Shell Pennsylvania Petrochemicals Complex

The Shell Pennsylvania Petrochemicals Complex[2][3][4] is an ethylene cracker plant located in Potter Township, Pennsylvania, United States, owned and operated by Shell Oil Company, the American subsidiary of supermajor oil company Royal Dutch Shell.[5] The plant is near the interchange of Interstate 376 and Pennsylvania Route 18, about 25 miles (40 km) from Pittsburgh. Operations began in November, 2022 [6] and will produce over a million tons per year of plastic pellets.[1]

Shell Pennsylvania Petrochemicals Complex
Construction of the Shell Pennsylvania Petrochemicals Complex along the Ohio River, Beaver County, Pennsylvania in January 2019
Shell ethylene cracker
LocationPotter Township, PA
Coordinates40°40′8.8926″N 80°20′11.349″W / 40.669136833°N 80.33648583°W / 40.669136833; -80.33648583
ProductsEthylene
Area386 acres[1]
Owner(s)Shell Oil Company

Site history edit

The location of the plant has had a long history as an industrial site. Both Horsehead Corporation and Koppers had plants on the site; Koppers unofficially incorporated the area as Kobuta. Before its industrial use, the area had been farmland owned by a local family, which included a private cemetery (albeit with unmarked graves) that was discovered after Shell purchased the property for cleanup; the company informed living descendants in the area of the skeletal remains.[7]

Shell involvement edit

Pennsylvania, Ohio and West Virginia engaged in a tax competition for the plant. In 2012, Pennsylvania structured a deal requiring Shell to invest at least $1 billion in Pennsylvania and create at least 2,500 construction jobs in exchange for a 25-year tax incentive of $66 million per year and tied to production, reducing Shell's tax by up to 20 per cent. The combined incentive could reach $1.65 billion.[8] Shell announced the Pennsylvania site on March 15, 2012.[9] The deal was one of the largest tax incentives in Pennsylvania's history.[1]

Shell began leasing the bulk of the property from Horsehead in 2012, which promptly closed the zinc plant on the site and began cleanup of the site in preparation of potentially opening a cracker plant on the site, which would be used to convert natural gas products into ethylene and then into plastics.[5][10] Shell had selected the site due to the ongoing Marcellus natural gas trend and the site's prime location within the Marcellus Shale.[1] By 2015, after executing several short-term lease extensions, Shell purchased the property outright from Horsehead, and subsequently purchasing other nearby properties, effectively absorbing all of Kobuta.[11][12]

Shell pledged with Beaver County officials on environmental cleanup regardless if it opened the proposed plant, and in a worst-case scenario prepare the area land for at least some sort of future industrial use if Shell decided not to build there. This included building a massive bridge over PA 18, commenced in 2015,[13] to connect both sides of the property without requiring an intersection along the route, as well as a Shell-funded rerouting of PA 18 and infrastructure improvements to I-376. Shell also gave a donation to the Beaver County recycling center so the center could extend its operating hours.[1]

Despite a downturn in oil prices, on June 7, 2016, Shell announced it would build the plant.[14][8] In a press release, Shell stated that 70% of polyethylene customers in North America are within a 700-mile (1,100 km) radius of Pittsburgh and that the location would be more cost-effective for its customers than at existing facilities along the Gulf Coast, which unlike North Central Appalachia are susceptible to the Atlantic hurricane season.[5]

Construction edit

 
The plant is pictured under construction during a visit by president Donald Trump in August 2019.

In 2015, Shell began preparing the site for future construction, moving 7.2 million cubic yards of dirt, building new bridges and a new rail line, and completing a total relocation of PA Route 18. Docking and bulkhead facilities to be used during construction were created by Alberici.[4] Construction on the plant itself began on November 8, 2017, and is expected to continue through the early 2020s.[15] As of 2019, over 5,000 employees are working on construction.[1] The site will have four processing units – three of which will be polyethelene reactors and one an ethane cracker – a natural gas power plant to support both the plant and the local electric grid, a 900 ft (270 m)-long cooling tower, a rail system with over 3,000 freight cars,[1] numerous loading facilities for both trains and trucks,[2] a water treatment plant, an office building, a laboratory, and an innovation center once construction is complete.[15]

