fbpx
Wikipedia

Trams in Kolkata

The tram system in Kolkata, the capital city of the Indian state of West Bengal, operated by West Bengal Transport Corporation (WBTC) after Calcutta Tramways Company (CTC) was dissolved, is the oldest tram network operating in India, and oldest operating tramway in Asia.[5] Started in 1902, it is the oldest electric tramway in India.[6] It is the only operating tram network of India at present.[7]

Kolkata Tramway
A modern tram at Esplanade terminus
A vintage tram moving through the streets
Overview
OwnerGovernment of West Bengal
Locale Kolkata, India
Transit typeTram
Number of lines6[1]
Daily ridership15,000 daily[2]
WebsiteCalcutta Tramways
Operation
Began operation1873 (electrification since 1902)[3]
Operator(s)West Bengal Transport Corporation
Reporting marksCTC • WBTC
Number of vehicles257 trams (35 in operation)[4]
Technical
System length14.1 km
Track gaugeStandard gauge 1,435 mm (4 ft 8+12 in)[3]
Electrification550 V DC Overhead line, Trolleypole
System map

The network initially had up to 37 lines in the 1960s,[8] but has gradually reduced over the years with only six lines currently operating due to financial struggles, poor maintenance, low ridership, addition of road flyovers, expansion of the Kolkata Metro, slow tram speed and perceptions that the trams are outdated and occupy too much road space. As per WBTC which maintains the existing tram lines, two routes (24/29 and 25) had been running regularly, with very irregular and limited service on the other five routes (36, 5, 18, 11, 15/12).[9][10] As of January 2023, only the two regular routes are in service with the service on other routes shut down.[11]

Due to these issues, there have been occasional talks of either shutting down the network permanently or lowering operations of the system.[citation needed] However, the system is also considered environmentally friendly and an icon of Kolkata, so there have also been recent efforts to sustain the system with newer trams.

History edit

1873–1901: Horse-drawn trams edit

 
Life-size model of a horse-drawn tram at the City Centre arcade, Salt Lake

The first horse-drawn trams in India ran for 2.4 miles (3.9 km) between Sealdah and Armenian Ghat Street on 24 February 1873. The service was discontinued on 20 November of that year.[3] The Calcutta Tramway Company was formed and registered in London on 22 December 1880. Meter-gauge horse-drawn tram tracks were laid from Sealdah to Armenian Ghat via Bowbazar Street, Dalhousie Square, and Strand Road. The route was inaugurated by the Viceroy, Lord Ripon, on 1 November 1880.[3]

 
The oldest tram terminus is now suspended for construction of metro line 2
 
Esplanade tram terminus is now mostly closed due to construction of metro line 2
 
Kalighat depot is the smallest (in term of both area and track number) and oldest tram depot in Kolkata

At first, it was planned to open tram network in three directions – in north towards Kumartuli via Chitpur Road (now Rabindra Sarani) for easy transportation of then-rich Indians, middle-classes and poor who lived in those areas, in the east towards Sealdah stations via Bowbazar Street (now Bipin Bihari Gangopadhay Street) for railway passengers’ interchange who come from outside of Kolkata, and in the south towards Kalighat via Russa Road (now Ashutosh Mukhopadhyay Road) because not only for easy transportation of then-rich Indians, middle-classes and poor who lived at those areas but also as a Hindu pilgrimage regarding Kali temple for inhabitants and tourists. Kalighat tram depot was also constructed at that, time, which was also a minor workshop for all horse trams. Besides this the city center connection between Dharmatala (now known as Esplanade) & Dalhousie Square (now known as Binay Badal Dinesh Bag) was also established via Old Court House Street (now Hemanta Basu Sarani).[12] One year later, a second route towards north Kolkata up to Shyambazar via College Street was opened for residents and students of medical college, university, and various schools & colleges. A second route from Wellington Square (now known as Subodh Chandra Mullick Square) to Sealdah Station via Moula Ali was also opened for more transportation of railway passengers. Sealdah tram terminus was at that place where now the Kolkata metro line 2 station is under construction. At the same time, the first opening a westward tram route was opened by the High Court via Strand Road (now Rajib Gandhi Sarani) was connected by tram network for pleaders, law-related peoples, and river-bathers of Ganga. High Court tram terminus was at that place where now the annexure building of the High Court is situated. Another connection from Metcalf Hall towards Nimtala via Strand Road (now Rajib Gandhi Sarani) was also opened for serving the crematorium and serving of businessmen. Nimtala tram terminus was at that place beside of the red temple building is now situated.[12] By opening those routes, Shyambazar, High Court, Nimtala, Sealdah, Dalhousie Square, Dharmatala and Kalighat area was connected by horse tram. Kalighat was the only depot at that time, so it is the oldest tram depot.

Timeline edit

  • 1873 – Opening of horse tram as meter gauge, closure in the same year.
  • 1880 – Final opening of horse tram as a permanent system. Calcutta Tramways Company was established.
  • 1881 – Dalhousie Square – Lalbazar - Bowbazar – Lebutala - Sealdah Station route opened (Later route 14). Esplanade – Lalbazar – Pagyapatti – Companybagan - Shobhabazar – Kumortuli route opened (Later route 7 after extension). Dalhousie Square – Esplanade connection opened (Later route 22, 24, 25 & 29). The connection was improved at Lalbazar Junction for through running trams from Dalhousie Square to Kumortuli (Later route 8 after extension). Esplanade – Planetarium - Hazra Park – Kalighat route opened. (Later route 30). Occasional through service started from Kumortuli to Kalighat either via Esplanade or via Dalhousie Square.
  • 1882 - Esplanade – Wellington Square – Bowbazar – Boipara - Hatibagan - Shyambazar Junction route opened (Later route 5). The connection was improved at Bowbazar Junction for through running trams from Dalhousie Square to Shyambazar (Later route 6). Wellington Square – Moula Ali - Sealdah Station route opened (Later route 12 after extension). Dalhousie Square – Metcalfe Hall - High Court route opened (Later route 14 extension). Direct tram service from Sealdah Station to High Court started. Metcalfe Hall – Howrah Bridge – Nimtala route opened (Later route 19). Direct tram service from Esplanade to Nimtala started. At this time steam tram service was thought.[12]

1883–1902: Steam trams edit

In 1882, steam locomotives were deployed experimentally to haul tram cars. In the next year a new route opened for steam tram service towards Khidirpur. Tram tracks were laid down via Dufferin Road through maidan, and on reserved track for high-speed steam trams for morning walkers, tourists, race-course goers, and peoples living on those area. Khidirpur tram depot was also constructed at that time, which was also a minor workshop for all steam trams.[12] It was followed by a south-central branch towards from Wellington Square to Park Street (now Mother Teresa Sarani) via Wellesley Street (now Rafi Ahmed Kidwai Road).[12] After a long sixteen years gap, the Nimtala route was connected with Company Bagan line via Nimtala Ghat Street, and the Dharmatala – Nimtala service was changed to steam tram. At this time horse trams ran on Shyambazar, Sealdah, High Court & Kalighat routes, and steam trams ran on Nimtala, Park Street & Khidirpur route. The Dharmatala – Wellington Square section and Esplanade – Metcalfe Hall section, were served by both horse and steam trams until 1901. Khidirpur & Kalighat were the only steam & horse tram depot at that time respectively.

By the end of the century, the company owned 166 tram cars, 1,000 horses, seven steam locomotives, and 19 miles of track.[3]

Timeline edit

  • 1883 - Esplanade – Racecourse - Wattganj – Khidirpur route opened (Later route 36)
  • 1884 - Wellington Square – Park Street route opened (Later route 21 & 22 after extension)
  • 1900 - Nimtala – Companybagan route opened (non-revenue service only). Electrification & conversion to standard gauge was started.[12]

1902–1951: Electric trams edit

 
Early electric tram at Chitpur Road (Rabindra Sarani)
 
A tram in 1945 at Hatibagan
 
A Calcutta tram in Esplanade terminus during British period
 
Shyambazar terminus is now the northernmost terminus
 
Tollygunge depot is the southernmost tram depot of Kolkata

In 1900, the electrification of the tramway and conversion of its tracks to 4 ft 8+12 in (1,435 mm) (standard gauge) began.[3] The first electric tramcar in Calcutta ran from Esplanade to Kidderpore on 27 March 1902, with service from Esplanade to Kalighat introduced on 14 June of that year. Both Kalighat & Khidirpur tram depot was converted to electric tram depot. The connecting route through Grey Street (now Arabinda Sarani) was opened in that year for a second route between Shyambazar and Dharmatala. The Nonapukur tram workshop was established also in that year, from where the track connection up to Wellesley Street opened via Elliott Road, after which the Park Street branch closed. Now the major repairing of the horse, steam and electric trams was started at Nonapukur.[12] In next year, the Kalighat line was extended to Tollygunge for serving the then south suburban area and film studios via Russa Road (now Shyama Prasad Mukhopadhyay Road). Tollygunge tram depot was also construed at that time, which was the largest tram depot in terms of area. The Shyambazar line was also extended to Belgachia for serving the then north suburban area, hospital, and rail yards via Belgachhia Road (now Radha Gobinda Kar Road). Belgachhia tram depot and Shyambazar tram terminus were also opened in this year.[12] In next year, The Kumourtuli line was extended to Bagbazar, after which the Kumortuli terminus was closed. Bagbazar tram terminus was at that place where now a lorry parking area beside the circular railway track.[12] A new route from Sealdah Station to Howrah Bridge (now Rabindra Setu) via Harrison Road (now Mahatma Gandhi Road) was opened on next year, for serving the businessmen, residents, ferry passengers and railway passengers for Howrah Station. At that time the electrification project was completed.[3]

 
The old Behala tram terminus was the only V-shaped terminus
 
Galiff Street terminus is now suspended for construction of Kolkata metro line 2

Two years later, the connection between Nonapukur and Moula Ali opened via Circular Road (now Acharya Jagadish Chandra Basu Road), and after that tram service started from Nonapukur to Howrah Bridge via Sealdah station. A branch up to Mominpur was also opened from Wattganj via Diamond Harbour Road, but at that time direct access was constructed through Orphanganjbazar.[12] In next year a new branch was constructed from Shyambazar Junction to Galiff Street via Cornwallis Street (now Bidhan Sarani), and occasional tram service was also started from Galiff Street to Dharmatala. Side by side the Mominpur branch was also extended up to Behala, another then south suburban area via Diamond Harbour Road (now Balananda Brahmachari Sarani). At that time Behala tram terminus was at right side of Diamond Harbour Road. The connecting route through Alipur Road was also opened in that year for a tram connection between Behala & Kalighat, also a second route between Kalighat and Dharmatala.[12]

At that time, tram service was opened in Howrah City. From Howrah Station, two routes were selected. One towards north up to Bandhaghat via Dobson Road (Now Moulana Abul Kalam Azad Road), another towards south up to Shibpur via Grand Trunk Road. For shibpur route, a single coach double-ended tram was selected due to the lack of creating a loop at Shibpur. For Howrah service, a new depot was constructed at Ghasbagan. Hence then the old Howrah Bridge was a pontoon bridge, it was not possible to connect Kolkata tram and Howrah tram directly.[12]

 
Rajabazar depot is the only remaining tram depot of North Kolkata

Two years later, the Sealdah Station to Rajabazar route opened in 1910. Rajabazar tram depot was also constructed at that time, which was the largest tram depot in terms of track number.[12]

 
Ballygunge terminus is now the eastermnost terminus

After a long 15 years gap, new tram route construction had started again in 1925. The Nonapukur line was extended to Park Circus via Park Street (now Mother Teresa Sarani) for serving residents and circus goers of that area. Park Circus tram depot was also constructed at that time. In the next year, the direct access of the Behala line via Orphanganjbazar was replaced by present alignment via Wattganj junction for smooth tram service.[12] A new terminus near Racecourse was constructed in next year for race special trams towards Belgachhia, Bagbazar, Galiff Street, Rajabazar, High Court, Nimtala, Park Circus, Tollygunge, Behala & Khidirpur. In the next year, a new branch was constructed from Kalighat to Ballygunge, another then south suburb of Kolkata via Ballygunge Avenue (now Rasbihari Avenue).[12]

 
Tram tracks on Acharya Praphulla Chandra Roy Road, closed in 2020
 
Gariahat tram depot is the newest tram depot, the first three tracks are now closed and converted to electric bus depot

After again a long 13 years gap, new tram route construction had started again in 1941. The Rajabazar line was extended to connect with Galiff Street line at Shyambazar junction via Circular Road (now Acharya Praphulla Chandra Ray Road).[12] Two years later, when new Howrah Bridge (now Rabindra Setu) was opened, tram service started crossing the river Hooghly and connecting Kolkata & Howrah tram network. Very few times trams from Shibpur and Bandhaghat came towards Dharmatala and Rajabazar. In the same year, the Park Circus line was extended to connect with the Ballygunge line at Gariahat junction via Gariahat Road (now Syed Amir Ali Avenue). Gariahat tram depot was also constructed at that time.[12] With this extension, total track length reached 42.0 miles (67.59 km).[3]

1951–1990: Nationalisation edit

In 1951, the government of West Bengal entered an agreement with the Calcutta Tramways Company, and the Calcutta Tramways Act of 1951 was enacted. The government assumed the tramways, reserving the right to purchase the system with two years' notice on 1 January 1972 or at any time thereafter.[3] After Independence, during the partition of India, the number of people started dramatically increasing on the roads of Kolkata due to a lot of refugees. The city centre area started getting congested due to the increasing number of buses and cars. So tram company thought to shift the tram tracks of Dalhousie Square from outside to the inside of the square. It was completed in 1952.[12] It was followed by redesigning of Esplanade terminus in 1960, also due to increasing number of pedestrians and automobiles. At that time, there were five ways of tram routes from Esplanade, i.e. – Bentinck Street, Dharmatala Street (now Lenin Sarani), Chowrangi Road (now Jawaharlal Nehru Road), Dufferin Road and Old Court House Street (now Hemanta Basu Sarani), and three ways of tram routes from Dalhousie Square, i.e. – Old Court House Street (now Hemanta Basu Sarani), Hare Street & Lalbazar Street.[12] Four years later, the old Majherhat bridge was replaced by a new bridge with tram tracks.[12] In 1967, the Government of West Bengal passed the Calcutta Tramways Company (Taking Over of Management) Act and assumed management on 19 July. Until this time, there was the platinum age of Kolkata, with maximum number of rolling stocks, route kilometers and passengers.

