Soroti–Katakwi–Moroto–Lokitanyala Road

Soroti–Katakwi–Moroto–Lokitanyala Road is a road in the Eastern and Northern regions of Uganda. The road connects the urban centers of Soroti, the largest city in Teso sub-region, to Katakwi, the district headquarters of Katakwi District and to Moroto, the largest city in the Karamoja sub-region. It ends at Lokitanyala, at the international border with Kenya.[1]

Soroti–Katakwi–Moroto–Lokitanyala Road
Route information
Length133 mi (214 km)
HistoryCompletion (Soroti–Katakwi–Moroto) in 2020
Major junctions
South endSoroti
Major intersectionsKatakwi
Napak
Moroto
North endLokitanyala
Location
CountryUganda
Highway system

Location

The road starts at Soroti and continues northeastwards through Katakwi, and on to Moroto. The distance between Soroti and Moroto is approximately 170 kilometres (106 mi).[2]

At Moroto, the road takes a southeasterly direction for approximately 44 kilometres (27 mi), to end at Lokitanyala, for a total road distance of 214 kilometres (133 mi).[3]

Overview

Prior to 2016 this transport corridor posed serious challenges to residents and visitors, who endured the dust and potholes during the dry season. In the rainy season the road became a bog, with vehicles stuck in the mud for days, sometimes for weeks.[4][5]

Upgrading to bitumen

In November 2016, the upgrade of the road to grade II bitumen standard, with culverts, shoulders and drainage channels began. The work was contracted to China Communications Construction Company Limited (CCCC) and China Railway Group 3 Construction Company. The construction bill totaled USh646.8 billion (approx. US$175 million), funded by the government of Uganda and other development partners.[6]

The work on the Soroti–Katakwi–Moroto section was completed in late 2019. Official handover to the Ugandan government is expected in 2020.[7] As of January 2020, the road had been fully tarmacked from Soroti to Moroto, and was open to the public.[8] The Moroto–Lokitanyala section is expected to be tarmacked during the 2020/2021 financial year that begins in July 2020.[3]

On 21 November 2020, the government received the completed Soroti–Katakwi–Moroto section. Work on the Moroto–Lokitanyala section, measuring 44 kilometres (27 mi), was also flagged off, on the same day. President Yoweri Museveni presided over these events.[9]

See also

References

  1. ^ Google (30 June 2020). "Map Showing Soroti–Katakwi–Moroto–Lokitanyala Road in the Town of Katakwi" (Map). Google Maps. Google. Retrieved 30 June 2020.
  2. ^ Google (30 June 2020). "Road Distance Between Soroti and Moroto in Uganda" (Map). Google Maps. Google. Retrieved 30 June 2020.
  3. ^ a b Eninu, Edward (31 March 2019). "Delay In Construction Of Lokitanyala Road Irks Moroto Leaders". Kampala: Uganda Radio Network. Retrieved 30 June 2020.
  4. ^ "Trucks Stuck For Days Along Soroti–Moroto Road" (Video). Kampala: NTV Uganda. 19 December 2015. Retrieved 30 June 2020 – via YouTube.
  5. ^ "Rains cut off access to Karamoja". The Observer. Kampala. Uganda Radio Network. 9 December 2015. Retrieved 30 June 2020.
  6. ^ Emwamu, Simon Peter (8 February 2019). "Tamarcked Soroti-Moroto road boosts transport, trade". Daily Monitor. Kampala. Retrieved 30 June 2020.
  7. ^ Steven Ariong (18 December 2019). "Joy As Government Completes Soroti–Moroto Highway". Daily Monitor. Kampala. Retrieved 30 June 2020.
  8. ^ Steven Ariong (17 January 2020). "New Moroto–Soroti Road Boosts Trade". Daily Monitor. Kampala. Retrieved 30 June 2020.
  9. ^ Conan Businge (21 November 2020). "Commissioned Soroti-Moroto road cost sh646bn". New Vision. Kampala. Retrieved 22 November 2020.