On September 20, 2018, two of the world's largest cranes arrived on site. The largest of the pair is almost 700 feet (210 m) tall and can lift 3,500 tons at a time, and is used around the globe on megaprojects. The smaller of the two is 430 feet (130 m) tall and can lift about 2,300 tons in its current configuration.[16]

On September 25, 2018 in a conference with the Wall Street Journal, Ben van Beurden, the CEO of Royal Dutch Shell, said that the project is both within budget and ahead of schedule.[17]

The Pennsylvania Department of Environmental Protection approved two permits for a 97 miles (156 km)-long pipeline that will lead to the cracker plant on December 20, 2018.[18] Called the Falcon Ethane Pipeline, it will connect ethane sources in Houston, Pennsylvania, Scio, Ohio, and Cadiz, Ohio to the plant.[19] Construction on the pipeline began in March 2019.[20]

Shell will also construct an 85,000-square-foot innovation center at the site of the plant, including labs, a "Center of Expertise", and an application hall. It is expected to be operational at the same time as the rest of the site.[21]

Regional economic impact edit

The opening of the cracker plant could have an economic impact on both the immediate area and the Pittsburgh metropolitan area in general. In 2016, Shell estimated the project would create 6,000 construction jobs to build the site and 600 permanent jobs for employees working at the plant.[14] It could expand neighboring Center Township, which has already seen a hotel construction boom prior to the plant's site selection, as well keep the dwindling Beaver Valley Mall afloat.[22] The Penn-Beaver Hotel of Rochester, a building dating to the 1920s, once serving as a luxury hotel, was restored due to demand from plant construction.[23] Parts of Northern Lights Shopping Center in Economy have been demolished for redevelopment, more than likely due to the plant.[24] However, as of January 2020, Economy Borough has not been informed of any future redevelopment plans at the site.[25] In 2018 Mount Airy Casinos won the licensing to build a satellite casino just 12 miles (19 km) north of the cracker plant, although that plan was rejected by the Pennsylvania Gaming Control Board in November 2019 [26]

The plant could become a factor spurring long-delayed highway expansion projects. The Southern Beltway, which had already confirmed would be extending its second leg in 2020 from U.S. Route 22 to Interstate 79, moved the project up a year solely as a result of the proposed plant.[27]

Project opposition edit

In late 2015, a group of environmentalists submitted an appeal to Pennsylvania's Environmental Hearing Board to challenge the air quality permit that was granted for the proposed plant; the group argued that the state should have required stricter monitoring requirements for fugitive pollutant emissions from the plant.[28]

The state of Pennsylvania will allow the factory to release 2.2 million tons of carbon dioxide each year. Shell has stated they believe the plant's emissions will be below that level.[1]

Residents have also expressed concerns about the network of pipelines that will carry ethane to the plant, as existing pipelines have already caused problems. In September 2018, a landslide caused by heavy rains caused the Revolution pipeline, operated by Sunoco parent Energy Transfer Partners, to explode. One house was destroyed, other homes and vehicles were damaged, power lines were downed, and roads were closed; no one was injured.[29][1][30]

In 2020, there were growing doubts and concerns about the realization of the plant as it will not be as profitable as expected, due to the fallen price for plastic, and contribute to global warming and plastic pollution on a large scale.[31]

In popular culture edit

Morgantown, West Virginia country-folk musician Charles Wesley Godwin wrote his song "Cranes of Potter" about the hypothetical backstory of the woman whose buried bones were found during excavation for the complex, which he saw driving from West Virginia to his studio in Pennsylvania.[32]