Decline edit

 
Historical lines, active lines and formerly planned lines.

The decline of tram networks was started in India in the early thirties, where the Kanpur tram was closed. However other cities had continued tram, but mass closure started from mid- fifties to mid-sixties, where tram networks of Chennai, Delhi, and Mumbai gradually closed. Overall the world, at that time, trams thought an old technology and inflexible. The number of automobiles was increasing, so it was started occupying tram tracks especially on narrow streets, and tram services got hampered. But surprisingly, car and bus drivers started blaming the tram, which was fueled by political leaders. So it was decided to close the entire Kolkata tram network within 1980. On 8 November 1976, the Calcutta Tramways (Acquisition of Undertaking) ordinance was promulgated under which the company (and its assets) was nationalized.[3]

 
The former Ghasbagan tram depot is now a bus depot
 
The former Shibpur tram terminus
 
The former Nimtala tram terminus

The Howrah sections were decided to close first, because the government thought trams were creating traffic jams on narrow streets of Howrah city. So in 1971, both the Bandhaghat and Shibpur lines were closed, including the Ghasbagan tram depot. The depot got vacant and abandoned for some vehicle dumping place. However the Howrah station terminus survived, but it was started redesigning largely. All single and double coach trams were transferred to Kolkata area. In Kolkata, a new tram terminus was constructed in Behala, this time on the left side of Diamond Harbour Road for no need for reversing the tram.[12] Two years later, Nimtala route along Companybagan (now Rabindra Kanan) section was closed in May 1973, and the Howrah Station terminus redesigning completed in 1976. The racecourse terminus was also closed due to the construction of 2nd Hooghly Bridge (now Vidyasagar Setu).[12] Total track length was now reduced to 38 miles (61.2 km).[3]

 
The diverted tram route through Surya Sen street, recently became one way for tram, now temporarily suspended for metro line 2.

However, tram service was survived in Kolkata, largely supported by then transport minister Rabin Mukherjee, and also due to high rise of oil prices in the international market, which make costly for automobiles. Internationally some cities were started returning tram for this economical reason. Since 1978, line 1 of Kolkata metro construction was started by the cut & cover method. It was needed the construction of a large trench through the planned route, which was mostly served before by tram. So it was thought to temporarily close the tram service along those routes. Later it was planned to part of the tram routes in south Kolkata would remain opened because two tram depots - Kalighat & Tollygunge are situated along the tram route, and it was not practical to close those depots and close a number of tram routes for this reason, rather thought to diverse some tram routes. For this reason, tram tracks between Hazra Park (then renamed to Jatin Das Park) and Dharmatala (then renamed to Esplanade) via Planetarium was closed (the 3rd oldest tram route), but all tram routes which were running via Ashutosh Mukhopadhyay Road and Jawaharlal Nehru Road were diverted via Biplabi Ganesh Ghosh Sarani, Alipur Road, Diamond Harbour Road, Khidirpur Road & Dufferin Road. This closed section was partially reopened in the next year between Planetarium and Esplanade due to protests of passengers, tourists, and hawkers. A new terminus was constructed beside Birla Planetarium.[12] At that time, construction of Sealdah Flyover was started. Due to its low height (for running tram on it), it was decided to close tracks between Sealdah and Lebutala, but diverse this route from Lebutala to Mirzapur via Raja Ram Mohan Sarani & Surya Sen Street. In the 1st phase, tram service opened between Mirzapur and Purabi cinema for Howrah Station tram routes, and in the next year from Purabi Cinema to Lebutala for Binay Badal Dinesh Bag routes. At that time Surya Sen Street was the only tram only street of Kolkata, and the original route previously mentioned (the oldest tram route) with Sealdah Station terminus was closed.[12] For metro line 1 construction, the tracks between Lalbazar and Esplanade via Bentinck Street (the 2nd oldest tram route) was also closed, but all tram routes which were running via Bentinck Street were diverted via Hemanta Basu Sarani & Lalbazar Street.[12] In next year, Sealdah flyover opened with tram tracks on it. It was very few flyovers of the world which had tram tracks.[12]

Expansion edit

After a one decade major closures of the lines, some new routes were planned by government. Then transport minister Rabin Mukherjee proposed some new lines and connecting lines. Those were – 1) Maniktala to Bidhannagar 2) Behala to Joka 3) Galiff Street to Dakshineshwar 4) Tollygunge out post to Jadabpur. 5) Ultadanga to Airport 6) Kalighat to Taratala (via New Alipur) 7) Moula Ali to Park Circus (via Sundari Mohan Avenue) For first phase, first two lines were selected. On 17 April 1985, tracks were extended 3.7 km (2.30 mi) from Maniktala to Ultadanga via Maniktala Main Road (now Satin Sen Sarani) and C. I. T. Road.[12] (now Acharya Satyendra Nath Basu Sarani).[3] This route was selected for expanding the Kolkata towards east. At first it was planned that there will be two branches, one to Bidhannagar (Karunamayi), another to Airport. However, residents of Bidhanngar were highly against of tram, so that extension was finally cancelled. The Airport extension was also cancelled later. On 31 December 1986, the route extension from Behala to Joka was completed via Diamond Harbour Road.[3] It was the first and only village extension of Kolkata tram network, for developing this area as a city. After opening this line, it was the longest tram route of Kolkata.[12]

Unfortunately, this opening created some controversy. The then transport minister Rabin Mukherjee was an MLA of Behala (West), where this route passed. When it was opened, it broke the election code of conduct, and so he was suspended from the post of transport minister before the election. He was a strong supporter of tram, and after his suspension, when new transport minister Shyamal Chakraborty joined, fast declining of Kolkata tram was started again after some years. All the remaining plans were also cancelled forever at that time.[citation needed]

Timeline edit

  • 1902 - Khidirpur & Kalighat routes were electrified. Shobhabazar – Hatibagan connecting route opened. (Later route 9 & 10), alternative service was started from Shambazar to Dharmatala and Dalhousie Square via this route. Nonapukur Workshop opened with Royd Street – Nonapukur route opening (Later route 21 & 22 after re-extension). Direct tram service from Nonapukur to Dalhousie Square started. Royd Street – Park Street closed.
  • 1903 – Shyambazar terminus opened with Shyambazar – Belgachhia route opened. (Later route 1, 2, 3, 4 & 11). Direct tram service from Belgachhia to Dharmatala & Dalhousie Square started. Kalighat – Tollyganj route opened (Later route 29 & 32). Direct tram service from Tollyganj to Dalhousie Square started.
  • 1904 - Kumortuli – Bagbazar route opened. Kumortuli terminus closed. (Later route 7 & 8) Direct tram service was started from Bagbazar to Dharmatala and Dalhousie Square.
  • 1905 - Howrah Bridge – Pagyapatti – Boipara – Purabi Cinema - Sealdah Station route opened (Later route 15). The connection was improved at Pageyapatti Junction and Boipara Junction for through running trams from Howrah Bridge to Dharmatala (Later route 21) and Howrah Bridge to Shyambazar (Later route 11). Semi Circular service from High Court to Esplanade via Sealdah started. All remaining then-opened routes were electrified.
  • 1907 - Moula Ali – Nonapukur route opened (Later route 20 & 26 after extension). Direct tram service started from Nonapukur to Howrah Bridge. Wattganj – Mominpur route opened (via direct access through Orphanganjbazar). (Later route 31)
  • 1908 - Shyambazar Junction – Galiff Street route opened (Later route 12). Howrah Station – Ghasbagan - Bandhaghat. (Later route 41 & 42) and Howrah Station – Shibpur route opened (Later route 40). Hazra Park – Mominpur – Behala old terminus route opened (via Majherhat old bridge). (Later route 27 & 35). Direct tram service started from Behala to Dharmatala and Behala to Kalighat. The connection was improved at Mominpur Junction for alternative service was started from Kalighat to Dharmatala and Dalhousie Square via this route. (Later route 31)
  • 1910 - Sealdah Station – Mirzapur – Rajabazar route opened. (Later route 12) Direct tram service started from Rajabazar to Dharmatala. The connection was improved at Sealdah Junction for through running trams from Rajabazar to High Court. (Later route 14)
  • 1925 - Nonapukur – Parkcircus route opened. (Later route 20, 21 & 22)
  • 1926 - Orphanganjbazar direct access was replaced by present alignment via Wattganj Junction.
  • 1927 - Racecourse terminus built for race special tram service.
  • 1928 - Kalighat Junction – Ballyganj route opened.. (Later route 24 & 27 extension). Direct tram service started from Ballyganj to Tollyganj, Behala, and Dalhousie Square.
  • 1941 - Rajabazar – Shyambazar Junction route opened. (Later route 12 & 13). Direct tram service started from Galiff Street to Dharmatala & Dalhousie Square via Sealdah and/or Moula Ali, also some occasional tram service started from Belgachia to Rajabazar, Belgachia to Bagbazar route.
  • 1943 - Howrah Bridge – Howrah Station (via Howrah Bridge) route opened.. Route 11, 20, 21, 22, 30 & 32 were extended to Howrah Station. All tram routes which were running up to Howrah Bridge now started going directly up to Howrah station from Belgachhia, Galiff Street, Rajabazar, Park Circus, Tollygunge, and Kalighat. Occasional tram service also started from Howrah Station to Nimtala & High Court. Gariahat depot opened with Parkcircus – Gariahat Junction route opened (Later route 25 & 26). Direct tram service started from Ballygunge to Dharmatala & Howrah Station via Park Circus. This was the last tram extension in Kolkata before Indian Independence.
  • 1952 - Dalhousie Square terminus redesigned, outside park tracks brought into the park.
  • 1960 - Esplanade terminus redesigned.
  • 1964 - Majherhat new bridge built.
  • 1971 - Behala new terminus built. Howrah Station – Ghasbagan – Bandhaghat closed, Ghasbagan depot became a goods vehicle stock depot. (Route 41, 42). Howrah Station – Shibpur closed. (Route 40)
  • 1973 - Howrah Bridge – Nimtala - Companybagan section closed. (Route 19)
  • 1976 - Howrah Station terminus redesigned after the closure of Bandhaghat & Shibpur route, converted to the private bus terminus and opening of the pedestrian subway. Racecourse terminus closed.
  • 1978 - Esplanade – Planetarium - Hazra Park closed for conversion to metro line 1. All tram services from Tollyganj, Kalighat & some services from Ballyganj were started running via Mominpur & Wattganj.
  • 1979 - Esplanade – Planetarium reopened. (Route 12A)
  • 1980 - Purabi Cinema – Mirzapur route opened. (Route 13 diversion)
  • 1981 - Lebutala – Purabi Cinema route opened. (Route 14 diversion). Esplanade – Lalbazar closed. (Route 3, 7 & 9). Lebutala - Sealdah Station terminus closed for flyover, but trams continued serving Sealdah Station. (Route 13 & 14 diversion) Some tram services from Galiff Street, Rajabazar, High Court, Park Circus & Ballyganj were started running via Purabi Cinema.
  • 1982 - Sealdah flyover opened, with tram tracks on it.
  • 1985 - Maniktala – Ultadanga old terminus route opened. (Route 16 & 17)
  • 1986 - Behala – Joka route opened. (Route 37) [12] Connection was improved at Maniktala Junction for through running trams from Belgachhia to Ultadanga.

