fbpx
Wikipedia

Shin'etsu Main Line

The Shinetsu Main Line (Japanese: 信越本線, Japanese pronunciation: [Shin'etsu-honsen]) is a railway line, consisting of three geographically separated sections, operated by the East Japan Railway Company (JR East) in Japan. It was originally one continuous line connecting Takasaki and Niigata via Nagano. Since the opening and later extension of the Hokuriku Shinkansen, sections running in parallel have either been abandoned or transferred to third-sector railway companies.

Shinetsu Main Line
A 115 series train (Ōmigawa - Kujiranami)
Overview
Native name信越本線
StatusOperational
LocaleGunma, Nagano, and Niigata prefectures
Service
Operator(s) East Japan Railway Company (JR East)
History
OpenedStages between 1885 (138 years ago) (1885) and 1904 (119 years ago) (1904)
Closed
Technical
Line length175.3 km (108.9 mi)
Track gauge1,067 mm (3 ft 6 in)
Electrification1,500 V DC overhead catenary
Route map
Map Legend
Red: Shin-etsu Main Line
Blue: Shinano Railway Line, Kita-Shinano Line and Myōkō Haneuma Line

The name of the line refers to the old names for Nagano and Niigata prefectures, Shinano (Japanese: ), and Echigo (Japanese: ).

The abandoned section through the Usui Pass was famous for its steep 66.7 (6.67%) gradient.[1]

Sections

From 14 March 2015, the line consists of the following three sections.

There are three small freight branches; from Echigo-Ishiyama Station to Niigata Freight Terminal, from Kami-Nuttari Junction to Nuttari Station, and from Kami-Nuttari Junction to Higashi-Niigata-kō Station.

Services

Takasaki–Yokokawa

  • Local: 1 or 2 trains per hour
  • Excursion train: SL Gunma Yokokawa and SL YOGISHA Yokokawa

Shinonoi–Nagano

All trains run through on the Shinonoi Line or the Shinano Railway Line.

Naoetsu–Niigata

 
Stations of Shin'etsu Main Line between Naoetsu and Niigata
Limited express, Rapid

As of 17 March 2018, the following services are operated.[2][3]

Name Route Service frequency (daily)
Limited Express Shirayuki (Jōetsumyōkō/Arai) – Naoetsu – Niigata 5 return trips
Rapid Ohayo-Shinetsu Naoetsu – Niigata 1 down trip
Rapid Rakuraku-Train-Shinetsu Naoetsu – Niigata 1 up trip
Rapid (Arai -) Naoetsu – Niigata 1 return trip
Naoetsu – Nagaoka 2 down trips
1 up trip
Nagaoka – Niigata 1 return trip
Local
Naoetsu–Nagaoka: every 60-120 minutes
Nagaoka–Niitsu: every 60 minutes (every 20 minutes during peaks)
Niitsu–Niigata: every 20 minutes (every 5-10 minutes during peaks)
Excursion train (Joyful Train)
Koshino Shu*Kura

Stations

Takasaki–Yokokawa

Station Japanese Distance
(km)
SL Connections Location
Takasaki 高崎 0.0 Takasaki Gunma Prefecture
Kita-Takasaki 北高崎 2.4  
Gumma-Yawata 群馬八幡 6.4  
Annaka 安中 10.6   Annaka
Isobe 磯部 17.6  
Matsuida 松井田 22.7  
Nishi-Matsuida 西松井田 23.9  
Yokokawa 横川 29.7 JR Bus Kanto Usui Line
  1. ^ a b Although the official terminus of the Ryōmō Line is at Shin-Maebashi and that of the Agatsuma Line is at Shibukawa, trains on both lines run through to Takasaki.

Yokokawa–Shinonoi

The section between Yokokawa and Karuizawa was closed and the section between Karuizawa and Shinonoi was transferred to the ownership of the third-sector railway operator Shinano Railway from 1 October 1997 with the opening of the Hokuriku Shinkansen (Nagano Shinkansen) between Takasaki and Nagano.

Shinonoi–Nagano

Station Japanese Distance
(km)
Connections Location
Shinonoi 篠ノ井 0.0
Nagano Nagano Prefecture
Imai 今井 2.1  
Kawanakajima 川中島 4.3  
Amori 安茂里 6.4  
Nagano 長野 9.3
  1. ^ Although the official terminus of the Iiyama Line is at Toyono, trains on the line run through to Nagano.