References edit

  1. ^ a b c d e f g h i Corkery, Michael (August 12, 2019). "A Giant Factory Rises to Make a Product Filling Up the World: Plastic". The New York Times. Retrieved August 12, 2019.
  2. ^ a b "Remarks by President Trump During Tour of the Shell Pennsylvania Petrochemicals Complex | Monaca, PA". whitehouse.gov. August 13, 2019. Retrieved August 18, 2019 – via National Archives.
  3. ^ Fadulu, Lola; Haberman, Maggie (August 13, 2019). "At Chemical Plant Under Construction, Trump Builds List of Grievances". The New York Times. Retrieved August 18, 2019.
  4. ^ a b "Shell Pennsylvania Petrochemicals Complex – Early Works". Alberici. Retrieved August 18, 2019.
  5. ^ a b c Shell takes final investment decision to build a new petrochemicals complex in Pennsylvania, US Royal Dutch Shell (June 7, 2016)
  6. ^ "Shell's ethane cracker, a mammoth plastics plant near Pittsburgh, begins operations". November 15, 2022.
  7. ^ Investigation underway to identify bones found on Shell site The Beaver County Times (August 20, 2015)
  8. ^ a b Bumsted, Brad (June 7, 2016). "Pennsylvania tax incentive plan played major role in luring Shell cracker plant". Pittsburgh Tribune-Review. Retrieved September 19, 2017.
  9. ^ "What's An Ethane Cracker? (article list)". NPR. Retrieved September 19, 2017.
  10. ^ Shell to build billion-dollar 'cracker' in Beaver County Pittsburgh Post-Gazette (March 15, 2012)
  11. ^ Shell buys Horsehead property for $13.5 million for proposed ethane plant Pittsburgh Post-Gazette (June 15, 2015)
  12. ^ Shell buys former Kobuta Hotel property in Beaver County Pittsburgh Business Times (March 24, 2016)
  13. ^ Stonesifer, Jared (August 30, 2015). "Shell Chemicals starts building bridge over Route 18 in Potter Township". The Beaver County Times. Retrieved July 23, 2016.
  14. ^ a b The Beaver County Times (June 7, 2016)
  15. ^ a b Stonesifer, Jared. "Shell officially starts construction on $6 billion ethane cracker plant". The Times. Retrieved February 12, 2019.
  16. ^ Pennsylvania, Jared StonesiferGateHouse Media. "Two of world's largest cranes come to Pennsylvania construction site". Athens Banner-Herald. Retrieved February 12, 2019.
  17. ^ Stonesifer, Jared. "Shell CEO: Cracker plant project ahead of schedule, within budget". The Times. Retrieved February 12, 2019.
  18. ^ "DEP approves ethane pipeline to Shell's cracker in Beaver County". StateImpact Pennsylvania. December 20, 2018. Retrieved February 12, 2019.
  19. ^ "Falcon Ethane Pipeline System". www.shell.us. Retrieved February 12, 2019.
  20. ^ Stonesifer, Jared (March 14, 2019). "Shell's Falcon ethane pipeline enters construction phase". The Times. Retrieved August 3, 2019.
  21. ^ Stonesifer, Jared. "Shell to build innovation center at Potter Township cracker plant site". The Times. Retrieved February 12, 2019.
  22. ^ Officials: Shell's decision to build here will be felt in Beaver County for decades The Beaver County Times (06/07/2016)
  23. ^ "Rochester Hotel - Main Site". Rochester Hotel. Retrieved September 24, 2021.
  24. ^ Kurutz, Daveen Rae. "Northern Lights owners planning to demolish part of shopping plaza". The Times.
  25. ^ Demolition resumes at Northern Lights
  26. ^ Denied: Big Beaver mini-casino denied by Pa. Gaming Control Board
  27. ^ "Corbett breaks ground for new Southern Beltway leg". Pittsburgh Post-Gazette. May 12, 2014.
  28. ^ Frazier, Reid (August 6, 2015). "Enviro groups appeal air permit for Shell's ethane cracker". StateImpact Pennsylvania. National Public Radio. Retrieved August 14, 2016.
  29. ^ Phillips, Susan; Frazier, Reid (September 10, 2018). "Natural gas pipeline blast in Beaver County prompts evacuation". StateImpact Pennsylvania. NPR. Retrieved August 12, 2019.
  30. ^ Sandoval, Polo (September 10, 2018). "Natural gas line explosion leads to evacuations in western Pennsylvania town". CNN. Retrieved August 12, 2019.
  31. ^ "Shell's Plastics Plant Outside Pittsburgh Has Suddenly Become a Riskier Bet, a Study Concludes". InsideClimate News. June 3, 2020. Retrieved October 13, 2020.
  32. ^ Tady, Scott (December 29, 2021). "Charles Wesley Godwin's West Virginia roots (and Beaver County ties) taking him far". Beaver County Times. Retrieved July 19, 2022.