1990–present: Later developments and mass closures edit

 
Planetarium terminus was constructed during construction of metro line 1
 
The realigned former Howrah Station tram terminus
 
Howrah Bridge tram terminus, former Burrabazar junction

Since 1990, losses of Kolkata tram started increasing, and to overcome this, it was thought by government that the entire tram network will be gradually replaced by bus, and lands of depot and terminus will be sold to promoters for construction of high-rise buildings. Calcutta Tramways Company introduced the bus service on 4 November 1992 with a fleet of 40 buses.[3] The Planetarium line was closed due to excuse of loss making. The terminus was converted to park, however tracks were still present until 2010, and masts are still present, now are being used by lamp posts.[12] After two years, The Howrah Station terminus closed, converted to bus terminus and the tram tracks were removed on Rabindra Setu the following year, since the world's busiest ageing cantilever bridge was not strong enough for trams. The routes which terminated there were moved back to the Burrabazar (Howrah Bridge) terminus (formerly Burrabazar Junction). Tram tracks from Howrah Bridge terminus to Metcalf Hall was also closed due to excuse of road repair, and all routes which were served this section was now diverted via Rabindra Sarani. However, in this year a new terminus in Ultadanga opened near Railway Station.[12]

The system had degraded by the 1990s, and Minister for Transport Shyamal Chakraborty planned to close the network. In 1995, the High Court terminus closed for the reconstruction of Strand Road. Rails and wires were removed from there and from Strand Road, Hare Street, and Shahid Khudiram Basu Road and it is now the site of the newest Kolkata High Court centenary building.[12] However, Melbourne tram conductor Roberto D'Andrea befriended fellow Calcutta conductors during a 1994 visit. When D'Andrea heard about the planned network closure, he suggested an art project to decorate the trams (as was done in his home city). The project increased public awareness of the network and its value, ultimately saving it at that time.[13]

However closures were continued. In 1998, the Gariahat Depot–Gariahat Junction link on Lila Roy Sarani closed for construction of the Gariahat overpass.[14] It was early planned to relaying tram tracks on two sides of the road under the overpass, but it was finally cancelled because of then Mayor Subrata Mukherjee. During his reign, tram network again got on threat of closure, because he is a strong anti-tram person. Four years later, the Mominpur–Behala route on Diamond Harbour Road closed for the construction of an overpass in Taratala.[12] Although it was initially planned to relaying tracks on the overpass after its completion, the road was later converted to a national highway and the plan was dismissed.

Mass Concretization edit

In 2004, state government decided to deserved all grass-bed reserved tracks from tram only operation, and replace it by concrete bed. Cobblestone bed tracks were also planned to replacing by concrete bed. For this reason, Shayambazar to Galiff Street section was closed, and modification of Shyambazar junction done by now tram service could continue from Rajabazar to Belgachia instead of Galiff Street. Rails and overhead lines were removed from part of the Bidhan Sarani route. In 2008, Binay Badal Dinesh Bag terminus was largely redesigned for construction of underground car parking.[12]

 
Place of former Behala terminus, closed for metro line 3
 
Joka terminus was the newest terminus of Kolkata tram network
 
Exit of former Bagbazar tram terminus

Since 2011, line 3 of Kolkata metro construction was started by elevated method. It was needed construction of pillars through the planned route from Majherhat to Joka, which was mostly served before by tram. So the Behala-Joka route closed for construction of the metro line 3. In next year, Bagbazar terminus was closed, due to a legal dispute, and the non-revenue section between Bagbazar and Galiff Street became regular route, and double tracked. Galiff Street Terminus was realigned, irregular service from Bagbazar to Galiff Street became regular service. The Lalbazar-Mirzapur down line was closed, but the up line remained.[12] In 2013, 'Charoibeti' and 'Rupasi Bangla', two AC trams, were manufactured at the Nonapukur workshop for heritage tours only.[15] A regular AC tram route would not start until 6 years later. On 30 September 2014, a tram, converted into a museum (Smaranika) in Esplanade, was opened to the public.[16] The Park Circus Depot closed for construction of the Maa Flyover in 2015 and the Nonapukur Depot/Workshop has started regular service; the Gariahat Depot remained.[12] The following year, the Ballygunge Station Depot next to Gariahat Mall also reopened and thus Kalighat/Rashbehari-Ballygunge Station stretch (via Gariahat) became active after 12 years.

 
Tram Museum (Smaranika) in Esplanade Tram Terminus
 
Park Circus depot before it closed as tram depot
 
Belgachhia depot before it closed as tram depot
 
Ultadanga terminus was the easternmost terminus of Kolkata’s tram network

After the starting of the line 2 of Kolkata metro in 2017, all the Binay Badal Dinesh Bag bound tram routes have been closed for an indefinite time. Thus tram-plying along Sealdah (Purabi Cinema) Junction-Bowbazar Junction-Lalbazar Junction-BBD Bag, Galiff Street-Sovabazar Junction-Chitpur Junction-Lalbazar Junction, and Hatibagan Junction-Sovabazar Junction stretches has been stopped. The Wattgunge junction to Kalighat/Rashbehari Junction stretch has also been closed for an indefinite time since 2018, due to the Majherhat Bridge collapse and thus Tollygunge to Ballygunge Station bound tram route becomes an isolated one. In 2019, it was decided by All India Trinamool Congress government that no any tram service would be continued over any bridge, because tram could reduce the lifespan of bridges. After the decision of mayor Firhad Hakim and transport minister Shubhendu Adhikari, tram service was closed on Belgachia Bridge, Shyambazar Bridge, Maniktala Bridge, Kalighat Bridge & Sealdah Overpass. The tram trackbed renewal program became unfinished on Belgachia Bridge and Sealdah Overpass, and starting of tram track uprooting started on those bridges. Belgachia tram depot also has been converted to bus depot, despite the track renewal program inside the depot was just completed two months earlier, and thus tram-plying along Maniktala Junction-Shyambazar Junction-Belgachia and Shyambazar Tram Terminus-Shyambazar Junction stretches is closed since 2018.[17] In 2019, first A.C. tram route (AC-1) of Kolkata starts which runs between Esplanade and Shyambazar.[15] The state government decided to stop tram-plying on the 37 years old Sealdah Flyover (Vidyapati Setu), after the survey of the bridge-advisory committee officers in 2019 and thus tram-plying along the Mirzapur-Nonapukur, Purabi Cinema-Sealdah and Moulali-Subodh Chandra Mallik Square stretches has also been stopped.[18][19] State Government also decided to shut down tram-plying on Belgachia Bridge permanently due to the excessive load on the bridge.[20]

Timeline edit

  • 1992 - Esplanade – Planetarium route reclosed. (Route 12A). Bus service introduced.
  • 1994 - Howrah Station terminus closed and converted to public bus terminus. Route 11, 20 & 26 had come back to Howrah Bridge terminus. Metcalfe Hall – Howrah Bridge terminus closed. (Route 15, 21, 30 & 32 diversion). Ultadanga new terminus opened.
  • 1995 - Dalhousie Square – Metcalfe Hall - High Court route closed. Route 14 had come back to Dalhousie Square terminus.
  • 1998 - Gariahat Depot – Gariahat Junction route closed. (Route 25 & 26 had come back to Gariahat Depot)
  • 2002 - Mominpur – Behala route closed. (Route 27, 35 & 37)
  • 2004 - Shyambazar Junction – Galiff Street route closed. (Route 13, route 12 had come back to Rajabazar)
  • 2008 - Dalhousie Square terminus redesigned for underground car parking.
  • 2011 - Behala – Joka route closed for conversion to metro line 3.
  • 2012 - Bagbazar terminus closed, Bagbazar – Galiff Street section doubled. (Route 8 had extended to Galiff Street)
  • 2019 - Maniktala - Shyambazar – Belgachhia route closed. Belgachhia depot became a full bus depot. (Route 1, 2, & 4. Route 11 had started from Shyambazar terminus). Mirzapur – Sealdah – Moula Ali – Nonapukur route closed. (Route 12, 17, 20, 26) Wellington Square – Moula Ali route closed. (Route 12, 17)
  • 2020 - Kalighat – Wattganj closed (Route 24, 29, 30). Rajabazar – Maniktala – Ultadanga closed. (Route 16, 17, 18). Khidirpur – Esplanade closed. (Route 36).

Rolling stock edit

CTC owns 257 trams, of which 125 used to run daily.[4] Each single-deck articulated car can carry 200 passengers (60 seated). But the number of trams is decreasing sharply due to various reasons and now only 35 trams run daily.

The early horse-drawn cars and steel cars manufactured before 1952 were imported from England. Early trams were single-coach, similar to those in Delhi, Mumbai, Chennai and Kanpur. Triple-coach trams were tried without success. The later stock was the SLT type: double-coach with three doors, four wheels under each coach and no wheels between coaches. SLT trams had no front iron net but had a front-coach trolley pole. The both-end type had a front iron net and a rear-coach trolley pole. These were gradually replaced by articulated trams on all routes. The SLC type was introduced much later on the Bandhaghat line, and continued until its closure in 1971; after that, SLC trams began running on the Gariahat and Tollygunge lines on the Kolkata side.

Two trams were recently renovated with front and back glass, fluorescent lights, FM radio, digital display boards, angled seats, and a fibreglass ceiling. The Nonapukur workshop began manufacturing 19 new trams from 2008 to 2010, of which four are nearing completion. The roof is clear polycarbonate sheeting with a wide window, and it has comfortable seating and better visibility from within. The workshop is also renovating steel-body (BSCL) cars. With plans for banquet-cafeteria[21] and air-conditioned trams to attract commuters and foreign tourists (increasing CTC revenue), a single-coach, air-conditioned banquet tram has been introduced for heritage tours of North Kolkata in the morning and South Kolkata in the evening.[22] Although the air-conditioned tram had poor ridership when it was introduced,[23] more air-conditioned trams have since been introduced.[4] These include a tram restaurant (Victoria)[24] and the world's first shopping (glam) tram[25] and library tram.[26]

Types of rolling stock edit

 
SLC tram in 2009
 
Articulated tram
  • J Class Trams - The J Class trams were 4 Axled Single Car Trams numbered from 301 to 306
    • K Class Trams - The K Class trams (often called the English Cars) were articulated 6 axled wooden trams manufactured between 1931 and 1939. These trams were numbered between 307 and 489.
      • L Class Trams - The L Class trams (often affectionately called the Hatigari or Elephant Car) were Streamlined articulated trams manufactured between 1942 and 1951 at the Nonapukur Workshop. These trams were numbered between 490 and 559. The L class trams were one of the most iconic types of trams to have ever ran on Kolkata's streets, it had extra overhand both at its front and rear.
        • PAYE Trams- Pay As You Enter or PAYE Trams - after the closure of the Bombay (now Mumbai) tramways in 1964, CTC obtained 45 sets of maximum-traction trucks and controllers from Bombay Electricity Supply and Transport Undertaking (BEST). These running units were used in a class of six experimental Pay As You Enter (PAYE) trams. The prototype (201) was built in 1965, and 202-203 followed in 1966, with 204 - 206 being added in 1967. In about 1970 the PAYE system was dropped and the trams were modified to conventional layout with roving rather than seated conductors, and the entrances at the ends of the trams were sealed.
          • Sundari Trams - Sundari trams were wooden articulated trams similar to the K Class built in 1976 - 77. These trams were numbered between 561 and 587. The chief difference was that these trams were fitted out as double first-class cars. This feature also won the trams their alternative title of "De Luxe" trams. The double headlamps gave way to a single unit but, on the other hand, the blue and white livery was adorned with black and white flashes on the dash, and black and white chevrons on the fenders and trolley poles, and a glass windscreen.
 
Burn Standard made tram
  • Burn & Jessop cars – After many years of SLC and articulated trams, rolling stock arrived from Burn Standard India which is stronger, heavier and faster than earlier designs and reversed the declining public perception of trams in the city. The improved stock began running throughout the city on all routes. The Burnstandard Trams were delivered between 1982 and 1989, and were numbered between: A- 207 to 281, B- 291 to 299, C- 600 to 659 and D- 701 to 725. The Jessop trams are sleeker than the Burnstandard in design and were delivered between 1988 and 1989 and were numbered between 681 to 700. Some were modified with front glass; some are modified to resemble Melbourne's B-class trams with fluorescent lights, back glass and double ends.
 