Nagano–Naoetsu

The section between Nagano and Naoetsu was transferred to the ownership of the third-sector railway operators Shinano Railway and Echigo Tokimeki Railway from 14 March 2015 with the opening of the Hokuriku Shinkansen extension north of Nagano.

Naoetsu–Niigata

A: Limited Express Shirayuki
B: Rapid Ohayo-Shinetsu
C: Rapid Rakuraku-Train-Shinetsu
D: Rapid
Trains stop at stations marked "O", skip at stations marked "|".
Station Japanese Distance
(km)
A B C D Connections Location
Naoetsu 直江津 84.3 O O O O Jōetsu Niigata Prefecture
Kuroi 黒井 87.0 | | | |  
Saigata 犀潟 91.4 | | | O Hokuhoku Line
Dosokohama 土底浜 93.7 | | | |  
Katamachi 潟町 95.5 | | | |  
Jōgehama 上下浜 98.3 | | | |  
Kakizaki 柿崎 101.9 O O O O  
Yoneyama 米山 107.8 | | | |   Kashiwazaki
Kasashima 笠島 111.7 | | | |  
Ōmigawa 青海川 113.9 | | | |  
Kujiranami 鯨波 116.9 | | | |  
Kashiwazaki 柏崎 120.6 O O O O Echigo Line
Ibarame 茨目 123.6 | | | |  
Yasuda 安田 126.5 | | | |  
Kitajō 北条 129.1 | | | |  
Echigo-Hirota 越後広田 132.4 | | | |  
Nagatori 長鳥 135.1 | | | |  
Tsukayama 塚山 140.1 | | | |   Nagaoka
Echigo-Iwatsuka 越後岩塚 144.8 | | | |  
Raikōji 来迎寺 147.6 | O O O  
Maekawa 前川 151.7 | | | |  
Miyauchi 宮内 154.3 | O O O Jōetsu Line
Minami-Nagaoka
Freight Terminal
南長岡 (155.7)  
Nagaoka 長岡 157.3 O O O O   Jōetsu Shinkansen
Kita-Nagaoka 北長岡 159.8 | | | |  
Oshikiri 押切 164.2 | | | |  
Mitsuke 見附 168.7 O O O O   Mitsuke
Obiori 帯織 172.8 | | | |   Sanjō
Tōkōji 東光寺 175.4 | | | |  
Sanjō 三条 178.9 | | O O  
Higashi-Sanjō 東三条 180.5 O O O O Yahiko Line
Honai 保内 184.3 | | | |  
Kamo 加茂 188.1 O O O O   Kamo
Hanyūda 羽生田 192.2 | | | |   Tagami
Tagami 田上 195.4 | | | |  
Yashiroda 矢代田 199.1 | | O O   Akiha-ku, Niigata
Furutsu 古津 202.2 | | | |  
Niitsu 新津 205.4 O O O O
Satsukino さつき野 206.9 | | | |  
Ogikawa 荻川 209.2 | | | |  
Kameda 亀田 214.1 | | | O   Kōnan-ku, Niigata
Echigo-Ishiyama 越後石山 216.5 | | | |   Higashi-ku, Niigata
Niigata 新潟 220.6 O O O O Chūō-ku, Niigata

Rolling Stock

Present

Takasaki–Yokokawa

Shinonoi–Nagano

Naoetsu–Niigata

Former

Takasaki–Yokokawa

Naoetsu–Niigata

History

 
Abt rack railway loco used on the Usui Pass line, note the 'shoe' ahead of the nearest wheel to collect power via a third rail

The Japanese Government Railways opened the Takasaki to Yokokawa section in 1885, the Naoetsu to Sekiyama section the following year, and the Sekiyama - Nagano - Karuizawa section in 1888. In order to surmount the 552 metre altitude difference between Yokokawa and Karuizawa (which are 10 km apart), it then constructed an Abt rack section through the Usui Pass, which opened in 1893, and was double-tracked for 1 km from Karuizawa to the top of the rack section. A horse-drawn tramway operated between Yokokawa and Karuizawa until the rack section opened.

