US 50 highlighted in redRoute informationMaintained by KDOT and the cities of Cimarron Dodge City and EmporiaLength447 93 mi 1 720 87 km Existed1927 2 presentMajor junctionsWest endUS 50 US 400 at Colorado state lineMajor intersectionsUS 83 in Garden CityUS 400 in Dodge City US 56 from Dodge City to Kinsley US 281 near St John I 135 US 81 K 15 in Newton I 35 Kansas Turnpike in Emporia US 59 in Ottawa US 169 K 7 in Olathe I 35 US 169 US 56 I 435 in Lenexa US 69 in Overland ParkEast endI 435 US 50 at State Line Road between Leawood Kansas and Kansas City MissouriLocationCountryUnited StatesStateKansasCountiesHamilton Kearny Finney Gray Ford Edwards Stafford Reno Harvey Marion Chase Lyon Coffey Osage Franklin Miami JohnsonHighway systemUnited States Numbered Highway SystemList Special DividedKansas State Highway SystemInterstate US State Spurs K 49 K 51US 50 was established in Kansas by 1927 and at that time split into two branch routes in Kansas The US 50 split began in Garden City and ended slightly west of Baldwin City In Garden City the split began at Kansas Avenue and Main Street US 50N continued east on Kansas Ave and went through Jetmore Larned Great Bend Lyons McPherson and Baldwin City US 50S ran along current US 50 The routes rejoined near what is now the intersection of US 56 and K 33 US 50N was replaced by US 156 from Garden City to Great Bend and by US 56 the rest of the way US 156 is now known as K 156 The split was removed during the late 1950s Contents 1 Route description 2 History 3 Future 4 Junction list 5 Special routes 6 References 7 External linksRoute description editUS 50 enters the state running concurrently with US 400 which joins US 50 at Granada Colorado The first town it runs through is Coolidge Syracuse is the first county seat Hamilton County In western Kansas US 50 parallels the Arkansas River nbsp US 50 at its junction with US 77 nbsp US 50 Eastbound west of EmporiaUS 50 then enters Kearny County and passes through the towns of Lakin and Deerfield before entering Finney County West of the Old US 50 and Big Lowe Road overpass in Holcomb US 50 splits into four lanes and the speed limit increases to 70 MPH until east of the intersection with US 83 The highway then tapers back into two lanes at the 3rd Street intersection and remains so until the intersection with Bus 50 south of town US 50 then passes through the towns of Ingalls Cimarron Dodge City Kinsley and Hutchinson before it heads to Newton In Newton US 50 joins I 135 for a short time before it angles northeast to Emporia another meat packing town as well as the home of Emporia State University US 50 then joins I 35 and it overlaps that interstate for most of the rest of the way in Kansas US 50 along with I 35 then passes through a place known as BETO Junction which is where it meets US 75 north of Burlington The letters in the acronym stand for Burlington Emporia Topeka and Ottawa which are the cities to the south west north and east respectively From there US 50 passes through Olathe and meets I 435 in Lenexa At this point US 50 leaves I 35 and joins I 435 for the rest of its trip in Kansas The entire 1 369 miles 2 km section of US 50 in Cimarron is maintained by the city 3 The entire 1 662 section within Dodge City is maintained by the city The section in Emporia from Graphic Arts Road to the east city limit is maintained by the city History edit nbsp Santa Fe Trail sign along US 50US 50 was established in Kansas by 1927 and at that time split into two branch routes Branch routes were once common along the U S highway system but have always been discouraged Branch routes that remain exist mostly in Kentucky and Tennessee The US 50 split began in Garden City and ended near Baldwin City In Garden City the split began at Kansas Avenue and Main Street US 50N continued east on Kansas Ave and went through Jetmore Larned Great Bend Lyons McPherson