New fibreglass made tram
    • Single-coach – Introduced on 24 December 2012, they are reportedly faster and more manoeuvrable than double-coach trams; the carriage is longer than those in double-coach trams.[27] More single-coach trams are planned across the city (including air-conditioned coaches), possibly replacing double-coach trams and enabling some closed routes to reopen.[28]
    • Fibre Body Trams – Before the introduction of the single-coach tram in December 2012, this was the last new rolling stock. Refurbished in the Nonapukur Workshop, various L Class, Burnstandard and Jessop trams were completely torn down and refurbished from scratch. Some were modified with front glass; one was modified with fluorescent lights, FM radio, digital advertising and route boards. These refurbished cars were built between 2008 and 2011

Power supply edit

The trams have a 550 V DC power supply from overhead lines. Power is obtained from a trolley pole, a current collector mounted on top of the tram. The track rails are the return path for the current. DC power is supplied by mercury-arc rectifier (converter) stations, located throughout the city.

Depots and Termini edit

A tram depot featured as workshop is located at Nonapukur, where trams are refurbished and modernised.[29]

 
Inside Nonapukur workshop

Depots edit

  • Kalighat – 1881 to still running, tram depot. (Route 30, 31)
  • Khidirpur – 1883 to still running, tram and bus depot. (Route 36)
  • Belgachhia – 1903 to 2019 = 116 years, now bus depot. (Route 1, 2, 3, 4, 11)
  • Tollygunge – 1903 to still running, now tram & bus depot. (Route 28, 29, 32, 50)
  • Ghasbagan – 1908 to 1971 = 63 years, now bus depot. (Route 41, 42)
  • Rajabazar – 1910 to still running, now tram & bus depot. (Route 14)
  • Park Circus – 1925 to 2016, now a bus depot. (Route 20, 21, 22)
  • Gariahat – 1943 to still running, now tram & bus depot. (No specific route originally, later 25 & 26)

Termini edit

  • Dalhousie Square – 1881, temporarily suspended as tram terminus (?) for construction of metro line 2. (Route 2,4,6,8,13,14,16,22,24,25,29,30)
  • Sealdah Station – 1881 to 1981 = 100 years, now metro station entrance. (Route 14)
  • Esplanade – 1881 to still running, now tram & bus terminus. (Route 1,3,5,7,9,12,15,17,19,22,24,25,29,31,35,36,37)
  • High Court – 1882 to 1995 = 91 years, now annex building of high court. (Route 14,15)
  • Nimtala – 1882 to 1973 = 63 years, now a street. (Route 19)
  • Shyambazar - 1903 to still running, tram terminus. (Route 5,6,9,10)
  • Bagbazar – 1904 to 2012 = 108 years, now a godown. (Route 7,8)
  • Galiff Street – 1908, temporarily suspended as terminus (?) for construction of metro line 2. (Route 12,13, 50)
  • Howrah Station – 1908 to 1994 = 86 years, now bus terminus. (Route 11,12A, 12B, 18,20,21,26,28,30,32,40,41,42)
  • Bandhaghat – 1908 to 1971 = 63 years, now a street. (Route 41,42)
  • Shibpur – 1908 to 1971 = 63 years, now a street. (Route 40)
  • Behala - 1908 to 2011 = 103 years, now a street. (Route 27,35)
  • Racecourse - 1927 to 1976 = 49 years, now a street. (no specified route, only race specials)
  • Ballygunge - 1928 to still running, tram terminus. (Route 24,25,26,27)
  • Planetarium - 1979 to 1992 = 13 years, now a park. (Route 12A)
  • Ultadanga - 1985 to 2020 = 35 years, now lying abandoned. (Route 16,17,18)
  • Joka - 1986 to 2011 = 25 years (Route 37), now bus terminus.

Routes edit

Active edit

Route No. Description Destination via Total km
24 / 29 TollygungeBallygunge Mahanayak Uttam Kumar metro, Golf Club, Bangur Hospital, Prince Anwar Shah Road, Charu Market Police Station, Bhawani Cinema, Charu Market, Tollygunge Bridge, Mudiali, Southern Market, Tollygunge Police Station, Rashbehari Crossing, Lake Market, Sarat Bose Road, Deshapriya Park, Lake View, Mahanirban Math, Triangular Park, Hindustan Park, Basanti Devi College, Gariahat More, Fern Road, Ekdalia, Bharat Sevashram 5.65 km [9][1]
25 GariahatB.B.D Bagh Ballygunge Phari, Birla Mandir, Gurusaday Road, Ice Skating Rink, Beck Bagan, Zeeshan, Park Circus 7 Point, Jannagar Road, Mullick Bazar, Nonapukur, Elliot Road, Royd Street, Bata, Ripon Street, Gol Talab, Muslim Institute, Maulana Azad College, Wellington Crossing, Janbazar, Chandni Chowk 8.45 km [9][1]
5 ShyambazarEsplanade Darpan Cinema, Town School, Hatibagan, Rupbani Cinema, Khudiram College, Scottish College, Hedua Park, Vivekananda Road, Sreemani Bazar, Vidyasagar College, Thanthania Kalibari, Bata More, College Street, Presidency College, Calcutta University, Calcutta Medical College, Bowbazar, Hind Cinema, Wellington Crossing, Janbazar, Chandni Chowk 5.43 km [9]

Inactive edit

Route No. Description Destination via Total km
36 KidderporeEsplanade Babu Bazar, Kidderpore College, Fancy Market, Khidderpore Crossing, Khidderpore Market, Hastings, Race Course, Fort William Gate 3, South Gate, Victoria, Mayo Road 4.99 km [9]
11 ShyambazarHowrah Bridge Darpan Cinema, Town School, Hatibagan, Rupbani Cinema, Khudiram College, Scottish College, Hedua Park, Vivekananda Road, Sreemani Bazar, Vidyasagar College, Thanthania Kalibari, Bata More, College Street, Mahatma Gandhi Road, Central Avenue, Machuabazar, Chitpur, Barabazar 6 km [9]
18 Howrah BridgeBidhannagar Barabazar, Chitpur, Machuabazar, Central Avenue, Mahatma Gandhi Road, College Street, College Square, Amherst Street, Purabi Cinema Hall, Sealdah, Sealdah ESI Hospital, Rajabazar, Rajabazar Crossing, Rajabazar Science College, Sukia Street, Maniktala, Maniktala Post Office, Bagmari Bazar, North Road, Marwari Bagan, Kankurgachi, Bagmari Kabaristan, Maniktala ESI Hospital, Housing Estate, 5th Battalion 8.85 km [9]`
15 / 12 Howrah BridgeRajabazar Barabazar, Chitpur, Machuabazar, Central Avenue, Mahatma Gandhi Road, College Street, College Square, Amherst Street, Purabi Cinema Hall, Sealdah, Sealdah ESI Hospital [10]

Former edit

Colored edit

There are 6 Colored tram routes.

Route No. Description color
25 Gariahat-Esplanade Yellow
24/29 Ballygunge-Tollygunge Pink
5 Shyambazar- Esplanade Red
11 Shyambazar - Howrah Bridge Green
18 Bidhannagar - Howrah Bridge Purple
36 Kidderpore- Esplanade Blue

Accidents edit

  1. On 3 December 2012, a seven-year-old was killed by a tram entering the Ultadanga depot. The boy was reportedly playing near the tracks when the tram approached and it struck him, before the brakes could be fully applied.[31]
  2. A bus driver attempted to overtake a tram on 31 January 2013. The rear of the bus grazed the tram, amputating a bus passenger's arm. The man was rushed to the hospital for his arm to be reattached.[32]
  3. On 19 June 2014, a driverless tram struck 10 cars. No fatalities or injuries were reported.[33]

Present Day Advocacy and Awareness edit

Calcutta Tram Users Association (CTUA) is an apolitical organization created in December 2016 and registered under the Society Act, formed by the common people of West Bengal united by their love for the tramways advocating for the Tramways of Kolkata since 2016.

Various news agencies and newspapers are trying to make articles to bring social awareness and government attention to preserve this heritage city transit.

In popular culture edit

Several movies have been shot on the tram network and in its depots:[29]

See also edit

References edit

  1. ^ a b c "Tram Routes – CTC".
  2. ^ "Kolkata's famed trams slowly drive into history". The Hindu. Retrieved 19 December 2019.
  3. ^ a b c d e f g h i j k l m n "History – CTC". Retrieved 7 June 2020.
  4. ^ a b c "Bankrupt CTC to introduce two more AC trams". The Times of India. 14 August 2013. Archived from the original on 16 August 2013.
  5. ^ "Reaching India". New Delhi: Times Internet Limited. Retrieved 27 February 2012.
  6. ^ . The Times of India. 13 July 2012. Archived from the original on 27 September 2013.
  7. ^ "Asia's Only Tram Service Celebrates 150 Years". Outlook (Indian magazine). Outlook Publishing India Pvt. Ltd. Retrieved 26 September 2023.
  8. ^ "Kolkata's historic trams trundle once more". thehindu.com. The Hindu. Retrieved 26 August 2020.
  9. ^ a b c d e f g "Tram Service". wbtc.co.in. WBTC. Retrieved 9 January 2023.
  10. ^ a b c d "The Tram Routes of Kolkata". ctua.in. CTUA. Retrieved 27 January 2023.
  11. ^ Dey, Shreyashi (9 December 2022). "Last trams standing—Kolkata citizens are pushing hard to keep them running". theprint.in. The Print. Retrieved 9 January 2023.
  12. ^ a b c d e f g h i j k l m n o p q r s t u v w x y z aa ab ac ad ae af ag ah ai aj "Details history of Kolkata tram" (PDF).
  13. ^ "How a Melbourne conductor helped save Kolkata's trams". www.abc.net.au. 6 October 2016.
  14. ^ "GARIAHAT GOODBYE TO TRAMS". www.telegraphindia.com.
  15. ^ a b "Kolkata's iconic tram gets a cool makeover". 5 June 2019.
  16. ^ "Calcutta Tramways Company inaugurates museum on wheels". 30 September 2014.
  17. ^ Javed, Zeeshan (9 March 2019). "Glimmer of hope for trams in Kolkata". The Times of India. Retrieved 24 July 2019.
  18. ^ "Sealdah bridge to get rid of age-old tram lines and heavy vehicles | Kolkata News - Times of India". The Times of India.
  19. ^ "শিয়ালদা ব্রিজে চিরতরে বন্ধ হতে চলেছে ট্রাম চলাচল". বিশ্ব বাংলা সংবাদ. 11 September 2019.
  20. ^ "PWD set to remove tram tracks from Belgachia bridge". www.millenniumpost.in. 24 October 2019.
  21. ^ "Kolkata to get banquet and cafeteria trams". Daily News. 12 February 2013.
  22. ^ "Enjoy Kolkata's heritage with an AC tram ride". The Economic Times. 18 April 2013.
  23. ^ "Kolkata's modernised heritage trams fail to woo passengers". India Today. 24 June 2013.
  24. ^ "Dining in Kolkata in a tramcar named 'Victoria'". The Hindu. Retrieved 15 October 2020.
  25. ^ "Durga Puja 2018: Kolkata gets world's first 'Glam Tram' fashion store on wheels". Deccan Chronicle. Deccan Chronicle. Retrieved 15 October 2020.
  26. ^ "In a first, Kolkata to get tram library". The Indian Express. The Indian Express. Retrieved 15 October 2020.
  27. ^ . hindustan times. 23 December 2012. Archived from the original on 23 December 2012.
  28. ^ "More single-coach trams to run on various streets in Kolkata soon". RailNews. 26 March 2013.
  29. ^ a b বসুমল্লিক, গৌতম (10 July 2020). "আত্মনির্ভর ট্রাম, বিজলি পথের গল্প". EiSamay Gold (in Bengali). Retrieved 28 July 2020.
  30. ^ a b "Calcutta Tramways Route maps". ctua.in. CTUA. Retrieved 27 January 2023.
  31. ^ "Tram runs over 7-year-old". The Times of India. 3 December 2012.
  32. ^ "'Passenger's arm ripped off as bus races tram in Kolkata". The Times of India. 31 January 2013.
  33. ^ "'Ghost tram' rams into 10 cars in Kolkata". The Times of India. 20 June 2014.