 
An electric train with both head and center locomotives in 1914

The Hokuetsu Railway opened the Naoetsu to Nagaoka section in 1897, extending the line to Niigata in 1904. That company was nationalised in 1907. In 1909, the Imperial Japanese Railway authorities invited bids for the electrification of the route. A German company was selected to provide the engines and General Electric supplied the turbines at the power station. In 1912, the rack section was electrified using third rail at 600 V DC, this being the first use of this method in Japan. The electrification allowed for the use of faster and longer trains which reduced journey times and also pollution from the steam engines.[4] A link to archival footage of the rack section operation is available here

Double-tracking

The Karuizawa to Nagano section was double-tracked between 1917 and 1920, with the Nagaoka to Miyauchi section double-tracked in 1931, and the Niitsu - Kamo section in 1944. Double-tracking of the remainder of the Niigata to Naoetsu line was undertaken in sections between 1958 and 1973.

Double-tracking of the remainder of the Takasaki to Kaminagano line was undertaken in sections between 1963 and 1973, commencing with the replacement of the rack mechanism with an adhesion only electrified (1,500 V DC catenary) operation on the 1 in 15 (6.7%) grade. The rack equipment was initially kept as a contingency, and removed two months after the adhesion-only operation commenced and had proved its reliability.

The Kurohime to Myoko-Kogen section was double-tracked in conjunction with a realignment in 1980. The Mure to Kurohime section was also realigned and prepared for double-tracking (including new double-track size tunnels), but the second track was not laid.

Electrification

The Miyauchi to Nagaoka section was electrified in 1947 at 1,500 V DC in conjunction with the electrification of the Joetsu Line, with the Nagaoka to Niigata section electrified in 1962, the same year the Takasaki to Yokokawa section was commissioned to facilitate the extension to Nagano the following year via the new adhesion line through the Usui Pass mentioned above. The Nagano to Naoetsu section was electrified in 1966, and extended to Miyauchi in 1969.

Separation into sections

In 1997, following the opening of the Nagano Shinkansen, the Yokokawa to Karuizawa section was closed, and the Karuizawa to Shinonoi section transferred to the third-sector Shinano Railway.

On 14 March 2015, following the extension of the Hokuriku Shinkansen to Kanazawa, the Nagano to Naoetsu section was also spun off to the following two third-sector operating companies owned primarily by the respective prefectures and municipalities.[5]

Former connecting lines

 
The Kubiki Railway prior to 1940
 
A train on the Uomuna line in 1937, prior to its conversion to 1,067 mm gauge

(Note - for the connections at stations between Karuizawa and Shinonoi, see Shinano Railway Line)

  • Nagano Station: The Zenkoji Hakuba Railway Co. opened a 7 km line to Susohana Guchi in 1936. A proposal for the line to be extended to Hakuba on the Oito Line did not eventuate, and the line closed in 1944.
  • Kuroi Station: The Kubiki Railway Co. opened a 15 km 762 mm (2 ft 6 in) gauge line to Uragawara between 1914 and 1916, with the line closing in 1971.
  • Raikoji Station: The Nagaoka Railway Co. opened a 39 km line to Teradomari (on the Echigo Line) between 1915 and 1921. This company introduced Japan's first diesel railcar in 1928, and in 1951 electrified 31 km of the line at 750 V DC in 70 days, completing the balance the following year. Significant typhoon damage occurred in 1966, and in 1972, passenger services ceased between Raikoji and Nishinagaoka, with the entire line becoming freight-only three years later. The line closed in 1995.
The 13 km 762 mm (2 ft 6 in) gauge Uonuma Railway to Nishiojiya was opened in 1911, and nationalised in 1922. It was converted to 1,067 mm (3 ft 6 in) gauge in 1954, freight services ceased in 1960, and the line closed in 1984.
  • Nagaoka Station: The Tochio Railway opened a 27 km 762 mm (2 ft 6 in) gauge line to Tochio and Yūkyūzan between 1915 and 1924.[6] The line was electrified at 600 V DC in 1948, with this being raised to 750 V DC in 1956. CTC signalling was commissioned in 1961, freight services ceased in 1967, and the line closed between 1973 and 1975.
  • Higashi Sanjo Station: The Echigo Railway Co. opened the 8 km line to Echigo Nagasawa in 1927, and was nationalised two months later. Freight services ceased in 1960, and the line closed in 1985.
  • Kamo Station: The Kanbara Railway Co. operated a line to Gosen on the Ban'etsu West Line from 1923 until 2002.