and Baldwin City US 50S ran along current US 50 The routes rejoined near what is now the intersection of US 56 and K 33 2 4 The first route considered for US 56 was via US 40 from Ellsworth to Topeka and K 4 and US 59 via Atchison to St Joseph Missouri 5 A revised route adopted in March 1955 due to AASHO objections to the original route which traveled concurrently with other U S Highways for over half of its length followed K 14 K 18 US 24 K 63 K 16 and US 59 via Lincoln and Manhattan 6 7 In July 1955 the US 50N Association proposed a plan that would have eliminated US 50N by routing US 56 along most of its length from Larned east to Baldwin Junction and then along US 59 to Lawrence and K 10 to Kansas City towns on US 50N west of Larned which would have been bypassed led a successful fight against this 8 9 However in September of that year the Kansas Highway Commission accepted that plan taking US 56 east to Kansas City 10 On June 27 1956 the AASHO Route Numbering Committee considered this refined plan for US 56 between Springer New Mexico and Kansas City Missouri with a short US 156 along the remaining portion of US 50N from Larned west to Garden City 11 The entirety of US 156 was decommissioned on April 1 1981 and redesignated as K 156 12 13 14 In mid 2019 work began to convert the junction with US 281 to an enhanced roundabout The roundabout includes outer diamond shape lanes for oversized loads to bypass the roundabout The former intersection with US 281 was dangerous as only US 281 traffic had to stop and therefore was the location of several injury and fatal accidents 15 Between 2002 and 2012 there were 21 accidents resulting in one fatality 16 On March 4 2020 traffic was rerouted from a four way stop and temporary asphalt detour onto the permanent concrete outer roads for the roundabout 17 The roundabout was completed and opened up to traffic on May 22 2020 Venture Corporation from Great Bend was the primary contractor for the 5 2 million project 18 On July 20 2020 work began on a project to reconstruct US 50 from Road E5 to a half mile east of Road F in Lyon County The project will widen the highway to 4 lanes for one mile Improvements also will be made at the Road E5 and Road F intersections Koss Construction Company of Topeka is the primary contractor of the 7 8 million project 19 Future editIn May 2020 KDOT s Eisenhower Legacy Transportation Plan was announced One project included in the statewide plan will complete the four lane expressway between Garden City and Dodge City 20 Junction list editThis section is missing mileposts for junctions Please help adding them CountyLocationmi 21 kmExitDestinationsNotesHamiltonCoolidge0 0000 000 nbsp nbsp nbsp nbsp US 50 west US 400 westContinuation into ColoradoSyracuse16 09425 901 nbsp nbsp K 27 north McDow Street TribuneWest end of concurrency with K 2716 62426 754 nbsp nbsp K 27 south Main Street Johnson CityEast end of concurrency with K 27KearnyLakin43 96570 755 nbsp K 25 Main Street Ulysses LeotiFinneyHolcomb59 84896 316Big Lowe Road HolcombDiamond interchangeGarden City65 848105 972 nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp US 83 north US 50 Bus east US 83 Bus south Garden City Scott CityDiamond interchange west end of concurrency with US 8369 618112 039 nbsp K 156 Kansas Avenue Mary StreetPair of half diamond interchanges with one way ramps connecting Mary Street and K 15671 156114 514 nbsp nbsp nbsp nbsp nbsp US 83 south US 50 Bus west Fulton Street Garden City LiberalPartial cloverleaf interchange east end of concurrency with US 83GrayCimarron102 427164 840 nbsp K 23 Main Street Meade DightonFord 116 681187 780 nbsp nbsp US 400 east Greensburg HugotonEast end of concurrency with US 400Dodge City126 349203 339 nbsp nbsp nbsp nbsp US 56 west US 283 south Dodge City MinneolaWest end of concurrencies with US 56 and US 283Wright128 085206 133 nbsp nbsp US 283 