Notes edit

  • Niyogi, S. Shake, rattle & roll. The Sunday Story, Sunday Times of India, Kolkata, 25 June 2006. Available on Times of India e-paper (paid subscription required as of 2010).
  • Calcutta Tram Users Association (CTUA)
  • Pathak Pratap Shankar, The Sunday Story, Sunday Times of India, Kolkata
  • Tramjatra
  • Tramjatra: imagining Melbourne and Kolkata by tramways Mick Douglas
  • Pramanick, S., Anwaruzzaman, A. K., & Roy, U. (2019). A Profile of Tramways in Kolkata - A Sustainable Urban Public Transport. (A. Sarkar, Ed.) Indian Journal of Spatial Science, 10 (2), 59–64. (https://www.researchgate.net/publication/336085491_A_Profile_of_Tramways_in_Kolkata_ _A_Sustainable_Urban_Public_Transport)

External links edit

  • Official website of Calcutta Tramways Company
  • The Calcutta Tram Users Association (CTUA)
  • Urbanrail.net page with schematic map of trams in Kolkata
  • Melbourne - Calcutta Tramjatra Festival
  • Geographical map of trams in Kolkata, both past and latest updates
  • Some great photos of trams in Kolkata
  • Department of Transport from the Government of West Bengal website
  • A little more Information about trams in Kolkata