External links

  • Uganda National Road Authority Homepage
  • Government Is On Steady Progress In Road Infrastructural Development As at 11 April 2019.

soroti, katakwi, moroto, lokitanyala, road, road, eastern, northern, regions, uganda, road, connects, urban, centers, soroti, largest, city, teso, region, katakwi, district, headquarters, katakwi, district, moroto, largest, city, karamoja, region, ends, lokita. Soroti Katakwi Moroto Lokitanyala Road is a road in the Eastern and Northern regions of Uganda The road connects the urban centers of Soroti the largest city in Teso sub region to Katakwi the district headquarters of Katakwi District and to Moroto the largest city in the Karamoja sub region It ends at Lokitanyala at the international border with Kenya 1 Soroti Katakwi Moroto Lokitanyala RoadRoute informationLength133 mi 214 km HistoryCompletion Soroti Katakwi Moroto in 2020Major junctionsSouth endSorotiMajor intersectionsKatakwiNapakMorotoNorth endLokitanyalaLocationCountryUgandaHighway systemRoads in Uganda Contents 1 Location 2 Overview 3 Upgrading to bitumen 4 See also 5 References 6 External linksLocation EditThe road starts at Soroti and continues northeastwards through Katakwi and on to Moroto The distance between Soroti and Moroto is approximately 170 kilometres 106 mi 2 At Moroto the road takes a southeasterly direction for approximately 44 kilometres 27 mi to end at Lokitanyala for a total road distance of 214 kilometres 133 mi 3 Overview EditPrior to 2016 this transport corridor posed serious challenges to residents and visitors who endured the dust and potholes during the dry season In the rainy season the road became a bog with vehicles stuck in the mud for days sometimes for weeks 4 5 Upgrading to bitumen EditIn November 2016 the upgrade of the road to grade II bitumen standard with culverts shoulders and drainage channels began The work was contracted to China Communications Construction Company Limited CCCC and China Railway Group 3 Construction Company The construction bill totaled USh646 8 billion approx US 175 million funded by the government of Uganda and other development partners 6 The work on the Soroti Katakwi Moroto section was completed in late 2019 Official handover to the Ugandan government is expected in 2020 7 As of January 2020 the road had been fully tarmacked from Soroti to Moroto and was open to the public 8 The Moroto Lokitanyala section is expected to be tarmacked during the 2020 2021 financial year that begins in July 2020 3 On 21 November 2020 the government received the completed Soroti Katakwi Moroto section Work on the Moroto Lokitanyala section measuring 44 kilometres 27 mi was also flagged off on the same day President Yoweri Museveni presided over these events 9 See also EditMoroto District Katakwi District Soroti District Economy of Uganda List of roads in UgandaReferences Edit Google 30 June 2020 Map Showing Soroti Katakwi Moroto Lokitanyala Road in the Town of Katakwi Map Google Maps Google Retrieved 30 June 2020 Google 30 June 2020 Road Distance Between Soroti and Moroto in Uganda Map Google Maps Google Retrieved 30 June 2020 a b Eninu Edward 31 March 2019 Delay In Construction Of Lokitanyala Road Irks Moroto Leaders Kampala Uganda Radio Network Retrieved 30 June 2020 Trucks Stuck For Days Along Soroti Moroto Road Video Kampala NTV Uganda 19 December 2015 Retrieved 30 June 2020 via YouTube Rains cut off access to Karamoja The Observer Kampala Uganda Radio Network 9 December 2015 Retrieved 30 June 2020 Emwamu Simon Peter 8 February 2019 Tamarcked Soroti Moroto road boosts transport trade Daily Monitor Kampala Retrieved 30 June 2020 Steven Ariong 18 December 2019 Joy As Government Completes Soroti Moroto Highway Daily Monitor Kampala Retrieved 30 June 2020 Steven Ariong 17 January 2020 New Moroto Soroti Road Boosts Trade Daily Monitor Kampala Retrieved 30 June 2020 Conan Businge 21 November 2020 Commissioned Soroti Moroto road cost sh646bn New Vision Kampala Retrieved 22 November 2020 External links EditUganda National Road Authority Homepage Government Is On Steady Progress In Road Infrastructural Development As at 11 April 2019 Retrieved from https en wikipedia org w index php title Soroti Katakwi Moroto Lokitanyala Road amp oldid 989935159, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.