References

  1. ^ Harada, Katsumasa (1981). "Technological independence and progress of standardization in the Japanese railways". JETRO. Retrieved January 2, 2009. it was eventually decided to build the track at a steep grade of 66.7/1,000
  2. ^ "Timetable Nagaoka up (2018.3-)" (PDF). Retrieved March 19, 2018.
  3. ^ "Timetable Nagaoka down (2018.3-)" (PDF). Retrieved March 19, 2018.
  4. ^ Electric Railway Journal, June 20, 1914, Electrification of the Usui-Toge Railway, Japan, pg. 1393, https://archive.org/stream/electricrailway431914newy/electricrailway431914newy#page/1393/mode/1up/search/power+company
  5. ^ Osano, Kagetoshi (March 2015). 北陸新幹線並行在来線各社の姿 [Guide to companies operating conventional lines alongside the Hokuriku Shinkansen]. Tetsudō Daiya Jōhō Magazine (in Japanese). Vol. 44, no. 371. Japan: Kōtsū Shimbun. pp. 28–33.
  6. ^ Wakuda, Yasuo (1993). 私鉄史ハンドブック [Private Railways History Handbook] (in Japanese). Tokyo: Denkisha Kenkyūkai. p. 43. ISBN 4-88548-065-5.

External links

  • Stations of the Shin'etsu Main Line (Gumma) (JR East) (in Japanese)
  • Stations of the Shin'etsu Main Line (Nagano/Niigata) (JR East) (in Japanese)