trams, kolkata, this, article, needs, additional, citations, verification, please, help, improve, this, article, adding, citations, reliable, sources, unsourced, material, challenged, removed, find, sources, news, newspapers, books, scholar, jstor, january, 20. This article needs additional citations for verification Please help improve this article by adding citations to reliable sources Unsourced material may be challenged and removed Find sources Trams in Kolkata news newspapers books scholar JSTOR January 2021 Learn how and when to remove this template message The tram system in Kolkata the capital city of the Indian state of West Bengal operated by West Bengal Transport Corporation WBTC after Calcutta Tramways Company CTC was dissolved is the oldest tram network operating in India and oldest operating tramway in Asia 5 Started in 1902 it is the oldest electric tramway in India 6 It is the only operating tram network of India at present 7 Kolkata TramwayA modern tram at Esplanade terminusA vintage tram moving through the streetsOverviewOwnerGovernment of West BengalLocaleKolkata IndiaTransit typeTramNumber of lines6 1 Daily ridership15 000 daily 2 WebsiteCalcutta TramwaysOperationBegan operation1873 electrification since 1902 3 Operator s West Bengal Transport CorporationReporting marksCTC WBTCNumber of vehicles257 trams 35 in operation 4 TechnicalSystem length14 1 kmTrack gaugeStandard gauge 1 435 mm 4 ft 8 1 2 in 3 Electrification550 V DC Overhead line TrolleypoleSystem mapThe network initially had up to 37 lines in the 1960s 8 but has gradually reduced over the years with only six lines currently operating due to financial struggles poor maintenance low ridership addition of road flyovers expansion of the Kolkata Metro slow tram speed and perceptions that the trams are outdated and occupy too much road space As per WBTC which maintains the existing tram lines two routes 24 29 and 25 had been running regularly with very irregular and limited service on the other five routes 36 5 18 11 15 12 9 10 As of January 2023 update only the two regular routes are in service with the service on other routes shut down 11 Due to these issues there have been occasional talks of either shutting down the network permanently or lowering operations of the system citation needed However the system is also considered environmentally friendly and an icon of Kolkata so there have also been recent efforts to sustain the system with newer trams Contents 1 History 1 1 1873 1901 Horse drawn trams 1 1 1 Timeline 1 2 1883 1902 Steam trams 1 2 1 Timeline 1 3 1902 1951 Electric trams 1 4 1951 1990 Nationalisation 1 5 Decline 1 6 Expansion 1 6 1 Timeline 1 7 1990 present Later developments and mass closures 1 8 Mass Concretization 1 8 1 Timeline 2 Rolling stock 2 1 Types of rolling stock 3 Power supply 4 Depots and Termini 4 1 Depots 4 2 Termini 5 Routes 5 1 Active 5 2 Inactive 5 3 Former 6 Colored 7 Accidents 8 Present Day Advocacy and Awareness 9 In popular culture 10 See also 11 References 12 Notes 13 External linksHistory edit1873 1901 Horse drawn trams edit nbsp Life size model of a horse drawn tram at the City Centre arcade Salt LakeThe first horse drawn trams in India ran for 2 4 miles 3 9 km between Sealdah and Armenian Ghat Street on 24 February 1873 The service was discontinued on 20 November of that year 3 The Calcutta Tramway Company was formed and registered in London on 22 December 1880 Meter gauge horse drawn tram tracks were laid from Sealdah to Armenian Ghat via Bowbazar Street Dalhousie Square and Strand Road The route was inaugurated by the Viceroy Lord Ripon on 1 November 1880 3 nbsp The oldest tram terminus is now suspended for construction of metro line 2 nbsp Esplanade tram terminus is now mostly closed due to construction of metro line 2 nbsp Kalighat depot is the smallest in term of both area and track number and oldest tram depot in KolkataAt first it was planned to open tram network in three directions in north towards Kumartuli via Chitpur Road now Rabindra Sarani for easy transportation of then rich Indians middle classes and poor who lived in those areas in the east towards Sealdah stations via Bowbazar Street now Bipin Bihari Gangopadhay Street for railway passengers interchange who come from outside of Kolkata and in the south towards Kalighat via Russa Road now Ashutosh Mukhopadhyay Road because not only for easy transportation of then rich Indians middle classes and poor who lived at those areas but also as a Hindu pilgrimage regarding Kali temple for inhabitants and tourists Kalighat tram depot was also constructed at that time which was also a minor workshop for all horse trams Besides this the city center connection between Dharmatala now known as Esplanade amp Dalhousie Square now known as Binay Badal Dinesh Bag was also established via Old Court House Street now Hemanta Basu Sarani 12 One year later a second route towards north Kolkata up to Shyambazar via College Street was opened for residents and students of medical college university and various schools amp colleges A second route from Wellington Square now known as Subodh Chandra Mullick Square to Sealdah Station via Moula Ali was also opened for more transportation of railway passengers Sealdah tram terminus was at that place where now the Kolkata metro line 2 station is under construction At the same time the first opening a westward tram route was opened by the High Court via Strand Road now Rajib Gandhi Sarani was connected by tram network for pleaders law related peoples and river bathers of Ganga High Court tram terminus was at that place where now the annexure building of the High Court is situated Another connection from Metcalf Hall towards Nimtala via Strand Road now Rajib Gandhi Sarani was also opened for serving the crematorium and serving of businessmen Nimtala tram terminus was at that place beside of the red temple building is now situated 12 By opening those routes Shyambazar High Court Nimtala Sealdah Dalhousie Square Dharmatala and Kalighat area was connected by horse tram Kalighat was the only depot at that time so it is the oldest tram depot Timeline edit 1873 Opening of horse tram as meter gauge closure in the same year 1880 Final opening of horse tram as a permanent system Calcutta Tramways Company was established 1881 Dalhousie Square Lalbazar Bowbazar Lebutala Sealdah Station route opened Later route 14 Esplanade Lalbazar Pagyapatti Companybagan Shobhabazar Kumortuli route opened Later route 7 after extension Dalhousie Square Esplanade connection opened Later route 22 24 25 amp 29 The connection was improved at Lalbazar Junction for through running trams from Dalhousie Square to Kumortuli Later route 8 after extension Esplanade Planetarium Hazra Park Kalighat route opened Later route 30 Occasional through service started from Kumortuli to Kalighat either via Esplanade or via Dalhousie Square 1882 Esplanade Wellington Square Bowbazar Boipara Hatibagan Shyambazar Junction route opened Later route 5 The connection was improved at Bowbazar Junction for through running trams from Dalhousie Square to Shyambazar Later route 6 Wellington Square Moula Ali Sealdah Station route opened Later route 12 after extension Dalhousie Square Metcalfe Hall High Court route opened Later route 14 extension Direct tram service from Sealdah Station to High Court started Metcalfe Hall Howrah Bridge Nimtala route opened Later route 19 Direct tram service from Esplanade to Nimtala started At this time steam tram service was thought 12 1883 1902 Steam trams edit In 1882 steam locomotives were deployed experimentally to haul tram cars In the next year a new route opened for steam tram service towards Khidirpur Tram tracks were laid down via Dufferin Road through maidan and on reserved track for high speed steam trams for morning walkers tourists race course goers and peoples living on those area Khidirpur tram depot was also constructed at that time which was also a minor workshop for all steam trams 12 It was followed by a south central branch towards from Wellington Square to Park Street now Mother Teresa Sarani via Wellesley Street now Rafi Ahmed Kidwai Road 12 After a long sixteen years gap the Nimtala route was connected with Company Bagan line via Nimtala Ghat Street and the Dharmatala Nimtala service was changed to steam tram At this time horse trams ran on Shyambazar Sealdah High Court amp Kalighat routes and steam trams ran on Nimtala Park Street amp Khidirpur route The Dharmatala Wellington Square section and Esplanade Metcalfe Hall section were served by both horse and steam trams until 1901 Khidirpur amp Kalighat were the only steam amp horse tram depot at that time respectively By the end of the century the company owned 166 tram cars 1 000 horses seven steam locomotives and 19 miles of track 3 Timeline edit 1883 Esplanade Racecourse Wattganj Khidirpur route opened Later route 36 1884 Wellington Square Park Street route opened Later route 21 amp 22 after extension 1900 Nimtala Companybagan route opened non revenue service only Electrification amp conversion to standard gauge was started 12 1902 1951 Electric trams edit nbsp Early electric tram at Chitpur Road Rabindra Sarani nbsp A tram in 1945 at Hatibagan nbsp A Calcutta tram in Esplanade terminus during British period nbsp Shyambazar terminus is now the northernmost terminus nbsp Tollygunge depot is the southernmost tram depot of KolkataIn 1900 the electrification of the tramway and conversion of its tracks to 4 ft 8 1 2 in 1 435 mm standard gauge began 3 The first electric tramcar in Calcutta ran from Esplanade to Kidderpore on 27 March 1902 with service from Esplanade to Kalighat introduced on 14 June of that year Both Kalighat amp Khidirpur tram depot was converted to electric tram depot The connecting route through Grey Street now Arabinda Sarani was opened in that year for a second route between Shyambazar and Dharmatala The Nonapukur tram workshop was established also in that year from where the track connection up to Wellesley Street opened via Elliott Road after which the Park Street branch closed Now the major repairing of the horse steam and electric trams was started at Nonapukur 12 In next year the Kalighat line was extended to Tollygunge for serving the then south suburban area and film studios via Russa Road now Shyama Prasad Mukhopadhyay Road Tollygunge tram depot was also construed at that time which was the largest tram depot in terms of area The Shyambazar line was also extended to Belgachia for serving the then north suburban area hospital and rail yards via Belgachhia Road now Radha Gobinda Kar Road Belgachhia tram depot and Shyambazar tram terminus were also opened in this year 12 In next year The Kumourtuli line was extended to Bagbazar after which the Kumortuli terminus was closed Bagbazar tram terminus was at that place where now a lorry parking area beside the circular railway track 12 A new route from Sealdah Station to Howrah Bridge now Rabindra Setu via Harrison Road now Mahatma Gandhi Road was opened on next year for serving the businessmen residents ferry passengers and railway passengers for Howrah Station At that time the electrification project was completed 3 nbsp The old Behala tram terminus was the only V shaped terminus nbsp Galiff Street terminus is now suspended for construction of Kolkata metro line 2Two years later the connection between Nonapukur and Moula Ali opened via Circular Road now Acharya Jagadish Chandra Basu Road and after that tram service started from Nonapukur to Howrah Bridge via Sealdah station A branch up to Mominpur was also opened from Wattganj via Diamond Harbour Road but at that time direct access was constructed through Orphanganjbazar 12 In next year a new branch was constructed from Shyambazar Junction to Galiff Street via Cornwallis Street now Bidhan Sarani and occasional tram service was also started from Galiff Street to Dharmatala Side by side the Mominpur branch was also extended up to Behala another then south suburban area via Diamond Harbour Road now Balananda Brahmachari Sarani At that time Behala tram terminus was at right side of Diamond Harbour Road The connecting route through Alipur Road was also opened in that year for a tram connection between Behala amp Kalighat also a second route between Kalighat and Dharmatala 12 At that time tram service was opened in Howrah City From Howrah Station two routes were selected One towards north up to Bandhaghat via Dobson Road Now Moulana Abul Kalam Azad Road another towards south up to Shibpur via Grand Trunk Road For shibpur route a single coach double ended tram was selected due to the lack of creating a loop at Shibpur For Howrah service a new depot was constructed at Ghasbagan Hence then the old Howrah Bridge was a pontoon bridge it was not possible to connect Kolkata tram and Howrah tram directly 12 nbsp Rajabazar depot is the only remaining tram depot of North KolkataTwo years later the Sealdah Station to Rajabazar route opened in 1910 Rajabazar tram depot was also constructed at that time which was the largest tram depot in terms of track number 12 nbsp Ballygunge terminus is now the eastermnost terminusAfter a long 15 years gap new tram route construction had started again in 1925 The Nonapukur line was extended to Park Circus via Park Street now Mother Teresa Sarani for serving residents and circus goers of that area Park Circus tram depot was also constructed at that time In the next year the direct access of the Behala line via Orphanganjbazar was replaced by present alignment via Wattganj junction for smooth tram service 12 A new terminus near Racecourse was constructed in next year for race special trams towards Belgachhia Bagbazar Galiff Street Rajabazar High Court Nimtala Park Circus Tollygunge Behala amp Khidirpur In the next year a new branch was constructed from Kalighat to Ballygunge another then south suburb of Kolkata via Ballygunge Avenue now Rasbihari Avenue 12 nbsp Tram tracks on Acharya Praphulla Chandra Roy Road closed in 2020 nbsp Gariahat tram depot is the newest tram depot the first three tracks are now closed and converted to electric bus depotAfter again a long 13 years gap new tram route construction had started again in 1941 The Rajabazar line was extended to connect with Galiff Street line at Shyambazar junction via Circular Road now Acharya Praphulla Chandra Ray Road 12 Two years later when new Howrah Bridge now Rabindra Setu was opened tram service started crossing the river Hooghly and connecting Kolkata amp Howrah tram network Very few times trams from Shibpur and Bandhaghat came towards Dharmatala and Rajabazar In the same year the Park Circus line was extended to connect with the Ballygunge line at Gariahat junction via Gariahat Road now Syed Amir Ali Avenue Gariahat tram depot was also constructed at that time 12 With this extension total track length reached 42 0 miles 67 59 km 3 1951 1990 Nationalisation edit In 1951 the government of West Bengal entered an agreement with the Calcutta Tramways Company and the Calcutta Tramways Act of 1951 was enacted The government assumed the tramways reserving the right to purchase the system with two years notice on 1 January 1972 or at any time thereafter 3 After Independence during the partition of India the number of people started dramatically increasing on the roads of Kolkata due to a lot of refugees The city centre area started getting congested due to the increasing number of buses and cars So tram company thought to shift the tram tracks of Dalhousie Square from outside to the inside of the square It was completed in 1952 12 It was followed by redesigning of Esplanade terminus in 1960 also due to increasing number of pedestrians and automobiles At that time there were five ways of tram routes from Esplanade i e Bentinck Street Dharmatala Street now Lenin Sarani Chowrangi Road now Jawaharlal Nehru Road Dufferin Road and Old Court House Street now Hemanta Basu Sarani and three ways of tram routes from Dalhousie Square i e Old Court House Street now Hemanta Basu Sarani Hare Street amp Lalbazar Street 12 Four years later the old Majherhat bridge was replaced by a new bridge with tram tracks 12 In 1967 the Government of West Bengal passed the Calcutta Tramways Company Taking Over of Management Act and assumed management on 19 July Until this time there was the platinum age of Kolkata with maximum number of rolling stocks route kilometers and passengers Decline edit nbsp Historical lines active lines and formerly planned lines The decline of tram networks was started in India in the early thirties where the Kanpur tram was closed However other cities had continued tram but mass closure started from mid fifties to mid sixties where tram networks of Chennai Delhi and Mumbai gradually closed Overall the world at that time trams thought an old technology and inflexible The number of automobiles was increasing so it was started occupying tram tracks especially on narrow streets and tram services got hampered But surprisingly car and bus drivers started blaming the tram which was fueled by political leaders So it was decided to close the entire Kolkata tram network within 1980 On 8 November 1976 the Calcutta Tramways Acquisition of Undertaking ordinance was promulgated under which the company and its assets was nationalized 3 nbsp The former Ghasbagan tram depot is now a bus depot nbsp The former Shibpur tram terminus nbsp The former Nimtala tram terminusThe Howrah sections were decided to close first because the government thought trams were creating traffic jams on narrow streets of Howrah city So in 1971 both the Bandhaghat and Shibpur lines were closed including the Ghasbagan tram depot The depot got vacant and abandoned for some vehicle dumping place However the Howrah station terminus survived but it was started redesigning largely All single and double coach trams were transferred to Kolkata area In Kolkata a new tram terminus was constructed in Behala this time on