north JetmoreEast end of concurrency with US 283EdwardsKinsley156 245251 452 nbsp nbsp US 56 east Great BendEast end of concurrency with US 56157 363253 251 nbsp US 183 Niles Avenue Greensburg La CrosseBelpre175 192281 944 nbsp nbsp K 19 north Larned Street LarnedStafford 194 427312 900 nbsp US 281 Great Bend PrattReno 232 954374 903 nbsp nbsp K 61 south John Neal Memorial Highway PrattInterchange west end of concurrency with K 61 238 462383 767 nbsp nbsp nbsp nbsp K 14 north K 96 west Nickerson Boulevard LyonsPartial cloverleaf interchange west end of expressway west end of concurrencies with K 14 and K 96South Hutchinson239 974386 201 nbsp nbsp nbsp nbsp K 14 south K 96 east Main Street north South Hutchinson WichitaEast end of concurrencies with K 14 and K 96240 957387 783 Scott Boulevard McNew RoadHutchinson242 535390 322 nbsp nbsp K 61 north Ken Kennedy Freeway Lorraine Street south McPhersonEast end of concurrency with K 61 nbsp Airport Road Yoder RoadEast end of expressway serves Hutchinson Municipal AirportHarvey 264 566425 778 nbsp nbsp K 89 south HalsteadNewton271 238436 515 Meridian RoadPartial cloverleaf interchange west end of freeway272 514438 569 Anderson Avenue273 514440 178 nbsp nbsp nbsp K 15 north Kansas Avenue Partial cloverleaf interchange west end of concurrency with K 15 serves Newton Medical Center274 272441 398 nbsp nbsp I 135 south US 81 K 15 south WichitaFull Y interchange east end of concurrency with K 15 west end of concurrency with I 135 US 81 I 135 exit 30275 037 275 543442 629 443 44331First Street Broadway StreetPair of half diamond interchanges with one way ramps connecting First Street and Broadway Street exit number follows I 135276 373444 779 nbsp nbsp nbsp I 135 US 81 north SalinaEastbound exit westbound entrance east end of concurrency with I 135 US 81 I 135 exit number 33277 406446 442 12th StreetWestbound exit and eastbound entrance access via Old Trail Road east end of freewayMarionFlorence302 524486 865 nbsp US 77 8th Street east Marion El DoradoRoundaboutChaseElmdale320 589515 938 nbsp nbsp K 150 west MarionEastern terminus of K 150Strong City327 581527 191 nbsp K 177 Cottonwood Falls Council GrovePartial cloverleaf interchangeLyonEmporia345 346555 781 nbsp nbsp nbsp nbsp nbsp nbsp To I 35 I 335 Kansas Turnpike Kansas City Wichita TopekaRoundabout with connector to I 35 I 35 Exit 127A348 128560 258 nbsp K 99 Commercial Street Olpe Admire350 438563 975 nbsp nbsp I 35 south WichitaDiamond interchange west end of concurrency with I 35 I 35 exit 133Jackson Township135County Road R1138County Road U141 nbsp K 130 Neosho Rapids HartfordCoffeyLebo148 nbsp K 131 LeboKey West Township155 nbsp US 75 Lyndon BurlingtonOsageMelvern160 nbsp nbsp K 31 north MelvernSouthern end of K 31 concurrency162 nbsp nbsp K 31 south WaverlyNorthern end of K 31 concurrencyFranklinWilliamsburg170Williamsburg PomonaFormerly designated as K 273Homewood Township176HomewoodOttawa182Eisenhower Road183 nbsp nbsp US 59 south GarnettSouthern end of US 59 concurrencyHarrison Township18515th StreetOttawa187 nbsp K 68 Ottawa Louisburg188 nbsp nbsp US 59 north LawrenceNorthern end of US 59 concurrencyFranklin Township193Tennessee RoadWellsville198 nbsp K 33 WellsvilleMiami No major junctionsJohnsonEdgerton202Sunflower Road EdgertonGardner Township205Homestead LaneDiverging diamond interchangeGardner207Gardner Road210 nbsp nbsp US 56 west GardnerSouthern end of US 56 concurrencyOlathe214Lone Elm Road 159th Street215 nbsp nbsp nbsp US 169 south K 7 PaolaSouthern end of US 169 concurrency217Old Highway 56Southbound exit and northbound entrance218Santa Fe220119th StreetLenexa nbsp nbsp I 35 north US 56 east US 169 north Des MoinesExit 222A on I 35 east end of concurrency with I 35 US 56 US 169 nbsp nbsp I 435 westExit 83 on I 435 west end of concurrency with I 435Overlap with I 435Leawood447 93720 87 nbsp nbsp nbsp nbsp I 435 east