shin, etsu, main, line, this, article, needs, additional, citations, verification, please, help, improve, this, article, adding, citations, reliable, sources, unsourced, material, challenged, removed, find, sources, news, newspapers, books, scholar, jstor, jul. This article needs additional citations for verification Please help improve this article by adding citations to reliable sources Unsourced material may be challenged and removed Find sources Shin etsu Main Line news newspapers books scholar JSTOR July 2014 Learn how and when to remove this template message The Shinetsu Main Line Japanese 信越本線 Japanese pronunciation Shin etsu honsen is a railway line consisting of three geographically separated sections operated by the East Japan Railway Company JR East in Japan It was originally one continuous line connecting Takasaki and Niigata via Nagano Since the opening and later extension of the Hokuriku Shinkansen sections running in parallel have either been abandoned or transferred to third sector railway companies Shinetsu Main LineA 115 series train Ōmigawa Kujiranami OverviewNative name信越本線StatusOperationalLocaleGunma Nagano and Niigata prefecturesServiceOperator s East Japan Railway Company JR East HistoryOpenedStages between 1885 138 years ago 1885 and 1904 119 years ago 1904 ClosedYokokawa Karuizawa 1 October 1997 Karuizawa Shinonoi 1 October 1997 Shinano Railway Line Nagano Naoetsu 14 March 2015 Kita Shinano Line ETR Myōkō Haneuma Line TechnicalLine length175 3 km 108 9 mi Track gauge1 067 mm 3 ft 6 in Electrification1 500 V DC overhead catenaryRoute mapMap LegendRed Shin etsu Main LineBlue Shinano Railway Line Kita Shinano Line and Myōkō Haneuma LineRoute diagramLegend1 Takasaki YokokawaJōetsu Shinkansen Takasaki LineJōshin Dentetsu Jōshin Line0 0 TakasakiJōetsu LineFormer Tobu Takasaki Line2 4 Kita TakasakiJōetsu ShinkansenHokuriku Shinkansen6 4 Gumma Yawata10 6 Annaka17 6 Isobe22 7 Matsuida Since 1962Matsuida Until 196223 9 Nishi Matsuida29 7 YokokawaUsui Horsecar31 5 Maruyama Signal Box Until 196635 8 Kumanotaira Signal Box Until 199740 1 Yagasaki Signal Box Until 1966Former Kusakaru Dentetsu40 9 KaruizawaHokuriku Shinkansen Shinano Railway Line2 Shinonoi NaganoHokuriku Shinkansen Shinano Railway LineShinonoi Line0 0 Shinonoi2 1 Imai4 3 Kawanakajima5 9 Saigawa Signal Box Until 1935Saigawa6 4 AmoriZenkōji Hakuba DentetsuFormer South Nagano Line9 3 NaganoNagano Electric RailwayHokuriku Shinkansen Shinano Railway Kita Shinano Line3 Naoetsu NiigataETR Myōkō Haneuma LineETR Nihonkai Hisui Line0 0 Naoetsu Since 18990 2 Naoetsu Until 18991 4 Naoetsu Port Until 1959Sekigawa0 8 Kasuga Shinden Until 19062 7 KuroiKubiki Railway Line7 1 SaigataHokuetsu Express Hokuhoku Line9 4 Dosokohama11 2 Katamachi14 0 Jogehama17 6 Kakizaki21 2 Takehana Signal Box Until 197323 5 Yoneyama27 4 Kasashima29 6 Oumigawa32 6 Kujiranami36 3 KashiwazakiEchigo Line39 3 Ibarame42 2 Yasuda44 8 Kitajo48 1 Echigo Hirota50 8 NagatoriTsukayama Tunnel53 9 Nishi Tsukayama Signal Box Until 196755 8 TsukayamaNishi Shibuumikawa Until 1900Higashi Shibuumikawa Until 190060 5 Echigo IwatsukaFormer Echigo Kotsu Nagaoka Line63 3 RaikōjiShinano River67 4 MaekawaJōetsu Line70 0 Miyauchi71 4 Minami Nagaoka Freight TerminalJōetsu Shinkansen73 0 Nagaoka75 5 Kita Nagaoka79 9 Oshikiri82 0 Kariyada Signal Box Until 194584 4 Mitsuke88 5 Obiori91 1 Tōkōji94 6 SanjōYahiko Line96 2 Higashi SanjōFormer Yahiko Line100 0 Honai103 8 KamoKanbara Railway Line107 9 Hanyuda111 1 Tagami114 8 Yashiroda117 9 FurutsuBanetsu West Line121 1 NiitsuUetsu Main Line122 6 Satsukino124 9 Ogikawa129 8 Kameda132 20 0 Echigo IshiyamaHakushin LineHigashi Niigata2 4 Niigata Freight Terminal134 40 0 Kami Nuttari Signal Box 2 1 Yakejima3 8 East Niigata Port5 5 Ōgata Until 1941136 20 0 Nuttari Until 20101 4 Niigata Port Until 1986136 31 9 Niigata Since 1958138 1 Niigata Until 19584 3 Bandai Until 1965Jōetsu ShinkansenEchigo LineThe name of the line refers to the old names for Nagano and Niigata prefectures Shinano Japanese 信濃 and Echigo Japanese 越後 The abandoned section through the Usui Pass was famous for its steep 66 7 6 67 gradient 1 Contents 1 Sections 2 Services 2 1 Takasaki Yokokawa 2 2 