the left side of Diamond Harbour Road for no need for reversing the tram 12 Two years later Nimtala route along Companybagan now Rabindra Kanan section was closed in May 1973 and the Howrah Station terminus redesigning completed in 1976 The racecourse terminus was also closed due to the construction of 2nd Hooghly Bridge now Vidyasagar Setu 12 Total track length was now reduced to 38 miles 61 2 km 3 nbsp The diverted tram route through Surya Sen street recently became one way for tram now temporarily suspended for metro line 2 However tram service was survived in Kolkata largely supported by then transport minister Rabin Mukherjee and also due to high rise of oil prices in the international market which make costly for automobiles Internationally some cities were started returning tram for this economical reason Since 1978 line 1 of Kolkata metro construction was started by the cut amp cover method It was needed the construction of a large trench through the planned route which was mostly served before by tram So it was thought to temporarily close the tram service along those routes Later it was planned to part of the tram routes in south Kolkata would remain opened because two tram depots Kalighat amp Tollygunge are situated along the tram route and it was not practical to close those depots and close a number of tram routes for this reason rather thought to diverse some tram routes For this reason tram tracks between Hazra Park then renamed to Jatin Das Park and Dharmatala then renamed to Esplanade via Planetarium was closed the 3rd oldest tram route but all tram routes which were running via Ashutosh Mukhopadhyay Road and Jawaharlal Nehru Road were diverted via Biplabi Ganesh Ghosh Sarani Alipur Road Diamond Harbour Road Khidirpur Road amp Dufferin Road This closed section was partially reopened in the next year between Planetarium and Esplanade due to protests of passengers tourists and hawkers A new terminus was constructed beside Birla Planetarium 12 At that time construction of Sealdah Flyover was started Due to its low height for running tram on it it was decided to close tracks between Sealdah and Lebutala but diverse this route from Lebutala to Mirzapur via Raja Ram Mohan Sarani amp Surya Sen Street In the 1st phase tram service opened between Mirzapur and Purabi cinema for Howrah Station tram routes and in the next year from Purabi Cinema to Lebutala for Binay Badal Dinesh Bag routes At that time Surya Sen Street was the only tram only street of Kolkata and the original route previously mentioned the oldest tram route with Sealdah Station terminus was closed 12 For metro line 1 construction the tracks between Lalbazar and Esplanade via Bentinck Street the 2nd oldest tram route was also closed but all tram routes which were running via Bentinck Street were diverted via Hemanta Basu Sarani amp Lalbazar Street 12 In next year Sealdah flyover opened with tram tracks on it It was very few flyovers of the world which had tram tracks 12 Expansion edit After a one decade major closures of the lines some new routes were planned by government Then transport minister Rabin Mukherjee proposed some new lines and connecting lines Those were 1 Maniktala to Bidhannagar 2 Behala to Joka 3 Galiff Street to Dakshineshwar 4 Tollygunge out post to Jadabpur 5 Ultadanga to Airport 6 Kalighat to Taratala via New Alipur 7 Moula Ali to Park Circus via Sundari Mohan Avenue For first phase first two lines were selected On 17 April 1985 tracks were extended 3 7 km 2 30 mi from Maniktala to Ultadanga via Maniktala Main Road now Satin Sen Sarani and C I T Road 12 now Acharya Satyendra Nath Basu Sarani 3 This route was selected for expanding the Kolkata towards east At first it was planned that there will be two branches one to Bidhannagar Karunamayi another to Airport However residents of Bidhanngar were highly against of tram so that extension was finally cancelled The Airport extension was also cancelled later On 31 December 1986 the route extension from Behala to Joka was completed via Diamond Harbour Road 3 It was the first and only village extension of Kolkata tram network for developing this area as a city After opening this line it was the longest tram route of Kolkata 12 Unfortunately this opening created some controversy The then transport minister Rabin Mukherjee was an MLA of Behala West where this route passed When it was opened it broke the election code of conduct and so he was suspended from the post of transport minister before the election He was a strong supporter of tram and after his suspension when new transport minister Shyamal Chakraborty joined fast declining of Kolkata tram was started again after some years All the remaining plans were also cancelled forever at that time citation needed Timeline edit 1902 Khidirpur amp Kalighat routes were electrified Shobhabazar Hatibagan connecting route opened Later route 9 amp 10 alternative service was started from Shambazar to Dharmatala and Dalhousie Square via this route Nonapukur Workshop opened with Royd Street Nonapukur route opening Later route 21 amp 22 after re extension Direct tram service from Nonapukur to Dalhousie Square started Royd Street Park Street closed 1903 Shyambazar terminus opened with Shyambazar Belgachhia route opened Later route 1 2 3 4 amp 11 Direct tram service from Belgachhia to Dharmatala amp Dalhousie Square started Kalighat Tollyganj route opened Later route 29 amp 32 Direct tram service from Tollyganj to Dalhousie Square started 1904 Kumortuli Bagbazar route opened Kumortuli terminus closed Later route 7 amp 8 Direct tram service was started from Bagbazar to Dharmatala and Dalhousie Square 1905 Howrah Bridge Pagyapatti Boipara Purabi Cinema Sealdah Station route opened Later route 15 The connection was improved at Pageyapatti Junction and Boipara Junction for through running trams from Howrah Bridge to Dharmatala Later route 21 and Howrah Bridge to Shyambazar Later route 11 Semi Circular service from High Court to Esplanade via Sealdah started All remaining then opened routes were electrified 1907 Moula Ali Nonapukur route opened Later route 20 amp 26 after extension Direct tram service started from Nonapukur to Howrah Bridge Wattganj Mominpur route opened via direct access through Orphanganjbazar Later route 31 1908 Shyambazar Junction Galiff Street route opened Later route 12 Howrah Station Ghasbagan Bandhaghat Later route 41 amp 42 and Howrah Station Shibpur route opened Later route 40 Hazra Park Mominpur Behala old terminus route opened via Majherhat old bridge Later route 27 amp 35 Direct tram service started from Behala to Dharmatala and Behala to Kalighat The connection was improved at Mominpur Junction for alternative service was started from Kalighat to Dharmatala and Dalhousie Square via this route Later route 31 1910 Sealdah Station Mirzapur Rajabazar route opened Later route 12 Direct tram service started from Rajabazar to Dharmatala The connection was improved at Sealdah Junction for through running trams from Rajabazar to High Court Later route 14 1925 Nonapukur Parkcircus route opened Later route 20 21 amp 22 1926 Orphanganjbazar direct access was replaced by present alignment via Wattganj Junction 1927 Racecourse terminus built for race special tram service 1928 Kalighat Junction Ballyganj route opened Later route 24 amp 27 extension Direct tram service started from Ballyganj to Tollyganj Behala and Dalhousie Square 1941 Rajabazar Shyambazar Junction route opened Later route 12 amp 13 Direct tram service started from Galiff Street to Dharmatala amp Dalhousie Square via Sealdah and or Moula Ali also some occasional tram service started from Belgachia to Rajabazar Belgachia to Bagbazar route 1943 Howrah Bridge Howrah Station via Howrah Bridge route opened Route 11 20 21 22 30 amp 32 were extended to Howrah Station All tram routes which were running up to Howrah Bridge now started going directly up to Howrah station from Belgachhia Galiff Street Rajabazar Park Circus Tollygunge and Kalighat Occasional tram service also started from Howrah Station to Nimtala amp High Court Gariahat depot opened with Parkcircus Gariahat Junction route opened Later route 25 amp 26 Direct tram service started from Ballygunge to Dharmatala amp Howrah Station via Park Circus This was the last tram extension in Kolkata before Indian Independence 1952 Dalhousie Square terminus redesigned outside park tracks brought into the park 1960 Esplanade terminus redesigned 1964 Majherhat new bridge built 1971 Behala new terminus built Howrah Station Ghasbagan Bandhaghat closed Ghasbagan depot became a goods vehicle stock depot Route 41 42 Howrah Station Shibpur closed Route 40 1973 Howrah Bridge Nimtala Companybagan section closed Route 19 1976 Howrah Station terminus redesigned after the closure of Bandhaghat amp Shibpur route converted to the private bus terminus and opening of the pedestrian subway Racecourse terminus closed 1978 Esplanade Planetarium Hazra Park closed for conversion to metro line 1 All tram services from Tollyganj Kalighat amp some services from Ballyganj were started running via Mominpur amp Wattganj 1979 Esplanade Planetarium reopened Route 12A 1980 Purabi Cinema Mirzapur route opened Route 13 diversion 1981 Lebutala Purabi Cinema route opened Route 14 diversion Esplanade Lalbazar closed Route 3 7 amp 9 Lebutala Sealdah Station terminus closed for flyover but trams continued serving Sealdah Station Route 13 amp 14 diversion Some tram services from Galiff Street Rajabazar High Court Park Circus amp Ballyganj were started running via Purabi Cinema 1982 Sealdah flyover opened with tram tracks on it 1985 Maniktala Ultadanga old terminus route opened Route 16 amp 17 1986 Behala Joka route opened Route 37 12 Connection was improved at Maniktala Junction for through running trams from Belgachhia to Ultadanga 1990 present Later developments and mass closures edit nbsp Planetarium terminus was constructed during construction of metro line 1 nbsp The realigned former Howrah Station tram terminus nbsp Howrah Bridge tram terminus former Burrabazar junctionSince 1990 losses of Kolkata tram started increasing and to overcome this it was thought by government that the entire tram network will be gradually replaced by bus and lands of depot and terminus will be sold to promoters for construction of high rise buildings Calcutta Tramways Company introduced the bus service on 4 November 1992 with a fleet of 40 buses 3 The Planetarium line was closed due to excuse of loss making The terminus was converted to park however tracks were still present until 2010 and masts are still present now are being used by lamp posts 12 After two years The Howrah Station terminus closed converted to bus terminus and the tram tracks were removed on Rabindra Setu the following year since the world s busiest ageing cantilever bridge was not strong enough for trams The routes which terminated there were moved back to the Burrabazar Howrah Bridge terminus formerly Burrabazar Junction Tram tracks from Howrah Bridge terminus to Metcalf Hall was also closed due to excuse of road repair and all routes which were served this section was now diverted via Rabindra Sarani However in this year a new terminus in Ultadanga opened near Railway Station 12 The system had degraded by the 1990s and Minister for Transport Shyamal Chakraborty planned to close the network In 1995 the High Court terminus closed for the reconstruction of Strand Road Rails and wires were removed from there and from Strand Road Hare Street and Shahid Khudiram Basu Road and it is now the site of the newest Kolkata High Court centenary building 12 However Melbourne tram conductor Roberto D Andrea befriended fellow Calcutta conductors during a 1994 visit When D Andrea heard about the planned network closure he suggested an art project to decorate the trams as was done in his home city The project increased public awareness of the network and its value ultimately saving it at that time 13 However closures were continued In 1998 the Gariahat Depot Gariahat Junction link on Lila Roy Sarani closed for construction of the Gariahat overpass 14 It was early planned to relaying tram tracks on two sides of the road under the overpass but it was finally cancelled because of then Mayor Subrata Mukherjee During his reign tram network again got on threat of closure because he is a strong anti tram person Four years later the Mominpur Behala route on Diamond Harbour Road closed for the construction of an overpass in Taratala 12 Although it was initially planned to relaying tracks on the overpass after its completion the road was later converted to a national highway and the plan was dismissed Mass Concretization edit In 2004 state government decided to deserved all grass bed reserved tracks from tram only operation and replace it by concrete bed Cobblestone bed tracks were also planned to replacing by concrete bed For this reason Shayambazar to Galiff Street section was closed and modification of Shyambazar junction done by now tram service could continue from Rajabazar to Belgachia instead of Galiff Street Rails and overhead lines were removed from part of the Bidhan Sarani route In 2008 Binay Badal Dinesh Bag terminus was largely redesigned for construction of underground car parking 12 nbsp Place of former Behala terminus closed for metro line 3 nbsp Joka terminus was the newest terminus of Kolkata tram network nbsp Exit of former Bagbazar tram terminusSince 2011 line 3 of Kolkata metro construction was started by elevated method It was needed construction of pillars through the planned route from Majherhat to Joka which was mostly served before by tram So the Behala Joka route closed for construction of the metro line 3 In next year Bagbazar terminus was closed due to a legal dispute and the non revenue section between Bagbazar and Galiff Street became regular route and double tracked Galiff Street Terminus was realigned irregular service from Bagbazar to Galiff Street became regular service The Lalbazar Mirzapur down line was closed but the up line remained 12 In 2013 Charoibeti and Rupasi Bangla two AC trams were manufactured at the Nonapukur workshop for heritage tours only 15 A regular AC tram route would not start until 6 years later On 30 September 2014 a tram converted into a museum Smaranika in Esplanade was opened to the public 16 The Park Circus Depot closed for construction of the Maa Flyover in 2015 and the Nonapukur Depot Workshop has started regular service the Gariahat Depot remained 12 The following year the Ballygunge Station Depot next to Gariahat Mall also reopened and thus Kalighat Rashbehari Ballygunge Station stretch via Gariahat became active after 12 years nbsp Tram Museum Smaranika in Esplanade Tram Terminus nbsp Park Circus depot before it closed as tram depot nbsp Belgachhia depot before it closed as tram depot nbsp Ultadanga terminus was the easternmost terminus of Kolkata s tram networkAfter the starting of the line 2 of Kolkata metro in 2017 all the Binay Badal Dinesh Bag bound tram routes have been closed for an indefinite time Thus tram plying along Sealdah Purabi Cinema Junction Bowbazar Junction Lalbazar Junction BBD Bag Galiff Street Sovabazar Junction Chitpur Junction Lalbazar Junction and Hatibagan Junction Sovabazar Junction stretches has been stopped The Wattgunge junction to Kalighat Rashbehari Junction stretch has also been closed for an indefinite time since 2018 due to the Majherhat Bridge collapse and thus Tollygunge to Ballygunge Station bound tram route becomes an isolated one In 2019 it was decided by All India Trinamool Congress government that no any tram service would be continued over any bridge because tram could reduce the lifespan of bridges After the decision of mayor Firhad Hakim and transport minister Shubhendu Adhikari tram service was closed on Belgachia Bridge Shyambazar Bridge Maniktala Bridge Kalighat Bridge amp Sealdah Overpass The tram trackbed renewal program became unfinished on Belgachia Bridge and Sealdah Overpass and starting of tram track uprooting started on those bridges Belgachia tram depot also has been converted to bus depot despite the track renewal program inside the depot was just completed two months earlier and thus tram plying along Maniktala Junction Shyambazar Junction Belgachia and Shyambazar Tram Terminus Shyambazar Junction stretches is closed since 2018 17 In 2019 first A C tram route AC 1 of Kolkata starts which runs between Esplanade and Shyambazar 15 The state government decided to stop tram plying on the 37 years old Sealdah Flyover Vidyapati Setu after the survey of the bridge advisory committee officers in 2019 and thus tram plying along the Mirzapur Nonapukur Purabi Cinema Sealdah and Moulali Subodh Chandra Mallik Square stretches has also been stopped 18 19 State Government also decided to shut down tram plying on Belgachia Bridge permanently due to the excessive load on the bridge 20 Timeline edit 1992 Esplanade Planetarium route reclosed Route 12A Bus service introduced 1994 Howrah Station terminus closed and converted to public bus terminus Route 11 20 amp 26 had come back to Howrah Bridge terminus Metcalfe Hall Howrah Bridge terminus closed Route 15 21 30 amp 32 diversion Ultadanga new terminus opened 1995 Dalhousie Square Metcalfe Hall High Court route closed Route 14 had come back to Dalhousie Square terminus 1998 Gariahat Depot Gariahat Junction route closed Route 25 amp 26 had come back to Gariahat Depot 2002 Mominpur Behala route closed Route 27 35 amp 37 2004 Shyambazar Junction Galiff Street route closed Route 13 route 12 had come back to Rajabazar 2008 Dalhousie Square terminus redesigned for underground car parking 2011 Behala Joka route closed for conversion to metro line 3 2012 Bagbazar terminus closed Bagbazar Galiff Street section doubled Route 8 had extended to Galiff Street 2019 Maniktala Shyambazar Belgachhia route closed Belgachhia depot became a full bus depot Route 1 2 amp 4 Route 11 had started