shell, pennsylvania, petrochemicals, complex, this, article, needs, updated, please, help, update, this, article, reflect, recent, events, newly, available, information, february, 2023, ethylene, cracker, plant, located, potter, township, pennsylvania, united,. This article needs to be updated Please help update this article to reflect recent events or newly available information February 2023 The Shell Pennsylvania Petrochemicals Complex 2 3 4 is an ethylene cracker plant located in Potter Township Pennsylvania United States owned and operated by Shell Oil Company the American subsidiary of supermajor oil company Royal Dutch Shell 5 The plant is near the interchange of Interstate 376 and Pennsylvania Route 18 about 25 miles 40 km from Pittsburgh Operations began in November 2022 6 and will produce over a million tons per year of plastic pellets 1 Shell Pennsylvania Petrochemicals ComplexConstruction of the Shell Pennsylvania Petrochemicals Complex along the Ohio River Beaver County Pennsylvania in January 2019Shell ethylene crackerLocationPotter Township PACoordinates40 40 8 8926 N 80 20 11 349 W 40 669136833 N 80 33648583 W 40 669136833 80 33648583ProductsEthyleneArea386 acres 1 Owner s Shell Oil Company Contents 1 Site history 2 Shell involvement 3 Construction 4 Regional economic impact 5 Project opposition 6 In popular culture 7 ReferencesSite history editThe location of the plant has had a long history as an industrial site Both Horsehead Corporation and Koppers had plants on the site Koppers unofficially incorporated the area as Kobuta Before its industrial use the area had been farmland owned by a local family which included a private cemetery albeit with unmarked graves that was discovered after Shell purchased the property for cleanup the company informed living descendants in the area of the skeletal remains 7 Shell involvement editPennsylvania Ohio and West Virginia engaged in a tax competition for the plant In 2012 Pennsylvania structured a deal requiring Shell to invest at least 1 billion in Pennsylvania and create at least 2 500 construction jobs in exchange for a 25 year tax incentive of 66 million per year and tied to production reducing Shell s tax by up to 20 per cent The combined incentive could reach 1 65 billion 8 Shell announced the Pennsylvania site on March 15 2012 9 The deal was one of the largest tax incentives in Pennsylvania s history 1 Shell began leasing the bulk of the property from Horsehead in 2012 which promptly closed the zinc plant on the site and began cleanup of the site in preparation of potentially opening a cracker plant on the site which would be used to convert natural gas products into ethylene and then into plastics 5 10 Shell had selected the site due to the ongoing Marcellus natural gas trend and the site s prime location within the Marcellus Shale 1 By 2015 after executing several short term lease extensions Shell purchased the property outright from Horsehead and subsequently purchasing other nearby properties effectively absorbing all of Kobuta 11 12 Shell pledged with Beaver County officials on environmental cleanup regardless if it opened the proposed plant and in a worst case scenario prepare the area land for at least some sort of future industrial use if Shell decided not to build there This included building a massive bridge over PA 18 commenced in 2015 13 to connect both sides of the property without requiring an intersection along the route as well as a Shell funded rerouting of PA 18 and infrastructure improvements to I 376 Shell also gave a donation to the Beaver County recycling center so the center could extend its operating hours 1 Despite a downturn in oil prices on June 7 2016 Shell announced it would build the plant 14 8 In a press release Shell stated that 70 of polyethylene customers in North America are within a 700 mile 1 100 km radius of Pittsburgh and that the location would be more cost effective for its customers than at existing facilities along the Gulf Coast which unlike North Central Appalachia are susceptible to the Atlantic hurricane season 5 Construction edit nbsp The plant is pictured under construction during a visit by president Donald Trump in August 2019 In 2015 Shell began preparing the site for future construction moving 7 2 million cubic yards of dirt building new bridges and a new