Shinonoi Nagano 2 3 Naoetsu Niigata 3 Stations 3 1 Takasaki Yokokawa 3 2 Yokokawa Shinonoi 3 3 Shinonoi Nagano 3 4 Nagano Naoetsu 3 5 Naoetsu Niigata 4 Rolling Stock 4 1 Present 4 1 1 Takasaki Yokokawa 4 1 2 Shinonoi Nagano 4 1 3 Naoetsu Niigata 4 2 Former 4 2 1 Takasaki Yokokawa 4 2 2 Naoetsu Niigata 5 History 5 1 Double tracking 5 2 Electrification 5 3 Separation into sections 5 4 Former connecting lines 6 References 7 External linksSections EditSee also Separation into sections From 14 March 2015 the line consists of the following three sections Takasaki Yokokawa 29 7 km in Gunma Prefecture Shinonoi Nagano 9 3 km in Nagano Prefecture Naoetsu Niigata 136 3 km in Niigata PrefectureThere are three small freight branches from Echigo Ishiyama Station to Niigata Freight Terminal from Kami Nuttari Junction to Nuttari Station and from Kami Nuttari Junction to Higashi Niigata kō Station Services EditTakasaki Yokokawa Edit Local 1 or 2 trains per hour Excursion train SL Gunma Yokokawa and SL YOGISHA YokokawaShinonoi Nagano Edit All trains run through on the Shinonoi Line or the Shinano Railway Line Naoetsu Niigata Edit Stations of Shin etsu Main Line between Naoetsu and Niigata Limited express RapidAs of 17 March 2018 update the following services are operated 2 3 Name Route Service frequency daily Limited Express Shirayuki Jōetsumyōkō Arai Naoetsu Niigata 5 return tripsRapid Ohayo Shinetsu Naoetsu Niigata 1 down tripRapid Rakuraku Train Shinetsu Naoetsu Niigata 1 up tripRapid Arai Naoetsu Niigata 1 return tripNaoetsu Nagaoka 2 down trips1 up tripNagaoka Niigata 1 return tripLocal Naoetsu Nagaoka every 60 120 minutes Nagaoka Niitsu every 60 minutes every 20 minutes during peaks Niitsu Niigata every 20 minutes every 5 10 minutes during peaks Excursion train Joyful Train Koshino Shu KuraStations EditTakasaki Yokokawa Edit Station Japanese Distance km SL Connections LocationTakasaki 高崎 0 0 Joetsu Shinkansen Hokuriku Shinkansen Takasaki Line Hachikō Line Jōetsu Line Agatsuma Line 1 Ryōmō Line 1 Joshin Dentetsu Joshin Line Takasaki Gunma PrefectureKita Takasaki 北高崎 2 4 Gumma Yawata 群馬八幡 6 4 Annaka 安中 10 6 AnnakaIsobe 磯部 17 6 Matsuida 松井田 22 7 Nishi Matsuida 西松井田 23 9 Yokokawa 横川 29 7 JR Bus Kanto Usui Line a b Although the official terminus of the Ryōmō Line is at Shin Maebashi and that of the Agatsuma Line is at Shibukawa trains on both lines run through to Takasaki Yokokawa Shinonoi Edit The section between Yokokawa and Karuizawa was closed and the section between Karuizawa and Shinonoi was transferred to the ownership of the third sector railway operator Shinano Railway from 1 October 1997 with the opening of the Hokuriku Shinkansen Nagano Shinkansen between Takasaki and Nagano Shinonoi Nagano Edit Station Japanese Distance km Connections LocationShinonoi 篠ノ井 0 0 Shinonoi Line through service Shinano Railway Line Nagano Nagano PrefectureImai 今井 2 1 Kawanakajima 川中島 4 3 Amori 安茂里 6 4 Nagano 長野 9 3 Hokuriku Shinkansen Shinano Railway Kita Shinano Line Iiyama Line 1 Nagano Electric Railway Although the official terminus of the Iiyama Line is at Toyono trains on the line run through to Nagano Nagano Naoetsu Edit The section between Nagano and Naoetsu was transferred to the ownership of the third sector railway operators Shinano Railway and Echigo Tokimeki Railway from 14 March 2015 with the opening of the Hokuriku Shinkansen extension north of Nagano Naoetsu Niigata Edit A Limited Express Shirayuki B Rapid Ohayo Shinetsu C Rapid Rakuraku Train Shinetsu D Rapid Trains stop at stations marked O skip at stations marked Station Japanese Distance km A B C D Connections LocationNaoetsu 直江津 84 3 O O O O ETR Myōkō Haneuma Line ETR Nihonkai Hisui Line Jōetsu Niigata PrefectureKuroi 黒井 87 0 Saigata 犀潟 91 4 O Hokuhoku LineDosokohama 土底浜 93 7 Katamachi 潟町 95 5 Jōgehama 上下浜 98 3 Kakizaki 柿崎 101 9 O O O O Yoneyama 米山 107 8 KashiwazakiKasashima 笠島 111 7 Ōmigawa 青海川 113 9 Kujiranami 鯨波 116 9 Kashiwazaki 柏崎 120 6 O O O O Echigo LineIbarame 茨目 123 6 Yasuda 安田 126 5 Kitajō 北条 129 1 Echigo Hirota 越後広田 132 4 Nagatori 長鳥 135 1 Tsukayama 塚山 140 1 NagaokaEchigo Iwatsuka 越後岩塚 144 8 Raikōji 来迎寺 147 6 O O O Maekawa 前川 151 7 Miyauchi 宮内 154 3 O O O Jōetsu