US 50 eastContinuation into Kansas City Missouri1 000 mi 1 609 km 1 000 km 0 621 mi Concurrency terminus Incomplete accessSpecial routes editIn Garden City US 50 and US 83 each have business routes They both start at the same place at the junction of US 50 83 and 400 about one mile 1 6 km north of town They run concurrently along the former alignments of US 50 and 83 through town to the intersection of Main Street and Fulton Street At that point the business routes split and Business 50 heads east to meet up with US 50 83 and 400 east of town US 50 once had alternate routings in Garden City and Dodge City and business routes in Dodge City and Ottawa Former Alternate 50 in Garden City is now known as Campus Drive Its purpose was to connect US 50 travelers to then US 156 without having to go all the way into downtown Its purpose was taken over by Spur US 83 in the 1970s Spur US 83 is now the bypass around Garden City that carries highways 50 83 and 400 Former Alternate 50 at Dodge City is now the main route for US 50 Business 50 in Dodge City was decommissioned when the US 400 bypass was built to the south and west of that city Business 50 in Ottawa ran along the former US 50 alignment through Ottawa References edit Federal Highway Administration National Highway Planning Network GIS data version 2005 08 a b Rand McNally and Company 1927 Kansas Map Rand McNally Auto Road Atlas of the United States and Ontario Quebec and the Maritime Provinces of Canada with a Brief Description of the National Parks and Monuments 1 1 600 000 Chicago Rand McNally and Company pp 54 55 OCLC 2078375 Retrieved August 24 2020 via Rumsey Collection Kansas Department of Transportation January 1 2012 Resolution Designating City Connecting Links in State Highway System Topeka Kansas Department of Transportation Retrieved September 7 2020 1932 Kansas Highway Map PDF Kansas Department of Transportation Retrieved 9 October 2014 Great Bend Daily Tribune January 6 1955 Great Bend Daily Tribune New US 55 Route Approved Here March 20 1955 Atchison Daily Globe March 20 1955 Great Bend Daily Tribune July 26 1955 Great Bend Daily Tribune July 29 1955 Great Bend Daily Tribune Highway Boosters Here Oppose New US 55 Plan September 16 1955 Oklahoma Department of Transportation Chronological History Documentation US 56 correspondence between ODOT AASHO and other DOTs Resolution to redesignate a Highway Map KDOT Retrieved August 24 2020 1956 Kansas Highway Map PDF Kansas Department of Transportation Retrieved 9 October 2014 1957 Kansas Highway Map PDF Kansas Department of Transportation Retrieved 9 October 2014 Rose Gale Roundabout work begins near St John Salina Salina Journal Retrieved 24 August 2020 Rose Gale It s roundabout time at St John Pratt Pratt Tribune Retrieved 24 August 2020 Traffic flow change at U S 50 281 roundabout work zone PDF Kansas Department of Transportation Retrieved 4 March 2020 Green John US 50 281 roundabout opens in Stafford County Hutchinson The Hutchinson News Retrieved 24 August 2020 Kansas Department of Transportation July 20 2020 U S 50 T WORKS project in Lyon County now underway Topeka Kansas Department of Transportation Retrieved August 24 2020 Kansas Department of Transportation May 2020 Expansion Pipeline May 2020 PDF Topeka Kansas Department of Transportation Retrieved August 31 2020 Kansas Department of Transportation Pavement Management Information System Archived from the original on September 24 2014 Retrieved 2012 11 10 External links editKML file edit help Template Attached KML U S Route 50 in KansasKML is not from Wikidata Kansas Highway Maps Current Historic KDOT 1926 US Highway Map Department of Agriculture nbsp U S Route 50Previous state Colorado Kansas Next state Missouri Retrieved from https en wikipedia org w index php title U S Route 50 in Kansas amp oldid 1181430805, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.