rail line and completing a total relocation of PA Route 18 Docking and bulkhead facilities to be used during construction were created by Alberici 4 Construction on the plant itself began on November 8 2017 and is expected to continue through the early 2020s 15 As of 2019 over 5 000 employees are working on construction 1 The site will have four processing units three of which will be polyethelene reactors and one an ethane cracker a natural gas power plant to support both the plant and the local electric grid a 900 ft 270 m long cooling tower a rail system with over 3 000 freight cars 1 numerous loading facilities for both trains and trucks 2 a water treatment plant an office building a laboratory and an innovation center once construction is complete 15 On September 20 2018 two of the world s largest cranes arrived on site The largest of the pair is almost 700 feet 210 m tall and can lift 3 500 tons at a time and is used around the globe on megaprojects The smaller of the two is 430 feet 130 m tall and can lift about 2 300 tons in its current configuration 16 On September 25 2018 in a conference with the Wall Street Journal Ben van Beurden the CEO of Royal Dutch Shell said that the project is both within budget and ahead of schedule 17 The Pennsylvania Department of Environmental Protection approved two permits for a 97 miles 156 km long pipeline that will lead to the cracker plant on December 20 2018 18 Called the Falcon Ethane Pipeline it will connect ethane sources in Houston Pennsylvania Scio Ohio and Cadiz Ohio to the plant 19 Construction on the pipeline began in March 2019 20 Shell will also construct an 85 000 square foot innovation center at the site of the plant including labs a Center of Expertise and an application hall It is expected to be operational at the same time as the rest of the site 21 Regional economic impact editThe opening of the cracker plant could have an economic impact on both the immediate area and the Pittsburgh metropolitan area in general In 2016 Shell estimated the project would create 6 000 construction jobs to build the site and 600 permanent jobs for employees working at the plant 14 It could expand neighboring Center Township which has already seen a hotel construction boom prior to the plant s site selection as well keep the dwindling Beaver Valley Mall afloat 22 The Penn Beaver Hotel of Rochester a building dating to the 1920s once serving as a luxury hotel was restored due to demand from plant construction 23 Parts of Northern Lights Shopping Center in Economy have been demolished for redevelopment more than likely due to the plant 24 However as of January 2020 Economy Borough has not been informed of any future redevelopment plans at the site 25 In 2018 Mount Airy Casinos won the licensing to build a satellite casino just 12 miles 19 km north of the cracker plant although that plan was rejected by the Pennsylvania Gaming Control Board in November 2019 26 The plant could become a factor spurring long delayed highway expansion projects The Southern Beltway which had already confirmed would be extending its second leg in 2020 from U S Route 22 to Interstate 79 moved the project up a year solely as a result of the proposed plant 27 Project opposition editIn late 2015 a group of environmentalists submitted an appeal to Pennsylvania s Environmental Hearing Board to challenge the air quality permit that was granted for the proposed plant the group argued that the state should have required stricter monitoring requirements for fugitive pollutant emissions from the plant 28 The state of Pennsylvania will allow the factory to release 2 2 million tons of carbon dioxide each year Shell has stated they believe the plant s emissions will be below that level 1 Residents have also expressed concerns about the network of pipelines that will carry ethane to the plant as existing pipelines have already caused problems In September 2018 a landslide caused by heavy rains caused the Revolution pipeline operated by Sunoco parent Energy Transfer Partners to explode One house was destroyed other homes and vehicles were damaged power lines were downed and roads were closed no one was injured 29 1 30 In 2020 there were growing doubts and concerns about the realization of the plant as it will not be as profitable as expected due to the fallen price for plastic