LineMinami NagaokaFreight Terminal 南長岡 155 7 Nagaoka 長岡 157 3 O O O O Jōetsu ShinkansenKita Nagaoka 北長岡 159 8 Oshikiri 押切 164 2 Mitsuke 見附 168 7 O O O O MitsukeObiori 帯織 172 8 SanjōTōkōji 東光寺 175 4 Sanjō 三条 178 9 O O Higashi Sanjō 東三条 180 5 O O O O Yahiko LineHonai 保内 184 3 Kamo 加茂 188 1 O O O O KamoHanyuda 羽生田 192 2 TagamiTagami 田上 195 4 Yashiroda 矢代田 199 1 O O Akiha ku NiigataFurutsu 古津 202 2 Niitsu 新津 205 4 O O O O Uetsu Main Line Banetsu West LineSatsukino さつき野 206 9 Ogikawa 荻川 209 2 Kameda 亀田 214 1 O Kōnan ku NiigataEchigo Ishiyama 越後石山 216 5 Higashi ku NiigataNiigata 新潟 220 6 O O O O Jōetsu Shinkansen Hakushin Line Echigo Line Chuō ku NiigataRolling Stock EditPresent Edit Takasaki Yokokawa Edit 211 series 4 6 car DC EMUsShinonoi Nagano Edit 115 series 2 3 car DC EMUs Shinano Railway 211 series 3 car DC EMUs E127 100 series 2 car DC EMUs 383 series 6 car DC EMUs Shinano Naoetsu Niigata Edit 115 series 3 car DC EMUs rapid only E129 series 2 4 car DC EMUs since December 2014 ET127 series 2 car DC EMUs Naoetsu Nagaoka late night early morning only E653 1100 series 4 car DC AC EMUs Shirayuki Ohayo Shinetsu Rakuraku Train Shinetsu 211 series in Takasaki area Isobe Matsuida Shinano Railway 115 series 211 series in Nagano area E127 100 series 115 series in Niigata area Furutsu Niitsu E129 series Nagatori Tsukayama E653 1100 series Naoetsu Station Former Edit Takasaki Yokokawa Edit 115 series until March 2018 107 series until September 2017 Naoetsu Niigata Edit 485 series Until March 2017 Hokuetsu Kubikino Ohayo Shinetsu Rakuraku Train Shinetsu Moonlight Echigo Minori Hakuchō etc 489 series Noto etc 583 series Until January 2013 Kitaguni 181 series 183 series Toki etc 165 series 70 series 115 series Yokokawa Station 107 series Gumma Yawata Annaka 485 1000 series Hokuetsu Naoetsu Station History Edit Abt rack railway loco used on the Usui Pass line note the shoe ahead of the nearest wheel to collect power via a third rail The Japanese Government Railways opened the Takasaki to Yokokawa section in 1885 the Naoetsu to Sekiyama section the following year and the Sekiyama Nagano Karuizawa section in 1888 In order to surmount the 552 metre altitude difference between Yokokawa and Karuizawa which are 10 km apart it then constructed an Abt rack section through the Usui Pass which opened in 1893 and was double tracked for 1 km from Karuizawa to the top of the rack section A horse drawn tramway operated between Yokokawa and Karuizawa until the rack section opened An electric train with both head and center locomotives in 1914 The Hokuetsu Railway opened the Naoetsu to Nagaoka section in 1897 extending the line to Niigata in 1904 That company was nationalised in 1907 In 1909 the Imperial Japanese Railway authorities invited bids for the electrification of the route A German company was selected to provide the engines and General Electric supplied the turbines at the power station In 1912 the rack section was electrified using third rail at 600 V DC this being the first use of this method in Japan The electrification allowed for the use of faster and longer trains which reduced journey times and also pollution from the steam engines 4 A link to archival footage of the rack section operation is available here Double tracking Edit The Karuizawa to Nagano section was double tracked between 1917 and 1920 with the Nagaoka to Miyauchi section double tracked in 1931 and the Niitsu Kamo section in 1944 Double tracking of the remainder of the Niigata to Naoetsu line was undertaken in sections between 1958 and 1973 Double tracking of the remainder of the Takasaki to Kaminagano line was undertaken in sections between 1963 and 1973 commencing with the replacement of the rack mechanism with an adhesion only electrified 1 500 V DC catenary operation on the 1 in 15 6 7 grade The rack equipment was initially kept as a contingency and removed two months after the adhesion only operation commenced and had proved its reliability The Kurohime to Myoko Kogen section was double tracked in conjunction with a realignment in 1980 The Mure to Kurohime section was also realigned and prepared for double tracking including new double track size tunnels but the second