fbpx
Wikipedia

SeaRose FPSO

SeaRose FPSO is a floating production, storage and offloading vessel primarily located in the White Rose oil and gas field, approximately 350 kilometres (217 Nm) east-southeast off the coast of Newfoundland, Canada in the North Atlantic Ocean. The White Rose field is currently operated by Cenovus Energy (as of 2021, after its acquisition of Husky Energy), with a 60% ownership interest. Suncor Energy owns a 35% interest and Nalcor owning the remaining 5%.[2]

SeaRose FPSO coming into Belfast, Northern Ireland, United Kingdom on June 6th 2012
History
NameSeaRose FPSO
OwnerCenovus Energy, Suncor Energy, Nalcor
OperatorCenovus Energy
Port of registry
OrderedMarch 2002
Builder
LaunchedApril 2004
Identification
StatusOperational
Notes[1]
General characteristics
TypeFPSO
Tonnage
  • 93,984 GT
  • 40,132 NT
  • 150,000 DWT
Displacement187,100 long tons (190,102 t)
Length258 m (846 ft)
Beam46 m (151 ft)
Draught18.043 m (59.20 ft)
Propulsion
  • Wärtsilä 8L46B generators (7,800 kW)
  • Wärtsilä SCV95 gearboxes
  • Lips 5.5 m-diameter controllable pitch propellers
Speed12 knots (22 km/h; 14 mph)
Capacity
  • Oil storage: 940,000 bbl (149,000 m3)
  • Oil production: 140,000 bbl (22,000 m3)/day
  • Gas production: 180 million cu ft/d (5.1 million m3/d) at 1 bar.
Notes[1]

SeaRose is approximately 50 km (31 mi) east of the successful Hibernia field and the more recent Terra Nova field. All three fields are in the Jeanne d'Arc Basin on the eastern edge of the famous Grand Banks fishing territory.

SeaRose made her way from the Samsung Heavy Industries shipyard in Geoje South Korea to Marystown, Newfoundland, for final preparation, in April 2004; a 14,000 nmi (26,000 km; 16,000 mi) trip that took two months. In August 2005 she left Marystown for her work duty at Cenovus Energy's White Rose oil field.

In January 2018, the C-NLOPB suspended White Rose operations because of Husky's failure to disconnect when an iceberg approached, contrary to Husky's ice management plan.[3]

As of March 2024, SeaRose was undergoing refit in dry dock in Belfast.

References edit

  1. ^ a b "SeaRose (30254)". Vessel Register for DNV. DNV. Retrieved 21 November 2010.
  2. ^ "Cenovus announces restart of West White Rose Project". www.cenovus.com. Retrieved 2023-08-10.
  3. ^ "SeaRose shut down after Husky reprimanded for iceberg close call | CBC News".

External links edit

  • SeaRose at Ship Technology
  • "SeaRose FPSO Husky’s White Rose floater preparing to make sail" from Ocean Resources
  • "SeaRose FPSO Arrives at White Rose Oil Field" from Rigzone
  • "Husky Energy's SeaRose FPSO Arrives in Marystown" at Rigzone
  • White Rose at Huskey Energy
  • White Rose field @ Offshore Technology

searose, fpso, floating, production, storage, offloading, vessel, primarily, located, white, rose, field, approximately, kilometres, east, southeast, coast, newfoundland, canada, north, atlantic, ocean, white, rose, field, currently, operated, cenovus, energy,. SeaRose FPSO is a floating production storage and offloading vessel primarily located in the White Rose oil and gas field approximately 350 kilometres 217 Nm east southeast off the coast of Newfoundland Canada in the North Atlantic Ocean The White Rose field is currently operated by Cenovus Energy as of 2021 after its acquisition of Husky Energy with a 60 ownership interest Suncor Energy owns a 35 interest and Nalcor owning the remaining 5 2 SeaRose FPSO coming into Belfast Northern Ireland United Kingdom on June 6th 2012History NameSeaRose FPSO OwnerCenovus Energy Suncor Energy Nalcor OperatorCenovus Energy Port of registry Canada St John s Newfoundland and Labrador OrderedMarch 2002 BuilderSamsung Heavy Industries Geoje South Korea LaunchedApril 2004 IdentificationCall sign VOXS DNV ID 24492 IMO number 9274501 MMSI no 316317000 StatusOperational Notes 1 General characteristics TypeFPSO Tonnage93 984 GT 40 132 NT 150 000 DWT Displacement187 100 long tons 190 102 t Length258 m 846 ft Beam46 m 151 ft Draught18 043 m 59 20 ft PropulsionWartsila 8L46B generators 7 800 kW Wartsila SCV95 gearboxes Lips 5 5 m diameter controllable pitch propellers Speed12 knots 22 km h 14 mph CapacityOil storage 940 000 bbl 149 000 m3 Oil production 140 000 bbl 22 000 m3 day Gas production 180 million cu ft d 5 1 million m3 d at 1 bar Notes 1 SeaRose is approximately 50 km 31 mi east of the successful Hibernia field and the more recent Terra Nova field All three fields are in the Jeanne d Arc Basin on the eastern edge of the famous Grand Banks fishing territory SeaRose made her way from the Samsung Heavy Industries shipyard in Geoje South Korea to Marystown Newfoundland for final preparation in April 2004 a 14 000 nmi 26 000 km 16 000 mi trip that took two months In August 2005 she left Marystown for her work duty at Cenovus Energy s White Rose oil field In January 2018 the C NLOPB suspended White Rose operations because of Husky s failure to disconnect when an iceberg approached contrary to Husky s ice management plan 3 As of March 2024 SeaRose was undergoing refit in dry dock in Belfast References edit a b SeaRose 30254 Vessel Register for DNV DNV Retrieved 21 November 2010 Cenovus announces restart of West White Rose Project www cenovus com Retrieved 2023 08 10 SeaRose shut down after Husky reprimanded for iceberg close call CBC News External links editSeaRose at Ship Technology SeaRose FPSO Husky s White Rose floater preparing to make sail from Ocean Resources SeaRose FPSO Arrives at White Rose Oil Field from Rigzone Husky Energy s SeaRose FPSO Arrives in Marystown at Rigzone White Rose at Huskey Energy White Rose field Offshore Technology Retrieved from https en wikipedia org w index php title SeaRose FPSO amp oldid 1215963726, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.