from Shyambazar terminus Mirzapur Sealdah Moula Ali Nonapukur route closed Route 12 17 20 26 Wellington Square Moula Ali route closed Route 12 17 2020 Kalighat Wattganj closed Route 24 29 30 Rajabazar Maniktala Ultadanga closed Route 16 17 18 Khidirpur Esplanade closed Route 36 Rolling stock editCTC owns 257 trams of which 125 used to run daily 4 Each single deck articulated car can carry 200 passengers 60 seated But the number of trams is decreasing sharply due to various reasons and now only 35 trams run daily The early horse drawn cars and steel cars manufactured before 1952 were imported from England Early trams were single coach similar to those in Delhi Mumbai Chennai and Kanpur Triple coach trams were tried without success The later stock was the SLT type double coach with three doors four wheels under each coach and no wheels between coaches SLT trams had no front iron net but had a front coach trolley pole The both end type had a front iron net and a rear coach trolley pole These were gradually replaced by articulated trams on all routes The SLC type was introduced much later on the Bandhaghat line and continued until its closure in 1971 after that SLC trams began running on the Gariahat and Tollygunge lines on the Kolkata side Two trams were recently renovated with front and back glass fluorescent lights FM radio digital display boards angled seats and a fibreglass ceiling The Nonapukur workshop began manufacturing 19 new trams from 2008 to 2010 of which four are nearing completion The roof is clear polycarbonate sheeting with a wide window and it has comfortable seating and better visibility from within The workshop is also renovating steel body BSCL cars With plans for banquet cafeteria 21 and air conditioned trams to attract commuters and foreign tourists increasing CTC revenue a single coach air conditioned banquet tram has been introduced for heritage tours of North Kolkata in the morning and South Kolkata in the evening 22 Although the air conditioned tram had poor ridership when it was introduced 23 more air conditioned trams have since been introduced 4 These include a tram restaurant Victoria 24 and the world s first shopping glam tram 25 and library tram 26 Types of rolling stock edit nbsp SLC tram in 2009 nbsp Articulated tramJ Class Trams The J Class trams were 4 Axled Single Car Trams numbered from 301 to 306 K Class Trams The K Class trams often called the English Cars were articulated 6 axled wooden trams manufactured between 1931 and 1939 These trams were numbered between 307 and 489 L Class Trams The L Class trams often affectionately called the Hatigari or Elephant Car were Streamlined articulated trams manufactured between 1942 and 1951 at the Nonapukur Workshop These trams were numbered between 490 and 559 The L class trams were one of the most iconic types of trams to have ever ran on Kolkata s streets it had extra overhand both at its front and rear PAYE Trams Pay As You Enter or PAYE Trams after the closure of the Bombay now Mumbai tramways in 1964 CTC obtained 45 sets of maximum traction trucks and controllers from Bombay Electricity Supply and Transport Undertaking BEST These running units were used in a class of six experimental Pay As You Enter PAYE trams The prototype 201 was built in 1965 and 202 203 followed in 1966 with 204 206 being added in 1967 In about 1970 the PAYE system was dropped and the trams were modified to conventional layout with roving rather than seated conductors and the entrances at the ends of the trams were sealed Sundari Trams Sundari trams were wooden articulated trams similar to the K Class built in 1976 77 These trams were numbered between 561 and 587 The chief difference was that these trams were fitted out as double first class cars This feature also won the trams their alternative title of De Luxe trams The double headlamps gave way to a single unit but on the other hand the blue and white livery was adorned with black and white flashes on the dash and black and white chevrons on the fenders and trolley poles and a glass windscreen nbsp Burn Standard made tramBurn amp Jessop cars After many years of SLC and articulated trams rolling stock arrived from Burn Standard India which is stronger heavier and faster than earlier designs and reversed the declining public perception of trams in the city The improved stock began running throughout the city on all routes The Burnstandard Trams were delivered between 1982 and 1989 and were numbered between A 207 to 281 B 291 to 299 C 600 to 659 and D 701 to 725 The Jessop trams are sleeker than the Burnstandard in design and were delivered between 1988 and 1989 and were numbered between 681 to 700 Some were modified with front glass some are modified to resemble Melbourne s B class trams with fluorescent lights back glass and double ends nbsp New fibreglass made tramSingle coach Introduced on 24 December 2012 they are reportedly faster and more manoeuvrable than double coach trams the carriage is longer than those in double coach trams 27 More single coach trams are planned across the city including air conditioned coaches possibly replacing double coach trams and enabling some closed routes to reopen 28 Fibre Body Trams Before the introduction of the single coach tram in December 2012 this was the last new rolling stock Refurbished in the Nonapukur Workshop various L Class Burnstandard and Jessop trams were completely torn down and refurbished from scratch Some were modified with front glass one was modified with fluorescent lights FM radio digital advertising and route boards These refurbished cars were built between 2008 and 2011Power supply editThe trams have a 550 V DC power supply from overhead lines Power is obtained from a trolley pole a current collector mounted on top of the tram The track rails are the return path for the current DC power is supplied by mercury arc rectifier converter stations located throughout the city Depots and Termini editA tram depot featured as workshop is located at Nonapukur where trams are refurbished and modernised 29 nbsp Inside Nonapukur workshopDepots edit Kalighat 1881 to still running tram depot Route 30 31 Khidirpur 1883 to still running tram and bus depot Route 36 Belgachhia 1903 to 2019 116 years now bus depot Route 1 2 3 4 11 Tollygunge 1903 to still running now tram amp bus depot Route 28 29 32 50 Ghasbagan 1908 to 1971 63 years now bus depot Route 41 42 Rajabazar 1910 to still running now tram amp bus depot Route 14 Park Circus 1925 to 2016 now a bus depot Route 20 21 22 Gariahat 1943 to still running now tram amp bus depot No specific route originally later 25 amp 26 Termini edit Dalhousie Square 1881 temporarily suspended as tram terminus for construction of metro line 2 Route 2 4 6 8 13 14 16 22 24 25 29 30 Sealdah Station 1881 to 1981 100 years now metro station entrance Route 14 Esplanade 1881 to still running now tram amp bus terminus Route 1 3 5 7 9 12 15 17 19 22 24 25 29 31 35 36 37 High Court 1882 to 1995 91 years now annex building of high court Route 14 15 Nimtala 1882 to 1973 63 years now a street Route 19 Shyambazar 1903 to still running tram terminus Route 5 6 9 10 Bagbazar 1904 to 2012 108 years now a godown Route 7 8 Galiff Street 1908 temporarily suspended as terminus for construction of metro line 2 Route 12 13 50 Howrah Station 1908 to 1994 86 years now bus terminus Route 11 12A 12B 18 20 21 26 28 30 32 40 41 42 Bandhaghat 1908 to 1971 63 years now a street Route 41 42 Shibpur 1908 to 1971 63 years now a street Route 40 Behala 1908 to 2011 103 years now a street Route 27 35 Racecourse 1927 to 1976 49 years now a street no specified route only race specials Ballygunge 1928 to still running tram terminus Route 24 25 26 27 Planetarium 1979 to 1992 13 years now a park Route 12A Ultadanga 1985 to 2020 35 years now lying abandoned Route 16 17 18 Joka 1986 to 2011 25 years Route 37 now bus terminus Routes editActive edit Route No Description Destination via Total km24 29 Tollygunge Ballygunge Mahanayak Uttam Kumar metro Golf Club Bangur Hospital Prince Anwar Shah Road Charu Market Police Station Bhawani Cinema Charu Market Tollygunge Bridge Mudiali Southern Market Tollygunge Police Station Rashbehari Crossing Lake Market Sarat Bose Road Deshapriya Park Lake View Mahanirban Math Triangular Park Hindustan Park Basanti Devi College Gariahat More Fern Road Ekdalia Bharat Sevashram 5 65 km 9 1 25 Gariahat B B D Bagh Ballygunge Phari Birla Mandir Gurusaday Road Ice Skating Rink Beck Bagan Zeeshan Park Circus 7 Point Jannagar Road Mullick Bazar Nonapukur Elliot Road Royd Street Bata Ripon Street Gol Talab Muslim Institute Maulana Azad College Wellington Crossing Janbazar Chandni Chowk 8 45 km 9 1 5 Shyambazar Esplanade Darpan Cinema Town School Hatibagan Rupbani Cinema Khudiram College Scottish College Hedua Park Vivekananda Road Sreemani Bazar Vidyasagar College Thanthania Kalibari Bata More College Street Presidency College Calcutta University Calcutta Medical College Bowbazar Hind Cinema Wellington Crossing Janbazar Chandni Chowk 5 43 km 9 Inactive edit Route No Description Destination via Total km36 Kidderpore Esplanade Babu Bazar Kidderpore College Fancy Market Khidderpore Crossing Khidderpore Market Hastings Race Course Fort William Gate 3 South Gate Victoria Mayo Road 4 99 km 9 11 Shyambazar Howrah Bridge Darpan Cinema Town School Hatibagan Rupbani Cinema Khudiram College Scottish College Hedua Park Vivekananda Road Sreemani Bazar Vidyasagar College Thanthania Kalibari Bata More College Street Mahatma Gandhi Road Central Avenue Machuabazar Chitpur Barabazar 6 km 9 18 Howrah Bridge Bidhannagar Barabazar Chitpur Machuabazar Central Avenue Mahatma Gandhi Road College Street College Square Amherst Street Purabi Cinema Hall Sealdah Sealdah ESI Hospital Rajabazar Rajabazar Crossing Rajabazar Science College Sukia Street Maniktala Maniktala Post Office Bagmari Bazar North Road Marwari Bagan Kankurgachi Bagmari Kabaristan Maniktala ESI Hospital Housing Estate 5th Battalion 8 85 km 9 15 12 Howrah Bridge Rajabazar Barabazar Chitpur Machuabazar Central Avenue Mahatma Gandhi Road College Street College Square Amherst Street Purabi Cinema Hall Sealdah Sealdah ESI Hospital 10 Former edit Route No 10 Description Destination via 30 1 Belgachia Esplanade Wellington2 Belgachia B B D Bagh Bowbazar Street3 Belgachia Esplanade Bentinck Street4 Belgachia B B D Bagh Rabindra Sarani6 Shyambazar B B D Bagh Bowbazar Street7 Bagbazar Esplanade Bentinck Street8 Bagbazar B B D Bagh9 Shyambazar Esplanade Bentinck Street10 Shyambazar B B D Bagh Rabindra Sarani12 Rajabazar Esplanade13 Galiff Street Howrah Station B B D Bagh14 Rajabazar B B D Bagh15 Esplanade High Court Sealdah Howrah Bridge16 Bidhannagar B B D Bagh17 Bidhannagar Esplanade19 Nimtala Park Circus20 Park Circus Howrah Bridge Sealdah21 Park Circus Howrah Bridge Esplanade22 Park Circus B B D Bagh24 Ballygunge Esplanade26 Gariahat Howrah Bridge Sealdah27 Behala Ballygunge29 Tollygunge B B D Bagh30 Kalighat Howrah Bridge31 Kalighat Esplanade32 Tollygunge Howrah Bridge Esplanade35 Behala Esplanade37 Joka Esplanade40 Howrah Station Shibpur41 Howrah Station Bandhaghat Grand Trunk Road42 Howrah Station Bandhaghat Salkia School Road50 Galiff Street Tollygunge Sealdah Gariahat Route No 10 Description Destination via 30 1 11 Belgachia Howrah Station APC Road Sealdah1 12 Belgachia Esplanade APC Road Sealdah1 17 Belgachia Bidhannagar1 20 Belgachia Park Circus APC Road Sealdah1 37 Belgachia Joka2 13 Belgachia B B D Bagh APC Road Sealdah8 36 Bagbazar Kidderpore Esplanade12A Planetarium Howrah Station Chowringhee12 7 Galiff Street Esplanade B B D Bagh12 20 Galiff Street Park Circus12 26 Galiff Street Ballygunge12 32 Rajabazar Howrah Station12 36 Rajabazar Kidderpore15 20 High Court Howrah Station17 20 Bidhannagar Park Circus Sealdah17 26 Bidhannagar Gariahat Sealdah19 15 Nimtala High Court24 37 Ballygunge Joka29 37 Tollygunge Joka30 36 Kalighat Kidderpore35A Behala Howrah Station36 24 Kidderpore Ballygunge36 29 Kidderpore Tollygunge37 35 Joka BehalaColored editThere are 6 Colored tram routes Route No Description color25 Gariahat Esplanade Yellow24 29 Ballygunge Tollygunge Pink5 Shyambazar Esplanade Red11 Shyambazar Howrah Bridge Green18 Bidhannagar Howrah Bridge Purple36 Kidderpore Esplanade BlueAccidents editOn 3 December 2012 a seven year old was killed by a tram entering the Ultadanga depot The boy was reportedly playing near the tracks when the tram approached and it struck him before the brakes could be fully applied 31 A bus driver attempted to overtake a tram on 31 January 2013 The rear of the bus grazed the tram amputating a bus passenger s arm The man was rushed to the hospital for his arm to be reattached 32 On 19 June 2014 a driverless tram struck 10 cars No fatalities or injuries were reported 33 Present Day Advocacy and Awareness editCalcutta Tram Users Association CTUA is an apolitical organization created in December 2016 and registered under the Society Act formed by the common people of West Bengal united by their love for the tramways advocating for the Tramways of Kolkata since 2016 Various news agencies and newspapers are trying to make articles to bring social awareness and government attention to preserve this heritage city transit In popular culture editSeveral movies have been shot on the tram network and in its depots 29 Howrah Bridge Bari theke Paliye Mahanagar Interview Baharen Phir Bhi Aayengi City of Joy Char Adhyay Calcutta Mail Yuva Parineeta Sukno Lanka Kahaani Barfi Open tee Bioscope Piku Bullet Raja Jay Jay Parineeta Detective Byomkesh Bakshy Meri Pyaari Bindu RaavanSee also editTrams in India Kolkata Metro Kolkata Suburban Railway Kolkata Circular Railway List of tram and light rail transit systemsReferences edit a b c Tram Routes CTC Kolkata s famed trams slowly drive into history The Hindu Retrieved 19 December 2019 a b c d e f g h i j k l m n History CTC Retrieved 7 June 2020 a b c Bankrupt CTC to introduce two more AC trams The Times of India 14 August 2013 Archived from the original on 16 August 2013 Reaching India New Delhi Times Internet Limited Retrieved 27 February 2012 Kolkata trams to get a GenX makeover The Times of India 13 July 2012 Archived from the original on 27 September 2013 Asia s Only Tram Service Celebrates 150 Years Outlook Indian magazine Outlook Publishing India Pvt Ltd Retrieved 26 September 2023 Kolkata s historic trams trundle once more thehindu com The Hindu Retrieved 26 August 2020 a b c d e f g Tram Service wbtc co in WBTC Retrieved 9 January 2023 a b c d The Tram Routes of Kolkata ctua in CTUA Retrieved 27 January 2023 Dey Shreyashi 9 December 2022 Last trams standing Kolkata citizens are pushing hard to keep them running theprint in The Print Retrieved 9 January 2023 a b c d e f g h i j k l m n o p q r s t u v w x y z aa ab ac ad ae af ag ah ai aj Details history of Kolkata tram PDF How a Melbourne conductor helped save Kolkata s trams www abc net au 6 October 2016 GARIAHAT GOODBYE TO TRAMS www telegraphindia com a b Kolkata s iconic tram gets a cool makeover 5 June 2019 Calcutta Tramways Company inaugurates museum on wheels 30 September 2014 Javed Zeeshan 9 March 2019 Glimmer of hope for trams in Kolkata The Times of India Retrieved 24 July 2019 Sealdah bridge to get rid of age old tram lines and heavy vehicles Kolkata News Times of India The Times of India শ য লদ ব র জ চ রতর বন ধ হত চল ছ ট র ম চল চল ব শ ব ব ল স ব দ 11 September 2019 PWD set to remove tram tracks from Belgachia bridge www millenniumpost in 24 October 2019 Kolkata to get banquet and cafeteria trams Daily News 12 February 2013 Enjoy Kolkata s heritage with an AC tram ride The Economic Times 18 April 2013 Kolkata s modernised heritage trams fail to woo passengers India Today 24 June 2013 Dining in Kolkata in a tramcar named Victoria The Hindu Retrieved 15 October 2020 Durga Puja 2018 Kolkata gets world s first Glam Tram fashion store on wheels Deccan Chronicle Deccan Chronicle Retrieved 15 October 2020 In a first Kolkata to get tram library The Indian Express The Indian Express Retrieved 15 October 2020 City s new public ride arrives on Christmas Eve hindustan times 23 December 2012 Archived from the original on 23 December 2012 More single coach trams to run on various streets in Kolkata soon RailNews 26 March 2013 a b বস মল ল ক গ তম 10 July 2020 আত মন র ভর ট র ম ব জল পথ র গল প EiSamay Gold in Bengali Retrieved 28 July 2020 a b Calcutta Tramways Route maps ctua in CTUA Retrieved 27 January 2023 Tram runs over 7 year old The Times of India 3 December 2012 Passenger s arm ripped off as bus races tram in Kolkata The Times of India 31 January 2013 Ghost tram rams into 10 cars in Kolkata The Times of India 20 June 2014 Notes editNiyogi S Shake rattle amp roll The Sunday Story Sunday Times of India Kolkata 25 June 2006 Available on Times of India e paper paid subscription required as of 2010 update Calcutta Tram Users Association CTUA Pathak Pratap Shankar The Sunday Story Sunday Times of India Kolkata Tramjatra Tramjatra imagining Melbourne and Kolkata by tramways Mick Douglas Pramanick S Anwaruzzaman A K amp Roy U 2019 A Profile of Tramways in Kolkata A Sustainable Urban Public Transport A Sarkar Ed Indian Journal of Spatial Science 10 2 59 64 https www researchgate net publication 336085491 A Profile of Tramways in Kolkata A Sustainable Urban Public Transport External links edit nbsp Wikimedia Commons has media related to Trams in Kolkata Official website of Calcutta Tramways Company The Calcutta Tram Users Association CTUA Urbanrail net page with schematic map of trams in Kolkata Melbourne Calcutta Tramjatra Festival Geographical map of trams in Kolkata both past and latest updates Some great photos of trams in Kolkata Department of Transport from the Government of West Bengal website A little more Information about trams in Kolkata Retrieved from https en wikipedia org w index php title Trams in Kolkata amp oldid 1180945193, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.