track was not laid Electrification Edit The Miyauchi to Nagaoka section was electrified in 1947 at 1 500 V DC in conjunction with the electrification of the Joetsu Line with the Nagaoka to Niigata section electrified in 1962 the same year the Takasaki to Yokokawa section was commissioned to facilitate the extension to Nagano the following year via the new adhesion line through the Usui Pass mentioned above The Nagano to Naoetsu section was electrified in 1966 and extended to Miyauchi in 1969 Separation into sections Edit In 1997 following the opening of the Nagano Shinkansen the Yokokawa to Karuizawa section was closed and the Karuizawa to Shinonoi section transferred to the third sector Shinano Railway On 14 March 2015 following the extension of the Hokuriku Shinkansen to Kanazawa the Nagano to Naoetsu section was also spun off to the following two third sector operating companies owned primarily by the respective prefectures and municipalities 5 Shinano Railway Kita Shinano Line 37 3 km Nagano to Myōkō Kōgen Echigo Tokimeki Railway Myōkō Haneuma Line 37 7 km Myōkō Kōgen to Naoetsu Former connecting lines Edit The Kubiki Railway prior to 1940 A train on the Uomuna line in 1937 prior to its conversion to 1 067 mm gauge Note for the connections at stations between Karuizawa and Shinonoi see Shinano Railway Line Nagano Station The Zenkoji Hakuba Railway Co opened a 7 km line to Susohana Guchi in 1936 A proposal for the line to be extended to Hakuba on the Oito Line did not eventuate and the line closed in 1944 Kuroi Station The Kubiki Railway Co opened a 15 km 762 mm 2 ft 6 in gauge line to Uragawara between 1914 and 1916 with the line closing in 1971 Raikoji Station The Nagaoka Railway Co opened a 39 km line to Teradomari on the Echigo Line between 1915 and 1921 This company introduced Japan s first diesel railcar in 1928 and in 1951 electrified 31 km of the line at 750 V DC in 70 days completing the balance the following year Significant typhoon damage occurred in 1966 and in 1972 passenger services ceased between Raikoji and Nishinagaoka with the entire line becoming freight only three years later The line closed in 1995 The 13 km 762 mm 2 ft 6 in gauge Uonuma Railway to Nishiojiya was opened in 1911 and nationalised in 1922 It was converted to 1 067 mm 3 ft 6 in gauge in 1954 freight services ceased in 1960 and the line closed in 1984 Nagaoka Station The Tochio Railway opened a 27 km 762 mm 2 ft 6 in gauge line to Tochio and Yukyuzan between 1915 and 1924 6 The line was electrified at 600 V DC in 1948 with this being raised to 750 V DC in 1956 CTC signalling was commissioned in 1961 freight services ceased in 1967 and the line closed between 1973 and 1975 Higashi Sanjo Station The Echigo Railway Co opened the 8 km line to Echigo Nagasawa in 1927 and was nationalised two months later Freight services ceased in 1960 and the line closed in 1985 Kamo Station The Kanbara Railway Co operated a line to Gosen on the Ban etsu West Line from 1923 until 2002 References Edit Harada Katsumasa 1981 Technological independence and progress of standardization in the Japanese railways JETRO Retrieved January 2 2009 it was eventually decided to build the track at a steep grade of 66 7 1 000 Timetable Nagaoka up 2018 3 PDF Retrieved March 19 2018 Timetable Nagaoka down 2018 3 PDF Retrieved March 19 2018 Electric Railway Journal June 20 1914 Electrification of the Usui Toge Railway Japan pg 1393 https archive org stream electricrailway431914newy electricrailway431914newy page 1393 mode 1up search power company Osano Kagetoshi March 2015 北陸新幹線並行在来線各社の姿 Guide to companies operating conventional lines alongside the Hokuriku Shinkansen Tetsudō Daiya Jōhō Magazine in Japanese Vol 44 no 371 Japan Kōtsu Shimbun pp 28 33 Wakuda Yasuo 1993 私鉄史ハンドブック Private Railways History Handbook in Japanese Tokyo Denkisha Kenkyukai p 43 ISBN 4 88548 065 5 External links EditStations of the Shin etsu Main Line Gumma JR East in Japanese Stations of the Shin etsu Main Line Nagano Niigata JR East in Japanese Retrieved from https en wikipedia org w index php title Shin 27etsu Main Line amp oldid 1117783237, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.