and contribute to global warming and plastic pollution on a large scale 31 In popular culture editMorgantown West Virginia country folk musician Charles Wesley Godwin wrote his song Cranes of Potter about the hypothetical backstory of the woman whose buried bones were found during excavation for the complex which he saw driving from West Virginia to his studio in Pennsylvania 32 References edit a b c d e f g h i Corkery Michael August 12 2019 A Giant Factory Rises to Make a Product Filling Up the World Plastic The New York Times Retrieved August 12 2019 a b Remarks by President Trump During Tour of the Shell Pennsylvania Petrochemicals Complex Monaca PA whitehouse gov August 13 2019 Retrieved August 18 2019 via National Archives Fadulu Lola Haberman Maggie August 13 2019 At Chemical Plant Under Construction Trump Builds List of Grievances The New York Times Retrieved August 18 2019 a b Shell Pennsylvania Petrochemicals Complex Early Works Alberici Retrieved August 18 2019 a b c Shell takes final investment decision to build a new petrochemicals complex in Pennsylvania US Royal Dutch Shell June 7 2016 Shell s ethane cracker a mammoth plastics plant near Pittsburgh begins operations November 15 2022 Investigation underway to identify bones found on Shell site The Beaver County Times August 20 2015 a b Bumsted Brad June 7 2016 Pennsylvania tax incentive plan played major role in luring Shell cracker plant Pittsburgh Tribune Review Retrieved September 19 2017 What s An Ethane Cracker article list NPR Retrieved September 19 2017 Shell to build billion dollar cracker in Beaver County Pittsburgh Post Gazette March 15 2012 Shell buys Horsehead property for 13 5 million for proposed ethane plant Pittsburgh Post Gazette June 15 2015 Shell buys former Kobuta Hotel property in Beaver County Pittsburgh Business Times March 24 2016 Stonesifer Jared August 30 2015 Shell Chemicals starts building bridge over Route 18 in Potter Township The Beaver County Times Retrieved July 23 2016 a b Shell confirms it will build cracker plant in Potter Twp The Beaver County Times June 7 2016 a b Stonesifer Jared Shell officially starts construction on 6 billion ethane cracker plant The Times Retrieved February 12 2019 Pennsylvania Jared StonesiferGateHouse Media Two of world s largest cranes come to Pennsylvania construction site Athens Banner Herald Retrieved February 12 2019 Stonesifer Jared Shell CEO Cracker plant project ahead of schedule within budget The Times Retrieved February 12 2019 DEP approves ethane pipeline to Shell s cracker in Beaver County StateImpact Pennsylvania December 20 2018 Retrieved February 12 2019 Falcon Ethane Pipeline System www shell us Retrieved February 12 2019 Stonesifer Jared March 14 2019 Shell s Falcon ethane pipeline enters construction phase The Times Retrieved August 3 2019 Stonesifer Jared Shell to build innovation center at Potter Township cracker plant site The Times Retrieved February 12 2019 Officials Shell s decision to build here will be felt in Beaver County for decades The Beaver County Times 06 07 2016 Rochester Hotel Main Site Rochester Hotel Retrieved September 24 2021 Kurutz Daveen Rae Northern Lights owners planning to demolish part of shopping plaza The Times Demolition resumes at Northern Lights Denied Big Beaver mini casino denied by Pa Gaming Control Board Corbett breaks ground for new Southern Beltway leg Pittsburgh Post Gazette May 12 2014 Frazier Reid August 6 2015 Enviro groups appeal air permit for Shell s ethane cracker StateImpact Pennsylvania National Public Radio Retrieved August 14 2016 Phillips Susan Frazier Reid September 10 2018 Natural gas pipeline blast in Beaver County prompts evacuation StateImpact Pennsylvania NPR Retrieved August 12 2019 Sandoval Polo September 10 2018 Natural gas line explosion leads to evacuations in western Pennsylvania town CNN Retrieved August 12 2019 Shell s Plastics Plant Outside Pittsburgh Has Suddenly Become a Riskier Bet a Study Concludes InsideClimate News June 3 2020 Retrieved October 13 2020 Tady Scott December 29 2021 Charles Wesley Godwin s West Virginia roots and Beaver County ties taking him far Beaver County Times Retrieved July 19 2022 Retrieved from https en wikipedia org w index php title Shell Pennsylvania Petrochemicals Complex amp oldid 1188562787, wikipedia, wiki, book, books, library,